GRID [(N120,N130),(M140,M150)] considering X - direction

Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 7.37 m DL 5.625
Longer span(L1) 7.50 m TOTAL LOAD 20.625
Mo (kNm) 1089.097
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 452.92
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 1161.239 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 452.92001214 KNm TENS (+ve)
Factored Bending moment -Mu 679.38001821 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 0.72
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.56
Characteristic strength of of concrete fcu 35 N/MM² M/Z 4.38
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 8 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.03 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.10 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-3.54 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 679.38001821 KNm
So,the remaining moment only for which reinforcement has to be provided 414 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1161.23931 Kn
factored value 1741.858965 Kn

V Vu/bo*d
0.614 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 1089.097
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 167.721
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -167.720987 KNm TENS (+ve)
Factored Bending moment -Mu -251.5814804 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.52
fpu 1860 N/MM² Pe/Z -2.37
fcu 35 N/MM² M/Z -7.23
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 8 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.07 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-6.38 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

3.33 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -251.5814804 KNm
So,the remaining moment only for which reinforcement has to be provided -339 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm 600
Effective depth 440 mm 565
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm 600
bo 6450 mm
Total load (axial) 1161.23931 Kn
factored value 1741.858965 Kn

V Vu/bo*d
0.614 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

Middle Strip
Support Section
Mo (kNm) 1089.097
Mmss (0.25x0.65xMo), 0.65Mo-D4 254.9932
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 4620 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1039500 MM²
Z 3.90E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 254.99324447 KNm TENS (+ve)
Factored Bending moment -Mu 382.48986671 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.36
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.69
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 6.54
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 12 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.06 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
3.50 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-6.22 N/MM²
Moment of resistance only for PT Tendons
fpb*Aps*(d-0.45xu) 362 KNm
& total moment 382.48986671 KNm
So,the remaining moment only for which reinforcement has to be provided 21 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 1089.097
Mmsm (0.40x0.35xMo),0.35Mo-D89 213.4631
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 4620 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1039500 MM²
Z 3.90E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -213.4630743 KNm TENS (+ve)
Factored Bending moment -Mu -320.1946115 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.36
fpu 1860 N/MM² Pe/Z -2.12
fcu 35 N/MM² M/Z -5.48
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 12 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.06 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-4.71 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

2.00 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -320.1946115 KNm
So,the remaining moment only for which reinforcement has to be provided -408 KNm
Provided Reinforcement
GRID [(N120,N130),(M140,M150)] considering Z - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 7.50 m DL 5.625
Longer span(L1) 7.37 m TOTAL LOAD 20.625
Mo (kNm) 1069.364
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 444.7136
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 1160.775 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 444.7135566 KNm TENS (+ve)
Factored Bending moment -Mu 667.07033489 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 0.90
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.95
Characteristic strength of of concrete fcu 35 N/MM² M/Z 4.30
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 10 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.04 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
1.45 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-3.25 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 667.07033489 KNm
So,the remaining moment only for which reinforcement has to be provided 401 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1160.775 Kn
factored value 1741.1625 Kn

V Vu/bo*d
0.614 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 1069.364
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 164.6821
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -164.6820512 KNm TENS (+ve)
Factored Bending moment -Mu -247.0230768 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.90
fpu 1860 N/MM² Pe/Z -2.97
fcu 35 N/MM² M/Z -7.10
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 10 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.08 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-6.03 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

2.23 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -247.0230768 KNm
So,the remaining moment only for which reinforcement has to be provided -335 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 1069.364
Mmss (0.25x0.65xMo), 0.65Mo-D4 250.373
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 4750 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1068750 MM²
Z 4.01E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 250.37302309 KNm TENS (+ve)
Factored Bending moment -Mu 375.55953464 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.76
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 2.19
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 6.25
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 16 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.08 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.30 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-5.82 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 375.55953464 KNm
So,the remaining moment only for which reinforcement has to be provided 14 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 1069.364
Mmsm (0.40x0.35xMo),0.35Mo-D89 209.5953
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 4750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1068750 MM²
Z 4.01E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -209.5953379 KNm TENS (+ve)
Factored Bending moment -Mu -314.3930068 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.76
fpu 1860 N/MM² Pe/Z -2.75
fcu 35 N/MM² M/Z -5.23
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 16 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.08 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-4.24 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.72 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -314.3930068 KNm
So,the remaining moment only for which reinforcement has to be provided -402 KNm
Provided Reinforcement
GRID [(N108,N120),(M140,M150)] considering X - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 8.08 m DL 5.625
Longer span(L1) 7.50 m TOTAL LOAD 20.625
Mo (kNm) 1193.063
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 496.1557
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 1272.6 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 496.15573661 KNm TENS (+ve)
Factored Bending moment -Mu 744.23360491 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 0.90
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.95
Characteristic strength of of concrete fcu 35 N/MM² M/Z 4.80
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 10 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.04 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
1.94 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-3.75 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 744.23360491 KNm
So,the remaining moment only for which reinforcement has to be provided 478 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1272.6 Kn
factored value 1908.9 Kn

V Vu/bo*d
0.673 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 1193.063
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 183.7316
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -183.731625 KNm TENS (+ve)
Factored Bending moment -Mu -275.5974375 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.90
fpu 1860 N/MM² Pe/Z -2.97
fcu 35 N/MM² M/Z -7.92
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 10 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.08 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-6.85 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

3.05 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -275.5974375 KNm
So,the remaining moment only for which reinforcement has to be provided -363 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 1193.063
Mmss (0.25x0.65xMo), 0.65Mo-D4 279.3349
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 279.33488839 KNm TENS (+ve)
Factored Bending moment -Mu 419.00233259 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.57
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.95
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 6.21
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 16 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.07 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.69 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-5.83 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 419.00233259 KNm
So,the remaining moment only for which reinforcement has to be provided 57 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 1193.063
Mmsm (0.40x0.35xMo),0.35Mo-D89 233.8403
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -233.84025 KNm TENS (+ve)
Factored Bending moment -Mu -350.760375 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.57
fpu 1860 N/MM² Pe/Z -2.45
fcu 35 N/MM² M/Z -5.20
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 16 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.07 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-4.32 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

1.18 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -350.760375 KNm
So,the remaining moment only for which reinforcement has to be provided -438 KNm
Provided Reinforcement
GRID [(N108,N120),(M140,M150)] considering Z- direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 7.50 m DL 5.625
Longer span(L1) 8.08 m TOTAL LOAD 20.625
Mo (kNm) 1285.326
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 534.5251
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 1272.6 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 534.52511357 KNm TENS (+ve)
Factored Bending moment -Mu 801.78767036 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 0.90
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.95
Characteristic strength of of concrete fcu 35 N/MM² M/Z 5.17
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 10 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.04 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.31 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-4.12 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 801.78767036 KNm
So,the remaining moment only for which reinforcement has to be provided 536 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1272.6 Kn
factored value 1908.9 Kn

V Vu/bo*d
0.673 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 1285.326
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 197.9402
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -197.940204 KNm TENS (+ve)
Factored Bending moment -Mu -296.910306 KNm COMP (-ve)
Aps 98.125 MM² P/A 2.28
fpu 1860 N/MM² Pe/Z -3.56
fcu 35 N/MM² M/Z -8.53
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 12 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.10 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-7.25 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

2.68 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -296.910306 KNm
So,the remaining moment only for which reinforcement has to be provided -385 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 1285.326
Mmss (0.25x0.65xMo), 0.65Mo-D4 300.9368
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 300.93678643 KNm TENS (+ve)
Factored Bending moment -Mu 451.40517964 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.57
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.95
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 6.69
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 16 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.07 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
3.17 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-6.31 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 451.40517964 KNm
So,the remaining moment only for which reinforcement has to be provided 90 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 1285.326
Mmsm (0.40x0.35xMo),0.35Mo-D89 251.9239
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -251.923896 KNm TENS (+ve)
Factored Bending moment -Mu -377.885844 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.57
fpu 1860 N/MM² Pe/Z -2.45
fcu 35 N/MM² M/Z -5.60
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 16 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.07 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-4.72 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

1.58 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -377.885844 KNm
So,the remaining moment only for which reinforcement has to be provided -466 KNm
Provided Reinforcement
GRID [(N150,N163),(M140,M150)] considering X - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 8.73 m DL 5.625
Longer span(L1) 7.68 m TOTAL LOAD 20.625
Mo (kNm) 1351.655
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 562.1094
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 1407.974 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 562.10935515 KNm TENS (+ve)
Factored Bending moment -Mu 843.16403273 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.08
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 2.34
Characteristic strength of of concrete fcu 35 N/MM² M/Z 5.44
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 12 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.05 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.01 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-4.17 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 843.16403273 KNm
So,the remaining moment only for which reinforcement has to be provided 577 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1407.9744 Kn
factored value 2111.9616 Kn

V Vu/bo*d
0.744 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 1351.655
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 208.1549
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -208.1549353 KNm TENS (+ve)
Factored Bending moment -Mu -312.2324029 KNm COMP (-ve)
Aps 98.125 MM² P/A 2.28
fpu 1860 N/MM² Pe/Z -3.56
fcu 35 N/MM² M/Z -8.97
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 12 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.10 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-7.69 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

3.12 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -312.2324029 KNm
So,the remaining moment only for which reinforcement has to be provided -400 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 1351.655
Mmss (0.25x0.65xMo), 0.65Mo-D4 316.4667
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5975 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1344375 MM²
Z 5.04E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 316.46667045 KNm TENS (+ve)
Factored Bending moment -Mu 474.70000567 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.75
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 2.17
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 6.28
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 20 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.08 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.35 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-5.86 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 474.70000567 KNm
So,the remaining moment only for which reinforcement has to be provided 113 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 1351.655
Mmsm (0.40x0.35xMo),0.35Mo-D89 264.9245
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5975 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1344375 MM²
Z 5.04E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -264.9244631 KNm TENS (+ve)
Factored Bending moment -Mu -397.3866947 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.75
fpu 1860 N/MM² Pe/Z -2.73
fcu 35 N/MM² M/Z -5.25
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 20 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.08 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-4.27 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.77 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -397.3866947 KNm
So,the remaining moment only for which reinforcement has to be provided -485 KNm
Provided Reinforcement
GRID [(N150,N163),(M140,M150)] considering Z - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 7.68 m DL 5.625
Longer span(L1) 8.73 m TOTAL LOAD 20.625
Mo (kNm) 1536.452
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 638.9602
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 1407.974 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 638.96024355 KNm TENS (+ve)
Factored Bending moment -Mu 958.44036533 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.44
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 3.12
Characteristic strength of of concrete fcu 35 N/MM² M/Z 6.18
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 16 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.06 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
1.61 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-4.50 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 958.44036533 KNm
So,the remaining moment only for which reinforcement has to be provided 693 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1407.9744 Kn
factored value 2111.9616 Kn

V Vu/bo*d
0.744 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 1536.452
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 236.6136
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -236.6136179 KNm TENS (+ve)
Factored Bending moment -Mu -354.9204268 KNm COMP (-ve)
Aps 98.125 MM² P/A 3.04
fpu 1860 N/MM² Pe/Z -4.75
fcu 35 N/MM² M/Z -10.20
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 16 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.13 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-8.49 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

2.40 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -354.9204268 KNm
So,the remaining moment only for which reinforcement has to be provided -443 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 1536.452
Mmss (0.25x0.65xMo), 0.65Mo-D4 359.7336
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 4750 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1068750 MM²
Z 4.01E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 359.73359805 KNm TENS (+ve)
Factored Bending moment -Mu 539.60039707 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 2.64
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 3.28
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 8.98
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 24 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.12 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
3.05 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-8.34 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 539.60039707 KNm
So,the remaining moment only for which reinforcement has to be provided 178 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 1536.452
Mmsm (0.40x0.35xMo),0.35Mo-D89 301.1446
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 4750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1068750 MM²
Z 4.01E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -301.1446045 KNm TENS (+ve)
Factored Bending moment -Mu -451.7169068 KNm COMP (-ve)
Aps 98.125 MM² P/A 2.64
fpu 1860 N/MM² Pe/Z -4.12
fcu 35 N/MM² M/Z -7.51
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 24 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.12 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-6.03 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.74 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -451.7169068 KNm
So,the remaining moment only for which reinforcement has to be provided -539 KNm
Provided Reinforcement
GRID [(N108,N120),(M170,M180)] considering X - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 8.11 m DL 5.625
Longer span(L1) 7.50 m TOTAL LOAD 20.625
Mo (kNm) 1197.492
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 497.9979
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2775 MM 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1318125 MM²
Z 1.04E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 497.997899 KNm TENS (+ve)
Factored Bending moment -Mu 746.99684849 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 0.89
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.94
Characteristic strength of of concrete fcu 35 N/MM² M/Z 4.77
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 10 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.04 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
1.94 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-3.73 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 746.99684849 KNm
So,the remaining moment only for which reinforcement has to be provided 481 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1277.325 Kn
factored value 1915.9875 Kn

V Vu/bo*d
0.675 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

Column Strip
Mid Span Section
Mo (kNm) 1197.492
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 184.4138
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2775 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 624375 MM²
Z 2.34E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -184.4137969 KNm TENS (+ve)
Factored Bending moment -Mu -276.6206953 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.89
fpu 1860 N/MM² Pe/Z -2.94
fcu 35 N/MM² M/Z -7.88
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 10 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.08 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-6.82 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

3.05 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -276.6206953 KNm
So,the remaining moment only for which reinforcement has to be provided -364 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 1197.492
Mmss (0.25x0.65xMo), 0.65Mo-D4 280.372
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 280.37202288 KNm TENS (+ve)
Factored Bending moment -Mu 420.55803432 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.96
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 2.44
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 6.23
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 20 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.09 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
1.84 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-5.76 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 420.55803432 KNm
So,the remaining moment only for which reinforcement has to be provided 59 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 1197.492
Mmsm (0.40x0.35xMo),0.35Mo-D89 234.7085
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -234.7084688 KNm TENS (+ve)
Factored Bending moment -Mu -352.0627031 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.96
fpu 1860 N/MM² Pe/Z -3.06
fcu 35 N/MM² M/Z -5.22
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 20 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.09 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-4.12 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.19 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -352.0627031 KNm
So,the remaining moment only for which reinforcement has to be provided -440 KNm
Provided Reinforcement
GRID [(N108,N120),(M170,M180)] considering Z - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 7.50 m DL 5.625
Longer span(L1) 8.11 m TOTAL LOAD 20.625
Mo (kNm) 1294.888
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 538.5017
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 1277.325 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 538.50172811 KNm TENS (+ve)
Factored Bending moment -Mu 807.75259217 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.44
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 3.12
Characteristic strength of of concrete fcu 35 N/MM² M/Z 5.21
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 16 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.06 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
0.64 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-3.53 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 807.75259217 KNm
So,the remaining moment only for which reinforcement has to be provided 542 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1277.325 Kn
factored value 1915.9875 Kn

V Vu/bo*d
0.675 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 1294.888
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 199.4128
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -199.4127857 KNm TENS (+ve)
Factored Bending moment -Mu -299.1191785 KNm COMP (-ve)
Aps 98.125 MM² P/A 3.04
fpu 1860 N/MM² Pe/Z -4.75
fcu 35 N/MM² M/Z -8.59
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 16 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.13 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-6.89 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.80 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -299.1191785 KNm
So,the remaining moment only for which reinforcement has to be provided -387 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 1294.888
Mmss (0.25x0.65xMo), 0.65Mo-D4 303.1756
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 4750 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1068750 MM²
Z 4.01E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 303.17561407 KNm TENS (+ve)
Factored Bending moment -Mu 454.76342111 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 2.20
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 2.73
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 7.56
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 20 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.10 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.63 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-7.04 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 454.76342111 KNm
So,the remaining moment only for which reinforcement has to be provided 93 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 1294.888
Mmsm (0.40x0.35xMo),0.35Mo-D89 253.7981
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 4750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1068750 MM²
Z 4.01E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -253.7980909 KNm TENS (+ve)
Factored Bending moment -Mu -380.6971363 KNm COMP (-ve)
Aps 98.125 MM² P/A 2.20
fpu 1860 N/MM² Pe/Z -3.44
fcu 35 N/MM² M/Z -6.33
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 20 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.10 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-5.10 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.69 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -380.6971363 KNm
So,the remaining moment only for which reinforcement has to be provided -468 KNm
Provided Reinforcement
GRID [(N130,N140),(M240,M235)] considering X - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 7.16 m DL 5.625
Longer span(L1) 5.89 m TOTAL LOAD 20.625
Mo (kNm) 651.5827
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 270.972
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 885.002 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 270.97196281 KNm TENS (+ve)
Factored Bending moment -Mu 406.45794421 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 0.72
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.56
Characteristic strength of of concrete fcu 35 N/MM² M/Z 2.62
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 8 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.03 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
0.34 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-1.78 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 406.45794421 KNm
So,the remaining moment only for which reinforcement has to be provided 141 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 885.00195 Kn
factored value 1327.502925 Kn

V Vu/bo*d
0.468 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 651.5827
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 100.3437
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -100.3437336 KNm TENS (+ve)
Factored Bending moment -Mu -150.5156004 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.52
fpu 1860 N/MM² Pe/Z -2.37
fcu 35 N/MM² M/Z -4.32
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 8 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.07 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-3.47 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.43 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -150.5156004 KNm
So,the remaining moment only for which reinforcement has to be provided -238 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 651.5827
Mmss (0.25x0.65xMo), 0.65Mo-D4 152.5568
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 4405 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 991125 MM²
Z 3.72E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 152.55678289 KNm TENS (+ve)
Factored Bending moment -Mu 228.83517433 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.19
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.47
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 4.10
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 10 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.05 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
1.44 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-3.82 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 228.83517433 KNm
So,the remaining moment only for which reinforcement has to be provided -133 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 651.5827
Mmsm (0.40x0.35xMo),0.35Mo-D89 127.7102
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
SECTIONAL PROPERTIES

Breadth of the slab 4405 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 991125 MM²
Z 3.72E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -127.7102064 KNm TENS (+ve)
Factored Bending moment -Mu -191.5653096 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.19
fpu 1860 N/MM² Pe/Z -1.85
fcu 35 N/MM² M/Z -3.44
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 10 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.05 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-2.77 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.39 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -191.5653096 KNm
So,the remaining moment only for which reinforcement has to be provided -279 KNm
Provided Reinforcement
GRID [(N130,N140),(M240,M235)] considering X - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 5.89 m DL 5.625
Longer span(L1) 7.16 m TOTAL LOAD 20.625
Mo (kNm) 792.6303
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 329.629
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 885.6204 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 329.6290425 KNm TENS (+ve)
Factored Bending moment -Mu 494.44356375 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 0.54
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.17
Characteristic strength of of concrete fcu 35 N/MM² M/Z 3.19
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 6 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.02 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
1.48 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-2.56 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 494.44356375 KNm
So,the remaining moment only for which reinforcement has to be provided 229 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 885.6204 Kn
factored value 1328.4306 Kn

V Vu/bo*d
0.468 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 792.6303
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 122.0651
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -122.0650597 KNm TENS (+ve)
Factored Bending moment -Mu -183.0975896 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.14
fpu 1860 N/MM² Pe/Z -1.78
fcu 35 N/MM² M/Z -5.26
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 6 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.05 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-4.62 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

2.34 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -183.0975896 KNm
So,the remaining moment only for which reinforcement has to be provided -271 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 792.6303
Mmss (0.25x0.65xMo), 0.65Mo-D4 185.5806
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 3140 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 706500 MM²
Z 2.65E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 185.5806252 KNm TENS (+ve)
Factored Bending moment -Mu 278.3709378 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 2.00
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 2.48
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 7.00
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 12 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.09 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.52 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-6.52 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 278.3709378 KNm
So,the remaining moment only for which reinforcement has to be provided -83 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 792.6303
Mmsm (0.40x0.35xMo),0.35Mo-D89 155.3555
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 3140 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 706500 MM²
Z 2.65E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -155.3555306 KNm TENS (+ve)
Factored Bending moment -Mu -233.0332959 KNm COMP (-ve)
Aps 98.125 MM² P/A 2.00
fpu 1860 N/MM² Pe/Z -3.12
fcu 35 N/MM² M/Z -5.86
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 12 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.09 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-4.74 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.74 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -233.0332959 KNm
So,the remaining moment only for which reinforcement has to be provided -321 KNm
Provided Reinforcement
GRID [(N163,N174),(M140,M150)] considering X - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 8.11 m DL 5.625
Longer span(L1) 7.50 m TOTAL LOAD 20.625
Mo (kNm) 1196.754
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 497.6909
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 1276.538 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 497.69087193 KNm TENS (+ve)
Factored Bending moment -Mu 746.5363079 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 0.90
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.95
Characteristic strength of of concrete fcu 35 N/MM² M/Z 4.81
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 10 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.04 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
1.96 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-3.76 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 746.5363079 KNm
So,the remaining moment only for which reinforcement has to be provided 481 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1276.5375 Kn
factored value 1914.80625 Kn

V Vu/bo*d
0.675 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 1196.754
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 184.3001
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -184.3001016 KNm TENS (+ve)
Factored Bending moment -Mu -276.4501523 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.90
fpu 1860 N/MM² Pe/Z -2.97
fcu 35 N/MM² M/Z -7.94
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 10 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.08 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-6.88 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

3.07 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -276.4501523 KNm
So,the remaining moment only for which reinforcement has to be provided -364 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 1196.754
Mmss (0.25x0.65xMo), 0.65Mo-D4 280.1992
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 280.19916713 KNm TENS (+ve)
Factored Bending moment -Mu 420.2987507 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.57
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.95
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 6.23
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 16 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.07 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.71 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-5.85 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 420.2987507 KNm
So,the remaining moment only for which reinforcement has to be provided 59 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 1196.754
Mmsm (0.40x0.35xMo),0.35Mo-D89 234.5638
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -234.5637656 KNm TENS (+ve)
Factored Bending moment -Mu -351.8456484 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.57
fpu 1860 N/MM² Pe/Z -2.45
fcu 35 N/MM² M/Z -5.22
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 16 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.07 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-4.34 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

1.19 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -351.8456484 KNm
So,the remaining moment only for which reinforcement has to be provided -440 KNm
Provided Reinforcement
GRID [(N163,N174),(M140,M150)] considering X - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 7.50 m DL 5.625
Longer span(L1) 8.11 m TOTAL LOAD 20.625
Mo (kNm) 1294.888
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 538.5017
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 1277.325 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 538.50172811 KNm TENS (+ve)
Factored Bending moment -Mu 807.75259217 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.08
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 2.34
Characteristic strength of of concrete fcu 35 N/MM² M/Z 5.21
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 12 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.05 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
1.78 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-3.95 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 807.75259217 KNm
So,the remaining moment only for which reinforcement has to be provided 542 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1277.325 Kn
factored value 1915.9875 Kn

V Vu/bo*d
0.675 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

Column Strip
Mid Span Section
Mo (kNm) 1294.888
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 199.4128
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -199.4127857 KNm TENS (+ve)
Factored Bending moment -Mu -299.1191785 KNm COMP (-ve)
Aps 98.125 MM² P/A 2.28
fpu 1860 N/MM² Pe/Z -3.56
fcu 35 N/MM² M/Z -8.59
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 12 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.10 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-7.32 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

2.75 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -299.1191785 KNm
So,the remaining moment only for which reinforcement has to be provided -387 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 1294.888
Mmss (0.25x0.65xMo), 0.65Mo-D4 303.1756
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 4750 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1068750 MM²
Z 4.01E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 303.17561407 KNm TENS (+ve)
Factored Bending moment -Mu 454.76342111 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 2.20
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 2.73
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 7.56
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 20 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.10 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.63 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-7.04 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 454.76342111 KNm
So,the remaining moment only for which reinforcement has to be provided 93 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 1294.888
Mmsm (0.40x0.35xMo),0.35Mo-D89 253.7981
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 4750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1068750 MM²
Z 4.01E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -253.7980909 KNm TENS (+ve)
Factored Bending moment -Mu -380.6971363 KNm COMP (-ve)
Aps 98.125 MM² P/A 2.20
fpu 1860 N/MM² Pe/Z -3.44
fcu 35 N/MM² M/Z -6.33
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 20 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.10 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-5.10 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.69 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -380.6971363 KNm
So,the remaining moment only for which reinforcement has to be provided -468 KNm
Provided Reinforcement
GRID [(N160,N174),(M240,M235)] considering X - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 10.30 m DL 5.625
Longer span(L1) 5.89 m TOTAL LOAD 20.625
Mo (kNm) 937.9877
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 390.0784
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 1274.007 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 390.07843703 KNm TENS (+ve)
Factored Bending moment -Mu 585.11765554 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 0.54
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.17
Characteristic strength of of concrete fcu 35 N/MM² M/Z 3.77
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 6 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.02 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.06 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-3.14 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 585.11765554 KNm
So,the remaining moment only for which reinforcement has to be provided 319 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1274.007 Kn
factored value 1911.0105 Kn

V Vu/bo*d
0.673 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 937.9877
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 144.4501
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -144.4500987 KNm TENS (+ve)
Factored Bending moment -Mu -216.675148 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.14
fpu 1860 N/MM² Pe/Z -1.78
fcu 35 N/MM² M/Z -6.23
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 6 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.05 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-5.59 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

3.30 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -216.675148 KNm
So,the remaining moment only for which reinforcement has to be provided -304 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 937.9877
Mmss (0.25x0.65xMo), 0.65Mo-D4 219.6135
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 219.61353791 KNm TENS (+ve)
Factored Bending moment -Mu 329.42030687 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.57
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 1.95
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 4.88
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 16 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.07 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
1.36 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-4.51 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 329.42030687 KNm
So,the remaining moment only for which reinforcement has to be provided -32 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 937.9877
Mmsm (0.40x0.35xMo),0.35Mo-D89 183.8456
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -183.8455801 KNm TENS (+ve)
Factored Bending moment -Mu -275.7683702 KNm COMP (-ve)
Aps 98.125 MM² P/A 1.57
fpu 1860 N/MM² Pe/Z -2.45
fcu 35 N/MM² M/Z -4.09
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 16 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.07 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-3.21 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.07 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -275.7683702 KNm
So,the remaining moment only for which reinforcement has to be provided -363 KNm
Provided Reinforcement
NON FIRE TENDER AREA
considering Z - direction
Column Strip
Support Section SIDL 11
Total load 21 KN/m2 LL 4
Shorter span(L2) 5.89 m DL 5.625
Longer span(L1) 10.30 m TOTAL LOAD 20.625
Mo (kNm) 1640.284
Mcss (0.75x0.65xMo)x2.75x0.475/(2.75x0.475+1.0x0.225) 682.1406
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3
Column Strip
SECTIONAL PROPERTIES

Breadth of the slab 2750 MM 1274.007 2750


Depth of the slab MM
Depth of the slab with drop 475 MM
CG from top 66 MM
Ecentricity of the cable 171.5 MM
Area of the section A 1306250 MM²
Z 1.03E+08 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 682.1405605 KNm TENS (+ve)
Factored Bending moment -Mu 1023.2108408 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 1.44
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 3.12
Characteristic strength of of concrete fcu 35 N/MM² M/Z 6.60
Maximum prestress after losses fpe 1200 N/MM² 1246.2

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 409 MM


Number of Strands 16 Nos. Number of Strands 4 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.06 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.03 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 57.26 MM

(-P/A+Pe/Z-M/Z)
Aps 392.5 MM²

-4.91 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 266 KNm
& total moment 1023.2108408 KNm
So,the remaining moment only for which reinforcement has to be provided 757 KNm
Provided Reinforcement

PUNCHING SHEAR CALCULATIONS

Slab thickness 225 mm


Drop thickness 475 mm
Effective depth 440 mm
d/2 220 mm
Concrete grade-fcu 35 N/mm2
Drop width 2750 mm
Drop depth 475 mm
bo 6450 mm
Total load (axial) 1274.007 Kn
factored value 1911.0105 Kn

V Vu/bo*d
0.673 N/mm²

Allowable shear 1.48 N/mm²

Hence safe

1842.5 3685

2750 4620

Column Strip 0.5


Mid Span Section
Mo (kNm) 1640.284
Mcsm (0.60x0.35xMo)x2.75x0.225/(2.75x0.225+1.0x0.225) 252.6037
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 2750 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 618750 MM²
Z 2.32E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -252.6037379 KNm TENS (+ve)
Factored Bending moment -Mu -378.9056069 KNm COMP (-ve)
Aps 98.125 MM² P/A 3.04
fpu 1860 N/MM² Pe/Z -4.75
fcu 35 N/MM² M/Z -10.89
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 16 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.13 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-9.18 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

3.09 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -378.9056069 KNm
So,the remaining moment only for which reinforcement has to be provided -467 KNm
Provided Reinforcement

Middle Strip
Support Section
Mo (kNm) 1640.284
Mmss (0.25x0.65xMo), 0.65Mo-D4 384.044
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM 7370 3685
Depth of the slab 225 MM
CG from top 66 MM
Ecentricity of the cable 46.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M 384.04404762 KNm TENS (+ve)
Factored Bending moment -Mu 576.06607143 KNm COMP (-ve)
Area of prestressing steel Aps 98.125 MM² P/A 2.55
Maximum prestress before losses fpu 1860 N/MM² Pe/Z 3.17
Charaterisitic compressive strength of concrete fcu 35 N/MM² M/Z 8.54
Maximum prestress after losses fpe 1200 N/MM²

Prestressing force P 117750

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 159 MM


Number of Strands 26 Nos. Number of Strands 14 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.11 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
2.82 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 22.26 MM

(-P/A+Pe/Z-M/Z)
Aps 1373.75 MM²

-7.93 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 362 KNm
& total moment 576.06607143 KNm
So,the remaining moment only for which reinforcement has to be provided 214 KNm
Provided Reinforcement

Middle Strip
Mid Span Section
Mo (kNm) 1640.284
Mmsm (0.40x0.35xMo),0.35Mo-D89 321.4957
DESIGN CALCULATIONS FOR THE POSITIVE MOMENT OF THE GRID LOCATION -3

SECTIONAL PROPERTIES

Breadth of the slab 5330 MM


Depth of the slab MM
Depth of the slab 225 MM
CG from top 171 MM
Ecentricity of the cable -58.5 MM
Area of the section A 1199250 MM²
Z 4.50E+07 MM³
e+ve above na
m+ve support

Unfactored moment-M-SUPPORT 0 KNm/m


Unfactored moment-M -321.4956665 KNm TENS (+ve)
Factored Bending moment -Mu -482.2434997 KNm COMP (-ve)
Aps 98.125 MM² P/A 2.55
fpu 1860 N/MM² Pe/Z -3.98
fcu 35 N/MM² M/Z -7.15
fpe 1200 N/MM²

Prestressing force P 117750 N

CHECK FOR STRESSES MOMENT OF RESISTANCE

mid Depth -d 54 MM
Number of Strands 26 Nos. Number of Strands 10 Nos.

Top fiber As per BS 8110-1997, Clause 4.3.7.3 & table 4.4

(-P/A-Pe/Z+M/Z)
fpu*Aps/fcu*b*d 0.11 fpe/fpu 0.6
On the basis of these two ratios we can determine fpb/0.95fpu from table7.3
fpb/0.95fpu 1 X/d 0.14
-5.72 N/MM²
fpb 1767 N/MM²

Bottom fiber xu 7.56 MM

(-P/A+Pe/Z-M/Z)
Aps 981.25 MM²

0.61 N/MM²

Moment of resistance only for PT Tendons


fpb*Aps*(d-0.45xu) 88 KNm
& total moment -482.2434997 KNm
So,the remaining moment only for which reinforcement has to be provided -570 KNm
Provided Reinforcement