PETROLEUM DEVELOPMENT OMAN LLC.

TRSCSSSSV CHECK LIST FOR 10K CEMENTED COMPLETION

1. Testing the TRSCSSSV on the Deck

Steps Description Results Witnessed by


1.1 Cycle the valve Three times Cycle Full Full Closing Return
with 15000 psig in control Opening pressure volume
pressure (Psig) (ml)
line. Hold the pressure for 10 (Psig)
minutes in each cycle.
1
2 DSV / PE
3

1.2 Drift the assembly Pass □ Fail □


DSV / PE

2. Make TRSCSSSV assembly and connect control line

Steps Description Results Witnessed by


2.1 M/U the TRSCSSV assembly
to the tubing string. Lower Operation executed as per plan □
the string so as to make up Comment in case of problem :
the next joint of tubing then
pull the TRSCSSV above the DSV/ Tool pusher
rotary
2.2 Take out the control line
plug and connect the control Operation executed as per plan □
line to the TRSCSSV. Flush air Comment in case of problem :
from the system and then
fully tightened the
DSV/ Tool pusher
connection

2.3 Cycle the valve Three times Cycle Opening Return volume
with 15000 psig in control pressure (Psig) (ml)
line. Hold the pressure for 10 1
minutes in each cycle. Check 2
the connection for any 3
external leak during the job.
Record this on chart
Control line connection :
recorder.
Pass □ Fail □ DSV / PE
Bleed back control line
2.4 pressure to 5000 psig and Operation executed as per plan □
maintain this pressure while DSV/ Tool pusher
running completion

3. Make Up Tubing Hanger and Land Hanger

Steps Description Results Witnessed by


3.1 Bleed off control line DSV/ Tool pusher/WHE
pressure. Cut control line at Operation executed as per plan □
about 15 feet from slips. Comment in case of problem :
3.2 Wrap below hanger, feed
through hanger, wrap Operation executed as per plan □
around hanger neck, feed Comment in case of problem :
into lower housing (R/tool).
DSV/ Tool pusher
M/U R/tool upper housing
3.3 Connect the control line to THRT connection :
the THRT and do a quick 5
minute visual test to 12500
psig. Check for any external
Pass □ Fail □
leak in THRT and ensure
TRSCSSSV function:
TRSCSSSV functioning.
Measure the control line Pass □ Fail □
fluid return. Note opening Control line return is in line with step 2.3:
and closing pressures
Yes □ No □ DSV / PE

3.4 Bleed back control line pressure


to 5000 psig and land the
hanger
Operation executed as per plan □ DSV/ Tool pusher

4. Cementing and Displacement

Steps Description Results Witnessed by


4.1 Increase control line pressure to
10000 psig and maintain this Implemented □ DSV
pressure during entire cementing job.
4.2 Bump plug & perform green cement
test for 15 minutes. Implemented □
Note: CL pressure must be > then test Comment in case of problem :
pressure+ opening pressure+ 500
DSV
psig

Note:

1. Completion Supervisor on site is responsible for executing the job. He will ensure that the jobs are witnessed and the check list is signed by the witness

2. Well head Engineer on site is responsible for the feed through and termination of the control line

3. This check list MUST be filled up and signed by witnesses during each stage of the job

4. The final copy MUST be scanned and attached in EDM. Please contact UWXE/2 for any clarification
4.3 Bleed off tubing pressure and check
floats are holding. Estimate return Plug holding □ Plug Not holding □
from tubing
Full tubing return □ Less return □ DSV

4.4 Cycle the TRSCSSSV four times at Cycle Opening pressure (Psig)
10000 psig and record observation. 1
* This step to be performed before 2
rigging down the cementing head. 3
4 DSV
4.5 Bleed off control line pressure DSV/Tool pusher
Implemented □

5. Install and Test the Production X-mas Tree

Steps Description Results Witnessed by


5.1 Unwrap the control line and
prepare the same for final Operation executed as per plan □
termination. Feed control Comment in case of problem :
line through tangential exit
port in well head and install
DSV
the terminating flange.
5.2 Cycled the valve at 15000 Cycle @ Opening pressure Return volume
psig and 10000 psig three 15000 (Psig) (ml)
psig
times each. Record the
1
parameters
2
3

Cycle @ Opening Return volume


10000 pressure (Psig) (ml)
psig
Note: This will be final 1
reference for future 2 DSV
3
6. Drift run

Steps Description Results Witnessed by


6.1 Apply 10000 psig in control line and
observe valve functioning Indication of valve opening at…………… psig

No indication of valve opening □


Trapped pressure below the flapper □
Equalized the valve at …………………. Psig DSV

6.2 Made drift run


Operation executed as per plan □
Comment in case of problem :

DSV

6.3 Bleed off all remaining tubing


pressure if any Operation executed as per plan □ DSV
6.4 Bleed off control line pressure to
close the valve Operation executed as per plan □ DSV

Signatures:

Completion Supervisor:…………………………………………………..

Drilling Supervisor: ………………………………………………………

Tick the box to identify exit block incase two blocks installed

Note:

1. Completion Supervisor on site is responsible for executing the job. He will ensure that the jobs are witnessed and the check list is signed by the witness

2. Well head Engineer on site is responsible for the feed through and termination of the control line

3. This check list MUST be filled up and signed by witnesses during each stage of the job

4. The final copy MUST be scanned and attached in EDM. Please contact UWXE/2 for any clarification