Sie sind auf Seite 1von 12

Sapura Fabrication Sdn. Bhd.

(83307-K)
(Formerly known as SapuraKencana HL Sdn. Bhd.)
Plot D1, Lumut Port Industrial Park, Kg Acheh, Mukim of Lumut,
32000 Sitiawan, Perak Darul Ridzuan.
Tel : 05-692 3071 Fax : 05-6922609

HIRADC (Rev:_1_Year:_2019___)
PROJECT NAME: PEGAGA DEVELOPMENT PROJECT
ACTIVITY OR PROCESS HEAVY LIFTING OPERATION Date : 7/16/2019
Department (HIRADC owner): YARD FACILITIES & MAINTENANCE HIRADC No :
Location: SECTOR 1 & SECTOR 3
1) LIFTING JACKET LEG PORTIONS ROW 1 AND ROW 7 USING TWO GANTRY CRANES
2) LIFTING JACKET LEG PORTIONS ROW 1 AND ROW 7 USING TWO CRAWLER CRANES
Task/Process : 3) LIFTING JACKET LEG ROW 6A AND 6B USING TWO CRAWLER CRANES
4) SHIFTING JACKET LEGS PORTIONS ROW 1 AND ROW 7 USING Transporter/SPMT
5 SHIFTING JACKET LEGS ROW 6A AND 6B USING Transporter/SPMT
Specific Work area: TABLE A,B & OPEN AREA

HAZARD IDENTIFICATION - tick all that apply, add additional as necessary


Hazard Source (√) Hazard Source (√) Hazard Source (√) Hazard Source (√) Hazard Source (√) Hazard Source (√) (Other hazard sources than stated)
Trip hazards √ Radiation Suspended load √ Line of fire √ Sharp material √ Vibration
Falling objects √ Electrical hazards - LV / HV √ Engulfment Pressurised fluid Confined space General waste √
Oxygen deficiency/excess Multiple electrical feeds Live rails - gantry crane Pressurised air / gas Remote or isolated work √ Hazardous waste
Poisonous gas Ladders √ Working near crane √ Moving / mobile plant √ Extreme temperature Hydrocarbon / chemical spill

Explosive gas Working at height √ Work near crane walkway √ Traffic management √ Extreme weather √ Soil disturbance / erosion

Flammable materials Elevated work platform Slippery surface Moving parts √ Reduced visibility √
Combustible materials √ Potential for difficult rescue Manual handling √ Unauthorized persons √ Communication √
Difficult entry/exit
Hazardous substances √ Noise - plant & equipment √ Air emissions - dust, fumes √ Lighting √

CONTROLS: PPE - tick all that apply


OTHER PPE (if required):

✘ ✘ ✘ ✘ ✘ ✘

Safety equipment or controls required:


Fire Watcher Lock-out / tag out system Ventilation
Barriers √ Fire extinguishers √ Lighting √
Warning signs √ Scaffolding tag Earthing
O
Banksman √ Pocket Dosimeter Fire Blanket N
Signalman √ Spill Kit -
Personal Film Badge First Aid Box √ S
Additional safety equipment/control measures if required: IT
MEDIC WITHIN DISTANCE E
B
R
I
Briefing of HIRADC at work site (Prior to starting work for critical activity only)
Perkongsian HIRADC di tapak kerja kerja (sebelum memulakan aktiviti kritikal sahaja) E Day 6 Day 7
Day 1 Day 2 Day 3
FI Day 4 Day 5
N
Date Date Date Date Date Date Date
Tarikh : _________________________ Tarikh : _________________________ Tarikh : G
_________________________ Tarikh : _________________________ Tarikh : _________________________ Tarikh : _________________________ Tarikh : __________________

(P
By By By RI By By By By
Oleh : _________________________ Oleh : _________________________ Oleh : O
_________________________ Oleh : _________________________ Oleh : _________________________ Oleh : _________________________ Oleh : ___________________
R
Note 1: ALARP - As Low As Reasonably Practicable - Where risk levels have been reduced to as safe level as possible but as to allow the completion
T of the task or activity.
Note 2: If high risk work is being performed, stop work. Management intervention is required if additional control measure (s) is/are unableO
to reduce the risk level.
S
T
A
R
TI
N
G
W
O
R
K
F
O
R
C
RI
TI
C
A
L
A
C
TI
VI
T
DETERMINING CONTROL SITE VERIFICATION PBED
HAZARD IDENTIFICATION RISK ASSESSMENT Penentuan Langkah Kawalan Penilaian tapak kerja (JHA Audit)
Pengenalpastian Hazad Penilaian Hazad

Elimination Substitution Engineering Administrative PPE


Penghapusan Penggantian Kejuruteraan Pentadbiran PPE
site verification / suggestion on particular site verification / audit
RISK date by CE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada tarikh penilaian / audit oleh
No H/M/L/ oleh CE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARANG KETERUK
PENILAIAN
Saranan langkah keselamatan
KALIAN AN
RISIKO
Preparation of Worksite (Loading)
PANDEMIC ENVIRONMENT EXPOSURE 0.0) abide to procedure PRO-00-2180
0) Temperature check
1)Do not come to work if you are unwell.
2)Prevent frequently touch your face (eyes, nose and
mouth)
3)Follow cough / sneezing etiquette
4)Regular hand washing
5)Social distancing requirement (maintain minimum
COVID-19 PREVENTION 1.5m distance requirement) C 2 M
6)Avoid any physical contact
7)Wear hand gloves and mask mandatory
8) Cough, sneezing,fever symptom shall not be allow
to enter yard.

Wrong lifting gear (low capacity). To inspect lifting gear as per inspection check sheet by
Gear angkat yang salah (kapasiti rendah). relevant party & to ensure the capacity of lifting gear as per
approved procedure.

Periksa gear mengangkat seperti dalam senarai


pemeriksaan dan diperiksa oleh pihak yang berkenaan Lifing plan to be established to determine the correct correct crane and lifting gears
A 4 L
untuk memastikan kapasiti gear mengangkat seperti di to be used , the gears are to comply with SFSB colour coding inspection and to be
dalam prosedur yang telah diluluskan. visually inspected for damages before use.

Refer to lifting equipment list (List, Certifiacte, Report)

Pelan mengangkat yang ditetapkan untuk menentukan kren betul dan gear angkat
Wrong crane. (Low capacity crane) Check all the certification, PMA validity, and crane yang digunakan untuk digunakan, gear hendaklah mematuhi pemeriksaan
inspection checklist. pengekodan warna SFSB dan diperiksa secara visual untuk ganti rugi sebelum
Mesin angkat yang salah (kapasiti rendah). digunakan.
Periksa gear mengangkat seperti dalam senarai
pemeriksaan dan diperiksa oleh pihak yang berkenaan Rujuk kepada senarai peralatan mengangkat (Senarai, Sahkan, Laporan)
untuk memastikan kapasiti gear mengangkat seperti di A 4 L
dalam prosedur yang telah diluluskan.

Unfit Crane Operator Trained operator shall be operating the crane. To do Drug
Kren Operator tidak layak and Alcohol Test prior to Lifting Activity

Pengendali kren hendaklah yang terlatih, dan melakukan


Ubat dan Ujian Alkohol sebelum Mengangkat Aktiviti B 2 L

Loss of balance while lifting may cause trip and fall. Perform housekeeping at worksite prior any activity. C 2 M NA

tidak seimbang semasa mengangkat manual lakukan kerja mengemas setiap kali sebelum memulakan
Preparation and Installation of lifting mengakibatkan tersadung atau jatuh sesuatu kerja mengangkat
activity, equipment and lifting gear.
1 Persediaan adan pemasangan latan Incorrect method of manual handling cause back pain Follow the manual handling technique. C 2 M NA
kerja mengangkat dan aktiviti kerja injury.
mengangkat
Kaedah yang salah semasa mengangkat manual
ikut panduan tkerja eknik manual
mengakibatkan sakit belakang

Fingers trapped in-between load or lifting gear while


Using proper hand gloves while rigging or releasing the
rigging, transporting or releasing the lifting gears off C 3 M use proper tool while raleasing the lifting gear and keep safe distances
equipment.
the load after placing.

Jari tersepit diantara beban dan alatan mengangkat


gunakan sarung tangan yang sesuai semasa melakukan
semasa melakukan kerja mengikat, membuka alatan
kerja rigging
kerja.

To perform barriacade at lifting area and clear all


Congested lifting area may cause clashing, injury and obstructions including gas cylinders and to switch off electrician must be on stanby mode (on call basis) if required any urgent support.
C 2 M
hazards at workplace electrical distribution panels or remove if in the way of
crane path / lifting final position. Only lifting parameter (radius) need to be barricaded, while other nearby still can
continue work but required safe access and permission from PIC.

Electrician perlu berjaga jaga jika diperlukan


Lakukan hadangan pada kawasan kerja mengangkat dan Hanya kawasan lifting radius sahaja perlu untuk di kawal dan dihadang, kawasan
keadaan kawasan kerja yang sempit dan tidak teratur
mengemas halangan termasuk silinder gas dan kerja sekitar masih dibenarkan bekerja dengan syarat mempunyai laluan yang
boleh mengundang bahaya tempat kerja dan
mematikan panel elektrik atau memindahkan ia jika berada selamat dan mendapat kebernaran PIC>
mengakibatkan kecederaan
dilaluan pergerakkan kren / di posisi akhir .
site verification / suggestion on particular site verification / audit
RISK date by CE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada tarikh penilaian / audit oleh
No H/M/L/ oleh CE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARANG KETERUK
PENILAIAN
Saranan langkah keselamatan
KALIAN AN
RISIKO

To fully comply with HSE Adverse Weather Condition


Adverse weather condition. C 2 M refer to PR0-00-1301 - Working in Adverse Weather and Haze Condition.
Procedure

Pastikan mengikut HSE Adverse Weather Condition


Cuaca berkeadaan tidak baik ikut to PR0-00-1301 - Working in Adverse Weather and Haze Condition.
Prosedur
site verification / suggestion on particular site verification / audit
RISK date by CE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada tarikh penilaian / audit oleh
No H/M/L/ oleh CE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARANG KETERUK
PENILAIAN
Saranan langkah keselamatan
KALIAN AN
RISIKO
Lifting Leg using Gantry crane/Crawler Crane (Rotator-Table-SPMT/TRANSPORTER-Final Position)

Improper secure of hook latch to lifting gear may fall Ensure the safety latch of the crane hook is inspected and
C 3 M NA
from hook and injured the personnel. with in good condition prior any hook up activity.

kaedah yang salah atau safety latch hook yang rosak


pastikan safety latch kren hook diperiksa dan berfungsi
mungkin boleh mengakibatkan kecederaan jika beban
dengan baik sebelum melakukan kerja hook up.
/ alatan kerja terjatuh.

ensure the hook up area and lifting parameter to be


unintentional release of sling while hook up activity
barricaded and personnel involve to be aware on hazard of C 3 M NA
can cause injury
line of fire

Hook up the lifting jacket leg to the


secara tidak sengaja sling terjatuh dari hook semasa pastikan kawasan kerja dihadang dan pekerja berjagaa
lifting gear using crane and
bekerja boleh mencederakan jaga tentang kawawasan bahaya.
tensioning the slings.

2
Kerja pemasangan alatan Working at height without proper safetry harness may
Comply with complete and inspected Full Harness if
mengangkat pada hook kren dan cause injury during hook up load above 1.8meter C 3 M use proper access e.g ladder , skylift etc.
working above 1.8meter height.
menegangkan alatan mengangkat height.
tersebut.

bekerja tempat tinggi tanpa alatan keselamatan / abah


gunakan harness / abah abah sekiranya bekerjja pada
abah boleh mengakibatkan kecederaan semasa kerja gunakan medium yang sesuai seperti menggunakan tangga , skylift
ketinggian lebih 1.8meter
hook up pada ketinggian lebih 1.8meter

Working near to moving crane leg might cause injury barricaded the working radius to avoid personnel working To ensure crane operator perform daily inspection on crane and the track condition
C 4 S
due to track broken. near to crane. to be inspected

bekerja berdekatan kren bergerak mungkin buat halangan / barricade kawasan kerja untuk
pastikan kren operator melakukan pemeriksaan harian terhadap kren dan
mengakibatkan kecederaan disebabkan oleh trek mengelakkan pekerja yang tidak berkaitan masuk kawsan
memastikan trek kren berkeadaan baik dan diperiksa
rosak kerja

Lift the load slowly until minimum height, if the load stable
Improper lifting sequence may effect to load swinging
can proceed the operation, but if not stable do lower down C 4 S engineering representative shall be available for the operation at site
and unstable can cause injury and property damage.
the load and take nessesary action to rectify the operation.

lakukan angkatan secara perlahan dan berhemah, serta


ketidak sesuaian susun atur kerja mengangkat
pada ketingginaan yang minimum dan periksa beban , jika
mungkin mengakibatkan beban tidak stabil dan boleh
stabil lakukan angkatan seterusnya dan jika beban tidak wakil jabatan kejuruteraan perlu ada pada masa operasi dilaksanakan
membawa kecederaan terhadap individu dan
stabil, turunkan semula beban dan bincang serta lakukan
kerosakan aset syarikat.
pengubahsuaian yang lebih baik.

To ensure crane used, specification and lifting orientation


Insufficient capacity of crane and hook may cause
as per engineering procedure / lifting plan to avoid any C 4 S engineering representative shall be available for the operation at site
load drop down and hit people.
underrated capacity while lifting taken place.

kapasiti kren dan cangkuk tidak sesuai atau kurang pastikan kren yang digunakan, spesifikasi dan orentasi
boleh mengakibatkan beban jatuh dan mencederakan kerja mengankat seperti yang dirancang untuk wakil jabatan kejuruteraan perlu ada pada masa operasi dilaksanakan
pekerja mengelakkan berlakunya kemalangan.

Damaged lifting gear may snapped during lifting can Perform inspection on lifting gear prior and valid tagging
C 4 S Lifting gear certification and inspection shall be attached to lifting plan.
cause injury to personnel and damaged to property. prior any lifting operation.

alatan kerja mengangkat putus semasa mengangkat lakukan pemeriksaan fizikal terhadap alatan mengangkat
menyebabkan cedera pada ipekerja dan kerosakan dan tag yang diperiksa setiapkali sebelum kerja sijil alatan dan senarai semak pemeriksaan perlu disertakan bersama lifting pelan
aset syarikat mengangkat

Attached sufficient quantity and length of tag lines on the


Unbalance load while lifting due to jerky and keep safe distances. Ensure minimum height of load during moving / transferring
load to control the swinging during the lifting operation. C 3 M
inconsistent of lifting. the load and use push - pull stick while handling taglines.
Lifting and slowly move the leg from
from initial location to the final
position (temporary support / gunakan tagline yang cukup panjang dengan kuantiti pastikan jarak selamat. Tentukan ketinggian yang minimum semasa
beban tidak stabil disebabkan oleh kerja angkatan
/Transporter/SPMT) yang sesuai untuk memastikan dan mengawal beban menggerakkan beban dan gunakan tpush pull stick semasa mengendalikan
3 yang tidak lkonsisten dan terhenjut-henjut.
daripada berhayun dan tidak stabil. taglines
Kren mengangkat beban dari posisi
asal dan menghalakan beban
kepada posisi yang akan diletakkan inspect walkie talkie prior to use among lifting team, use
miscommunication and interuption of walkie talkie specific channel during lifting and declare to the other that To ensure the walkie talkie have suffcient baterry and spare walkie talkie are
C 3 M
while lifting load the lifting operation shall be perform using the selected available during operation
channel

lakukan pemeriksaan walkie talkie sebelum digunakan,


pastikan channel yang tertentu sahaja digunapakai dan
gangguan komunikasi semasa mengendalikan beban pastikan walkie talkie berkeadaan baik dan bateri yang cukup dan sentiasa
pastikan arahan menggunakan channel tersebut telah
secara walkie talkie mempunyai walkie talkie gantian jika diperlukan
dilakukan dalam walkie talkie untuk kerja mengangkat
tersebut
site verification / suggestion on particular site verification / audit
RISK date by CE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada tarikh penilaian / audit oleh
No H/M/L/ oleh CE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARANG KETERUK
PENILAIAN
Saranan langkah keselamatan
KALIAN AN
RISIKO

crane clash with other vehicles, materials and To ensure proper housekeeping on the crane path. Traffic
electrician must be on stanby mode (on call basis) if required any urgent support.
unidentified item which can cause injury and damaged controller to be implemented while crane moving and witch C 3 M
Crane gantry need to move away from lifting area if lifting use crawler crane
cranes and properties. off the life control panel (if required)

pastikan housekeeping dilakukan pada laluan kren. Traffik


kren berlanggar dengan jentera lain, atau barang2 electrician perlu ada jika diperlukan. Gantry kren perlu dipindahkan jauh dari
pengawal perlu menjaga laluan dan pastikan panel elektrik
lain yang mengakibatkan cedera dan kerosakann kawasan kerja mengangkat (jika pakai crawler crane)
dipadamkan jika perlu

Uneven ground & low soil bearing capacity can cause To perform checking on the soil bearing data at site and
C 3 M NA
crane sinking and lost it balance. steel plate to encounter any soft spot when neceesary.

lakukan pemeriksaan terhadap permukaan tanah dan


keadaan struktur tanah tidak rata dan kapasiti yang semak data kapasiti soil bearing pada tapak kerja.
rendah mungkin mengakibatkan kren tidak stabil Sediakan steeel plate jika perlu untuk kawasan yang
lembut.

Using proper hand gloves while rigging or releasing the


Hand injury due to snapped in between load and
equipment. No personnel allowed working under C 2 M NA
support during lowerring the load to final position.
suspended load.

Jari tersepit diantara beban dan alatan mengangkat


gunakan sarung tangan yang sesuai semasa melakukan
semasa melakukan kerja mengikat, membuka alatan
kerja rigging
kerja.

Damaged lifting gear may snapped during lifting can Perform inspection on lifting gear prior and valid tagging
C 4 S Lifting gear certification and inspection shall be attached to lifting plan.
cause injury to personnel and damaged to property. prior any lifting operation.

alatan kerja mengangkat rosak dan putus semasa lakukan pemeriksaan fizikal terhadap alatan mengangkat
mengangkat menyebabkan cedera pada ipekerja dan dan tag yang diperiksa setiapkali sebelum kerja sijil alatan dan senarai semak pemeriksaan perlu disertakan bersama lifting pelan
kerosakan aset syarikat mengangkat

Only one personnel (PIC) to perform as signalman and


Load swinging and hit other structure/ equipment due
give instruction to crane operator. Toolbox talk shall be Inspection and functional test of walkie talkie shall be perform during toolbox talk
to communication breakdown between signalman and C 4 S
perform and sequence of operation has to brief to the lifting prior heavy lifting.
crane operator.
team.

hanya kompeten personel sahaja (PIC) yang dibenarkan


beban tidak stabil dan terlanggar struktur, alatan melngetuai kerja mengangkat dan memberi signal
jentera dan aset syarikat disebabkan oleh kegagalan komnunikasi kepada kren operator. Semasa toolbox, PIC
lakukan pemeriksaan dan periksa fungsi walkie talkie semasa toolbox
sistem komunikasi antara signalman dengan operator perlu memberi taklimat ringkas tentang cara dan langkah-
Lowering the jacket leg to the final kren langkah kerja operasi mengangkat kepada pasukan
position. (temporary support / mengangkat
Transporter/SPMT)
4
Turunkan beban perlahan-lahan
pada posisi akhir beban (Support To comply with safety requirement on lifting with allowable
sementara /Transporter/SPMT) Load fell down due to strong wind can cause injury. wind speed below 20knot which can be measured from C 3 M To ensure realease note has been approved and hazard weather identified.
crane wind speed indicator.

kerja mengangkat dibenarkan untuk keadaan angin


beban terjatuh disebabkan oleh angin kuat pastikan release note telah diperiksa dan disahkan serta bahaya cuaca
dibawah 20knot sahaja dan bacaan angin boleh diperolehi
mengakibatkan kecederaan dikenalpasti
dari kren

Attached sufficient quantity and length of tag lines on the


Unbalance load while lifting due to jerky and keep safe distances. Ensure minimum height of load during moving / transferring
load to control the swinging during the lifting operation. C 3 M
inconsistent of lifting. the load and use push - pull stick while handling taglines.

gunakan tagline yang cukup panjang dengan kuantiti pastikan jarak selamat. Tentukan ketinggian yang minimum semasa
beban tidak stabil disebabkan oleh kerja angkatan
yang sesuai untuk memastikan dan mengawal beban menggerakkan beban dan gunakan tpush pull stick semasa mengendalikan
yang tidak lkonsisten dan terhenjut-henjut.
daripada berhayun dan tidak stabil. taglines
site verification / suggestion on particular site verification / audit
RISK date by CE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada tarikh penilaian / audit oleh
No H/M/L/ oleh CE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARANG KETERUK
PENILAIAN
Saranan langkah keselamatan
KALIAN AN
RISIKO

inspect walkie talkie prior to use among lifting team, use


miscommunication and interuption of walkie talkie specific channel during lifting and declare to the other that
C 3 M NA
while lifting load the lifting operation shall be perform using the selected
channel
site verification / suggestion on particular site verification / audit
RISK date by CE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada tarikh penilaian / audit oleh
No H/M/L/ oleh CE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARANG KETERUK
PENILAIAN
Saranan langkah keselamatan
KALIAN AN
RISIKO

lakukan pemeriksaan walkie talkie sebelum digunakan,


pastikan channel yang tertentu sahaja digunapakai (, dan
gangguan komunikasi semasa mengendalikan beban
pastikan arahan menggunakan channel tersebut telah
secara walkie talkie
dilakukan dalam walkie talkie untuk kerja mengangkat
tersebut

Fingers trapped in-between load or lifting gear while Using proper hand gloves while rigging or releasing the
C 2 M NA
instal the lifting gear to the load. equipment.

Jari tersepit diantara beban dan alatan mengangkat


gunakan sarung tangan yang sesuai semasa melakukan
semasa melakukan kerja mengikat, membuka alatan
kerja rigging
kerja.

Incorrect method of manual handling cause back pain


Follow the manual handling technique. C 2 M NA
injury.

Kaedah yang salah semasa mengangkat manual


ikut panduan tkerja eknik manual
mengakibatkan sakit belakang
Disconnect the lifting equipment from
crane.
5 Working at height without proper safetry harness may
Buka semua alatan mengangkat Comply with complete and inspected Harness if working
cause injury during hook up load above 1.8meter C 3 M use proper access e.g ladder , skylift etc.
daripada kren. above 1.8meter height.
height.

bekerja tempat tinggi tanpa alatan keselamatan / abah


gunakan harness / abah abah sekiranya bekerjja pada
abah boleh mengakibatkan kecederaan semasa kerja gunakan medium yang sesuai seperti menggunakan tangga , skylift
ketinggian lebih 1.8meter
hook up pada ketinggian lebih 1.8meter

Proper communication between operator and signalman


Personnel hit by lifting gear due to swinging of crane barricade the lifting area during disconnecting the lifting gear. To ensure the load is
through walkie talkie / hand signal to ensure safe C 3 M
may injured the personnel. fully secured before releasing the lifting gear.
operation.

personel dihentam oleh alat mengangkat kerana sistem komunikasi diantara signalman dengan operator
buat hadangan pada kawasan kerja semasa membuka alatan rigging. Pastikan
pergerakkan kren swing yang berbahaya dan mesti lah sistematik dan selamat supaya tidak
beban selamat sebelum membuka alatan rigging.
mengakibatkan kecederaan membahayakan kawasan kerja dan untuk kerja selamat

Fingers trapped in-between load or lifting gear during Using proper hand gloves while rigging or releasing the
C 2 M NA
housekeeping work equipment.

Jari tersepit diantara beban dan alatan mengangkat gunakan sarung tangan yang sesuai semasa melakukan
semasa melakukan kerja mengemas kerja rigging

6 Incorrect method of manual handling cause back pain


Follow the manual handling technique. C 2 M NA
Housekeeping injury.

Kemas semula tapak kerja


Kaedah yang salah semasa mengangkat manual
ikut panduan tkerja eknik manual
mengakibatkan sakit belakang

Loss of balance while lifting may cause trip and fall. Perform housekeeping at worksite prior any activity. C 2 M NA

tidak seimbang semasa mengangkat manual lakukan kerja mengemas setiap kali sebelum memulakan
mengakibatkan tersadung atau jatuh sesuatu kerja mengangkat
site verification / suggestion on particular site verification / audit
RISK date by CE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada tarikh penilaian / audit oleh
No H/M/L/ oleh CE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARANG KETERUK
PENILAIAN
Saranan langkah keselamatan
KALIAN AN
RISIKO
Shifting Leg Activity (Table - Fabrication Area)

To ensure the position of Transporter/SPMT underneath


jacket leg as per MOS and sufficient lashing been
Jacket leg unbalance while shifting and fell down from
performed to hold the jacket leg while sitting on unauthorized personnel to away from Transporter/SPMT while performing the
Transporter/SPMT.
Transporter/SPMT shifting. Only escort team and traffic controller to assist Transporter/SPMT Team
B 3 M during shifting. ERT Team to be on standby mode. Transporter/SPMT WILL BE
jacket leg tidak stabil semasa bergerak dan
memastikan kedudukan Transporter/SPMT dibawah jacket SYNCHRONIZE AND ONLY 1 OPERATOR TO OPERATE THE OPERATION.)
mengakibatkan jacket leg terjatuh daripada
leg adalah seperti MOS dan lashing yang cukup perlu Keep safe distance
Transporter/SPMT
untuk mengawal jacket leg semasa berada diatas
Transporter/SPMT

Perform daily inspection and functional test of


Transporter/SPMT prior prior lifting the load onto the
Powerpack unit (PPU) of Transporter/SPMT
Transporter/SPMT.
malfunction and breakdown
C 3 M MAINTENANCE TEAM,AIR MARINE ON STANBY MODE
Lakukan pemeriksaan fizikal dan fungsi terhadap
Power pack unit (PPU) tidak berfungsi dan rosak
Transporter/SPMT sebelumbeban diangkat keatas
Transporter/SPMT.

Ensure the Transporter/SPMT in good condition during


inspection, and spilled kit (standby mode) are available to
Hose burst and hydraulic spilled off onto ground encaunter any spillage issue
C 3 M MAINTENANCE TEAM,AIR MARINE ON STANBY MODE
hos bocor dan hidraulik tumpah ke tanah pastikan Transporter/SPMT berkeadaan baik semasa
melakukan pemeriksaan, dan spill kit tersedia untuk
mengawal insiden tumpahan hidraulik

Transporter/SPMT hit trepassing personnel or the Use hon to alert the workers serounding and traffic
other vehicle while shifting operation. controller to assist movement of Transporter/SPMT. unauthorized personnel to away from Transporter/SPMT while performing the
shifting. Only escort team and traffic controller to assist Transporter/SPMT Team
B 3 M
Transporter/SPMT melanggar pejalan kaki atau Gunakan hon untuk memastikan pekerja sekeliling ketahui during shifting. ERT Team to be on standby mode. Transporter/SPMT WILL BE
Shifting leg from Table to Fabrication kenderaan / mesin lain semasa bergerak menuju ke akan pergerakan Transporter/SPMT, pengawal trafik perlu SYNCHRONIZE AND ONLY 1 OPERATOR TO OPERATE THE OPERATION.)
Area by Transporter/SPMT topside menjalankan tugas membantu operator Transporter/SPMT.
7 Transporter/SPMT bergerak
membawa leg dari table ke tapak
project

Uneven ground can cause stability issue to the Route survey to be performed prior shifting operation and
Transporter/SPMT and jacket leg might fell down. ensure the path is in good condition and levelled.
steel plate to be on standby mode if Transporter/SPMT need to travel on uneven or
B 3 M water ponding area. IF HEAVY RAIN PRIOR BEFORE OPERATION, FINAL
Bentuk keadaan permukaan tanah yang tidak rata Survey pada laluan adalah perlu dilakukan sebelum
ROUTE SURVEY TO BE PERFORM)
mungkin menyebabkan Transporter/SPMT tidak stabil melakukan aktiviti shifting dan memastikan laluan
dan jacket leg berkemungkinan akan terjatuh berkeadaan baik dan rata.

Route survey to be performed prior shifting operation and


Obstruction on shifting path can cause property ensure the path is in good condition and housekeeping the
damage and injury obstructed item prior any movement.
B 3 M NA
Halangan pada laluan shifting boleh mengakibatkan Survey pada laluan shifting perlu dilakukan sebelum aktiviti
kerosakan dan kecederaan dilaksanakan dan pastikan laluan bebas dari halangan
serta berkeadaan baik

To fully comply with HSE Adverse Weather Condition


Adverse weather condition. C 3 M refer to PR0-00-1301 - Working in Adverse Weather and Haze Condition.
Procedure

Pastikan mengikut HSE Adverse Weather Condition


Cuaca berkeadaan tidak baik ikut to PR0-00-1301 - Working in Adverse Weather and Haze Condition.
Prosedur

Working at extended hour( night) can cause issue with To ensure getting management approval in order to
visibility. proceed with night time critical activity
C 4 S NA
Bekerja diwaktu malam mungkin berbahaya Perlu dapatkan kebenaran pihak atasan jika melakukan
disebabkan oleh faktor penglihatan yang tidak jelas kerja kritikal pada waktu malam.
site verification / suggestion on particular site verification / audit
RISK date by CE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada tarikh penilaian / audit oleh
No H/M/L/ oleh CE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARANG KETERUK
PENILAIAN
Saranan langkah keselamatan
KALIAN AN
RISIKO
Lifting Leg using Crawler Crane at Fabrication/Erection Area

Improper secure of hook latch to lifting gear may fall Ensure the safety latch of the crane hook is inspected and
C 3 M NA
from hook and injured the personnel. with in good condition prior any hook up activity.

kaedah yang salah atau safety latch hook yang rosak


pastikan safety latch kren hook diperiksa dan berfungsi
mungkin boleh mengakibatkan kecederaan jika beban
dengan baik sebelum melakukan kerja hook up.
/ alatan kerja terjatuh.

ensure the hook up area and lifting parameter to be


unintentional release of sling while hook up activity
barricaded and personnel involve to be aware on hazard of C 3 M NA
can cause injury
line of fire

Hook up the lifting gear to jacket leg secara tidak sengaja sling terjatuh dari hook semasa pastikan kawasan kerja dihadang dan pekerja berjagaa
and tensioning the slings. bekerja boleh mencederakan jaga tentang kawawasan bahaya.

8 Kerja pemasangan alatan


mengangkat pada hook kren dan Working at height without proper safetry harness may
Comply with complete and inspected Full harness if
menegangkan alatan mengangkat cause injury during hook up load above 1.8meter C 3 M NA
working above 1.8meter height.
tersebut. height.

bekerja tempat tinggi tanpa alatan keselamatan / abah


gunakan harness / abah abah sekiranya bekerjja pada
abah boleh mengakibatkan kecederaan semasa kerja
ketinggian lebih 1.8meter
hook up pada ketinggian lebih 1.8meter

Working near to moving crane leg might cause injury barricaded the working radius to avoid personnel working To ensure crane operator perform daily inspection on crane and the track condition
C 4 S
due to track broken. near to crane. to be inspected

bekerja berdekatan kren bergerak mungkin buat halangan / barricade kawasan kerja untuk
pastikan kren operator melakukan pemeriksaan harian terhadap kren dan
mengakibatkan kecederaan disebabkan oleh trek mengelakkan pekerja yang tidak berkaitan masuk kawsan
memastikan trek kren berkeadaan baik dan diperiksa
rosak kerja
site verification / suggestion on particular site verification / audit
RISK date by CE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada tarikh penilaian / audit oleh
No H/M/L/ oleh CE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARANG KETERUK
PENILAIAN
Saranan langkah keselamatan
KALIAN AN
RISIKO

Lift the load slowly until minimum height, if the load stable
Improper lifting sequence may effect to load swinging
can proceed the operation, but if not stable do lower down C 4 S engineering representative shall be available for the operation at site
and unstable can cause injury and property damage.
the load and take nessesary action to rectify the operation.

lakukan angkatan secara perlahan dan berhemah, serta


ketidak sesuaian susun atur kerja mengangkat
pada ketingginaan yang minimum dan periksa beban , jika
mungkin mengakibatkan beban tidak stabil dan boleh
stabil lakukan angkatan seterusnya dan jika beban tidak wakil jabatan kejuruteraan perlu ada pada masa operasi dilaksanakan
membawa kecederaan terhadap individu dan
stabil, turunkan semula beban dan bincang serta lakukan
kerosakan aset syarikat.
pengubahsuaian yang lebih baik.

To ensure crane used, specification and lifting orientation


Insufficient capacity of crane and hook may cause
as per engineering procedure / lifting plan to avoid any C 4 S engineering representative shall be available for the operation at site
load drop down and hit people.
underrated capacity while lifting taken place.

kapasiti kren dan cangkuk tidak sesuai atau kurang pastikan kren yang digunakan, spesifikasi dan orentasi
boleh mengakibatkan beban jatuh dan mencederakan kerja mengankat seperti yang dirancang untuk wakil jabatan kejuruteraan perlu ada pada masa operasi dilaksanakan
pekerja mengelakkan berlakunya kemalangan.

Damaged lifting gear may snapped during lifting can Perform inspection on lifting gear prior and valid tagging
C 4 S Lifting gear certification and inspection shall be attached to lifting plan.
cause injury to personnel and damaged to property. prior any lifting operation.

alatan kerja mengangkat putus semasa mengangkat lakukan pemeriksaan fizikal terhadap alatan mengangkat
menyebabkan cedera pada ipekerja dan kerosakan dan tag yang diperiksa setiapkali sebelum kerja sijil alatan dan senarai semak pemeriksaan perlu disertakan bersama lifting pelan
aset syarikat mengangkat

Lifting and slowly move the leg from


Transporter/SPMT to the final
position. Attached sufficient quantity and length of tag lines on the
Unbalance load while lifting due to jerky and keep safe distances. Ensure minimum height of load during moving / transferring
9 Kren mengangkat beban dari load to control the swinging during the lifting operation. C 3 M
inconsistent of lifting. the load and use push - pull stick while handling taglines.
Transporter/SPMT dan menghalakan
beban kepada posisi yang akan
diletakkan
gunakan tagline yang cukup panjang dengan kuantiti pastikan jarak selamat. Tentukan ketinggian yang minimum semasa
beban tidak stabil disebabkan oleh kerja angkatan
yang sesuai untuk memastikan dan mengawal beban menggerakkan beban dan gunakan tpush pull stick semasa mengendalikan
yang tidak lkonsisten dan terhenjut-henjut.
daripada berhayun dan tidak stabil. taglines

inspect walkie talkie prior to use among lifting team, use


miscommunication and interuption of walkie talkie specific channel during lifting and declare to the other that To ensure the walkie talkie have suffcient baterry and spare walkie talkie are
C 3 M
while lifting load the lifting operation shall be perform using the selected available during operation
channel

lakukan pemeriksaan walkie talkie sebelum digunakan,


pastikan channel yang tertentu sahaja digunapakai dan
gangguan komunikasi semasa mengendalikan beban pastikan walkie talkie berkeadaan baik dan bateri yang cukup dan sentiasa
pastikan arahan menggunakan channel tersebut telah
secara walkie talkie mempunyai walkie talkie gantian jika diperlukan
dilakukan dalam walkie talkie untuk kerja mengangkat
tersebut

crane clash with other vehicles, materials and To ensure proper housekeeping on the crane path. Traffic
unidentified item which can cause injury and damaged controller to be implemented while crane moving and witch C 3 M electrician must be on stanby mode (on call basis) if required any urgent support.
cranes and properties. off the life control panel (if required)

pastikan housekeeping dilakukan pada laluan kren. Traffik


kren berlanggar dengan jentera lain, atau barang2
pengawal perlu menjaga laluan dan pastikan panel elektrik electrician perlu ada jika diperlukan
lain yang mengakibatkan cedera dan kerosakann
dipadamkan jika perlu

Uneven ground & low soil bearing capacity can cause To perform checking on the soil bearing data at site and To provide where necessary gravel especially at Gantry Crane Track to obtain
C 3 M
crane sinking and lost it balance. steel plate to encounter any soft spot when neceesary. even level.

lakukan pemeriksaan terhadap permukaan tanah dan


keadaan struktur tanah tidak rata dan kapasiti yang semak data kapasiti soil bearing pada tapak kerja. sediakan batu / tanah jika perlu terutama pada kawasan trek gantri kren supaya
rendah mungkin mengakibatkan kren tidak stabil Sediakan steeel plate jika perlu untuk kawasan yang kawasan tersebut rata.
lembut.
site verification / suggestion on particular site verification / audit
RISK date by CE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada tarikh penilaian / audit oleh
No H/M/L/ oleh CE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARANG KETERUK
PENILAIAN
Saranan langkah keselamatan
KALIAN AN
RISIKO

Using proper hand gloves while rigging or releasing the


Hand injury due to snapped in between load and
equipment. No personnel allowed working under C 2 M NA
support during lowerring the load to final position.
suspended load.

Jari tersepit diantara beban dan alatan mengangkat


gunakan sarung tangan yang sesuai semasa melakukan
semasa melakukan kerja mengikat, membuka alatan
kerja rigging
kerja.

Damaged lifting gear may snapped during lifting can Perform inspection on lifting gear prior and valid tagging
C 4 S Lifting gear certification and inspection shall be attached to lifting plan.
cause injury to personnel and damaged to property. prior any lifting operation.

alatan kerja mengangkat rosak dan putus semasa lakukan pemeriksaan fizikal terhadap alatan mengangkat
mengangkat menyebabkan cedera pada ipekerja dan dan tag yang diperiksa setiapkali sebelum kerja sijil alatan dan senarai semak pemeriksaan perlu disertakan bersama lifting pelan
kerosakan aset syarikat mengangkat

Only one personnel (PIC) to perform as signalman and


Load swinging and hit other structure/ equipment due
give instruction to crane operator. Toolbox talk shall be Inspection and functional test of walkie talkie shall be perform during toolbox talk
to communication breakdown between signalman and C 4 S
perform and sequence of operation has to brief to the lifting prior heavy lifting.
crane operator.
team.

hanya kompeten personel sahaja (PIC) yang dibenarkan


beban tidak stabil dan terlanggar struktur, alatan melngetuai kerja mengangkat dan memberi signal
jentera dan aset syarikat disebabkan oleh kegagalan komnunikasi kepada kren operator. Semasa toolbox, PIC
lakukan pemeriksaan dan periksa fungsi walkie talkie semasa toolbox
sistem komunikasi antara signalman dengan operator perlu memberi taklimat ringkas tentang cara dan langkah-
kren langkah kerja operasi mengangkat kepada pasukan
mengangkat

To comply with safety requirement on lifting with allowable


Load fell down due to strong wind can cause injury. wind speed below 20knot which can be measured from C 4 S To ensure realease note has been approved and hazard weather identified.
crane wind speed indicator.

Lowering the jacket leg to the final


position.
10 kerja mengangkat dibenarkan untuk keadaan angin
beban terjatuh disebabkan oleh angin kuat pastikan release note telah diperiksa dan disahkan serta bahaya cuaca
Turunkan beban perlahan-lahan dibawah 20knot sahaja dan bacaan angin boleh diperolehi
mengakibatkan kecederaan dikenalpasti
pada posisi akhir beban dari kren

Attached sufficient quantity and length of tag lines on the


Unbalance load while lifting due to jerky and keep safe distances. Ensure minimum height of load during moving / transferring
load to control the swinging during the lifting operation. C 3 M
inconsistent of lifting. the load and use push - pull stick while handling taglines.

gunakan tagline yang cukup panjang dengan kuantiti pastikan jarak selamat. Tentukan ketinggian yang minimum semasa
beban tidak stabil disebabkan oleh kerja angkatan
yang sesuai untuk memastikan dan mengawal beban menggerakkan beban dan gunakan tpush pull stick semasa mengendalikan
yang tidak lkonsisten dan terhenjut-henjut.
daripada berhayun dan tidak stabil. taglines

inspect walkie talkie prior to use among lifting team, use


miscommunication and interuption of walkie talkie specific channel during lifting and declare to the other that To ensure the walkie talkie have suffcient baterry and spare walkie talkie are
C 3 M
while lifting load the lifting operation shall be perform using the selected available during operation
channel

lakukan pemeriksaan walkie talkie sebelum digunakan,


pastikan channel yang tertentu sahaja digunapakai (, dan
gangguan komunikasi semasa mengendalikan beban pastikan walkie talkie berkeadaan baik dan bateri yang cukup dan sentiasa
pastikan arahan menggunakan channel tersebut telah
secara walkie talkie mempunyai walkie talkie gantian jika diperlukan
dilakukan dalam walkie talkie untuk kerja mengangkat
tersebut

To ensure proper housekeeping on the final position. PIC


clashing between jacket leg with erected scaffold /
to perform site inspection prior offloading and switch off the C 3 M scaffolder and electricain to be on stanby (on call basis) if required any assistance.
electrical panel at final position area.
life control panel (if required)

perlanggaran antara jacket leg dengan scaffolding lakukan pemeriksaan dan housekeeping pada posisi
scaffolder dan electrician dalam keadaan sedia jika diperlukan.
atau panel elektrik pada posisi akhir beban akhir . Tutup semua panel dikawsan terlibat jika perlu.
site verification / suggestion on particular site verification / audit
RISK date by CE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada tarikh penilaian / audit oleh
No H/M/L/ oleh CE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARANG KETERUK
PENILAIAN
Saranan langkah keselamatan
KALIAN AN
RISIKO
Completion of liftingion of cutting activity and removal of the cut pipe from the machine to storage area.

Fingers trapped in-between load or lifting gear while Using proper hand gloves while rigging or releasing the
C 2 M NA
instal the lifting gear to the load. equipment.

Jari tersepit diantara beban dan alatan mengangkat


gunakan sarung tangan yang sesuai semasa melakukan
semasa melakukan kerja mengikat, membuka alatan
kerja rigging
kerja.

Incorrect method of manual handling cause back pain


Follow the manual handling technique. C 2 M NA
injury.

Kaedah yang salah semasa mengangkat manual


ikut panduan tkerja eknik manual
mengakibatkan sakit belakang
Disconnect all the lifting equipment
from the jacket leg
11 Working at height without proper safetry harness may
Comply with complete and inspected harness if working
Buka semua alatan mengangkat cause injury during hook up load above 1.8meter C 2 M NA
above 1.8meter height.
daripada beban height.

bekerja tempat tinggi tanpa alatan keselamatan / abah


gunakan harness / abah abah sekiranya bekerjja pada
abah boleh mengakibatkan kecederaan semasa kerja
ketinggian lebih 1.8meter
hook up pada ketinggian lebih 1.8meter

Proper communication between operator and signalman


Personnel hit by lifting gear due to swinging of crane
through walkie talkie / hand signal to ensure safe C 3 M NA
may injured the personnel.
operation.

personel dihentam oleh alat mengangkat kerana sistem komunikasi diantara signalman dengan operator
pergerakkan kren swing yang berbahaya dan mesti lah sistematik dan selamat supaya tidak
mengakibatkan kecederaan membahayakan kawasan kerja dan untuk kerja selamat

Fingers trapped in-between load or lifting gear during Using proper hand gloves while rigging or releasing the
C 2 M NA
housekeeping work equipment.

Jari tersepit diantara beban dan alatan mengangkat gunakan sarung tangan yang sesuai semasa melakukan
semasa melakukan kerja mengemas kerja rigging

12 Incorrect method of manual handling cause back pain


Follow the manual handling technique. C 2 M NA
Housekeeping injury.

Kemas semula tapak kerja


Kaedah yang salah semasa mengangkat manual
ikut panduan tkerja eknik manual
mengakibatkan sakit belakang

Loss of balance while lifting may cause trip and fall. Perform housekeeping at worksite prior any activity. C 2 M NA

tidak seimbang semasa mengangkat manual lakukan kerja mengemas setiap kali sebelum memulakan
mengakibatkan tersadung atau jatuh sesuatu kerja mengangkat

Restoration of Worksite

Prepared by: Reviewed by: Approved by:


PROCESS OWNER HSE OFFICER / ENGINEER CONSTRUCTION MANAGER
Signature: Signature: ________________ Signature:
Name : Name: ________________ Name:
Designation: Designation: ________________ Designation:
Date : Date: _________________ Date:

Debriefing of HIRADC at work site


Perkongsian HIRADC di tapak kerja setelah tamat kerja

Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7


Date Date Date Date Date Date Date
Tarikh : _________________________ Tarikh : _________________________ Tarikh : _________________________ Tarikh : _________________________ Tarikh : _________________________ Tarikh : _________________________ Tarikh : __________________

By By By By By By By
Oleh : _________________________ Oleh : _________________________ Oleh : _________________________ Oleh : _________________________ Oleh : _________________________ Oleh : _________________________ Oleh : ___________________

Das könnte Ihnen auch gefallen