- What is the company role in the project? Supplier / Manufacturer / Subcontractor
- Company profile attached? Y/N/NA - Organization Chart / Key personel details attached? Y/N/NA - Is the company ISO:9001:2008 Certified? Y/N/NA - Does the company have a valid commercial, registration no. (CR) in Qatar? Y/N/NA - Does the company have a valid membership with Qatar Chamber of Commerce and Industry? Y/N/NA - Is the company product / service list / catalogue attached? Y/N/NA - Is the company listed under the client specified vendor list? Y/N/NA - Summary of the current / most similar projects of similar nature in Qatar / Middle East is attached? Y/N/NA - Previous approval records attached? Y/N/NA
Material Submittal
- Is the supplier/subcontractor prequalification documents submitted earlier to GHD and
approved with code status A or B? Y/N/NA - Is the proposed material as per the specified vendor list? Y/N/NA - Comparison sheet attached (if material not as per specified vendor list)? Y/N/NA - Is the compliance sheet to project specification / QCS requirement attached? Y/N/NA - Is the country of origin certificate attached? Y/N/NA - Is the warranty certificate attached? Y/N/NA - Is the warranty period equal to or greater than the project requirement? Y/N/NA - Is spare parts / materials required for this material? Y/N - Is the product catalogue showing the main features and characteristic of the supplied material attached? Y/N/NA - Installation, Operation & Maintenance details attached? - Are samples of the proposed material attached? Y/N/NA - Are test certificates for the supplied materials (as approved by third party) attached? Y/N/NA - Is the supplied materials approved by Qatar Civil Defence Department (if required)? Y/N/NA - If subsequent submission: Response to consultants’ comment sheet to be attached
Shop drawing submittal
- Reference to IFC drawing stated?
- is there any RFI response incorporated in the revision? Material Delivery Inspection
- Reference to approved material submittal stated?
- Reference to approved structural calculations stated? - Material delivered on site as per approved physical sample? - Supplier Invoice attached? - Certificate of country of origin attached? - Manufacture Certificates attached? - Bill of Laden attached?
Inspection Request
- Reference to approved shop drawing stated?
- Reference to approved material submittal/s stated? - Reference to approved material delivery inspection stated? - Reference to approved method statement stated?
Request for Information
- With cost and time implication? Y/N, if Yes why
- Reference to Project specification, IFC drawing, BOQ stated?