IS 16227 (Part 2) : 2016


IEC 61869-2 : 2012

SUPPLIED BY Book Supply Bureau UNDER THE LICENSE FROM BIS FOR BHILAI STEEL PLANT - BHILAI ON 10/23/2019 11:33:29 AM (10.145.50.227) valid uptp 2/8/2020
If the test voltage given in 5.3.201 is not reached at maximum primary current, the obtained
voltage shall be regarded as the test voltage.

Procedure B: with the primary winding open-circuited, the test voltage given in 5.3.201 (at
some suitable test frequency) shall be applied for 60 s to the terminals of each secondary
winding.

The r.m.s. value of the secondary current shall not exceed the rated secondary current (or the
appropriate extended value if specified).

The test frequency shall be chosen in order to reach the test voltage, but it shall not exceed
400 Hz.

If the test voltage given in 5.3.201 is not reached at maximum secondary current and
maximum test frequency, the obtained voltage shall be regarded as the test voltage.

When the test frequency exceeds twice the rated frequency, the duration of the test t shall be
reduced as below:

f
t 120 s R
f
T
where

fR is the rated frequency;

fT is the test frequency;

with a minimum t of 15 s.

NOTE The inter-turn overvoltage test is not a test carried out to verify the suitability of a current transformer to
operate with the secondary winding open-circuited. Current transformers should not be operated with the
secondary winding open-circuited because of the potentially dangerous overvoltage and overheating which can
occur.

7.4 Special tests

7.4.3 Measurement of capacitance and dielectric dissipation factor

This clause of IEC 61869-1:2007 is applicable with the addition of the following:

The test voltage shall be applied between the short-circuited primary winding terminals and
earth. Generally, the short-circuited secondary winding(s), any screen, and the insulated
metal casing shall be connected to the measuring device. If the current transformer has a
special terminal suitable for this measurement, the other low -voltage terminals shall be short-
circuited and connected together with the metal casing to the earth or the screen of the
measuring device.

The test shall be performed with the current transformer at ambient temperature, the value of
which shall be recorded.

7.4.6 Internal arc fault test

This clause of IEC 61869-1:2007 is applicable with the addition of the following note:

NOTE For top-core oil-immersed current transformers, the area in which in-service failure occurs, the incept is, in
many cases, located in the upper part of the main insulation. For hair-pin oil-immersed current transformers this
area is generally located in the bottom part of the main insulation.