Checklist for Material Submittal

Sl. Not
Description of Activity Yes No Remarks
no Applicable

1
PQD Approval Status

2 Material as per the Specified Vendor List

3
Comparison sheet attached

Compliance Sheet to Project Specification /QCS requirement


4
attached
5
Country of Origin certificate attached

6 Warranty certificate attached

7 Warranty period equal to or greater than the project requirement

8 Spare parts / material required for this material

Product Catalogue showing the main features and characteristic of


9
the supplied material attached

10 Installation, Operation & Maintenance details attached

11 Samples of the proposed material attached

Test certificates for the supplied materials (as approved by third


12
party) attached

13 Material approved by Qatar Civil Defense Department (if required)

Reply to Consultants comment sheet to be attached


14

Approved by
Prepared by Sub-Contractor Reviewed by Main Contractor
(Consultant
(QA/QC Engineer): (QA/QC Engineer):
Representative):
Name: Name: Name:

Sign: Sign: Sign:

Date: Date: Date: