Sie sind auf Seite 1von 4

QuickChart EIT 2 – Bell, intercom and lighting systems

Mains su
upply Flat intercom
Safety instructions
Transformer Pulse relay
Any experiment using mains electricity
g voltages.
involves life threatening g For this
reason, use safety connecting leads at all
times and be careful to avoid short circuits.

All equipment that is designed to be


earthed must always have the earth
connected.

Always check the wiring of the module


carefully before turning on the power
supply.

Al
Always observe
b any regulations
l ti and
d
standards that apply in your locale when
using electrical equipment.

Door opener
p Door intercom L p
Lamp Switch Flat intercom jjunction box Opener
p button

G/1_v1.0
www.lucass-nuelle.de

SO6205-4G
QuickChart EIT 2 – Bell, intercom and lighting systems
Intercom unit with
w door opener

Circuit/wiring diagram/composite rep.

L1
N
PE
Fl t
Flat
Door Flat

Door

Circuit diagram/detached rep.

www.lucass-nuelle.de
QuickChart EIT 2 – Bell, intercom and lighting systems
Pulse relays

Pulse relay for central control

Safety instructions

Any experiment using mains electricity


g voltages.
involves life threatening g For this
reason, use safety connecting leads at all
times and be careful to avoid short circuits.

All equipment that is designed to be


earthed must always have the earth
connected.

Always check the wiring of the module


carefully before turning on the power
supply.

Al
Always observe
b any regulations
l ti and
d
standards that apply in your locale when
using electrical equipment.

ES12Z 110 8..230V UC


ES12Z-110-8..230V
• 1 Normally open floating switch
• 1 Normally closed floating switch
• 16A/250V AC
• Lamps 1600W
• Stand-by loss: 0.1 watt
• Central control priorities can be selected.

Example connection
Switch setting Priority

Off Permanently off
local
on/off Res-
ponse
witches still work. The most central 
No priority. Even if central control inputs are permanently switched on, local sw
1/5*
/
i t ti i
instruction is executed (by default):
t d (b d f lt)

2/6* Priority for switching centrally. Local switches are ineffective but a central off rrequest has priority over an on request.

Central off

Centtral on
3/7* Priority for switching centrally. Local switches are ineffective but a central on request has priority over an off request.

Priority for local switches that are held on. Centralised instructions are not exeecuted until the switch is released. Glow 
4/8*
lamp current cannot be tolerated in this setting.
lamp current cannot be tolerated in this setting
ON
OFF
On Permanently on

* For switch settings 1 to 4 the setting remains after a power outage


outage, otherwise the power is cut off
off. Any central rrequests are carried out as soon as the system
is reactivated.

G/2_v1.0
www.lucass-nuelle.de

SO6205-4G
QuickChart EIT 2 – Bell, intercom and lighting systems
Stairway
y lighting

Circuit/wiring diagram/composite rep.

L1
N
PE

Circuit diagram/detached rep.

www.lucass-nuelle.de

Das könnte Ihnen auch gefallen