Beruflich Dokumente
Kultur Dokumente
PROJECT NAME: CONCRETING OF ACCESS ROAD WITH COVERED CANAL, BRGY. WILSON
START : AUG. 10, 2020
END : OCT. 23, 2020
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DESCRIPTION % WT. AUGUST SEPTEMBER OCTOBER
1 PROJECT BILLBOARD 0.46 0.46
2 MOBILIZATION/DEMOBILIZATION 0.99 0.59 0
3 SURPLUS COMMON EXCAVATION 3.85 3.85
4 EMBANKMENT FROM ROADWAY EXCAVATION 0.03 0
5 SUBGRADE PREPARATION ( COMMON MATERIALS ) 0.98 0.98
6 AGGREGATE SUBBASE COURSE 11.23 1.50 1.99 3.49 0.5 1.5 2.25
7 PCC PAVEMENT ( PLAIN ) 200mm THK. 82.46 20.6 20.6 20.6 20.6
100
54.59
7.41
0
CONSTRUCTION SCHEDULE
PROJECT NAME: CONCRETING OF ROAD JUNCTION NATIONAL HIGHWAY ( SAN JOSE GAMAY ) BRGY. SAN JOSE, LIBJO
START : JUNE 25, 2020
END : OCT. 3, 2020
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DESCRIPTION % WT. JUNE JULY AUGUST SEPTEMBER OCT
1 PROJECT BILLBOARD 0.36 ###
98.76 100
2 CONSTRUCTION SAFETY AND HEALTH 4.73 0.28 1.45 1.45 1.4 0.2
3 MOBLIZATION AND DEMOBILIZATION 0.9 ### 0
4 REMOVAL OF EXISTING CONCRETE PAVEMENT (0.23 m) 1.51 1.51
5 STRUCTURE EXCAVATION (COMMON SOIL) 1.5 0.50 1
6 EMBANKMENT FROM BORROW 2.16 2.16
7 EMBANKMENT FROM ROADWAY EXCAVATION 4.89 4.89
8 SUB-GRADE PREPARATION 2.03 1.22 0.81
9 AGGREGATE SUB-BASE COURSE 12.61 4.33 1.97 1.97 1
53.43 3.55
10 PORTLAND CEMENT CONCRETE PAVEMENT, (t=0.15 m) 2.86 2.86
11 PORTLAND CEMENT CONCRETE PAVEMENT, (t=0.23 m) 44.45 10 10 10 15
12 GROUTED RIPRAP, CLASS "A" 15.63 9.32 6.31
13 CONCRETE CURB ( BARRIER) 3.71 ### ### 3.71
14 REGULATORY SIGN (R3-1P) 0.76 1
15 REFLECTED THERMOPLASTIC PAVEMENT MARKING (WHITE) 1.04 13.82 1 0
16 REFLECTED THERMOPLASTIC PAVEMENT MARKING (YELLOW) 0.86 1 0
100###
###
###
### 3.1
0###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
ACCOMPLISHMENT FLOW
AUGUST AUGUST