Title: CABLE DRUM INSPECTION - Protocol for measurements of power cables Protocol ¹ upto 1000V insulation resistance on the drum Ïðîòîêîë ¹ Íàçâàíèå: Ï£ÎÂÅ£ÊÀ ÊÀÁÅËÜÍÛÕ ÁÀ£ÀÁÀÍΠ- Ïðîòîêîë èçìåðåíèÿ ñîïðîòèâëåíèÿ èçîëÿöèè ñèëîâûõ êàáåëåé äî 1000 íà áàðàáàíå Project No.: Area/Unit: ¹ ïðîåêòà: Ó¾àñòîê/Óñòàíîâêà: Project Title: System/Sub System: / Íàçâàíèå ïðîåêòà: Ñèñòåìà/Ïîäñèñòåìà: Equip. Desc.: Equip Tag No.: Îïèñàíèå îáîðóäîâàíèÿ: Íîìåð îáîðóä:
INFORMATION AND INSPECTION ÈÍÔΣÌÀÖÈß È ÊÎÍÒ£ÎËÜ
Manufacturer Èçãîòîâèòåëü Cable Schedule Drwg No rev. ¹ Êàáåëüíîãî æóðíàëà £åâèçèÿ Termination Drwg No rev. ¹ Èñïîëíèòåëüíîãî ¾åðòåæà £åâèçèÿ DESCRIPTION OF CHECK Confirm the following: Ñonclusion ÎÏÈÑÀÍÈŠϣÎÂÅ£ÊÈ Ïîäòâåðäèòå ñëåäóþùåå: Çàêëþ¾åíèå 1 Cables are not damaged and suitable for installation Êàáåëè íå ïîâðåæäåíû è ïðèãîäíû äëÿ ìîíòàæà 2 Insulation and Continuity checks performed on cable drum prior to pulling the cable off the drum Èñïûòàíèå èçîëÿöèè è íåïðåðûâíîñòè âûïîëíåíû íà êàáåëüíîì áàðàáàíå äî ðàçìîòêè êàáåëÿ ñ áàðàáàíà 3 Identification correct Ìàðêèðîâêà ïðàâèëüíà 4 Cables are sized correctly as per Specification for Electrical Design 0-000-P-1140 Section 29. £àçìåðû êàáåëåé ïðàâèëüíû è ñîîòâåòñòâåííû ñïåöèôèêàöèè äëÿ Ïðîåêòà Ýëåêðîòåõíè¾åñêèõ ðàáîò 0-000-P-1140 £àçäåë 29 TEST EQUIPMENT ÎÁΣÓÄÎÂÀÍÈÅ, ÈÑÏÎËÜÇÓÅÌÎÅ Ï£È ÈÑÏÛÒÀÍÈÈ Make Model Serial No Expiry Date Ñäåëàíî Ìîäåëü ¹Ñåðèè Äàòà ñëåä. ïðîâåðêè ïðèáîðà
Voltage Íàïðÿæåíèå
Punch list raised
Ïåðå¾åíü íåäîäåëîê ñîñòàâëåí Note: This checklist should be used with ECL 040A-2 Çàìå¾àíèå: Ýòà êîíòðîëüíàÿ âåäîìîñòü äîëæíà áûòü èñïîëüçîâàíà âìåñòå ñ êîíòðîëüíîé âåäîìîñòüþ ECL 040A-2 Completed By Çàïîëíèë Approved By Îäîáðåíî Accepted by Ïðèíÿòî Company Çàêàç¾èêîì Job Title Äîëæíîñòü