Beruflich Dokumente
Kultur Dokumente
Effective date:
October 2004 Work Instructions-Fastener Inspection
INDIA
TUV NORD
G GROUP
Page 1 of 3
G
Check List
1) Perform visual inspection of 100% qty.
2) Verify markings: Grade/class & Mfr.’s identification symbol.
3) Review Mfr.’s test certificate for compliance to material
specification.
4) Witness PMI on alloy steel bolts/nuts for conformance to
specification.
5) Unless other wise specified, perform dimensional inspection on
10% qty. per size & type for conformance to order specification.
The fasteners shall be inspected for diameter, thread form &
length, and width across flat, across corner & height of nut for
conformance to the tolerance specified in PO specification.
6) Verify that the Mfr.’s QC has performed 100% inspection &
documented the results.
Prepared by: NG Prabhu Approved by:G Chandrasekhar Issued by:G Chandrasekhar
Date : Octobr, 2004 Date : October, 2004 Date : October, 2004
WI/INSP/11/00
Effective date:
October 2004 Work Instructions-Fastener Inspection
INDIA
TUV NORD
G GROUP
Page 3 of 3
G