55
54
53
52
TOP OF SOIL NAIL WALL 2
F
51 50mm Ø WEEPHOLE AT 1.5m c/c
50 SPACING
49 TOP OF SOIL NAIL WALL 1 /
48
F
BASE OF SOIL NAIL WALL 2
47
46 50mm Ø WEEPHOLE AT 1.5m c/c (HOR.)
2
45 AND 2m c/c (VER.) SPACING
44
1 2
43 1
42
41
40 2
39
1 2
38
1
37
36
35 75mm Ø HORIZONTAL DRAIN FINISHED FORMATION
F
34
33
AT 3m c/c SPACING
32
31
100.000
113.470
123.470
-10.000
14.801
17.761
25.000
39.468
50.000
69.069
75.000
88.389
88.803
0.000
CHAINAGE (m)
39.215
43.109
43.088
43.036
42.932
42.856
42.719
42.677
42.581
42.578
40.682
38.400
TOP OF SOIL NAIL WALL 1 (m)
44.588
46.036
48.932
48.145
46.719
45.940
44.181
TOP OF SOIL NAIL WALL 2 (m)
37.215
37.109
37.088
37.036
36.932
36.856
36.719
36.677
36.581
36.578
36.497
36.400
FINISHED FORMATION LEVEL (m)