Sie sind auf Seite 1von 5

MANUAL TESTING TEST AUTOMATION Regular Executing the

Introduction                       FUNCTIONAL TESTING Expressions test


             USING QTP Introduction
Creating run logic
What is Quality? Advantages of
Run time settings
What is testing? Regular Creating Action
Why Testing?
Introduction
Expressionsblocks
Introduction to Automation
Configuring think
Testing
Software Need of Automation Testing Automation time settings
Development Life Framework to learn any Object Running the script
Cycle Automated Tool Model
Initial (or) Requirements Types of Automated Tools Introduction Viewing the
phase History of QTP Working with results
Analysis phase AOM Scripts Controller
Design phase Basics of QTP Advantages Introduction to
Coding phase Anatomy of QTP Dynamic controller
Testing phase Record and Run Settings Handling of Creating new scenario
Delivery and Maintence Recordings Object Designing a scenario
phase Recordings Modes Repositories Tabs in controller
Content Sensitive Framework Run tab
Where Exactly Analog Implementation Design tab
Testing Come into Low level Linear Creating manual
picture? VBScript Modular scenario
Object Repository Keyword Configuring scripts
Conventional Testing
Driven Creating goal oriented
Unconventional Testing Types of Object Repository
Local Hybrid scenarios
Shared Features in Scheduling scenarios
Testing Operations on Object Repository Latest Versions Executing the
Methodology Object Repository Manager Working with scenario
Black Box Testing Operational overview of Quality Center
White Box Testing Recording &Running Analysis
Gray Box Testing Object Identification VB Script Analysis basics
Smart Identification VB Script Opening Analysis
Levels of Testing Object Spy language graphs
Unit Level Testing Types of Objects overview Cross results and
Module Level Testing Runtime Objects Variables merged graphs
Integration Level Testing Test Objects Constants Analysis of some
System Level Testing Data Types important graphs
User Acceptance Level QTP Life Cycle Arrays Running vuser graph
Testing Phase 1: Test Plan Statements Transaction summary
Phase 2: Generating the basic Test Conditional graph
Software Phase 3: Enhansing the Test Statement Hits per second
Development If……then graph                            
Models Inserting the check points statement           
Select case Throughout graph
Waterfall Model Introduction
statement Windows resource
Prototype Model Operational Overview of check
Looping graph
Evolutionary Model points
Statements
Spiral Model Types of Check
For ……..Next Analysis Reports
Fish Model points(Standard,Bitmap,Database,
Do ……..While Viewing summary
v-Model Text,Text
Do………Until reports
Area,Accessibility,XML,Page,Tabl
While …… Analyzing the SLA
Environments e & Image check points)
Wend Creating the
One Tier Architecture Synchronizing Test Execution
Other Microsoft windows
Two Tier Architecture Data Driven Testing
statements reports
Three Tier Architecture Parameterization
Call Statement
N- Tier Architecture Different ways of
DIM statements
Parameterization
Types of Testing Inserting output values Exit statements Other tools
Build Verification Introduction Wait statements Win runner & Silk
Regression Operational overview Execute test
Re-Testing Types of Output values(Standard, statements Resume preparation
Alpha Testing Text, Text Area, DB & XML) Wait statements & Interview
Beta Testing Option explicit orientation
Static Testing Measuring Transactions statements
Dynamic Testing Set statements Real Time
Start Transaction
Installation Testing With statements
End Transaction Implementation
Compatibility Testing
Monkey Testing
of Testing
Usability Testing Inserting the Programmatic Operators Project
Arthamatic
End-To-End  Testing Statements operators
Exploratory Testing Object calls Comparison Domain
Security Testing Condition Statements operators Knowledge
Port Testing Looping Statements Concatenation
Comments
session
Reliability Testing operators
Mutation Testing Utility Object Statements Logical
Adhoc Testing Manual Testing
operators
Developing the script process
Software Testing statements Manually implementation
Procedures Introduction to
Life Cycle Test Frequently used Methods Sub Procedures Manual Testing
Planning Real Time Scenarios to use Function
Methods Process
Contents of Test Plan procedures
How to develop scripts in Real BRS,FRS and Test
time Plan Reviews
Test Development Pre-defined Preparing the
Use Case Reviews Working with Data Tables
Avoiding check points in Real Functions review reports
Types of Test Cases Date and Time Review meeting
Formats of Testing Time
Avoiding Output values in Real functions
Documents String functions
Designing test cases
Testing Process Time Peer Reviews and
Case Studies Conversion
Test case design functions lead reviews
Test design techniques Trimming Refining the test
BVA Phase 4: Debugging the functions design
ECP Test Other functions Build release
Introduction
Test Execution Break Points process
Step Out
Test Developing the
Execution Process
End-to- End Scenarios Step Over Management build with the
execution Debugging from step Using Test support of
Run to step Director/Qua deploying
Result Analysis Debug viewer pane lity center documents
Watch
Bug Tracking and Conducting build
Variables Overview on
Reporting Command acceptance testing
Types of Bugs Test
Proceeding with
Identifying the Bugs Management
Isolation the Bugs Phase 5:Test Execution Architecture of detailed testing
Normal Execution TD Tool Defect tracking
Bug Life Cycle
Reporting the Bugs Batch Execution and reporting
Classical Bug Reporting Site Conducting
Common Repository Phase 6: Result Analysis Administratoregression testing
oriented BRP Analyzing the Results r on the modified
Bug Tracking Tool Identifying the defects Create project build
Oriented BRP Create users Conducting system
Test Closure Reporting Assign users to testing
Activity Manual Defect Reporting projects Test closure
Test Execution stop Bug Tracking Tool Oriented Monitor
criteria Defect Reporting Connections &
Licenses Site
Functional
Test summary reports Integration with Quality Center
scope Automation
using QTP
Real Time Process Actions Introduction to test
Awareness with Introduction Quality
automation
Terminology Types of Actions Center
Normal Actions Customizing
Introduction to
Quality Assurance
Quality Control Reusable Actions Test Director automation
NCR External Actions Managing frameworks
Inspection Creating New Actions Requirements Analyzing the
Audit Splitting Actions Creating dynamism of
CAPA Renaming Actions Requirements application
Software Configuration Working with Data Table Action Creating Test Planning the tests
Management Sheets plans
Working with Input and Output Developing
to be created
Build Release process Planning the
SRN parameters Manual &
S/W Delivery process Automation required test data
SDN Functions Tests Working with
Reviews Need of Functions Coverage objects and object
Peer-Review Creating User Defined Functions analysis/Tracea repositories
Traceability Matrix Working with UDF’s bility Generating basic
Metrics Create test sets
scripts
Test Bed Running tests
Libraries Record results Developing the
Escalation Process Introduction
Slippage Defect reporting function libraries
Creating Library Files & tracking Developing the
Base Lining the Associating Library files
Documents Integration with environment files
Publishing the documents WR & QTP Developing the
Common Repository Additional Concepts recovery files
Management File System Object Test
Environment Variables Associating
Patch Management required resources
PPM Database Connections
Developing to the test
PPR MS Access
reports
MRM SQL Server Enhancing the tests
Developing
Defective Product Oracle Debugging the tests
graphs
Change Request Creating Log Files Executing the tests
Virtual Object Configuration
Impact Analysis
Recovery Scenario Manager Performance Analyzing the
Walk Through results and finding
Code Walk Through Introduction Testing
Code Optimization Types of Triggers using load the defects
Work Around Creating the Recovery files Runner
Defect Age Associating Recovery files Test
Latent Defect Error Handling Management
 Introduction
Descriptive programming
Introduction to using Quality
Introduction
Ways of Testing non-functional Center
Creating Descriptive scripts
Manual Testing Need of Defining
Advantages
Automation Testing performance Requirements
Drawbacks of Manual testing Planning the
Testing   Over view of tests(manual &
Automation)
Drawbacks of load testing
Automation Testing Overview of Mapping the tests
performance with requirements
testing Building the test sets
Overview of and executing
stress testing Defect tracking and
Introduction of reporting
Load Runner Test summary reports

Components
of Load
Runner
Virtual user
generator
Controller
Analysis
Load runner
Agent

Load Runner
Architecture
Virtual User
Generator
Selecting the
protocols
Recording the
basic script
Enhancing the
script
Inserting the
check points
Text check
point
Image check
point
Inserting
transaction
points
Inserting
rendezvous
point
Emulating the
Vuser think
time
Inserting log
messages
Inserting debug
messages
Parametrizing
the script
Creating
parameters
Defining
parameters
properties
Use existing
parameters
Correlation the
script
Correlation
methods
Correlation
before
recording
Automatic
correlation
Manual
correlation

 
 

Das könnte Ihnen auch gefallen