TE´s Raychem

Cable Accessories

Installation Instructions
EPP-3283-INT-1/19

Screened Separable Elbow


Connector 400 A for
Bushing Profile Type B
in accordance to EN 50181
and Single Core Polymeric
Insulated Cable with
Wire Shield
36 kV

Type: RSES-645x

Safety Warning:
It is essential to observe the
applicable safety regulations
for working with high voltage
equipment.
To view the TE Energy website:
For precise safety information
please contact the responsible
authority.

Tyco Electronics Raychem GmbH


a TE Connectivity Ltd. Company
Finsinger Feld 1
85521 Ottobrunn/Munich, Germany
Tel: +49-89-6089-0
Fax: +49-89-6096-345
TE.com/energy
Before Starting
Check to ensure that the kit you are going to use fits the cable.

Refer to the kit label and the title of the installation instructions.

Components or working steps may have been modified since you last installed this product.

Carefully read and follow the steps in the installation instructions.

1 4 8 11

5
9 12
2
6
10 13
3
7

1 3 x Connector body 4 3 x Main cable lug 8 3 x Sealing tape (grey) 11 1 x Binding wire

3 x Bail restraint
2 5 3 x Allen key 9 3 x Earth cable lug 12 1 x PVC-tape
(two parts)

3 3 x Stress cone 6 3 x Contact pin 10 3 x Protective bag 13 3 x Gloves

7 9 x Assembly paste

Table 1
Cross Section Ø Core Insulation 36 kV Reference No.
mm2 min. max. Al/Cu
50 – 95 24.5 – 30.0 RSES-645A
120 29.3 – 32.0 RSES-645B
150 – 240 30.8 – 37.6 RSES-645C

The Information contained in these installation instructions is for use only by installers trained to make electrical power installations and is
intended to describe the correct method of installation for this product. However, TE Connectivity has no control over the field conditions which
influence product installation.
It is the user’s responsibility to determine the suitability of the installation method in the user’s field conditions.
TE Connectivity’s only obligations are those in TE Connectivity’s standard Conditions of Sale for this product and in no case will TE Connectivity
be liable for any other incidental, indirect or consequential damages arising from the use or misuse of the products.
Raychem, TE, TE Connectivity and TE connectivity (logo) are trademarks.
© 2019 TE Connectivity. All Rights Reserved.
EPP-3283-INT-1/19 Page 2/6
Cable Preparation

1m

365

600

235

1 2
Clean and degrease the end of the Cable with wire shield
oversheath for a length of 1 metre with Position the cable with sufficient
solvent wipe. overlap to the bushing centre.
Mark the oversheath 235 mm below the
bushing centre.
Cut the cable 600 mm above the mark
and remove the oversheath over this
distance. Cut off Cu-spiral screening
tape flush with end of outer sheath.
Edges projecting beyond the outer
sheath must be avoided, so that the
stress cone cannot be damaged during
push on procedure.
Wrap one turn of sealant tape (grey)
Cut the core according to the
with no overlap and slight tension
drawing. Remove the core screen
around the end of the oversheath.
with appropriate screen cutting tool
Cut back the insulation according to
Cut the tape and push ends together. according to the drawing. The surface
dimension K given in drawing details.
of the insulation should be free from all
Bend the shielding wires back onto the
traces of conductive material. Compare
oversheath. BLMC K
the diameter over insulation with
Avoid crossing the individual wires. application range as shown in Table 1 25/95-14 30
Temporarily secure the wires with a as well as with marking of supplied
tape or wire binder. stress cone. 95/240-14 60

3 a 4 5

aaaa

K
195

40

EPP-3283-INT-1/19 Page 3/6


Core Preparation
Table 2 – Use of inserts
= 240 mm2
Lug
Type

BLMC-95/240-14
Cross BLMC-25/95-14
Section
(Stranded
mm2 (RM)
Chamfer
50 YES
70 NO
95 NO YES
120 - YES
150 - YES
185 - NO
240 - NO 6 7
Recommendation for large cross Slide the small protective bag
sections (assembly aid) over the exposed
Convenient push on process of the conductor and tie it down with a PVC
stress cone requires chamfering of the tape as shown in the drawing.
insulation for cross section 240 mm2. Gently lubricate the outer surface of the
See drawing! protective bag and the core insulation
with a layer of assembly paste.
(approx. ½ sachet)

Apply onto the inner surface of the


stress cone the remaining 50% of
assembly paste and spread it evenly
over the inner surface. Push the stress Mechanical lugs with inserts
cone in one sequence with a twisting The insert has to be used as noted in
movement over the assembly aid Table 2.
completely onto the insulation until the Ensure that the retention of the insert
inner collar of the stress cone stops at is locked into the appropriate hole in
the oversheath cut back of the cable. the barrel. Align the palm hole with the
bushing centre.
NOTE Install the cable lug using a lug fixture.
The arrow on the stress cone should Tighten the bolt set alternately in
point onto the cable sheath. several equal steps until the heads
Remove the assembly aid from the shear off.
conductor. Remove any sharp edges.

8 9

EPP-3283-INT-1/19 Page 4/6


Mounting of Connector
Body

10 11
Apply a layer of assembly paste onto Clean and degrease the bottom end of
the outer surface of the stress cone. the screened connector body and apply
(approx. ½ sachet) the remaining 50% of assembly paste
onto the inner surface.
NOTE
Use one way glove to evenly lubricate
the inner surface at a length of
approximately 80 mm.

Push screened connector body with no Insert the contact pin into the elbow
interruption onto the stress cone and and fasten it with the Allen key. Apply
hold it. Continue immediately with the enough torque until the Allen key is Assemble the two parts of the bail
next step. deformed. restraint.

12 13 14

EPP-3283-INT-1/19 Page 5/6


15 16
Clean the conical surface of the Insert the hooks of the bail restraint
bushing and the inner surface of the into the eyes of the bushing latch. Align
connector. the front of the connector body with
bushing centre and push the connector
Lubricate both with the assembly paste
onto the bushing.
using a disposable glove (½ packet
each).

Ensure that the grounding lead is


fastened tightly.
Fix the shielding wires with a wire
binder (four layers) at the end of the Screened separable connector
stress cone. Gather the wires together completed.
to form an earth lead. Install the earth
Install the bail restraint centrally behind cable lug supplied in the kit at the end Please dispose of all waste
the connector. Tighten the bail restraint of the shielding wires. according to environmental
firmly by hand. Perform connection to ground. regulations.

17 18 19

EPP-3283-INT-1/19 Page 6/6