RAIMONDI MRT111, 30m JIB & MRT144 32m JIB

21-27 DURHAM ST, MOUNT DRUITT 2770

GENERAL FOUNDATIONS 13. SPLICES IN REINFORCEMENT SHALL BE MADE


ONLY IN POSITIONS SHOWN OR OTHERWISE
1. READ THESE DRAWINGS IN CONJUNCTION WITH ALL OTHER APPROVED IN WRITING BY THE ENGINEER. LAPS
CONSULTANT'S DRAWINGS AND SPECIFICATIONS AND WITH OTHER SHALL BE IN ACCORDANCE WITH AS3600 AND
1. THE CRANE HAS BEEN DESIGNED TO BE SUPPORTED BY A PAD FOOTING NOT LESS THAN THE DEVELOPMENT LENGTH
WRITTEN INSTRUCTIONS AS MAY BE ISSUED.
ON SANDSTONE WITH AN ALLOWABLE BEARING CAPACITY OF 600kpa . FOR EACH BAR.
2. IF IN DOUBT ASK
2. FOOTINGS SHALL BE CONSTRUCTED AND BACKFILLED AS SOON AS 14. SITE BENDING OF DEFORMED REINFORCING
3. REFER ANY DISCREPANCY TO THE PROJECT MANAGER BEFORE
POSSIBLE FOLLOWING EXCAVATION. EXCAVATIONS SHALL BE KEPT FREE BARS SHALL BE DONE WITHOUT HEATING USING
PROCEEDING
OF PONDED WATER. MECHANICAL BENDING TOOLS. WELDING OF
4. CONSTRUCTION SHALL NOT COMMENCE UNTIL APPROVED BY THE
3. FOUNDATIONS HAVE BEEN DESIGNED IN ACCORDANCE WITH REINFORCEMENT SHALL NOT BE PERMITTED
RELEVANT AUTHORITY.
RECOMMENDATIONS MADE IN THE GEOTECHNICAL REPORT PREPARED UNLESS SHOWN ON THE STRUCTURAL
5. ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH
BY JK GEOTECHNICS (PROJECT: 30379SC) DATED 19th NOV 2018. DRAWINGS OR APPROVED BY THE ENGINEER.
THE RELEVANT AND CURRENT AUSTRALIAN STANDARDS AND THE
BUILDING CODE OF AUSTRALIA.
6. DO NOT SCALE THESE DRAWINGS FOR DIMENSIONS. CONCRETE SAFETY IN DESIGN
7. ALL SETOUT DIMENSIONS SHALL BE VERIFIED BY THE BUILDER ON SITE. 1. CONCRETE SHALL BE IN ACCORDANCE WITH AS3600 EXCEPT WHERE 1. NO UNUSUAL ASPECTS TO THE DESIGN HAVE
8. ALL LEVELS ARE IN METRES AND ALL DIMENSIONS ARE IN MILLIMETRES VARIED BY THE CONTRACT DOCUMENTS. BEEN IDENTIFIED.
U.N.O. 2. CONCRETE SUPPLY SHALL COMPLY WITH AS1379. PROJECT CONTROL
9. THESE DRAWINGS ARE THE COPYRIGHT OF AUSPACIFIC ENGINEERING TESTING SHALL BE CARRIED OUT.
AND MUST NOT BE USED, REPRODUCED OR COPIED, WHOLLY OR IN 3. CONCRETE STRENGTH AND COVER SHALL BE AS FOLLOWS:
PART, WITHOUT THE WRITTEN PERMISSION OF AUSPACIFIC
ENGINEERING. ALL RIGHTS RESERVED.
IMPORTANT!!!
TOWER CRANE PLEASE READ
1. CRANE TO BE ASSEMBLED AND OPERATED STRICTLY IN ACCORDANCE
WITHAS2550.1-2011, AS2550.4-2004, AS1418.1-2002, AS1418.4-2004 AND
THE MANUFACTURERS RECOMMENDATIONS BY EXPERIENCED AND 4. ADMIXTURES SHALL NOT BE USED U.N.O. OR APPROVED IN WRITING
QUALIFIED PERSONNEL 5. CONSTRUCTION JOINTS, WHERE NOT SHOWN SHALL BE LOCATED TO TO CERTIFY THE CRANE FOUNDATION AND TO
2. MAX RECOMMENDED OPERATIONAL WIND SPEED (INDUSTRY STANDARD) THE APPROVAL OF THE ENGINEER. ALLOW THE CRANE ERECTION WE REQUIRE THE
IS 15m/s 6. NO HOLES, CHASES OR EMBEDMENT OF PIPES OTHER THAN THOSE FOLLOWING:
3. NO SIGNAGE HAS BEEN ALLOWED FOR (EXCEPT MANUFACTURER SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE MADE IN CONCRETE
SPECIFIED WIND SAIL PLATES AS SPECIFIED IN THE CRANE MANUAL) MEMBERS WITHOUT THE PRIOR WRITTEN APPROVAL OF THE ENGINEER. 1. INSPECTION OF PAD FOOTING REINFORCEMENT
7. ALL CONCRETE SHALL BE COMPACTED WITH MECHANICAL VIBRATORS. BY AUSPACIFIC ENGINEERING PRIOR TO
8. THE FINISHED CONCRETE SHALL BE A DENSE HOMOGENEOUS MASS, CONCRETE PLACEMENT
DESIGN LOADS H
V
COMPLETELY FILLING THE FORMWORK THOROUGHLY EMBEDDING THE 2. CONCRETE TEST RESULTS
M REINFORCEMENT AND FREE OF STONE POCKETS ETC.
DESIGN LOADS IN ACCORDANCE WITH AS1418.4-2004, 9. CURING OF ALL CONCRETE SHALL BE ACHIEVED BY KEEPING SURFACES
AS1170.2-2011 AND CRANE MANUAL COMPLETELY WET FOR A PERIOD OF 5 DAYS, AND PREVENTION OF LOSS
OF MOISTURE FOR A TOTAL OF 10 DAYS FOLLOWED BY A GRADUAL
DRYING OUT. SCHEDULE OF DRAWINGS
TEMPORARY WORKS 10. REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY AND NOT
NECESSARILY IN TRUE PROJECTION.
No. TITLE
1. THE BUILDER SHALL PROVIDE SCAFFOLDING, FORMWORK, TEMPORARY 11. ALL REINFORCEMENTS SHALL BE FIRMLY SUPPORTED ON SOLID CHAIRS S001 GENERAL NOTES
BRACING, SHORING, PROPPING AND THE LIKE TO KEEP THE BUILDING AT NOT GREATER THAN 800 CENTRES BOTH WAYS. BARS SHALL BE TIED
WORKS AND EXCAVATIONS STABLE AT ALL TIMES. AT ALTERNATIVE INTERSECTIONS. S002 CRANE ELEVATION
2. THE BUILDER IS RESPONSIBLE FOR THE ADEQUACY OF ALL TEMPORARY 12. ALL REINFORCEMENT SHALL BE AS FOLLOWS TO AS4671 N GRADE 500
WORKS AND WHERE NECESSARY IS TO ENGAGE AN ENGINEER FOR ITS S003 CRANE FOOTING PLAN & SECTION MRT111
13. NORMAL DUCTILITY DEFORMED BAR. R GRADE 250 NORMAL DUCTILITY
DESIGN AND CERTIFICATION. PLAIN ROUND BAR. S004 CRANE RADIUS PLAN

S005 CRANE FOOTING PLAN & SECTION MRT144