Revision History
Contents
1. About This Document ................................................................................................. 4
1.1 Purpose .......................................................................................................................................... 4
1.2 Scope ............................................................................................................................................. 4
1.3 References ..................................................................................................................................... 4
2. General Upgrade Summary ........................................................................................ 4
2.1 Plug-in units to be installed ............................................................................................................ 4
2.2 Installation/Commissioning activities ............................................................................................. 6
2.3 Integration activities ....................................................................................................................... 7
1.2 Scope
The scope of this document is to outline the plug-in units to be installed, the procedures of RNC Charguia
hardware upgrade as well as the configuration of new designed interfaces. It indicates also the estimated
duration and the generated impact of each task.
1.3 References
• Hardware Expansions for RNC2600
RNC2600_HW_Expa
nsion.pdf
• Integration document
integrating_rnc.pdf
Estimated
Day RNC Work Impact
Time
Risk to remove existing timing cables
to insert new ones;
alarms related to timing module could
1h30 Connect HMS and timing cable in TBU0
be generated
and TBU1 in RNAC cabinet
Estimated
Day RNC Work Impact
Time
15 min Connect the SFU1 cables No impact
Estimated
Day RNC Work Impact
Time
cells lock/unlock and IPNB de-
2h ICSU balancing
attach/attach
RNC restart (recomended but not
20 min RNC restart
Day3 mandatory)
1h30 General Check No impact
Estimated
Day RNC Work Impact
Time
Add new 4 associations for IuPS:
1- Configure separate internal IP
over ATM interface to a
15 min No impact
signalling unit and the NPGE(P)
Day4 unit
2- Assign the IP addresses to both
15 min ATM interfaces of a signalling No impact
unit and the NPGE(P)
3- Create the static routes in the
15 min No impact
signalling unit
Estimated
Day RNC Work Impact
Time
Add new 4 associations for IuCS:
Estimated
Day RNC Work Impact
Time
Configure NPGEP:8/9, 10/11 for IuB UP
15 min No impact
and CP
Rehome a set of nodeB to the new
NPGEP:
1- CREATE NPGEP-8/9 and 10/11
5 min No impact
STATIC ROUTES
2- DELETE CURRENT IP BASED
Day6-Day12 5 min NodeB outage
ROUTE CONFIGURATION
3- CREATE THE NEW IP BASED
5 min ROUTE CONFIGURATION No impact
CONFIGURATION
4- DELETE AND RECREATE THE
5 min NodeB outage
IPBNBS
5- Make the necessary changes in
10 min NodeB outage
the WBTS commissioning