SCHEDULE -1
Important points for framing the price schedule
i) The quoted prices shall all be FIRM.
ii) ‘The tenderer shall note that the price shall be quoted in the price schedule
on percentage basis below / above the estimated rates. The prices shall be
inclusive of all taxes rates and cesses (Except GST), unloading at site,
insurance charges , erection, testing and commissioning etc. The
bidders/tenderers have to quote their bids without GST. GST shall be
payable on accepted contract value.
iii) If the tenderer quotes the variable prices, his tender will be rejected out
rightly.
iv) No ambiguity shall be left in filling the price schedule.
v) Tenderer shall specifically note that his tender should not involve any
deviation from provision of the specification.
vi) Tenderer shall give his certificate about cognizance of points in schedule
No. IL
CERTIFICATE
I certify that I have gone through various points of Schedule I and have
cognizance of them while quoting prices in schedule B (Price Schedule). I understand
that in case of any ambiguity / non-clarity / mistakes etc. in price schedule, the
department will not entertain any subsequent clarifications.
Signature of Tenderer
Name
Designation
Address
ContractorSCHEDULE - II
DEPARTURE FROM TECHNICAL SPECIFICATION
(To be filled in by the Tenderer)
Sr. No. Clause No. Departure Remarks
SIGNATURE OF TENDERER
NAME, ADDRESS & DESIGNATION OF THE TENDERER
DATE:
Note: Tender should indicate deviations, if any, to the Technical specification of the
equipment in this Schedule. If there is not deviation, tenderer Shall record “No
deviations” in this schedule.
Page ___ Executive Engineer _
Contractor _
84SCHEDULE III
DECLARATION BY THE CONTRACTOR
UWe
Contractor, hereby undertake that I/We shall pay the labours engaged on the work of
as per
minimum wages Act, 1948 and amendment there to applicable' to the zone in which
the work lies & act accordingly.
WWe hereby declare that VWe made myself / ourselves thoroughly
coniversation with the local conditions regarding all material and labour on which
TWWe have based my/our rates for this work have been carefully studied and
understood by me/us before submitting this tender. The specifications and lead, ete. of
this work I/We undertake to use only the best materials approved by the Executive
Engineer or his duly authorised Assistant before starting the work and abide with. Lwve
also undertake to abide by the various laws in force and extent necessary facilities and
am entities to the staff and workers employed by me/us.
Signature of Contractor
Be
Contractor Page Executive Engineer‘STATEMENT:
DETAILS OF PLANTS & MACHINERY PROPOSED TO BE USED FOR WORK IMMEDIATELY AVAILABLE.
WITH TENDERER
Se] Nameof | No. | Kind | Capacity already owned Ifto be purchased | Remark
No | Equipment | of | Of ‘Age and | Locatio | Probable Date of | (When? Months
Units | Make Condition | Availability and Year
1 2 aie [aaa 5 6 z 9 10
‘Note: If no machinery available with firm please give details as how the firm will manage to get the same.
We
Executive Engineer _‘STATEMENT-I
DETAILS OF PLANTS & MACHINERY PROPOSED TO BE USED FOR WORK BUT NOT IMMEDIATELY
AVAILABLE WITH TENDERER
Se] Nameof | No.OF] Kind | Capacity Ifalready owned Ifo be purchased | Remark
No} Equipment | Units | Of ‘Ageand |Location| Probable | (When? Months
Make | Condition Date of and Year
Availablity
1 z Bee) areas 6 7 & 9 ‘0
i
|
|
|
i
Note: If no machinery available with firm please give details as how the firm will manage to get the same.
Contractor
Page
a7
BW
Executive EngineerSTATEMENT-II1
Description
‘Name
Length of |
service in the
firm
Qualification
Professional
‘experience and
details of works
carried out
Project managet! Chief Executive!
‘General Manager/Dy.General
‘Manager’ Assistant General Manager
‘Works manager! Mech SrEngr Elect.
Sr.Engr./ Sr. Executive Manager /
Works Executive
Engineer ( Mech)
Engineer (Elect)
Supervisors