Sie sind auf Seite 1von 5

REQUISITION FOR INSPECTION OF

FABRICATION DIMENSION / WELDING DATE : 12/27/2018


PROJECT SOUTHERN AREA- GOSP-2 WORLD TOP GROUP
P.O. NO. AE891WOD8000159 QUALITY CONTROL SECTION

CLIENT LARSEN & TOUBRO SAUDI ARABIA LLC QA / QC FORM NO. 003 C

ITEM DESCRIPTION MODIFICATION OF STEEL STRUCTURES FABRICATED BY WTG DAMMAM K.S.A.

MARK NO. BEAMS FABRICATED DATE

ITEM NO. MATERIAL DESCRIPTION & SIZE ACCEPT FAIL COMMENT

1. Dimension a. Material profile & size are based on drawing ?


b. Overall dimension DWG ACTUAL

MARK W L Qty W L

b61-2 5,777 4

b62-2 5,140 4

b46-2 5646 2

b39-2 5646 2 welding not


required
b33-2 5646 2

b78-2 2626 2

b76-2 2626 2

b95-2 2626 2

b144-2 2626 2

Total 22

c. Connection location

2. Welding a. General welding condition


b. Total no. of welding
c. Removal & cleaning of welding scale
3. Alignment a. Flatness
b. Twisting
c. Others
4. Marking a. Marking made on plan
b. Marking condition
5. Others

INSPECTION BY: APPROVED BY:


WTG INSPECTOR : _____________ CLIENT INSPECTOR : _________
DATE : __________ DATE : _________
INSPECTION RESULT
Proceed to Hold for repair Reject
Touchup & Reinspection & Refabrication
REQUISITION FOR INSPECTION OF
FABRICATION DIMENSION / WELDING DATE :
PROJECT SOUTHERN AREA- GOSP-2 WORLD TOP GROUP
P.O. NO. AE891WOD8000159 QUALITY CONTROL SECTION

CLIENT LARSEN & TOUBRO SAUDI ARABIA LLC QA / QC FORM NO. 003 C

ITEM DESCRIPTION MODIFICATION OF STEEL STRUCTURES FABRICATED BY WTG DAMMAM K.S.A.

MARK NO. BEAMS & BRACES FABRICATED DATE

ITEM NO. MATERIAL DESCRIPTION & SIZE ACCEPT FAIL COMMENT

1. Dimension a. Material profile & size are based on drawing ?


b. Overall dimension DWG ACTUAL

MARK W L Qty W L

b29-2 1369 1,167 1

b28-2 1,369 1,167 1

b32-2 1369 1167 1

b75-2 2571 2368 1


welding not
b74-2 2571 2368 1 required
b82-2 2571 2368 1

v-68-2 1751 4

v69-2 3332 2

v70-2 3332 2

b145-2 4727 2
welding
b103-2 4727 2 required
type-7 1330 4370 2

Total 20
c. Connection location

2. Welding a. General welding condition


b. Total no. of welding
c. Removal & cleaning of welding scale
3. Alignment a. Flatness
b. Twisting
c. Others
4. Marking a. Marking made on plan
b. Marking condition
5. Others

INSPECTION BY: APPROVED BY:


WTG INSPECTOR : _____________ CLIENT INSPECTOR : _________
DATE : __________ DATE : _________
INSPECTION RESULT
Proceed to Hold for repair Reject
Touchup & Reinspection & Refabrication
REQUISITION FOR INSPECTION OF
FABRICATION DIMENSION / WELDING DATE :
PROJECT SOUTHERN AREA- GOSP-12 WORLD TOP GROUP
P.O. NO. AE891WOD8000159 QUALITY CONTROL SECTION

CLIENT LARSEN & TOUBRO SAUDI ARABIA LLC QA / QC FORM NO. 003 C

ITEM DESCRIPTION MODIFICATION OF STEEL STRUCTURES FABRICATED BY WTG DAMMAM K.S.A.

MARK NO. CABLE TRAY RACK STRUCTURES FABRICATED DATE

ITEM NO. MATERIAL DESCRIPTION & SIZE ACCEPT FAIL COMMENT

1. Dimension a. Material profile & size are based on drawing ?


b. Overall dimension DWG ACTUAL

MARK W L Qty W L

TYPE-5A 2400 2,400 5 Welding required


BEAM-b-12-2 8

BEAM-b-3-2 4

BRACES- V6 4

BRACES- V5 4

Total 25
c. Connection location

2. Welding a. General welding condition


b. Total no. of welding
c. Removal & cleaning of welding scale
3. Alignment a. Flatness
b. Twisting
c. Others
4. Marking a. Marking made on plan
b. Marking condition
5. Others

INSPECTION BY: APPROVED BY:


WTG INSPECTOR : _____________ CLIENT INSPECTOR : _________
DATE : __________ DATE : _________
INSPECTION RESULT
Proceed to Hold for repair Reject
Touchup & Reinspection & Refabrication