NOTES :

PART - 01

PART - 02
1- ALL DIMENSIONS ARE IN MM.
2- ALL LEVEL ARE MEASURED FROM FINISH FLOOR LEVEL.
A1-A A1-B A1-C
A1-D A1-E A1-F A1-G A1-H A1-I 3- ALL PIPE SIZES BASED ON NOMNAL DIAMETER .
4- ALL COMPRESSED AIR PIPES WILL BE GALVANIZED STEEL PIPE,
SCH.40
5- ALL COMPRESSED AIR OUTLETS SHALL C/W ISOLATING VALVE.

A1-1 A1-1

A1-A A1-B A1-C


A1-D A1-E A1-F A1-G A1-H A1-I

LEGEND :

SYMBOLS DESCRIPTION

C.O.P CENTER OF PIPE


F.F.L FINISHD FLOOR LEVEL
CA COMPRESED AIR
A1-2 A1-2 DN DOWN
H/L HIGH LEVEL
F/A FROM ABOVE LEVEL
A1-3 A1-3
T/A TO ABOVE LEVEL
C.O.S CENTER OF SLEEVE
FF .IL PIPE INVERT LEVEL FROM FINISH FLOOR LEVEL

REVISION TABLE

A1-4 A1-4

00 A1-GROND FLOOR PLAN SAMY 23/01/2020


REV. DESCRIPTION DRAWN BY DATE

DESIGN DRAWING REFERENCES

NO. DRAWING TITLE REV


COMP AIR 20ø
C.O.P=3500

KEY PLAN:
EXISTING BOUNDARY WALL
P L O T EXISTING BOUNDARY WALL

AIR OUTLET WITH CONCRETE ROAD CONCRETE ROAD


Advertisment wall
1

DRIVER ROOM
1

TOIET
1

SECURITY ROOM

BALL VALVE
+50.95 +50.95
50.20
T-1
Sliding Gate
6 m width +50.80
Coloured Paving tiles Security gates
FROM DYNAMIC R.C.C RAMP
SYSTEM FOR CONTRACTING COMPANY +51.22 +51.22 50.20 50.00
Coloured Gravel
E.E.
STEEL PIPE FROM DYNAMIC
15 14 13 12 11 10 9 8
7
16
17
6
5 +51.22
SYSTEM FOR CONTRACTING COMPANY Security Gate
RECEIVING
1
PRIMARY
18
19 STAIR
4
3 A/L
RECEIVING
AREA
1.5 m width
CHANGE
20 2 DOCK
WARE HOUSE 21 1 LEVELLER
3
ENTRANCE
+52.00 +52.00 +51.42 +51.22 +51.22 2

+51.05 +51.42 1

Security Gate
1.5 m width A/L M/L

UP
2 1
MATERIAL
SECONDARY
CHANGE ENTRY Sliding Gate
+51.30 MALE TOILET
SAMPLING
10 m width
6 FEMALE TOILET RECEIVING
5
4
SECURITY
ROOM CONTROL FROM DYNAMIC
3
SYSTEM FOR CONTRACTING COMPANY
2
1 +51.22 50.20 CONCRETE ROAD

WASHING BAY
+51.10
QA MANAGER
PRIMARY STAGING WARE HOUSE DISPATCH

A/L
M/T OUT CONTROL
Bright Paint for
Pedes trian Pas sage

+51.22
Corridor 50.156

CORRIDOR
QA-HALL-2
CLEAN
EQUIPMENT OUT
+51.22
DISPATCH
DISPATCHAREA
A/L
QA-HALL-1 DOCK
WEIGHING 1 A/L LEVELLER
Hood

Corridor
WEIGHING 2
1048 PALETEE STEEL PIPE
Hood

WALL
1 2 3 4 5 6 7 8 9 10 11

+51.22
up
12

NDA RY
13

Male Change STAIR


14
15
51.22 1
Room 16 2
17 3

CORRIDOR
18 4
QC STORE WEIGHING LAB SECONDARY STAGING AREA
PACKAGING FINISHED 19

G BOU
20

Female Change
+51.22 MATERIAL
TRANSFER IT ROOM
PRODUCT
TRANSFER
21
22

Room 3 2 1
+50.80

EXISTIN
QC MANAGER
Stone walkways

EXIT
51.22
+51.22
CORRIDOR-3
3
2
1
Dispensed Material

EXISTING BOUNDARY WALL


Holding Area M/T 9
0

LOGO
TRANSFORMER

CORRIDOR

R O A D
Chemistry Lab
INSTRUMENT LAB
BLISTER DERMAL DERMAL
CLEAN MOBILE PARTITION PACKAGING HALL-2
Wet Granulation EQUIPMENT WASHING DIRTY EQUIPMENT PACKAGING HALL PACKAGING HALL-1
WORKSHOP

CORRIDOR-8
OFFICE

TECHNICAL CORRIDOR -1
TUBE FEEDING TUBE FEEDING M.D.B. MEETING
PASS THRU BOX PASS THRU BOX Stone walkways ROOM

CORRIDOR-5
TUBE CARTON TRANSFER TUBE CARTON TRANSFER

CORRIDOR
OFFICE

CONCRETE ROAD
HATCH FOR MACHINE HATCH FOR MACHINE
AA/GC LAB
HATCH FOR MACHINE CONVEYOR HATCH FOR MACHINE CONVEYOR CONVEYOR CONVEYOR

+50.80

EXIT
JANITORIAL OFFICE
SAMPLE
DOCUMENTATION ROOM RECEIVING
ROOM
51.22 51.22 51.22 51.22 M/T 51.22 C/R
51.22

CONCRETE ROAD
BLISTER PACK-1

CORRIDOR-2
Blending MILLING BLISTER PACK-2 TUBE FILLING-1 TUBE FILLING-2

CORRIDOR-6
WASHING ROOM P.B.

OFFICE OFFICE

ST-01

CORRIDOR-10
M/T
CHILLER AREA
3 2 1

A D
C/R E.E.

JANITORIAL
4
Compression-1 OFFICE OFFICE
COMPACTOR 5
water Fountain 6

JANITORIAL
7
8
lks,F HgvwdT 9 21

R O
10 20

+51.20 +51.42 11
12
19
18
PANTRY
OR TOILET
TOILET PANTRY
13
ENTRANCE LOBBY 17 TOILET
14 16
15
CHANGE D
ENCAPSULATION M/T CORRIDOR-9 ROOM DIRTY CLEAN BULK
BULK
TRANSFER
CLEAN WASHING DIRTY SPARE PARTS Block Sill With Ceramic Cladding Block Sill With Ceramic Cladding +50.80
EQUIPMENT WASHING Equipment TRANSFER EQUIPMENT EQUIPMENT
+50.80
Compression-2 PARTS WASHING
VIP
GOWNING

JANITORIAL

JANITORIAL
EMERGENCY DOOR 51.22 FLAMMABLE STORE
A/L

+51.22 Coating Solution


CORRIDOR-7 Dermal Manufacturing-2
STAIR
COMPRESSOR
TOILETS
1

+50.80 +50.95
C/R
M/T

AUTO CLAVE Dermal Manufacturing-1


+50.80
SEC.CHANGE PRODUCTION WIP-TABLET/CAP
CLEAN EQUIPMENT M/T +50.80
Material IPQC-ROOM WIP- BULK STORAGE
STERILITY ROOM Transfer WASHING Coating TRASH-1 Room OFFICE TOOL ROOM C/R

S.P .B .
ROOM
Stone walkways

A1-5 A1-5
MALE 1
WC FEMALE 2
WC 24

D .P .B .
3
23 1 2 3 4 5 6
22

51.22 51.22 51.22 51.22


ST-02 7

CORRIDOR-1 +51.22
AIR LOCK AIRLOCK INCUBATION ROOM

EXIT
8
B
CORRIDOR
+0.00 +0.00
9
10
11
12
E.E. 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 13
34 33 32 31 30 29 28 27 26 26 27 28 29 30 31 32 33 34 14
AUTO CLAVE
+4.00 +4.00
23
AIR LOCK AIRLOCK
PRIMARY CHANGE
AIR LOCK 28 27
ROOM ( FEMALE) A/L PRIMARY CHANGE 25 24
PURIFIED WATER/ PRODUCTION OFFICE
24 24
ROOM ( MALE)
CROSS OVER
23
22
23
22 STAIR WATER FOR INJECTION AND DOCUMENT ROOM
A/L
PUMP ROOM +47.20
BENCH 21 21
PREPARATION MICRO BIOLOGY LAB 20 20
Document Store
15
CROSS OVER BENCH & CLEAN STEAM
ROOM MEDIA PREPARATION
19 19

Sample Receiving
STAIR
18
17
ELECTRICAL
18
17
PW-1
+51.22
Room ROOM
MEDIA STORE
+51.22

LL
16 16
15 15
14 1 STAIR 14 14

WA
40 15 WATER
HAND WASH
+0.00 13
12
13
12 PRE-TREATMENT
HAND WASH
+0.00 SECTION TRASH

RY

CORRIDOR
+1.75 +1.75
OUT

EXISTING BOUNDARY WALL


A/L

DA
14 1
51.22
1 2 3 4 5 6 7 8 9 10 11 11 10 9 8 7 6 5 4 3 2 1
1 1

UN
AIRLOCK AIR LOCK CORRIDOR
Male 1 BOILER (1) BOILER (2)
Change Room

BO
TOILET A/L TOILET (MALE) WATER TANK WATER TANK
(FEMALE)
CULTURE ROOM EXIT

EXIT
Glass Ware

ING
lks,F HgvwdT Store Change Room
Female EXIT EXIT 1

Gen.Office +51.05 +50.95


+51.20

IST
Manager Office
JAINTOR +51.15 +51.15 +51.15 51.22 51.22
Female Toilet
+51.42
MaleToilet
+51.22

EX
2
+0.00
1
1

CA B L E T R A Y
E.E.
R. M . U
M. V. S. G
MAIN
ENTRANCE +51.15 +50.80
10 9 8 7 6 5 4 3 2 1

+51.15 EXIT EXIT


space Out Out In C R In Out Out space
R. M . U

AIR FLOW
7.45X3.40
CA B L E T R A Y CA B L E T R A Y ±0.00
F.F.L

CONCRETE ROAD CONCRETE ROAD


A. T. S A. T. S

R
S

T
N

N
TRA NS FO RME R ( 2) TRA NS FO RME R ( 1)

T-2
50.52

EXISTING BOUNDARY WALL P L O T EXISTING BOUNDARY WALL

A1-6 A1-6

OWNER:

B1-A B1-B COMP AIR 20ø B1-C B1-D B1-E B1-FB1-G B1-H B1-I B1-J B1-K B1-L
B1-MB1-N B1-O B1-P
C.O.P=3500

940 CONSULTANT:

A1-7 A1-7
2140

COMP AIR 64ø COMP AIR 64ø COMP AIR 64ø COMP AIR 64ø COMP AIR 64ø
C.O.P=3200 C.O.P=3200 C.O.P=3200 C.O.P=3200 C.O.P=3200

AUT. DRAIN PROJECT:

AL JAMJOOM PHARMA PLANT


COMP AIR 25ø ELOBOUR CITY-EGYPT
2365
COMP AIR 38ø C.O.P=3500
C.O.P=3500
MAIN CONTRACTOR :
COMP AIR 25ø

6000
C.O.P=3500

AIR OUTLET WITH


BALL VALVE

CONSUKORRA Co. (S.A.E)


ALFY ST.EL THAWRA BUILDING-DOWNTOWN-CAIRO-EGYPT
WEB SITE: WWW.KORRA-ENERGI.COM
SPARE OUTLET TEL.: 202 2787 1587-202 2786 9730

DRAWN BY CHECKED BY REVIEWED BY APPROVED BY


AIR OUTLET WITH
COMP AIR 64ø AIR OUTLET WITH
BALL VALVE SAMY MOHAMED AbuBakr Desouky AbuBakr Desouky N.Tourki
C.O.P=3200 SPARE OUTLET BALL VALVE
DRAWING TITLE:

PART - 01 30 CFM @ 6 BAR


JAMJOOM PHARMA FOR PHARMACEUTICAL INDUSTRIES

MECHANICAL (SHOP DRAWING)

PART - 03 AIR OUTLET WITH COMP AIR 25ø


C.O.P=3500
A1-GROUD FLOOR PLAN 1/4
BALL VALVE COMPRESSED AIR SYSTEM LAYOUT
COMP AIR 25ø COMP AIR 38ø
C.O.P=3600 COMP AIR 25ø C.O.P=3500
PROJECT NO. DRAWING NUMBER SIZE SCALE REV.
C.O.P=3700 COMP AIR 25ø 6-No. 10 CFM @ 6 BAR
AIR OUTLET WITH JAM-CSK-SD-A1-GR-MEP-M-U-CA-01 A0 1/50 00
B1-A B1-B AIR OUTLET WITH B1-C B1-D B1-E B1-FB1-G B1-H B1-I C.O.P=3500 B1-J B1-K B1-L
B1-MB1-N B1-O B1-P
BALL 3-No.
VALVE 6 CFM @ 6 BAR STATUS ACTION CODE : DATE:
BALL VALVE AIR OUTLET WITH
(A) APPROVED SIGN:
BALL VALVE (B) APPROVED AS NOTED
(C) NOT APPROVED, REVISE AND RESUBMIT
(D) REJECTED