WORK SCHEDULE

PRELIMINARIES SUPER STRUCTURE


 Order Bahan Binaan 1. MEMBINA TIANG
 Susun Atur Tapak  Grid Line allignment/levelling
 Mohon Bekalan Air & Letrik Sementra  Pasang besi / re-bar
 Setting Out & Side Rail  Pasang formwork
 Checking verticallity and tie-up formwork
FABRICATING WORKS  Concrete Pouring to column
 Formwork
 Re Bar 2. MEMBINA ROOF BEAM
 Menyedia/menaikkan T-support/staging
SUB STRUCTURE  Pasang roof beam bottom formwork
1. EXCAVATION/INSTALLATION/CONCRETING  Pasang roof beam side formwork
 Menggali Tapak Asas  Masukkan tetulang besi/re-bar
 Grid Line allignment  Tie-up roof beam formwork
 Memasang Formwork  Concrete Pouring to roof beam
 “Lean Concrete 2″””
 Memasang besi / re-bar 3. KERJA-KERJA BUMBUNG
 Kerja-kerja konkrit tapak asas  Pasang wall plate dan kekuda
 Laying aluminium foil/timber battern
 2. DISMENTLING WORKS/RE-FILL EARTH  Pasang atap genting

 Membuka papan formwork 4. KERJA BATA, PLASTER, FRAME PINTU/TINGKAP DAN


 Kerja menimbus kembali tanah SILING
 Pasang Frame Pintu
 3. MEMBINA GROUND BEAM  Kerja Mengikat Dinding bata
 Pasang frame tingkap
 Grid Line allignment/levelling  Kerja-kerja plaster
 Pasang forwork  Kerja-Kerja Siling
 Pasang besi / re-bar
 Tie up / support formwork COLD WATER PLUMBING/SANITARY/SEWERAGE
 Kerja-kerja Concreting to Grd Beam
 Under ground paip
 4. GRD FLOOR SLAB  Piping and Sanitary fitting
 Sewer pipe and septic tank
 Mengisi tanah/pasir/hardcore
 Menghampar Plastic sheet KERJA-KERJA LETRIK
 Menghampar BRC
 Concrete Pouring to Slab  Cable laying
 Electrical appliance

FINISHING WORKS

 Floor and Wall tiles


 Painting
 Fixing Door/Window leaf

EXTERNAL WORKS

 Perimeter drain and Turfing