Sie sind auf Seite 1von 4

Assessment

14R210_Test-01_CEE Controller Architecture

1 Points: 1.00

Which of the following statements are incorrect?

A. C 200 processors can be redundant

B. C 200 Fieldbus interace modules can be redundant

C. C 200 PM IO link module can be redundant

D. C 200 Rack I/O can be redundant

E. C 200 PM I/O can be redundant

2 Points: 1.00

Which of the following statement is incorrect?

A. Supervisory Control Net can be on ethernet

B. Supervisory Control net cannot be used to connect the C 200 to the Experion
PKS Server

C. Supervisory Control Net can be redundant

D. Supervisory Control Net uses a PCIC card to accesses the C200

E. Supervisory Control Net can be used to connect C 200, Application Control


Environment and Allen Bradley Controllers

3 Points: 1.00

Which of the following cannot be an integral part of a C 200 Control Strategy?

A. Rack I/O

B. PM I/O

C. Rail I/O

D. Fieldbus valves

E. PLC I/O using OPC communications

4 Points: 1.00

EPKS CEE R210 Page: 1 of 4 06/07/05


Assessment
14R210_Test-01_CEE Controller Architecture

Which of the following statements about Control Builder is incorrect?

A. Can be used to configure control strategies in Programmable Logic Controllers

B. Can be used to configure control strategies for the Application Control


Environment

C. Can be used to configure control strategies for the C 200

D. Can be used to configure control strategies in Field bus devices

E. Can be used to monitor run time values in a control strategy

5 Points: 1.00

Which of the following statements are true?

A. The Application Control Environment can be redundant

B. A C 200 with a 5ms execution time can be redundant

C. A Simulation Control Environment can be redundant

D. B and C above

E. All the above

F. None of the above

6 Points: 1.00

Redundant controllers

A. are not available for the C200

B. can not contain a redundancy module

C. must have remote I/O

7 Points: 1.00

What is the maximum number of function blocks a CM can contain?

A. 64

B. 1

EPKS CEE R210 Page: 2 of 4 06/07/05


Assessment
14R210_Test-01_CEE Controller Architecture

C. 40

D. 4000

8 Points: 1.00

Which of the following statements is true for HART integration in Experion?

A. Supports HART Classic AI and AO cards

B. Supports redundant HART PMIO cards

C. Can access, interpret and display HART device data and status in Station detail
display

D. All of the above

EPKS CEE R210 Page: 3 of 4 06/07/05


Assessment
14R210_Test-01_CEE Controller Architecture

EPKS CEE R210 Page: 4 of 4 06/07/05

Das könnte Ihnen auch gefallen