THERMOTECH SYSTEMS LIMITED

AHMEDABAD, GUJARAT

COMMENTS RESPONSE SHEET (CRS)

Job No. 1920-77 P.O. No. SIPL/TSL/1501/19-20


Project Thermic Fluid Heater Package
Customer Name M/s. Sunita Impex Private Limited
End User Name M/s. Super Petro
Document No. 521 076 21 01 Rev. No. R3
Document Title P & I Diagram of Thermic Fluid Heater – 2 sheets
Date 04-07-2020

Sr.
Comments Response SPPL Comments
No.
According to your mail all We Will update once we have
actuator have end switch for clearance on Point No. 2 & 3
1
open and close position which below.
needs to show in P&ID.
In this Project all instrument As discussed with Mr. Towhid, As per contract you have
items must be ATEX/IECEx one SOV with POC can be to provide us all SOV and
certified and suitable for Zone 2 introduced at upstream of diesel Flow regulator Control
(Class 1 Div 2). Without POC, pump for safety purpose. And no Valve with POC. As you are
not acceptable. We have  need to change in existing not providing the POC type
procured  same valve from arrangement of burner system as SOV, downstream of pump
China. for, Pressure Jet Burners, Fuel Oil in diesel line for high
Pressure is very high & SOV with pressure, then you must
POC in not available in that high provide us one SOV with
pressure segment. open/close limit switch
(mechanical POC) with
Only 1 Vendor (Honeywell – field indicator upstream of
Maxon) had agreed to provide the pump.
Oil side SOV valve as per your
2 given specification (SOV with As Techmotech is unable
POC, open close limit switch and to provide according to
local indication). Additional Price contract than the change
for such valve = Rs. 10,85,000. should comply the safety
Spare valve will be our burner requirement / norm of
vendor standard SOV. If spare is SPL. If there any price
required as per client’s impact for that SPL is not
specification, same additional liable. So there is no logical
price is applicable. ground that Thermotech
can claim the cost.
We prefer Client to procure this
valve from its Chinese vendor. If
client can give us its vendor
name, we can check price from
our side & revert back.

Page 1 of 3
The Attached manual of  SOV Our Burner Vendor normally The SOV you offer is POC
for GAS don't have POC and provide SOV with POC in gas line by electronics Proximity
valve status Indication. as per specification we switch. So, this SOV is ok if
submitted earlier. you provide us the gas
For Special requirement of client regulator Control valve
on SOV with POC + open/close with POC. But if the gas
limit switch & local indication, regulator Control valve
our Burner Vendor is not don’t have POC then you
advising to install the same as it must provide us with
is old models & further spares (mechanical POC)
availability is also concern. Open/close limit switch
The earlier proposed valves by and field indicator.
us is new series of supplier & its
parts availability is guaranteed As per contract all SOV of
with our vendor. Pilot line should be POC
type.
As discussed with Mr. Tohliq, we
have to provide SOVs (SOV-5-6,
5-7 & 5-11) as per their special
requirement & specification (SOV
with POC, open close limit switch
and local indication) in off gas
3
main line.
This special valves are available
with only 1 vendor : Honeywell
– Maxon & its total price
including 1 spare SOV as per
spare item list = Rs. 53,88,000.
For Pilot gas line SOV (SOV-5-
16,5-17 & 5-18) with normal POC
(As proposed earlier) is
acceptable.

It took 4 weeks for Honeywell-


Maxon to give quote of this item
as it is slow moving item & not
available with Indian dealers.
We strongly recommend to go
ahead with our proposed &
agreed during discussion of SOV
with POC (Without local
indication & Open/close limit
switches)

The indicator should be in the Kindly give your confirmation on


field(see attached pics) and the point no. 2 and 3.
status should come from
4
separate Limit switch to
PLC/BMS.

Page 2 of 3
We must need below input For SOV please give your Replied at point No 3
from SOV and CV for safety confirmation on point no. 2 and
operation of Burner: 3.
    Vent valve close limit Switch
    Vent valve open limit Switch

    Control Valve Close Limit As discussed with Mr.Tohliq, and


5
Switch (See attached Pic "Off agreed that for actuator with
gas Control Valve limit switch") end switch will be sufficient
    SOV Close Limit Switch instead of open close limit
    SOV Open Limit Switch switch, because he suggested to
install main SOV with open close
limit switch.

Before start Burner, the Noted & same is incorporated in


BMS/PLC must check that all our operation logic
Close limit switch in close status
6
and all Open limit switch in
Open Status(Permissive is OK)

These shutoff valves need Kindly confirm Point No 2 & 3.


physical status indicator(close
or open, Please see attached
7
pics "Maxon Shut off Valve",
"Off gas Control Valve")

The RTD sensor should be


8 ATEX certified, please
New Topics confirm
Please provide data sheet
9
for Pressure Switch

Prepared by,

Daxesh Patel

Page 3 of 3