Beruflich Dokumente
Kultur Dokumente
Ground
Ground
Above
Under
To Main Gate Security Hut
n
Proposed Locatio Railway Line
1mx1mx0.3m) Rail bar
(Working Space
Exis. Pile
Short Wall
Exis. Pile Exis. Pile
BW
BW
Exis. Pile
Short Wall
0.9
Fence
BW
Building
BW
End Point
(Baron Jayathilaka Mawatha)
PLAN VIEW
PROPOSED DI 1000 FEEDER MAIN AT PORT AUTHORITY
CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN WEST OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 26.07.2020 NTS
CONTRACTOR. RASIKA INDIKA GUO JUN
(Varie at Site)
(Varie at Site)
1.43
200mm Long
1.00
1.00
25mm Thick 0.40
Neoprene
0.50
0.50
0.30
(For RHS) Section A - A Section B - B
B
A A
B1
2.00 1.00
A1 A1
100x10 mm Stainless B
2.00
B1 Neoprene 100x25 mm
Plan Rubber Pad Stainless Steel
G25 Concrete Plate
2.00
Block Section B1 - B1 Fillet
Welding
(For LHS) M24 Stainless Steel
Rag Bolt & Nut
200mm Long
Detail of Pipe Support Detail ''A''
CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN WEST OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 26.07.2020 NTS
CONTRACTOR. RASIKA INDIKA DHARSHANA
CHEC-CGC JV TITLE: 2 REVISED AS PER LATEST BRIDGE DETAILS 26.07.2020 CERTIFIED CORRECT : DRG.NO. REV.
PROPOSED PIPE BRIDGE DETAILS AT PORT AUTHORITY 1 REVISED AS PER LATEST BRIDGE DETAILS 07.03.2019
PREMISES. CHEC-CGC/GCWMP/FM01/BC/002 2
0 ISSUED FOR APPROVAL 24.08.2018 PROJECT MANAGER OF THE CONTRACTOR. DATE TEAM LEADER.
Security Hut
BW
0.9
Fence
BW
Building
BW
End Point
(Baron Jayathilaka Mawatha)
1.13
0.85
2.48
SECTION X1 -X1
CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN WEST OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 26.07.2020 NTS
CONTRACTOR. RASIKA INDIKA GUO JUN