TOTAL HT 21,039,250.10
RECAPITULATION
BLOC (A1) BARRE (12 logements ) EN (R+2)
N° Designation Montant
1 TERRASSEMENT 82,600.00
2 INFRASTRUCTURE 2,977,200.00
3 ASSAINISSEMENT 155,900.00
4 SUPERSTRUCTURE 5,755,980.00
5 MACONNERIE 2,148,312.00
5)1 ENDUIT 2,671,377.50
6 REVETEMENT 2,157,957.00
7 DIVERS 200,616.00
8 ETANCHEITE 992,000.00
9 MENUISERIE EN BOIS 1,326,000.00
10 MENUISERIE METALLIQUE 65,100.00
11 ELECTRICITE 350,564.00
12 PLOMBERIE 1,362,240.00
13 PEINTURE ET VITRERIE 793,403.60
TOTAL EN HT 21,039,250.10
TVA 7% 1,472,747.51
TOTAL EN TTC 22,511,997.61
TOTAL HT 21,039,250.10
RECAPITULATION
BLOC (A2) BARRE (12 logements ) EN (R+2)
N° Designation Montant
1 TERRASSEMENT 82,600.00
2 INFRASTRUCTURE 2,977,200.00
3 ASSAINISSEMENT 155,900.00
4 SUPERSTRUCTURE 5,755,980.00
5 MACONNERIE 2,148,312.00
5)1 ENDUIT 2,671,377.50
6 REVETEMENT 2,157,957.00
7 DIVERS 200,616.00
8 ETANCHEITE 992,000.00
9 MENUISERIE EN BOIS 1,326,000.00
10 MENUISERIE METALLIQUE 65,100.00
11 ELECTRICITE 350,564.00
12 PLOMBERIE 1,362,240.00
13 PEINTURE ET VITRERIE 793,403.60
TOTAL EN HT 21,039,250.10
TVA 7% 1,472,747.51
TOTAL EN TTC 22,511,997.61
TOTAL HT 21,039,250.10
RECAPITULATION
BLOC (A3) BARRE (12 logements ) EN (R+2)
N° Designation Montant
1 TERRASSEMENT 82,600.00
2 INFRASTRUCTURE 2,977,200.00
3 ASSAINISSEMENT 155,900.00
4 SUPERSTRUCTURE 5,755,980.00
5 MACONNERIE 2,148,312.00
5)1 ENDUIT 2,671,377.50
6 REVETEMENT 2,157,957.00
7 DIVERS 200,616.00
8 ETANCHEITE 992,000.00
9 MENUISERIE EN BOIS 1,326,000.00
10 MENUISERIE METALLIQUE 65,100.00
11 ELECTRICITE 350,564.00
12 PLOMBERIE 1,362,240.00
13 PEINTURE ET VITRERIE 793,403.60
TOTAL EN HT 21,039,250.10
TVA 7% 1,472,747.51
TOTAL EN TTC 22,511,997.61
TOTAL HT 21,039,250.10
RECAPITULATION
BLOC (A4) BARRE (12 logements ) EN (R+2)
N° Designation Montant
1 TERRASSEMENT 82,600.00
2 INFRASTRUCTURE 2,977,200.00
3 ASSAINISSEMENT 155,900.00
4 SUPERSTRUCTURE 5,755,980.00
5 MACONNERIE 2,148,312.00
5)1 ENDUIT 2,671,377.50
6 REVETEMENT 2,157,957.00
7 DIVERS 200,616.00
8 ETANCHEITE 992,000.00
9 MENUISERIE EN BOIS 1,326,000.00
10 MENUISERIE METALLIQUE 65,100.00
11 ELECTRICITE 350,564.00
12 PLOMBERIE 1,362,240.00
13 PEINTURE ET VITRERIE 793,403.60
TOTAL EN HT 21,039,250.10
TVA 7% 1,472,747.51
TOTAL EN TTC 22,511,997.61
TOTAL HT 28,052,334.85
RECAPITULATION
BLOC (B1) BARRE (16 logements ) EN (R+3)
N° Designation Montant
1 TERRASSEMENT 94,600.00
2 INFRASTRUCTURE 3,092,000.00
3 ASSAINISSEMENT 155,900.00
4 SUPERSTRUCTURE 8,581,500.00
5 MACONNERIE 2,860,320.00
5)1 ENDUIT 3,405,880.25
6 REVETEMENT 2,939,058.00
7 DIVERS 267,776.00
8 ETANCHEITE 992,000.00
9 MENUISERIE EN BOIS 1,766,000.00
10 MENUISERIE METALLIQUE 66,300.00
11 ELECTRICITE 532,952.00
12 PLOMBERIE 1,815,520.00
13 PEINTURE ET VITRERIE 1,482,528.60
TOTAL EN HT 28,052,334.85
TVA 7% 1,963,663.44
TOTAL EN TTC 30,015,998.29
TOTAL HT 28,052,334.85
RECAPITULATION
BLOC (B2) BARRE (16 logements ) EN (R+3)
N° Designation Montant
1 TERRASSEMENT 94,600.00
2 INFRASTRUCTURE 3,092,000.00
3 ASSAINISSEMENT 155,900.00
4 SUPERSTRUCTURE 8,581,500.00
5 MACONNERIE 2,860,320.00
5)1 ENDUIT 3,405,880.25
6 REVETEMENT 2,939,058.00
7 DIVERS 267,776.00
8 ETANCHEITE 992,000.00
9 MENUISERIE EN BOIS 1,766,000.00
10 MENUISERIE METALLIQUE 66,300.00
11 ELECTRICITE 532,952.00
12 PLOMBERIE 1,815,520.00
13 PEINTURE ET VITRERIE 1,482,528.60
TOTAL EN HT 28,052,334.85
TVA 7% 1,963,663.44
TOTAL EN TTC 30,015,998.29
Total HT 140,261,670.10
TVA 07% 9,818,316.91
Total TTC 150,079,987.01