GAS COMPRESSOR UNIT ( 7 COMPRESSOR)

ON-Z-1301 A/B/C/D/E/F/G

PROJECT-0846
VA&S1 ONSHORE DEVLOPMENT TERMINAL
ONGC- ODALAREVU
INTRODUCTION
(3)16.25 & (2) 10.5 & 10.0 X 6HOS6-3 @1000
COMPRESSOR TYPE :-

SERVICE NATURAL GAS


STAGE 3
CYLINDER DIA. (IN.) (3)16.25 & (2) 10.5 & 10.0
STROKE (IN.) 6

PERFORMANCE - DESIGN CASE


First- I First- II First- III
CYL 1&3&5 CYL2&4 CYL6
CYLINDER OPERATION Type DA DA DA
INLET PRESSURE BARG 6.78 22.96 46.2
INLET TEMPERATURE °C 35 57.2 57.2
DISCHARGE PRESSURE BARG 23.71 47.66 69.56
DISCH. TEMPERATURE °C 130 119 95
PISTON DISPLACEMENT M3/HR 7254.1 1985.46 897.76
CAPACITY AT INLET M3/HR 4741 1625 802.1
RATED CAPACITY (WET) M3/HR 34423.75 34423.33 34357.92
TOTAL COMPRESSOR BKW KW 3173
SPEED RPM 1000
BAROMETRIC PRESSURE BARA 1.0131

Page footer text | 2


SCOPE OF WORK

STAGES OF INSTALLATIONS:-

➢ Foundation inspection.
➢ Materials Verification& Inspection.
➢ Compressor skid Installation.
➢ Engine erection.
➢ Cylinders Installations & Levelling.
➢ Pistons Installations & clearances inspection.
➢ Lube oil Flushing.
➢ Engine Jacket water filling and Oil filling and Alignments.
➢ Air cooler Heat Exchanger (ACHE) Erection
➢ Tube Bundles & Platform Erection.
➢ Torqueing of Stud bolts.
➢ Alignment, coupling installation.
➢ Reports.
➢ Preservations of units.

Page footer text | 3


Foundation Inspection

• Size of Skid 12mtrs X 2.5 mtrs


• Pockets Cleaning inspection with TPI.
• Elevation and Foundation micro chipping for Grouting.
• Marking of centre lines for pockets and foundation.

Page footer text | 4


Materials Verification& Inspection

Materials inspection with Vendor

Page footer text | 5


Lifting Tools

Compressor lifting Beam Engine Lifting Beam

Page footer text | 6


Erection scheme &Safety Talk

Explaining erection activities.


Job Safety Task Instruction discussion before start the work.

Page footer text | 7


Compressor Erection

Page footer text | 8


Engine Erection

Page footer text | 9


ACHE Assembly

Page footer text | 10


ACHE Tube Bundles Erection

Page footer text | 11


Piping Installations

Page footer text | 12


Cylinder Levelling

Page footer text | 13


Crank case frame Levelling

Crank Case levelling by master level

Page footer text | 14


Skid Epoxy grouting & Skid cavity filling

Page footer text | 15


AOP alignment

Axillary pumps alignments

Page footer text | 16


Pistion istallations

Piston inspection & clearances check

Page footer text | 17


Pistion istallations

Page footer text | 18


Pistion Clearences ispection

Piston & Cylinders clearances check

Page footer text | 19


Pistion Clearences ispection

Torqueing of stud bolts

Page footer text | 20


Coupling fixing

Page footer text | 21


Laser Alignment

Page footer text | 22


Reports

Page footer text | 23


Lube oil flushing

Lube oil Flushing works started.

Page footer text | 24


Final completion of compressor

Page footer text | 25


Coupling & Belts Fixing

Page footer text | 26


Gas Compressor Final View

Page footer text | 27


Prepared by_ PADALA KIRAN KUMAR