F d634 (Pages: 2) Rcg. No....................,.............

B.TECH. DEGREE EXAMINATION, NOVEMBER 2015


Seventh Semester
Branch : Civil Engineering
CE O1O 7o2-ENVIRONMENTAL ENGINEERING-I (CE)
(New Scheme-20l0 Admission onwardq)
lRegular/Supplementaryl
Tirre : Three Hours Maximum : 100 Marks
Part A
Answer all questinns.
Edch question carrizs 3 marks.
1. Fire demand. 2. Location ofpumping stations.
3. Plain sedimentation. 4. Pressure filters.
5. Desalination.
(5x3=15marks)
Part B
Answer all questions.
Each question carries 5 marks.
6. Factors alfecting percapita demand.
7. Effect of storage on quality of water.
8- Break point chlorination.
9. Clariflocculators.
10. Various typcs ofjoints used in cast iron pipes.
(5x5=25marks)
Part C

Answer all questions.


Each question carries 12 marks.

11. Explain (i) Rural and Urban lvater supply syst€ms ; (ii) Threshold odour number and coliform
index.
Or
12. Explain (i) Water borne diseases ; (ii) Physical and chemical test on water. -i"

T\rrn over
2 F4S84
13. Estimate hydraulic gradient in a 2 m. diameter smooth concrete pipe carrying a discharge of
3 rn3/s at 10' C.

14. Explain various appurtenances in distribution system.

15. Explanr (i) Aeration and purpose of aeration ; (ii) Surface water and ground watcr.
Or
16. Explain with figu.res, different units of a coagulation sedimentation plant.

17. Desiga a rapid sand filter for 6.5 million litres per day of supply, with all its principal components.
Or'
18. Exptain:
(a) Chlorination-action andapplication.
(b) Filter media.
19. Explain treatment methods for (i) odour and taste removal ; (ii) hardness removal.
Or
20. Explain (i) Pumping and storage system ; (ii) Cleaning and maintenanee of distribution system.
(6 x 12 = 60 marks)