Beruflich Dokumente
Kultur Dokumente
Library Changes
Issue 02
Date 2019-06-29
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Website: http://www.huawei.com
Email: support@huawei.com
Contents
1 Library Changes.............................................................................................................................1
1 Library Changes
5G RAN2.1 02 (2019-06-29)
This issue introduces the following changes to 5G RAN2.1 01 (2019-06-13).
Change Document
Type
Modified MIMO
5G RAN2.1 01 (2019-06-13)
This issue introduces the following changes to 5G RAN2.1 Draft D (2019-05-10).
Change Document
Type
Change Document
Type
Modified All other documents, except for MIMO, Bandwidth Sharing of Multimode
Base Station Co-Transmission , IP Active Performance Measurement ,
Common Transmission , Security Overview, Transmission Security
Overview , Equipment Security, Base Station RTOS Security , Inventory
Management , Power Supply Management , Fault Management ,
Monitoring Management , Configuration Management , Time
Management , Performance Management , and Software Management
Change Document
Type
Modified All other documents, except for CPRI MUX (LampSite), Time
Management, Inventory Management , Fault Management, Configuration
Management , Performance Management, Software Management,
Transmission Security Overview , and Base Station RTOS Security
Change Document
Type
Change Document
Type
Modified MIMO
Modified Scheduling
Modified Synchronization
Modified ANR
Modified IPsec
Change Document
Type
New DRX
New ANR
Change Document
Type