Operating & Maintenance Instructions Bladder Accumulators

Trouble Shooting Guide

Type of Damage Cause Response


External Leakage from Gas Valve
Any leakage from the gas valve if not detected Any loss of Nitrogen from the gas valve will Always ensure that after pre-charging, or du-
will eventually lead to bladder failure. cause the compression ratio on the bladder ring service intervals where the pre-charge
to be exceeded and eventually cause the is checked, that the gas valve is inspected
bladder to fail. for leaks.
Severe leakage from the Gas Valve Gas valve assembly or valve core damaged. Replace Gas Valve.
In-correct charge valve used – gas valve has Ensure the correct charging equipment is
been tampered with. used.

External Leakage from Fluid Port


Leaking Oil between Fluid Port body and Damaged O-Ring caused during assembly or Replace Fluid Port O-Ring.
Accumulator Shell. ‘O’ ring has become hard due to high oil Check Assembly Methods
temperatures. Check oil system temperature.

O’Ring

Internal Leakage from Bladder


Upon pre-charge and less than 29 PSI (2 bar) The Accumulator was not lubricated properly Replace Bladder.
the Bladder fails leaving a star shape burst and / or pre-charged too quickly. Ensure that the Shell and Bladder are well
pattern at the bottom of the Bladder. Excessive stretching of the bladder or the lubricated with system fluid.
lower region has been caught in the poppet Pre-charge very slowly until the poppet valve
valve. is closed.

Bladder has abrasion lines on 1, 2 or 3 sides. The compression ratio between Max. and Min. Replace Bladder.
There is a failure along one of marked lines. pressure is too high. The pre-charge pressure Ensure that the compression ratio is below 4:1 –
is too low or has not been checked for a Check pre-charge pressure more frequently.
long time. Replace with Bladder that has a higher acro-
Gas permeation is an issue. lynitrile percentage.

Bladder has failed at the bonded seam – Bladder has rubbed on the inside of the shell Replace Bladder.
Vulcanizing failure. due to the compression ratio too high. Ensure that the compression ratio is below 4:1
Manufacturing or Material fault. Check pre-charge pressure more frequently.

Bladder has Circular cut mark on the base. Pre-charge pressure is too high. Lower Pre-charge pressure.

Bladder has a pin hole around the tip of the Loss of pre-charge pressure, leaking gas Check / replace gas valve
Bladder. valve, the pre-charge pressure has not Check pre-charge more frequently.
been checked.

www.stauff.com 31

STFF-195_Revised_Accumulators 2012.indd 31 4/4/13 3:53 PM


Bladder Accumulators Operating & Maintenance Instructions

Trouble Shooting Guide

Type of Damage Cause Response


Internal Leakage from Bladder
Bladder has hardened and is carbonized. Accumulator cycle time is very quick along Replace Bladder,
with a very high compression ratio, causing Check Accumulator cycle time and reduce or
high gas temperature. increase size of Accumulator.
Oil temperature is too high.. Ensure oil temperature is lowered to the
correct level.
Bladder is swollen. Incorrect bladder material. Check compatibility of the bladder material
System fluid is not compatible with the blad- with the fluid used.
der material. Consult Accumulator manufacturer.

Anti- Extrusion Ring


Anti-Extrusion Ring has split into two halves Normal wear and tear. Re-place Anti-Extrusion Ring.
after disassembly.

Fluid Port Assembly


Worn Poppet Valve. Normal Wear. Replace Fluid Port Assy.
Excessive side movement in the poppet valve Poppet valve is operated during each cycle. Ensure pre-charge pressure is lowered to
or poppet valve is sticking when pushed The pre-charge is too close or higher than the <90% of minimum working pressure.
down. minimum working pressure. Decrease flow rate, use a larger Accumulator
The flow rate from the accumulator is above with bigger port.
the recommend flow rate for that model. Increase the number of Accumulators used to
reduce the output flow.

Poppet Valve is broken. Poppet valve is operated during each cycle. Replace Fluid Port Assy.
Very High Cycling application. The pre-charge is too close or higher than the Ensure pre-charge pressure is lowered to
minimum working pressure. <90% of minimum working pressure.
The flow rate from the accumulator is above Decrease flow rate, use a larger Accumulator
the recommend flow rate for that model. with bigger port.
Increase the number of Accumulators used to
reduce the output flow.