2.3 Cycle the valve Three times Cycle Opening Return volume
with 15000 psig in control pressure (Psig) (ml)
line. Hold the pressure for 10 1
minutes in each cycle. Check 2
the connection for any 3
external leak during the job.
Record this on chart
Control line connection :
recorder.
Pass □ Fail □ DSV / PE
Bleed back control line
2.4 pressure to 5000 psig and Operation executed as per plan □
maintain this pressure while DSV/ Tool pusher
running completion
Note:
1. Completion Supervisor on site is responsible for executing the job. He will ensure that the jobs are witnessed and the check list is signed by the witness
2. Well head Engineer on site is responsible for the feed through and termination of the control line
3. This check list MUST be filled up and signed by witnesses during each stage of the job
4. The final copy MUST be scanned and attached in EDM. Please contact UWXE/2 for any clarification
4.3 Bleed off tubing pressure and check
floats are holding. Estimate return Plug holding □ Plug Not holding □
from tubing
Full tubing return □ Less return □ DSV
4.4 Cycle the TRSCSSSV four times at Cycle Opening pressure (Psig)
10000 psig and record observation. 1
* This step to be performed before 2
rigging down the cementing head. 3
4 DSV
4.5 Bleed off control line pressure DSV/Tool pusher
Implemented □
DSV
Signatures:
Completion Supervisor:…………………………………………………..
Tick the box to identify exit block incase two blocks installed
Note:
1. Completion Supervisor on site is responsible for executing the job. He will ensure that the jobs are witnessed and the check list is signed by the witness
2. Well head Engineer on site is responsible for the feed through and termination of the control line
3. This check list MUST be filled up and signed by witnesses during each stage of the job
4. The final copy MUST be scanned and attached in EDM. Please contact UWXE/2 for any clarification