RISK ASSESSMENT (RA) ON – GENERAL PREHEATING FLARING
DOC. No. Effective Date: Next Review Date not later than: Rev No.
RA-PROD–014-GALLAF 15.01.2020 15.01.2023 00
Page 1 of 11
This document contains trade secrets, proprietary and confidential information and is only
intended for use by PT SMOE Indonesia for its own purposes.  Any unauthorized disclosure, use Reviewed By: Approved By
or dissemination either in whole or in part is strictly prohibited. No representation, warranty, Document Administrator Andi Setiyawan Didi Hariyanto Document Owner
guarantees or undertaking expressed or implied is made by SCM Group as to the fairness, Wulandari (HSE Admin) (HSE Project Manager) (Const. Manager) Signature Nasri (PMT)
BE
accuracy or completeness of any information or data contained in this document. ISO 9001 ISO 45001 SMK3 ISO 14001 ISO 27001 COBIT ITIL ISPS ISO 22301 FRAMEWORK
6.1 6.1.2 2.1.2 6.1

3. Risk 5. Re-Risk
1.Hazard Identification 2.Determining Control 4. Determining Control 6. Responsibility 7. Reference
Evaluation Evaluation
Possible Risks/ Risk Risk Document for
No Task Steps/ Sub-Activity Hazard Existing Control Measures S L Additional Control Measures S L Designation
Injury/Ill-health Level Level Reference
1 Setting of gas 1. Trip & fall on I. Ensure unobstructed passageways 2 2 M Task supervisor 2 1 L Maintenan SWP -
cylinder pallets / poorly routed and good housekeeping during gas ensure all gas ce 21_Weldi
Manifolds / Heating cables. cylinder pallet / manifold arrangement cylinder pallets and Supervisor ng &
equipments Wear proper PPEs. manifolds in good Cutting
1. Tersandung working conditioned.
Mempersiapkan dan jatuh akibat I. Memastikan jalan tidak terhalangi
penyetelan cilinder kabel yang tidak dan kebersihan terjaga selama Supervisor
manifold dan rapi. pemasangan gas, manifold Gunakan memastikan gas
peralatan pemanas. APD yang tepat cylinder dan manifold
2. Use of dalam kondisi yang
damaged I. Physical per inspection on gas bagus.
cylinders / cylinders / Manifolds to ensure good
Gauges conditioned cylinders in place Ensure Supervisor to ensure
/Pressure the cylinders to be fitted with all gas cylinders / 2 1 L
Regulator which appropriate working conditioned manifolds to be
lead to gauges / pressure regulators and not secured and
hazardous contained any grease / oil. segregated.
conditions Cylinders not to be
I. Pengecekan Botol gas, manifold placed near to
2. Penggunaan untuk memastikan kondisi cilinder gangway /
cilinder, presure yang baik ditempat. 2 1 L emergency escape
gauge dan routes Check supplier
regulator yang Memastikan silinder dipasang sesuai
inventory.
rusak yang kondisi penggunaan gouge, tekanan
dapat berakibat regulator dan tidak terkontaminasi Supervisor
bahaya. dengan minyak/oli. memastikan semua
gas cilinder/ manifold
aman dan dipisah .

P3-S01-F3/Rev02/2019
Page 2 of 11
Doc No. : RA-PROD–014- Effective Date : 15.01.2020 Document Title : RISK ASSESSMENT (RA) ON : GENERAL This document contains trade secrets, proprietary and confidential information
GALLAF PREHEATING FLARING and is only intended for use by PT SMOE Indonesia for its own purposes.  Any
unauthorised disclosure, use or dissemination either in whole or in part is strictly
Rev No. : 00 Next Review Date : 15.01.2023 Document Owner : NASRI (PMT) prohibited. No representation, warranty, guarantees or undertaking expressed or
implied is made by SCM Group as to the fairness, accuracy or completeness of
any information or data contained in this document.

3. Risk 5. Re-Risk
1.Hazard Identification 2.Determining Control 4. Determining Control 6. Responsibility 7. Reference
Evaluation Evaluation
Possible Risks/ Risk Risk Document for
No Task Steps/ Sub-Activity Hazard Existing Control Measures S L Additional Control Measures S L Designation
Injury/Ill-health Level Level Reference
Cilinder jangan
ditempatkan dekat
jalan, jalan
Emergency tetap
harus bebas tidak
terhalang.

Setting of gas 6. Fire and II. Install Flash Back Arrestors at the Only competent SWP -
cylinder pallets / explosion gas cylindres side just after the personnel to install 21_Weldi
Manifolds / Heating pegulators.No greases / oil to be used 2 2 M Flash Back arrestors. Task ng &
equipments 6.Kebakaran at joint. Teflon tape(water tape)should superivsor Cutting
dan ledakan not be used for the thereaded Hanya personel yang / Gas
Mempersiapkan connection. kompeten untuk cutter /
penyetelan cilinder menginstal Flash Sub-Com
manifold dan II. Pasang flash back arrestor pada Back. Safety
7. Use of leaking
peralatan pemanas. gas silinder sebelum regulator, Promoter
hose / Damaged
jangan ada oli atau minyak saat
cutting torch.
memasang, telepon tidak boleh
7. Penggunaan digunakan
selang bocor / Tool box briefing on
I. Use only the gas hose / cutting
rusak use good conditioned
torches that have been tested end are
pemotongan hoses and torches 2 1 L
having valid inspection Labels. Per
obor.
job visual inspection on all hoses and Mengingatkan di
8. Accidental cutting torch. pertemuan pagi
disconnection tentang pengunaan
I. Gunakan hanya obor selang gas /
hoses
8. Membuka pemotongan yang telah diuji akhir
sambungan mengalami valid pekerjaan Be sure to install and
selang/terlepas Labels.Per pemeriksaan inspeksi replace the
visual pada semua selang dan appropriate keys to
9. improper pemotongan obor.

P3-S01-F3/Rev02/2019
Page 3 of 11
Doc No. : RA-PROD–014- Effective Date : 15.01.2020 Document Title : RISK ASSESSMENT (RA) ON : GENERAL This document contains trade secrets, proprietary and confidential information
GALLAF PREHEATING FLARING and is only intended for use by PT SMOE Indonesia for its own purposes.  Any
unauthorised disclosure, use or dissemination either in whole or in part is strictly
Rev No. : 00 Next Review Date : 15.01.2023 Document Owner : NASRI (PMT) prohibited. No representation, warranty, guarantees or undertaking expressed or
implied is made by SCM Group as to the fairness, accuracy or completeness of
any information or data contained in this document.

3. Risk 5. Re-Risk
1.Hazard Identification 2.Determining Control 4. Determining Control 6. Responsibility 7. Reference
Evaluation Evaluation
Possible Risks/ Risk Risk Document for
No Task Steps/ Sub-Activity Hazard Existing Control Measures S L Additional Control Measures S L Designation
Injury/Ill-health Level Level Reference
I. Ensure that except' Clips and not
the "Jublee Clips" are used for all the use his / her factory.
jointing’s on gas hoses. At every
joint,two'o'Clips are used and must be Pastikan untuk
offset by 90 degrees to each other so memasang dan
as prevent gas leakage. mengunci nya
gunakan kunci yang
I. Pastikan except'O 'Klip dan tidak sesuai / dari pabrik
location of gas boleh "Klip Jublee" yang digunakan nya.
bottles untuk semua sambungan pada
hoses dan sambungan harus dua To provide sufficient
9. Lokasi yang 'o'Clips digunakan dan harus fire blanket to cover
tidak datar atau diimbangi dengan 90 derajat satu cylinders and
tidak tepat untuk sama lain sehingga mencegah manifolds.
penempatan kebocoran gas.
tabung gas. Pastikan kain api
I. Oxygen and Acetylene / LPG gas yang cukup untuk 1
bottles should be segregated with menutup silinder dan 2 L
adequate distance(minimum of 5 manifold.
meter away)

I. Oksigen dan botol gas Acetylene /


LPG harus dipisahkan dengan jarak
yang cukup (minimal 5 meter)

2 Laying of gas hoses 1. Trip & fall on I. Proper housekeeping .Elevate the 2 1 L Superivsor to ensure 2 1 L Task/ Gas
and secure the work poorly routed gas hoses at 2M Length not run and reinforce in tool cutter /
location. cables. hoses across door opening or access box briefing. Sub-Com
ladders. Safety
Pemasangan selang 1. Tersandung Supervisor Promoter
gas dan dan jatuh akibat 1. Kebersihan sesuai menempatkan memastikan dan
mengamankan lokasi kabel yang tidak selang gas diatas menyampaikan
kerja. dalam tool box

P3-S01-F3/Rev02/2019
Page 4 of 11
Doc No. : RA-PROD–014- Effective Date : 15.01.2020 Document Title : RISK ASSESSMENT (RA) ON : GENERAL This document contains trade secrets, proprietary and confidential information
GALLAF PREHEATING FLARING and is only intended for use by PT SMOE Indonesia for its own purposes.  Any
unauthorised disclosure, use or dissemination either in whole or in part is strictly
Rev No. : 00 Next Review Date : 15.01.2023 Document Owner : NASRI (PMT) prohibited. No representation, warranty, guarantees or undertaking expressed or
implied is made by SCM Group as to the fairness, accuracy or completeness of
any information or data contained in this document.

3. Risk 5. Re-Risk
1.Hazard Identification 2.Determining Control 4. Determining Control 6. Responsibility 7. Reference
Evaluation Evaluation
Possible Risks/ Risk Risk Document for
No Task Steps/ Sub-Activity Hazard Existing Control Measures S L Additional Control Measures S L Designation
Injury/Ill-health Level Level Reference
rapi. 2 meter jangan mnempatkan selang briefing SWP -
gas merintangi pintu atau tangga. 21_Weldi
ng &
I. Do not single handedly carry heavy Cutting
2. Exposure to coils of hoses.Use help from fellow 2 2 M Appointed fire
ergonomic worker. watcher to ensure the
hazards while hot work area and
manual handling 1. Jangan memegang satu tangan surroundings aways
and carrying of dengan koil yang berat minta free from combustible
coils or cables pertolongna rekan kerja. / flammable
substances ptior to
2.Bahaya I. Hot work and surrounding area 2 2 M task commence. 2 1 L Task/ Gas
ergonomic saat should be free from combustible / cutter /
pengangkatan flammable substances. Petugas penjaga api Sub-Com
manual dan memastikan Safety
membawa coli 1. Pekerjaan panas dan sekitarnya pekerjan panas dan Promoter
atau kabel. harus bebas dari bahan yang mudah sekitarnya bebas dari
terbakar bahan yang mudah
2 1 L terbakar /menyala.
1. Fire blankets should be used to
3. Presence of cover the hot work areaz. Surrounding
flammable equipments to be
materials which 2. Heating toach shall be removed
adequately protected
lead to fire from internal of box girder
by fire blankets.Use
occurrence. proper PPE(safety
1. Fire Blanket harus digunakan
untuk melindungi area pekerjaan boot,Goggle,Hand
3. Kehadiran
panas. gloves) SMOE
material yang
2 1 L Discipline
mudah terbakar Disekitar peralatan
2. Pemanasan dengan toech tidak Superivsor
yang dapat harus cukup kain api.
boleh ada didalam dan yang mudah / Task
mengakibatkan
terbakar disingkirkan. Superivsor
kebakaran. Penggunaan APD
cutter /
yang sesuai (Sepatu

P3-S01-F3/Rev02/2019
Page 5 of 11
Doc No. : RA-PROD–014- Effective Date : 15.01.2020 Document Title : RISK ASSESSMENT (RA) ON : GENERAL This document contains trade secrets, proprietary and confidential information
GALLAF PREHEATING FLARING and is only intended for use by PT SMOE Indonesia for its own purposes.  Any
unauthorised disclosure, use or dissemination either in whole or in part is strictly
Rev No. : 00 Next Review Date : 15.01.2023 Document Owner : NASRI (PMT) prohibited. No representation, warranty, guarantees or undertaking expressed or
implied is made by SCM Group as to the fairness, accuracy or completeness of
any information or data contained in this document.

3. Risk 5. Re-Risk
1.Hazard Identification 2.Determining Control 4. Determining Control 6. Responsibility 7. Reference
Evaluation Evaluation
Possible Risks/ Risk Risk Document for
No Task Steps/ Sub-Activity Hazard Existing Control Measures S L Additional Control Measures S L Designation
Injury/Ill-health Level Level Reference
4. Presence of safety, goggle, Sub - Con
flammable sarung tangan kulit safety
materials which dipakai) promoter.
lead to fire
occurrence

4. Kehadiran
material yang
mudah terbakar
yang dapat
menimbulkan

3 1. Incompatible I. Comply Permit to Work System Hot 3 2 M SMOE Discipline 2 1 M SMOE


works Work be co-ordinate in PSCC Superivsor to monitor Discipline
Heating Process / meeting. hot work activites and Superivsor
1.Pekerjaan compliance PTW. /
Proses pemanasan. yang I. Mematuhi Izin Kerja Sistem Hot
bertentangan. Work akan berkoordinasi dalam rapat SMOE Disiplin
PSCC. Pengawas untuk
memantau aktivitas
II. Only Competent person to do hot kerja panas dan
Work. 2 2 M kepatuhan PTW.

II. Hanya pekerja yang terlatih saja SMOE


Per job briefing to be 2 1 M
yang boleh mengoperasikan nya. Discipline
conducted by task
Superivsor
superivsor.
III. Maintain safe working distance /
from hot works to gascylider pallets/ 2 2 M Supervisor Foreman /
gas manifolds / flammable items(at memberikan Pra Cuter.
least 5 meter away) breiping sebelum
melakukan aktifitas
Perbaiki pekerjaan dengan aman
diantara pekerjaan panas dan Work location and

P3-S01-F3/Rev02/2019
Page 6 of 11
Doc No. : RA-PROD–014- Effective Date : 15.01.2020 Document Title : RISK ASSESSMENT (RA) ON : GENERAL This document contains trade secrets, proprietary and confidential information
GALLAF PREHEATING FLARING and is only intended for use by PT SMOE Indonesia for its own purposes.  Any
unauthorised disclosure, use or dissemination either in whole or in part is strictly
Rev No. : 00 Next Review Date : 15.01.2023 Document Owner : NASRI (PMT) prohibited. No representation, warranty, guarantees or undertaking expressed or
implied is made by SCM Group as to the fairness, accuracy or completeness of
any information or data contained in this document.

3. Risk 5. Re-Risk
1.Hazard Identification 2.Determining Control 4. Determining Control 6. Responsibility 7. Reference
Evaluation Evaluation
Possible Risks/ Risk Risk Document for
No Task Steps/ Sub-Activity Hazard Existing Control Measures S L Additional Control Measures S L Designation
Injury/Ill-health Level Level Reference
tabung gas, manifold, material yang space requirements 2 1 M Fitter/ SWP -
mudah terbakar beri jarak 5 meter. to be properly Foreman. 21_Weldi
coordinated by ng &
IV. Appointed Fire Watchman is to discipline Supervisor. Cutting
standby at the hot works area with 2 2 M
working condition fire extinguisher. Lokasi kerja dan
syarat-syarat
Penunjukan pejaga api di tempat pengaturan jarak
pekerjaan panas dan dengan dikoordinasikan oleh
menyediakan pemadam api ringan. Supervisor.
Fire
Fire watchman must Watchman
do visual inspection / Sub -con
at and around hot 2 1 M
safety
work location. supervisor
Penjaga api harus
mengecek di sekitar
pekerjaan panas.

Superivsor to ensure
the surrounding
equipments to be
covered with fire
Fire
blankets
Watchman
2. Contact with I. The Pre-heating / flering area and 2 2 M 2 2 M /Foreman
Supervisor
hot surfacer its surroundings to be barricaded with
memastikan di
proper signs.
sekitar peralatan
2. Tersentuh
Tempat pemanasan dan sekitarnya dipasang fire blanket
bagian atas
yang panas. dibariket dan diberi tanda papan
peringatan

P3-S01-F3/Rev02/2019
Page 7 of 11
Doc No. : RA-PROD–014- Effective Date : 15.01.2020 Document Title : RISK ASSESSMENT (RA) ON : GENERAL This document contains trade secrets, proprietary and confidential information
GALLAF PREHEATING FLARING and is only intended for use by PT SMOE Indonesia for its own purposes.  Any
unauthorised disclosure, use or dissemination either in whole or in part is strictly
Rev No. : 00 Next Review Date : 15.01.2023 Document Owner : NASRI (PMT) prohibited. No representation, warranty, guarantees or undertaking expressed or
implied is made by SCM Group as to the fairness, accuracy or completeness of
any information or data contained in this document.

3. Risk 5. Re-Risk
1.Hazard Identification 2.Determining Control 4. Determining Control 6. Responsibility 7. Reference
Evaluation Evaluation
Possible Risks/ Risk Risk Document for
No Task Steps/ Sub-Activity Hazard Existing Control Measures S L Additional Control Measures S L Designation
Injury/Ill-health Level Level Reference
Superivsor to ensure
the surrounding
equipments to be Fire
covered with fire Watchman
blankets /Foreman

I. Safety goggle and Faceshield must 2 2 M 2 1 L


Supervisor
be used during hot work process.
3. Exposure Pre memastikan disekitar
heating /flaring I. Proses pemotongan harus peralatan dipasang
menggunakan Kacamata goggle dan fire blanket
3. Dampak dari faceshield diwaktu bekerja
pemanasan

1. Immediate Task
housekeeping superivsor
(clearing of dust) / Gas
upon job completion; cutter /
4. Exposure to 2 2 M 2 1 L
Sub-Com
metal dust I. PPE (N95 dust mask) must be worn 2. Ventilation to be
Safety
during operation; provided at work
4. Paparan debu Promoter
areas
logam II. Interval breaks of 1 to 2 mins after
over 5 mins continuous operation; 1 Segera melakukan
kebersihan saat
III. Screens for adjacent operations to penyelesaian
prevent inhalation of dust/ fumes from pekerjaan.
nearby works 2.Ventilasi
disediakan ditempat
I. Masker (N95) digunakan
saat pekerjaan.

P3-S01-F3/Rev02/2019
Page 8 of 11
Doc No. : RA-PROD–014- Effective Date : 15.01.2020 Document Title : RISK ASSESSMENT (RA) ON : GENERAL This document contains trade secrets, proprietary and confidential information
GALLAF PREHEATING FLARING and is only intended for use by PT SMOE Indonesia for its own purposes.  Any
unauthorised disclosure, use or dissemination either in whole or in part is strictly
Rev No. : 00 Next Review Date : 15.01.2023 Document Owner : NASRI (PMT) prohibited. No representation, warranty, guarantees or undertaking expressed or
implied is made by SCM Group as to the fairness, accuracy or completeness of
any information or data contained in this document.

3. Risk 5. Re-Risk
1.Hazard Identification 2.Determining Control 4. Determining Control 6. Responsibility 7. Reference
Evaluation Evaluation
Possible Risks/ Risk Risk Document for
No Task Steps/ Sub-Activity Hazard Existing Control Measures S L Additional Control Measures S L Designation
Injury/Ill-health Level Level Reference
II. Interval istirahat 1-2 menit kerja
setelah 5 menit bekerja terus
menerus. Briefing on
Pemasangan pelindung maintaining good
cable management to Task
untuk menjaga, terhirupnya
be done daily during superivsor
debu, asap dekat dari tempat
Toolbox Meetings / / Gas
kerja.
Selama TBT cutter /
2 2 M 2 1 L
diinformasikan Sub-Com
5.Trip/ Fall on mengenai selang Safety
poorly routed I. Cables to be routed on C-channels / dan kabel yang harus Promoter
hoses / Selang digantung dengan setiap saat rapi.
penggantung "C"
5. Tersandung
dan jatuh karna
selang
berserakan.

6. Head/ Neck
caught on poorly I. Hang on insulated S-hooks above
routed hoses head level /

6. Terperangkap I. Pasang penggantung "S" diatas Tool box meeting to


kepala atau dahi lebih kepala.
karna selang re-inforce PPE
yang tidak rapi
compliance. Worker

2 1 L should be sent for 2 1 L


7. Heat radiation
annual audiometric
7. Radiasi I. Brief Workers to drink a more water
through tool box meeting and pre job test / Menerangkan

P3-S01-F3/Rev02/2019
Page 9 of 11
Doc No. : RA-PROD–014- Effective Date : 15.01.2020 Document Title : RISK ASSESSMENT (RA) ON : GENERAL This document contains trade secrets, proprietary and confidential information
GALLAF PREHEATING FLARING and is only intended for use by PT SMOE Indonesia for its own purposes.  Any
unauthorised disclosure, use or dissemination either in whole or in part is strictly
Rev No. : 00 Next Review Date : 15.01.2023 Document Owner : NASRI (PMT) prohibited. No representation, warranty, guarantees or undertaking expressed or
implied is made by SCM Group as to the fairness, accuracy or completeness of
any information or data contained in this document.

3. Risk 5. Re-Risk
1.Hazard Identification 2.Determining Control 4. Determining Control 6. Responsibility 7. Reference
Evaluation Evaluation
Possible Risks/ Risk Risk Document for
No Task Steps/ Sub-Activity Hazard Existing Control Measures S L Additional Control Measures S L Designation
Injury/Ill-health Level Level Reference
Panas. briefings; kepada pekerja di

Provide ventilation at area; TBT mengenai

Interval breaks to be taken to reduce pematuhan APD.


heat exposure

I. Informasikan Pekerja untuk minum


dengan cukup didalam TBT.
Menyediakan ventilasi dengan cukup
dan interval istirahat mengurangi
dampak panas. 2 2 M 2 1 L

8. Work carried
out in noisy
I. Wear hearing protection / 1. I.
environment /
Gunakan pelindung telinga
8. Lingkungan
kerja yang bising

Completion of 1. Exposure to I. Display appropriate signboards 2 2 M Housekeeping of 2 1 L


heating hot surfaces such as "Hot Surface - Do not area to be performed
touch".The area to be tidy up and all after completion of
Penyelesaian 1. Bahaya hoses to be dissconnect from the work.
pekerjaan panas. permukaan cylinders / manifold and coiled
panas properly . Kebersihan dilakukan
saat selesai bekerja.
I. Pasang tanda keselamatan yang
cukup seperti" Permukaan panas
jangan disentuh. Tempat kerja harus
rapi semua selang harus dilepas

P3-S01-F3/Rev02/2019
Page 10 of 11
Doc No. : RA-PROD–014- Effective Date : 15.01.2020 Document Title : RISK ASSESSMENT (RA) ON : GENERAL This document contains trade secrets, proprietary and confidential information
GALLAF PREHEATING FLARING and is only intended for use by PT SMOE Indonesia for its own purposes.  Any
unauthorised disclosure, use or dissemination either in whole or in part is strictly
Rev No. : 00 Next Review Date : 15.01.2023 Document Owner : NASRI (PMT) prohibited. No representation, warranty, guarantees or undertaking expressed or
implied is made by SCM Group as to the fairness, accuracy or completeness of
any information or data contained in this document.

3. Risk 5. Re-Risk
1.Hazard Identification 2.Determining Control 4. Determining Control 6. Responsibility 7. Reference
Evaluation Evaluation
Possible Risks/ Risk Risk Document for
No Task Steps/ Sub-Activity Hazard Existing Control Measures S L Additional Control Measures S L Designation
Injury/Ill-health Level Level Reference
saat selesai pekerjaan.

3. Exposure to I. Use selected tools to adjust the 2 2 M Fire watchman to be 2 1 L


pinch points hotwork objects. Wear proper Hand
gloves stay at hot work
3. Dampak dari
titik jepit Periksa alat alat untuk pekerjaan location until hot work
panas, Gunakan sarung tangan yang
surface getting in to
sesuai.
normal.

4. Exposure to Penjaga api


I. All hotwork object sharp edges to
Sharp edges be protected by using padding .Wear 2 2 M disiagakan saat 2 1 L
proper hand gloves
4. Bahaya
pekerjaan panas
sudut yang 1. Semua sudut yang tajam dilapisi
tajam. dengan pengaman dan gunakan sampai selesai
sarung tangan.
pekerjaan.

Note:
*All control measure(s) shall be adequately and effectively implemented before commencement of work(s);
*All additional and residual hazard(s) shall be addressed and registered on the “ RISK ASSESSMENT ON ADDITIONAL HAZARDS AND RESIDUAL RISKS IDENTIFIED AT SITE” and highlight to the Risk Assessment Team for the revision of RA.

P3-S01-F3/Rev02/2019
Page 11 of 11
Doc No. : HOW2J-RA- Effective Date : 09/09/2019 Document Title : RISK ASSESSMENT (RA) ON GENERAL This document contains trade secrets, proprietary and confidential information and
P017 PREHEATING FLARING is only intended for use by PT SMOE Indonesia for its own purposes.  Any
unauthorised disclosure, use or dissemination either in whole or in part is strictly
Rev No. : 00 Next Review Date : 09/09/2022 Document Owner : HSE Dept. PT SMOE Indonesia prohibited. No representation, warranty, guarantees or undertaking expressed or
implied is made by SCM Group as to the fairness, accuracy or completeness of any
information or data contained in this document.

1. REFERENCE

1.1. SWP-21_Welding & Cutting

2. REVISION HISTORY

REV NO REVISION SUMMARY EFFECTIVE DATE


00 None 09/09/2019

P3-S01-F3/Rev02/2019