Figured dimensions to be used in preference to scaled sizes.

All dimensions
must be checked before commencing work on site. The copyright of this
drawing remains with PROAIR CONSULTANTS and may not be reproduced in
any form without prior written consent.

EXISTING CONCRETE PIERS RETAINED AND FOUR NEW 9m LONG 254x146x37UB`s FIXED
PREPARED FOR REUSE ON TOP OF EXISTING CONCRETE PIERS
AFTER REMOVEL OF EXISTING CHILLER
AND STEELWORK (333kg EACH OR 1332kg IN
TOTAL)

12950
150Ø REVERSE AND RETURN HEADER ARRANGEMENT
AAV

750
AAV
DC

DC

IV IV IV IV
2880 2260 2000 2260 27.0 120 13.5 240 FS 2PMV 13.5 240 FS 2PMV
150Ø 1.50 100Ø 1.60 100Ø 1.60
flex flex flex flex
200mm WALL 1150mm HIGH
3950
CHILLER 1 CHILLER 2
(100Ø CHW F+R) (100Ø CHW F+R)

12°C 6°C

GULLY CHANNEL AAV


DRAINAGE CHANNEL DRAINAGE CHANNEL
P5/P6
150Ø TP TP
SVP T TS T TS P P IV
500

100Ø IV 150Ø
RECONNECT TO EXISTING
IV FMD CV IV
150Ø T TS flex flex
ROOF 100Ø IV
80Ø
ACCESS IV FMD CV IV

600mmØ LOW VELOCITY HEADER


IV
DC 25Ø P1/P2 = GRUNDFOS TPE 80 - 110/4

CABLE TRAY
IV P3/P4 = GRUNDFOS TPE 80 - 110/4
13.5 240 10 LITRE P5/P6 = GRUNDFOS TPE 100 - 240/2-S
22Ø
DOSING
MCW 100Ø 1.60 POT DP/1
IV
DCV
GULLY`S IV
IV
TWO NEW MITSUBISHI ELECTRIC EUROPE P3/P4 25Ø
IV PU/01 EV/01 TP TP
TECS2/HFO/SL-CA-E/0351 CHILLERS 150Ø T TS P P Str P
100Ø
INSTALLED ON NEW STEEL BEAMS IV
200 IV CV
4000mm L x 2260mmW x 2430mmH AND flex flex 80Ø
IV litre P1/P2
150Ø FMD
3130kg EACH (6260kg TOTAL) TP TP
100Ø T TS P P Str P P Str P
150Ø
15Ø IV RECONNECT TO EXISTING
IV CV IV IV CV IV
25Ø DC flex flex
25Ø 25Ø 25Ø
IV 25Ø DC

100Ø CHW F+R CONNECT TO SHELL AND


TUBE HEAT EXCHANGERS

150Ø CHW F+R TO FORM A 150Ø CHW RETURN RUN ABOVE FLOW
REVERSE-RETURN HEAER ARRANGEMENT DROPPING TO FORM REVERSE-RETURN
ON PARAPET WALL HEADER ARRANGEMENT ON PARAPET WALL

DC

DC

SECTION A-A

A A
150Ø CHW FLOW DROP INTO PLANTROOM
BELOW THROUGH EXISTING HOLE IN ROOF

100Ø CHW F+R 100Ø CHW F+R


AAV
CONNECT TO SHELL CONNECT TO SHELL 200mm WALL 1150mm HIGH
150Ø CHW RETURN PIPE TO RUN ABOVE AND TUBE HEAT AND TUBE HEAT
FLOW ON WALL EXCHANGER EXCHANGER

150Ø CHW RETURN RISE FROM PLANTROOM


BELOW THROUGH EXISTING HOLE IN ROOF
CHILLER No. 1 CHILLER No. 2
AAV REV DATE DESCRIPTION NAME

GULLY CHANNEL
PROAIR
DRAINAGE CHANNEL CONTROL PANEL CONTROL PANEL DRAINAGE CHANNEL
CONSULTANTS
SVP TEC2 HFO /SL-CA-E/0351 CHILLER Mechanical and Electrical
Services Engineers
ROOF
ACCESS
CLIENT

PORSCHE GB LTD
CABLE TRAY

ARCHITECT
GULLY`S

PROJECT

PORSCHE CALCOT CHILLERS


TITLE

NEW CHILLED INSTALLATION


ON THE ROOF

DESIGNED BY DRAWN BY CHECKED


SHELL AND TUBE HEAT EXCHANGER AS JW
DATE SCALE

OCT 2018 1:50 (A1)


DRAWING No REVISION

7598/M/1000 T1
PROAIR CONSULTANTS
25 The Birchwoods, Reading,
Berkshire, RG31 5UH
Tel - 0118 9428522 Email - lee.turner@proairconsultants.co.uk

Das könnte Ihnen auch gefallen