Sie sind auf Seite 1von 5

NESPAK (Pvt.

) Limited is Pakistan’s premier consultancy organization

NESPAK enjoys the reputation of being one of the top engineering consultancy
organizations in Asia and Africa.
NESPAK was established in 1973 as a private limited company by the
Government of Pakistan. The objective of its creation was to create a pool of
talented engineers, attain self-reliance in engineering consultancy and replace
foreign consultants.
Currently NESPAK has total strength of over 4500 employees.
The Total estimated turnover for the year 2018-2019 was Rs. 8.2 Billion with the
total cumulative cost of the projects undertaken by NESPAK is US $ 301 Billion.
MR. OMER RASUL
Secretary,
Power Division, Ministry of Chairman BOD - NESPAK
Energy
Government of Pakistan

DR. TAHIR MASOOD


Managing
Managing Director,
Director
NESPAK

CAPT. (R) SIKANDAR


QAYYUM
Chairman, Director
National Highways
Authority

DR. AHMED MUJTABA


MEMON
Director
Additional Secretary (CF),
Ministry of Finance

MR. WASEEM MUKHTAR


Additional Secretary (II),
Director
Power Division, Ministry
of Energy

MR. HAMID YAQOOB


SHEIKH Director
Chairman Planning &
Development Board,
Punjab

MR. MUHAMMAD
WASEEM
Additional Chief Secretary Director
(Development),
Sindh

DR. SHAHZAD KHAN


BANGASH
Additional Chief Secretary
Director
(Development),
Khyber Pakhtunkhwa -
Peshawar

MR. ABDUL SABOOR


KAKAR
Additional Chief Secretary Director
(Development),
Balochistan - Quetta

MR. MUHAMMAD IRFAN


AKRAM
Independent
Ex-Vice President
Director
Customer,
Mobilink

MR. NAEEMUDDIN KHAN


Independent
President & CEO,
Director
The Bank of Punjab

MR. MUHAMMAD
Independent
NAWAZ KASURI
Director
Barrister-at-Law
“ WHEN A TEAM OUTGROWS
INDIVIDUAL PERFORMANCE AND
LEARNS TEAM CONFIDENCE,
EXCELLENCE BECOMES A REALITY.”
JOE PATERNO

The name of NESPAK has become synonymous with toil, hardwork, endurance
and perseverance which resulted in growth, success and prosperity for the
Company.
The Company, which was established to bring different engineering disciplines
under one roof, has come a long way during the last 44 years of its existence.
The journey of success and struggle continued with new achievements during
the year with the Company scaling new heights while compensating for its
loopholes and mistakes.
NESPAK has attained the status of a leader in the consultancy industry through a
long struggle but retaining this position was even more challenging. It required an
even harder struggle which NESPAK went through with panache and elegance.
A lowdown of the progress depicts a brilliant upsurge in the current year's
business. The fee contracted during the year was Rs. 11.87 billion which is 18
percent more than the year 2015-16.
The increase in business was made possible due to NESPAK's concerted and
consistent policies to get good projects. The efficiency and effectiveness of
NESPAK's aggressive marketing are evident from the fact that it won more than
70 percent jobs through open competition out of a total of 105 projects in
Pakistan and overseas during the year 2016-17.
The major projects acquired during the fiscal year include Punjab Power Plant
Jhang, Hanzel Hydropower Project, Tarap-KotBelian Road and Havelian-Thakot
Expressway for the China-Pakistan Economic Corridor, Dualisation of Khanewal-
Lodhran Road, Quetta Development Package-Road Projects, Permanent
Reconstruction Works in Federally Administered Tribal Areas, Infrastructure
Design of Islamabad Metro Bus, DHA Medical City Phase-VIII, Lahore, 100-bed
Mother and Child Care Hospital, Murree and Landslide Hazard Zonation of
Murree Hills. The 10 foreign projects acquired during the year include Raising
Wala Dam, Jordan and Rehabilitation of Rural Access Roads and Mobility
Project-II, Nigeria.
Social thinker John Ruskin has rightly said that quality is never an accident. It is
always the result of intelligent effort. NESPAK always strives to take practical
steps to achieve best quality by enhancing its expertise through guidance and
training. During the year, NESPAK arranged nine professional and management
training programmes in Lahore, Karachi and Islamabad wherein 256
professionals attended technical lectures in the field of managerial and support
competencies. Professionals are being sent to foreign countries to acquire
knowledge of the latest trends in the domains of water resources, energy,
environment management e.t.c.
Workforce is the show window of a Company and NESPAK regards its
employees as its great asset. As the volume of work increases, NESPAK raises
its staff strength to carry out its operations in a more effective manner. The
current strength of NESPAK staff stands at 5552, including professionals and
technical experts in various engineering disciplines.
Quality has always been taken a great care at NESPAK. This is achieved
through attaining the ISO 9001 Quality Management System (QMS) of NESPAK
as well as continuously upgrading the quality of our services.
As part of the QMS implementation, the Internal Quality Audit (IQA) Programme
was issued for various NESPAK Divisions/Offices for the year 2017 in advance to
monitor implementation of the QMS on design and construction supervision-
related activities.
The Surveillance Audits were conducted by the Lead Auditor/Technical Experts
of TUV Austria Bureau of Inspection and Certification in December 2016 and
May2017 in various divisions at NESPAK Head Office Lahore, Islamabad and
Karachi. The audits were extensive aiming at measuring the conformance of
NESPAK QMS to meet the requirements of ISO 9001:2008 Standard. The QMS
was found compliant with the requirements of the standard by the Lead TUV
Austria auditors and NESPAK was recommended for continued certification.
Though the year 2016-17 was brilliant, yet NESPAK could not bank upon past
successes. It believes in moving forward and constantly looking for the greener
pastures. Efforts are being made to explore new business in the Middle East and
North Africa. Not only that, NESPAK has also started focusing on the South East
Asia Region, particularly Indonesia, Malaysia, Sri Lanka, Singapore, Philippines
and Vietnam for possible business acquisition. It is refreshing to note that clients
of NESPAK are satisfied with the Company's cost-cutting and up-to-date
services, yet more efforts are required to win new clients. May Allah reward us
with the courage and valour to succeed in all of our endeavours.

Das könnte Ihnen auch gefallen