Commissioning Service Department

Commissioning Standard Test Formats

Description: AC VOLTMETER Record No. :


Equip. No. Drawing ref.: Sheet :
Contractor : Contract no.: Substation No :

GENERAL DATA AND INFORMATION:


Bay No. DCDB#
Designation
ACCURACY 0.5% ± 1 digit

MECHANICAL CHECKS AND VISUAL INSPECTION:

ITEM DESCRIPTION CHECKED

1 Inspect for any physical damage or defects.

2 Verify connections as per approved drawing

Secondary Injection Test :

Observed meter reading (V)


Volt % Applied Voltage (A) % Error Remarks
R Y B

25

50

75

100

% Error = (Observed meter reading-Applied meter reading) / Full scale reading x 100.

- Test Equipment's : FREJA 300

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date: