INFORMACIÓN PLUVIOMÉTRICA
2011 29.60 16.00 31.00 14.80 13.90 11.20 15.00 11.20 8.00 11.60 38.20 30.60 38.20 8.00
2012 15.30 23.70 20.60 24.80 16.10 19.40 15.90 16.30 14.70 38.60 11.70 16.80 38.60 11.70
2013 11.70 12.60 42.20 25.80 48.30 18.20 16.60 8.80 17.40 55.50 11.50 12.10 55.50 8.80
90.70 3.80
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
NOTA:
NIVEL DE SIGNIFICANCIA: 95%
Conservadoramente se trabajará con la Distribución de logGUMBEL, según el cuadro anterior.
Para los cálculos anteriores, se ha hecho uso del programa Hidro Esta.
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
COTA SUP.
PROGRESIVA OBRA PROYECTADA COTA INF. (msnm) DESNIVEL (∆H) LONG. PROM. (L) PENDIENTE (S) ÁREA TRIB. (Ha)
(msnm)
38+950.24 Alcantarilla 81 1979.164 2007.469 28.3050000000001 129.695 0.22 0.477
39+120.69 Alcantarilla 82 1955.771 1981.149 25.3779999999999 86.174 0.29 0.206
39+479.33 Alcantarilla 83 1951.427 1978.863 27.4360000000001 86.395 0.32 0.000
39+646.96 Alcantarilla 84 1960.637 1991.245 30.6079999999999 54.735 0.56 0.000
39+714.91 Alcantarilla 85 1899.082 1970.615 71.5329999999999 108.143 0.66 0.000
40+037.01 Alcantarilla 86 1881.236 1925.236 44 92.7 0.47 0.216
40+369.13 Alcantarilla 87 1895.34 1939.18 43.8400000000001 77.965 0.56 0.000
40+741.85 Alcantarilla 88 1893.84 1943.05 49.21 109.236 0.45 0.316
41+058.64 Alcantarilla 89 1843.99 1913.8 69.8099999999999 113.265 0.62 0.243
41+279.32 Alcantarilla 90 1826.27 1872.24 45.97 71.095 0.65 0.000
41+512.39 Alcantarilla 91 1820.236 1869.23 48.9939999999999 152.023 0.32 0.187
41+810.44 Alcantarilla 92 1904.86 1925.4 20.5400000000002 97.8425 0.21 0.189
42+038.58 Alcantarilla 93 1874.01 1954.28 80.27 111.425 0.72 0.000
42+246.20 Alcantarilla 94 1898.89 1955.5 56.6099999999999 120.325 0.47 0.000
42+363.03 Alcantarilla 95 1861.41 1908.53 47.1199999999999 187.239 0.25 0.588
42+554.26 Alcantarilla 96 1791.41 1875.45 84.04 122.45 0.69 0.000
42+864.50 Baden 01 1757.37 1827.27 69.9000000000001 132.365 0.53 1.298
43+058.82 Baden 02 1745.67 1817.57 71.8999999999999 134.965 0.53 0.000
43+158.06 Alcantarilla 97 1730.8 1768.28 37.48 62.83 0.60 0.000
43+378.01 Alcantarilla 98 1718.78 1769.35 50.5699999999999 126.598 0.40 0.000
43+582.65 Alcantarilla 99 1717.46 1771.25 53.79 130.956 0.41 1.607
43+791.15 Alcantarilla 100 1682.36 1723.22 40.8600000000001 90.236 0.45 0.000
43+989.21 Alcantarilla 101 1693.2 1736.26 43.06 107.752 0.40 0.000
44+131.93 Alcantarilla 102 1683.514 1737.99 54.4760000000001 101.856 0.53 0.000
44+263.67 Alcantarilla 103 1680.123 1757.96 77.837 95.011 0.82 0.637
44+364.80 Alcantarilla 104 1686.21 1723.24 37.03 98.586 0.38 0.000
44+658.43 Alcantarilla 105 1646.57 1708.71 62.1400000000001 129.536 0.48 0.000
44+885.03 Alcantarilla 106 1630.95 1684.85 53.8999999999999 138.256 0.39 0.000
45+329.12 Alcantarilla 107 1654.64 1685.01 30.3699999999999 91.458 0.33 0.387
45+355.69 Alcantarilla 108 1648.13 1671.5 23.3699999999999 126.534 0.18 0.588
45+593.48 Alcantarilla 109 1625.65 1669.32 43.6699999999999 118.254 0.37 0.000
45+817.19 Alcantarilla 110 1620.62 1684.55 63.9300000000001 133.265 0.48 0.000
46+135.05 Alcantarilla 111 1561.26 1634 72.74 106.536 0.68 0.000
46+495.85 Alcantarilla 112 1569.85 1654.3 84.45 95.845 0.88 0.000
46+621.39 Alcantarilla 113 1600.99 1656.71 55.72 90.458 0.62 0.000
46+860.48 Alcantarilla 114 1563.22 1641.01 77.79 123.564 0.63 0.000
46+968.81 Alcantarilla 115 1543.68 1600.95 57.27 107.456 0.53 0.000
47+151.22 Baden 03 1606 1664.69 58.6900000000001 201.235 0.29 0.781
47+441.36 Alcantarilla 116 1530.58 1590.82 60.24 136.235 0.44 0.000
47+561.93 Baden 04 1515.35 1551.88 36.5300000000002 175.2365 0.21 0.954
47+841.76 Alcantarilla 117 1455.69 1523.29 67.5999999999999 146.235 0.46 0.000
48+049.33 Alcantarilla 118 1445.55 1529.25 83.7 145.68 0.57 0.000
48+315.43 Alcantarilla 119 1454.77 1478.19 23.4200000000001 55.654 0.42 0.000
48+452.37 Alcantarilla 120 1437.6 1489.31 51.71 135.236 0.38 0.769
48+701.99 Alcantarilla 121 1402.74 1442.47 39.73 136.564 0.29 0.000
49+043.20 Alcantarilla 122 1414.46 1431.9 17.4400000000001 198.536 0.09 4.428
49+252.11 Alcantarilla 123 1381.8 1435.56 53.76 210.564 0.26 0.000
49+314.68 Alcantarilla 124 1406.1 1428.59 22.49 84.594 0.27 0.787
49+556.01 Alcantarilla 125 1370.1 1416.19 46.0900000000001 127.456 0.36 0.000
49+702.20 Alcantarilla 126 1340.32 1403.78 63.46 126.536 0.50 0.000
49+984.11 Alcantarilla 127 1304.87 1352.19 47.3200000000002 125.369 0.38 0.000
50+152.90 Alcantarilla 128 1303.27 1348.000 44.73 243.526 0.18 3.218
50+377.90 Alcantarilla 129 1303.27 1348.000 44.73 243.526 0.18 0.000
Todas las obras proyectadas en el presente proyecto, son necesarias para el mantenimiento de la vía a mejorar.
EXPEDIENTE TECNICO
2.- CUADRO DE DATOS TECNICOS PARA DISEÑO
Ang. F. Cohesion
Tramo Talud Según Suelo 1:Z Carga Admisible
Interna "C"
N° Inicia Termina L (m) Tipo de Suelo (SUCS) Z Minimo Z Maximo qa (kg/cm2) de a C (kg/cm2)
1 0+000.00 12+099.00 12099.00 CL, ML (Talud estable) 1.00 4.00 > 1.50 30° 35°
2
PARÁMETROS GEOMORFOLÓGICOS
TRAMO ÁREA
N° Tramo LONGIT ANCHO PENDIEN
TRIB. Observaciones
de Cuneta Inicia Termina UD (m) (m) TE (S)
(Ha)
1 20+736.49 20+950.45 213.96 50 0.31 1.070 Alcantarilla TMC 01
2 20+950.45 21+247.21 296.76 50 0.36 1.484 Alcantarilla TMC 02
3 21+247.21 21+477.20 229.99 50 0.29 1.150 Alcantarilla TMC 03
4 21+477.20 21+661.44 184.24 50 0.50 0.921 Alcantarilla TMC 04
5 21+661.44 21+811.76 150.32 50 0.45 0.752 Alcantarilla TMC 05
6 21+811.76 21+995.00 183.24 50 0.45 0.916 Alcantarilla TMC 06
7 21+995.00 22+238.23 243.23 50 0.26 1.216 Alcantarilla TMC 07
8 22+238.23 22+256.31 18.08 50 0.31 0.090 Alcantarilla TMC 08
9 22+256.31 22+614.40 358.09 50 0.36 1.790 Alcantarilla TMC 09
10 22+614.40 22+952.54 338.14 50 0.24 1.691 Alcantarilla TMC 10
11 22+952.54 23+129.31 176.77 50 0.34 0.884 Alcantarilla TMC 11
12 23+129.31 23+377.16 247.85 50 0.20 1.239 Alcantarilla TMC 12
13 23+377.16 23+766.00 388.84 50 0.25 1.944 Alcantarilla TMC 13
14 23+766.00 24+001.02 235.020 50 0.34 1.175 Alcantarilla TMC 14
15 24+001.02 24+597.48 596.46 50 0.27 2.982 Alcantarilla TMC 15
16 24+597.48 24+812.87 215.39 50 0.39 1.077 Alcantarilla TMC 16
17 24+812.87 24+896.22 83.35 50 0.36 0.417 Alcantarilla TMC 17
18 24+896.22 25+073.16 176.94 50 0.39 0.885 Alcantarilla TMC 18
19 25+073.16 25+147.84 74.68 50 0.37 0.373 Alcantarilla TMC 19
20 25+147.84 25+274.71 126.87 50 0.32 0.634 Alcantarilla TMC 20
21 25+274.71 25+658.61 383.90 50 0.28 1.920 Alcantarilla TMC 21
22 25+658.61 25+781.69 123.08 50 0.48 0.615 Alcantarilla TMC 22
23 25+781.69 26+061.87 280.18 50 0.34 1.401 Muro Alcantarilla 01
24 26+061.87 26+098.06 36.19 50 0.23 0.181 Alcantarilla TMC 23
25 26+098.06 26+324.62 226.56 50 0.32 1.133 Alcantarilla TMC 24
26 26+324.62 26+432.20 107.58 50 0.27 0.538 Alcantarilla TMC 25
27 26+432.20 26+544.99 112.79 50 0.32 0.564 Alcantarilla TMC 26
28 26+544.99 26+651.61 106.62 50 0.07 0.533 Alcantarilla TMC 27
29 26+651.61 26+891.23 239.62 50 0.11 1.198 Alcantarilla TMC 28
30 26+891.23 27+128.84 237.61 50 0.30 1.188 Alcantarilla TMC 29
31 27+128.84 27+446.81 317.97 50 0.47 1.590 Alcantarilla TMC 30
32 27+446.81 27+704.71 257.90 50 0.43 1.289 Alcantarilla TMC 31
33 27+704.71 27+791.51 86.80 50 0.43 0.434 Alcantarilla TMC 32
34 27+791.51 27+906.85 115.34 50 0.56 0.577 Alcantarilla TMC 33
35 27+906.85 28+159.66 252.81 50 0.55 1.264 Alcantarilla TMC 34
36 28+159.66 28+353.43 193.77 50 0.51 0.969 Muro Alcantarilla 02
37 28+353.43 28+421.87 68.44 50 0.63 0.342 Alcantarilla TMC 35
38 28+421.87 28+486.99 65.12 50 0.42 0.326 Muro Alcantarilla 03
39 28+486.99 28+560.30 73.31 50 0.51 0.367 Alcantarilla TMC 36
40 28+560.30 28+895.47 335.17 50 0.50 1.676 Alcantarilla TMC 37
41 28+895.47 29+290.20 394.73 50 0.52 1.974 Alcantarilla TMC 38
42 29+290.20 29+624.77 334.57 50 0.36 1.673 Alcantarilla TMC 39
43 29+624.77 29+972.42 347.65 50 0.39 1.738 Alcantarilla TMC 40
44 29+972.42 30+190.58 218.16 50 0.37 1.091 Alcantarilla TMC 41
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN
IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO –
CAJAMARCA”
PARÁMETROS GEOMORFOLÓGICOS
TRAMO ÁREA
N° Tramo LONGIT ANCHO PENDIEN
TRIB. Observaciones
de Cuneta Inicia Termina UD (m) (m) TE (S)
(Ha)
45 30+190.58 30+375.49 184.91 50 0.37 0.925 Muro Alcantarilla 04
46 30+375.49 30+585.31 209.82 50 0.50 1.049 Alcantarilla TMC 42
47 30+585.31 30+769.80 184.49 50 0.05 0.922 Alcantarilla TMC 43
48 30+769.80 30+952.43 182.63 50 0.32 0.913 Alcantarilla TMC 44
49 30+952.43 31+135.47 183.04 50 0.30 0.915 Alcantarilla TMC 45
50 31+135.47 31+271.15 135.68 50 0.23 0.678 Alcantarilla TMC 46
51 31+271.15 31+376.92 105.77 50 0.41 0.529 Alcantarilla TMC 47
52 31+376.92 31+596.28 219.36 50 0.49 1.097 Alcantarilla TMC 48
53 31+596.28 31+925.56 329.28 50 0.15 1.646 Alcantarilla TMC 49
54 31+925.56 32+202.97 277.41 50 0.18 1.387 Alcantarilla TMC 50
55 32+202.97 32+356.24 153.27 50 0.34 0.766 Alcantarilla TMC 51
56 32+356.24 32+562.05 205.81 50 0.30 1.029 Alcantarilla TMC 52
57 32+562.05 32+900.39 338.34 50 0.40 1.692 Alcantarilla TMC 53
58 32+900.39 33+183.71 283.32 50 0.47 1.417 Alcantarilla TMC 54
59 33+183.71 33+382.63 198.92 50 0.29 0.995 Alcantarilla TMC 55
60 33+382.63 33+509.28 126.65 50 0.34 0.633 Alcantarilla TMC 56
61 33+509.28 33+596.61 87.33 50 0.35 0.437 Alcantarilla TMC 57
62 33+596.61 33+707.58 110.97 50 0.23 0.555 Alcantarilla TMC 58
63 33+707.58 33+807.48 99.90 50 0.19 0.500 Alcantarilla TMC 59
64 33+807.48 33+922.51 115.03 50 0.17 0.575 Alcantarilla TMC 60
65 33+922.51 34+226.45 303.94 50 0.28 1.520 Alcantarilla TMC 61
66 34+226.45 34+406.66 180.21 50 0.33 0.901 Alcantarilla TMC 62
67 34+406.66 34+621.41 214.75 50 0.24 1.074 Alcantarilla TMC 63
68 34+621.41 34+796.65 175.24 50 0.24 0.876 Alcantarilla TMC 64
69 34+796.65 34+883.73 87.08 50 0.08 0.435 Alcantarilla TMC 65
70 34+883.73 35+115.60 231.87 50 0.13 1.159 Alcantarilla TMC 66
71 35+115.60 35+499.30 383.70 50 0.15 1.919 Alcantarilla TMC 67
72 35+499.30 35+693.49 194.19 50 0.17 0.971 Alcantarilla TMC 68
73 35+693.49 36+071.99 378.50 50 0.06 1.893 Alcantarilla TMC 69
74 36+071.99 36+379.84 307.85 50 0.20 1.539 Alcantarilla TMC 70
75 36+379.84 36+672.23 292.39 50 0.23 1.462 Alcantarilla TMC 71
76 36+672.23 36+916.28 244.05 50 0.32 1.220 Alcantarilla TMC 72
77 36+916.28 37+128.52 212.24 50 0.32 1.061 Alcantarilla TMC 73
78 37+128.52 37+376.26 247.74 50 0.28 1.239 Alcantarilla TMC 74
79 37+376.26 37+620.25 243.99 50 0.09 1.220 Alcantarilla TMC 75
80 37+620.25 38+114.96 494.71 50 0.04 2.474 Alcantarilla TMC 76
81 38+114.96 38+376.91 261.95 50 0.25 1.310 Alcantarilla TMC 77
82 38+376.91 38+544.83 167.92 50 0.26 0.840 Alcantarilla TMC 78
83 38+544.83 38+669.72 124.89 50 0.29 0.624 Alcantarilla TMC 79
84 38+669.72 38+950.24 280.52 50 0.32 1.403 Alcantarilla TMC 80
85 38+950.24 39+120.69 170.45 50 0.33 0.852 Alcantarilla TMC 81
86 39+120.69 39+479.33 358.64 50 0.42 1.793 Alcantarilla TMC 82
87 39+479.33 39+646.96 167.63 50 0.38 0.838 Alcantarilla TMC 83
88 39+646.96 39+714.91 67.95 50 0.07 0.340 Alcantarilla TMC 84
89 39+714.91 40+037.01 322.10 50 0.01 1.611 Alcantarilla TMC 85
90 40+037.01 40+369.13 332.12 50 0.01 1.661 Alcantarilla TMC 86
91 40+369.13 40+741.85 372.72 50 0.07 1.864 Alcantarilla TMC 87
92 40+741.85 41+058.64 316.79 50 0.07 1.584 Alcantarilla TMC 88
93 41+058.64 41+279.32 220.68 50 0.07 1.103 Alcantarilla TMC 89
94 41+279.32 41+512.39 233.07 50 0.07 1.165 Alcantarilla TMC 90
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN
IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO –
CAJAMARCA”
PARÁMETROS GEOMORFOLÓGICOS
TRAMO ÁREA
N° Tramo LONGIT ANCHO PENDIEN
TRIB. Observaciones
de Cuneta Inicia Termina UD (m) (m) TE (S)
(Ha)
95 41+512.39 41+810.44 298.05 50 0.07 1.490 Alcantarilla TMC 91
96 41+810.44 42+038.58 228.14 50 0.06 1.141 Alcantarilla TMC 92
97 42+038.58 42+246.20 207.62 50 0.06 1.038 Alcantarilla TMC 93
98 42+246.20 42+363.03 116.83 50 0.06 0.584 Alcantarilla TMC 94
99 42+363.03 42+554.26 191.23 50 0.03 0.956 Alcantarilla TMC 95
100 42+554.26 42+864.50 310.24 50 0.07 1.551 Alcantarilla TMC 96
101 42+864.50 43+058.82 194.32 50 0.07 0.972 Baden 01
102 43+058.82 43+158.06 99.24 50 0.07 0.496 Baden 02
103 43+158.06 43+378.01 219.95 50 0.07 1.100 Alcantarilla TMC 97
104 43+378.01 43+582.65 204.64 50 0.07 1.023 Alcantarilla TMC 98
105 43+582.65 43+791.15 208.50 50 0.07 1.043 Alcantarilla TMC 99
106 43+791.15 43+989.21 198.06 50 0.07 0.990 Alcantarilla TMC 100
107 43+989.21 44+131.93 142.72 50 0.07 0.714 Alcantarilla TMC 101
108 44+131.93 44+263.67 131.74 50 0.07 0.659 Alcantarilla TMC 102
109 44+263.67 44+364.80 101.13 50 0.07 0.506 Alcantarilla TMC 103
110 44+364.80 44+658.43 293.63 50 0.07 1.468 Alcantarilla TMC 104
111 44+658.43 44+885.03 226.60 50 0.07 1.133 Alcantarilla TMC 105
112 44+885.03 45+329.12 444.09 50 0.07 2.220 Alcantarilla TMC 106
113 45+329.12 45+355.69 26.57 50 0.07 0.133 Alcantarilla TMC 107
114 45+355.69 45+593.48 237.79 50 0.07 1.189 Alcantarilla TMC 108
115 45+593.48 45+817.19 223.71 50 0.07 1.119 Alcantarilla TMC 109
116 45+817.19 46+135.05 317.86 50 0.07 1.589 Alcantarilla TMC 110
117 46+135.05 46+495.85 360.80 50 0.07 1.804 Alcantarilla TMC 111
118 46+495.85 46+621.39 125.54 50 0.07 0.628 Alcantarilla TMC 112
119 46+621.39 46+860.48 239.09 50 0.07 1.195 Alcantarilla TMC 113
120 46+860.48 46+968.81 108.33 50 0.07 0.542 Alcantarilla TMC 114
121 46+968.81 47+151.22 182.41 50 0.07 0.912 Alcantarilla TMC 115
122 47+151.22 47+441.36 290.14 50 0.07 1.451 Baden 03
123 47+441.36 47+561.93 120.57 50 0.07 0.603 Alcantarilla TMC 116
124 47+561.93 47+841.76 279.83 50 0.07 1.399 Baden 04
125 47+841.76 48+049.33 207.57 50 0.07 1.038 Alcantarilla TMC 117
126 48+049.33 48+315.43 266.10 50 0.07 1.331 Alcantarilla TMC 118
127 48+315.43 48+452.37 136.94 50 0.07 0.685 Alcantarilla TMC 119
128 48+452.37 48+701.99 249.62 50 0.07 1.248 Alcantarilla TMC 120
129 48+701.99 49+043.20 341.21 50 0.07 1.706 Alcantarilla TMC 121
130 49+043.20 49+252.11 208.91 50 0.07 1.045 Alcantarilla TMC 122
131 49+252.11 49+314.68 62.57 50 0.07 0.313 Alcantarilla TMC 123
132 49+314.68 49+556.01 241.33 50 0.07 1.207 Alcantarilla TMC 124
133 49+556.01 49+702.20 146.19 50 0.07 0.731 Alcantarilla TMC 125
134 49+702.20 49+984.11 281.91 50 0.07 1.410 Alcantarilla TMC 126
135 49+984.11 50+152.90 168.79 50 0.07 0.844 Alcantarilla TMC 127
136 50+152.90 50+377.90 225.00 50 0.07 1.125 Alcantarilla TMC 128
137 50+377.90 50+463.00 85.10 50 0.07 0.425 Alcantarilla TMC 129
Total ###
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN
IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO –
CAJAMARCA”
PARÁMETROS GEOMORFOLÓGICOS
TRAMO ÁREA
N° Tramo LONGIT ANCHO PENDIEN
TRIB. Observaciones
de Cuneta Inicia Termina UD (m) (m) TE (S)
(Ha)
PARÁMETROS GEOMORFOLÓGICOS
TRAMO ÁREA
N° Tramo LONGIT ANCHO PENDIEN
TRIB. Observaciones
de Cuneta Inicia Termina UD (m) (m) TE (S)
(Ha)
1 20+736.49 20+950.45 213.96 3.1 0.06 0.066 Alcantarilla TMC 01
2 20+950.45 21+247.21 296.76 3.1 0.05 0.092 Alcantarilla TMC 02
3 21+247.21 21+477.20 229.99 3.1 0.06 0.071 Alcantarilla TMC 03
4 21+477.20 21+661.44 184.24 3.1 0.08 0.057 Alcantarilla TMC 04
5 21+661.44 21+811.76 150.32 3.1 0.00 0.047 Alcantarilla TMC 05
6 21+811.76 21+995.00 183.24 3.1 0.01 0.057 Alcantarilla TMC 06
7 21+995.00 22+238.23 243.23 3.1 0.01 0.075 Alcantarilla TMC 07
8 22+238.23 22+256.31 18.08 3.1 0.01 0.006 Alcantarilla TMC 08
9 22+256.31 22+614.40 358.09 3.1 0.01 0.111 Alcantarilla TMC 09
10 22+614.40 22+952.54 338.14 3.1 0.03 0.105 Alcantarilla TMC 10
11 22+952.54 23+129.31 176.77 3.1 0.03 0.055 Alcantarilla TMC 11
12 23+129.31 23+377.16 247.85 3.1 0.03 0.077 Alcantarilla TMC 12
13 23+377.16 23+766.00 388.84 3.1 0.03 0.121 Alcantarilla TMC 13
14 23+766.00 * 24+001.02 235.02 3.1 0.03 0.073 Alcantarilla TMC 14
15 24+001.02 24+597.48 596.46 3.1 0.03 0.185 Alcantarilla TMC 15
16 24+597.48 24+812.87 215.39 3.1 0.02 0.067 Alcantarilla TMC 16
17 24+812.87 24+896.22 83.35 3.1 0.02 0.026 Alcantarilla TMC 17
18 24+896.22 25+073.16 176.94 3.1 0.02 0.055 Alcantarilla TMC 18
19 25+073.16 25+147.84 74.68 3.1 0.02 0.023 Alcantarilla TMC 19
20 25+147.84 25+274.71 126.87 3.1 0.06 0.039 Alcantarilla TMC 20
21 25+274.71 25+658.61 383.90 3.1 0.06 0.119 Alcantarilla TMC 21
22 25+658.61 25+781.69 123.08 3.1 0.05 0.038 Alcantarilla TMC 22
23 25+781.69 26+061.87 280.18 3.1 0.05 0.087 Muro Alcantarilla 01
24 26+061.87 26+098.06 36.19 3.1 0.06 0.011 Alcantarilla TMC 23
25 26+098.06 26+324.62 226.56 3.1 0.06 0.070 Alcantarilla TMC 24
26 26+324.62 26+432.20 107.58 3.1 0.06 0.033 Alcantarilla TMC 25
27 26+432.20 26+544.99 112.79 3.1 0.06 0.035 Alcantarilla TMC 26
28 26+544.99 26+651.61 106.62 3.1 0.06 0.033 Alcantarilla TMC 27
29 26+651.61 26+891.23 239.62 3.1 0.06 0.074 Alcantarilla TMC 28
30 26+891.23 27+128.84 237.61 3.1 0.05 0.074 Alcantarilla TMC 29
31 27+128.84 27+446.81 317.97 3.1 0.05 0.099 Alcantarilla TMC 30
32 27+446.81 27+704.71 257.90 3.1 0.05 0.080 Alcantarilla TMC 31
33 27+704.71 27+791.51 86.80 3.1 0.05 0.027 Alcantarilla TMC 32
34 27+791.51 27+906.85 115.34 3.1 0.06 0.036 Alcantarilla TMC 33
35 27+906.85 28+159.66 252.81 3.1 0.06 0.078 Alcantarilla TMC 34
36 28+159.66 28+353.43 193.77 3.1 0.06 0.060 Muro Alcantarilla 02
37 28+353.43 28+421.87 68.44 3.1 0.06 0.021 Alcantarilla TMC 35
38 28+421.87 28+486.99 65.12 3.1 0.06 0.020 Muro Alcantarilla 03
39 28+486.99 28+560.30 73.31 3.1 0.06 0.023 Alcantarilla TMC 36
40 28+560.30 28+895.47 335.17 3.1 0.06 0.104 Alcantarilla TMC 37
41 28+895.47 29+290.20 394.73 3.1 0.05 0.122 Alcantarilla TMC 38
42 29+290.20 29+624.77 334.57 3.1 0.05 0.104 Alcantarilla TMC 39
43 29+624.77 29+972.42 347.65 3.1 0.06 0.108 Alcantarilla TMC 40
44 29+972.42 30+190.58 218.16 3.1 0.03 0.068 Alcantarilla TMC 41
45 30+190.58 30+375.49 184.91 3.1 0.01 0.057 Muro Alcantarilla 04
46 30+375.49 30+585.31 209.82 3.1 0.01 0.065 Alcantarilla TMC 42
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN
IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO –
CAJAMARCA”
PARÁMETROS GEOMORFOLÓGICOS
TRAMO ÁREA
N° Tramo LONGIT ANCHO PENDIEN
TRIB. Observaciones
de Cuneta Inicia Termina UD (m) (m) TE (S)
(Ha)
47 30+585.31 30+769.80 184.49 3.1 0.06 0.057 Alcantarilla TMC 43
48 30+769.80 30+952.43 182.63 3.1 0.06 0.057 Alcantarilla TMC 44
49 30+952.43 31+135.47 183.04 3.1 0.01 0.057 Alcantarilla TMC 45
50 31+135.47 31+271.15 135.68 3.1 0.04 0.042 Alcantarilla TMC 46
51 31+271.15 31+376.92 105.77 3.1 0.05 0.033 Alcantarilla TMC 47
52 31+376.92 31+596.28 219.36 3.1 0.05 0.068 Alcantarilla TMC 48
53 31+596.28 31+925.56 329.28 3.1 0.06 0.102 Alcantarilla TMC 49
54 31+925.56 32+202.97 277.41 3.1 0.00 0.086 Alcantarilla TMC 50
55 32+202.97 32+356.24 153.27 3.1 0.01 0.048 Alcantarilla TMC 51
56 32+356.24 32+562.05 205.81 3.1 0.01 0.064 Alcantarilla TMC 52
57 32+562.05 32+900.39 338.34 3.1 0.02 0.105 Alcantarilla TMC 53
58 32+900.39 33+183.71 283.32 3.1 0.01 0.088 Alcantarilla TMC 54
59 33+183.71 33+382.63 198.92 3.1 0.00 0.062 Alcantarilla TMC 55
60 33+382.63 33+509.28 126.65 3.1 0.00 0.039 Alcantarilla TMC 56
61 33+509.28 33+596.61 87.33 3.1 0.00 0.027 Alcantarilla TMC 57
62 33+596.61 33+707.58 110.97 3.1 0.00 0.034 Alcantarilla TMC 58
63 33+707.58 33+807.48 99.90 3.1 0.00 0.031 Alcantarilla TMC 59
64 33+807.48 33+922.51 115.03 3.1 0.01 0.036 Alcantarilla TMC 60
65 33+922.51 34+226.45 303.94 3.1 0.01 0.094 Alcantarilla TMC 61
66 34+226.45 34+406.66 180.21 3.1 0.07 0.056 Alcantarilla TMC 62
67 34+406.66 34+621.41 214.75 3.1 0.07 0.067 Alcantarilla TMC 63
68 34+621.41 34+796.65 175.24 3.1 0.01 0.054 Alcantarilla TMC 64
69 34+796.65 34+883.73 87.08 3.1 0.01 0.027 Alcantarilla TMC 65
70 34+883.73 35+115.60 231.87 3.1 0.06 0.072 Alcantarilla TMC 66
71 35+115.60 35+499.30 383.70 3.1 0.06 0.119 Alcantarilla TMC 67
72 35+499.30 35+693.49 194.19 3.1 0.06 0.060 Alcantarilla TMC 68
73 35+693.49 36+071.99 378.50 3.1 0.06 0.117 Alcantarilla TMC 69
74 36+071.99 36+379.84 307.85 3.1 0.07 0.095 Alcantarilla TMC 70
75 36+379.84 36+672.23 292.39 3.1 0.07 0.091 Alcantarilla TMC 71
76 36+672.23 36+916.28 244.05 3.1 0.07 0.076 Alcantarilla TMC 72
77 36+916.28 37+128.52 212.24 3.1 0.07 0.066 Alcantarilla TMC 73
78 37+128.52 37+376.26 247.74 3.1 0.07 0.077 Alcantarilla TMC 74
79 37+376.26 37+620.25 243.99 3.1 0.06 0.076 Alcantarilla TMC 75
80 37+620.25 38+114.96 494.71 3.1 0.06 0.153 Alcantarilla TMC 76
81 38+114.96 38+376.91 261.95 3.1 0.06 0.081 Alcantarilla TMC 77
82 38+376.91 38+544.83 167.92 3.1 0.06 0.052 Alcantarilla TMC 78
83 38+544.83 38+669.72 124.89 3.1 0.06 0.039 Alcantarilla TMC 79
84 38+669.72 38+950.24 280.52 3.1 0.06 0.087 Alcantarilla TMC 80
85 38+950.24 39+120.69 170.45 3.1 0.06 0.053 Alcantarilla TMC 81
86 39+120.69 39+479.33 358.64 3.1 0.03 0.111 Alcantarilla TMC 82
87 39+479.33 39+646.96 167.63 3.1 0.06 0.052 Alcantarilla TMC 83
88 39+646.96 39+714.91 67.95 3.1 0.02 0.021 Alcantarilla TMC 84
89 39+714.91 40+037.01 322.10 3.1 0.06 0.100 Alcantarilla TMC 85
90 40+037.01 40+369.13 332.12 3.1 0.04 0.103 Alcantarilla TMC 86
91 40+369.13 40+741.85 372.72 3.1 0.04 0.116 Alcantarilla TMC 87
92 40+741.85 41+058.64 316.79 3.1 0.04 0.098 Alcantarilla TMC 88
93 41+058.64 41+279.32 220.68 3.1 0.05 0.068 Alcantarilla TMC 89
94 41+279.32 41+512.39 233.07 3.1 0.06 0.072 Alcantarilla TMC 90
95 41+512.39 41+810.44 298.05 3.1 0.06 0.092 Alcantarilla TMC 91
96 41+810.44 42+038.58 228.14 3.1 0.05 0.071 Alcantarilla TMC 92
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN
IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO –
CAJAMARCA”
PARÁMETROS GEOMORFOLÓGICOS
TRAMO ÁREA
N° Tramo LONGIT ANCHO PENDIEN
TRIB. Observaciones
de Cuneta Inicia Termina UD (m) (m) TE (S)
(Ha)
97 42+038.58 42+246.20 207.62 3.1 0.07 0.064 Alcantarilla TMC 93
98 42+246.20 42+363.03 116.83 3.1 0.07 0.036 Alcantarilla TMC 94
99 42+363.03 42+554.26 191.23 3.1 0.07 0.059 Alcantarilla TMC 95
100 42+554.26 42+864.50 310.24 3.1 0.07 0.096 Alcantarilla TMC 96
101 42+864.50 43+058.82 194.32 3.1 0.07 0.060 Baden 01
102 43+058.82 43+158.06 99.24 3.1 0.07 0.031 Baden 02
103 43+158.06 43+378.01 219.95 3.1 0.05 0.068 Alcantarilla TMC 97
104 43+378.01 43+582.65 204.64 3.1 0.06 0.063 Alcantarilla TMC 98
105 43+582.65 43+791.15 208.50 3.1 0.06 0.065 Alcantarilla TMC 99
106 43+791.15 43+989.21 198.06 3.1 0.07 0.061 Alcantarilla TMC 100
107 43+989.21 44+131.93 142.72 3.1 0.03 0.044 Alcantarilla TMC 101
108 44+131.93 44+263.67 131.74 3.1 0.00 0.041 Alcantarilla TMC 102
109 44+263.67 44+364.80 101.13 3.1 0.05 0.031 Alcantarilla TMC 103
110 44+364.80 44+658.43 293.63 3.1 0.05 0.091 Alcantarilla TMC 104
111 44+658.43 44+885.03 226.60 3.1 0.08 0.070 Alcantarilla TMC 105
112 44+885.03 45+329.12 444.09 3.1 0.07 0.138 Alcantarilla TMC 106
113 45+329.12 45+355.69 26.57 3.1 0.08 0.008 Alcantarilla TMC 107
114 45+355.69 45+593.48 237.79 3.1 0.07 0.074 Alcantarilla TMC 108
115 45+593.48 45+817.19 223.71 3.1 0.07 0.069 Alcantarilla TMC 109
116 45+817.19 46+135.05 317.86 3.1 0.07 0.099 Alcantarilla TMC 110
117 46+135.05 46+495.85 360.80 3.1 0.07 0.112 Alcantarilla TMC 111
118 46+495.85 46+621.39 125.54 3.1 0.08 0.039 Alcantarilla TMC 112
119 46+621.39 46+860.48 239.09 3.1 0.08 0.074 Alcantarilla TMC 113
120 46+860.48 46+968.81 108.33 3.1 0.06 0.034 Alcantarilla TMC 114
121 46+968.81 47+151.22 182.41 3.1 0.06 0.057 Alcantarilla TMC 115
122 47+151.22 47+441.36 290.14 3.1 0.06 0.090 Baden 03
123 47+441.36 47+561.93 120.57 3.1 0.06 0.037 Alcantarilla TMC 116
124 47+561.93 47+841.76 279.83 3.1 0.06 0.087 Baden 04
125 47+841.76 48+049.33 207.57 3.1 0.05 0.064 Alcantarilla TMC 117
126 48+049.33 48+315.43 266.10 3.1 0.02 0.082 Alcantarilla TMC 118
127 48+315.43 48+452.37 136.94 3.1 0.05 0.042 Alcantarilla TMC 119
128 48+452.37 48+701.99 249.62 3.1 0.07 0.077 Alcantarilla TMC 120
129 48+701.99 49+043.20 341.21 3.1 0.07 0.106 Alcantarilla TMC 121
130 49+043.20 49+252.11 208.91 3.1 0.06 0.065 Alcantarilla TMC 122
131 49+252.11 49+314.68 62.57 3.1 0.06 0.019 Alcantarilla TMC 123
132 49+314.68 49+556.01 241.33 3.1 0.08 0.075 Alcantarilla TMC 124
133 49+556.01 49+702.20 146.19 3.1 0.07 0.045 Alcantarilla TMC 125
134 49+702.20 49+984.11 281.91 3.1 0.07 0.087 Alcantarilla TMC 126
135 49+984.11 50+152.90 168.79 3.1 0.06 0.052 Alcantarilla TMC 127
136 50+152.90 50+377.90 225.00 3.1 0.06 0.070 Alcantarilla TMC 128
137 50+377.90 50+463.00 85.10 4.1 0.06 0.035 Alcantarilla TMC 129
Total 29641
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Area Desnivel Longitud Pendiente Tiempo de Concentración (Tc), PREC MÁX. Intensidad Max. Caudal
PROGRESIVA METODO DE KIRPICH (mm).
N° DE OBRA Estructura a del cauce mm/hora Máximo
DE DIST.
DE ARTE Proyectar
UBICACIÓN LogGUMBE
L
A (km2) H (m) L (m) S (m/m) minutos Adop* (min) MET. USS (m3/s)
1 20+736.49 Alcantarilla TMC 01 0.007 44.19 140.00 0.32 1.37 10.00 73.74 81.57 0.07
2 20+950.45 Alcantarilla TMC 02 0.000 4.27 68.00 0.06 1.46 10.00 73.74 81.57 0.00
3 21+247.21 Alcantarilla TMC 03 0.005 35.05 76.00 0.46 0.74 10.00 73.74 81.57 0.05
4 21+477.20 Alcantarilla TMC 04 0.000 39.49 100.00 0.39 0.97 10.00 73.74 81.57 0.00
5 21+661.44 Alcantarilla TMC 05 0.000 49.00 94.50 0.52 0.83 10.00 73.74 81.57 0.00
6 21+811.76 Alcantarilla TMC 06 0.000 48.66 141.23 0.34 1.33 10.00 73.74 81.57 0.00
7 21+995.00 Alcantarilla TMC 07 0.026 83.38 300.00 0.28 2.58 10.00 73.74 81.57 0.26
8 22+238.23 Alcantarilla TMC 08 0.026 105.71 450.20 0.23 3.76 10.00 73.74 81.57 0.26
9 22+256.31 Alcantarilla TMC 09 0.036 54.75 265.24 0.21 2.63 10.00 73.74 81.57 0.36
10 22+614.40 Alcantarilla TMC 10 0.000 39.23 177.53 0.22 1.88 10.00 73.74 81.57 0.00
11 22+952.54 Alcantarilla TMC 11 0.018 38.36 190.25 0.20 2.06 10.00 73.74 81.57 0.18
12 23+129.31 Alcantarilla TMC 12 0.000 14.31 61.25 0.23 0.81 10.00 73.74 81.57 0.00
13 23+377.16 Alcantarilla TMC 13 0.003 10.58 40.23 0.26 0.56 10.00 73.74 81.57 0.03
14 23+766.00 Alcantarilla TMC 14 0.002 40.71 170.25 0.24 1.77 10.00 73.74 81.57 0.02
15 24+001.02 Alcantarilla TMC 15 0.000 42.68 112.24 0.38 1.07 10.00 73.74 81.57 0.00
16 24+597.48 Alcantarilla TMC 16 0.005 68.36 169.57 0.40 1.44 10.00 73.74 81.57 0.05
17 24+812.87 Alcantarilla TMC 17 0.000 97.03 217.12 0.45 1.67 10.00 73.74 81.57 0.00
18 24+896.22 Alcantarilla TMC 18 0.000 60.39 190.25 0.32 1.73 10.00 73.74 81.57 0.00
19 25+073.16 Alcantarilla TMC 19 0.000 51.90 191.26 0.27 1.84 10.00 73.74 81.57 0.00
20 25+147.84 Alcantarilla TMC 20 0.000 42.30 165.24 0.26 1.68 10.00 73.74 81.57 0.00
21 25+274.71 Alcantarilla TMC 21 0.000 28.65 145.69 0.20 1.69 10.00 73.74 81.57 0.00
22 25+658.61 Alcantarilla TMC 22 0.008 101.11 240.57 0.42 1.86 10.00 73.74 81.57 0.08
23 25+781.69 Muro Alcantarilla 01 0.008 72.93 200.52 0.36 1.71 10.00 73.74 81.57 0.08
24 26+061.87 Alcantarilla TMC 23 0.005 52.92 195.02 0.27 1.87 10.00 73.74 81.57 0.05
25 26+098.06 Alcantarilla TMC 24 0.000 55.72 200.12 0.28 1.89 10.00 73.74 81.57 0.00
26 26+324.62 Alcantarilla TMC 25 0.004 26.17 100.24 0.26 1.14 10.00 73.74 81.57 0.04
27 26+432.20 Alcantarilla TMC 26 0.002 9.86 65.24 0.15 1.01 10.00 73.74 81.57 0.02
28 26+544.99 Alcantarilla TMC 27 0.000 13.50 93.54 0.14 1.35 10.00 73.74 81.57 0.00
29 26+651.61 Alcantarilla TMC 28 0.000 42.27 126.53 0.33 1.24 10.00 73.74 81.57 0.00
30 26+891.23 Alcantarilla TMC 29 0.014 65.80 140.26 0.47 1.17 10.00 73.74 81.57 0.14
31 27+128.84 Alcantarilla TMC 30 0.000 38.47 104.52 0.37 1.03 10.00 73.74 81.57 0.00
32 27+446.81 Alcantarilla TMC 31 0.010 54.01 98.25 0.55 0.84 10.00 73.74 81.57 0.10
33 27+704.71 Alcantarilla TMC 32 0.005 64.56 155.13 0.42 1.33 10.00 73.74 81.57 0.05
34 27+791.51 Alcantarilla TMC 33 0.000 125.75 597.24 0.21 4.88 10.00 73.74 81.57 0.00
35 27+906.85 Alcantarilla TMC 34 0.064 96.89 465.24 0.21 4.04 10.00 73.74 81.57 0.64
36 28+159.66 Muro Alcantarilla 02 0.000 47.29 104.24 0.45 0.95 10.00 73.74 81.57 0.00
37 28+353.43 Alcantarilla TMC 35 0.000 49.31 133.26 0.37 1.24 10.00 73.74 81.57 0.00
38 28+421.87 Muro Alcantarilla 03 0.000 50.09 150.24 0.33 1.41 10.00 73.74 81.57 0.00
39 28+486.99 Alcantarilla TMC 36 0.004 54.18 89.24 0.61 0.75 10.00 73.74 81.57 0.04
40 28+560.30 Alcantarilla TMC 37 0.000 49.71 90.26 0.55 0.79 10.00 73.74 81.57 0.00
41 28+895.47 Alcantarilla TMC 38 0.000 50.01 110.24 0.45 0.99 10.00 73.74 81.57 0.00
42 29+290.20 Alcantarilla TMC 39 0.004 32.19 89.27 0.36 0.92 10.00 73.74 81.57 0.04
43 29+624.77 Alcantarilla TMC 40 0.000 5.91 49.27 0.12 0.89 10.00 73.74 81.57 0.00
44 29+972.42 Alcantarilla TMC 41 0.004 36.25 63.52 0.57 0.59 10.00 73.74 81.57 0.04
45 30+190.58 Muro Alcantarilla 04 0.005 67.22 158.24 0.42 1.34 10.00 73.74 81.57 0.05
46 30+375.49 Alcantarilla TMC 42 0.007 67.44 175.24 0.38 1.50 10.00 73.74 81.57 0.07
47 30+585.31 Alcantarilla TMC 43 0.003 52.79 193.27 0.27 1.85 10.00 73.74 81.57 0.03
48 30+769.80 Alcantarilla TMC 44 0.004 28.89 121.36 0.24 1.36 10.00 73.74 81.57 0.04
49 30+952.43 Alcantarilla TMC 45 0.010 21.82 115.24 0.19 1.43 10.00 73.74 81.57 0.10
50 31+135.47 Alcantarilla TMC 46 0.002 74.22 145.24 0.51 1.17 10.00 73.74 81.57 0.02
51 31+271.15 Alcantarilla TMC 47 0.003 28.39 98.81 0.29 1.08 10.00 73.74 81.57 0.03
52 31+376.92 Alcantarilla TMC 48 0.004 39.97 86.19 0.46 0.81 10.00 73.74 81.57 0.04
53 31+596.28 Alcantarilla TMC 49 0.000 25.43 83.85 0.30 0.93 10.00 73.74 81.57 0.00
54 31+925.56 Alcantarilla TMC 50 0.017 53.13 168.27 0.32 1.57 10.00 73.74 81.57 0.16
55 32+202.97 Alcantarilla TMC 51 0.004 60.33 142.37 0.42 1.24 10.00 73.74 81.57 0.04
56 32+356.24 Alcantarilla TMC 52 0.002 21.94 68.52 0.32 0.78 10.00 73.74 81.57 0.02
57 32+562.05 Alcantarilla TMC 53 0.001 34.30 83.10 0.41 0.82 10.00 73.74 81.57 0.01
58 32+900.39 Alcantarilla TMC 54 0.005 34.73 124.85 0.28 1.31 10.00 73.74 81.57 0.05
59 33+183.71 Alcantarilla TMC 55 0.000 29.00 102.57 0.28 1.12 10.00 73.74 81.57 0.00
60 33+382.63 Alcantarilla TMC 56 0.003 26.04 103.26 0.25 1.18 10.00 73.74 81.57 0.03
61 33+509.28 Alcantarilla TMC 57 0.000 30.01 145.57 0.21 1.66 10.00 73.74 81.57 0.00
62 33+596.61 Alcantarilla TMC 58 0.000 36.06 109.55 0.33 1.11 10.00 73.74 81.57 0.00
63 33+707.58 Alcantarilla TMC 59 0.057 28.00 206.54 0.14 2.55 10.00 73.74 81.57 0.57
64 33+807.48 Alcantarilla TMC 60 0.003 34.72 99.07 0.35 1.01 10.00 73.74 81.57 0.03
65 33+922.51 Alcantarilla TMC 61 0.000 5.17 81.07 0.06 1.66 10.00 73.74 81.57 0.00
66 34+226.45 Alcantarilla TMC 62 0.010 20.57 170.69 0.12 2.30 10.00 73.74 81.57 0.10
67 34+406.66 Alcantarilla TMC 63 0.013 12.97 223.57 0.06 3.76 10.00 73.74 81.57 0.13
68 34+621.41 Alcantarilla TMC 64 0.000 25.97 52.13 0.50 0.54 10.00 73.74 81.57 0.00
69 34+796.65 Alcantarilla TMC 65 0.004 20.13 52.37 0.38 0.59 10.00 73.74 81.57 0.04
70 34+883.73 Alcantarilla TMC 66 0.000 29.83 76.72 0.39 0.79 10.00 73.74 81.57 0.00
71 35+115.60 Alcantarilla TMC 67 0.000 12.38 73.27 0.17 1.06 10.00 73.74 81.57 0.00
72 35+499.30 Alcantarilla TMC 68 0.000 16.45 64.26 0.26 0.81 10.00 73.74 81.57 0.00
73 35+693.49 Alcantarilla TMC 69 0.000 33.69 69.27 0.49 0.67 10.00 73.74 81.57 0.00
74 36+071.99 Alcantarilla TMC 70 0.000 10.32 43.27 0.24 0.62 10.00 73.74 81.57 0.00
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Area Desnivel Longitud Pendiente Tiempo de Concentración (Tc), PREC MÁX. Intensidad Max. Caudal
PROGRESIVA METODO DE KIRPICH (mm).
N° DE OBRA Estructura a del cauce mm/hora Máximo
DE DIST.
DE ARTE Proyectar
UBICACIÓN LogGUMBE
L
A (km2) H (m) L (m) S (m/m) minutos Adop* (min) MET. USS (m3/s)
75 36+379.84 Alcantarilla TMC 71 0.000 28.54 71.64 0.40 0.75 10.00 73.74 81.57 0.00
76 36+672.23 Alcantarilla TMC 72 0.000 15.06 138.27 0.11 2.04 10.00 73.74 81.57 0.00
77 36+916.28 Alcantarilla TMC 73 0.000 26.84 102.59 0.26 1.16 10.00 73.74 81.57 0.00
78 37+128.52 Alcantarilla TMC 74 0.000 10.51 50.63 0.21 0.73 10.00 73.74 81.57 0.00
79 37+376.26 Alcantarilla TMC 75 0.006 8.25 64.27 0.13 1.06 10.00 73.74 81.57 0.06
80 37+620.25 Alcantarilla TMC 76 0.001 24.78 61.24 0.40 0.66 10.00 73.74 81.57 0.01
81 38+114.96 Alcantarilla TMC 77 0.000 62.45 113.24 0.55 0.94 10.00 73.74 81.57 0.00
82 38+376.91 Alcantarilla TMC 78 0.002 28.60 76.24 0.38 0.80 10.00 73.74 81.57 0.02
83 38+544.83 Alcantarilla TMC 79 0.001 36.71 92.00 0.40 0.90 10.00 73.74 81.57 0.01
84 38+669.72 Alcantarilla TMC 80 0.005 28.31 129.70 0.22 1.48 10.00 73.74 81.57 0.05
85 38+950.24 Alcantarilla TMC 81 0.002 25.38 86.17 0.29 0.97 10.00 73.74 81.57 0.02
86 39+120.69 Alcantarilla TMC 82 0.000 27.44 86.40 0.32 0.94 10.00 73.74 81.57 0.00
87 39+479.33 Alcantarilla TMC 83 0.000 30.61 54.74 0.56 0.53 10.00 73.74 81.57 0.00
88 39+646.96 Alcantarilla TMC 84 0.000 71.53 108.14 0.66 0.84 10.00 73.74 81.57 0.00
89 39+714.91 Alcantarilla TMC 85 0.002 44.00 92.70 0.47 0.85 10.00 73.74 81.57 0.02
90 40+037.01 Alcantarilla TMC 86 0.000 43.84 77.97 0.56 0.70 10.00 73.74 81.57 0.00
91 40+369.13 Alcantarilla TMC 87 0.003 49.21 109.24 0.45 0.98 10.00 73.74 81.57 0.03
92 40+741.85 Alcantarilla TMC 88 0.002 69.81 113.27 0.62 0.90 10.00 73.74 81.57 0.02
93 41+058.64 Alcantarilla TMC 89 0.000 45.97 71.10 0.65 0.61 10.00 73.74 81.57 0.00
94 41+279.32 Alcantarilla TMC 90 0.002 48.99 152.02 0.32 1.44 10.00 73.74 81.57 0.02
95 41+512.39 Alcantarilla TMC 91 0.002 20.54 97.84 0.21 1.21 10.00 73.74 81.57 0.02
96 41+810.44 Alcantarilla TMC 92 0.000 80.27 111.43 0.72 0.83 10.00 73.74 81.57 0.00
97 42+038.58 Alcantarilla TMC 93 0.000 56.61 120.33 0.47 1.04 10.00 73.74 81.57 0.00
98 42+246.20 Alcantarilla TMC 94 0.006 47.12 187.24 0.25 1.86 10.00 73.74 81.57 0.06
99 42+363.03 Alcantarilla TMC 95 0.000 84.04 122.45 0.69 0.91 10.00 73.74 81.57 0.00
100 42+554.26 Alcantarilla TMC 96 0.013 69.90 132.37 0.53 1.07 10.00 73.74 81.57 0.13
101 42+864.50 Baden 01 0.000 71.90 134.97 0.53 1.09 10.00 73.74 81.57 0.00
102 43+058.82 Baden 02 0.000 37.48 62.83 0.60 0.58 10.00 73.74 81.57 0.00
103 43+158.06 Alcantarilla TMC 97 0.000 50.57 126.60 0.40 1.15 10.00 73.74 81.57 0.00
104 43+378.01 Alcantarilla TMC 98 0.016 53.79 130.96 0.41 1.17 10.00 73.74 81.57 0.16
105 43+582.65 Alcantarilla TMC 99 0.000 40.86 90.24 0.45 0.85 10.00 73.74 81.57 0.00
106 43+791.15 Alcantarilla TMC 100 0.000 43.06 107.75 0.40 1.02 10.00 73.74 81.57 0.00
107 43+989.21 Alcantarilla TMC 101 0.000 54.48 101.86 0.53 0.87 10.00 73.74 81.57 0.00
108 44+131.93 Alcantarilla TMC 102 0.006 77.84 95.01 0.82 0.70 10.00 73.74 81.57 0.06
109 44+263.67 Alcantarilla TMC 103 0.000 37.03 98.59 0.38 0.97 10.00 73.74 81.57 0.00
110 44+364.80 Alcantarilla TMC 104 0.000 62.14 129.54 0.48 1.09 10.00 73.74 81.57 0.00
111 44+658.43 Alcantarilla TMC 105 0.000 53.90 138.26 0.39 1.25 10.00 73.74 81.57 0.00
112 44+885.03 Alcantarilla TMC 106 0.004 30.37 91.46 0.33 0.96 10.00 73.74 81.57 0.04
113 45+329.12 Alcantarilla TMC 107 0.006 23.37 126.53 0.18 1.55 10.00 73.74 81.57 0.06
114 45+355.69 Alcantarilla TMC 108 0.000 43.67 118.25 0.37 1.13 10.00 73.74 81.57 0.00
115 45+593.48 Alcantarilla TMC 109 0.000 63.93 133.27 0.48 1.12 10.00 73.74 81.57 0.00
116 45+817.19 Alcantarilla TMC 110 0.000 72.74 106.54 0.68 0.82 10.00 73.74 81.57 0.00
117 46+135.05 Alcantarilla TMC 111 0.000 84.45 95.85 0.88 0.69 10.00 73.74 81.57 0.00
118 46+495.85 Alcantarilla TMC 112 0.000 55.72 90.46 0.62 0.75 10.00 73.74 81.57 0.00
119 46+621.39 Alcantarilla TMC 113 0.000 77.79 123.56 0.63 0.95 10.00 73.74 81.57 0.00
120 46+860.48 Alcantarilla TMC 114 0.000 57.27 107.46 0.53 0.91 10.00 73.74 81.57 0.00
121 46+968.81 Alcantarilla TMC 115 0.008 58.69 201.24 0.29 1.86 10.00 73.74 81.57 0.08
122 47+151.22 Baden 03 0.000 60.24 136.24 0.44 1.17 10.00 73.74 81.57 0.00
123 47+441.36 Alcantarilla TMC 116 0.010 36.53 175.24 0.21 1.90 10.00 73.74 81.57 0.10
124 47+561.93 Baden 04 0.000 67.60 146.24 0.46 1.22 10.00 73.74 81.57 0.00
125 47+841.76 Alcantarilla TMC 117 0.000 83.70 145.68 0.57 1.12 10.00 73.74 81.57 0.00
126 48+049.33 Alcantarilla TMC 118 0.000 23.42 55.65 0.42 0.60 10.00 73.74 81.57 0.00
127 48+315.43 Alcantarilla TMC 119 0.008 51.71 135.24 0.38 1.24 10.00 73.74 81.57 0.08
128 48+452.37 Alcantarilla TMC 120 0.000 39.73 136.56 0.29 1.38 10.00 73.74 81.57 0.00
129 48+701.99 Alcantarilla TMC 121 0.044 17.44 198.54 0.09 2.92 10.00 73.74 81.57 0.44
130 49+043.20 Alcantarilla TMC 122 0.000 53.76 210.56 0.26 2.03 10.00 73.74 81.57 0.00
131 49+252.11 Alcantarilla TMC 123 0.008 22.49 84.59 0.27 0.99 10.00 73.74 81.57 0.08
132 49+314.68 Alcantarilla TMC 124 0.000 46.09 127.46 0.36 1.21 10.00 73.74 81.57 0.00
133 49+556.01 Alcantarilla TMC 125 0.000 63.46 126.54 0.50 1.06 10.00 73.74 81.57 0.00
134 49+702.20 Alcantarilla TMC 126 0.000 47.32 125.37 0.38 1.17 10.00 73.74 81.57 0.00
135 49+984.11 Alcantarilla TMC 127 0.032 44.73 243.53 0.18 2.58 10.00 73.74 81.57 0.32
136 50+152.90 Alcantarilla TMC 128 0.000 44.50 163.21 0.27 1.63 10.00 73.74 81.57 0.00
137 50+377.90 Alcantarilla TMC 129 0.000 44.73 152.56 0.29 1.50 10.00 73.74 81.57 0.00
(*) Se considera 10 minutos como mínimo el Tiempo de Concentración -Tc
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO –
RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Desnivel Tiempo de
PREC MÁX.
Concentración Intensidad
Longitud (mm). Caudal
Estructura a Area A Pendiente (Tc), METODO Max.
Ubicación H (m) del cauce DIST. Máximo
Proyectar (km2) S (m/m) DE KIRPICH (mm/hora)
L (m) LogGUMBE (m3/s)
MET. USS
minutosAdop* (min) L
1 20+736.49 Alcantarilla TMC 01 0.01 44.19 140.00 0.32 1.37 10.00 87.55 96.84 0.08
2 20+950.45 Alcantarilla TMC 02 0.00 4.27 68.00 0.06 1.46 10.00 87.55 96.84 0.00
3 21+247.21 Alcantarilla TMC 03 0.01 35.05 76.00 0.46 0.74 10.00 87.55 96.84 0.06
4 21+477.20 Alcantarilla TMC 04 0.00 39.49 100.00 0.39 0.97 10.00 87.55 96.84 0.00
5 21+661.44 Alcantarilla TMC 05 0.00 49.00 94.50 0.52 0.83 10.00 87.55 96.84 0.00
6 21+811.76 Alcantarilla TMC 06 0.00 48.66 141.23 0.34 1.33 10.00 87.55 96.84 0.00
7 21+995.00 Alcantarilla TMC 07 0.03 83.38 300.00 0.28 2.58 10.00 87.55 96.84 0.33
8 22+238.23 Alcantarilla TMC 08 0.03 105.71 450.20 0.23 3.76 10.00 87.55 96.84 0.33
9 22+256.31 Alcantarilla TMC 09 0.04 54.75 265.24 0.21 2.63 10.00 87.55 96.84 0.44
10 22+614.40 Alcantarilla TMC 10 0.00 39.23 177.53 0.22 1.88 10.00 87.55 96.84 0.00
11 22+952.54 Alcantarilla TMC 11 0.02 38.36 190.25 0.20 2.06 10.00 87.55 96.84 0.22
12 23+129.31 Alcantarilla TMC 12 0.00 14.31 61.25 0.23 0.81 10.00 87.55 96.84 0.00
13 23+377.16 Alcantarilla TMC 13 0.00 10.58 40.23 0.26 0.56 10.00 87.55 96.84 0.03
14 23+766.00 Alcantarilla TMC 14 0.00 40.71 170.25 0.24 1.77 10.00 87.55 96.84 0.03
15 24+001.02 Alcantarilla TMC 15 0.00 42.68 112.24 0.38 1.07 10.00 87.55 96.84 0.00
16 24+597.48 Alcantarilla TMC 16 0.01 68.36 169.57 0.40 1.44 10.00 87.55 96.84 0.06
17 24+812.87 Alcantarilla TMC 17 0.00 97.03 217.12 0.45 1.67 10.00 87.55 96.84 0.00
18 24+896.22 Alcantarilla TMC 18 0.00 60.39 190.25 0.32 1.73 10.00 87.55 96.84 0.00
19 25+073.16 Alcantarilla TMC 19 0.00 51.90 191.26 0.27 1.84 10.00 87.55 96.84 0.00
20 25+147.84 Alcantarilla TMC 20 0.00 42.30 165.24 0.26 1.68 10.00 87.55 96.84 0.00
21 25+274.71 Alcantarilla TMC 21 0.00 28.65 145.69 0.20 1.69 10.00 87.55 96.84 0.00
22 25+658.61 Alcantarilla TMC 22 0.01 101.11 240.57 0.42 1.86 10.00 87.55 96.84 0.10
23 25+781.69 Muro Alcantarilla 01 0.01 72.93 200.52 0.36 1.71 10.00 87.55 96.84 0.10
24 26+061.87 Alcantarilla TMC 23 0.01 52.92 195.02 0.27 1.87 10.00 87.55 96.84 0.06
25 26+098.06 Alcantarilla TMC 24 0.00 55.72 200.12 0.28 1.89 10.00 87.55 96.84 0.00
26 26+324.62 Alcantarilla TMC 25 0.00 26.17 100.24 0.26 1.14 10.00 87.55 96.84 0.05
27 26+432.20 Alcantarilla TMC 26 0.00 9.86 65.24 0.15 1.01 10.00 87.55 96.84 0.03
28 26+544.99 Alcantarilla TMC 27 0.00 13.50 93.54 0.14 1.35 10.00 87.55 96.84 0.00
29 26+651.61 Alcantarilla TMC 28 0.00 42.27 126.53 0.33 1.24 10.00 87.55 96.84 0.00
30 26+891.23 Alcantarilla TMC 29 0.01 65.80 140.26 0.47 1.17 10.00 87.55 96.84 0.18
31 27+128.84 Alcantarilla TMC 30 0.00 38.47 104.52 0.37 1.03 10.00 87.55 96.84 0.00
32 27+446.81 Alcantarilla TMC 31 0.01 54.01 98.25 0.55 0.84 10.00 87.55 96.84 0.12
33 27+704.71 Alcantarilla TMC 32 0.01 64.56 155.13 0.42 1.33 10.00 87.55 96.84 0.06
34 27+791.51 Alcantarilla TMC 33 0.00 125.75 597.24 0.21 4.88 10.00 87.55 96.84 0.00
35 27+906.85 Alcantarilla TMC 34 0.06 96.89 465.24 0.21 4.04 10.00 87.55 96.84 0.79
36 28+159.66 Muro Alcantarilla 02 0.00 47.29 104.24 0.45 0.95 10.00 87.55 96.84 0.00
37 28+353.43 Alcantarilla TMC 35 0.00 49.31 133.26 0.37 1.24 10.00 87.55 96.84 0.00
38 28+421.87 Muro Alcantarilla 03 0.00 50.09 150.24 0.33 1.41 10.00 87.55 96.84 0.00
39 28+486.99 Alcantarilla TMC 36 0.00 54.18 89.24 0.61 0.75 10.00 87.55 96.84 0.05
40 28+560.30 Alcantarilla TMC 37 0.00 49.71 90.26 0.55 0.79 10.00 87.55 96.84 0.00
41 28+895.47 Alcantarilla TMC 38 0.00 50.01 110.24 0.45 0.99 10.00 87.55 96.84 0.00
42 29+290.20 Alcantarilla TMC 39 0.00 32.19 89.27 0.36 0.92 10.00 87.55 96.84 0.05
43 29+624.77 Alcantarilla TMC 40 0.00 5.91 49.27 0.12 0.89 10.00 87.55 96.84 0.00
44 29+972.42 Alcantarilla TMC 41 0.00 36.25 63.52 0.57 0.59 10.00 87.55 96.84 0.04
45 30+190.58 Muro Alcantarilla 04 0.01 67.22 158.24 0.42 1.34 10.00 87.55 96.84 0.06
46 30+375.49 Alcantarilla TMC 42 0.01 67.44 175.24 0.38 1.50 10.00 87.55 96.84 0.09
47 30+585.31 Alcantarilla TMC 43 0.00 52.79 193.27 0.27 1.85 10.00 87.55 96.84 0.03
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO –
RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Desnivel Tiempo de
Concentración PREC MÁX. Intensidad
Longitud (mm). Caudal
Estructura a Area A Pendiente (Tc), METODO Max.
Ubicación H (m) del cauce DE KIRPICH DIST. Máximo
Proyectar (km2) S (m/m) (mm/hora)
L (m) LogGUMBE (m3/s)
MET. USS
minutosAdop* (min) L
48 30+769.80 Alcantarilla TMC 44 0.00 28.89 121.36 0.24 1.36 10.00 87.55 96.84 0.05
49 30+952.43 Alcantarilla TMC 45 0.01 21.82 115.24 0.19 1.43 10.00 87.55 96.84 0.13
50 31+135.47 Alcantarilla TMC 46 0.00 74.22 145.24 0.51 1.17 10.00 87.55 96.84 0.03
51 31+271.15 Alcantarilla TMC 47 0.00 28.39 98.81 0.29 1.08 10.00 87.55 96.84 0.03
52 31+376.92 Alcantarilla TMC 48 0.00 39.97 86.19 0.46 0.81 10.00 87.55 96.84 0.05
53 31+596.28 Alcantarilla TMC 49 0.00 25.43 83.85 0.30 0.93 10.00 87.55 96.84 0.00
54 31+925.56 Alcantarilla TMC 50 0.02 53.13 168.27 0.32 1.57 10.00 87.55 96.84 0.20
55 32+202.97 Alcantarilla TMC 51 0.00 60.33 142.37 0.42 1.24 10.00 87.55 96.84 0.05
56 32+356.24 Alcantarilla TMC 52 0.00 21.94 68.52 0.32 0.78 10.00 87.55 96.84 0.03
57 32+562.05 Alcantarilla TMC 53 0.00 34.30 83.10 0.41 0.82 10.00 87.55 96.84 0.02
58 32+900.39 Alcantarilla TMC 54 0.00 34.73 124.85 0.28 1.31 10.00 87.55 96.84 0.06
59 33+183.71 Alcantarilla TMC 55 0.00 29.00 102.57 0.28 1.12 10.00 87.55 96.84 0.00
60 33+382.63 Alcantarilla TMC 56 0.00 26.04 103.26 0.25 1.18 10.00 87.55 96.84 0.03
61 33+509.28 Alcantarilla TMC 57 0.00 30.01 145.57 0.21 1.66 10.00 87.55 96.84 0.00
62 33+596.61 Alcantarilla TMC 58 0.00 36.06 109.55 0.33 1.11 10.00 87.55 96.84 0.00
63 33+707.58 Alcantarilla TMC 59 0.06 28.00 206.54 0.14 2.55 10.00 87.55 96.84 0.71
64 33+807.48 Alcantarilla TMC 60 0.00 34.72 99.07 0.35 1.01 10.00 87.55 96.84 0.04
65 33+922.51 Alcantarilla TMC 61 0.00 5.17 81.07 0.06 1.66 10.00 87.55 96.84 0.00
66 34+226.45 Alcantarilla TMC 62 0.01 20.57 170.69 0.12 2.30 10.00 87.55 96.84 0.17
67 34+406.66 Alcantarilla TMC 63 0.01 12.97 223.57 0.06 3.76 10.00 87.55 96.84 0.17
68 34+621.41 Alcantarilla TMC 64 0.00 25.97 52.13 0.50 0.54 10.00 87.55 96.84 0.00
69 34+796.65 Alcantarilla TMC 65 0.00 20.13 52.37 0.38 0.59 10.00 87.55 96.84 0.05
70 34+883.73 Alcantarilla TMC 66 0.00 29.83 76.72 0.39 0.79 10.00 87.55 96.84 0.00
71 35+115.60 Alcantarilla TMC 67 0.00 12.38 73.27 0.17 1.06 10.00 87.55 96.84 0.00
72 35+499.30 Alcantarilla TMC 68 0.00 16.45 64.26 0.26 0.81 10.00 87.55 96.84 0.00
73 35+693.49 Alcantarilla TMC 69 0.00 33.69 69.27 0.49 0.67 10.00 87.55 96.84 0.00
74 36+071.99 Alcantarilla TMC 70 0.00 10.32 43.27 0.24 0.62 10.00 87.55 96.84 0.00
75 36+379.84 Alcantarilla TMC 71 0.00 28.54 71.64 0.40 0.75 10.00 87.55 96.84 0.00
76 36+672.23 Alcantarilla TMC 72 0.00 15.06 138.27 0.11 2.04 10.00 87.55 96.84 0.00
77 36+916.28 Alcantarilla TMC 73 0.00 26.84 102.59 0.26 1.16 10.00 87.55 96.84 0.00
78 37+128.52 Alcantarilla TMC 74 0.00 10.51 50.63 0.21 0.73 10.00 87.55 96.84 0.00
79 37+376.26 Alcantarilla TMC 75 0.01 8.25 64.27 0.13 1.06 10.00 87.55 96.84 0.08
80 37+620.25 Alcantarilla TMC 76 0.00 24.78 61.24 0.40 0.66 10.00 87.55 96.84 0.02
81 38+114.96 Alcantarilla TMC 77 0.00 62.45 113.24 0.55 0.94 10.00 87.55 96.84 0.00
82 38+376.91 Alcantarilla TMC 78 0.00 28.60 76.24 0.38 0.80 10.00 87.55 96.84 0.02
83 38+544.83 Alcantarilla TMC 79 0.00 36.71 92.00 0.40 0.90 10.00 87.55 96.84 0.02
84 38+669.72 Alcantarilla TMC 80 0.00 28.31 129.70 0.22 1.48 10.00 87.55 96.84 0.06
85 38+950.24 Alcantarilla TMC 81 0.00 25.38 86.17 0.29 0.97 10.00 87.55 96.84 0.03
86 39+120.69 Alcantarilla TMC 82 0.00 27.44 86.40 0.32 0.94 10.00 87.55 96.84 0.00
87 39+479.33 Alcantarilla TMC 83 0.00 30.61 54.74 0.56 0.53 10.00 87.55 96.84 0.00
88 39+646.96 Alcantarilla TMC 84 0.00 71.53 108.14 0.66 0.84 10.00 87.55 96.84 0.00
89 39+714.91 Alcantarilla TMC 85 0.00 44.00 92.70 0.47 0.85 10.00 87.55 96.84 0.03
90 40+037.01 Alcantarilla TMC 86 0.00 43.84 77.97 0.56 0.70 10.00 87.55 96.84 0.00
91 40+369.13 Alcantarilla TMC 87 0.00 34.26 94.95 0.36 0.96 10.00 87.55 96.84 0.00
93 40+741.85 Alcantarilla TMC 88 0.00 69.81 113.27 0.62 0.90 10.00 87.55 96.84 0.03
94 41+058.64 Alcantarilla TMC 89 0.00 45.97 71.10 0.65 0.61 10.00 87.55 96.84 0.00
95 41+279.32 Alcantarilla TMC 90 0.00 48.99 152.02 0.32 1.44 10.00 87.55 96.84 0.02
96 41+512.39 Alcantarilla TMC 91 0.00 20.54 97.84 0.21 1.21 10.00 87.55 96.84 0.02
97 41+810.44 Alcantarilla TMC 92 0.00 80.27 111.43 0.72 0.83 10.00 87.55 96.84 0.00
98 42+038.58 Alcantarilla TMC 93 0.00 56.61 120.33 0.47 1.04 10.00 87.55 96.84 0.00
99 42+246.20 Alcantarilla TMC 94 0.01 47.12 187.24 0.25 1.86 10.00 87.55 96.84 0.07
100 42+363.03 Alcantarilla TMC 95 0.00 84.04 122.45 0.69 0.91 10.00 87.55 96.84 0.00
101 42+554.26 Alcantarilla TMC 96 0.01 69.90 132.37 0.53 1.07 10.00 87.55 96.84 0.16
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO –
RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Desnivel Tiempo de
Concentración PREC MÁX. Intensidad
Longitud (mm). Caudal
Estructura a Area A Pendiente (Tc), METODO Max.
Ubicación H (m) del cauce DE KIRPICH DIST. Máximo
Proyectar (km2) S (m/m) (mm/hora)
L (m) LogGUMBE (m3/s)
MET. USS
minutosAdop* (min) L
102 42+864.50 Baden 01 0.00 71.90 134.97 0.53 1.09 10.00 87.55 96.84 0.00
103 43+058.82 Baden 02 0.00 37.48 62.83 0.60 0.58 10.00 87.55 96.84 0.00
104 43+158.06 Alcantarilla TMC 97 0.00 50.57 126.60 0.40 1.15 10.00 87.55 96.84 0.00
105 43+378.01 Alcantarilla TMC 98 0.02 53.79 130.96 0.41 1.17 10.00 87.55 96.84 0.20
106 43+582.65 Alcantarilla TMC 99 0.00 40.86 90.24 0.45 0.85 10.00 87.55 96.84 0.00
107 43+791.15 Alcantarilla TMC 100 0.00 43.06 107.75 0.40 1.02 10.00 87.55 96.84 0.00
108 43+989.21 Alcantarilla TMC 101 0.00 54.48 101.86 0.53 0.87 10.00 87.55 96.84 0.00
109 44+131.93 Alcantarilla TMC 102 0.01 77.84 95.01 0.82 0.70 10.00 87.55 96.84 0.08
110 44+263.67 Alcantarilla TMC 103 0.00 37.03 98.59 0.38 0.97 10.00 87.55 96.84 0.00
111 44+364.80 Alcantarilla TMC 104 0.00 62.14 129.54 0.48 1.09 10.00 87.55 96.84 0.00
112 44+658.43 Alcantarilla TMC 105 0.00 53.90 138.26 0.39 1.25 10.00 87.55 96.84 0.00
113 44+885.03 Alcantarilla TMC 106 0.00 30.37 91.46 0.33 0.96 10.00 87.55 96.84 0.05
114 45+329.12 Alcantarilla TMC 107 0.01 23.37 126.53 0.18 1.55 10.00 87.55 96.84 0.07
115 45+355.69 Alcantarilla TMC 108 0.00 43.67 118.25 0.37 1.13 10.00 87.55 96.84 0.00
116 45+593.48 Alcantarilla TMC 109 0.00 63.93 133.27 0.48 1.12 10.00 87.55 96.84 0.00
117 45+817.19 Alcantarilla TMC 110 0.00 72.74 106.54 0.68 0.82 10.00 87.55 96.84 0.00
118 46+135.05 Alcantarilla TMC 111 0.00 84.45 95.85 0.88 0.69 10.00 87.55 96.84 0.00
119 46+495.85 Alcantarilla TMC 112 0.00 55.72 90.46 0.62 0.75 10.00 87.55 96.84 0.00
120 46+621.39 Alcantarilla TMC 113 0.00 77.79 123.56 0.63 0.95 10.00 87.55 96.84 0.00
121 46+860.48 Alcantarilla TMC 114 0.00 57.27 107.46 0.53 0.91 10.00 87.55 96.84 0.00
122 46+968.81 Alcantarilla TMC 115 0.01 58.69 201.24 0.29 1.86 10.00 87.55 96.84 0.10
123 47+151.22 Baden 03 0.00 60.24 136.24 0.44 1.17 10.00 87.55 96.84 0.00
124 47+441.36 Alcantarilla TMC 116 0.01 36.53 175.24 0.21 1.90 10.00 87.55 96.84 0.12
125 47+561.93 Baden 04 0.00 67.60 146.24 0.46 1.22 10.00 87.55 96.84 0.00
126 47+841.76 Alcantarilla TMC 117 0.00 83.70 145.68 0.57 1.12 10.00 87.55 96.84 0.00
127 48+049.33 Alcantarilla TMC 118 0.00 23.42 55.65 0.42 0.60 10.00 87.55 96.84 0.00
128 48+315.43 Alcantarilla TMC 119 0.01 51.71 135.24 0.38 1.24 10.00 87.55 96.84 0.10
129 48+452.37 Alcantarilla TMC 120 0.00 39.73 136.56 0.29 1.38 10.00 87.55 96.84 0.00
130 48+701.99 Alcantarilla TMC 121 0.06 17.44 198.54 0.09 2.92 10.00 87.55 96.84 0.80
131 49+043.20 Alcantarilla TMC 122 0.00 53.76 210.56 0.26 2.03 10.00 87.55 96.84 0.00
132 49+252.11 Alcantarilla TMC 123 0.01 22.49 84.59 0.27 0.99 10.00 87.55 96.84 0.10
133 49+314.68 Alcantarilla TMC 124 0.00 46.09 127.46 0.36 1.21 10.00 87.55 96.84 0.00
134 49+556.01 Alcantarilla TMC 125 0.00 63.46 126.54 0.50 1.06 10.00 87.55 96.84 0.00
135 49+702.20 Alcantarilla TMC 126 0.00 47.32 125.37 0.38 1.17 10.00 87.55 96.84 0.00
136 49+984.11 Alcantarilla TMC 127 0.03 44.73 243.53 0.18 2.58 10.00 87.55 96.84 0.40
137 50+152.90 Alcantarilla TMC 128 0.00 44.50 163.21 0.27 1.63 10.00 87.55 96.84 0.00
138 50+377.90 Alcantarilla TMC 129 0.00 44.73 152.56 0.29 1.50 10.00 87.55 96.84 0.00
(*) Se considera 10 minutos como mínimo el Tiempo de Concentración -Tc
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA
COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Tiempo de
Concentración PREC MÁX.
(Tc), METODO (mm). Intensidad
Longitud Caudal
Area A Desnivel Pendient Max.
Ubicación Estructura a Proyectar del cauce L DE KIRPICH DIST. Máximo
(km2) H (m) e S (m/m) (mm/hora)
(m) LogGUMBE (m3/s)
MET. USS
L
Adop*
minutos
(min)
1 20+736.49 Alcantarilla TMC 01 0.007 44.19 140.00 0.32 1.37 10.00 109.32 120.92 0.11
2 20+950.45 Alcantarilla TMC 02 0.000 4.27 68.00 0.06 1.46 10.00 109.32 120.92 0.00
3 21+247.21 Alcantarilla TMC 03 0.005 35.05 76.00 0.46 0.74 10.00 109.32 120.92 0.08
4 21+477.20 Alcantarilla TMC 04 0.000 39.49 100.00 0.39 0.97 10.00 109.32 120.92 0.00
5 21+661.44 Alcantarilla TMC 05 0.000 49.00 94.50 0.52 0.83 10.00 109.32 120.92 0.00
6 21+811.76 Alcantarilla TMC 06 0.000 48.66 141.23 0.34 1.33 10.00 109.32 120.92 0.00
7 21+995.00 Alcantarilla TMC 07 0.026 83.38 300.00 0.28 2.58 10.00 109.32 120.92 0.43
8 22+238.23 Alcantarilla TMC 08 0.026 105.71 450.20 0.23 3.76 10.00 109.32 120.92 0.43
9 22+256.31 Alcantarilla TMC 09 0.036 54.75 265.24 0.21 2.63 10.00 109.32 120.92 0.58
10 22+614.40 Alcantarilla TMC 10 0.000 39.23 177.53 0.22 1.88 10.00 109.32 120.92 0.00
11 22+952.54 Alcantarilla TMC 11 0.018 38.36 190.25 0.20 2.06 10.00 109.32 120.92 0.29
12 23+129.31 Alcantarilla TMC 12 0.000 14.31 61.25 0.23 0.81 10.00 109.32 120.92 0.00
13 23+377.16 Alcantarilla TMC 13 0.003 10.58 40.23 0.26 0.56 10.00 109.32 120.92 0.04
14 23+766.00 Alcantarilla TMC 14 0.002 40.71 170.25 0.24 1.77 10.00 109.32 120.92 0.04
15 24+001.02 Alcantarilla TMC 15 0.000 42.68 112.24 0.38 1.07 10.00 109.32 120.92 0.00
16 24+597.48 Alcantarilla TMC 16 0.005 68.36 169.57 0.40 1.44 10.00 109.32 120.92 0.08
17 24+812.87 Alcantarilla TMC 17 0.000 97.03 217.12 0.45 1.67 10.00 109.32 120.92 0.00
18 24+896.22 Alcantarilla TMC 18 0.000 60.39 190.25 0.32 1.73 10.00 109.32 120.92 0.00
19 25+073.16 Alcantarilla TMC 19 0.000 51.90 191.26 0.27 1.84 10.00 109.32 120.92 0.00
20 25+147.84 Alcantarilla TMC 20 0.000 42.30 165.24 0.26 1.68 10.00 109.32 120.92 0.00
21 25+274.71 Alcantarilla TMC 21 0.000 28.65 145.69 0.20 1.69 10.00 109.32 120.92 0.00
22 25+658.61 Alcantarilla TMC 22 0.008 101.11 240.57 0.42 1.86 10.00 109.32 120.92 0.12
23 25+781.69 Muro Alcantarilla 01 0.008 72.93 200.52 0.36 1.71 10.00 109.32 120.92 0.12
24 26+061.87 Alcantarilla TMC 23 0.005 52.92 195.02 0.27 1.87 10.00 109.32 120.92 0.08
25 26+098.06 Alcantarilla TMC 24 0.000 55.72 200.12 0.28 1.89 10.00 109.32 120.92 0.00
26 26+324.62 Alcantarilla TMC 25 0.004 26.17 100.24 0.26 1.14 10.00 109.32 120.92 0.06
27 26+432.20 Alcantarilla TMC 26 0.002 9.86 65.24 0.15 1.01 10.00 109.32 120.92 0.04
28 26+544.99 Alcantarilla TMC 27 0.000 13.50 93.54 0.14 1.35 10.00 109.32 120.92 0.00
29 26+651.61 Alcantarilla TMC 28 0.000 42.27 126.53 0.33 1.24 10.00 109.32 120.92 0.00
30 26+891.23 Alcantarilla TMC 29 0.014 65.80 140.26 0.47 1.17 10.00 109.32 120.92 0.23
31 27+128.84 Alcantarilla TMC 30 0.000 38.47 104.52 0.37 1.03 10.00 109.32 120.92 0.00
32 27+446.81 Alcantarilla TMC 31 0.010 54.01 98.25 0.55 0.84 10.00 109.32 120.92 0.16
33 27+704.71 Alcantarilla TMC 32 0.005 64.56 155.13 0.42 1.33 10.00 109.32 120.92 0.08
34 27+791.51 Alcantarilla TMC 33 0.000 125.75 597.24 0.21 4.88 10.00 109.32 120.92 0.00
35 27+906.85 Alcantarilla TMC 34 0.064 96.89 465.24 0.21 4.04 10.00 109.32 120.92 1.04
36 28+159.66 Muro Alcantarilla 02 0.000 47.29 104.24 0.45 0.95 10.00 109.32 120.92 0.00
37 28+353.43 Alcantarilla TMC 35 0.000 49.31 133.26 0.37 1.24 10.00 109.32 120.92 0.00
38 28+421.87 Muro Alcantarilla 03 0.000 50.09 150.24 0.33 1.41 10.00 109.32 120.92 0.00
39 28+486.99 Alcantarilla TMC 36 0.004 54.18 89.24 0.61 0.75 10.00 109.32 120.92 0.07
40 28+560.30 Alcantarilla TMC 37 0.000 49.71 90.26 0.55 0.79 10.00 109.32 120.92 0.00
41 28+895.47 Alcantarilla TMC 38 0.000 50.01 110.24 0.45 0.99 10.00 109.32 120.92 0.00
42 29+290.20 Alcantarilla TMC 39 0.004 32.19 89.27 0.36 0.92 10.00 109.32 120.92 0.07
43 29+624.77 Alcantarilla TMC 40 0.000 5.91 49.27 0.12 0.89 10.00 109.32 120.92 0.00
44 29+972.42 Alcantarilla TMC 41 0.004 36.25 63.52 0.57 0.59 10.00 109.32 120.92 0.06
45 30+190.58 Muro Alcantarilla 04 0.005 67.22 158.24 0.42 1.34 10.00 109.32 120.92 0.08
46 30+375.49 Alcantarilla TMC 42 0.007 67.44 175.24 0.38 1.50 10.00 109.32 120.92 0.12
47 30+585.31 Alcantarilla TMC 43 0.003 52.79 193.27 0.27 1.85 10.00 109.32 120.92 0.04
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA
COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Tiempo de
Concentración PREC MÁX.
(Tc), METODO (mm). Intensidad
Longitud Caudal
Area A Desnivel Pendient DE KIRPICH Max.
Ubicación Estructura a Proyectar del cauce L DIST. Máximo
(km2) H (m) e S (m/m) (mm/hora)
(m) LogGUMBE (m3/s)
MET. USS
L
Adop*
minutos
(min)
48 30+769.80 Alcantarilla TMC 44 0.004 28.89 121.36 0.24 1.36 10.00 109.32 120.92 0.06
49 30+952.43 Alcantarilla TMC 45 0.010 21.82 115.24 0.19 1.43 10.00 109.32 120.92 0.16
50 31+135.47 Alcantarilla TMC 46 0.002 74.22 145.24 0.51 1.17 10.00 109.32 120.92 0.04
51 31+271.15 Alcantarilla TMC 47 0.003 28.39 98.81 0.29 1.08 10.00 109.32 120.92 0.04
52 31+376.92 Alcantarilla TMC 48 0.004 39.97 86.19 0.46 0.81 10.00 109.32 120.92 0.06
53 31+596.28 Alcantarilla TMC 49 0.000 25.43 83.85 0.30 0.93 10.00 109.32 120.92 0.00
54 31+925.56 Alcantarilla TMC 50 0.017 53.13 168.27 0.32 1.57 10.00 109.32 120.92 0.27
55 32+202.97 Alcantarilla TMC 51 0.004 60.33 142.37 0.42 1.24 10.00 109.32 120.92 0.06
56 32+356.24 Alcantarilla TMC 52 0.002 21.94 68.52 0.32 0.78 10.00 109.32 120.92 0.03
57 32+562.05 Alcantarilla TMC 53 0.001 34.30 83.10 0.41 0.82 10.00 109.32 120.92 0.02
58 32+900.39 Alcantarilla TMC 54 0.005 34.73 124.85 0.28 1.31 10.00 109.32 120.92 0.08
59 33+183.71 Alcantarilla TMC 55 0.000 29.00 102.57 0.28 1.12 10.00 109.32 120.92 0.00
60 33+382.63 Alcantarilla TMC 56 0.003 26.04 103.26 0.25 1.18 10.00 109.32 120.92 0.04
61 33+509.28 Alcantarilla TMC 57 0.000 30.01 145.57 0.21 1.66 10.00 109.32 120.92 0.00
62 33+596.61 Alcantarilla TMC 58 0.000 36.06 109.55 0.33 1.11 10.00 109.32 120.92 0.00
63 33+707.58 Alcantarilla TMC 59 0.057 28.00 206.54 0.14 2.55 10.00 109.32 120.92 0.92
64 33+807.48 Alcantarilla TMC 60 0.003 34.72 99.07 0.35 1.01 10.00 109.32 120.92 0.06
65 33+922.51 Alcantarilla TMC 61 0.000 5.17 81.07 0.06 1.66 10.00 109.32 120.92 0.00
66 34+226.45 Alcantarilla TMC 62 0.014 20.57 170.69 0.12 2.30 10.00 109.32 120.92 0.22
67 34+406.66 Alcantarilla TMC 63 0.013 12.97 223.57 0.06 3.76 10.00 109.32 120.92 0.22
68 34+621.41 Alcantarilla TMC 64 0.000 25.97 52.13 0.50 0.54 10.00 109.32 120.92 0.00
69 34+796.65 Alcantarilla TMC 65 0.004 20.13 52.37 0.38 0.59 10.00 109.32 120.92 0.07
70 34+883.73 Alcantarilla TMC 66 0.000 29.83 76.72 0.39 0.79 10.00 109.32 120.92 0.00
71 35+115.60 Alcantarilla TMC 67 0.000 12.38 73.27 0.17 1.06 10.00 109.32 120.92 0.00
72 35+499.30 Alcantarilla TMC 68 0.000 16.45 64.26 0.26 0.81 10.00 109.32 120.92 0.00
73 35+693.49 Alcantarilla TMC 69 0.000 33.69 69.27 0.49 0.67 10.00 109.32 120.92 0.00
74 36+071.99 Alcantarilla TMC 70 0.000 10.32 43.27 0.24 0.62 10.00 109.32 120.92 0.00
75 36+379.84 Alcantarilla TMC 71 0.000 28.54 71.64 0.40 0.75 10.00 109.32 120.92 0.00
76 36+672.23 Alcantarilla TMC 72 0.000 15.06 138.27 0.11 2.04 10.00 109.32 120.92 0.00
77 36+916.28 Alcantarilla TMC 73 0.000 26.84 102.59 0.26 1.16 10.00 109.32 120.92 0.00
78 37+128.52 Alcantarilla TMC 74 0.000 10.51 50.63 0.21 0.73 10.00 109.32 120.92 0.00
79 37+376.26 Alcantarilla TMC 75 0.006 8.25 64.27 0.13 1.06 10.00 109.32 120.92 0.10
80 37+620.25 Alcantarilla TMC 76 0.001 24.78 61.24 0.40 0.66 10.00 109.32 120.92 0.02
81 38+114.96 Alcantarilla TMC 77 0.000 62.45 113.24 0.55 0.94 10.00 109.32 120.92 0.00
82 38+376.91 Alcantarilla TMC 78 0.002 28.60 76.24 0.38 0.80 10.00 109.32 120.92 0.02
83 38+544.83 Alcantarilla TMC 79 0.001 36.71 92.00 0.40 0.90 10.00 109.32 120.92 0.02
84 38+669.72 Alcantarilla TMC 80 0.005 28.31 129.70 0.22 1.48 10.00 109.32 120.92 0.08
85 38+950.24 Alcantarilla TMC 81 0.002 25.38 86.17 0.29 0.97 10.00 109.32 120.92 0.03
86 39+120.69 Alcantarilla TMC 82 0.000 27.44 86.40 0.32 0.94 10.00 109.32 120.92 0.00
87 39+479.33 Alcantarilla TMC 83 0.000 30.61 54.74 0.56 0.53 10.00 109.32 120.92 0.00
88 39+646.96 Alcantarilla TMC 84 0.000 71.53 108.14 0.66 0.84 10.00 109.32 120.92 0.00
89 39+714.91 Alcantarilla TMC 85 0.002 44.00 92.70 0.47 0.85 10.00 109.32 120.92 0.03
90 40+037.01 Alcantarilla TMC 86 0.000 43.84 77.97 0.56 0.70 10.00 109.32 120.92 0.00
91 40+369.13 Alcantarilla TMC 87 0.000 34.26 94.95 0.36 0.96 10.00 109.32 120.92 0.00
93 40+741.85 Alcantarilla TMC 88 0.002 69.81 113.27 0.62 0.90 10.00 109.32 120.92 0.04
94 41+058.64 Alcantarilla TMC 89 0.000 45.97 71.10 0.65 0.61 10.00 109.32 120.92 0.00
95 41+279.32 Alcantarilla TMC 90 0.002 48.99 152.02 0.32 1.44 10.00 109.32 120.92 0.03
96 41+512.39 Alcantarilla TMC 91 0.002 20.54 97.84 0.21 1.21 10.00 109.32 120.92 0.03
97 41+810.44 Alcantarilla TMC 92 0.000 80.27 111.43 0.72 0.83 10.00 109.32 120.92 0.00
98 42+038.58 Alcantarilla TMC 93 0.000 56.61 120.33 0.47 1.04 10.00 109.32 120.92 0.00
99 42+246.20 Alcantarilla TMC 94 0.006 47.12 187.24 0.25 1.86 10.00 109.32 120.92 0.09
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA
COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Tiempo de
Concentración PREC MÁX.
(Tc), METODO (mm). Intensidad
Longitud Caudal
Area A Desnivel Pendient DE KIRPICH Max.
Ubicación Estructura a Proyectar del cauce L DIST. Máximo
(km2) H (m) e S (m/m) (mm/hora)
(m) LogGUMBE (m3/s)
MET. USS
L
Adop*
minutos
(min)
100 42+363.03 Alcantarilla TMC 95 0.000 84.04 122.45 0.69 0.91 10.00 109.32 120.92 0.00
101 42+554.26 Alcantarilla TMC 96 0.013 69.90 132.37 0.53 1.07 10.00 109.32 120.92 0.21
102 42+864.50 Baden 01 0.000 71.90 134.97 0.53 1.09 10.00 109.32 120.92 0.00
103 43+058.82 Baden 02 0.000 37.48 62.83 0.60 0.58 10.00 109.32 120.92 0.00
104 43+158.06 Alcantarilla TMC 97 0.000 50.57 126.60 0.40 1.15 10.00 109.32 120.92 0.00
105 43+378.01 Alcantarilla TMC 98 0.016 53.79 130.96 0.41 1.17 10.00 109.32 120.92 0.26
106 43+582.65 Alcantarilla TMC 99 0.000 40.86 90.24 0.45 0.85 10.00 109.32 120.92 0.00
107 43+791.15 Alcantarilla TMC 100 0.000 43.06 107.75 0.40 1.02 10.00 109.32 120.92 0.00
108 43+989.21 Alcantarilla TMC 101 0.000 54.48 101.86 0.53 0.87 10.00 109.32 120.92 0.00
109 44+131.93 Alcantarilla TMC 102 0.006 77.84 95.01 0.82 0.70 10.00 109.32 120.92 0.10
110 44+263.67 Alcantarilla TMC 103 0.000 37.03 98.59 0.38 0.97 10.00 109.32 120.92 0.00
111 44+364.80 Alcantarilla TMC 104 0.000 62.14 129.54 0.48 1.09 10.00 109.32 120.92 0.00
112 44+658.43 Alcantarilla TMC 105 0.000 53.90 138.26 0.39 1.25 10.00 109.32 120.92 0.00
113 44+885.03 Alcantarilla TMC 106 0.004 30.37 91.46 0.33 0.96 10.00 109.32 120.92 0.06
114 45+329.12 Alcantarilla TMC 107 0.006 23.37 126.53 0.18 1.55 10.00 109.32 120.92 0.09
115 45+355.69 Alcantarilla TMC 108 0.000 43.67 118.25 0.37 1.13 10.00 109.32 120.92 0.00
116 45+593.48 Alcantarilla TMC 109 0.000 63.93 133.27 0.48 1.12 10.00 109.32 120.92 0.00
117 45+817.19 Alcantarilla TMC 110 0.000 72.74 106.54 0.68 0.82 10.00 109.32 120.92 0.00
118 46+135.05 Alcantarilla TMC 111 0.000 84.45 95.85 0.88 0.69 10.00 109.32 120.92 0.00
119 46+495.85 Alcantarilla TMC 112 0.000 55.72 90.46 0.62 0.75 10.00 109.32 120.92 0.00
120 46+621.39 Alcantarilla TMC 113 0.000 77.79 123.56 0.63 0.95 10.00 109.32 120.92 0.00
121 46+860.48 Alcantarilla TMC 114 0.000 57.27 107.46 0.53 0.91 10.00 109.32 120.92 0.00
122 46+968.81 Alcantarilla TMC 115 0.008 58.69 201.24 0.29 1.86 10.00 109.32 120.92 0.13
123 47+151.22 Baden 03 0.000 60.24 136.24 0.44 1.17 10.00 109.32 120.92 0.00
124 47+441.36 Alcantarilla TMC 116 0.010 36.53 175.24 0.21 1.90 10.00 109.32 120.92 0.15
125 47+561.93 Baden 04 0.000 67.60 146.24 0.46 1.22 10.00 109.32 120.92 0.00
126 47+841.76 Alcantarilla TMC 117 0.000 83.70 145.68 0.57 1.12 10.00 109.32 120.92 0.00
127 48+049.33 Alcantarilla TMC 118 0.000 23.42 55.65 0.42 0.60 10.00 109.32 120.92 0.00
128 48+315.43 Alcantarilla TMC 119 0.008 51.71 135.24 0.38 1.24 10.00 109.32 120.92 0.12
129 48+452.37 Alcantarilla TMC 120 0.000 39.73 136.56 0.29 1.38 10.00 109.32 120.92 0.00
130 48+701.99 Alcantarilla TMC 121 0.006 17.44 198.54 0.09 2.92 10.00 109.32 120.92 0.10
131 49+043.20 Alcantarilla TMC 122 0.000 53.76 210.56 0.26 2.03 10.00 109.32 120.92 0.00
132 49+252.11 Alcantarilla TMC 123 0.008 22.49 84.59 0.27 0.99 10.00 109.32 120.92 0.13
133 49+314.68 Alcantarilla TMC 124 0.000 46.09 127.46 0.36 1.21 10.00 109.32 120.92 0.00
134 49+556.01 Alcantarilla TMC 125 0.000 63.46 126.54 0.50 1.06 10.00 109.32 120.92 0.00
135 49+702.20 Alcantarilla TMC 126 0.000 47.32 125.37 0.38 1.17 10.00 109.32 120.92 0.00
136 49+984.11 Alcantarilla TMC 127 0.032 44.73 243.53 0.18 2.58 10.00 109.32 120.92 0.52
137 50+152.90 Alcantarilla TMC 128 0.000 44.50 163.21 0.27 1.63 10.00 109.32 120.92 0.00
138 50+377.90 Alcantarilla TMC 129 0.000 44.730 152.560 0.29 1.50 10.00 109.32 120.92 0.00
(*) Se considera 10 minutos como mínimo el Tiempo de Concentración -Tc
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
F. de
Coeficiente de escorrentía C: 0.400 rugosidad: 0.200 Periodo de Retorno: 10 años
23 25+781.69 26+061.87 0.28 0.05 0.34 0.014 0.20 0.20 73.74 73.87 0.11 Muro Alcantarilla 01
24 26+061.87 26+098.06 0.04 0.05 0.23 0.002 0.09 0.17 73.74 81.56 0.02 Alcantarilla 23
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
25 26+098.06 26+324.62 0.23 0.05 0.32 0.011 0.19 0.19 73.74 77.08 0.10 Alcantarilla 24
26 26+324.62 26+432.20 0.11 0.05 0.27 0.005 0.14 0.17 73.74 81.56 0.05 Alcantarilla 25
27 26+432.20 26+544.99 0.11 0.05 0.32 0.006 0.13 0.17 73.74 81.56 0.05 Alcantarilla 26
28 26+544.99 26+651.61 0.11 0.05 0.07 0.005 0.19 0.19 73.74 77.04 0.05 Alcantarilla 27
29 26+651.61 26+891.23 0.24 0.05 0.11 0.012 0.24 0.24 73.74 67.36 0.09 Alcantarilla 28
30 26+891.23 27+128.84 0.24 0.05 0.30 0.012 0.19 0.19 73.74 75.60 0.10 Alcantarilla 29
31 27+128.84 27+446.81 0.32 0.05 0.47 0.016 0.20 0.20 73.74 74.51 0.13 Alcantarilla 30
32 27+446.81 27+704.71 0.26 0.05 0.43 0.013 0.18 0.18 73.74 77.54 0.11 Alcantarilla 31
33 27+704.71 27+791.51 0.09 0.05 0.43 0.004 0.11 0.17 73.74 81.56 0.04 Alcantarilla 32
34 27+791.51 27+906.85 0.12 0.05 0.56 0.006 0.12 0.17 73.74 81.56 0.05 Alcantarilla 33
35 27+906.85 28+159.66 0.25 0.05 0.54 0.013 0.17 0.17 73.74 79.93 0.11 Alcantarilla 34
36 28+159.66 28+353.43 0.19 0.05 0.51 0.010 0.16 0.17 73.74 81.56 0.09 Muro Alcantarilla 02
37 28+353.43 28+421.87 0.07 0.05 0.63 0.003 0.09 0.17 73.74 81.56 0.03 Alcantarilla 35
38 28+421.87 28+486.99 0.07 0.05 0.42 0.003 0.10 0.17 73.74 81.56 0.03 Muro Alcantarilla 03
39 28+486.99 28+560.30 0.07 0.05 0.31 0.004 0.11 0.17 73.74 81.56 0.03 Alcantarilla 36
40 28+560.30 28+895.47 0.34 0.05 0.51 0.017 0.20 0.20 73.74 74.33 0.14 Alcantarilla 37
41 28+895.47 29+290.20 0.39 0.05 0.50 0.020 0.22 0.22 73.74 71.40 0.16 Alcantarilla 38
42 29+290.20 29+624.77 0.33 0.05 0.52 0.017 0.20 0.20 73.74 74.56 0.14 Alcantarilla 39
43 29+624.77 29+972.42 0.35 0.05 0.36 0.017 0.22 0.22 73.74 70.80 0.14 Alcantarilla 40
44 29+972.42 30+190.58 0.22 0.05 0.39 0.011 0.18 0.18 73.74 79.55 0.10 Alcantarilla 41
45 30+190.58 30+375.49 0.18 0.05 0.37 0.009 0.16 0.17 73.74 81.56 0.08 Muro Alcantarilla 04
46 30+375.49 30+585.31 0.21 0.05 0.37 0.010 0.17 0.17 73.74 79.86 0.09 Alcantarilla 42
47 30+585.31 30+769.80 0.18 0.05 0.50 0.009 0.15 0.17 73.74 81.56 0.08 Alcantarilla 43
48 30+769.80 30+952.43 0.18 0.05 0.05 0.009 0.27 0.27 73.74 64.46 0.07 Alcantarilla 44
49 30+952.43 31+135.47 0.18 0.05 0.32 0.009 0.17 0.17 73.74 81.04 0.08 Alcantarilla 45
50 31+135.47 31+271.15 0.14 0.05 0.30 0.007 0.15 0.17 73.74 81.56 0.06 Alcantarilla 46
51 31+271.15 31+376.92 0.11 0.05 0.23 0.005 0.14 0.17 73.74 81.56 0.05 Alcantarilla 47
52 31+376.92 31+596.28 0.22 0.05 0.41 0.011 0.17 0.17 73.74 79.92 0.10 Alcantarilla 48
53 31+596.28 31+925.56 0.33 0.05 0.49 0.016 0.20 0.20 73.74 74.33 0.14 Alcantarilla 49
54 31+925.56 32+202.97 0.28 0.05 0.15 0.014 0.25 0.25 73.74 67.15 0.10 Alcantarilla 50
55 32+202.97 32+356.24 0.15 0.05 0.18 0.008 0.18 0.18 73.74 78.73 0.07 Alcantarilla 51
56 32+356.24 32+562.05 0.21 0.05 0.34 0.010 0.18 0.18 73.74 79.36 0.09 Alcantarilla 52
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
57 32+562.05 32+900.39 0.34 0.05 0.30 0.017 0.23 0.23 73.74 69.78 0.13 Alcantarilla 53
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
58 32+900.39 33+183.71 0.28 0.05 0.40 0.014 0.20 0.20 73.74 75.16 0.12 Alcantarilla 54
59 33+183.71 33+382.63 0.20 0.05 0.47 0.010 0.16 0.17 73.74 81.56 0.09 Alcantarilla 55
60 33+382.63 33+509.28 0.13 0.05 0.29 0.006 0.15 0.17 73.74 81.56 0.06 Alcantarilla 56
61 33+509.28 33+596.61 0.09 0.05 0.34 0.004 0.12 0.17 73.74 81.56 0.04 Alcantarilla 57
62 33+596.61 33+707.58 0.11 0.05 0.35 0.006 0.13 0.17 73.74 81.56 0.05 Alcantarilla 58
63 33+707.58 33+807.48 0.10 0.05 0.23 0.005 0.14 0.17 73.74 81.56 0.05 Alcantarilla 59
64 33+807.48 33+922.51 0.12 0.05 0.19 0.006 0.15 0.17 73.74 81.56 0.05 Alcantarilla 60
65 33+922.51 34+226.45 0.30 0.05 0.17 0.015 0.25 0.25 73.74 66.76 0.11 Alcantarilla 61
66 34+226.45 34+406.66 0.18 0.05 0.28 0.009 0.17 0.17 73.74 80.03 0.08 Alcantarilla 62
67 34+406.66 34+621.41 0.21 0.05 0.33 0.011 0.18 0.18 73.74 78.26 0.09 Alcantarilla 63
68 34+621.41 34+796.65 0.18 0.05 0.24 0.009 0.18 0.18 73.74 79.23 0.08 Alcantarilla 64
69 34+796.65 34+883.73 0.09 0.05 0.24 0.004 0.13 0.17 73.74 81.56 0.04 Alcantarilla 65
70 34+883.73 35+115.60 0.23 0.05 0.08 0.012 0.26 0.26 73.74 65.66 0.08 Alcantarilla 66
71 35+115.60 35+499.30 0.38 0.05 0.13 0.019 0.29 0.29 73.74 61.43 0.13 Alcantarilla 67
72 35+499.30 35+693.49 0.19 0.05 0.15 0.010 0.21 0.21 73.74 73.28 0.08 Alcantarilla 68
73 35+693.49 36+071.99 0.38 0.05 0.17 0.019 0.27 0.27 73.74 63.73 0.13 Alcantarilla 69
74 36+071.99 36+379.84 0.31 0.05 0.06 0.015 0.32 0.32 73.74 58.66 0.10 Alcantarilla 70
75 36+379.84 36+672.23 0.29 0.05 0.20 0.015 0.23 0.23 73.74 68.87 0.11 Alcantarilla 71
76 36+672.23 36+916.28 0.24 0.05 0.23 0.012 0.21 0.21 73.74 72.87 0.10 Alcantarilla 72
77 36+916.28 37+128.52 0.21 0.05 0.32 0.011 0.18 0.18 73.74 78.42 0.09 Alcantarilla 73
78 37+128.52 37+376.26 0.25 0.05 0.32 0.012 0.19 0.19 73.74 75.41 0.10 Alcantarilla 74
79 37+376.26 37+620.25 0.24 0.05 0.28 0.012 0.20 0.20 73.74 74.60 0.10 Alcantarilla 75
80 37+620.25 38+114.96 0.49 0.05 0.09 0.025 0.36 0.36 73.74 55.32 0.15 Alcantarilla 76
81 38+114.96 38+376.91 0.26 0.05 0.04 0.013 0.32 0.32 73.74 58.80 0.09 Alcantarilla 77
82 38+376.91 38+544.83 0.17 0.05 0.25 0.008 0.17 0.17 73.74 80.42 0.08 Alcantarilla 78
83 38+544.83 38+669.72 0.12 0.05 0.26 0.006 0.15 0.17 73.74 81.56 0.06 Alcantarilla 79
84 38+669.72 38+950.24 0.28 0.05 0.35 0.014 0.20 0.20 73.74 74.18 0.12 Alcantarilla 80
85 38+950.24 39+120.69 0.17 0.05 0.47 0.009 0.15 0.17 73.74 81.56 0.08 Alcantarilla 81
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
86 39+120.69 39+479.33 0.36 0.05 0.29 0.018 0.24 0.24 73.74 68.60 0.14 Alcantarilla 82
87 39+479.33 39+646.96 0.17 0.05 0.32 0.008 0.16 0.17 73.74 81.56 0.08 Alcantarilla 83
88 39+646.96 39+714.91 0.07 0.05 0.33 0.003 0.11 0.17 73.74 81.56 0.03 Alcantarilla 84
89 39+714.91 40+037.01 0.32 0.05 0.49 0.016 0.20 0.20 73.74 74.64 0.13 Alcantarilla 85
90 40+037.01 40+369.13 0.33 0.05 0.42 0.017 0.21 0.21 73.74 72.83 0.13 Alcantarilla 86
91 40+369.13 40+741.85 0.37 0.05 0.38 0.019 0.23 0.23 73.74 69.98 0.14 Alcantarilla 87
92 40+741.85 41+058.64 0.32 0.05 0.05 0.016 0.33 0.33 73.74 57.60 0.10 Alcantarilla 88
93 41+058.64 41+279.32 0.22 0.05 0.07 0.011 0.26 0.26 73.74 64.86 0.08 Alcantarilla 89
94 41+279.32 41+512.39 0.23 0.05 0.07 0.012 0.27 0.27 73.74 64.04 0.08 Alcantarilla 90
95 41+512.39 41+810.44 0.30 0.05 0.01 0.015 0.45 0.45 73.74 49.50 0.08 Alcantarilla 91
96 41+810.44 42+038.58 0.23 0.05 0.01 0.011 0.40 0.40 73.74 52.68 0.07 Alcantarilla 92
97 42+038.58 42+246.20 0.21 0.05 0.07 0.010 0.25 0.25 73.74 66.13 0.08 Alcantarilla 93
98 42+246.20 42+363.03 0.12 0.05 0.07 0.006 0.19 0.19 73.74 75.62 0.05 Alcantarilla 94
99 42+363.03 42+554.26 0.19 0.05 0.07 0.010 0.24 0.24 73.74 67.41 0.07 Alcantarilla 95
100 42+554.26 42+864.50 0.31 0.05 0.07 0.016 0.31 0.31 73.74 60.21 0.10 Alcantarilla 96
101 42+864.50 43+058.82 0.19 0.05 0.07 0.010 0.25 0.25 73.74 67.16 0.07 Baden 01
102 43+058.82 43+158.06 0.10 0.05 0.07 0.005 0.18 0.18 73.74 78.56 0.04 Baden 02
103 43+158.06 43+378.01 0.22 0.05 0.07 0.011 0.26 0.26 73.74 65.24 0.08 Alcantarilla 97
104 43+378.01 43+582.65 0.20 0.05 0.07 0.010 0.25 0.25 73.74 66.35 0.08 Alcantarilla 98
105 43+582.65 43+791.15 0.21 0.05 0.07 0.010 0.25 0.25 73.74 66.06 0.08 Alcantarilla 99
106 43+791.15 43+989.21 0.20 0.05 0.07 0.010 0.25 0.25 73.74 66.86 0.07 Alcantarilla 100
107 43+989.21 44+131.93 0.14 0.05 0.07 0.007 0.21 0.21 73.74 72.17 0.06 Alcantarilla 101
108 44+131.93 44+263.67 0.13 0.05 0.06 0.007 0.21 0.21 73.74 72.36 0.05 Alcantarilla 102
109 44+263.67 44+364.80 0.10 0.05 0.06 0.005 0.19 0.19 73.74 76.97 0.04 Alcantarilla 103
110 44+364.80 44+658.43 0.29 0.05 0.06 0.015 0.31 0.31 73.74 60.01 0.10 Alcantarilla 104
111 44+658.43 44+885.03 0.23 0.05 0.03 0.011 0.33 0.33 73.74 57.72 0.07 Alcantarilla 105
112 44+885.03 45+329.12 0.44 0.05 0.07 0.022 0.36 0.36 73.74 55.27 0.14 Alcantarilla 106
113 45+329.12 45+355.69 0.03 0.05 0.07 0.001 0.10 0.17 73.74 81.56 0.01 Alcantarilla 107
114 45+355.69 45+593.48 0.24 0.05 0.07 0.012 0.27 0.27 73.74 63.94 0.08 Alcantarilla 108
115 45+593.48 45+817.19 0.22 0.05 0.07 0.011 0.26 0.26 73.74 64.86 0.08 Alcantarilla 109
116 45+817.19 46+135.05 0.32 0.05 0.07 0.016 0.31 0.31 73.74 59.75 0.11 Alcantarilla 110
117 46+135.05 46+495.85 0.36 0.05 0.07 0.018 0.33 0.33 73.74 58.01 0.12 Alcantarilla 111
118 46+495.85 46+621.39 0.13 0.05 0.07 0.006 0.20 0.20 73.74 73.80 0.05 Alcantarilla 112
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
119 46+621.39 46+860.48 0.24 0.05 0.07 0.012 0.28 0.28 73.74 63.49 0.08 Alcantarilla 113
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
120 46+860.48 46+968.81 0.11 0.05 0.07 0.005 0.19 0.19 73.74 76.38 0.05 Alcantarilla 114
121 46+968.81 47+151.22 0.18 0.05 0.07 0.009 0.24 0.24 73.74 67.63 0.07 Alcantarilla 115
122 47+151.22 47+441.36 0.29 0.05 0.07 0.015 0.30 0.30 73.74 60.69 0.10 Baden 03
123 47+441.36 47+561.93 0.12 0.05 0.07 0.006 0.20 0.20 73.74 74.50 0.05 Alcantarilla 116
124 47+561.93 47+841.76 0.28 0.05 0.07 0.014 0.30 0.30 73.74 61.20 0.10 Baden 04
125 47+841.76 48+049.33 0.21 0.05 0.07 0.010 0.26 0.26 73.74 65.62 0.08 Alcantarilla 117
126 48+049.33 48+315.43 0.27 0.05 0.07 0.013 0.29 0.29 73.74 61.93 0.09 Alcantarilla 118
127 48+315.43 48+452.37 0.14 0.05 0.07 0.007 0.21 0.21 73.74 72.31 0.06 Alcantarilla 119
128 48+452.37 48+701.99 0.25 0.05 0.07 0.012 0.28 0.28 73.74 62.86 0.09 Alcantarilla 120
129 48+701.99 49+043.20 0.34 0.05 0.07 0.017 0.32 0.32 73.74 58.44 0.11 Alcantarilla 121
130 49+043.20 49+252.11 0.21 0.05 0.07 0.010 0.26 0.26 73.74 65.53 0.08 Alcantarilla 122
131 49+252.11 49+314.68 0.06 0.05 0.07 0.003 0.15 0.17 73.74 81.56 0.03 Alcantarilla 123
132 49+314.68 49+556.01 0.24 0.05 0.07 0.012 0.28 0.28 73.74 63.36 0.08 Alcantarilla 124
133 49+556.01 49+702.20 0.15 0.05 0.07 0.007 0.22 0.22 73.74 71.22 0.06 Alcantarilla 125
134 49+702.20 49+984.11 0.28 0.05 0.07 0.014 0.30 0.30 73.74 61.10 0.10 Alcantarilla 126
135 49+984.11 50+152.90 0.17 0.05 0.07 0.008 0.23 0.23 73.74 68.87 0.06 Alcantarilla 127
136 50+152.90 50+377.90 0.23 0.05 0.07 0.011 0.27 0.27 73.74 64.40 0.08 Alcantarilla 128
137 50+377.90 50+462.00 0.08 0.05 0.07 0.004 0.17 0.17 73.74 81.03 0.04 Alcantarilla 129
Caudales Máximos Método Racional
PARÁMETROS HIDROLÓGICOS - APORTES DEL ÁREA LATERAL DE LA VÍA
F. de
Coeficiente de escorrentía C: 0.400 rugosidad: 0.200 Periodo de Retorno: 10 años
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
7 21+995.00 22+238.23 0.24 0.0031 0.01 0.0008 0.41 0.41 73.74 51.71 0.000 Alcantarilla 07
8 22+238.23 22+256.31 0.02 0.0031 0.01 0.0001 0.12 0.17 73.74 81.56 0.000 Alcantarilla 08
9 22+256.31 22+614.40 0.36 0.0031 0.01 0.0011 0.49 0.49 73.74 47.77 0.010 Alcantarilla 09
10 22+614.40 22+952.54 0.34 0.0031 0.03 0.0010 0.40 0.40 73.74 52.54 0.010 Alcantarilla 10
11 22+952.54 23+129.31 0.18 0.0031 0.03 0.0005 0.30 0.30 73.74 61.13 0.000 Alcantarilla 11
12 23+129.31 23+377.16 0.25 0.0031 0.03 0.0008 0.34 0.34 73.74 56.88 0.000 Alcantarilla 12
13 23+377.16 23+766.00 0.39 0.0031 0.03 0.0012 0.42 0.42 73.74 51.20 0.010 Alcantarilla 13
14 23+766.00 24+001.02 0.24 0.0031 0.03 0.0007 0.33 0.33 73.74 58.12 0.000 Alcantarilla 14
15 24+001.02 24+597.48 0.60 0.0031 0.03 0.0018 0.51 0.51 73.74 46.76 0.010 Alcantarilla 15
16 24+597.48 24+812.87 0.22 0.0031 0.02 0.0007 0.35 0.35 73.74 55.97 0.000 Alcantarilla 16
17 24+812.87 24+896.22 0.08 0.0031 0.02 0.0003 0.23 0.23 73.74 69.86 0.000 Alcantarilla 17
18 24+896.22 25+073.16 0.18 0.0031 0.02 0.0005 0.32 0.32 73.74 58.60 0.000 Alcantarilla 18
19 25+073.16 25+147.84 0.07 0.0031 0.02 0.0002 0.22 0.22 73.74 71.67 0.000 Alcantarilla 19
20 25+147.84 25+274.71 0.13 0.0031 0.06 0.0004 0.21 0.21 73.74 72.25 0.000 Alcantarilla 20
21 25+274.71 25+658.61 0.38 0.0031 0.06 0.0012 0.36 0.36 73.74 55.80 0.010 Alcantarilla 21
22 25+658.61 25+781.69 0.12 0.0031 0.05 0.0004 0.21 0.21 73.74 72.12 0.000 Alcantarilla 22
23 25+781.69 26+061.87 0.28 0.0031 0.05 0.0009 0.31 0.31 73.74 59.52 0.010 Muro Alcantarilla 01
24 26+061.87 26+098.06 0.04 0.0031 0.06 0.0001 0.12 0.17 73.74 81.56 0.000 Alcantarilla 23
25 26+098.06 26+324.62 0.23 0.0031 0.06 0.0007 0.28 0.28 73.74 63.38 0.000 Alcantarilla 24
26 26+324.62 26+432.20 0.11 0.0031 0.06 0.0003 0.19 0.19 73.74 75.42 0.000 Alcantarilla 25
27 26+432.20 26+544.99 0.11 0.0031 0.06 0.0003 0.20 0.20 73.74 74.78 0.000 Alcantarilla 26
28 26+544.99 26+651.61 0.11 0.0031 0.06 0.0003 0.19 0.19 73.74 75.76 0.000 Alcantarilla 27
29 26+651.61 26+891.23 0.24 0.0031 0.06 0.0007 0.28 0.28 73.74 62.72 0.010 Alcantarilla 28
30 26+891.23 27+128.84 0.24 0.0031 0.05 0.0007 0.29 0.29 73.74 61.87 0.010 Alcantarilla 29
31 27+128.84 27+446.81 0.32 0.0031 0.05 0.0010 0.33 0.33 73.74 57.81 0.010 Alcantarilla 30
32 27+446.81 27+704.71 0.26 0.0031 0.05 0.0008 0.30 0.30 73.74 60.36 0.010 Alcantarilla 31
33 27+704.71 27+791.51 0.09 0.0031 0.05 0.0003 0.18 0.18 73.74 77.83 0.000 Alcantarilla 32
34 27+791.51 27+906.85 0.12 0.0031 0.06 0.0004 0.21 0.21 73.74 73.54 0.000 Alcantarilla 33
35 27+906.85 28+159.66 0.25 0.0031 0.06 0.0008 0.30 0.30 73.74 61.23 0.010 Alcantarilla 34
36 28+159.66 28+353.43 0.19 0.0031 0.06 0.0006 0.26 0.26 73.74 65.15 0.000 Muro Alcantarilla 02
37 28+353.43 28+421.87 0.07 0.0031 0.06 0.0002 0.16 0.17 73.74 81.56 0.000 Alcantarilla 35
38 28+421.87 28+486.99 0.07 0.0031 0.06 0.0002 0.15 0.17 73.74 81.56 0.000 Muro Alcantarilla 03
39 28+486.99 28+560.30 0.07 0.0031 0.06 0.0002 0.16 0.17 73.74 81.56 0.000 Alcantarilla 36
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
40 28+560.30 28+895.47 0.34 0.0031 0.06 0.0010 0.33 0.33 73.74 57.88 0.010 Alcantarilla 37
41 28+895.47 29+290.20 0.39 0.0031 0.05 0.0012 0.37 0.37 73.74 54.64 0.010 Alcantarilla 38
42 29+290.20 29+624.77 0.33 0.0031 0.05 0.0010 0.34 0.34 73.74 56.79 0.010 Alcantarilla 39
43 29+624.77 29+972.42 0.35 0.0031 0.06 0.0011 0.34 0.34 73.74 56.98 0.010 Alcantarilla 40
44 29+972.42 30+190.58 0.22 0.0031 0.03 0.0007 0.31 0.31 73.74 59.53 0.000 Alcantarilla 41
45 30+190.58 30+375.49 0.18 0.0031 0.01 0.0006 0.35 0.35 73.74 56.48 0.000 Muro Alcantarilla 04
46 30+375.49 30+585.31 0.21 0.0031 0.01 0.0007 0.37 0.37 73.74 54.84 0.000 Alcantarilla 42
47 30+585.31 30+769.80 0.18 0.0031 0.06 0.0006 0.25 0.25 73.74 66.73 0.000 Alcantarilla 43
48 30+769.80 30+952.43 0.18 0.0031 0.06 0.0006 0.25 0.25 73.74 66.63 0.000 Alcantarilla 44
49 30+952.43 31+135.47 0.18 0.0031 0.01 0.0006 0.36 0.36 73.74 55.20 0.000 Alcantarilla 45
50 31+135.47 31+271.15 0.14 0.0031 0.04 0.0004 0.23 0.23 73.74 68.78 0.000 Alcantarilla 46
51 31+271.15 31+376.92 0.11 0.0031 0.05 0.0003 0.20 0.20 73.74 74.44 0.000 Alcantarilla 47
52 31+376.92 31+596.28 0.22 0.0031 0.05 0.0007 0.28 0.28 73.74 62.79 0.000 Alcantarilla 48
53 31+596.28 31+925.56 0.33 0.0031 0.06 0.0010 0.33 0.33 73.74 57.75 0.010 Alcantarilla 49
54 31+925.56 32+202.97 0.28 0.0031 0.00 0.0009 0.57 0.57 73.74 44.31 0.000 Alcantarilla 50
55 32+202.97 32+356.24 0.15 0.0031 0.01 0.0005 0.40 0.40 73.74 52.63 0.000 Alcantarilla 51
56 32+356.24 32+562.05 0.21 0.0031 0.01 0.0006 0.46 0.46 73.74 49.13 0.000 Alcantarilla 52
57 32+562.05 32+900.39 0.34 0.0031 0.02 0.0010 0.43 0.43 73.74 50.92 0.010 Alcantarilla 53
58 32+900.39 33+183.71 0.28 0.0031 0.01 0.0009 0.52 0.52 73.74 46.06 0.000 Alcantarilla 54
59 33+183.71 33+382.63 0.20 0.0031 0.00 0.0006 0.50 0.50 73.74 47.03 0.000 Alcantarilla 55
60 33+382.63 33+509.28 0.13 0.0031 0.00 0.0004 0.41 0.41 73.74 52.25 0.000 Alcantarilla 56
61 33+509.28 33+596.61 0.09 0.0031 0.00 0.0003 0.34 0.34 73.74 56.99 0.000 Alcantarilla 57
62 33+596.61 33+707.58 0.11 0.0031 0.00 0.0003 0.38 0.38 73.74 53.89 0.000 Alcantarilla 58
63 33+707.58 33+807.48 0.10 0.0031 0.00 0.0003 0.36 0.36 73.74 55.23 0.000 Alcantarilla 59
64 33+807.48 33+922.51 0.12 0.0031 0.01 0.0004 0.32 0.32 73.74 59.33 0.000 Alcantarilla 60
65 33+922.51 34+226.45 0.30 0.0031 0.01 0.0009 0.50 0.50 73.74 47.29 0.000 Alcantarilla 61
66 34+226.45 34+406.66 0.18 0.0031 0.07 0.0006 0.24 0.24 73.74 68.04 0.000 Alcantarilla 62
67 34+406.66 34+621.41 0.21 0.0031 0.07 0.0007 0.26 0.26 73.74 65.32 0.000 Alcantarilla 63
68 34+621.41 34+796.65 0.18 0.0031 0.01 0.0005 0.43 0.43 73.74 51.01 0.000 Alcantarilla 64
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
69 34+796.65 34+883.73 0.09 0.0031 0.01 0.0003 0.26 0.26 73.74 65.71 0.000 Alcantarilla 65
70 34+883.73 35+115.60 0.23 0.0031 0.06 0.0007 0.28 0.28 73.74 63.10 0.010 Alcantarilla 66
71 35+115.60 35+499.30 0.38 0.0031 0.06 0.0012 0.35 0.35 73.74 56.10 0.010 Alcantarilla 67
72 35+499.30 35+693.49 0.19 0.0031 0.06 0.0006 0.26 0.26 73.74 65.77 0.000 Alcantarilla 68
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
97 42+038.58 42+246.20 0.21 0.0031 0.07 0.0006 0.25 0.25 73.74 66.13 0.000 Alcantarilla 93
98 42+246.20 42+363.03 0.12 0.0031 0.07 0.0004 0.19 0.19 73.74 75.62 0.000 Alcantarilla 94
99 42+363.03 42+554.26 0.19 0.0031 0.07 0.0006 0.24 0.24 73.74 67.41 0.000 Alcantarilla 95
100 42+554.26 42+864.50 0.31 0.0031 0.07 0.0010 0.31 0.31 73.74 60.21 0.010 Alcantarilla 96
101 42+864.50 43+058.82 0.19 0.0031 0.07 0.0006 0.25 0.25 73.74 67.16 0.000 Baden 01
102 43+058.82 43+158.06 0.10 0.0031 0.07 0.0003 0.18 0.18 73.74 78.56 0.000 Baden 02
103 43+158.06 43+378.01 0.22 0.0031 0.07 0.0007 0.26 0.26 73.74 65.24 0.000 Alcantarilla 97
104 43+378.01 43+582.65 0.20 0.0031 0.07 0.0006 0.25 0.25 73.74 66.35 0.000 Alcantarilla 98
105 43+582.65 43+791.15 0.21 0.0031 0.07 0.0006 0.25 0.25 73.74 66.06 0.000 Alcantarilla 99
106 43+791.15 43+989.21 0.20 0.0031 0.07 0.0006 0.25 0.25 73.74 66.86 0.000 Alcantarilla 100
107 43+989.21 44+131.93 0.14 0.0031 0.07 0.0004 0.21 0.21 73.74 72.17 0.000 Alcantarilla 101
108 44+131.93 44+263.67 0.13 0.0031 0.06 0.0004 0.21 0.21 73.74 72.36 0.000 Alcantarilla 102
109 44+263.67 44+364.80 0.10 0.0031 0.06 0.0003 0.19 0.19 73.74 76.97 0.000 Alcantarilla 103
110 44+364.80 44+658.43 0.29 0.0031 0.06 0.0009 0.31 0.31 73.74 60.01 0.010 Alcantarilla 104
111 44+658.43 44+885.03 0.23 0.0031 0.03 0.0007 0.33 0.33 73.74 57.72 0.000 Alcantarilla 105
112 44+885.03 45+329.12 0.44 0.0031 0.07 0.0014 0.36 0.36 73.74 55.27 0.010 Alcantarilla 106
113 45+329.12 45+355.69 0.03 0.0031 0.07 0.0001 0.10 0.17 73.74 81.56 0.000 Alcantarilla 107
114 45+355.69 45+593.48 0.24 0.0031 0.07 0.0007 0.27 0.27 73.74 63.94 0.010 Alcantarilla 108
115 45+593.48 45+817.19 0.22 0.0031 0.07 0.0007 0.26 0.26 73.74 64.86 0.000 Alcantarilla 109
116 45+817.19 46+135.05 0.32 0.0031 0.07 0.0010 0.31 0.31 73.74 59.75 0.010 Alcantarilla 110
117 46+135.05 46+495.85 0.36 0.0031 0.07 0.0011 0.33 0.33 73.74 58.01 0.010 Alcantarilla 111
118 46+495.85 46+621.39 0.13 0.0031 0.07 0.0004 0.20 0.20 73.74 73.80 0.000 Alcantarilla 112
119 46+621.39 46+860.48 0.24 0.0031 0.07 0.0007 0.28 0.28 73.74 63.49 0.010 Alcantarilla 113
120 46+860.48 46+968.81 0.11 0.0031 0.07 0.0003 0.19 0.19 73.74 76.38 0.000 Alcantarilla 114
121 46+968.81 47+151.22 0.18 0.0031 0.07 0.0006 0.24 0.24 73.74 67.63 0.000 Alcantarilla 115
122 47+151.22 47+441.36 0.29 0.0031 0.07 0.0009 0.30 0.30 73.74 60.69 0.010 Baden 03
123 47+441.36 47+561.93 0.12 0.0031 0.07 0.0004 0.20 0.20 73.74 74.50 0.000 Alcantarilla 116
124 47+561.93 47+841.76 0.28 0.0031 0.07 0.0009 0.30 0.30 73.74 61.20 0.010 Baden 04
125 47+841.76 48+049.33 0.21 0.0031 0.07 0.0006 0.26 0.26 73.74 65.62 0.000 Alcantarilla 117
126 48+049.33 48+315.43 0.27 0.0031 0.07 0.0008 0.29 0.29 73.74 61.93 0.010 Alcantarilla 118
127 48+315.43 48+452.37 0.14 0.0031 0.07 0.0004 0.21 0.21 73.74 72.31 0.000 Alcantarilla 119
128 48+452.37 48+701.99 0.25 0.0031 0.07 0.0008 0.28 0.28 73.74 62.86 0.010 Alcantarilla 120
129 48+701.99 49+043.20 0.34 0.0031 0.07 0.0011 0.32 0.32 73.74 58.44 0.010 Alcantarilla 121
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
130 49+043.20 49+252.11 0.21 0.0031 0.07 0.0006 0.26 0.26 73.74 65.53 0.000 Alcantarilla 122
131 49+252.11 49+314.68 0.06 0.0031 0.07 0.0002 0.15 0.17 73.74 81.56 0.000 Alcantarilla 123
132 49+314.68 49+556.01 0.24 0.0031 0.07 0.0007 0.28 0.28 73.74 63.36 0.010 Alcantarilla 124
133 49+556.01 49+702.20 0.15 0.0031 0.07 0.0005 0.22 0.22 73.74 71.22 0.000 Alcantarilla 125
134 49+702.20 49+984.11 0.28 0.0031 0.07 0.0009 0.30 0.30 73.74 61.10 0.010 Alcantarilla 126
135 49+984.11 50+152.90 0.17 0.0031 0.07 0.0005 0.23 0.23 73.74 68.87 0.000 Alcantarilla 127
136 50+152.90 50+377.90 0.23 0.0031 0.07 0.0007 0.27 0.27 73.74 64.40 0.000 Alcantarilla 128
137 50+377.90 50+462.00 0.08 0.0041 0.07 0.0003 0.17 0.17 73.74 81.03 0.000 Alcantarilla 129
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
CAUDALES DE APORTE
N° OBRA QTOTAL
TIPO DE OBRA PROGRESIVA OBSERVAC.
PROYEC. QCUNETA QMICROCUENCA (m3/s)
(m3/s) (m3/s)
76 Alcantarilla TMC 72 36+672.23 0.11 0.00 0.11 Alcantarilla TMC 72
77 Alcantarilla TMC 73 36+916.28 0.09 0.00 0.09 Alcantarilla TMC 73
78 Alcantarilla TMC 74 37+128.52 0.11 0.00 0.11 Alcantarilla TMC 74
79 Alcantarilla TMC 75 37+376.26 0.11 0.10 0.21 Alcantarilla TMC 75
80 Alcantarilla TMC 76 37+620.25 0.16 0.02 0.18 Alcantarilla TMC 76
81 Alcantarilla TMC 77 38+114.96 0.10 0.00 0.10 Alcantarilla TMC 77
82 Alcantarilla TMC 78 38+376.91 0.08 0.02 0.10 Alcantarilla TMC 78
83 Alcantarilla TMC 79 38+544.83 0.06 0.02 0.08 Alcantarilla TMC 79
84 Alcantarilla TMC 80 38+669.72 0.13 0.08 0.21 Alcantarilla TMC 80
85 Alcantarilla TMC 81 38+950.24 0.08 0.03 0.11 Alcantarilla TMC 81
86 Alcantarilla TMC 82 39+120.69 0.15 0.00 0.15 Alcantarilla TMC 82
87 Alcantarilla TMC 83 39+479.33 0.08 0.00 0.08 Alcantarilla TMC 83
88 Alcantarilla TMC 84 39+646.96 0.03 0.00 0.03 Alcantarilla TMC 84
89 Alcantarilla TMC 85 39+714.91 0.14 0.03 0.17 Alcantarilla TMC 85
90 Alcantarilla TMC 86 40+037.01 0.14 0.00 0.14 Alcantarilla TMC 86
91 Alcantarilla TMC 87 40+369.13 0.15 0.00 0.15 Alcantarilla TMC 87
92 Alcantarilla TMC 88 40+741.85 0.11 0.04 0.15 Alcantarilla TMC 88
93 Alcantarilla TMC 89 41+058.64 0.08 0.00 0.08 Alcantarilla TMC 89
94 Alcantarilla TMC 90 41+279.32 0.09 0.03 0.12 Alcantarilla TMC 90
95 Alcantarilla TMC 91 41+512.39 0.09 0.03 0.12 Alcantarilla TMC 91
96 Alcantarilla TMC 92 41+810.44 0.07 0.00 0.07 Alcantarilla TMC 92
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE,
DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
137 Alcantarilla TMC 129 50+377.90 0.30 0.00 0.30 Alcantarilla TMC 129
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
“ESTUDIO DIFINITIVO DE LA CARRETERA CIUDAD DE LA COIPA – CENTRO POBLADO RUMIPITE, DISTRITO DE LA COIPA, PROVINCIA DE SAN IGNACIO, REGION
CAJAMARCA”
Caudal de Quebrada
Caudal de Quebrada
Cuneta Via
Cudal Total
Caudal de
Cuneta
Via Perfil Longitudinal
Caudal
Planta
Total
Cuadro de caudales que pasaran por las alcantarillas de alivio, originados por el paso de manantiales, laderas, haciendo mayor el
caudal agregado a la cuneta
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Calcularemos el caudal má ximo, para estas condiciones. Considerando la alcantarilla de TMC, 48´´, pendiente
mínima 2%. Para tal fin utilizaremos el programa HidroEsta.
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Como se puede apreciar, el diá metro de TMC 48´´, para sus condiciones mínimas, tiene una capacidad de 2.73 m3, y el flujo alcanza una velocidad de 2.99 m/s y
un borde libre de 0.3 m, tirante má ximo de 0.90m y pendiente de 2%.
Como se puede apreciar, el diá metro de TMC 36´´, para sus condiciones mínimas, tiene una capacidad de 1.265 m3, y el flujo alcanza una velocidad de 2.47 m/s y
un borde libre de 0.225 m, tirante má ximo de 0.675m y pendiente de 2%.
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Donde :
Aplicando la formula de MANNING Q: Caudal en m3/seg..
2/3 1/2 A: Á rea hidrá ulica en m2
Q= A R S P: Perímetro mojado en m
n R: Radio hidrá ulico = A/P
S: Pendiente de la alcantarilla
n: coeficiente de rugosidad
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
PESO DE LA ESTRUCTURA
Peso losa superior (kg) 648
Peso losa inferior (kg) 648 B=1.80 m
Peso muro izquierdo (kg) 684
Peso muro derecho (kg) 684
Peso total de la estructura (kg) 2664
L= 2.10 m
Peso de relleno sobre la estructura (kg/m^ 1260
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Carga sobre la losa superior (kg/m^2) 4874.61 Extremo de losa superior (kg.m) 1791.42
Reacción del terreno (kg/m^2) 8066.61 Extremo de losa inferior (kg.m) 2964.48
Carga sobre la losa inferior (kg/m^2) -8066.6 Zona superior de pared lateral (kg.m) 1115.32
Carga en zona superior del muro lateral (kg/m^2) 2573.13 Zona inferior de pared lateral (kg.m) 1285.94
Carga en zona inferior del muro lateral (kg/m^2) 5408.87
4874.61 kg/m^2
D C
-8066.61 kg/m^2
DISTRIBUCION DE MOMENTOS POR EL METODO DE CROSS
Calculo de rigideces K=4EI/L
Las secciones son iguales en todo el cajon y el material es el mismo, asi que "EI" es constante
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
KAB 1.90
KAD 2.11
SUMA= 4.01
Factor de distribucion
FAB 0.48
FAD 0.53
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
1345.28 -1345.28
-285.57 285.57
160.57 -160.57
-321.15 321.15
1791.42 0.48 -1791.42
-1115.32 1115.32
-354.95 354.95
440.62 -440.62
-315.63 B 315.63
A
-1345.28 1345.28
0.53 0.53
D C
2292.16 -2292.16
302.47 -302.47
-177.48 177.48
881.24 -881.24
1285.94 -1285.94
-2964.48 0.48 2964.48
797.31 -797.31
MOMENTOS FINALES -398.65 398.65
MA=MB 1345.28 273.66 -273.66
MC=MD 2292.16 -2292.16 2292.16
En losa superior (kg) 5118.34 Calculando el cortante igual a Cortante que absorve el concreto (kg) 6912.39
cero para determinar el
En losa inferior (kg) 8469.94 momento máximo
EN PAREDES LATERALES X (cortante igual a cero) 0.781 En losa superior CUMPLE
CORTANTE ISOSTATICA f(x)=RA- (P1(2L-X)+P2X/2L)X383.43 En losa inferior NO CUMPLE
Zona superior de pared lateral (kg) 3432.26 f(x)^2 ### En muros laterales CUMPLE
Zona inferior de pared lateral (kg) 4150.65
CORTANTE HIPERESTATICA
V -498.36
EXPEDIENTE TECNICO
NOTA: Encontramos la distancia
"X" con ayuda de la herramienta
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO
"SOLVER",cada vezVECINAL,
que se CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
cambien algun parametro del
diseño se tendra que realizar de
nueva cuenta el cálculo.
Losa superior (kg) 895.71 FACTOR DE SEGURIDAD ">1.5" 1.86 SI CUMPLE
Losa Inferior (kg) 1482.24
Paredes laterales (kg) 333.95
5118.34 kg
1345.3 kg.m 1345.3 kg.m 2933.90 kg
B
A
A B
D C
8469.94 kg
D C
1482.2 kg.m
4649.01 kg
2292.2 kg.m 2292.2 kg.m 4649.01 kg
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Carga sobre la losa superior (kg/m^2) 4874.61160395304 Extremo de losa superior (kg.m) 1791.42
Reacción del terreno (kg/m^2) 6146.61160395304 Extremo de losa inferior (kg.m) 2258.88
Carga sobre la losa inferior (kg/m^2) -6146.61160395304 Zona superior de pared lateral (kg.m) 1115.32
Carga en zona superior del muro latera 2573.13 zona inferior de pared lateral (kg.m) 1285.94
Carga en zona inferior del muro lateral 5408.87
4874.61 kg/m^2
D C
-6146.61 kg/m^2
Calculo de rigidecesK=4EI/L Las secciones son iguales en todo el cajon y el material es el mismo, asi que "EI" es constante
1433.26 -1433.26
KAB 1.90 -197.59 197.59
KAD 2.11 160.57 -160.57
SUMA= 4.01 -321.15 321.15
Factor de distribuci 1791.42 0.48 -1791.42
FAB 0.48 -1115.32 1115.32
FAD 0.53 -354.95 354.95
255.40 -255.40
-218.39 A B 218.39
-1433.26 1433.26
0.53 0.53
D C
1833.74 -1833.74
214.49 -214.49
-177.48 177.48
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL DCAMINO VECINAL,
C CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
510.80 -510.80
1285.94 -1285.94
-2258.88 0.48 2258.88
462.15 -462.15
-231.07 231.07
194.06 -194.06
-1833.74 1833.74
MOMENTOS FINALE
MA=MB 1433.26
MC=MD 1833.74
En losa superior (kg) 5118.34 Cortante que absorve el concreto (kg) 6912.39
En losa inferior (kg) 6453.94
CORTANTE HIPERESTATICA
V -210.781
CAPACIDAD DEL SUELO
5118.34 kg
1433.3 kg.m 1433.3 kg.m
3221.48 kg
1433.3 kg.m 1433.3 kg.m 4361.43 kg
895.71 kg.m
5118.34 kg
B
A
A B
D C
EXPEDIENTE TECNICO
D C
B
A
A B
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
D C
6453.94 kg
D C
1129.44 kg.m
### 1833.7 kg.m 4361.43 kg 4361.43 kg
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
CALCULO DE ACERO
LECHO EXTERIOR LECHO INTERIOR
Mmáx (kg.cm) 229216.33 Mmáx (kg.cm) 148223.99
f'c (kg/cm^2) 210 f'c (kg/cm^2) 210.00
Base (cm) 100 Base (cm) 100.00
Peralte d 10 Peralte d 10.00
K 0.121278482 K 0.08
Indice de refuerzo w 0.131477403 Indice de refuerzo w 0.08
Porcentaje de acero 0.00657387 Porcentaje de acero 0.00
Porcentaje minimo 0.003333333 SI CUMPLE Porcentaje minimo 0.00333 SI CUMPLE
Porcentaje maximo 0.016061879 SI CUMPLE Porcentaje maximo 0.01606 SI CUMPLE
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
ARMADO DE LA ALCANTARILLA
#3 @ 10 cm #3 @ 37.5 cm
NOTAS:
#3 @ 15 cm
@ 10 cm #3 @ 10 cm
#3 @ 15 cm
#3 @ 15 cm
#3 @ 15 cm
#3 @ 10 cm #3 @ 37.5 cm
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
RESUMEN DE REFUERZOS
ELEMENTO LECHO AREA DE ACERO (cm^2)
# DE BARRA A UTILIZAR
SEPARACION (cm)
Losa superior Exterior 6.57 3 10.00 cm2
Losa superior Exterior por temperatura 1.8 3 37.50 cm2
Losa superior Interior 4.12 3 15.00 cm2
Losa superior Interior por temperatura 1.8 3 37.50 cm2
Losa inferior Interior 4.12 3 15.00 cm2
Losa inferior Interior por temperatura 1.8 3 37.50 cm2
Losa inferior Exterior 6.57 3 10.00 cm2
Losa inferior Exterior por temperatura 1.8 3 37.50 cm2
Paredes laterales Exterior 6.57 3 10.00 cm2
Paredes laterales Exterior por temperatura 1.8 3 37.50 cm2
Paredes laterales Interior 4.12 3 15.00 cm2
Paredes laterales Interior por temperatura 1.8 3 37.50 cm2
VOLUMEN DE MATERIALES
Volumen de concreto
Losa superior (m^3) 1.62
Losa Inferior (m^3) 1.62
Paredes laterales (m^3) 3.42
Total de concreto (m^3) 6.66
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Cantidad de acero
LOSAS SUPERIOR E INFERIOR LECHO EXTERIOR
LOSAS SUPERIOR E INFERIOR LECHO INTERIOR
PAREDES LATERALES LECHO EXTERIOR
Acero principal Acero principal Acero principal
Largo de barras (m) 2.16 Largo de barras (m) 2.16 Largo de barras (m) 1.96
Numero de barras 60.00 Numero de barras 60.00 Numero de barras 19.00
total de ml 130 total de ml 130 total de ml 37
Varilla a utilizar # 3 Varilla a utilizar # 3 Varilla a utilizar # 3
Total de varilla (kg) 72.1872 Total de varilla (kg) 72.187 Total de varilla (kg) 20.743
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA –
SAN IGNACIO – CAJAMARCA”
“ESTUDIO DIFINITIVO DE LA CARRETERA CIUDAD DE LA COIPA – CENTRO POBLADO RUMIPITE, DISTRITO DE LA COIPA, PROVINCIA DE SAN IGNACIO, REGION CAJAMARCA”
BL
Y' 1 Y
z
a b a
Caudal por Ancho Longitud de Pendient Tirante Datos Hidrau. Borde Altura
N° Ubicación a Talud n V. Caudal
Baden Solera Baden e Asum. A P R Libre Total
UND km m m3/seg b (m) (Z) s (y) m2 m m (m/s) BL (m) Y' (m) m3/s
I 42+858.25 2.40 0.070 15.0 19.80 12.00 0.028 3.00% 0.05 0.8 16.20 0.05 0.82 0.15 0.200 0.64
F 42+878.05 Diseño correcto
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA –
SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA –
SAN IGNACIO – CAJAMARCA”
“ESTUDIO DIFINITIVO DE LA CARRETERA CIUDAD DE LA COIPA – CENTRO POBLADO RUMIPITE, DISTRITO DE LA COIPA, PROVINCIA DE SAN IGNACIO, REGION CAJAMARCA”
BL
Y' 1 Y
z
a b a
Caudal por Ancho Longitud de Pendient Tirante Datos Hidrau. Borde Altura
N° Ubicación a Talud n V. Caudal
Baden Solera Baden e Asum. A P R Libre Total
m m3/seg b (m) (Z) s (y) m2 m m (m/s) BL (m) Y' (m) m3/s
I 43+052.25 2.40 0.040 9.2 14.00 12.00 0.028 3.00% 0.05 0.5 10.40 0.05 0.81 0.15 0.200 0.40
F 43+066.25 Diseño correcto
BL
Y' 1 Y
z
a b a
Caudal por Ancho Longitud de Pendient Tirante Datos Hidrau. Borde Altura
N° Ubicación a Talud n V. Caudal
Baden Solera Baden e Asum. A P R Libre Total
m m3/seg b (m) (Z) s (y) m2 m m (m/s) BL (m) Y' (m) m3/s
I 47+141.75 2.40 0.110 13.3 18.05 12.00 0.028 3.00% 0.05 0.7 14.45 0.05 0.82 0.15 0.200 0.57
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO DE LA COIPA –
SAN IGNACIO – CAJAMARCA”
BL
Y' 1 Y
z
a b a
Caudal por Ancho Longitud de Pendient Tirante Datos Hidrau. Borde Altura
N° Ubicación a Talud n V. Caudal
Baden Solera Baden e Asum. A P R Libre Total
m m3/seg b (m) (Z) s (y) m2 m m (m/s) BL (m) Y' (m) m3/s
I 47+557.25 2.40 0.110 7.2 12.00 12.00 0.025 2.80% 0.05 0.4 8.40 0.05 0.86 0.15 0.200 0.34
F 47+569.25 Diseño correcto
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
Caudal de Quebrada
Caudal de Quebrada
Cuneta Via
Cudal Total
Caudal de
Cuneta
Via Perfil Longitudinal
Caudal
Planta
Total
Cuadro de caudales que pasaran por las alcantarillas de paso, originados por el paso de
quebradas o manantiales, haciendo mayor el caudal agregado a la cuneta
Q. DISEÑO
Alcantarilla N° PROGRESIVA
(m3/s)
1 20+736.49 0.20
2 21+247.21 0.19
3 21+477.20 0.08
4 21+661.44 0.07
5 21+811.76 0.08
6 21+995.00 0.53
7 22+238.23 0.44
8 22+614.40 0.14
9 23+377.16 0.19
10 25+073.16 0.03
11 25+147.84 0.06
12 25+274.71 0.15
13 25+658.61 0.18
14 26+061.87 0.10
15 26+544.99 0.05
16 26+651.61 0.10
17 26+891.23 0.34
18 27+128.84 0.14
19 27+446.81 0.28
20 27+704.71 0.12
21 28+353.43 0.03
22 28+421.87 0.03 0.53
23 28+486.99 0.10
24 28+560.30 0.15
25 28+895.47 0.17
26 29+290.20 0.22
27 29+624.77 0.15
28 29+972.42 0.16
29 30+190.58 0.16
30 30+375.49 0.21
31 30+585.31 0.12 0.22
32 30+769.80 0.13
33 31+135.47 0.10
34 31+376.92 0.16
35 31+596.28 0.15
36 31+925.56 0.37 0.37
37 32+202.97 0.13
38 32+356.24 0.12
39 32+900.39 0.20
40 33+382.63 0.10
41 33+509.28 0.04
42 33+707.58 1.07
43 33+922.51 0.11
44 34+226.45 0.30
45 34+406.66 0.31
46 34+883.73 0.09
47 35+499.30 0.08
48 36+071.99 0.11
49 36+379.84 0.00
50 36+916.28 0.09
51 37+376.26 0.21
52 37+620.25 0.18 1.07
53 38+376.91 0.10
54 38+544.83 0.08
55 39+714.91 0.17
56 40+037.01 0.14
58 40+369.13 0.15
59 40+741.85 0.15
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
60 41+058.64 0.08
61 41+512.39 0.12
62 42+038.58 0.08
63 42+246.20 0.14
64 42+554.26 0.32
65 43+158.06 0.08
66 43+582.65 0.08
67 44+131.93 0.15
68 44+364.80 0.11
69 44+658.43 0.07
70 44+885.03 0.21
71 45+329.12 0.10
72 45+355.69 0.09 0.32
73 45+593.48 0.08
74 45+817.19 0.12
75 46+135.05 0.13
76 46+495.85 0.05
77 46+621.39 0.09
78 46+860.48 0.05
79 46+968.81 0.20
80 47+151.22 0.11
81 47+441.36 0.20
82 47+561.93 0.11
83 47+841.76 0.08
84 48+049.33 0.10
85 48+315.43 0.18
86 48+452.37 0.10
87 48+701.99 0.22
88 49+043.20 0.08
89 49+252.11 0.16
90 49+314.68 0.09
91 49+556.01 0.06
92 49+702.20 0.11
93 49+984.11 0.58
94 50+152.90 0.08
Como podemos observar, vamos a calcular hidráulicamente una sola clase de alcantarillas
tipo marco para el máximo de los caudales calculados.
* Alcantarillas N° 07, 15
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
C.1. ALCANTARILLAS N° 07 , 15
* Caudal de Diseño para las alcantarillas:
Q= 0.44 m3/seg.
Adoptamos: Q= 4.000 m3/seg.
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
EXPEDIENTE TECNICO
" MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL, CA-507:EMP.PE – 5N SAN IGNACIO – RUMIPITE, TRAMO II: LA COIPA – C.P. RUMIPITE, DISTRITO
DE LA COIPA – SAN IGNACIO – CAJAMARCA”
C.3. ALCANTARILLAS N° 02 , 03 , 04 , 05 , 08 , 09 , 10 , 13 , 14 , 16 , 17 , 18 , 19 , 20 , 21 ,
22,23,23,24,26,27,28,29,30,33,34,35,36,38,39,40,41,42,43,44,45,46,47,48,49,50,51,52,53,54,55,56,57,58,5
9,60,61,62,63,64,65,66,67,68,69,70,71,72
EXPEDIENTE TECNICO