STANDARD INSPECTION AND TEST PLAN

ITP No: 653


SACRIFICIAL ANODE INSTALLATION FOR TANKS

0 30/04/98 Issued for Implementation CMA SW MK


REV DATE REVISION BY CHKD APPR

p:\\itp\\electric\\itp653.doc Standard Inspection and Test Plan ITP No. 653 Rev 0 Page 1 of 2
Standard Inspection and Test Plan
ITP No. 653

FORMS INDEX

LIST OF ATTACHED FORMS

No. Form No. Rev. Description


1. ITP-653 1 Sacrificial Anode Installation for Tanks
2.
3.

LIST OF REFERENCED FORMS

No. Form No. Doc. Ref. Description


1.
2.
3.

Note: The referenced forms are included in and controlled by the referenced document.
Therefore, the latest revision of these forms, at the time of initiation of the forms, will be
utilised.
p:\\itp\\electric\\itp653.doc Standard Inspection and Test Plan ITP No. 653 Rev 0 Page 2 of 2
STANDARD INSPECTION AND TEST PLAN ITP No. ITP-653

BECHTEL - EAMS Rev. No. 1

SACRIFICIAL ANODE INSTALLATION FOR TANKS Hand. Class. Specific


Page 1 of 1
UNIT/ AREA ISO NO.: BARCODE

Activity Inspection/Test Reference Document Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Spec./Dwg./QCP No.: Sub-Contr. QC Contractor QC. Bechtel Rep. Client/TPI Rep. Reference No.:
653-1.0 Anodes installed and backfilled as specified.  Distance from tank as specified. Manufacturers W W
 Installed at depth as specified. Instructions
 Backfilled as specified. Drawings
Spec Rqs.
653-2.0 The below ground CP cable for the tank  Correct location and depth. Manufacturers W W
installed as per requirement.  Correct size and type of cable. Instructions
Drawings
Spec. Rqs.
653-3.0 Splicing of below grade CP cable.  Correct type of splice used. Manufacturers S S
 Splice wrapped and coated as specified. Instructions
 Splice checked for tightness. Drawings
Spec. Rqs.
653-4.0 Tank CP cable network complete  All underground cells backfilled. Manufacturers W W
Instructions
Drawings
Spec. Rqs.
653-5.0 CP connections to tank.  Steel surfaces wire brushed and thoroughly Manufacturers W W
cleaned prior to installing ground lug. Instructions
 Correct type and size of cells. Drawings
 Check connections for tightness. Spec. Rqs.
653-6.0 Tank anode installation complete.  Verify all inspections/tests complete and H H W
conformant.
 Anode installation released.

Legend : S - Surveillance Inspection W - Witness Inspection Point H - Mandatory Hold Point For Inspection R - Record Review Note : * Generic Record not attached to ITP
Sub -contractor QC Date & Signature /Stamp No. Contractor QC Date & Signature /Stamp No. Bechtel Rep. Date & Signature /Stamp No. Client/TPI Rep. Date & Signature/ Stamp No. Computer. Ref. :

System File Reference: