Preliminary Budget Sheet

1. Provide Input in orange highlighted area


2. For green highlighted cell
Select 1 - for area input in Square Feet(Sqft)
Note : Select 2 - for area input in Square Meter (Sqmt)
Provided estimate is based on best market rates and practice and may vary from condition to condition;
The author is not bound to the user to complete the work at the same rates

Input Total Floor Area 100 Sqmt

For Luxurious Quality For Premium Quality


Sr. No. Item Description Estimated Amount (in Estimated Amount(in
Rs.) Rs.)

1 Civil Works 1,506,960.00 1,237,860.00


2 Electrical Works 322,920.00 226,044.00
3 Plumbing Works 322,920.00 226,044.00
4 HVAC Works 403,650.00 296,010.00
5 Flooring 511,290.00 296,010.00
6 Door Windows 349,830.00 215,280.00
7 Interior Carpentry, Ceiling, Paint Etc. 699,660.00 441,324.00
8 Other Misc. Expenses 411,723.00 293,857.20

9 Total 4,528,953.00 3,232,429.20


Author : Dynamic Consulting Engineers
Cost Consultant||Quantity Surveyor||Contract administrator
Contact: dce.engineers@gmail.com to save your money during construction!!!
et

dition to condition;

For Standard Quality


Estimated Amount (in
Rs.)

1,022,580.00
139,932.00
139,932.00
236,808.00
236,808.00
161,460.00
242,190.00
217,971.00

2,397,681.00