Beruflich Dokumente
Kultur Dokumente
(BILL FOR LARGE INDUSTRIAL/SCHEDULE LP/HT-5 TARIFF CONSUMER) Available Security Deposit against
Office of Issue: Payment of this bill should be made at collection centre of 1.Electricity Consumption Rs. 0.00
Chief Account Officer(FM-W&M):
AEN(A-1,Alwar),JVVNL,Alwar Rs. 0.00
2.Meter Security Rs. 0.00
JVVNL PAN: AABCJ6373K AEN Mob No.: 0
GSTIN : 08AABCJ6373K1Z7 Phone No. : 27007707 3.CT/PT Security Rs.0.00
HSN CODE : 2716
(A) METER READING & CONSUMPTION: BU: ED End Date: ED Rebate: Reading Date: 09-Jun-2020
Billing KWH Cons. For DS KWH Cons. For NDS Net KWH Cons. to Bill at KWH Consp. For
Demand Av. P.F. Use Use Test Report Units LIP Rate Sundry Units Dr/Cr MIS Purpose
(1) Energy Charge (2) Fixed Charges on (3) Total (5) Net Total (6) Exceed Demand Power Factor S. Ch.
(4) Voltage Rebate
@ 0.000 Per KWH Billing Demand (1+2) (3-4) Ch. @ 0.00 % on Incentive @ 0.00
@ 0.00 %
Rs. @ 0.00 Per KVA Rs. Rs. (3) on (1) Rs.
Current Assessment
Current Assessment
Total
N.D. E.D. W.C.C. Urban Cess User Charge
Arrears In Rs.
L.P.S. on old L.P.S. on L.P.S. on
Arrear Current FNB Rs.
N.D. E.D. W.C.C. Urban Cess User Charge Arrear
Total Dues
Net Amount Payable
Rupees
N.D. E.D. W.C.C. Urban Cess User Charge
(E.& O.E) For Instructions and Code list etc, please see overleaf.
Notice : If the amount of this bill is not paid within 15 days from the due date mentioned for payment,the connection is liable to be disconnected
under Section 56 'A' of the Electricity Act. 2003 without any further information/notice