REQUIRED : HT Megger,
ENSURE OPERATIONS Screw Driver set, APPAREL,HARNESS,SIGNS
INFORMED/SAFETY Spaner Set, Blower, Multimeter, Hand Lamp
AND BARRIERS ARE, USED/PLACED
ecleaner and cotton waste.
AS REQUIRED
TRANSFORMER
* TAKE ISOLATION FROM HT CIRCUIT BREAKER AND LT CIRCUIT.
* PERFORM A THAROUGH VISUAL INSPECTION OF PRIMARY AND SECONDARY CONNECTION.
* ENSURE THE TEMPORARY EARTH CONNECTION HAS BEEN REMOVED BEFOREN HANDING OVER.
* SWITCH ON HT CIRCUIT BREAKER AND
CHECK THE 3- PHASE SUPPLY AT METER ON LT BREAKER. THEN SWITCH ON LT BREAKER ALSO.
* CHECK THE EARTH FAULT VALUE AND OVERLOAD VALUE WITHIN SPECIFIED LIMIT
* RECORD THE TAP CHANGER POSITION .
TRAFO NO.
CONNECTION RESISTANCE MEGGER
& RATING
UNIT R-Y Y-B B-R R-E Y-E B-E R-Y Y-B B-R
HT TRANSFORMER PRIMARY
DY11
HT TRANSFORMER SECONDARY
SETTING Actual reading
WINDING TEMP ALARM
WINDING TEMP TRIP
OIL TEMP ALARM
OIL TEMP TRIP
CONDITION CONNECTION SECURITY MOUNTING REMARKS
TIGHTNESS OF POWER CABLE CONNECTIONS
HT END TERMINATION TIGHTNESS
SILICA GEL (IF REDISH, CHANGE IT)
INDICATION LAMP OF TMG PANEL
Function of TRANSFORMER ANNUNCIATION PANEL
Functioning of BUCHOLZ RELAY
MARSHILING BOX
DOUBLE EARTHING
CONSERVATOR OIL LEVEL
OIL LEKAGE
PRESSURE VALVE
TANK LEVEL GAUGE
TRAFO CABLE(CABLE GLAND,TIGHTNESS AND TRENCH)
PRIMARY AND SECONDARY TERMINAL BUSHING
HT CABLE TERMINAL BOX
LT CABLE TERMINAL BOX
BLOWING OF TRAFO PANELS
CHECK TRIPING CIRCUIT FOR PROPER FUNCTION
Check Tripping Circuit Voltage and Charger
BREATHER
Condition of Exhaust fans
Condition of Drains / trenches
Transformer room illumination
ADDITIONAL INFORMATION
DOC NO-
WORK INSTRUCTION FOR PORT
TITLE: MAINTENANCE OF HT TRANSFORMER
REV-
SPECIFICATION
EFFECTIVEHTDATE
TRANSFORMER (4 NOS) , MAKE : 2NO'S- 1600KVA ,11/3.3 KV & 2 NO'S 600KVA 11/415V
TOOLS REQUIRED
ENSURE OPERATIONS INFORMED/SAFETY APPAREL,HARNESS,SIGNS AND BARRIERS ARE USED/PLACED AS REQUIRED
TRANSFORMER
* TAKE ISOLATION FROM HT CIRCUIT BREAKER AND LT CIRCUIT.
* PERFORM A THAROUGH VISUAL INSPECTION OF PRIMARY AND SECONDARY CONNECTION.
* ENSURE THE TEMPORARY EARTH CONNECTION HAS BEEN REMOVED BEFOREN HANDING OVER.
* SWITCH ON HT CIRCUIT BREAKER AND CHECK THE 3- PHASE SUPPLY AT METER ON LT BREAKER. THEN SWITCH ON LT BREAKER ALSO.
* CHECK THE EARTH FAULT VALUE AND OVERLOAD VALUE WITHIN SPECIFIED LIMIT
* RECORD THE TAP CHANGER POSITION .
MEGGER
Y-B B-R
REMARKS
HANGE IT)