Beruflich Dokumente
Kultur Dokumente
ITP
NO DISCIPLINE ITP CODE DESCRIPTION ITP NO.
CODE
D02
Pre-installation checklist B I W RW
Alignment/plumness inspection B I W RW
Fit-up inspection C I RW RW
REMARKS
EXHIBIT-E FIELD INSPECTION REPORT DOC. CLASSIFICATION
ITP NO. :
INSPECTION GR. :
REPORT NO. :
SYSTEM NO. :
DATE :
BACK TO ITP
INSPECTION TYPE : WORK NO. :
FINAL VISUAL INSPECTION PUNCHLIST ITEM NO. :
(EQUIPMENT) AREA/LOCATION :
ITEM DESCRIPTION : SIGNATURE
INSPECTION NOTICE NO. : SUB-CONT CONTRACTOR CLIENT
CLIENT'S INSPECTOR : / / / / / /
CONTRACTOR'S INSPECTOR :
SUB-CONTRACTOR'S INSPECTOR :
DRAWING NO. (S) :
ACCEPTANCE CRITERIA :
COMMENTS
1. ELEVATION DEVIATION
Unit : mm
ORIENTATION ALLOWABLE ACTUAL
B
+3
C
COMMENT/SKETCH :
10
ATTACHMENT LIST
COMMENT/SKETCH :
1 SUPPORT BEAM
2 WEIR
3 DOWN COMER
4 DISTRIBUTOR
5 DEMISTER
6 SPRAY NOZZLE
10
COMMENTS
1 PLATFORM
2 HANDRAIL
3 LADDER
4 DAVIT
5 STAIRCASE/TREAD
10
COMMENTS
GROUTING CHECKLIST
ATTACHMENT LIST
COMMENTS/SKETCH :
ISOMETRIC DRAWING NUMBER JOINT NO. WELDER NO. RESULT ACC REP C-O
COMMENTS
LEGEND ACC : ACCEPTED N.A : NOT APPLICABLE REJ : REJECT
10
11
12
13
14
15
16
COMMENTS
ISOMETRIC DRAWING NUMBER JOINT NUMBER ACC REJ ACC REJ ACC REJ
COMMENTS
ATTACHMENT LIST
COMMENT/SKETCH :
1. CENTERING DEVIATION
90O
+3
180O
270O
2. ELEVATION DEVIATION
90O
+3
180O
270O
OO
A
270O 90O
B
C
180O
ORIENTATION
COMMENT/SKETCH :
7 Dress-up work (If necessary) have been completed and related work
have been inspected.
10
11
12
13
ATTACHMENT LIST
NO. DOCUMENT DESCRIPTION REMARKS
1
2
3
COMMENT/SKETCH :