Defect Code: CR- Crack IP-Incomplete Penetration IF– Incomplete Fusion SL- Slag P- Porosity EP-Excess Penetration CP- Cluster Porosity CON – Concavity BSR – Before Stress Relief ASR – After Stress Rel
TESTED BY: Arbab Witness
Name: Md.Shaharia alam Name: Engr.Salman
IES: ASNT Level –II (UT,MT,DPT,VT) Arbab -Engineer
Signature: Signature:
WELD INDI. THK X Y(yw) BPL(w) A d CLASS L DEPTH y Y-y RESULT REMARKS
IDENTIFICA NO. mm mm mm mm. dB dB. mm. mm. mm. mm.
TION
Joint No-13 06 - - - - 66.1 - - - - - Accepted Satisfactory,
Rafter After Recheck
Joint no -15 06 - - - - 66.1 - - - - - Accepted Satisfactory,
After Recheck
Joint no-16 06 - - - - 66.1 - - - - - Accepted Satisfactory,
After Recheck
T** LEGEND: X = Circumferential distance from datum, Y= Distance from weld C/L to probe index. BPL = Beam path length, y = Calculated distance from probe index, L = Length, a = Indication level, d = Indication
rating,
Defect Code: CR- Crack IP-Incomplete Penetration IF– Incomplete Fusion SL- Slag P- Porosity EP-Excess Penetration CP- Cluster Porosity CON – Concavity BSR – Before Stress Relief ASR – After Stress Rel
TESTED BY: Arbab Witness
Name: Md.Shaharia alam Name: Engr.Salman
IES: ASNT Level –II (UT,MT,DPT,VT) Arbab -Engineer
Signature: Signature:
WELD INDI. THK X Y(yw) BPL(w) A d CLASS L DEPTH y Y-y RESULT REMARKS
IDENTIFICA NO. mm mm mm mm. dB dB. mm. mm. mm. mm.
TION
Joint No-35 06 - - - - 66.1 - - - - - Accepted Satisfactory,
Rafter After Recheck
Joint No-36 06 - - - - 66.1 - - - - - Accepted Satisfactory,
After Recheck
Joint no -39 06 - - - - 66.1 - - - - - Accepted Satisfactory,
After Recheck
Joint no-40 06 - - - - 66.1 - - - - - Accepted Satisfactory,
After Recheck
T** LEGEND: X = Circumferential distance from datum, Y= Distance from weld C/L to probe index. BPL = Beam path length, y = Calculated distance from probe index, L = Length, a = Indication level, d = Indication
rating,
Defect Code: CR- Crack IP-Incomplete Penetration IF– Incomplete Fusion SL- Slag P- Porosity EP-Excess Penetration CP- Cluster Porosity CON – Concavity BSR – Before Stress Relief ASR – After Stress Rel
TESTED BY: Arbab Witness
Name: Md.Shaharia alam Name: Engr.Salman
IES: ASNT Level –II (UT,MT,DPT,VT) Arbab -Engineer
Signature: Signature:
Defect Code: CR- Crack IP-Incomplete Penetration IF– Incomplete Fusion SL- Slag P- Porosity EP-Excess Penetration CP- Cluster Porosity CON – Concavity BSR – Before Stress Relief ASR – After Stress Rel
TESTED BY: Arbab Witness
Name: Md.Shaharia alam Name: Engr.Salman
IES: ASNT Level –II (UT,MT,DPT,VT) Arbab -Engineer
Signature: Signature: