Sie sind auf Seite 1von 8

VISIT REPORT

TUV SAP No.: 8116429925 Branch: Bangalore

Report No: 8116429925/TUV/DELTA/2500HV-01 , Dt: 12.12.2018


DEC/PMC Name(if any) NA Project : NA
End Client : NA Client’s PO No. NA
(on vendor) :
Vendor Name : M/s Delta Electronics NA Sub vend or name :
India Pvt Ltd
Place of Inspection: M/s Delta Electronics India Pvt Ltd , # 87-A, 6th Cross, Electronic city
phase 1, Hosur Road, Doddathogur, Bangalore - 560100
Call Received on: 07th Nov 2018 Test Witness Date: 14th , 15th, 16th, 17th, 19th,
20th, 21st, 22nd, 23rd, 24th,
25th , 26th Nov 2018,
06th, 11th & 12th Dec 2018
Stage of inspection:
Kick off/Pre – inspection meeting Material Identification  Interim stage
Document review Final Re-inspection
Sr. No Item Description PO Offered
quantity Qty

01 Product description : Solar Inverter DelCEN2500HV -- 01 No


Product Code : IPVCI2500HV 00
Serial No : IPVCIABF18I0001B00

02 Product description : Solar Inverter DelCEN2625HV -- 01 No


Product Code : IPVCI2625HV 00
Serial No : IPVCIBBF18I0001B00

03 Product description : Solar Inverter DelCEN2750HV -- 01 No


Product Code : IPVCI2750HV 00
Serial No : IPVCICBF18I0001B00

04 Product description : Solar Inverter DelCEN2875HV -- 01 No


Product Code : IPVCI2875HV 00
Serial No : IPVCIDBF18I0001B00

Reference Documents:

APPLICABLE STANDARD DESCRIPTION


IEEE Recommended Practice and Requirements for Harmonic
IEEE 519 : 2014 Control in Electric Power Systems.
Photovoltaic systems – Power conditioners – Procedure for
IEC 61683 : 1999 measuring efficiency
Safety of power converters for use in photovoltaic power systems
IEC 62109-1 : 2010 – Part 1: General requirements
Safety of power converters for use in photovoltaic power systems
IEC 62109-2 : 2011 – Part 2: Particular requirements for Inverters
BS EN 50530:2010+A1:2013 Overall efficiency of grid connected photovoltaic inverters
Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s)
concerned in full compliance with requirements of its order specification.
Distribution list:  Client Vendor  TUV Branch – Bangalore
Form No. : F / INSP/VR / 11 - R 3 Revision date 12/04/2014 Page 1 of 8
VISIT REPORT
IEEE Standard Conformance Test Procedures for Equipment
Interconnecting Distributed Resources with Electric Power
IEEE 1547.1 : 2005 Systems
IEEE Standard for Interconnection and Interoperability of
Distributed Energy Resources with Associated Electric Power
IEEE 1547: 2018 Systems Interfaces
DOCUMENT NAME DOCUMENT NUMBER
GA DRAWING GAD/IPVCI 2500HV 00 Rev 00
MWP/Electrical BOM/2500HV-01 Rev 00
BOM MWP/Mechanical BOM/2500HV-01 Rev 00

SCHEMATIC DRAWING SC/IPVCI 2500HV 00 Rev 00


Inspection Activities carried out:
1. Visual verification of UUT wrt GA – Found satisfactory
2. Dimension check wrt GA – Found satisfactory
3. Components verification wrt BOM – Found satisfactory
4. Verification of Test set-up – Found satisfactory
5. Voltage and current Harmonics measurement test as per IEEE 519 standard – Results
found satisfactory and refer witness report for details.
6. Power Efficiency measurement test as per ICE 61683 standard - Results found satisfactory
and refer witness report for details.
7. Safety tests carried out as per IEC 62109-1 & IEC 62109-2 standard - Results found
satisfactory and refer witness report for details.
8. MPPT Efficiency measurement test as per BS EN 50530 standard - Results found
satisfactory and refer witness report for details.
9. Anti-islanding test carried out as per IEEE 1547 standard – Trip time observed was <2sec
and found meeting the requirements and refer witness report for details
Document Review :

1. Verification of calibration certificates for used measuring instruments – Found valid


2. Bought out components safety certificates verified as per BOM – Found satisfactory
INDENTIFICATION: NA

Areas of concern/Comments:
1. Panel door Open/close identification sticker to be provided for all doors.
2. Lifting hook sticker to be provided for all lifting points.
Non Conformities raised(if any) (mention NCR no’s): NA
Attachments (Vendor records, NCR’s, Deviation requests etc.):
Checklist, Witness reports, Boughtout test reports
Name of inspector : Adarsh Kumar Date : 12/12/2018
Signature & Stamp :

Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s)
concerned in full compliance with requirements of its order specification.
Distribution list:  Client Vendor  TUV Branch – Bangalore
Form No. : F / INSP/VR / 11 - R 3 Revision date 12/04/2014 Page 2 of 8
VISIT REPORT

Ref photographs

Panel front view

Panel rear view

Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s)
concerned in full compliance with requirements of its order specification.
Distribution list:  Client Vendor  TUV Branch – Bangalore
Form No. : F / INSP/VR / 11 - R 3 Revision date 12/04/2014 Page 3 of 8
VISIT REPORT

Panel door open condition

Panel internal view

Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s)
concerned in full compliance with requirements of its order specification.
Distribution list:  Client Vendor  TUV Branch – Bangalore
Form No. : F / INSP/VR / 11 - R 3 Revision date 12/04/2014 Page 4 of 8
VISIT REPORT

Harmonics measurement

Efficiency measurement

Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s)
concerned in full compliance with requirements of its order specification.
Distribution list:  Client Vendor  TUV Branch – Bangalore
Form No. : F / INSP/VR / 11 - R 3 Revision date 12/04/2014 Page 5 of 8
VISIT REPORT

Temperature rise test

Dimensioanal checks

Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s)
concerned in full compliance with requirements of its order specification.
Distribution list:  Client Vendor  TUV Branch – Bangalore
Form No. : F / INSP/VR / 11 - R 3 Revision date 12/04/2014 Page 6 of 8
VISIT REPORT

Caution labels

Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s)
concerned in full compliance with requirements of its order specification.
Distribution list:  Client Vendor  TUV Branch – Bangalore
Form No. : F / INSP/VR / 11 - R 3 Revision date 12/04/2014 Page 7 of 8
VISIT REPORT

Nameplate details

Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s)
concerned in full compliance with requirements of its order specification.
Distribution list:  Client Vendor  TUV Branch – Bangalore
Form No. : F / INSP/VR / 11 - R 3 Revision date 12/04/2014 Page 8 of 8

Das könnte Ihnen auch gefallen