ŽŶƐƚƌƵĐƟŽŶŽĨ75D>Bhairoba^dWŽŶKĂƐŝƐ

/ŶĐůƵĚŝŶŐZĞŚĂďŝůŝƚĂƟŽŶŽĨKalyani Nagar IPS


sŽůƵŵĞϮͲŵƉůŽLJĞƌΖƐZĞƋƵŝƌĞŵĞŶƚƐ
(Section -VI ͲĂĐŬŐƌŽƵŶĚ/ŶĨŽƌŵĂƚŝŽŶ)

WƌŽũĞĐƚ͗ ŵƉůŽLJĞƌ͗
WŽůůƵƟŽŶďĂƚĞŵĞŶƚŽĨ dŚĞDƵŶŝĐŝƉĂůŽŵŵŝƐƐŝŽŶĞƌ͕
ZŝǀĞƌDƵůĂDƵƚŚĂĂƚWƵŶĞ WƵŶĞDƵŶŝĐŝƉĂůŽƌƉŽƌĂƟŽŶ

džĞĐƵƟŶŐŐĞŶĐLJ͗ /ŵƉůĞŵĞŶƟŶŐŐĞŶĐLJ͗

EĂƟŽŶĂůZŝǀĞƌŽŶƐĞƌǀĂƟŽŶŝƌĞĐƚŽƌĂƚĞ͕ WƵŶĞDƵŶŝĐŝƉĂůŽƌƉŽƌĂƟŽŶ
DŽ&Θ

WƌŽũĞĐƚDĂŶĂŐĞŵĞŶƚŽŶƐƵůƚĂŶƚ͗

3 H O O ) U L V F K P D Q Q ) 3 3 U R M H F W 0 D Q D J H P H Q W
& R Q V X O W L Q J ( Q J L Q H H U V )RUPHUO\ )ULVFKPDQQ 3UDEKX ,QGLD  3ULYDWH /LPLWHG 1-6(QJLQHHUV
,QGLD 3YW /WG

December
3)7'3$005<CC
Project for Pollution Abatement of River Mula-Mutha Volume – 2 - Employer’s Requirements
Construction of 75 MLD Bhairoba STP on DBO Basis, Including Rehabilitation of Kalyani Nagar
Intermediate Pumping Station (IPS)

Table of Contents

Annexure 1 – Drawings ............................................................................................................... 1

Annexure 2 – Geotechnical Data ................................................................................................ 9

Annexure 3 – Influent Quality Data............................................................................................ 18

Section VI-C: Background Information Page ii


Project for Pollution Abatement of River Mula-Mutha Volume – 2 - Employer’s Requirements
Construction of 75 MLD Bhairoba STP on DBO Basis, Including Rehabilitation of Kalyani Nagar
Intermediate Pumping Station (IPS)

Annexure 1 – Drawings

Sr.No. Drawing No. Title


PF-D-PARMM-5-43-900-Y-0001 PROPOSED BHAIROBA 75 MLD STP
1.
Rev A LOCATION PLAN.
PF-D-PARMM-5-43-400-Y-0001 BHAIROBA PUMPING STATION EXISTING
2.
Rev A LAYOUT PLAN.
PF-D-PARMM-5-43-400-Y-0002 PROPOSED BHAIROBA 75 MLD STP
3.
Rev B BATTERY LIMIT.
PF-D-PARMM-5-43-400-Y-0003 PROPOSED BHAIROBA 75 MLD STP SITE
4.
Rev B AREA AND FENCING.
ELECTRICAL POWER DISTRIBUTION
PF-D-PARMM-5-43-113-E-4002
5. SYSTEM SCHEMATIC DIAGRAM FOR
Rev B
PROPOSED BHAIROBA 75 MLD STP.
ELECTRICAL POWER DISTRIBUTION
PF-D-PARMM-5-64-113-E-4002
6. SYSTEM SCHEMATIC DIAGRAM FOR
Rev C
PROPOSED KALYANINAGAR IPS.
SYSTEM ARCHITECTURE TYPICAL FOR
PF-D-PARMM-5-43-113-E-4012
7. PROPOSED BHAIROBA 75 MLD STP AND
Rev B
KALYANINAGAR IPS

Section VI-C: Background Information Page 1


12 11 10 9 8 7 6 5 4 3 2 1
N
NOTES :
1. EXISTING DETAILS PROVIDED IN THE
DRAWING IS FOR INFORMATION ONLY
AND TO BE ASCERTAINED BY THE
CONTRACTOR. H
H

TO M

ALANDI
LOHGAON

UMBA
SD-14

ROAD
I
WAKAD
MENTAL HOSPITAL

TO M
17 AERODROME

UMBA
BOPKHEL

MUM

TO M
R G
G DAPODI KALAS GA
BALEWADI NA

I
MAHALUNGE TO

BAI

UMBA
SANGAVI BOPODI 18 MLD VIMANNAGAR 01
- BA
23
SD-15

I
KHULEWADI
NGL KHARADI
ORE BANER 30 MLD CENTRALJAIL
AUNDH AD
GA R RO
KHADAKI
E NA
BYP
BANER SD-13 MENTAL_HOSPITAL PUN
SD-10 SD-12 02
A

SANGAMWADI
SS

SUS
BOPODI KALYANI NAGAR
RAMWADI
KHARADI

PUNE_UNIVERSITY
NEW_KHADAKI 06
F SD-11 19 KALYANI NAGAR
SOMESHWARWADI
KHARADI 40 MLD F
BANER YERWADA

SD-09
SUTARWADI
PASHAN TANAJIWADI 15 BHAIROBA 75 MLD
CHATARSHINGI TANAJIWADI
PUNE STATION BHAIROBA 130 MLD
VAIDWADI 18 17 MLD KOREGAON
BEHRAWADI NAIDU 115 MLD
PARK GHORPURI
16 MUNDHWA 45 MLD
WADIA_COLLEGE
JANWADI WADARWADI
MANGALWAR PETH LONKARVASTI
GHORPURI
FOREST GOKHALENAGAR SHIVAJI NAGAR
HADAPSAR LEGEND

D
10 09

OA
PROPOSED STP

.R
E
KASBA PETH 08 07 E

J.M
BHAVDHAN_KHURD 14 RASTA PETH PUNE SADESATRANAL TO S EXISTING STP
SD-08 O LA
BHAVDHAN_BUDRUKH S. CANTONEMENT PU
R
KOTHRUD P.
RO NANA PETH
EMPRESS_GARDEN MAGARPATTA
PAUD ROAD AD BETAL GARDEN
ERANDWANE 50 MLD
13 MALWADI
LOKMANYANAGAR KASEWADI PUNE
NEW MODIKHANA SOLA
PUR
ERANDWANA R OAD
KOTHRUD DATTAWADI GHORPADE SD-01
SWARGATE
RAMTEKADI MATSYBEEJ
HADAPSAR GADITAL TO SO
LAPUR
WANWADI HINGNEMALA KENDRA
GANESHNAGAR 03 MAHARSHINAGAR
SASANENAGAR
VITTHALWADI LAXMINAGAR
21 SALISBURYPARK
D
D 32 MLD
KALEPADAL
HINGNEBUDRUK NETAJINAGAR SD-02 SAYYADNAGAR
MARKETYARD
SD-07 SD-05
ARANYESHWAR LULLANAGAR MUNDHWA
WARJE MALWADI VITTHALWADI
FOREST

SHANKARNAGAR SANTOSHNAGAR
WARJE SD-03 BHAIROBA BEDWADI
HINGNEKHURD
BUDHAWADI BIBAVEWADI KONDHAWA_KHURD
TO
MIR
MUHAMMADWADI AJ
SD-17 VADGAON_BUDRUK
05 20 22
SHIVANE DAULATNAGAR
DHANKAWADI C
C UTTAMNAGAR
VADGAONKHURD
04 KONDHAWA_BUDRUK

AMBEGAONBUDRUK SD-04
SD-16 DATTANAGAR NAIDU
NANDED KATRAJ
KOLTHEWADI REV. DATE OF DRAWN PREP. CHEC. APPRD. SUBMISSION PURPOSE
ISSUE BY BY BY BY
SD-06
NEW_KHADAKI 06 EXECUTING AGENCY :

NATIONAL RIVER CONSERVATION


VADGAON
KALYANI NAGAR DIRECTORATE MoEF & CC
IMPLEMENTING AGENCY :
B YERWADA B

MANGADEWADI
PUNE MUNICIPAL CORPORATION
GIRINAGAR JAMBHULWADI
NIBALKARWADI CONSULTANT :
GUJARWADI
TANAJIWADI 15 BHAIROBA 75 MLD

PUNE STATION BHAIROBA 130 MLD


Pell Frischmann
Consulting Engineers NJS
KOREGAON FP Project Management NJS Engineers
NAIDU 115 MLD Formerly Frischmann Prabhu (india) Private Limited India Pvt. Ltd.
PARK GHORPURI
16 MUNDHWA 45 MLD
PROJECT :
WADIA_COLLEGE POLLUTION ABATEMENT
MANGALWAR PETH OF RIVER MULA - MUTHA
GHORPURI AT PUNE
HADAPSAR
JICA LOAN NO: ID - P243
A
A
09 PACKAGE P5
08 07
DATE :

DRAWN :
TITLE :
PROPOSED BHAIROBA 75 MLD STP
RASTA PETH PUNE PREPARED :
LOCATION PLAN
PROPOSED 127 MLD NAIDU STP LOCATION PLAN CANTONEMENT CHECKED :
SCALE : DRAWING NO : REV :
EMPRESS_GARDEN APPROVED :
A
12 11 10 9 8 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
N
NOTES :

1. ALL DIMENSIONS ARE IN METRES


UNLESS SPECIFIED.
2. EXISTING DETAILS PROVIDED IN THE
H
H DRAWING IS FOR INFORMATION
ONLY AND TO BE ASCERTAINED BY
THE CONTRACTOR.
3. THE INFORMATION ON NUMBER AND
LOCATION OF TREES IS
APPROXIMATE. THE CONTRACTOR
MUST VERIFY AND CONFIRM ON
FIELD.
4. CONTRACTOR MUST SEEK
NECESSARY PERMISSION FOR TREE
CUTTING FROM CONCERNED
DEPARTMENT BEFORE COMMENCING
15.4

157 187 21.7

161
G
166 160 184 186 190
WORK. G
169 168 167 162 43.9

199 242
5. CONTRACTOR TO ASCERTAIN
11.8

165 164 163 158 189


159 198
7.9

244
DETAILS OF EXISTING
29.1

185
200
170
X
148 149 150 151
153 182 188 246
245
243 31.7

UNDERGROUND UTILITIES BEFORE


193
X

COMMENCING THE WORK.


X

154 183 197

X
.0

152 156

X
13

171

X
10.2

191

X
86 X

155 204
192
X

89 87X
X
X

252
12.8

253
X
X
X
X X

146
X
X

145 147
X

88
X
X
X
51.3 X

249
X

194
195 203
X
X X
X
X 5.0
X
X X
X
X
X

250
X
X
X X
X

286
X
X X
X

205 305304
X

251
X X

254
X
X 7.2

140 142
X
X X
X
X

201 202
X X

93 175 206
X
X

143
X

240
X

139 141
X X
X
X X

255
X
X X
X

144
X X
X

263

11.
X X
X
X
X X

9
94 105 285 303
X
X X

241
X

207
X X

106 239
X

119 172 221


104 120 121
238 261 256
237 220 219 262
85 92 122 267 284
19.9

268
235 236 230
229
176 264 259
222 218 257
177 224 260 258
107 234 217 266 287
108 233 216 265
90 91 123
124 173
174
178
223 215
214 274 288
101 102 118 281
F 125 226 208
227 213 280 283 F
103 225 269
232 228 279
109 179 209
110 282
96 116 275
270
117 231 212 210 277 278
128 211 273
22.8

100 276
95 336 271 272
111 127 327 292
291

30.2
328 306
97 126 180 293 290 289
98 99 129 181
LEGEND
296
115 294 295
112 307
113 114 302
130 335 325 326
346 298 301
133 317 347
138 297 300
299
134
135
132 131
45.4

334
E 318 319 320 E
137
321 333
136

348
76
77

322 343 344


75 349

60.5
345

337
6.4

323 299
332
74 331 338 342
340
100.25
341
5.4

324
0.4

549.87 339
X
X
X
X
X
X
5.9

X
X
X
X

D
X

D
X

72
X
X
X

330
X
X
X
X
X

84 73
X
X
X

316 313 372


X
X

71 350
X

80
X
X
X

79
X
X
X
X

329 312 371 351


X
9.1

78
X
X

83
X
X
X

82
X
X
X

363 362361 360


X
X
X

315
X

81 43 314 367
X

364
X

358
X
X

66
X

359
X

67
X

368
X
X
X

X
X

352
X

68 65 366
63 62 57 369 370
365
55
X X X X X X X X X X X X

23.8
64 310
70 47 353
46 309
45
60 59 56 48
X

311
X

54 44
X

49
X

53 308 354
X
10.8

357
X

50
X
X
X

51
X

58
X

69
X

52 24
X

28 27 23 22
X
X

18
21 20
X

61 25 19
X

29 26 355 356
30 17.9 37.5

4.9
37 36 32 5.0
17
35 33
39.3

38 42 31
39 40 41 28.0
27.4

34 7.4 8.5
7.1 11.7

C
15.1
C
20.1

17.6
18.1

2 3
5 4
6
9 8 7
16 11 10
15 13 12
14

REV. DATE OF DRAWN PREP. CHEC. APPRD. SUBMISSION PURPOSE


ISSUE BY BY BY BY
EXECUTING AGENCY :

NATIONAL RIVER CONSERVATION


DIRECTORATE MoEF & CC
IMPLEMENTING AGENCY :
B B

PUNE MUNICIPAL CORPORATION

CONSULTANT :

Pell Frischmann
Consulting Engineers NJS
FP Project Management NJS Engineers
Formerly Frischmann Prabhu (india) Private Limited India Pvt. Ltd.

PROJECT :
POLLUTION ABATEMENT
OF RIVER MULA - MUTHA
AT PUNE
JICA LOAN NO: ID - P243
A PACKAGE P5 A

DATE : TITLE :
BHAIROBA PUMPING STATION
DRAWN :
EXISTING LAYOUT PLAN
PREPARED :

CHECKED :
SCALE : DRAWING NO : REV :
APPROVED : A
12 11 10 9 8 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
N
NOTES :

1. ALL DIMENSIONS ARE IN METRES


UNLESS SPECIFIED.
2. EXISTING DETAILS PROVIDED IN THE
H
H DRAWING IS FOR INFORMATION
ONLY AND TO BE ASCERTAINED BY
THE CONTRACTOR.
3. THE INFORMATION ON NUMBER AND
LOCATION OF TREES IS
APPROXIMATE. THE CONTRACTOR
MUST VERIFY AND CONFIRM ON
FIELD.
4. CONTRACTOR MUST SEEK
NECESSARY PERMISSION FOR TREE
CUTTING FROM CONCERNED
BATTERY LIMIT BATTERY LIMIT DEPARTMENT BEFORE COMMENCING
G
WORK. G
15.35
21.74
5. CONTRACTOR TO ASCERTAIN
43.87
DETAILS OF EXISTING
7. 11.78 UNDERGROUND UTILITIES BEFORE
87
29.06 COMMENCING THE WORK.
31.7
10.2
X
1
.01 X

13 X

X
X

N- 5100
X
X
X
X 51.27
X
7 X

4.9
X
X
X
X

12.75
X
X
X
X
X

7.19
X
X X
X
X
X X
X
X
X
X X
X X
X

PIPE
X X
X
X X

11.8
19.89

6
F
F
SIG
CHIMNEY N
BO
22.77 AR
D

G+5

4
30.2
SHED

LEGEND
BATTERY LIMIT
E SHED E
45.43

N- 5050
R
GRIT CHAMBE

BATTERY LIMIT
GRIT CHEMBE

W/T

4
60.5
6.4

PUMP
HOUSE
5.41

D BATTERY LIMIT D
X
X
5.86

X
X
X

W/T
X
X
X
X
X
X
X
X
X
X
9.1

X
X

INLET CHAMBER
X
X
X
X
X
X
X
X

X
X
X

23.82
VALVE
CHAMBER
10.79

X X
X
X

TRANSFORMER AREA
X X
X
X

N- 5000
X

C EB 37.53 C
BUS STOP 5.03 17.93 39.33

4.85
28.01
7.43
8.5 7.09 27.43
15.1 11.66

BATTERY LIMIT

LA
BUS STOP BUS STOP TO K REV. DATE OF DRAWN PREP. CHEC. APPRD. SUBMISSION PURPOSE
ALYA ISSUE BY BY BY BY

NA
NI NA EXECUTING AGENCY :
GAR
NATIONAL RIVER CONSERVATION
DIRECTORATE MoEF & CC
IMPLEMENTING AGENCY :
B B

PUNE MUNICIPAL CORPORATION

CONSULTANT :

Pell Frischmann
Consulting Engineers NJS
E- 4900

E- 4950

E- 5000

E- 5050

E- 5100

E- 5150
FP Project Management NJS Engineers
Formerly Frischmann Prabhu (india) Private Limited India Pvt. Ltd.

PROJECT :
POLLUTION ABATEMENT
OF RIVER MULA - MUTHA
AT PUNE
JICA LOAN NO: ID - P243
A PACKAGE P5 A

DATE : TITLE :

DRAWN :
PROPOSED BHAIROBA 75 MLD STP
BATTERY LIMIT
PREPARED :

CHECKED :
SCALE : DRAWING NO : REV :
APPROVED : B
12 11 10 9 8 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
N
NOTES :
1. ALL DIMENSIONS ARE IN METRES
UNLESS SPECIFIED.
2. EXISTING DETAILS PROVIDED IN THE
DRAWING IS FOR INFORMATION ONLY H
H AND TO BE ASCERTAINED BY THE
CONTRACTOR.
3. THE INFORMATION ON NUMBER AND
LOCATION OF TREES IS APPROXIMATE.
THE CONTRACTOR MUST VERIFY AND
CONFIRM ON FIELD.
4. CONTRACTOR MUST SEEK NECESSARY
PERMISSION FOR TREE CUTTING FROM
CONCERNED DEPARTMENT BEFORE
EXISTING COMPOUND WALL PROPOSED RETAINING COMMENCING WORK.
TO BE DEMOLISHED AND WALL TO SITE BOUNDARY 5. CONTRACTOR TO ASCERTAIN DETAILS
PROPOSED NEW COMPOUND EXPOSED TO RIVER TO OF EXISTING UNDERGROUND UTILITIES
G
G BEFORE COMMENCING THE WORK.
WALL TO BE CONSTRUCTED BE CONSTRUCTED BY 187
TENTATIVE LOCATION OF PROPOSED ROAD 30M 6. CONTRACTOR TO PROVIDE RETAINING
157
BY THE CONTRACTOR. 169 168
THE
167
CONTRACTOR.
166 161
162
160
184
186
WIDE AS PER DP PLAN, CONTRACTOR TO WALL TO SITE BOUNDARY EXPOSED
164 163 190 199
165
159
158 189
ASCERTAIN BEFORE COMMENCEMENT
242
OF DESIGN THE RIVER AND NALLAH.
198 244
7. CONTRACTOR TO PROVIDE COMPOUND
170 148
185 OF WORKSP
149 150 151
153 182 188
200
246 243 WALL AND SECURITY GATE AS SHOWN.
98.56 193 245
154
86 171 152 156 183 197 8. CONTRACTOR TO RETAIN / PROTECT
89 87 155 191
N- 5100 88
145 146 147
192 204 EXISTING RETAINING WALL AS SHOWN.
252
93 140 142
194
195 203
253
249 9. CONTRACTOR TO ASCERTAIN DETAILS
98.94 139 141 143 250
94 105 144 175 240 201 202
205 251 254 286 305304 OF EXISTING UNDERGROUND RISING
PIPE
106 119 206
104 172 241 255
85
92
120 121 239
238
221 207 263
285 303 MAIN PARSING TROUGH SITE
122 237 220 261
235 236 230
219
267 262 256 BOUNDARY BE FOR COMMENCING THE
176 229 268 284
F 107 177 222 218 264 259
WORK.
108 234 224 260 258 257 F
90 91 217
266
CHIMNEY 101 102
118
124
123
173
174
178
233
223 215
214
216
265
287 SIG
274 288 N
103 125
227
226
213
208 281 BO
96 110
109
179
232 228 225 269 280 283 AR
99.71 116 209 279
282
D
101.46 117 270 275
95 100 128 231 212
211 210 277 278
111 336 273
276
G+5 101.43 127
327 271 272
97 328 292
126 180 SHED 291
306
98 99 293 290 289
101.53 129 181
115
112 113 296
114 294 295
130
335 325 326 302
307 LEGEND
133
138
317
346
298 301
PROPOSED
347
134
SHED 297 300
RETAINING WALL
E 135 299 E
132
131 PROPOSED
334 102.64 COMPOUND WALL
137 98.89
318 319 TENTATIVE ROAD

100
136 320
321
WIDENING
100

333
N- 5050 102.63
101.74 98.96
76 98.94 EXISTING
R

COMPOUND WALL

100
77
GRIT CHAMBE

348
R
GRIT CHEMBE

101.79 75 98.87 322


343 344
98.88

W/T
349
101.81
98.90 345
101.82 PUMP
323
74
HOUSE 332 337 102.25
331 338 342
D 103.42 324 340 341 D
98.88 102.25
101.81 98.88 100.25
339
W/T

72 98.88

84 73
EXISTING RETAINING
102.25
330
80
79
71
316 313 372
WALL TO BE
350 102.26
INLET
82
83 CHAMBER 78 98.96
329 RETAINED/PROTECTED,
312 371 351
81
67 66
98.92
43 315 314 363 362361 360 EXISTING COMPOUND
102.26

65 367
102.25 WALL TO BE DEMOLISHED
68 63 62 364 358
57 368 359
366 352
101.40 64 55
98.41 VALVE 369 370
70 100.03
47
46
CHAMBER
310
365
102.26
AND PROPOSED NEW
101.40 60 59 309
56
54 48
45 353
COMPOUND WALL TO BE
X

53 44 102.78
X

49 311
TRANSFORMER AREA 102.69
X

102.73 308
X

50 102.26
CONSTRUCTED BY THE
X

69 58 51 102.75 357 354


X
X

61 102.67 52 28 27 24
X

102.62 23 102.27
N- 5000 22
X

C 37 36 30 B
E29 26 25 102.79 102.73
21 20 19 18
CONTRACTOR. C
38
40 41
102.56
42
102.51 35
33
32 BUS STOP 102.75 102.60
355 356
39 102.64 102.62 102.63 31 17
34

PROPOSED NEW COMPOUND


WALL TO BE CONSTRUCTED
BY THE CONTRACTOR. 1

2 3
5
6

LA
9 8 4
15 16 13 12 11 10
BUS STOP BUS STOP 7 TO K REV. DATE OF DRAWN PREP. CHEC. APPRD. SUBMISSION PURPOSE
14 ALYA ISSUE BY BY BY BY

NA
NI NA EXECUTING AGENCY :
GAR
NATIONAL RIVER CONSERVATION
DIRECTORATE MoEF & CC

B
EXISTING COMPOUND WALL EXISTING COMPOUND NORTH MAIN ROAD IS PROPOSED UNDER TENTATIVE LOCATION OF IMPLEMENTING AGENCY :
B

TO BE DEMOLISHED AND WALL TO BE DEMOLISHED WIDENING TO 24M AS PER DP PLAN, EXISTING UNDERGROUND PUNE MUNICIPAL CORPORATION
PROPOSED NEW COMPOUND BY THE CONTRACTOR CONTRACTOR TO ASCERTAIN BEFORE RISING MAIN TO BE
CONSULTANT :
WALL TO BE CONSTRUCTED COMMENCEMENT OF DESIGN OF WORKS (TO RETAINED/PROTECTED BY
BY THE CONTRACTOR. BE CONFIRMED FROM PMC) THE CONTRACTOR Pell Frischmann
Consulting Engineers NJS
E- 4900

E- 4950

E- 5000

E- 5050

E- 5100

E- 5150
FP Project Management NJS Engineers
Formerly Frischmann Prabhu (india) Private Limited India Pvt. Ltd.

PROJECT :
POLLUTION ABATEMENT
OF RIVER MULA - MUTHA
AT PUNE
JICA LOAN NO: ID - P243
A PACKAGE P5 A

DATE : TITLE :

DRAWN :
PROPOSED BHAIROBA 75 MLD STP
SITE AREA AND FENCING
PREPARED :

CHECKED :
SCALE : DRAWING NO : REV :
APPROVED : B
12 11 10 9 8 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1

NOTES :

H
H

G
G
UTILITY SCOPE (MSEDCL)

F
F

PACKAGE - 5
CONTRACTOR SCOPE
LEGEND

E E

D D

C C

REV. DATE OF DRAWN PREP. CHEC. APPRD. SUBMISSION PURPOSE


ISSUE BY BY BY BY
EXECUTING AGENCY :

NATIONAL RIVER CONSERVATION


DIRECTORATE MoEF & CC
IMPLEMENTING AGENCY :
B B

PUNE MUNICIPAL CORPORATION

CONSULTANT :

Pell Frischmann
Consulting Engineers NJS
NJS Engineers
FP Project Management
Formerly Frischmann Prabhu (india) Private Limited India Pvt. Ltd.
PROJECT :
POLLUTION ABATEMENT
OF RIVER MULA - MUTHA
AT PUNE
JICA LOAN NO: ID - P243
A PACKAGE P5 A

DATE : TITLE :

DRAWN :
ELECTRICAL POWER DISTRIBUTION
PREPARED :
SYSTEM SCHEMATIC DIAGRAM
CHECKED :
FOR BHAIROBA STP
SCALE : DRAWING NO : REV :
APPROVED : B
12 11 10 9 8 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1

NOTES :

H
H

G
G

EXISTING ELECTRICAL
POWER DISTRIBUTION
SYSTEM

F
F

PACKAGE-5
CONTRACTOR SCOPE
LEGEND

E E

D D

C C

REV. DATE OF DRAWN PREP. CHEC. APPRD. SUBMISSION PURPOSE


ISSUE BY BY BY BY
EXECUTING AGENCY :

NATIONAL RIVER CONSERVATION


DIRECTORATE MoEF & CC
IMPLEMENTING AGENCY :
B B

PUNE MUNICIPAL CORPORATION

CONSULTANT :

Pell Frischmann
Consulting Engineers NJS
FP Project Management NJS Engineers
Formerly Frischmann Prabhu (india) Private Limited India Pvt. Ltd.

PROJECT :
POLLUTION ABATEMENT
OF RIVER MULA - MUTHA
AT PUNE
JICA LOAN NO: ID - P243
A PACKAGE - 5 A

DATE : TITLE :

DRAWN :
ELECTRICAL POWER DISTRIBUTION
PREPARED :
SYSTEM SCHEMATIC DIAGRAM
CHECKED :
FOR KALYANI NAGAR IPS
SCALE : DRAWING NO : REV :
APPROVED : C
12 11 10 9 8 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1

NOTES :

H
H

G
G

F
F

'' '' ''


E
RIO-1 RIO-2 ----- ----- ----- ----- RIO-N E

D D

C C

REV. DATE OF DRAWN PREP. CHEC. APPRD. SUBMISSION PURPOSE


ISSUE BY BY BY BY
EXECUTING AGENCY :

IMPLEMENTING AGENCY :
B B

CONSULTANT :

NJS Engineers
Formerly Frischmann Prabhu (india) Private Limited India Pvt. Ltd.
POLLUTION ABATEMENT
PROJECT :

OF RIVER MULA - MUTHA


AT PUNE

A
A

DATE : TITLE :

DRAWN :

PREPARED :

CHECKED :
SCALE : DRAWING NO : REV :
APPROVED :

12 11 10 9 8 6 5 4 3 2 1
Project for Pollution Abatement of River Mula-Mutha Volume – 2 - Employer’s Requirements
Construction of 75 MLD Bhairoba STP on DBO Basis, Including Rehabilitation of Kalyani Nagar
Intermediate Pumping Station (IPS)

Annexure 2 – Geotechnical Data

A) Location Plan (Borehole)

Section VI-C: Background Information Page 9


Project for Pollution Abatement of River Mula-Mutha Volume – 2 - Employer’s Requirements
Construction of 75 MLD Bhairoba STP on DBO Basis, Including Rehabilitation of Kalyani Nagar
Intermediate Pumping Station (IPS)

B) Borehole Logs

Section VI-C: Background Information Page 10


Project for Pollution Abatement of River Mula-Mutha Volume – 2 - Employer’s Requirements
Construction of 75 MLD Bhairoba STP on DBO Basis, Including Rehabilitation of Kalyani Nagar
Intermediate Pumping Station (IPS)

Section VI-C: Background Information Page 11


Project for Pollution Abatement of River Mula-Mutha Volume – 2 - Employer’s Requirements
Construction of 75 MLD Bhairoba STP on DBO Basis, Including Rehabilitation of Kalyani Nagar
Intermediate Pumping Station (IPS)

Section VI-C: Background Information Page 12


Project for Pollution Abatement of River Mula-Mutha Volume – 2 - Employer’s Requirements
Construction of 75 MLD Bhairoba STP on DBO Basis, Including Rehabilitation of Kalyani Nagar Intermediate Pumping Station (IPS)

C) Summary of Lab Test Results

Section VI-C: Background Information Page 13


Project for Pollution Abatement of River Mula-Mutha Background Information
Construction of 75 MLD Bhairoba STP on DBO Basis, Including Rehabilitation of Kalyani Nagar
Intermediate Pumping Station (IPS)
ROCK TEST RESULTS

Avg. Avg. Unconfined


BH Depth Specific Water
dia of height Density Porosity Comp.
NO. (m) Gravity Absorption
core of core Strength
(mm) (mm) (kg/m3) % % (kg/cm2)
9.0-
BH-1 54 108 2674 1.84 20.91 38.57 438.64
10.0
BH-2 8.0-9.0 54 108 2484 2.02 2.33 4.71 346.01
BH-3 6.6-8.0 54 85 2338 1.77 9.64 17.05 36.96
Note : BH-Borehole, PC –Piece No.

Section VI-C: Background Information Page 14


Project for Pollution Abatement of River Mula-Mutha Background Information
Construction of 75 MLD Bhairoba STP on DBO Basis, Including Rehabilitation of Kalyani Nagar Intermediate
Pumping Station (IPS)

D) Site Photographs

Location: BH-1

Description: BH-1 is drilling for 10m depth from the ground existing ground at the time of
investigation. Photo shows general site view at the time of investigation & drilling in progress

Total samples recovered from borehole kept in core box. All samples are properly tagged &
placed in sequence.

Section VI-C: Background Information Page 15


Project for Pollution Abatement of River Mula-Mutha Background Information
Construction of 75 MLD on DBO Basis, Including Rehabilitation of Kalyani Nagar Intermediate Pumping
Stations (IPS)

Location: BH-2

Description: BH-2 is drilling for 10m depth from the ground existing ground at the time of
investigation. Photo shows general site view at the time of investigation & drilling in
progress

Total samples recovered from borehole kept in core box. All samples are properly tagged &
placed in sequence

Section VI-C: Background Information Page 16


Project for Pollution Abatement of River Mula-Mutha Background Information
Construction of 75 MLD on DBO Basis, Including Rehabilitation of Kalyani Nagar Intermediate Pumping
Stations (IPS)

Location: BH-3

Description: BH-3 is drilling for 8m depth from the ground existing ground at the time of
investigation. Photo shows general site view at the time of investigation & drilling in
progress.

Total samples recovered from borehole kept in core box. All samples are properly tagged &
placed in sequence

Section VI-C: Background Information Page 17


Project for Pollution Abatement of River Mula-Mutha Background Information
Construction of 75 MLD on DBO Basis, Including Rehabilitation of Kalyani Nagar Intermediate Pumping
Stations (IPS)

Annexure 3 – Influent Quality Data


Summary Sheet

Raw Sewage - (Bhairoba STP)

Sample Collection Date 26.03.2018 28.03.2018 31.03.2018


Tue (TIME:- Thu (TIME:- 10 Sun (TIME :-
Day & Time
10 AM TO 12PM) AM TO 12PM) 10 AM TO 12PM)
Analysis Start Date 26.03.2018 28.03.2018 31.04.2018
Analysis Completion Date 03.04.2018 06.04.2018 09.04.2018
Report No. 1445 1451 1481
Sl.
Parameters Method Unit Results
No.
APHA
1 pH 4500 - -- 6.61 6.6 6.58
H+ B
Suspended APHA
2 mg/L 136 272 198
Solids 2540 D
APHA
3 C.O.D. mg/L 204 399.51 269
5220 C
3 Day B.O.D. IS: 3025
4 mg/L 77 145 109
@ 27OC (Part 44)
IS:3025
5 Oil & Grease mg/L BDL(MDL<0.1) BDL(MDL<0.1) BDL(MDL<0.1)
(Part 39)
APHA
6 Total Phenol mg/L BDL(MDL<0.001) 0.02 BDL(MDL<0.001)
5530 C
IS 3025
7 Arsenic mg/L BDL(MDL<0.01) BDL(MDL<0.01) BDL(MDL<0.01)
(Part 37)
Ammonical IS 3025
8 mg/L 17.64 21.28 20.16
Nitrogen (Part 34)
Filtered APHA
9 mg/L 41 88.19 72
C.O.D. 5220 C
APHA
10 Cadmium mg/L BDL(MDL<0.3) BDL(MDL<0.3) BDL(MDL<0.3)
3111 B
APHA BDL(MDL<0.00
11 Mercury mg/L BDL(MDL<0.001) BDL(MDL<0.001)
3112 B 1)
Filtered 3
IS: 3025
12 Day B.O.D. mg/L 10 20 16
(Part 44)
@ 27OC
APHA
Total kjeldahl
13 4500- mg/L 23.97 37.8 29.68
Nitrogen
NH3-B
APHA
14 Calcium 3500-Ca mg/L 39 34.47 36.87
B.

Section VI-C: Background Information Page 18


Project for Pollution Abatement of River Mula-Mutha Background Information
Construction of 75 MLD on DBO Basis, Including Rehabilitation of Kalyani Nagar Intermediate Pumping
Stations (IPS)

APHA
15 Magnesium 3500-Mg mg/L 14 16.04 14.58
B.
Volatile
APHA
16 Suspended mg/L 106 212 154
2540 E
Solids
Flocculated &
APHA
17 Filtered mg/L 28 83 60
5220 C
C.O.D.
IS: 3025
18 Alkalinity mg/L 209 276.86 265.96
(Part 23)
µmh
APHA
19 Conductivity os/C 600 650 610
2510 B
m
APHA
Total
20 4500 – P mg/L 2.142 2.016 4.078
Phosphorous
D

Section VI-C: Background Information Page 19