Sie sind auf Seite 1von 127

How many Mark for Review 

virtual CPUs (1) Points


can a single
M7 processor
support
considering
that each
thread can be
a virtual
CPU ?

32
64
256
128

Correct !
5.Which Mark for Review 
type of (1) Points
DIMMs
are
supported
by the M7
processor ?

DDR3
DDR2
DDR5
DDR4

Correct !
17.Which interconnect Mark for Review 
is common to the (1) Points
M7-8 and M7-16
configurations?

II_CMIOU_SP
XI_N_4_T2B_S
II_8_N_RO
II_W_248

Correct !
25.Which Mark for Review 
memory (1) Points
technology is
used on the
SPARC M7
systems?

DDR5
DDR3
DDR2
DDR4

Correct !
26.Which processor-to- Mark for Review 
processor (1) Points
interconnectivity
technology is used to
connect between the
CMIOUs in a
SPARC M7-8?

Scalability links
Coherency links
memory channels
I/O links

Correct !

27. Which generation of the PCIe interconnect is Mark for Review 


supported by the SPARC M7 systems? (1) Points
2
3
1
4

Correct !
35.What is a key Mark for Review 
characteristic that (1) Points
is new about the
SPARC M7
processor?

32 cores
3 threads per core
On-chip memory controllers
3 cache levels

Correct !
38.Which Mark for Review 
term is (1) Points
used to
describe
a logical
server
that runs
its own
OS?

LDOM
PDOM
container
zone

Correct !

39. Which optional software can be installed on the SPARC M7 Mark for Review 
systems to create and manage LDOMs? (1) Points

Oracle VM Server for SPARC


Oracle Enterprise Manager Ops Center
Java
Oracle ILOM
Correct !

40. What OS and version is supported on the SPARC M7 system Mark for Review 
CMIOUs at release? (1) Points

Red Hat Enterprise Linux 6.5


Solaris 11.3
Solaris 11.1
Oracle Linux 6.5

Correct !
2.How Mark for Review 
many (1) Points
PCIe
cards are
supported
a fully
populated
the
SPARC
M7-8?

32
8
16
24

Correct !
45.You are Mark for Review 
ready to (1) Points
create a
logical
domain
called test.
Which
command
do you
execute?

ldm add-domain test


ldm add-logical-domain test
ldm create-domain test
ldm set-domain test

Correct !

50.A Mark for Review 


customer (1) Points
asks you to
create a
user
account
for a night-
shift
employee
to be able
to monitor
the system
but to
nothing
else.
Which
privilege
do you
assign to
this user?

read-only operator (o)


user (u)
console (c )
administrator (a)

Correct !
54.You are Mark for Review 
traveling to (1) Points
the customer's
site with a
new
replacement
part. What
should you
have with you
to help
prevent
electrostatic
discharge
(ESD) from
damaging the
new part?

antistatic wrist strap


screwdriver
torque wrence
steel-toe shoes

Correct !

67.Based on this output, Mark for Review 


what version of (1) Points
firmware is this
customer running?
System_fw_version =
Sun System Firmware
10.1.3.e 2015/01/15
08:53

10
10.1
0.370138888888889
10.1.3.e

Correct !

69.What happens Mark for Review 


when an (1) Points
unsupported
CMIOU
configuration is
detected?

Starting the respective host will fail. No impact on any running host.
An alert is generated.
Starting the respective host will succeed. No impact on any running
host. An alert is generated.
Starting the respective host will fail. Any running host will be
gracefully stopped. An alert is generated.

Correct !
73.On which Mark for Review 
platforms (1) Points
can M7
and M8
CMIOUs
be mixed?

M7-8 with 2 Pdoms using M7 Service Processor and M8 CMIOUs in


DCU#1
M7-8 with 2 Pdoms using M7 Service Processor, M7 and M8 CMIOUs in
the same DCU
M7-8 platform using M7 Service Processor
M7-8 and M7-16 platform using M7 Service Processor

Correct !
75.Mixing an Mark for Review 
M7 SP and (1) Points
an M8 SP
in the same
chassis is
supported.

True
False

Incorrect. Please review all the SPARC M8 vs M7


courses and try again.
77.What are the Mark for Review 
configuration (1) Points
rules for Power
Supplies A261
and A265?

A261 and A265 can be mixed in a platform


A261 and A265 cannot be mixed but A265 from Belpower and Delta
can be mixed with no error
A261 and A265 cannot be mixed and A265 from Belpower and Delta
should not be mixed.

Correct !
94.What is the Mark for Review 
primary goal of (1) Points
the Installation
and
Configuration of
Oracle Hardware
and Software
step in the EIS
methodology?

Troubleshooting software configuration issues


System acclimatization, installation, and basic configuration
Hardware cabling , wiring and Power ON
Managing transition from Installation phase to Field Service issue
recording

Correct!

98.Why should Mark for Review 


you use the (1) Points
EIS
methodology
to guide your
installation
process?

Installation processes are very lengthy, the EIS


methodology is quick and dirty
Larry Ellison has mandated using EIS
Using the proven EIS methodology will provide
step-by-step installation guidelines, help guarantee a
quality installation, make your life easier, and
ensure customer satisfaction
The EIS methodology provides a 20% discount on
Support Services if you install your customers’
hardware or software using it

Correct!

99. Why do the EIS Standards recommend that external Mark for Review 
cables between Oracle hardware, such as servers, (1) Points
storage devices, network devices and ports be clearly
labeled?

For ease of maintenance it should be unambiguously


clear from the label on each cable, where the cable
has to be attached
Labeling is not an EIS best practice
Cable routing should be done with rubber bands for
ease of reconfiguration
Service requests for field diagnostics will not be
accepted unless cables are labeled

Correct!
112.What is the Mark for Review 
mission (1) Points
statement for
use of the
Enterprise
Installation
Standards?

To use a methodology for support service that is from the field, created
by the field for the Field.
To drive the ongoing development and usage of Enterprise Installation
Standards (EIS), resulting in consistent, high quality, and cost effective
installations that speed time to deployment and provide the foundation
for enhanced stability and performance.
To manage communication and resolution of Services Requests in a
timely and customer-friendly manner
To drive consistent best practices for Oracle Services field delivery

Correct!
1.How Mark for Review 
many (1) Points
DIMM
slots are
supported
on the
CMIOU
board ?

16
128
64
32

Correct !
5.Which three statements are true Mark for Review 
about M7 processors ? (1) Points

(Choose all correct answers)


Level 4 cache is one of the most important
processor enhancements
SSM is also a common features with Intel
Processors
Each M7 processor provides coherency
links, referred to as CLINKs
CLINKS are used on both the M7 and T7
servers
CLINKS provide for inter-processor
connections
Correct !

7What enhancements to the SPARC M7 Mark for


. processor contribute to security at all Review 
layers of the hardware and software (1) Points
stack ?

Improvements to on-chip
cryptography
Increased password
protection
4 layers of cache

Correct !

8. Which statement is true ? Mark for


Review 
(1) Points

The S3 supports 16 threads


per core
The SPARC M7 processor
uses the fourth generation
CMT Core, referred to as S3.
The SPARC M7 processor
uses the fourth generation
CMT Core, referred to as S4
The S4 supports 16 threads
per core

Correct !
6Which feature of the SPARC M7 Mark for
. processor permits the server to reduce Review 
power consumption ? (1) Points
(Choose all correct answers)

Dynamic Voltage Frequency


Scaling
Dynamic memory allocation
Power gating
Voltage Acclimatization

Incorrect.
Please refer
back to the
lesson
“Oracle
SPARC M7
Processor
Architecture
".
10.Which systems use the Mark for Review 
SPARC M7 processor ? (1) Points

(Choose all correct answers)

SPARC M6-32
SPARC T7-2
Oracle SuperCluster M7
Oracle SuperCluster T5-8
SPARC T7-4

Correct !
12.How many CMIOUs are Mark for Review 
there in a DCU in the M7- (1) Points
16?

4
1
2
3

Correct !

13. Select the two specifications that correspond to Mark for


the M7 processor? Review 
(1) Points

(Choose all correct answers)

Total of 4 MB of level 3 cache per each set


of 4 cores
Total of 32 cores
Total of 512KB level 2 data cache per core
pair
Total of 3 memory controllers
Greater than a 4.0 GHz clock speed

Correct !

14. Which are the boot options available on the Mark for
SPARC M7-8 and M7-16 Servers? Review 
(1) Points

(Choose all correct answers)

USB port for a flash stick


Versaboot/eUSB
16 Gb FC to FC SAN attached Storage
using Ganymede-Q or Ganymede-E
Internal HBA and HDD
Aura3 Memory Express (NVMe) controller
and a Solid-State Disk (SSD).

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".

15. Which features of “Software in Silicon” are Mark for


supported by the SPARC M7 processor? Review 
(1) Points
(Choose all correct answers)

Database Query Acceleration


scalability links
coherency links
Database Decompression
Silicon Secured Memory

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".
16.How many M7 processors Mark for Review 
are supported on each (1) Points
CMIOU?

3
1
2
4

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".

17. Which links are connected to the switch units Mark for
from the CMIOUs on the M7-16? Review 
(1) Points

scalability
memory
cache
coherency

Correct !

18. Which interconnect is common to the M7-8 Mark for


and M7-16 configurations? Review 
(1) Points

II_CMIOU_SP
II_W_248
XI_N_4_T2B_S
II_8_N_RO

Correct !

19. How many DIMM slots are supported on Mark for


each CMIOU? Review 
(1) Points

64
32
8
16

Correct !

20. Which two responses are true about the Mark for
SPARC M7-8 Server? Review 
(1) Points

(Choose all correct answers)

The M7-8 has a maximum of 4


processors
The M7-8 with 1 PDOM uses the same
internal interconnects as that of the M7-8
with 2 PDOM
The M7-8 with 1 PDOM has cache
coherency between all 8 M7 processors
The M7-8 with 2 PDOM is configured as
a 1x8 socket arrangement with a
maximum of 8 processors
The M7-8 with 2 PDOM is configured as
a 2x4 socket arrangement with a
maximum of 8 processors

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".
22.What is a key difference in the PCIe Mark for
implementation on the SPARC M6-32 Review 
versus the SPARC M7? (1) Points

(Choose all correct answers)

PCIe slots support 16 lanes


versus 8 lanes
PCIe generation 3 versus 4
Each CMIOU has its own
PCIe slots versus the IOUs
used on the SPARC M6-32
Number of PCIe slots
available

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".

23. Which three statements are true Mark for


about PDoms and LDoms? Review 
(1) Points

(Choose all correct answers)


PDoms are defined by the
interconnect cabling used
Oracle VM Server for
SPARC is needed to be able
to create LDOms
Pdom stands for Pedabyte
domain
PDom is a physical domain
and Ldom is a logical domain
Ldoms cannot be configured
as hard partitions for software
licensing purposes

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".

24. Which optional software can be Mark for


installed on the SPARC M7 Review 
systems to perform system (1) Points
management?

Java
Oracle Enterprise Manager
Ops Center
Oracle ILOM
Oracle VM Server for
SPARC

Correct !
28.Which component contains the Oracle Mark for
ILOM management software? Review 
(1) Points

CMIOU
PDECB
SP
switch unit
Correct !

29. Which component connects the Mark for


two CMIOU chassis together Review 
using SLINKs on a SPARC M7- (1) Points
16?

interconnect chassis
switch chassis
Another CMIOU chassis
SP chassis

Correct !

30. How many physical PCIe card Mark for


slots are there per CMIOI board? Review 
(1) Points

2
3
1
4

Correct !
32.Which management tool provides a Mark for
discovery window to find the server Review 
within a network? (1) Points

Oracle VM Server for


SPARC
Java
Oracle ILOM
Oracle Enterprise Manager
Ops Center

Correct !

33. Which three of these Mark for


technologies can be used for the Review 
boot disk on the SPARC M7 (1) Points
systems?
(Choose all correct answers)

eUSB
NVME
Punched cards
Fiber Channel
Floppy disk

Correct !

34. Which component contains the Mark for


M7 processor? Review 
(1) Points

PDECB
SP tray
switch unit
CMIOU

Correct !
1What service processor Mark for Review 
. management software comes (1) Points
pre-installed on the SPARC
M7 systems?

Oracle Enterprise Manager Ops Center


Java
Oracle VM Server for SPARC
Oracle ILOM

Correct !

42. Which type of disk is used in a NVME Mark for


implementation? Review 
(1) Points

SAS HDD
USB flash disk
SATA HDD
SSD
Correct !
47.You're very familiar with Mark for Review 
ILOM on the T5-8 servers, (1) Points
but notice that there are two
targets that are new to you in
ILOM on the SPARC M7
servers? Which two targets
are new in the Simplified
Data Model?

(Choose all correct answers)

/SP
/System
/SYS
/Servers
/Storage

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".

48. Before you can perform a firmware upgrade, Mark for


you must first check the keyswitch property Review 
for each host. What must it be set to for the (1) Points
firmware upgrade to work?

Unlocked
Open
Normal
Locked
Diag

Correct !
52.Before you can configure the service Mark for
procesors, which three pieces of network Review 
information do you need from the (1) Points
customer?

(Choose all correct answers)

Active SP IP address
SP0 IP address
Clock board IP address
SP1 IP address
Domain IP address

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".

53. After completing the installation, Mark for


you need to collect the system's Review 
configuration. What two actions (1) Points
do you perform?

(Choose all correct answers)

Snapshot on the ACTIVE SP


Explorer on the Pdoms
Snapshot on the Pdoms
Explorer on the SPs

Correct !
57.Which of the following can Mark for Review 
be roles of a logical domain? (1) Points

(Choose all correct answers)

CPU Domain
I/O Domain
Control Domain
Service Domain

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".

58. The customer has finished running their tests Mark for
on the test domain and would like you to Review 
remove it. What command do you run to do (1) Points
that?

(Choose all correct answers)

ldm rm-ldom test


ldm remove-domain test
ldm remove-ldom test
ldm rm-domain test

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".
60.You attempt to add an Oracle Mark for Review 
ILOM user account but it (1) Points
fails. Which option
represents a possible reason
for the failure?

You do not have the host control role


enabled.
You need to add SSH keys to the system
before creating user accounts.
You have exceeded the maximum
number of 20 user accounts.
You do not have the user management
role enabled.

Correct !
62. You have powered-on HOST3 and want to Mark for
verify its current status. Which two commands Review 
would give you that output? (1) Points

(Choose all correct answers)

show
/Servers/Pdomains/Pdomain_1/HOST
status
show status
/Servers/Pdomains/Pdomain_3/HOST
show
/Servers/Pdomains/Pdomain_3/HOST
status
show
/Servers/Pdomains/Pdomain_3/HOST
status_detail

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".

63. Which three components require IP addresses Mark for


when you configure the SP network? Review 
(1) Points

(Choose all correct answers)

ACTIVE_SP
SP1
SPARE_SP
SP0
SLAVE_SP

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".

64. You need to find the system's serial number to Mark for
open a service call. What command do you run Review 
to see it? (1) Points

show /SP hostname


show /System serial_number
show /System model
show /SP network

Correct !

65. Which three statements are prerequisites for Mark for


powering on HOST0? Review 
(1) Points

(Choose all correct answers)

There must be suffucuent resources


assigned to HOST0.
keywitch must be set to Locked.
keyswitch must be set to Normal.
HOST0 must currently be powered off.
HOST0 must have at least one DCU
assigned to it.

Incorrect.
Please refer
back to the
lesson
“SPARC
M7
Systems
Product
Overview".
66.Which command would you run to Mark for
switch the ACTIVE_SP responsibilities? Review 
(1) Points

set /SP/redundancy
failover=on
set SP_failover=true
set /SP/redundancy
initiate_failover_action=true
set /SP failover=true

Correct !

67. When taking FRUs out of the Mark for


server, where should they be Review 
placed? (1) Points

table
antistatic mat
foam
raised floor

Correct !
72.What is the connection Mark for Review 
between the CMIOU, SP and (1) Points
eUSB disk?

Using respectively root ports 4 and 2 of


the IO controller
Sharing the root port 4 of the IO
controller
Using respectively root ports 3 and 1 of
the IO controller
Sharing the root port 2 of the IO
controller

Correct !
75.What are the configuration rules for Mark for
Power Supplies A261 and A265? Review 
(1) Points

A261 and A265 cannot be


mixed but A265 from
Belpower and Delta can be
mixed with no error
A261 and A265 can be mixed
in a platform
A261 and A265 cannot be
mixed and A265 from
Belpower and Delta should
not be mixed.

Correct !
77.What happens when an unsupported Mark for
CMIOU configuration is detected? Review 
(1) Points

Starting the respective host


will fail. No impact on any
running host. An alert is
generated.
Starting the respective host
will succeed. No impact on
any running host. An alert is
generated.
Starting the respective host
will fail. Any running host
will be gracefully stopped.
An alert is generated.

Correct !
79.Assuming a SPARC T5 Server Mark for
installation on which you install Solaris Review 
11, what EIS documentation, at a (1) Points
minimum, is it recommended that you
bring to support you in the installation
project?

(Choose all correct answers)

EIS Installation Checklist for


Common Array Manager
EIS Installation Checklist for
SPARC T5
EIS Installation Checklist for
Solaris 11 OS
EIS Installation Checklist for
Sun Datacenter InfiniBand
Switch 36

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

80. What three typical activities are Mark for


done during the Project Initiation Review 
phase of the EIS Methodology? (1) Points

(Choose all correct answers)

Details about the project are


identified and documented,
for example, is this a single
system installation or a
complex, multi-product
installation
Details about the customer
are determined and
documented
The EIS Site-Audit is
scheduled
System delivery occurs, and
the project commences
System configuration details
are documented.

Correct!
81.Why do the EIS Standards Mark for Review 
recommend that external (1) Points
cables between Oracle
hardware, such as servers,
storage devices, network
devices and ports be clearly
labeled?

Cable routing should be done with rubber


bands for ease of reconfiguration
Service requests for field diagnostics will
not be accepted unless cables are labeled
For ease of maintenance it should be
unambiguously clear from the label on
each cable, where the cable has to be
attached
Labeling is not an EIS best practice

Correct!

82. What three documents are typically used as Mark for


part of the EIS Planning and Preparation Review 
stage in the installation process? (1) Points

(Choose all correct answers)

Test Procedures Plan


Operational Hand-off Form
Acclimatization Report
Project Schedule
Site Audit Report
Installation and Configuration Plan

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

84.Which four documents are Mark for Review 


included as part of the (1) Points
Operational Handover?

(Choose all correct answers)


System Documentation
EIS Checklist for the System installed
Installation and Configuration Plan
Test Procedures Plan
MOS Internal Documentation
Site Audit Report

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

Mark for Review 


(1) Points

86.What four tasks are typically Mark for Review 


happening at the EIS (1) Points
Planning and Preparation
stage in the installation
process?

(Choose all correct answers)

Cable and install systems into custom


rack
Compile EIS planning documents
Unpack and power ON systems
Notification of Customer Installation
project
Identify Installation team – Oracle
Installation Coordinator, Project
Manager, Customer Point of Contact,
others as needed
Begin work on Project Schedule

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

87. Which Oracle products are covered by EIS Mark for


Checklists – select all that apply. Review 
(1) Points

(Choose all correct answers)

OS and Cluster-related Software


ERP applications
Oracle Fusion Middleware
Storage
Switches
Servers
Engineered Systems

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.
88. What are two activities that take place during Mark for
the System Test step of the EIS Review 
methodology? (1) Points

(Choose all correct answers)

Application installation, configuration,


and testing
Tests specified in the Test Procedures
Plan Plan will be carried performed
Electrical grounding and environmental
assessment
On Solaris-based systems, Oracle's
Explorer Data Collector will be run and
the results evaluated with ORAS/CLI
from the EIS-DVD

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

89. Why it is important to do Installation Mark for


planning, rather than just asking the customer Review 
as you work through the installation process? (1) Points
(Select three)

(Choose all correct answers)

Continuing interruptions can detract from


the professionalism of your work, and
lead to customer dissatisfaction
Customer technical contact may not be
readily available
Pricing for Installation Services is less
expensive if planning in not included
Support Services will not engage on
services requests if no installation
planning was done
Planning leads to more thoughtful
consideration for a predictable outcome
of the installation process

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

90. If the customer has asked for some Mark for


customization of their installation, how is Review 
testing for that accomplished? Choose all (1) Points
responses that apply.

(Choose all correct answers)

Additional tests can be inserted into the


Test Procedures plan
Oracle is automatically responsible for
any non-standard installation procedure,
regardless of whether they were agree to
as part of the Installation and
Configuration Plan
Not all installation actions need testing
Testing above and beyond the Covered
System Tests are at the sole discretion of
Oracle and/or the Partner installer

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.
91.Name two functions for the Mark for Review 
EIS-DVD during the (1) Points
Installation and
Configuration of Oracle
Hardware and Software step
in the EIS methodology?

(Choose all correct answers)

Provides installation assessment and


diagnostic tools
Used as a back-up for complete
documentation sets that are on
http://docs.oracle.com
Provides an excellent tool as a leave
behind utility for customers
Contains required patches and firmware
for most installations

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

92. Which three statements are true about EIS? Mark for
Review 
(1) Points

(Choose all correct answers)

EIS evolved from the field, is sustained


by those closely involved with the field,
and is intended to assist the field
EIS stands for “Enterprise Installation
Standards”
EIS is a methodology designed to address
issues before, during and after the actual
hands-on installation of Oracle systems
EIS stands for “Enterprise information
Standards”
EIS is a quick and dirty process for
expediting Oracle system installations
Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

93. What are two cautions that should be Mark for


acknowledged when acclimatizing a system? Review 
(1) Points

(Choose all correct answers)

The maximum positive or negative


temperature gradient that is permitted for
multi-layer boards is approximately 2° C
(4° F) per hour.
Powering ON the system will speed the
acclimatization process as the heat from
the system will accelerate its warming
Avoid unpacking items inside the
computer centre (dust/dirt contaminating
filters etc.)
Once powered on the temperature is no
longer an issue, as internal cooling
systems commence

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

94. What do EIS deliverables define? Mark for


Review 
(1) Points
EIS deliverables give a high level
description of the scope of the EIS
activities for each product or product
family
EIS deliverables are the Customer
Support Identifiers that customers use for
field delivery service after an installation
has completed
EIS deliverables describe detailed
process steps for each phase of the
installation service
EIS deliverables are the documents that
are left behind with customers after an
installation service is performed

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

95. What are three items in the EIS Site-Audit Mark for
Report are documented for all Oracle Review 
hardware? (1) Points

(Choose all correct answers)

Facility Power requirements


Access Route requirements
IP Address requirements
Operating Environment and Cooling
requirements
Operating System requirements

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again
96.What if the customer has Mark for Review 
their own labeling (1) Points
methodology that differs
from the recommended one
from EIS?

Follow the customer's standard for cable


labeling provided it meets with EIS
requirements for identification and port
location.
Redo cabling throughout the datacenter to
meet the EIS standard
Submit a Service Request for Oracle
approval on use of the customer labeling
and routing methods
Ignore the customer’s standard and use
the EIS standard

Correct!

97. What are two statements that are true about Mark for
EIS checklists? Review 
(1) Points

(Choose all correct answers)

EIS installation checklists are intended to


guide the installer through the installation
in a logical and consistent manner
Checklists are intended as guidelines for
properly trained installers and are NOT a
substitute for appropriate product
training.
Checklists are publicly available on
oracle.com
Checklists are a valuable tool to share
with customers so they know how to
install systems themselves

Correct!
98. Why should you use the EIS methodology to Mark for
guide your installation process? Review 
(1) Points

Using the proven EIS methodology will


provide step-by-step installation
guidelines, help guarantee a quality
installation, make your life easier, and
ensure customer satisfaction
Larry Ellison has mandated using EIS
Installation processes are very lengthy,
the EIS methodology is quick and dirty
The EIS methodology provides a 20%
discount on Support Services if you
install your customers’ hardware or
software using it

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

99. What are Oracle Standard System Mark for


Installations (OSSI)? Review 
(1) Points

Advanced professional services offered


by IBM Global Services
Installation Services sold by Oracle
Advanced Customer Support
Field Delivery Support Services offered
through certified partners
Installation Services sold by 3rd party
service providers

Correct!

100. What is the purpose for the Operational Mark for


Handover step in the EIS Methodology? Review 
(1) Points

Documents the installation and


configuration of Customer's system(s)
Used to negate responsibility for any
ongoing System issues
Perform system testing and diagnostics
Documents how to use the EIS
documentation and standards

Correct!
104Which two EIS documents are most Mark for
. useful during the Installation and Review 
Configuration of Oracle Hardware and (1) Points
Software step?

(Choose all correct answers)

Installation Configuration
Plan
Operational Handover
Agreement
DVD
Site-Audit Report
EIS Checklist

Correct!

105. Which three responses are true Mark for


regarding EISdoc v4? Review 
(1) Points

(Choose all correct answers)

Is an OpenOffice-based set of
documentation that includes
planning for installations of
Oracle equipment and some
software
Is a free guide to configuring
Oracle software
Is accessible to customers and
end-users of Oracle hardware
and software
Is available on the partner
Enterprise Installations
Standards web page and on
the EIS-DVD
Contains documents matched
to the steps in the EIS
Methodology

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.
107What is found on the Mark for Review 
. EIS-DVD? Select all (1) Points
the apply.

(Choose all correct answers)

Sales and presales technical training on Oracle


systems
Tools to help verify the quality of the
installation (e.g. ORAS/CLI)
A complete set all configuration files for every
Oracle server, storage system and Engineered
system
Selected Oracle/Sun Software
Scripts that assist during the installation

Incorrect! Please review the


"Using the EIS Methodology"
course and try again.

108. For safety awareness with respect to grounding, if a Mark for


system has been modified after the manufacturer's Review 
assembly process, what three recommendations (1) Points
does the EIS Grounding Standard make?

(Choose all correct answers)


If the temperature is below 60 degrees F., warm
the room first before power ON
Determine whether the local electrician can
support the installation process
If modifications involved any power supplies,
distribution units or wiring, did qualified
personnel verify that the modification was was
correct and did they test the system to ensure
that it doesn't pose any safety hazard?
If qualified personnel did not test the safety of
the modified system then proper testing should
be requested before Oracle and/or partner
personnel will work on the equipment
Check whether the modification involved any
power supplies, distribution units or wiring?

Incorrect! Please review the


"Using the EIS Methodology"
course and try again.

109. Why should you typically complete the Installation Mark for
Configuration Plan and create your Test Procedures Review 
Plan at the same time? (1) Points

Test Procedures plan is a standard document


used in all generic system installations.
As you work through the system configuration
process with your customer, you should state
how you will test key items in the system’s
configuration for having been successfully
completed.
You should create the Test Procedures Plan
after you have completed the system installation
and configuration.

Correct!
111What is the main purpose Mark for Review 
. of the EIS methodology? (1) Points

To provide a foundational methodology for


front line support triage by Help Desk
providers.
To use best practices, standards,
methodologies and continuous process
improvement to ensure consistent, efficient,
supportable and high quality product
installations globally
To enable customers to install and service
Oracle hardware and software.
To use best practices to support standard
field delivery and break/fix services by
partners.

Correct!

112. You are assigned to an installation project in Mark for


France in February to install 5 new SPARC T5 Review 
servers. The servers, in their original (1) Points
packaging, are sitting in the customer’s loading
dock with a temperature of 8 degrees C (46
degrees F). The customer’s data center is 20
degrees C (68 degrees F). What is the
recommended next step in acclimating these
systems?

Unpack the servers and store in the loading


dock
Move the systems (still packed) into a room
with a similar environment to the data
center
Unpack the servers and store in the data
center
Move the systems (still packed) into the
data center

Correct!

113. What is the mission statement for use of the Mark for
Enterprise Installation Standards? Review 
(1) Points

To manage communication and resolution


of Services Requests in a timely and
customer-friendly manner
To use a methodology for support service
that is from the field, created by the field
for the Field.
To drive consistent best practices for
Oracle Services field delivery
To drive the ongoing development and
usage of Enterprise Installation Standards
(EIS), resulting in consistent, high quality,
and cost effective installations that speed
time to deployment and provide the
foundation for enhanced stability and
performance.

Correct!

Mark for
Review 
(1) Points

115. What tasks occur during the operational


handover phase of the EIS methodology?

(Choose all correct answers)

Collate the EISdocV4 documents


pertaining to this customer installation, and
product documentation for handover
Document the serial number for the
system(s) installed, as well as any
comments pertaining to the installation
Provide the customer the 20% installation
service rebate that is required after a
successful installation
Obtain customer signatures to successful
close project

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.
116What are three factors Mark for Review 
. that influence how long a (1) Points
system (server, storage,
engineered system) will
require to be acclimatized
after delivery to a
customer, before power
can be applied without
causing damage?

(Choose all correct answers)

temperature
cleanliness
humidity
data center space
timezone

Correct!

117. What two activities are accomplished during Mark for


Installation Task Planning step in the EIS Review 
Methodology? (1) Points

(Choose all correct answers)

Networking and system component cabling


Communicate schedule for installation to
the customer
System unpacking and acclimatization
Organization of the team who will actively
work the Installation
Review the timeframe options for delivery
of the service

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

118. Who is involved in the Project Initiation phase? Mark for


Review 
(1) Points

(Choose all correct answers)

Customer point of contact


Partner point of contact
3rd party Service Provider
Oracle Installation Coordinator or Project
Manager (if applicable)
Oracle Financing contact

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

119. When should you review deliverables and why? Mark for
Review 
(1) Points

EIS deliverables are an interim checklist to


ensure that at the mid-way point of an
installation the project remains on track.
EIS deliverables are used as a last step in
the installation process to ensure the
installer provided everything that is required
Ideally EIS deliverables would be reviewed
at the very start of an installation project, as
they clearly define scope, roles and
responsibilities, and project deliverables
EIS deliverables are included in the Oracle
system shipping and packaging documents
near the start of an installation

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

120. According to the EIS methodology, when issues Mark for


are uncovered during the Site-Audit, who Review 
should be notified? (1) Points

(Choose all correct answers)

Customer point of contact


Installation coordinator if applicable
Oracle sales management
Oracle Premier Support

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.
121Name three of the Mark for Review 
. problems that EIS was (1) Points
created to overcome?

(Choose all correct answers)

Inconsistent installations: Customers buying


identical servers for two locations were
dismayed to find different patch levels,
firmware versions etc.
Poor communication/use of Best Practices
Lack of formal agreement with customers as
to outcome of an installation
Standards for delivery of replacement parts for
Oracle hardware
Oracle hardware shipping best practices for
on-time delivery

Correct!

122. What should partners do before first using Mark for


ESISdocV4? (Select two) Review 
(1) Points

(Choose all correct answers)

Review Oracle product overview


documentation
Submit their EIS Test Procedure Plan
outcomes
Review the Openoffice presentation on
EISdoc V4 found on the EIS Planning &
Documentation web page
Review the “EISdoc V4 Getting Started
Cookbook” and “Success with EISdoc V4
Cookbook”

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

123. What are the four key points covered in each test Mark for
topic of the Test Procedures Plan? Review 
(1) Points

(Choose all correct answers)


Method
Test Result
Conclusion
Objective
Outcome
Prerequisites

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

124. What are three types of configuration information Mark for


typically documented in an Installation Review 
Configuration Plan? (1) Points

(Choose all correct answers)

System documentation and guidelines


Boot Disk Layout
IO cards and controllers
System host names
Power cord specifications
General and Management Network
Configuration

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.

125. Which four objectives are primary goals for an Mark for
EIS Site Audit? Review 
(1) Points

(Choose all correct answers)

Determine how frequently system backups


will be completed
Determine the environmental conditions at
Customer's site including temperature,
humidity, cleanliness and such other
assessments as are determined to be necessary
in Oracle's sole discretion
Determine the floor weight load capacity at
the location where the System will be installed
Determine how many logical domains need to
be configured on the system
Determine the availability of required
electrical power to run and maintain the
System
Determine installation needs for the System,
including such assessments as: the suitability
of access routes to the installation location,
such as doors, elevators, floor strengths and
ramps

Incorrect!
Please
review the
"Using the
EIS
Methodolog
y" course
and try
again.
3Which feature of the SPARC Mark for Review 
. M7 processor permits the (1) Points
server to reduce power
consumption ?

(Choose all correct answers)

Dynamic Voltage Frequency Scaling


Voltage Acclimatization
Dynamic memory allocation
Power gating
Incorrect. Please refer back to the lesson “Oracle SPARC M7 Processor Architecture"
12Which Mark for Review 
. two (1) Points
response
s are
true
about
the
SPARC
M7-8
Server?

(Choose all correct answers)

The M7-8 with 2 PDOM is configured as a 2x4 socket


arrangement with a maximum of 8 processors
The M7-8 with 2 PDOM is configured as a 1x8 socket
arrangement with a maximum of 8 processors
The M7-8 has a maximum of 4 processors
The M7-8 with 1 PDOM has cache coherency between all 8
M7 processors
The M7-8 with 1 PDOM uses the same internal interconnects
as that of the M7-8 with 2 PDOM

Incorrect. Please refer back to


the lesson “SPARC M7
Systems Product Overview".

14Which Mark for Review 


. are the (1) Points
boot
options
availabl
e on the
SPARC
M7-8
and
M7-16
Servers
?

(Choose all correct answers)

Versaboot/eUSB
16 Gb FC to FC SAN attached Storage using Ganymede-Q or
Ganymede-E
Internal HBA and HDD
Aura3 Memory Express (NVMe) controller and a Solid-State
Disk (SSD).
USB port for a flash stick

Incorrect. Please refer back to


the lesson “SPARC M7
Systems Product Overview".
18.Which features of “Software Mark for Review 
in Silicon” are supported by (1) Points
the SPARC M7 processor?

(Choose all correct answers)

Silicon Secured Memory


Database Query Acceleration
coherency links
Database Decompression
scalability links

Incorrect.
Please refer
back to the
lesson
“SPARC M7
Systems
Product
Overview".
24.Which three statements are Mark for Review 
true about PDoms and (1) Points
LDoms?

(Choose all correct answers)

Oracle VM Server for SPARC is needed to


be able to create LDOms
Ldoms cannot be configured as hard
partitions for software licensing purposes
Pdom stands for Pedabyte domain
PDom is a physical domain and Ldom is a
logical domain
PDoms are defined by the interconnect
cabling used

Incorrect.
Please refer
back to the
lesson
“SPARC M7
Systems
Product
Overview".

25. What is a key difference in the PCIe Mark for


implementation on the SPARC M6-32 versus Review 
the SPARC M7? (1) Points

(Choose all correct answers)

PCIe slots support 16 lanes versus 8 lanes


Each CMIOU has its own PCIe slots versus
the IOUs used on the SPARC M6-32
PCIe generation 3 versus 4
Number of PCIe slots available

Incorrect.
Please refer
back to the
lesson
“SPARC M7
Systems
Product
Overview".
37.Where in the CMIOU Mark for Review 
does the PCIe root (1) Points
complex originate?

eUSB
M7 processor
IOH (Mystic River)
IOU

Correct !
46.You're very familiar with Mark for Review 
ILOM on the T5-8 servers, (1) Points
but notice that there are
two targets that are new to
you in ILOM on the
SPARC M7 servers?
Which two targets are new
in the Simplified Data
Model?

(Choose all correct answers)

/SP
/Servers
/Storage
/SYS
/System

Incorrect.
Please refer
back to the
lesson
“SPARC M7
Systems
Product
Overview".
50.Which of the following Mark for Review 
can be roles of a logical (1) Points
domain?

(Choose all correct answers)

Control Domain
CPU Domain
Service Domain
I/O Domain

Incorrect. Please refer back to


the lesson “SPARC M7
Systems Product Overview".
51.Which three statements are Mark for Review 
prerequisites for powering on (1) Points
HOST0?

(Choose all correct answers)


HOST0 must have at least one DCU
assigned to it.
keyswitch must be set to Normal.
HOST0 must currently be powered off.
keywitch must be set to Locked.
There must be suffucuent resources
assigned to HOST0.

Incorrect.
Please refer
back to the
lesson
“SPARC M7
Systems
Product
Overview".
53.Which three components Mark for Review 
require IP addresses when (1) Points
you configure the SP
network?

(Choose all correct answers)

SP0
SPARE_SP
SP1
SLAVE_SP
ACTIVE_SP

Incorrect. Please refer back to


the lesson “SPARC M7
Systems Product Overview".

54. Before you can configure the service procesors, Mark for
which three pieces of network information do Review 
you need from the customer? (1) Points

(Choose all correct answers)

Clock board IP address


Domain IP address
Active SP IP address
SP1 IP address
SP0 IP address

Incorrect. Please refer back to


the lesson “SPARC M7
Systems Product Overview".
56You are ready to run Mark for
. SunVTS against the Review 
SPARC M7 (1) Points
platform. Which
command do you
use to verify that it
is installed?

(Choose all correct answers)

pkg list system/test/sunvts


pkg install system/test/sunvts
pkg list sunvts
pkg list entire sunvts

Correct !
62.Multiple people are Mark for
working on a server. Review 
You power-on (1) Points
HOST1 and it sits for
a few minutes with
no messages before
starting and then
running. Which
option represents a
possible reason for
this?

Your firmware is not up to date.


The HOST does not meet the minimum
configuration requirements.
There is a lot of activity on the server.
Another HOST is going through POST.

Incorrect. Please refer back to


the lesson “SPARC M7
Systems Product Overview".
63. The customer has finished running their tests on the Mark for
test domain and would like you to remove it. What Review 
command do you run to do that? (1) Points

(Choose all correct answers)

ldm remove-domain test


ldm rm-domain test
ldm rm-ldom test
ldm remove-ldom test

Incorrect. Please refer back to


the lesson “SPARC M7
Systems Product Overview".

64. You want to start /HOST0 but, by accident, you hit Mark for
Enter after typing start /HOST. Which option best Review 
represents the outcome of this? (1) Points

The start command gives an error.


The start command gets applied to all HOSTs in
the system.
The start command lists all of the HOSTs and
asks you which one you want to start.
The start command defaults to HOST0 if you do
not specify a HOST number.

Incorrect. Please refer back to


the lesson “SPARC M7
Systems Product Overview".

65. You want to assign 12 virtual CPUs to the control Mark for
domain. Which command do you run? Review 
(1) Points

ldm assign-vcpu 12 control


ldm set-vcpu 12 control
ldm set-vcpu 12 primary
ldm assign-vcpu 12 primary

Incorrect. Please refer back to


the lesson “SPARC M7
Systems Product Overview".
66.During the initial Mark for Review 
installation of the M7 (1) Points
server, you notice that
the SP NET MGT
interface is not
available. Which
option represents a
possible reason for
this?

It must be connected to a Gigabit network.


The network does not use DHCP.
Oracle ILOM is down.
The SPARC M7 does not use the SP NET MGT
interface.

Incorrect. Please
refer back to the
lesson “SPARC
M7 Systems
Product
Overview".
70.The “ip-transport.interconnect-down” and “ip- Mark for Review 
transport.link-down” alerts are reporting a (1) Points
problem on _________.

The connection between


the NIC and the network
switch
The PCIe switch on the
CMIOU
The indicted network
interface
The EoUSB interconnect
path supporting the FMA
Fault Proxying mechanism

Incorrect.
Please
review all
the SPARC
M8 vs M7
courses and
try again.
75.What happens if Mark for Review 
Power Supplies (1) Points
A261 and A265 are
mixed in a platform?

The running hosts will be stopped and it's not


possible to restart any host.
The running hosts will not be impacted and it's
possible to restart the hosts with non-dominant PS
faulted.
The running hosts will be stopped but it's then
possible to restart the hosts with non-dominant PS
faulted.
The system is run as expected without any impact.

Incorrect. Please
review all the
SPARC M8 vs
M7 courses and
try again.
77.What components have been Mark for Review 
modified for M8 servers as (1) Points
compared to those used in M7
servers?

Service Processor, Power Supply


CMIOU, Service Processor, Power
Supply
CMIOU, Service Processor
CMIOU, Power Supply

Correct !

EIS Installation Best Practices Online Assessment


This assessment tests the participant's knowledge of accessing and using EIS methodology.
(Answer all questions in this section)

78. What is the primary purpose of the EIS- Mark for


DVD? Review 
(1) Points
The EIS-DVD is used for on-the-job
tutorials on how to install Oracle
servers and storage
The EIS-DVD is to help installers of
Oracle/Sun products perform
consistent installations in an efficient
manner.
The EIS-DVD is a tool that is
provided to installation partners as a
give-away to customers
The EIS-DVD is an annually
released product which support all
hardware installations, and
documents all bugs and issues that
have been logged during the prior
year

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.

79. What are two cautions that should be Mark for


acknowledged when acclimatizing a Review 
system? (1) Points

(Choose all correct answers)

Avoid unpacking items inside the


computer centre (dust/dirt
contaminating filters etc.)
Once powered on the temperature is
no longer an issue, as internal
cooling systems commence
The maximum positive or negative
temperature gradient that is
permitted for multi-layer boards is
approximately 2° C (4° F) per hour.
Powering ON the system will speed
the acclimatization process as the
heat from the system will accelerate
its warming

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.

80. Why are EIS deliverables relevant for Mark for


Partner installations too? Review 
(1) Points

When partners use the EIS


deliverables and submit
documentation to that effect, their
customer gets a 25% discount on
support
EIS deliverables provide flexibility
when customers want to make ad-
hoc configuration changes
Advanced Customer Services
mandates that Partners use the EIS
methodology for installations
EIS deliverables describe the amount
of time, materials and deliverables
are in scope for a standard
installation

Correct!
81.What tasks occur during the Mark for Review 
operational handover phase of (1) Points
the EIS methodology?

(Choose all correct answers)

Provide the customer the 20%


installation service rebate that is
required after a successful
installation
Obtain customer signatures to
successful close project
Document the serial number for the
system(s) installed, as well as any
comments pertaining to the
installation
Collate the EISdocV4 documents
pertaining to this customer
installation, and product
documentation for handover

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.
84.Assuming a SPARC T5 Server Mark for Review 
installation on which you install (1) Points
Solaris 11, what EIS
documentation, at a minimum, is
it recommended that you bring to
support you in the installation
project?

(Choose all correct answers)

EIS Installation Checklist for


Solaris 11 OS
EIS Installation Checklist for
Common Array Manager
EIS Installation Checklist for Sun
Datacenter InfiniBand Switch 36
EIS Installation Checklist for
SPARC T5

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.

85. According to the EIS methodology, Mark for


when issues are uncovered during the Review 
Site-Audit, who should be notified? (1) Points
(Choose all correct answers)

Oracle sales management


Oracle Premier Support
Installation coordinator if
applicable
Customer point of contact

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.
86.What three typical activities are Mark for Review 
done during the Project (1) Points
Initiation phase of the EIS
Methodology?

(Choose all correct answers)

The EIS Site-Audit is scheduled


System configuration details are
documented.
Details about the customer are
determined and documented
Details about the project are
identified and documented, for
example, is this a single system
installation or a complex, multi-
product installation
System delivery occurs, and the
project commences

Correct!
91.When should the Site-Audit be Mark for Review 
performed? (1) Points

As soon as the product has been


delivered to the customer
Prior to the completion of the sale, in
order to ensure that the customer’s
location is viable
As soon as possible, and certainly
prior to delivery of the system
After the system has been
acclimatized and is ready for
unpacking at the customer site

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.

92. What do EIS deliverables define? Mark for


Review 
(1) Points

EIS deliverables give a high level


description of the scope of the EIS
activities for each product or product
family
EIS deliverables are the documents
that are left behind with customers
after an installation service is
performed
EIS deliverables are the Customer
Support Identifiers that customers
use for field delivery service after an
installation has completed
EIS deliverables describe detailed
process steps for each phase of the
installation service

Correct!

93. What are Oracle Standard System Mark for


Installations (OSSI)? Review 
(1) Points

Installation Services sold by 3rd


party service providers
Field Delivery Support Services
offered through certified partners
Advanced professional services
offered by IBM Global Services
Installation Services sold by Oracle
Advanced Customer Support

Correct!

94. What is the primary purpose of Mark for


the”Basic Solaris” standard? Review 
(1) Points

Differentiates between Linux and


Solaris installation processes on
dual-boot systems
Defines a method for achieving a
consistent installation for Oracle
Servers with Solaris OS
Describes how to install legacy
versions of Solaris on systems that
need to support backward
compatible applications
Specifically describes how to install
Solaris on non-SPARC hardware

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.

95. Who is involved in the Project Initiation Mark for


phase? Review 
(1) Points

(Choose all correct answers)

Customer point of contact


Oracle Financing contact
Partner point of contact
Oracle Installation Coordinator or
Project Manager (if applicable)
3rd party Service Provider
90.For safety awareness with respect to grounding, if a Mark for
system has been modified after the manufacturer's Review 
assembly process, what three recommendations does (1) Points
the EIS Grounding Standard make?

(Choose all correct


answers)

If modifications
involved any
power supplies,
distribution units
or wiring, did
qualified
personnel verify
that the
modification
was was correct
and did they test
the system to
ensure that it
doesn't pose any
safety hazard?
Determine
whether the
local electrician
can support the
installation
process
Check whether
the modification
involved any
power supplies,
distribution units
or wiring?
If the
temperature is
below 60
degrees F.,
warm the room
first before
power ON
If qualified
personnel did
not test the
safety of the
modified system
then proper
testing should be
requested before
Oracle and/or
partner
personnel will
work on the
equipment

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.
96.Why should you use the EIS Mark for Review 
methodology to guide your (1) Points
installation process?

Using the proven EIS methodology


will provide step-by-step installation
guidelines, help guarantee a quality
installation, make your life easier,
and ensure customer satisfaction
Larry Ellison has mandated using
EIS
Installation processes are very
lengthy, the EIS methodology is
quick and dirty
The EIS methodology provides a
20% discount on Support Services if
you install your customers’ hardware
or software using it

Correct!

97. Name three of the problems that EIS Mark for


was created to overcome? Review 
(1) Points

(Choose all correct answers)


Lack of formal agreement with
customers as to outcome of an
installation
Poor communication/use of Best
Practices
Oracle hardware shipping best
practices for on-time delivery
Standards for delivery of
replacement parts for Oracle
hardware
Inconsistent installations: Customers
buying identical servers for two
locations were dismayed to find
different patch levels, firmware
versions etc.

Correct!

98. What four tasks are typically happening Mark for


at the EIS Planning and Preparation Review 
stage in the installation process? (1) Points

(Choose all correct answers)

Begin work on Project Schedule


Cable and install systems into
custom rack
Identify Installation team – Oracle
Installation Coordinator, Project
Manager, Customer Point of
Contact, others as needed
Notification of Customer Installation
project
Compile EIS planning documents
Unpack and power ON systems

Correct!

99. What are three types of configuration Mark for


information typically documented in an Review 
Installation Configuration Plan? (1) Points
(Choose all correct answers)

Boot Disk Layout


General and Management Network
Configuration
Power cord specifications
IO cards and controllers
System host names
System documentation and
guidelines

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.

100. What are two statements that are true Mark for
about EIS checklists? Review 
(1) Points

(Choose all correct answers)

Checklists are publicly available on


oracle.com
Checklists are a valuable tool to
share with customers so they know
how to install systems themselves
Checklists are intended as guidelines
for properly trained installers and are
NOT a substitute for appropriate
product training.
EIS installation checklists are
intended to guide the installer
through the installation in a logical
and consistent manner

Correct!
101. What are two activities that Mark for Review 
take place during the System (1) Points
Test step of the EIS
methodology?
(Choose all correct answers)

Electrical grounding and


environmental assessment
Tests specified in the Test
Procedures Plan Plan will be
carried performed
Application installation,
configuration, and testing
On Solaris-based systems, Oracle's
Explorer Data Collector will be run
and the results evaluated with
ORAS/CLI from the EIS-DVD

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.

102. Name two functions for the EIS-DVD Mark for


during the Installation and Review 
Configuration of Oracle Hardware and (1) Points
Software step in the EIS methodology?

(Choose all correct answers)

Provides an excellent tool as a


leave behind utility for customers
Used as a back-up for complete
documentation sets that are on
http://docs.oracle.com
Contains required patches and
firmware for most installations
Provides installation assessment
and diagnostic tools

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.

103. Which Oracle products are covered by Mark for


EIS Checklists – select all that apply. Review 
(1) Points

(Choose all correct answers)

Engineered Systems
Servers
Oracle Fusion Middleware
ERP applications
Switches
OS and Cluster-related Software
Storage

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.

104. What is the main purpose of the EIS Mark for


methodology? Review 
(1) Points

To provide a foundational
methodology for front line support
triage by Help Desk providers.
To use best practices to support
standard field delivery and
break/fix services by partners.
To enable customers to install and
service Oracle hardware and
software.
To use best practices, standards,
methodologies and continuous
process improvement to ensure
consistent, efficient, supportable
and high quality product
installations globally

Correct!

105. What two activities are accomplished Mark for


during Installation Task Planning step Review 
in the EIS Methodology? (1) Points

(Choose all correct answers)

Review the timeframe options for


delivery of the service
Organization of the team who will
actively work the Installation
System unpacking and
acclimatization
Networking and system component
cabling
Communicate schedule for
installation to the customer

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.
106. What three documents are Mark for Review 
typically used as part of the (1) Points
EIS Planning and Preparation
stage in the installation
process?

(Choose all correct answers)

Operational Hand-off Form


Acclimatization Report
Project Schedule
Site Audit Report
Installation and Configuration Plan
Test Procedures Plan
Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.

107. What is the mission statement for use of Mark for


the Enterprise Installation Standards? Review 
(1) Points

To drive the ongoing development


and usage of Enterprise Installation
Standards (EIS), resulting in
consistent, high quality, and cost
effective installations that speed time
to deployment and provide the
foundation for enhanced stability
and performance.
To use a methodology for support
service that is from the field, created
by the field for the Field.
To manage communication and
resolution of Services Requests in a
timely and customer-friendly
manner
To drive consistent best practices for
Oracle Services field delivery

Correct!

108. What are the two primary objectives for Mark for
the Installation Configuration Planning Review 
step of the EIS methodology? (1) Points

(Choose all correct answers)

Oracle/Partner confirms power and


cooling requirements for system
installation
Tests that will be performed during
the Systems Testing will be defined.
Oracle/Partner and Customer will
determine and mutually agree upon
the hardware and software
installation requirements which will
be documented in the Installation
and Configuration Plan
Customer provides walk-through of
installation site

Incorrect!
Please review
the "Using
the EIS
Methodology
" course and
try again.

109. What is the purpose for the Operational Mark for


Handover step in the EIS Methodology? Review 
(1) Points

Documents the installation and


configuration of Customer's
system(s)
Used to negate responsibility for any
ongoing System issues
Documents how to use the EIS
documentation and standards
Perform system testing and
diagnostics

Correct!

110. What is the primary goal of the Mark for


Installation and Configuration of Oracle Review 
Hardware and Software step in the EIS (1) Points
methodology?

Hardware cabling , wiring and


Power ON
System acclimatization, installation,
and basic configuration
Troubleshooting software
configuration issues
Managing transition from
Installation phase to Field Service
issue recording

Correct!
111. What Mark for Review 
is (1) Points
found
on the
EIS-
DVD?
Select
all the
apply.

(Choose all correct answers)

Sales and presales technical training on Oracle


systems
Scripts that assist during the installation
Selected Oracle/Sun Software
Tools to help verify the quality of the installation
(e.g. ORAS/CLI)
A complete set all configuration files for every
Oracle server, storage system and Engineered
system

Correct!

112.What are the four key points covered in each test topic Mark for
of the Test Procedures Plan? Review 
(1) Points

(Choose all correct answers)

Prerequisites
Conclusion
Method
Objective
Outcome
Test Result

Incorrect! Please
review the
"Using the EIS
Methodology"
course and try
again.

113.Which three statements are true about EIS? Mark for


Review 
(1) Points

(Choose all correct answers)

EIS is a methodology designed to address issues


before, during and after the actual hands-on
installation of Oracle systems
EIS stands for “Enterprise information Standards”
EIS stands for “Enterprise Installation Standards”
EIS evolved from the field, is sustained by those
closely involved with the field, and is intended to
assist the field
EIS is a quick and dirty process for expediting
Oracle system installations

Incorrect! Please
review the
"Using the EIS
Methodology"
course and try
again.

114.Why it is important to do Installation planning, rather Mark for


than just asking the customer as you work through the Review 
installation process? (Select three) (1) Points

(Choose all correct answers)

Continuing interruptions can detract from the


professionalism of your work, and lead to
customer dissatisfaction
Support Services will not engage on services
requests if no installation planning was done
Planning leads to more thoughtful consideration
for a predictable outcome of the installation
process
Customer technical contact may not be readily
available
Pricing for Installation Services is less expensive if
planning in not included

Incorrect! Please
review the
"Using the EIS
Methodology"
course and try
again.

115.Which four documents are included as part of the Mark for


Operational Handover? Review 
(1) Points

(Choose all correct answers)

MOS Internal Documentation


Site Audit Report
Installation and Configuration Plan
System Documentation
EIS Checklist for the System installed
Test Procedures Plan

Incorrect! Please
review the
"Using the EIS
Methodology"
course and try
again.
116.Why is the rate Mark for Review 
of temperature (1) Points
change when
acclimatizing
systems such an
important factor
as described in
the EIS
methodology?

Systems should be warmed up and powered ON as


quickly as possible to optimize the installation
project timeline
Variations in temperature should not exceed the
approved gradient of approximately 2° C (4° F)
per hour, because ignoring this may could lead to
long-term damage (hair-cracks) on the boards
It is actually not relevant or important
Variations in temperature do not have as big an
impact as do Service contract considerations for
how long an installation will take

Incorrect! Please
review the "Using
the EIS
Methodology"
course and try
again.

117. When should you review deliverables and why? Mark for
Review 
(1) Points

EIS deliverables are included in the Oracle system


shipping and packaging documents near the start
of an installation
Ideally EIS deliverables would be reviewed at the
very start of an installation project, as they clearly
define scope, roles and responsibilities, and project
deliverables
EIS deliverables are an interim checklist to ensure
that at the mid-way point of an installation the
project remains on track.
EIS deliverables are used as a last step in the
installation process to ensure the installer provided
everything that is required

Incorrect! Please
review the "Using
the EIS
Methodology"
course and try
again.

118. What should you do if you believe you have found an Mark for
error in an EIS checklist? Review 
(1) Points

Submit your concerns to My Oracle Support


Email Larry Ellison and recommend changes
Follow the feedback method on the last page of
every checklist: email SUPPORT-PARTNER-
QUESTIONS_WW_GRP@oracle.com
Assume that the EIS team is already aware and the
next version of the checklist will be updated

Correct!

119. Which two EIS documents are most useful during the Mark for
Installation and Configuration of Oracle Hardware and Review 
Software step? (1) Points

(Choose all correct answers)

Installation Configuration Plan


DVD
EIS Checklist
Operational Handover Agreement
Site-Audit Report

Correct!

120. Which four objectives are primary goals for an EIS Mark for
Site Audit? Review 
(1) Points

(Choose all correct answers)

Determine the environmental conditions at


Customer's site including temperature, humidity,
cleanliness and such other assessments as are
determined to be necessary in Oracle's sole
discretion
Determine how many logical domains need to be
configured on the system
Determine the floor weight load capacity at the
location where the System will be installed
Determine the availability of required electrical
power to run and maintain the System
Determine installation needs for the System,
including such assessments as: the suitability of
access routes to the installation location, such as
doors, elevators, floor strengths and ramps
Determine how frequently system backups will be
completed

Incorrect! Please
review the "Using
the EIS
Methodology"
course and try
again.
121.What Mark for
should you Review 
do with the (1) Points
EIS
checklist
when an
installation
project is
complete?

Remove the EIS checklist and other confidential Oracle


Intellectual Property from the customer datacenter
Crumple the checklist and throw it in the customer
wastepaper bin
Post the EIS checklist and Test Procedures Plan to My
Oracle Support under your customer’s account
Leave the EIS checklist with the customer so that they
can re-install when they need to

Correct!

122.If the customer has asked for some customization of their Mark for
installation, how is testing for that accomplished? Choose Review 
all responses that apply. (1) Points

(Choose all correct answers)

Oracle is automatically responsible for any non-


standard installation procedure, regardless of whether
they were agree to as part of the Installation and
Configuration Plan
Additional tests can be inserted into the Test Procedures
plan
Testing above and beyond the Covered System Tests
are at the sole discretion of Oracle and/or the Partner
installer
Not all installation actions need testing

Incorrect! Please review the "Using


the EIS Methodology" course and
try again.

123.What should partners do before first using ESISdocV4? Mark for


(Select two) Review 
(1) Points

(Choose all correct answers)

Submit their EIS Test Procedure Plan outcomes


Review the “EISdoc V4 Getting Started Cookbook” and
“Success with EISdoc V4 Cookbook”
Review the Openoffice presentation on EISdoc V4
found on the EIS Planning & Documentation web page
Review Oracle product overview documentation

Incorrect! Please review the "Using


the EIS Methodology" course and
try again.

124.Which three responses are true regarding EISdoc v4? Mark for
Review 
(1) Points

(Choose all correct answers)

Contains documents matched to the steps in the EIS


Methodology
Is a free guide to configuring Oracle software
Is an OpenOffice-based set of documentation that
includes planning for installations of Oracle equipment
and some software
Is available on the partner Enterprise Installations
Standards web page and on the EIS-DVD
Is accessible to customers and end-users of Oracle
hardware and software

Incorrect! Please review the "Using


the EIS Methodology" course and
try again.

125.What are three items in the EIS Site-Audit Report are Mark for
documented for all Oracle hardware? Review 
(1) Points

(Choose all correct answers)

Operating System requirements


Access Route requirements
Facility Power requirements
Operating Environment and Cooling requirements
IP Address requirements

Incorrect! Please review the "Using


the EIS Methodology" course and
try again.
4. Which feature of
the SPARC M7  Mark for Review 
processor (1) Points
permits the
server to reduce
power
consumption ?

(Choose all correct answers)

Power gating
Voltage Acclimatization
Dynamic Voltage Frequency Scaling
Dynamic memory allocation

Incorrect. Please refer back to the lesson


“Oracle SPARC M7 Processor Architecture".

5.  Which is the function of the Mystic River ASIC ?


 Mark for Review 
(1) Points

Disk Controller
Memory Buffer
Service Processor
I/O Hub

Correct !
11. Which type of
link is an inter-  Mark for Review 
processor (1) Points
cache coherent
connection ?

SLINK
CLINK
SP LINK
IL

Incorrect. Please refer back to the lesson


“Oracle SPARC M7 Processor Architecture".
13. What is the
Silicon  Mark for Review 
Secured (1) Points
Memory
feature?

A "Software in Silicon" feature where a DAX used to accelerate data


decompression by offloading it from the software threads.
A "Software in Silicon" feature that improves the performance of
Java.
A "Software in Silicon" feature where DAX used to execute the
database queries offloading it from the software threads.
A "Software in Silicon" feature that adds a 16 bit application data bits
which can associate the pointer to the object it is pointing to.

Correct !

14.  Which features of “Software in Silicon” are supported by the SPARC M7


processor?  Mark for Review 
(1) Points

(Choose all correct answers)

coherency links
Silicon Secured Memory
Database Query Acceleration
Database Decompression
scalability links

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview".
17. How many M7
processors are  Mark for Review 
supported on (1) Points
each CMIOU?
4
1
3
2

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview".
20. Which are the
boot options  Mark for Review 
available on (1) Points
the SPARC
M7-8 and M7-
16 Servers?

(Choose all correct answers)

USB port for a flash stick


Versaboot/eUSB
Internal HBA and HDD
16 Gb FC to FC SAN attached Storage using Ganymede-Q or
Ganymede-E
Aura3 Memory Express (NVMe) controller and a Solid-State Disk
(SSD).

Correct !
21. Which two
responses are  Mark for Review 
true about the (1) Points
SPARC M7-8
Server?

(Choose all correct answers)

The M7-8 with 2 PDOM is configured as a 2x4 socket arrangement


with a maximum of 8 processors
The M7-8 with 2 PDOM is configured as a 1x8 socket arrangement
with a maximum of 8 processors
The M7-8 with 1 PDOM uses the same internal interconnects as that
of the M7-8 with 2 PDOM
The M7-8 has a maximum of 4 processors
The M7-8 with 1 PDOM has cache coherency between all 8 M7
processors

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview
28. How many
DIMM slots  Mark for Review 
can each BoB (1) Points
(referred to
as Yuba)
support?

2
3
4
1

Correct !

31. Which PCIe-
based card is  Mark for Review 
used to support (1) Points
an NVME-based
boot disk?

1GbE card
IB HCA
card F320
HBA

Incorrect.
Please
refer back
to the
lesson
“SPARC
M7
Systems
Product
Overview"
.
33. What is a key
difference in  Mark for Review 
the PCIe (1) Points
implementation
on the SPARC
M6-32 versus
the SPARC M7?

(Choose all correct answers)

PCIe slots support 16 lanes versus 8 lanes


Each CMIOU has its own PCIe slots versus the IOUs used on the
SPARC M6-32
Number of PCIe slots available
PCIe generation 3 versus 4
Incorrect. Please refer back to the lesson
“SPARC M7 Systems Product Overview".
43. Which three
statements are  Mark for Review 
true about (1) Points
PDoms and
LDoms?

(Choose all correct answers)

Pdom stands for Pedabyte domain


PDoms are defined by the interconnect cabling used
Ldoms cannot be configured as hard partitions for software
licensing purposes
PDom is a physical domain and Ldom is a logical domain
Oracle VM Server for SPARC is needed to be able to create LDOms

Correct !

SPARC M7 Systems Product Overview - Part 3


This assessment tests the participant's knowledge of the content in the SPARC M7 Systems Product Overview
course. 
(Answer all questions in this section)

44.  You want to start /HOST0 but, by accident, you hit Enter after typing
start /HOST. Which option best represents the outcome of this?  Mark for Review 
(1) Points

The start command gives an error.


The start command defaults to HOST0 if you do not specify a HOST
number.
The start command lists all of the HOSTs and asks you which one
you want to start.
The start command gets applied to all HOSTs in the system.

Correct !
48. The customer
has finished  Mark for Review 
running their (1) Points
tests on the
test domain
and would like
you to remove
it. What
command do
you run to do
that?
(Choose all correct answers)

ldm rm-ldom test


ldm remove-ldom test
ldm remove-domain test
ldm rm-domain test

Correct !
50. You want
to assign  Mark for Review 
12 virtual (1) Points
CPUs to
the control
domain.
Which
command
do you
run?

ldm assign-vcpu 12 control


ldm set-vcpu 12 primary
ldm assign-vcpu 12 primary
ldm set-vcpu 12 control

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview".
51. You have
powered-on  Mark for Review 
HOST3 and (1) Points
want to
verify its
current
status.
Which two
commands
would give
you that
output?

(Choose all correct answers)

show /Servers/Pdomains/Pdomain_3/HOST status_detail


show /Servers/Pdomains/Pdomain_3/HOST status
show /Servers/Pdomains/Pdomain_1/HOST status
show status /Servers/Pdomains/Pdomain_3/HOST

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview".
54. You need
to set  Mark for Review 
auto-boot? (1) Points
To false for
the test
domain
that you
just
created.
Which
command
do you
run?

ldm set-var auto-boot\?=true test


ldm set auto-boot\?=true test
ldm set-var auto-boot=true test
ldm set-auto-boot\?=true test

Correct !

55.  Which of the following can be roles of a logical domain?


 Mark for Review 
(1) Points

(Choose all correct answers)

Control Domain
I/O Domain
Service Domain
CPU Domain

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview".
56. Which three
statements  Mark for Review 
are (1) Points
prerequisites
for powering
on HOST0?

(Choose all correct answers)

HOST0 must currently be powered off.


keywitch must be set to Locked.
keyswitch must be set to Normal.
There must be suffucuent resources assigned to HOST0.
HOST0 must have at least one DCU assigned to it.

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview".

57.  You're very familiar with ILOM on the T5-8 servers, but notice that there
are two targets that are new to you in ILOM on the SPARC M7 servers?  Mark for Review 
Which two targets are new in the Simplified Data Model? (1) Points

(Choose all correct answers)

/Servers
/SYS
/Storage
/System
/SP

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview".
59. Multiple
people are  Mark for Review 
working on (1) Points
a server.
You power-
on HOST1
and it sits
for a few
minutes
with no
messages
before
starting and
then
running.
Which
option
represents a
possible
reason for
this?

Your firmware is not up to date.


The HOST does not meet the minimum configuration requirements.
Another HOST is going through POST.
There is a lot of activity on the server.

Correct !
64.  During the
initial  Mark for Review 
installation (1) Points
of the M7
server, you
notice that
the SP NET
MGT
interface is
not
available.
Which
option
represents a
possible
reason for
this?

The SPARC M7 does not use the SP NET MGT interface.


The network does not use DHCP.
Oracle ILOM is down.
It must be connected to a Gigabit network.

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview".
66.  Which three
components  Mark for Review 
require IP (1) Points
addresses
when you
configure the
SP network?

(Choose all correct answers)

SP0
ACTIVE_SP
SLAVE_SP
SP1
SPARE_SP

Correct !

67.  Before you can configure the service procesors, which three pieces of
network information do you need from the customer?  Mark for Review 
(1) Points

(Choose all correct answers)

Active SP IP address
Domain IP address
SP0 IP address
Clock board IP address
SP1 IP address

Correct !
70.  Which IO
Controller  Mark for Review 
root port is (1) Points
used on the
M8 CMIOU,
but was left
not-
connected
(unused) on
the M7
CMIOU?

3
4
2
1

Correct !
73.  What
happens if  Mark for Review 
Power (1) Points
Supplies
A261 and
A265 are
mixed in a
platform?

The running hosts will not be impacted and it's possible to restart the
hosts with non-dominant PS faulted.
The running hosts will be stopped and it's not possible to restart any
host.
The system is run as expected without any impact.
The running hosts will be stopped but it's then possible to restart the
hosts with non-dominant PS faulted.

Incorrect. Please review all the SPARC M8 vs


M7 courses and try again.

74.  The “ip-transport.interconnect-down” and “ip-transport.link-down” alerts are


reporting a problem on _________.  Mark for Review 
(1) Points

The PCIe switch on the CMIOU


The connection between the NIC and the network switch
The EoUSB interconnect path supporting the FMA Fault Proxying
mechanism
The indicted network interface

Incorrect. Please review all the SPARC M8 vs


M7 courses and try again.
76.  What is the
minimum  Mark for Review 
ILOM (1) Points
major
release
supporting
M8?

ILOM 4.x
ILOM 9.8
ILOM 3.x
ILOM 5.x

Correct !
78.  What are
three types  Mark for Review 
of (1) Points
configuration
information
typically
documented
in an
Installation
Configuratio
n Plan?

(Choose all correct answers)

System host names


System documentation and guidelines
IO cards and controllers
Power cord specifications
Boot Disk Layout
General and Management Network Configuration

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
80.  What are
three items  Mark for Review 
in the EIS (1) Points
Site-Audit
Report are
documented
for all Oracle
hardware?
(Choose all correct answers)

Access Route requirements


Operating System requirements
Operating Environment and Cooling requirements
Facility Power requirements
IP Address requirements

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
83.  Name three
of the  Mark for Review 
problems (1) Points
that EIS was
created to
overcome?

(Choose all correct answers)

Lack of formal agreement with customers as to outcome of an


installation
Poor communication/use of Best Practices
Standards for delivery of replacement parts for Oracle hardware
Inconsistent installations: Customers buying identical servers for
two locations were dismayed to find different patch levels, firmware
versions etc.
Oracle hardware shipping best practices for on-time delivery

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

84.  If the customer has asked for some customization of their installation,
how is testing for that accomplished? Choose all responses that apply.  Mark for Review 
(1) Points

(Choose all correct answers)

Additional tests can be inserted into the Test Procedures plan


Oracle is automatically responsible for any non-standard installation
procedure, regardless of whether they were agree to as part of the
Installation and Configuration Plan
Testing above and beyond the Covered System Tests are at the
sole discretion of Oracle and/or the Partner installer
Not all installation actions need testing

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
87.  Name two
functions for  Mark for Review 
the EIS-DVD (1) Points
during the
Installation and
Configuration
of Oracle
Hardware and
Software step
in the EIS
methodology?

(Choose all correct answers)

Used as a back-up for complete documentation sets that are on


http://docs.oracle.com
Provides installation assessment and diagnostic tools
Contains required patches and firmware for most installations
Provides an excellent tool as a leave behind utility for customers

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

88.  Why it is important to do Installation planning, rather than just asking


the customer as you work through the installation process? (Select  Mark for Review 
three) (1) Points

(Choose all correct answers)

Pricing for Installation Services is less expensive if planning in not


included
Planning leads to more thoughtful consideration for a predictable
outcome of the installation process
Continuing interruptions can detract from the professionalism of
your work, and lead to customer dissatisfaction
Customer technical contact may not be readily available
Support Services will not engage on services requests if no
installation planning was done

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

89.  Who is involved in the Project Initiation phase?


 Mark for Review 
(1) Points

(Choose all correct answers)

Partner point of contact


3rd party Service Provider
Oracle Financing contact
Oracle Installation Coordinator or Project Manager (if applicable)
Customer point of contact

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

90.  What three documents are typically used as part of the EIS Planning
and Preparation stage in the installation process?  Mark for Review 
(1) Points

(Choose all correct answers)

Acclimatization Report
Installation and Configuration Plan
Operational Hand-off Form
Project Schedule
Site Audit Report
Test Procedures Plan

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
93. What two
activities are  Mark for
accomplished Review 
during Installation (1) Points
Task Planning
step in the EIS
Methodology?

(Choose all correct answers)

Review the timeframe options for delivery of the service


Organization of the team who will actively work the Installation
System unpacking and acclimatization
Communicate schedule for installation to the customer
Networking and system component cabling

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

94.  What are the four key points covered in each test topic of the Test
Procedures Plan?  Mark for Review 
(1) Points

(Choose all correct answers)


Outcome
Prerequisites
Test Result
Objective
Conclusion
Method

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
96. Which four
documents are  Mark for
included as part Review 
of the (1) Points
Operational
Handover?

(Choose all correct answers)

MOS Internal Documentation


Site Audit Report
EIS Checklist for the System installed
System Documentation
Installation and Configuration Plan
Test Procedures Plan

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

97.  Assuming a SPARC T5 Server installation on which you install Solaris


11, what EIS documentation, at a minimum, is it recommended that  Mark for Review 
you bring to support you in the installation project? (1) Points

(Choose all correct answers)

EIS Installation Checklist for Common Array Manager


EIS Installation Checklist for Sun Datacenter InfiniBand Switch 36
EIS Installation Checklist for SPARC T5
EIS Installation Checklist for Solaris 11 OS

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

98.  When should the Site-Audit be performed?


 Mark for Review 
(1) Points
As soon as possible, and certainly prior to delivery of the system
Prior to the completion of the sale, in order to ensure that the
customer’s location is viable
As soon as the product has been delivered to the customer
After the system has been acclimatized and is ready for unpacking
at the customer site

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

104.  What are two activities


that take place during  Mark for Review 
the System Test step of (1) Points
the EIS methodology?

(Choose all correct


answers)

Electrical grounding
and environmental
assessment
Tests specified in
the Test Procedures
Plan Plan will be
carried performed
Application
installation,
configuration, and
testing
On Solaris-based
systems, Oracle's
Explorer Data
Collector will be run
and the results
evaluated with
ORAS/CLI from the
EIS-DVD

Incorrect!
Please review
the "Using the
EIS
Methodology"
course and try
again.

105.  Which four objectives


are primary goals for an  Mark for Review 
EIS Site Audit? (1) Points
(Choose all correct
answers)

Determine how
frequently system
backups will be
completed
Determine the floor
weight load capacity
at the location
where the System
will be installed
Determine
installation needs
for the System,
including such
assessments as: the
suitability of access
routes to the
installation location,
such as doors,
elevators, floor
strengths and ramps
Determine the
environmental
conditions at
Customer's site
including
temperature,
humidity, cleanliness
and such other
assessments as are
determined to be
necessary in
Oracle's sole
discretion
Determine how
many logical
domains need to be
configured on the
system
Determine the
availability of
required electrical
power to run and
maintain the System

Incorrect!
Please review
the "Using the
EIS
Methodology"
course and try
again.
106.  According to the
EIS methodology,  Mark for Review 
when issues are (1) Points
uncovered during
the Site-Audit,
who should be
notified?

(Choose all correct answers)

Customer point of contact


Installation coordinator if applicable
Oracle sales management
Oracle Premier Support

Incorrect! Please review the


"Using the EIS Methodology"
course and try again.

107.  What is found on the EIS-DVD? Select all the apply.


 Mark for Review 
(1) Points

(Choose all correct answers)

Tools to help verify the quality of the installation (e.g.


ORAS/CLI)
Scripts that assist during the installation
A complete set all configuration files for every Oracle
server, storage system and Engineered system
Selected Oracle/Sun Software
Sales and presales technical training on Oracle systems

Incorrect! Please review the


"Using the EIS Methodology"
course and try again.

108.  What are the two primary objectives for the Installation
Configuration Planning step of the EIS methodology?  Mark for Review 
(1) Points

(Choose all correct answers)

Customer provides walk-through of installation site


Tests that will be performed during the Systems Testing
will be defined.
Oracle/Partner confirms power and cooling
requirements for system installation
Oracle/Partner and Customer will determine and
mutually agree upon the hardware and software
installation requirements which will be documented in
the Installation and Configuration Plan
Incorrect! Please review the
"Using the EIS Methodology"
course and try again.
110. What tasks occur during the
operational handover phase  Mark for Review 
of the EIS methodology? (1) Points

(Choose all correct answers)

Collate the EISdocV4 documents pertaining to this


customer installation, and product documentation for
handover
Document the serial number for the system(s)
installed, as well as any comments pertaining to the
installation
Obtain customer signatures to successful close project
Provide the customer the 20% installation service
rebate that is required after a successful installation

Incorrect! Please review the


"Using the EIS Methodology"
course and try again.
111. What is the
primary  Mark for Review 
purpose of the (1) Points
EIS-DVD?

The EIS-DVD is used for on-the-job tutorials on how to install Oracle


servers and storage
The EIS-DVD is to help installers of Oracle/Sun products perform
consistent installations in an efficient manner.
The EIS-DVD is an annually released product which support all
hardware installations, and documents all bugs and issues that have
been logged during the prior year
The EIS-DVD is a tool that is provided to installation partners as a
give-away to customers

Incorrect! Please review the "Using the


EIS Methodology" course and try again.
113. What should partners do
before first using  Mark for Review 
ESISdocV4? (Select two) (1) Points

(Choose all correct answers)

Review the “EISdoc V4 Getting Started Cookbook” and


“Success with EISdoc V4 Cookbook”
Submit their EIS Test Procedure Plan outcomes
Review Oracle product overview documentation
Review the Openoffice presentation on EISdoc V4 found
on the EIS Planning & Documentation web page
Incorrect! Please review the
"Using the EIS Methodology"
course and try again.

114.  Which Oracle products are covered by EIS Checklists – select


all that apply.  Mark for Review 
(1) Points

(Choose all correct answers)

Storage
Switches
Servers
OS and Cluster-related Software
ERP applications
Oracle Fusion Middleware
Engineered Systems

Incorrect! Please review the


"Using the EIS Methodology"
course and try again.

115.  Which three responses are true regarding EISdoc v4?


 Mark for Review 
(1) Points

(Choose all correct answers)

Is accessible to customers and end-users of Oracle


hardware and software
Is a free guide to configuring Oracle software
Contains documents matched to the steps in the EIS
Methodology
Is available on the partner Enterprise Installations
Standards web page and on the EIS-DVD
Is an OpenOffice-based set of documentation that includes
planning for installations of Oracle equipment and some
software

Correct!
9. Which type of
link is an inter-  Mark for Review 
processor cache (1) Points
coherent
connection ?

IL
SP LINK
CLINK
SLINK

Correct !
11. Which feature of the
SPARC M7 processor  Mark for Review 
permits the server to (1) Points
reduce power
consumption ?

(Choose all correct answers)

Dynamic Voltage Frequency Scaling


Dynamic memory allocation
Power gating
Voltage Acclimatization

Incorrect. Please refer back to the


lesson “Oracle SPARC M7
Processor Architecture".
15. Which features of
“Software in Silicon”  Mark for Review 
are supported by the (1) Points
SPARC M7 processor?

(Choose all correct answers)

coherency links
Silicon Secured Memory
scalability links
Database Query Acceleration
Database Decompression

Correct !
17. How many M7
processors are  Mark for Review 
supported on each (1) Points
CMIOU?

2
4
1
3

Incorrect. Please refer back to the


lesson “SPARC M7 Systems Product
Overview".
19. Which two
responses are  Mark for Review 
true about the (1) Points
SPARC M7-8
Server?

(Choose all correct answers)

The M7-8 with 1 PDOM has cache coherency between all 8 M7


processors
The M7-8 with 2 PDOM is configured as a 1x8 socket arrangement
with a maximum of 8 processors
The M7-8 has a maximum of 4 processors
The M7-8 with 1 PDOM uses the same internal interconnects as that
of the M7-8 with 2 PDOM
The M7-8 with 2 PDOM is configured as a 2x4 socket arrangement
with a maximum of 8 processors

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview".
29. Which
PCIe-  Mark for Review 
based (1) Points
card is
used to
support
an
NVME-
based
boot
disk?

HBA
1GbE card
card F320
IB HCA

Correct !

30.  What is a key difference in the PCIe implementation on the SPARC M6-32 versus
the SPARC M7?  Mark for Review 
(1) Points

(Choose all correct answers)

Number of PCIe slots available


PCIe slots support 16 lanes versus 8 lanes
PCIe generation 3 versus 4
Each CMIOU has its own PCIe slots versus the IOUs used on the SPARC M6-
32
Incorrect. Please refer back to the lesson “SPARC M7
Systems Product Overview".

44. You're very
familiar with  Mark for Review 
ILOM on the (1) Points
T5-8 servers,
but notice that
there are two
targets that are
new to you in
ILOM on the
SPARC M7
servers? Which
two targets are
new in the
Simplified Data
Model?

(Choose all
correct
answers)

/Storage
/Servers
/SYS
/SP
/System

Incorrect.
Please
refer back
to the
lesson
“SPARC
M7
Systems
Product
Overview".
46. Which of the
following  Mark for Review 
can be roles (1) Points
of a logical
domain?

(Choose all correct answers)

Service Domain
I/O Domain
Control Domain
CPU Domain

Incorrect. Please refer back to the lesson “SPARC


M7 Systems Product Overview".
48. During the initial
installation of the  Mark for Review 
M7 server, you (1) Points
notice that the SP
NET MGT
interface is not
available. Which
option represents
a possible reason
for this?

The network does not use DHCP.


The SPARC M7 does not use the SP NET MGT interface.
Oracle ILOM is down.
It must be connected to a Gigabit network.

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview".
51. You want to
assign 12  Mark for Review 
virtual CPUs to (1) Points
the control
domain. Which
command do
you run?

ldm set-vcpu 12 primary


ldm assign-vcpu 12 primary
ldm assign-vcpu 12 control
ldm set-vcpu 12 control

Correct !
53. Which three statements
are prerequisites for  Mark for Review 
powering on HOST0? (1) Points

(Choose all correct answers)

There must be suffucuent resources assigned to HOST0.


keywitch must be set to Locked.
keyswitch must be set to Normal.
HOST0 must currently be powered off.
HOST0 must have at least one DCU assigned to it.
Incorrect. Please refer back to the
lesson “SPARC M7 Systems Product
Overview".
56. You have
powered-on  Mark for Review 
HOST3 and (1) Points
want to verify its
current status.
Which two
commands
would give you
that output?

(Choose all correct answers)

show status /Servers/Pdomains/Pdomain_3/HOST


show /Servers/Pdomains/Pdomain_3/HOST status
show /Servers/Pdomains/Pdomain_3/HOST status_detail
show /Servers/Pdomains/Pdomain_1/HOST status

Incorrect. Please refer back to the lesson


“SPARC M7 Systems Product Overview".
72. The “ip-transport.interconnect-
down” and “ip-transport.link-  Mark for Review 
down” alerts are reporting a (1) Points
problem on _________.

The EoUSB interconnect path supporting the FMA Fault


Proxying mechanism
The PCIe switch on the CMIOU
The indicted network interface
The connection between the NIC and the network switch

Incorrect. Please review all the


SPARC M8 vs M7 courses and try
again.
76. What
happens  Mark for Review 
if Power (1) Points
Supplies
A261 and
A265 are
mixed in
a
platform?

The running hosts will not be impacted and it's possible to restart the
hosts with non-dominant PS faulted.
The running hosts will be stopped but it's then possible to restart the
hosts with non-dominant PS faulted.
The system is run as expected without any impact.
The running hosts will be stopped and it's not possible to restart any host.

Incorrect. Please review all the SPARC M8 vs M7


courses and try again.
78. Why it is
important to  Mark for Review 
do Installation (1) Points
planning,
rather than
just asking
the customer
as you work
through the
installation
process?
(Select three)

(Choose all correct answers)

Continuing interruptions can detract from the professionalism of your


work, and lead to customer dissatisfaction
Customer technical contact may not be readily available
Pricing for Installation Services is less expensive if planning in not
included
Support Services will not engage on services requests if no installation
planning was done
Planning leads to more thoughtful consideration for a predictable
outcome of the installation process

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

79.  What should partners do before first using ESISdocV4? (Select two)
 Mark for Review 
(1) Points

(Choose all correct answers)

Review Oracle product overview documentation


Review the “EISdoc V4 Getting Started Cookbook” and “Success with
EISdoc V4 Cookbook”
Review the Openoffice presentation on EISdoc V4 found on the EIS
Planning & Documentation web page
Submit their EIS Test Procedure Plan outcomes

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
81. Why is the rate of
temperature  Mark for Review 
change when (1) Points
acclimatizing
systems such an
important factor as
described in the
EIS methodology?

It is actually not relevant or important


Variations in temperature do not have as big an impact as do
Service contract considerations for how long an installation will
take
Variations in temperature should not exceed the approved
gradient of approximately 2° C (4° F) per hour, because ignoring
this may could lead to long-term damage (hair-cracks) on the
boards
Systems should be warmed up and powered ON as quickly as
possible to optimize the installation project timeline

Correct!

82.  What are three items in the EIS Site-Audit Report are documented for
all Oracle hardware?  Mark for Review 
(1) Points

(Choose all correct answers)

IP Address requirements
Facility Power requirements
Access Route requirements
Operating Environment and Cooling requirements
Operating System requirements

Correct!

83.  What tasks occur during the operational handover phase of the EIS
methodology?  Mark for Review 
(1) Points

(Choose all correct answers)

Collate the EISdocV4 documents pertaining to this customer


installation, and product documentation for handover
Obtain customer signatures to successful close project
Document the serial number for the system(s) installed, as well as
any comments pertaining to the installation
Provide the customer the 20% installation service rebate that is
required after a successful installation

Incorrect! Please review the "Using the


EIS Methodology" course and try again.
84.  Name two functions for the EIS-DVD during the Installation and
Configuration of Oracle Hardware and Software step in the EIS  Mark for Review 
methodology? (1) Points

(Choose all correct answers)

Used as a back-up for complete documentation sets that are on


http://docs.oracle.com
Provides an excellent tool as a leave behind utility for customers
Provides installation assessment and diagnostic tools
Contains required patches and firmware for most installations

Incorrect! Please review the "Using the


EIS Methodology" course and try again.

85.  What two activities are accomplished during Installation Task Planning
step in the EIS Methodology?  Mark for Review 
(1) Points

(Choose all correct answers)

System unpacking and acclimatization


Organization of the team who will actively work the Installation
Networking and system component cabling
Communicate schedule for installation to the customer
Review the timeframe options for delivery of the service

Incorrect! Please review the "Using the


EIS Methodology" course and try again.
88. For safety
awareness with  Mark for Review 
respect to (1) Points
grounding, if a
system has been
modified after the
manufacturer's
assembly process,
what three
recommendations
does the EIS
Grounding Standard
make?

(Choose all correct answers)

Check whether the modification involved any power supplies,


distribution units or wiring?
Determine whether the local electrician can support the
installation process
If qualified personnel did not test the safety of the modified
system then proper testing should be requested before Oracle
and/or partner personnel will work on the equipment
If the temperature is below 60 degrees F., warm the room first
before power ON
If modifications involved any power supplies, distribution units or
wiring, did qualified personnel verify that the modification was
was correct and did they test the system to ensure that it doesn't
pose any safety hazard?

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

89.  Which Oracle products are covered by EIS Checklists – select all that
apply.  Mark for Review 
(1) Points

(Choose all correct answers)

Storage
Engineered Systems
ERP applications
Oracle Fusion Middleware
Switches
Servers
OS and Cluster-related Software

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

90.  What is the primary purpose of the EIS-DVD?


 Mark for Review 
(1) Points

The EIS-DVD is an annually released product which support all


hardware installations, and documents all bugs and issues that
have been logged during the prior year
The EIS-DVD is to help installers of Oracle/Sun products perform
consistent installations in an efficient manner.
The EIS-DVD is used for on-the-job tutorials on how to install
Oracle servers and storage
The EIS-DVD is a tool that is provided to installation partners as
a give-away to customers

Correct!
1. Which three
responses  Mark for Review 
are true (1) Points
regarding
EISdoc v4?
(Choose all correct answers)

Is an OpenOffice-based set of documentation that includes planning for


installations of Oracle equipment and some software
Is available on the partner Enterprise Installations Standards web page and
on the EIS-DVD
Is a free guide to configuring Oracle software
Is accessible to customers and end-users of Oracle hardware and software
Contains documents matched to the steps in the EIS Methodology

Correct!
93. Which three statements are
true about EIS?  Mark for Review 
(1) Points

(Choose all correct answers)

EIS evolved from the field, is sustained by those


closely involved with the field, and is intended to assist
the field
EIS is a quick and dirty process for expediting Oracle
system installations
EIS stands for “Enterprise information Standards”
EIS is a methodology designed to address issues
before, during and after the actual hands-on
installation of Oracle systems
EIS stands for “Enterprise Installation Standards”

Incorrect!
Please
review the
"Using the
EIS
Methodology
" course and
try again.

94.  What three documents are typically used as part of the EIS
Planning and Preparation stage in the installation process?  Mark for
Review 
(1) Points

(Choose all correct answers)

Test Procedures Plan


Project Schedule
Operational Hand-off Form
Acclimatization Report
Site Audit Report
Installation and Configuration Plan

Incorrect!
Please
review the
"Using the
EIS
Methodology
" course and
try again.

95.  If the customer has asked for some customization of their


installation, how is testing for that accomplished? Choose  Mark for
all responses that apply. Review 
(1) Points

(Choose all correct answers)

Testing above and beyond the Covered System Tests


are at the sole discretion of Oracle and/or the Partner
installer
Oracle is automatically responsible for any non-
standard installation procedure, regardless of whether
they were agree to as part of the Installation and
Configuration Plan
Additional tests can be inserted into the Test
Procedures plan
Not all installation actions need testing

Correct!
96. What are two activities that take
place during the System Test  Mark for Review 
step of the EIS methodology? (1) Points

(Choose all correct answers)

On Solaris-based systems, Oracle's Explorer Data


Collector will be run and the results evaluated with
ORAS/CLI from the EIS-DVD
Tests specified in the Test Procedures Plan Plan will
be carried performed
Application installation, configuration, and testing
Electrical grounding and environmental assessment

Correct!

97.  What are two cautions that should be acknowledged when


acclimatizing a system?  Mark for
Review 
(1) Points
(Choose all correct answers)

Powering ON the system will speed the


acclimatization process as the heat from the system
will accelerate its warming
Once powered on the temperature is no longer an
issue, as internal cooling systems commence
Avoid unpacking items inside the computer centre
(dust/dirt contaminating filters etc.)
The maximum positive or negative temperature
gradient that is permitted for multi-layer boards is
approximately 2° C (4° F) per hour.

Incorrect!
Please
review the
"Using the
EIS
Methodology
" course and
try again.

99. According to the EIS


methodology, when issues are  Mark for Review 
uncovered during the Site-Audit, (1) Points
who should be notified?

(Choose all correct answers)

Oracle Premier Support


Installation coordinator if applicable
Oracle sales management
Customer point of contact

Incorrect!
Please
review the
"Using the
EIS
Methodology
" course and
try again.

100.  Assuming a SPARC T5 Server installation on which you


install Solaris 11, what EIS documentation, at a minimum,  Mark for
is it recommended that you bring to support you in the Review 
installation project? (1) Points

(Choose all correct answers)


EIS Installation Checklist for Common Array Manager
EIS Installation Checklist for SPARC T5
EIS Installation Checklist for Solaris 11 OS
EIS Installation Checklist for Sun Datacenter
InfiniBand Switch 36

Incorrect!
Please
review the
"Using the
EIS
Methodology
" course and
try again.
105.  Which four objectives are
primary goals for an EIS Site  Mark for Review 
Audit? (1) Points

(Choose all correct answers)

Determine installation needs for the System, including


such assessments as: the suitability of access routes to
the installation location, such as doors, elevators, floor
strengths and ramps
Determine the availability of required electrical power to
run and maintain the System
Determine the floor weight load capacity at the location
where the System will be installed
Determine how frequently system backups will be
completed
Determine the environmental conditions at Customer's
site including temperature, humidity, cleanliness and
such other assessments as are determined to be
necessary in Oracle's sole discretion
Determine how many logical domains need to be
configured on the system

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
106. What are the four key points
covered in each test topic of  Mark for Review 
the Test Procedures Plan? (1) Points

(Choose all correct answers)

Conclusion
Test Result
Objective
Prerequisites
Outcome
Method
Incorrect! Please review the
"Using the EIS Methodology"
course and try again.
108. Who is involved in the
Project Initiation phase?  Mark for Review 
(1) Points

(Choose all correct answers)

Partner point of contact


Oracle Installation Coordinator or Project Manager (if applicable)
3rd party Service Provider
Customer point of contact
Oracle Financing contact

Incorrect! Please review the


"Using the EIS Methodology"
course and try again.

110. What are three types of configuration


information typically documented in an  Mark for Review 
Installation Configuration Plan? (1) Points

(Choose all correct answers)

Power cord specifications


System host names
Boot Disk Layout
IO cards and controllers
System documentation and guidelines
General and Management Network Configuration

Incorrect! Please review the "Using


the EIS Methodology" course and
try again.
111. When should the Site-Audit
be performed?  Mark for Review 
(1) Points

Prior to the completion of the sale, in order to ensure


that the customer’s location is viable
As soon as the product has been delivered to the
customer
After the system has been acclimatized and is ready
for unpacking at the customer site
As soon as possible, and certainly prior to delivery of
the system
Incorrect!
Please
review the
"Using the
EIS
Methodology
" course and
try again.

112.  Why are EIS deliverables relevant for Partner installations


too?  Mark for
Review 
(1) Points

Advanced Customer Services mandates that Partners


use the EIS methodology for installations
When partners use the EIS deliverables and submit
documentation to that effect, their customer gets a
25% discount on support
EIS deliverables provide flexibility when customers
want to make ad-hoc configuration changes
EIS deliverables describe the amount of time,
materials and deliverables are in scope for a standard
installation

Correct!

113.  Which four documents are included as part of the


Operational Handover?  Mark for
Review 
(1) Points

(Choose all correct answers)

Site Audit Report


Test Procedures Plan
Installation and Configuration Plan
MOS Internal Documentation
System Documentation
EIS Checklist for the System installed

Incorrect!
Please
review the
"Using the
EIS
Methodology
" course and
try again.

114.  What is the primary purpose of the”Basic Solaris”


 Mark for
standard? Review 
(1) Points

Defines a method for achieving a consistent


installation for Oracle Servers with Solaris OS
Specifically describes how to install Solaris on non-
SPARC hardware
Differentiates between Linux and Solaris installation
processes on dual-boot systems
Describes how to install legacy versions of Solaris on
systems that need to support backward compatible
applications

Correct!
119. When should you review
deliverables and why?  Mark for Review 
(1) Points

EIS deliverables are used as a last step in the installation process to


ensure the installer provided everything that is required
EIS deliverables are included in the Oracle system shipping and packaging
documents near the start of an installation
Ideally EIS deliverables would be reviewed at the very start of an
installation project, as they clearly define scope, roles and responsibilities,
and project deliverables
EIS deliverables are an interim checklist to ensure that at the mid-way
point of an installation the project remains on track.

Incorrect! Please review the


"Using the EIS Methodology"
course and try again.
121. What three typical activities are
done during the Project  Mark for Review 
Initiation phase of the EIS (1) Points
Methodology?

(Choose all correct answers)

Details about the project are identified and


documented, for example, is this a single system
installation or a complex, multi-product installation
Details about the customer are determined and
documented
System configuration details are documented.
System delivery occurs, and the project commences
The EIS Site-Audit is scheduled

Correct!

122.  What is found on the EIS-DVD? Select all the apply.


 Mark for
Review 
(1) Points

(Choose all correct answers)

A complete set all configuration files for every Oracle


server, storage system and Engineered system
Sales and presales technical training on Oracle
systems
Selected Oracle/Sun Software
Scripts that assist during the installation
Tools to help verify the quality of the installation (e.g.
ORAS/CLI)

Correct!

123.  What are Oracle Standard System Installations (OSSI)?


 Mark for
Review 
(1) Points

Field Delivery Support Services offered through


certified partners
Installation Services sold by 3rd party service
providers
Installation Services sold by Oracle Advanced
Customer Support
Advanced professional services offered by IBM Global
Services

Correct!

124.  What are the two primary objectives for the Installation
Configuration Planning step of the EIS methodology?  Mark for
Review 
(1) Points

(Choose all correct answers)

Oracle/Partner confirms power and cooling


requirements for system installation
Oracle/Partner and Customer will determine and
mutually agree upon the hardware and software
installation requirements which will be documented in
the Installation and Configuration Plan
Customer provides walk-through of installation site
Tests that will be performed during the Systems
Testing will be defined.

Incorrect!
Please
review the
"Using the
EIS
Methodology
" course and
try again.
5. Which feature of the SPARC M7
processor permits the server to  Mark for Review 
reduce power consumption ? (1) Points

(Choose all correct answers)

Voltage Acclimatization
Power gating
Dynamic memory allocation
Dynamic Voltage Frequency Scaling

Incorrect. Please refer back to


the lesson “Oracle SPARC M7
Processor Architecture".
18. How many M7 processors are
supported on each CMIOU?  Mark for Review 
(1) Points

2
4
3
1

Incorrect. Please refer back to


the lesson “SPARC M7 Systems
Product Overview".
20. Which two responses are true
about the SPARC M7-8  Mark for Review 
Server? (1) Points

(Choose all correct answers)

The M7-8 with 1 PDOM uses the same internal interconnects as that of the
M7-8 with 2 PDOM
The M7-8 with 2 PDOM is configured as a 1x8 socket arrangement with a
maximum of 8 processors
The M7-8 with 2 PDOM is configured as a 2x4 socket arrangement with a
maximum of 8 processors
The M7-8 has a maximum of 4 processors
The M7-8 with 1 PDOM has cache coherency between all 8 M7 processors

Correct !
42. What is a key difference in the
PCIe implementation on the  Mark for Review 
(1) Points
SPARC M6-32 versus the SPARC
M7?

(Choose all correct answers)

Number of PCIe slots available


PCIe slots support 16 lanes versus 8 lanes
Each CMIOU has its own PCIe slots versus the IOUs used on the SPARC
M6-32
PCIe generation 3 versus 4

Incorrect. Please refer back to


the lesson “SPARC M7 Systems
Product Overview".
47. Which three statements are
prerequisites for powering on  Mark for Review 
HOST0? (1) Points

(Choose all correct answers)

keyswitch must be set to Normal.


keywitch must be set to Locked.
HOST0 must currently be powered off.
There must be suffucuent resources assigned to HOST0.
HOST0 must have at least one DCU assigned to it.

Incorrect. Please refer back to


the lesson “SPARC M7 Systems
Product Overview".
51. You're very familiar
with ILOM on the T5-8  Mark for Review 
servers, but notice that (1) Points
there are two targets
that are new to you in
ILOM on the SPARC
M7 servers? Which two
targets are new in the
Simplified Data Model?

(Choose all correct answers)

/Servers
/SP
/System
/Storage
/SYS
Incorrect. Please refer back to the
lesson “SPARC M7 Systems
Product Overview".

52.  During the initial installation of the M7 server, you notice that the
SP NET MGT interface is not available. Which option represents a  Mark for
possible reason for this? Review 
(1) Points

It must be connected to a Gigabit network.


The SPARC M7 does not use the SP NET MGT interface.
Oracle ILOM is down.
The network does not use DHCP.

Correct !
64. Which of the
following can be  Mark for Review 
roles of a logical (1) Points
domain?

(Choose all correct answers)

CPU Domain
Service Domain
Control Domain
I/O Domain

Incorrect. Please refer back to the


lesson “SPARC M7 Systems
Product Overview".

65.  You have powered-on HOST3 and want to verify its current status. Which
two commands would give you that output?  Mark for
Review 
(1) Points

(Choose all correct answers)

show /Servers/Pdomains/Pdomain_3/HOST status_detail


show /Servers/Pdomains/Pdomain_1/HOST status
show /Servers/Pdomains/Pdomain_3/HOST status
show status /Servers/Pdomains/Pdomain_3/HOST

Incorrect. Please refer back to the


lesson “SPARC M7 Systems
Product Overview".
69. The “ip-transport.interconnect-down” and “ip-
transport.link-down” alerts are reporting a problem  Mark for
on _________. Review 
(1) Points

The indicted network interface


The PCIe switch on the CMIOU
The connection between the NIC and the network
switch
The EoUSB interconnect path supporting the FMA
Fault Proxying mechanism

Correct !
71. What happens if
Power Supplies  Mark for Review 
A261 and A265 (1) Points
are mixed in a
platform?

The running hosts will be stopped and it's not possible to restart any host.
The system is run as expected without any impact.
The running hosts will not be impacted and it's possible to restart the hosts with non-
dominant PS faulted.
The running hosts will be stopped but it's then possible to restart the hosts with non-
dominant PS faulted.

Incorrect. Please review all the SPARC M8 vs M7


courses and try again.
80. Name two functions for the
EIS-DVD during the  Mark for Review 
Installation and Configuration (1) Points
of Oracle Hardware and
Software step in the EIS
methodology?

(Choose all correct answers)

Used as a back-up for complete documentation sets that are on


http://docs.oracle.com
Contains required patches and firmware for most installations
Provides installation assessment and diagnostic tools
Provides an excellent tool as a leave behind utility for customers

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
84. What three documents are
typically used as part of the  Mark for Review 
EIS Planning and Preparation (1) Points
stage in the installation
process?
(Choose all correct answers)

Site Audit Report


Acclimatization Report
Operational Hand-off Form
Installation and Configuration Plan
Project Schedule
Test Procedures Plan

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
88. What are two cautions that
should be acknowledged  Mark for Review 
when acclimatizing a system? (1) Points

(Choose all correct answers)

The maximum positive or negative temperature gradient


that is permitted for multi-layer boards is approximately
2° C (4° F) per hour.
Avoid unpacking items inside the computer centre
(dust/dirt contaminating filters etc.)
Powering ON the system will speed the acclimatization
process as the heat from the system will accelerate its
warming
Once powered on the temperature is no longer an issue,
as internal cooling systems commence

Incorrect! Please review the


"Using the EIS Methodology"
course and try again.

89.  What are three types of configuration information typically


documented in an Installation Configuration Plan?  Mark for
Review 
(1) Points

(Choose all correct answers)

System documentation and guidelines


IO cards and controllers
General and Management Network Configuration
Power cord specifications
System host names
Boot Disk Layout

Incorrect! Please review the


"Using the EIS Methodology"
course and try again.
93. For safety awareness with
respect to grounding, if a  Mark for Review 
system has been modified after (1) Points
the manufacturer's assembly
process, what three
recommendations does the EIS
Grounding Standard make?

(Choose all correct answers)

Determine whether the local electrician can support the installation


process
If modifications involved any power supplies, distribution units or wiring,
did qualified personnel verify that the modification was was correct and
did they test the system to ensure that it doesn't pose any safety hazard?
Check whether the modification involved any power supplies, distribution
units or wiring?
If qualified personnel did not test the safety of the modified system then
proper testing should be requested before Oracle and/or partner
personnel will work on the equipment
If the temperature is below 60 degrees F., warm the room first before
power ON

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
95. Which
Oracle  Mark for Review 
products (1) Points
are
covered
by EIS
Checklists
– select
all that
apply.

(Choose all correct answers)

Oracle Fusion Middleware


OS and Cluster-related Software
Switches
ERP applications
Servers
Engineered Systems
Storage

Incorrect! Please review the "Using the EIS Methodology" course and try
again.
96. Why it is
important  Mark for Review 
to do (1) Points
Installation
planning,
rather than
just asking
the
customer
as you
work
through
the
installation
process?
(Select
three)

(Choose all correct answers)

Support Services will not engage on services requests if no installation planning was done
Customer technical contact may not be readily available
Pricing for Installation Services is less expensive if planning in not included
Planning leads to more thoughtful consideration for a predictable outcome of the installation
process
Continuing interruptions can detract from the professionalism of your work, and lead to
customer dissatisfaction

Incorrect! Please review the "Using the EIS Methodology" course and try
again.
99. What are
the four  Mark for Review 
key points (1) Points
covered in
each test
topic of the
Test
Procedures
Plan?

(Choose all correct answers)

Objective
Test Result
Conclusion
Prerequisites
Method
Outcome

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

100.  Who is involved in the Project Initiation phase?


 Mark for Review 
(1) Points

(Choose all correct answers)

3rd party Service Provider


Partner point of contact
Customer point of contact
Oracle Financing contact
Oracle Installation Coordinator or Project Manager (if applicable)

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
102. Which
four  Mark for Review 
objectives (1) Points
are
primary
goals for
an EIS
Site
Audit?

(Choose all correct answers)

Determine the environmental conditions at Customer's site including


temperature, humidity, cleanliness and such other assessments as are
determined to be necessary in Oracle's sole discretion
Determine the availability of required electrical power to run and maintain
the System
Determine how many logical domains need to be configured on the
system
Determine how frequently system backups will be completed
Determine the floor weight load capacity at the location where the System
will be installed
Determine installation needs for the System, including such assessments
as: the suitability of access routes to the installation location, such as
doors, elevators, floor strengths and ramps

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

103.  According to the EIS methodology, when issues are uncovered during the
Site-Audit, who should be notified?  Mark for Review 
(1) Points

(Choose all correct answers)

Oracle sales management


Installation coordinator if applicable
Customer point of contact
Oracle Premier Support

Incorrect! Please review the "Using the EIS


Methodology" course and try again.

104.  What tasks occur during the operational handover phase of the EIS
methodology?  Mark for Review 
(1) Points

(Choose all correct answers)

Provide the customer the 20% installation service rebate that is required
after a successful installation
Document the serial number for the system(s) installed, as well as any
comments pertaining to the installation
Obtain customer signatures to successful close project
Collate the EISdocV4 documents pertaining to this customer installation,
and product documentation for handover

Incorrect! Please review the "Using the EIS


Methodology" course and try again.
107. Which
three  Mark for Review 
statements (1) Points
are true
about EIS?

(Choose all correct answers)

EIS is a quick and dirty process for expediting Oracle system installations
EIS stands for “Enterprise information Standards”
EIS stands for “Enterprise Installation Standards”
EIS is a methodology designed to address issues before, during and after the actual hands-
on installation of Oracle systems
EIS evolved from the field, is sustained by those closely involved with the field, and is
intended to assist the field

Incorrect! Please review the "Using the EIS Methodology" course and
try again.
112. What are the
two primary  Mark for Review 
objectives for (1) Points
the
Installation
Configuration
Planning step
of the EIS
methodology?

(Choose all correct answers)


Oracle/Partner confirms power and cooling requirements for system installation
Customer provides walk-through of installation site
Oracle/Partner and Customer will determine and mutually agree upon the hardware and
software installation requirements which will be documented in the Installation and
Configuration Plan
Tests that will be performed during the Systems Testing will be defined.

Incorrect! Please review the "Using the EIS Methodology" course


and try again.
115. Assuming a
SPARC T5  Mark for Review 
Server (1) Points
installation on
which you
install Solaris
11, what EIS
documentation,
at a minimum,
is it
recommended
that you bring
to support you
in the
installation
project?

(Choose all correct answers)

EIS Installation Checklist for SPARC T5


EIS Installation Checklist for Solaris 11 OS
EIS Installation Checklist for Sun Datacenter InfiniBand Switch 36
EIS Installation Checklist for Common Array Manager

Incorrect! Please review the "Using the EIS Methodology" course


and try again.
116. What two
activities are  Mark for Review 
accomplished (1) Points
during
Installation
Task Planning
step in the
EIS
Methodology?

(Choose all correct answers)

Communicate schedule for installation to the customer


System unpacking and acclimatization
Networking and system component cabling
Review the timeframe options for delivery of the service
Organization of the team who will actively work the Installation

Incorrect! Please review the "Using the EIS Methodology" course


and try again.
118. Which four
documents  Mark for Review 
are (1) Points
included as
part of the
Operational
Handover?

(Choose all correct answers)

System Documentation
Test Procedures Plan
MOS Internal Documentation
Installation and Configuration Plan
EIS Checklist for the System installed
Site Audit Report

Incorrect! Please review the "Using the EIS Methodology" course and
try again.
124. When
should the  Mark for Review 
Site-Audit (1) Points
be
performed?

As soon as the product has been delivered to the customer


As soon as possible, and certainly prior to delivery of the system
After the system has been acclimatized and is ready for unpacking at the customer site
Prior to the completion of the sale, in order to ensure that the customer’s location is viable

Correct!
125. When
should you  Mark for Review 
review (1) Points
deliverables
and why?

Ideally EIS deliverables would be reviewed at the very start of an installation project, as
they clearly define scope, roles and responsibilities, and project deliverables
EIS deliverables are an interim checklist to ensure that at the mid-way point of an
installation the project remains on track.
EIS deliverables are included in the Oracle system shipping and packaging documents near
the start of an installation
EIS deliverables are used as a last step in the installation process to ensure the installer
provided everything that is required

Correct!

Das könnte Ihnen auch gefallen