Sie sind auf Seite 1von 6
SCHEDULE -1 Important points for framing the price schedule i) The quoted prices shall all be FIRM. ii) ‘The tenderer shall note that the price shall be quoted in the price schedule on percentage basis below / above the estimated rates. The prices shall be inclusive of all taxes rates and cesses (Except GST), unloading at site, insurance charges , erection, testing and commissioning etc. The bidders/tenderers have to quote their bids without GST. GST shall be payable on accepted contract value. iii) If the tenderer quotes the variable prices, his tender will be rejected out rightly. iv) No ambiguity shall be left in filling the price schedule. v) Tenderer shall specifically note that his tender should not involve any deviation from provision of the specification. vi) Tenderer shall give his certificate about cognizance of points in schedule No. IL CERTIFICATE I certify that I have gone through various points of Schedule I and have cognizance of them while quoting prices in schedule B (Price Schedule). I understand that in case of any ambiguity / non-clarity / mistakes etc. in price schedule, the department will not entertain any subsequent clarifications. Signature of Tenderer Name Designation Address Contractor SCHEDULE - II DEPARTURE FROM TECHNICAL SPECIFICATION (To be filled in by the Tenderer) Sr. No. Clause No. Departure Remarks SIGNATURE OF TENDERER NAME, ADDRESS & DESIGNATION OF THE TENDERER DATE: Note: Tender should indicate deviations, if any, to the Technical specification of the equipment in this Schedule. If there is not deviation, tenderer Shall record “No deviations” in this schedule. Page ___ Executive Engineer _ Contractor _ 84 SCHEDULE III DECLARATION BY THE CONTRACTOR UWe Contractor, hereby undertake that I/We shall pay the labours engaged on the work of as per minimum wages Act, 1948 and amendment there to applicable' to the zone in which the work lies & act accordingly. WWe hereby declare that VWe made myself / ourselves thoroughly coniversation with the local conditions regarding all material and labour on which TWWe have based my/our rates for this work have been carefully studied and understood by me/us before submitting this tender. The specifications and lead, ete. of this work I/We undertake to use only the best materials approved by the Executive Engineer or his duly authorised Assistant before starting the work and abide with. Lwve also undertake to abide by the various laws in force and extent necessary facilities and am entities to the staff and workers employed by me/us. Signature of Contractor Be Contractor Page Executive Engineer ‘STATEMENT: DETAILS OF PLANTS & MACHINERY PROPOSED TO BE USED FOR WORK IMMEDIATELY AVAILABLE. WITH TENDERER Se] Nameof | No. | Kind | Capacity already owned Ifto be purchased | Remark No | Equipment | of | Of ‘Age and | Locatio | Probable Date of | (When? Months Units | Make Condition | Availability and Year 1 2 aie [aaa 5 6 z 9 10 ‘Note: If no machinery available with firm please give details as how the firm will manage to get the same. We Executive Engineer _ ‘STATEMENT-I DETAILS OF PLANTS & MACHINERY PROPOSED TO BE USED FOR WORK BUT NOT IMMEDIATELY AVAILABLE WITH TENDERER Se] Nameof | No.OF] Kind | Capacity Ifalready owned Ifo be purchased | Remark No} Equipment | Units | Of ‘Ageand |Location| Probable | (When? Months Make | Condition Date of and Year Availablity 1 z Bee) areas 6 7 & 9 ‘0 i | | | i Note: If no machinery available with firm please give details as how the firm will manage to get the same. Contractor Page a7 BW Executive Engineer STATEMENT-II1 Description ‘Name Length of | service in the firm Qualification Professional ‘experience and details of works carried out Project managet! Chief Executive! ‘General Manager/Dy.General ‘Manager’ Assistant General Manager ‘Works manager! Mech SrEngr Elect. Sr.Engr./ Sr. Executive Manager / Works Executive Engineer ( Mech) Engineer (Elect) Supervisors

Das könnte Ihnen auch gefallen