ADDENDUM :

Clause Ref. No. Existing Clause Revised Clause


7.9.3(ii) If the total cumulative period of all If the cumulative period of all
such suspension exceeds 30 days the suspension(s) exceeds 30 days, the
contractor shall, in addition, be Contractor shall, in addition, be
entitled to compensation for the entitled to compensation for the period
period of suspension beyond 30 of suspension beyond initial 30 days, in
days, as mentioned in the Schedule respect of wages for the employees and
A. However, the contractor shall workers, idling charges for plants,
submit within 10 days his claim to machineries and equipments, etc.
the engineer-in-charge for every 15 physically available at the site.
days of suspension, over and above However, the Contractor shall, at the
30 days. earliest within a maximum period of 15
days, from the date of suspension,
submit its claim to the Engineer-In-
Charge, for every 15 days of
suspension, over and above the initial
30 days period of suspension, along
with all documentary evidence
available in respect of the employees,
workmen, plants, machineries and
equipments remaining idle during such
period of suspension. In this regard, the
Engineer-In-Charge shall after giving an
opportunity of being heard to the
Contractor, assess, calculate, decide
and settle the claims so submitted by
the Contractor and that the decision of
Engineer-In-Charge shall, in this regard,
be final and binding upon the
Contractor.

1
Clause Ref. No. Existing Clause Revised Clause
11.3.2 For Contract(s) where completion For Contract(s) ------------------
period as stipulated in NIT or work ------------------------------------------------
order is less than and upto 12 ------------------------------------------------
(twelve) months and where there is ------------------------------------------------
a delay which is attributed to the ------------------------------------------------
Corporation, due to which the ------------------------------------------------
period of the contract exceeds 12 ------------------------------------------------
months, the contract price adjust- ------------------------------------------------
ments is applicable for the extended ------------------------------------------------
period (For example, where the ------------------------------------------------
original contract period is 10 months ------------------------------------------------
and there is extension for 3 months, ------------------------------------------------
then adjustment is payable for one ------------------------------------------------
month i.e. 13th month only). ---------------- -------------------------------
However, the subscript value of “0” ------------------ However, the subscript
defined in 11.3.4 above shall be the value of “0” defined in 11.3.4 above
indices of the month in which the shall be the indices of the month in
mid period (50% in terms of days) of which the mid period (50% in terms of
the extended contract period falls days) of the original contract period
on. falls on.
15.1.1 The Contractor shall provide in the The Contractor shall provide in the
joint names of the Corporation and joint names of the Corporation and the
the Contractor, insurance cover Contractor, insurance cover from the
from the date of commencement of date of commencement of work to the
work to the end of the Defects end of the Defects Liability Period. The
Liability Period. The Contractor is Contractor is liable to take
liable to take Contractor’s all risk Contractor’s all risk policy for the
policy for the whole contract value. whole contract value. Apart from
The insurance amount shall also Contractor’s all risk policy, the
cover third party liability to the contractor shall also take insurance
extent, if any as specified in policy to cover third party liability
Schedule A. In addition to this the for 10% of the contract value subject
contractor shall also take Workmen to a maximum of Rs 50 lakhs. In
Compensation Policy for workmen. addition to this the contractor shall
also take Workmen Compensation
Policy for workmen.
Sl.No.17 of Sch.A Compensation for suspension (entire
against Clause work) beyond 30 days (per day rate) Deleted
7.9.3 : Rs. _____ / day.
Sl.No. 24 of Sch A Amount of third party liability to be Deleted
against clause covered in insurance Rs.______
15.1.1
15.5 of NIT Attendance at the pre-bid meeting is Attending the pre bid meetings is in
mandatory for all the bidders. the interest of bidders to understand
the scope of work of the tender. It is
insisted upon that bidders shall attend
the pre bid meetings. However, incase
the bidders do not attend the pre bid
meetings, it would be presumed that
they have understood the scope of
work.

2
ÃÖÓ×¾Ö¤üÖ úß ÃÖÖ´ÖÖ­µÖ ¿ÖŸÖí
GENERAL CONDITIONS OF CONTRACT

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
GENERAL CONDITIONS OF CONTRACT

INDEX

1. GENERAL PROVISIONS 5
1.1 Definitions 5
1.2 Interpretation 8
1.3 Law and Language 8
1.4 Priority of Documents 8
1.5 Contractor's Documents for use by Corporation 9
1.6 Corporation's Documents for use by Contractor 9
1.7 Confidential Details 10
1.8 Compliance with Law 10
1.9 Changes in Constitution 10
1.10 Conflict of Interest 11
1.11 Patent Indemnity 11
2. THE CORPORATION 12
2.1 Possession of Site 12
2.2 Permits, Licenses or Approvals 12
2.3 Corporation's Personnel 12
2.4 Corporation Claims 13
3. THE ENGINEER-IN-CHARGE 13
3.1 Engineer-In-Charge's Duties and Authority 13
3.2 Instructions of the Engineer-In-Charge 14
3.3 Replacement of the Engineer-In-Charge 14
4. THE CONTRACTOR 14
4.1 Contract Documents 14
4.2 Security Deposit 15
4.3 Refund of Security Deposit 16
4.4 Sub-contracts 16
4.5 Construction coordination 16
4.6 Setting out the Work 17
4.7 Quality Compliance 17
4.8 Sufficiency of the Accepted Contract Amount 17
4.9 Reporting of Hindrances 17
4.10 Supply of Goods 17
4.11 Transport of Goods 17
4.12 Contractor's Equipment 18
4.13 Protection of the Environment 18
4.14 Electricity 18
4.15 Work during Night or on Sundays and Holidays 19
4.16 Material obtained from Excavation 19
4.17 Treasure, Trove, Fossils etc. 19
4.18 Site Drainage 19
4.19 Protection of Trees 19
4.20 Security of the site 19

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
ÃÖÓ×¾Ö¤üÖ úß ÃÖÖ´ÖÖ­µÖ ¿ÖŸÖí
×¾ÖÂÖµÖ ÃÖæ“Öß
1. ÃÖÖ´ÖÖ­µÖ ˆ¯Ö²ÖÓ¬Ö 5
1.1 ¯Ö׸ü³ÖÖÂÖÖ‹Ó 5
1.2 ¾µÖ֏µÖÖ 8
1.3 úÖ­Öæ­Ö ¾Ö ³ÖÖÂÖÖ 8
1.4 ¤üßÖÖ¾Öê•ÖÖë úß ¯ÖÏÖ£Ö״֍úŸÖÖ 8
1.5 ×­ÖÖ´Ö êú ¯ÖϵÖÖêÖ ´Öë †Ö­Öê ¾ÖÖ»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¤üßÖÖ¾Öê•Ö 9
1.6 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¯ÖϵÖÖêÖ ´Öë †Ö­Öê ¾ÖÖ»Öê ×­ÖÖ´Ö êú ¤üßÖÖ¾Öê•Ö 9
1.7 ÖÖê¯Ö­ÖßµÖ ×¾Ö¾Ö¸üÖ 10
1.8 úÖ­Öæ­Ö úÖ †­Öã¯ÖÖ»Ö­Ö 10
1.9 ÃÖÓ×¾Ö¬ÖÖ­Ö ´Öê ¯Ö׸ü¾ÖŸÖÔ­Ö 10
1.10 ×ÆüŸÖÖë úÖ ™üú¸üÖ¾Ö 11
1.11 ¯Öê™ëü™ü ²ÖÖ¬µÖŸÖÖ 11
2. ×­ÖÖ´Ö 12
2.1 úÖµÖÔÃ£Ö»Ö úÖ ú²•ÖÖ 12
2.2 ¯Ö¸ü×´Ö™ü, »ÖÖ‡ÃÖëÃÖ µÖÖ †­Öã´ÖÖê¤ü­Ö 12
2.3 ×­ÖÖ´Ö êú ú´ÖÔ“ÖÖ¸üß 12
2.4 ×­ÖÖ´Ö êú ¤üÖ¾Öê 13
3. ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ 13
3.1 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú úŸÖÔ¾µÖ ¾Ö ¯ÖÏÖ׬֍úÖ¸ü 13
3.2 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ×­Ö¤ìü¿Ö 14
3.3 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ ¯ÖÏןÖãÖÖ¯Ö­Ö 14
4. ÃÖÓ×¾Ö¤üÖ úÖ¸ü 14
4.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¤üßÖÖ¾Öê•ÖÌ 14
4.2 ¯ÖÏןֳÖæ •Ö´ÖÖ 15
4.3 ¯ÖÏןֳÖæ •Ö´ÖÖ úß ¾ÖÖ¯ÖÃÖß 16
4.4 ˆ¯Ö ÃÖÓ×¾Ö¤üÖ‹Ó 16
4.5 ×­Ö´ÖÖÔÖ ÃÖ´Ö­¾ÖµÖ 16
4.6 úÖµÖÔ úß ŸÖîµÖÖ¸üß 17
4.7 ÖãÖ¾Ö¢ÖÖ †­Öã¯ÖÖ»Ö­Ö 17
4.8 ÃÖÆü´ÖŸÖ ÃÖÓ×¾Ö¤üÖ ¸üÖ×¿Ö úß ¯ÖµÖÖÔ¯ŸÖŸÖÖ 17
4.9 †›Íü“Ö­ÖÖë úß ×¸ü¯ÖÖêÚ™üÖ 17
4.10 ¾ÖßÖã†Öë úß †Ö¯ÖæÙŸÖ 17
4.11 ¾ÖßÖã†Öë úÖ ¯Ö׸ü¾ÖÆü­Ö 17
4.12 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ˆ¯Öú¸üÖ 18
4.13 ¯ÖµÖÖÔ¾Ö¸üÖ úÖ ÃÖÓ¸üÖÖ 18
4.14 ײֻ֕Öß 18
4.15 ¸üÖ×¡Ö µÖÖ ¸ü×¾Ö¾ÖÖ¸ü ¾Ö ”ãû×¼üµÖÖë êú פü­ÖÖë ´Öë úÖµÖÔ 19
4.16 Öã¤üÖ‡Ô êú ¤üÖî¸üÖ­Ö ¯ÖÏÖ¯ŸÖ ÃÖִ֐ÖÏß 19
4.17 Ö•ÖÖ­ÖÖ, ¤ãü»ÖÔ³Ö ¾ÖßÖã‹Ó, †¾Ö¿ÖêÂÖ †Öפü 19
4.18 úÖµÖÔÃ£Ö»Ö •Ö»Ö ׭֍úÖÃÖß 19
4.19 ¾ÖéÖÖë úÖ ÃÖÓ¸üÖÖ 19
4.20 úÖµÖÔÃ£Ö»Ö úß ÃÖã¸üÖÖ 19

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.21 Co-operation and Facilities to Other Contractors 19
4.22 Training of Apprentice 20
4.23 Water Supply 20
4.24 Land 20
5. STAFF, LABOUR AND INDUSTRIAL SAFETY 21
5.1 Engagement of Staff and Labour 21
5.2 Rates of Wages and Conditions of Labour 22
5.3 Persons in the Service of Corporation and other Contractors 22
5.4 Labour Laws 22
5.5 Facilities for Staff and Labour 24
5.6 Health and Industrial Safety 24
5.7 Contractor's Supervision for compliance 26
5.8 Contractor's Personnel 26
5.9 Records of Contractor's Personnel 26
5.10 Disorderly Conduct 27
5.11 Foreign Personnel 27
5.12 Other Compliance 27
5.13 House Keeping 28
6. PLANT, MATERIALS AND QUALITY ASSURANCE 28
6.1 Tools, Plants & Equipments 28
6.2 Workmanship 29
6.3 Quality Assurance 30
6.4 Materials & Samples 31
6.5 Inspection 31
6.6 Testing 32
6.7 Rejection 32
6.8 Remedial Work 32
6.9 Ownership of Plant and Materials 32
6.10 Octroi, Cess, Taxes, Royalties etc. 33
6.11 Urgent Works 33
6.12 Materials Issued by the Corporation 33
6.13 Material Accounting 34
6.14 Mega Power Project Concessions 34
7. COMMENCEMENT, DELAYS AND SUSPENSION 34
7.1 Commencement of Work and completion time 34
7.2 Program 35
7.3 Early Detection of Hindrances 36
7.4 Hindrances 36
7.5 Rate of Progress 36
7.6 Extension of Time for Completion 36
7.7 Compensation for delay 37
7.8 Incentives 38
7.9 Suspension of work for period upto 90 days 38
7.10 Prolonged Suspension of work (beyond 90 days) 39
7.11 Payment for Plant and Materials in Event of Suspension 39
7.12 Resumption of Work 40

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.21 †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë ÃÖê ÃÖÆüµÖÖêÖ ¾Ö ÃÖã×¾Ö¬ÖÖ‹Ó 19
4.22 ¯ÖÏ׿ցÖã†Öë úÖ ¯ÖÏ×¿ÖÖÖ 20
4.23 •Ö»ÖÖ¯ÖæÙŸÖ 20
4.24 •Ö´Öß­Ö 20
5. ú´ÖÔ“ÖÖ¸üß, ÁÖ״֍ú ¾Ö †ÖªÖêא֍ú ÁÖ״֍ú ÃÖÓ¸üÖÖ 21
5.1 ú´ÖÔ“ÖÖ׸üµÖÖë ¾Ö ÁÖ״֍úÖë úÖê úÖ´Ö ¯Ö¸ü »ÖÖÖ­ÖÖ 22
5.2 ´Ö•Ö¤æü¸üß úß ¤ü¸ü ¾Ö ÁÖ´Ö ¿ÖŸÖí 22
5.3 ×­ÖÖ´Ö ¾Ö †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú ÃÖÖ£Ö ÃÖê¾ÖÖ¸üŸÖ ú´ÖÔ“ÖÖ¸üß 22
5.4 ÁÖ´Ö úÖ­Öæ­Ö 22
5.5 ú´ÖÔ“ÖÖ׸üµÖÖë ¾Ö ÁÖ״֍úÖë êú ×»Ö‹ ÃÖã×¾Ö¬ÖÖ‹Ó 24
5.6 þÖÖãµÖ ‹¾ÖÓ †ÖªÖêא֍ú ÃÖÓ¸üÖÖ 24
5.7 †­Öã¯ÖÖ»Ö­Ö êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ¯ÖµÖÔ¾ÖêÖÖ 26
5.8 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ¸üß 26
5.9 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ׸üµÖÖë úÖ ×¸üúÖò›Ôü 26
5.10 †¾µÖ¾ÖÛÃ£ÖŸÖ †Ö“Ö¸üÖ 27
5.11 ×¾Ö¤êü¿Öß ¾µÖÛŒŸÖ 27
5.11 †­µÖ †­Öã¯ÖÖ»Ö­Ö 27
5.12 †­µÖ †­Öã¯ÖÖ»Ö­Ö 28
5.13 ÖéÆüÃÖ••ÖÖ/ÆüÖˆÃ֍úßØ¯ÖÖ 28
6. ÃÖÓµÖÓ¡Ö, ÃÖִ֐ÖÏß ¾Ö ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö 28
6.1 †Öî•ÖÖ¸ü, ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ 29
6.2 úÖµÖÔ×­Ö¯ÖãÖŸÖÖ 30
6.3 ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö 31
6.4 ÃÖִ֐ÖÏß ¾Ö ­Ö´Öæ­Öê 31
6.5 ×­Ö¸üßÖÖ 32
6.6 •ÖÖÓ“Ö 32
6.7 †´ÖÖ­µÖ ú¸ü­ÖÖ 32
6.8 ×­Ö¾ÖÖ¸üÖ úÖµÖÔ 32
6.9 ÃÖÓµÖÓ¡Ö ¾Ö ÃÖִ֐ÖÏß úÖ Ã¾ÖÖ×´ÖŸ¾Ö 33
6.10 “ÖãӐÖß, †×¬Ö³ÖÖ¸ü, ¯ÖϳÖÖ¸ü, ¸üÖòµÖ»™üß †Öפü 33
6.11 ŸÖÖŸúÖ׻֍ú úÖµÖÔ 33
6.12 ×­ÖÖ´Ö «üÖ¸üÖ •ÖÖ¸üß úß Ö‡Ô ÃÖִ֐ÖÏß 34
6.13 ÃÖִ֐ÖÏß úÖ »ÖêÖ֍ú¸üÖ 34
6.14 ´ÖêÖÖ¯ÖÖò¾Ö¸ü ¯Ö׸üµÖÖê•Ö­ÖÖ ×¸üµÖÖµÖŸÖë 34
7. ¯ÖÏÖ¸Óü³Ö, ×¾Ö»ÖÓ²Ö ¾Ö ×­Ö»ÖÓ²Ö­Ö 34
7.1 úÖµÖÔ úÖ ¯ÖÏÖ¸Óü³Ö ¾Ö ÃÖ´ÖÖ¯Ö­Ö ÃÖ´ÖµÖ 34
7.2 úÖµÖԍÎú´Ö 35
7.3 ¯ÖÏןֲÖÖ¬ÖÖ†ÖêÓ úß µÖ£ÖÖ ¿Öß‘ÖÐ ¯ÖÆü“ÖÖ­Ö 36
7.4 ¯ÖÏןֲÖÖ¬ÖÖ‹Ó 36
7.5 ¯ÖϐÖ×ŸÖ úß ¤ü¸ü 36
7.6 úÖµÖÔ ¯ÖæÖÔŸÖÖ êú ×»Ö‹ ÃÖ´ÖµÖ-ÃÖß´ÖÖ ×¾ÖßÖÖ¸ü 36
7.7 ×¾Ö»ÖÓ²Ö úß Öן֯ÖæÙŸÖ 37
7.8 ¯ÖÏÖêŸÃÖÖÆü­Ö 38
7.9 90 פü­ÖÖë úß †¾Ö×¬Ö ŸÖú êú ×»Ö‹ úÖµÖÔ úÖ ×­Ö»ÖÓ²Ö­Ö 38
7.10 ¤üß‘ÖԍúÖ»Ö êú ×»Ö‹ úÖµÖÔ úÖ ×­Ö»ÖÓ²Ö­Ö(90 פü­ÖÖë ÃÖê †×¬Öú úß †¾Ö×¬Ö êú ×»Ö‹) 39
7.11 ×­Ö»ÖÓ²Ö­Ö úß ÛãÖ×ŸÖ ´Öë ÃÖÓµÖÓ¡Ö ¾Ö ÃÖִ֐ÖÏß êú ×»Ö‹ ³ÖãÖŸÖÖ­Ö 39
7.12 úÖµÖÔ úÖ ¯Öã­Ö: ¯ÖÏÖ¸Óü³Ö 40

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
8. CORPORATION'S TAKING OVER 40
8.1 Completion Certificate 40
9. DEFECTS LIABILITY 40
9.1 Rectification of Defects 40
10. MEASUREMENT AND EVALUATION 41
10.1 Records & Measurement 41
10.2 Method of Measurement 42
11. VARIATIONS AND ADJUSTMENTS 43
11.1 Right to Vary 43
11.2 Payment for Variations 43
11.3 Contract Price Adjustment 44
12. CONTRACT PRICE AND PAYMENT 47
12.1 Mobilisation Advance 47
12.2 Payment of Running Bills 48
12.3 Over payments and Under Payments 49
12.4 Time limit for Payment of Final Bill 50
12.5 Delayed Payment 50
13. CONTRACT TERMINATION BY CORPORATION 51
13.1 Foreclosure of contract 51
13.2 Determination/Cancellation of Contract 51
13.3 Termination of Contract of death 54
14. RISK AND RESPONSIBILITY 54
14.1 Liability for damage, defects or imperfections and 54
rectifications thereof
15. INSURANCE 55
15.1 General Requirements for Insurances 55
16. FORCE MAJEURE 56
16.1 Definition of Force Majeure 56
16.2 Consequence of Force Majeure 56
16.3 Duty to Minimise Delay 57
17. CLAIMS, DISPUTES AND ARBITRATION 57
17.1 Contractor's Claims 57
17.2 Dispute Resolution 58
17.3 Appointment of the Dispute Resolution Board 58
17.4 Obtaining Dispute Resolution Board's Decision 59
17.5 Amicable Settlement 60
17.6 Failure to Comply with Dispute Resolution Board's Decision 60
17.7 Expiry of Dispute Resolution Board's Appointment 61
17.8 Arbitration 61
18. SCHEDULES 63
SCHEDULE 'A' 63
SCHEDULE 'B' 65
SCHEDULE 'C' 66

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
8. ×­ÖÖ´Ö «üÖ¸üÖ ÖÏÆüÖ 40
8.1 ¯ÖæÖÔŸÖÖ ¯ÖÏ´ÖÖÖ¯Ö¡Ö 40
9. ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ 40
9.1 ú×´ÖµÖÖë úÖê ¤æü¸ü ú¸ü­ÖÖ 40
10. ´ÖÖ¯Ö­Ö ¾Ö ´Ö滵ÖÖӍú­Ö 41
10.1 ׸üúÖò›Ôü ¾Ö ´ÖÖ¯Ö­Ö 41
10.2 ´ÖÖ¯Ö­Ö úß ×¾Ö×¬Ö 42
11. ×¾Ö“Ö»Ö­Ö ¾Ö ÃÖ´ÖÖµÖÖê•Ö­Ö 43
11.1 ×¾Ö“Ö»Ö­Ö úÖ †×¬ÖúÖ¸ü 43
11.2 ×¾Ö“Ö»Ö­Ö úÖ ³ÖãÖŸÖÖ­Ö 43
11.3 ÃÖÓ×¾Ö¤üÖ úß úß´ÖŸÖ úÖ ÃÖ´ÖÖµÖÖê•Ö­Ö 44
12. ÃÖÓ×¾Ö¤üÖ úß úß´ÖŸÖ ¾Ö ³ÖãÖŸÖÖ­Ö 47
12.1 “ÖÖ»Ö­Ö †×ÖÏ´Ö 47
12.2 “ÖÖ»Öæ ײֻÖÖë úÖ ³ÖãÖŸÖÖ­Ö 48
12.3 †×¬Öú ³ÖãÖŸÖÖ­Ö ¾Ö ú´Ö ³ÖãÖŸÖÖ­Ö 49
12.4 †×ÓŸÖ´Ö ×²Ö»Ö êú ³ÖãÖŸÖÖ­Ö úß ÃÖ´ÖµÖ ÃÖß´ÖÖ 50
12.5 ×¾Ö»ÖÓ×²ÖŸÖ ³ÖãÖŸÖÖ­Ö 50
13. ×­ÖÖ´Ö «üÖ¸üÖ ÃÖÓ×¾Ö¤üÖ úß ÃÖ´ÖÖÛ¯ŸÖ 51
13.1 ÃÖÓ×¾Ö¤üÖ úÖê ÃÖ´ÖµÖ¯Öæ¾ÖÔ ²ÖÓ¤ü ú¸ü­ÖÖ 51
13.2 ÃÖÓ×¾Ö¤üÖ úß ÃÖ´ÖÖÛ¯ŸÖ/×­Ö¸üßÖߍú¸üÖ 51
13.3 ´Ö韵Öã ÆüÖê­Öê úß ÛãÖ×ŸÖ ´Öë ÃÖÓ×¾Ö¤üÖ úß ÃÖ´ÖÖÛ¯ŸÖ 54
14. •ÖÖê×Ö´Ö ¾Ö וִ´Öê¤üÖ¸üß 54
14.1 ÖןÖ, ¤üÖêÂÖ µÖÖ ú´Öß úß ×•Ö´´Öê¤üÖ¸üß ¾Ö ˆ­Æêü šüߍú ú¸ü­ÖÖ 54
15. ²Öß´ÖÖ 55
15.1 ²Öß´ÖÖ úß ÃÖÖ´ÖÖ­µÖ †Ö¾Ö¿µÖúŸÖÖ‹Ó 55
16. †¯Ö׸üÆüÖµÖÔ 56
16.1 †¯Ö׸üÆüÖµÖÔ úß ¯Ö׸ü³ÖÖÂÖÖ 56
16.2 †¯Ö׸üÆüÖµÖÔ êú úÖ¸üÖ ˆŸ¯Ö®Ö ¯Ö׸üÛãÖןֵÖÖÓ 56
16.3 ×¾Ö»ÖÓ²Ö úÖê ­µÖæ­ÖŸÖ´Ö ú¸ü­Öê êú ¤üÖ×µÖŸ¾Ö 57
17. ¤üÖ¾Öê, ×¾Ö¾ÖÖ¤ü †Öî¸ü ´Ö¬µÖã֟ÖÖ 57
17.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ¤üÖ¾ÖÖ 57
17.2 ×¾Ö¾ÖÖ¤ü ×­Ö¯Ö™üÖ­Ö 58
17.3 ×¾Ö¾ÖÖ¤ü ×­Ö¯Ö™üÖ­Ö ²ÖÖê›Ôü úÖ Öšü­Ö 58
17.4 ×¾Ö¾ÖÖ¤ü ×­Ö¯Ö™üÖ­Ö ²ÖÖê›Ôü ÃÖê ׭֝ÖÔµÖ ¯ÖÏÖ¯ŸÖ ú¸ü­ÖÖ 59
17.5 ´Öî¡Ö߯ÖæÖÔ ÃÖ´Ö—ÖÖîŸÖÖ 60
17.6 ×¾Ö¾ÖÖ¤ü ×­Ö¯Ö™üÖ­Ö ²ÖÖê›Ôü êú ׭֝ÖÔµÖ êú †­Öã¯ÖÖ»Ö­Ö ´Öë †ÃÖ±ú»ÖŸÖÖ 60
17.7 ×¾Ö¾ÖÖ¤ü ×­Ö¯Ö™üÖ­Ö ²ÖÖê›Ôü êú Öšü­Ö úß ÃÖ´ÖÖÛ¯ŸÖ 61
17.8 ´Ö¬µÖã֟ÖÖ 61
18. †­ÖãÃÖæדֵÖÖÓ 63
†­ÖãÃÖæ“Öß "‹" 63
†­ÖãÃÖæ“Öß "²Öß" 65
†­ÖãÃÖæ“Öß "ÃÖß" 66

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
FORMAT FOR 'HINDRANCE REGISTER' 66
19. CONTRACTOR'S LABOUR REGULATIONS AND FORMS 67
20. MODEL RULES FOR LABOUR WELFARE 84
21. AERB SAFETY GUIDE 89
22. TENDER FORMS 116
23. FORMS OF DIFFERENT DEEDS 118
24. DISPUTES RESOLUTION BOARD AGREEMENT 134

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
"¯ÖÏןֲÖÖ¬ÖÖ ¸üוÖÙü¸ü" úÖ ¯ÖÏÖºþ¯Ö 66
19. ÃÖÓ×¾Ö¤üÖ úÖ¸ü êú ÁÖ״֍úÖë ÃÖÓ²ÖÓ¬Öß ×¾Ö×­ÖµÖ´Ö ¾Ö ¯ÖÏ¯Ö¡Ö 67
20. ÁÖ´Ö ú»µÖÖÖ êú ×»Ö‹ †Ö¤ü¿ÖÔ ×­ÖµÖ´Ö 84
21. ¯Ö¸ü´Ö֝Öã ‰ú•ÖÖÔ ×­ÖµÖִ֍ú ¯Ö׸üÂÖ¤ü ÃÖÓ¸üÖÖ ×­Ö¤êü׿֍úÖ 89
22. ×­Ö×¾Ö¤üÖ ¯ÖÏ¯Ö¡Ö 116
23. ×¾Ö×³Ö®Ö ×¾Ö»ÖêÖÖë êú ¯ÖÏ¯Ö¡Ö 118
24 ×¾Ö¾ÖÖ¤ü ×­Ö¯Ö™üÖ­Ö ²ÖÖê›Ôü ú¸üÖ¸ü 134

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
1 GENERAL PROVISIONS
1.1 Definitions
1.1.1 "Accepting Authority" shall mean the authority mentioned in
Schedule “A”.
1.1.2 “Corporation” shall mean Nuclear Power Corporation of India Ltd.
(NPCIL) and include its legal representatives, successors and
permitted assigns.
1.1.3 "Contract" shall mean an agreement where a proposal has
been accepted and shall include notice inviting the tender, the
tender and acceptance thereof and the formal agreement, if any,
executed between Nuclear Power Corporation of India Ltd and the
Contractor together with the documents referred to therein
including these conditions with appendices and any special
conditions, specifications, designs, drawings, schedule of quantities
with rates and amounts. All these documents taken together shall
be deemed to form one contract and shall be complementary to
one another.
1.1.4 “Contractor” is a person(s) named as contractor in the work order /
agreement and its legal successors.
1.1.5 “Contract Price" shall mean:
(i) in the case of "Lumpsum Contracts", the sum for which the tender is
accepted
(ii) in the case of " Item Rate Contracts", the cost of the works
arrived at after extension of quantities shown in Schedule of
Quantities by the item rates quoted by the tenderer for various
items.
1.1.6 “Commissioning” means the trial/initial operation of the works / facility
or any part thereof by the contractor, for the purpose to demonstrate
successful operation of the facility as per contract provisions.
1.1.7 “Completion Certificate” means the certificate issued by the
Corporation on completion of works in accordance with sub clause 8.1
(Completion Certificate).
1.1.8 “Completion Time” means the time within which completion of the
works or part (where a separate time of completion of such part has
been prescribed) is to be completed as stipulated in the work order
and in accordance with the provisions of contract.
1.1.9 “Contract Documents” means documents listed in the Contract
Agreement including any amendments therein to.
1.1.10 “Contractors’ Equipment” means all apparatus, machineries, vehicles
and other things required for the execution and completion of the
works and the remedying of any defects. However, contractors
equipment excludes temporary works, employers equipment (if any),
plant, materials and any other things intended to form or forming part
of the works.
1.1.11 “Contractors’ Representative” means the person nominated or
appointed time to time by the contractor who acts on behalf of the
contractor.

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
1. ÃÖÖ´ÖÖ­µÖ ˆ¯Ö²ÖÓ¬Ö
1.1 ¯Ö׸ü³ÖÖÂÖÖ‹Ó
1.1.1 "þÖߍú¸üÖ ¯ÖÏÖ׬֍úÖ¸üß" ÃÖê ŸÖÖŸ¯ÖµÖÔ †­ÖãÃÖæ“Öß "‹" ´Öë ¾ÖÙÖŸÖ ¯ÖÏÖ׬֍úÖ¸üß ÃÖê ÆüÖêÖÖ…
1.1.2 "׭֐ִÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü(‹­Ö¯ÖßÃÖ߆ևԋ»Ö) †Öî¸ü
‡Ã֍úê úÖ­Öæ­Öß ¯ÖÏןÖ×­Ö׬Ö, ˆ¢Ö¸üÖ׬֍úÖ¸üß ¾Ö †­Öã´Ö­µÖ ÃÖ´Ö­Öã¤êü׿֟ÖÖë ÃÖê ÆüÖêÖÖ…
1.1.3 "ÃÖÓ×¾Ö¤üÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ‹ú ‹êÃÖê ú¸üÖ¸ü ÃÖê Æîü •ÖÆüÖÓ ¯Ö¸ü ׍úÃÖß ¯ÖÏßÖÖ¾Ö ¯Ö¸ü ÃÖÆü´Ö×ŸÖ ¤êü ¤üß Ö‡Ô Æîü †Öî¸ü
‡ÃÖ´Öë ×­Ö×¾Ö¤üÖ †Ö´ÖÓ¡ÖÖ ÃÖæ“Ö­ÖÖ, ×­Ö×¾Ö¤üÖ ¾Ö ˆÃ֍úß Ã¾ÖߍúÖ¸üÖêÛŒŸÖ †Öî¸ü µÖפü úÖê‡Ô †Öî¯Ö“ÖÖ׸üú ú¸üÖ¸ü
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ²Öß“Ö ´Öë, ‡­Ö ¿ÖŸÖÖìÓ ¾Ö
ˆ­Öêú ¯Ö׸ü׿Ö™üÖë ŸÖ£ÖÖ úÖê‡Ô ×¾Ö¿ÖêÂÖ ¿ÖŸÖí, ×¾Ö×­Ö¤ìü¿Ö, †×³Öú»¯Ö, ¸êüÖÖד֡Ö, ¤ü¸ü ¾Ö ¸üÖ×¿Ö ÃÖ×ÆüŸÖ ´ÖÖ¡ÖÖ
úß †­ÖãÃÖæ“Öß êú ÃÖÖ£Ö ÃÖÓ¤üÙ³ÖŸÖ ¤üßÖÖ¾Öê•ÖÖë ÃÖ×ÆüŸÖ, ×­Ö¯ÖÖפüŸÖ ׍úµÖÖ ÖµÖÖ ÆüÖê, ¿ÖÖ×´Ö»Ö ÆüÖêÖÖ… µÖê
ÃÖ³Öß ¤üßÖÖ¾Öê•Ö ״ֻ֍ú¸ü ‹ú ÃÖÓ×¾Ö¤üÖ úÖ ×­Ö´ÖÖÔÖ ú¸ëüÖê †Öî¸ü ‡­Æëü ‹ú-¤æüÃÖ¸êü úÖ ¯Öæ¸üú ´ÖÖ­ÖÖ
•ÖÖ‹ÖÖ…
1.1.4 "ÃÖÓ×¾Ö¤ü֍úÖ¸ü" ÃÖê ŸÖÖŸ¯ÖµÖÔ úÖµÖÔ †Ö¤êü¿Ö/ ú¸üÖ¸ü ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ºþ¯Ö ´Öë ¾ÖÙÖŸÖ ×úÃÖß ¾µÖÛŒŸÖ(µÖÖë)
†Öî¸ü ‡Ã֍êú úÖ­Öæ­Öß ¾ÖÖ׸üÃÖ ÃÖê Æîü…
1.1.5 "ÃÖÓ×¾Ö¤üÖ úß´ÖŸÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÆüÖêÖÖ :
(i) "‹ú´Öã¿ŸÖ ÃÖÓ×¾Ö¤üÖ†Öë" êú ´ÖÖ´Ö»Öê ´Öë ¾ÖÆü ¸üÖ×¿Ö ×•ÖÃÖ ¯Ö¸ü ×­Ö×¾Ö¤üÖ êú ×»Ö‹ ÃÖÆü´Ö×ŸÖ ¯ÖϤüÖ­Ö úß Ö‡Ô
ÆüÖê, ÃÖê Æîü…
(ii) "´Ö¤ü¾ÖÖ¸ü ¤ü¸ü ÃÖÓ×¾Ö¤üÖ†Öë" êú ´ÖÖ´Ö»Öê ´Öë úÖµÖÖí úß ¾ÖÆü úß´ÖŸÖ •ÖÖê ×­Ö×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×¾Ö×³Ö®Ö ´Ö¤üÖë
êú ×»Ö‹ ˆ¨éüŸÖ ¤ü¸üÖë úÖê ´ÖÖ¡ÖÖ †­ÖãÃÖæ“Öß ´Öë ¾ÖÙÖŸÖ ×¾Ö×³Ö®Ö ´ÖÖ¡ÖÖ†Öë êú ×»Ö‹ ´Ö¤ü ¾ÖÖ¸ü ¤ü¸üÖë úÖê
×¾ÖßÖÖ׸üŸÖ ú¸ü­Öê êú ²ÖÖ¤ü ˆ­Ö ´Ö¤üÖë êú ×»Ö‹ ×­Ö¬ÖÖÔ׸üŸÖ ú¸ü ׭֍úÖ»Öß Ö‡Ô ÆüÖ,ê ÃÖê Æîü…
1.1.6 "ú´Öß¿Öح֐Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ÃÖÓ×¾Ö¤üÖ êú ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë êú †­ÖãÃÖÖ¸ü úÖµÖÔ/ÃÖã×¾Ö¬ÖÖ µÖÖ ˆÃ֍êú
׍úÃÖß ³ÖÖÖ êú ÃÖ±ú»ÖŸÖÖ¯Öæ¾Öԍú ¯ÖÏ“ÖÖ»Ö­Ö úÖê ¯ÖϤüÙ¿ÖŸÖ ú¸ü­Öê êú ×»Ö‹ ¯Ö¸ü߁֝Ö/¯ÖÏÖ¸Óü׳֍ú ¯ÖÏ“ÖÖ»Ö­Ö ÃÖê
Æîü…
1.1.7 "¯ÖæÖÔŸÖÖ ¯ÖÏ´ÖÖÖ ¯Ö¡Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ˆ¯ÖÖ›ü 8.1 (¯ÖæÖÔŸÖÖ ¯ÖÏ´Ö֝֯֡Ö) êú †­Öãºþ¯Ö úÖµÖÔ úß ¯ÖæÖÔŸÖÖ ¯Ö¸ü
×­ÖÖ´Ö «üÖ¸üÖ •ÖÖ¸üß ×ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ¯ÖÏ´ÖÖÖ ¯Ö¡Ö ÃÖê Æîü…
1.1.8 "úÖµÖÔ¯ÖæÖÔŸÖÖ †¾Ö׬Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ˆÃÖ ÃÖ´ÖµÖ ÃÖê Æîü וÖÃÖ´Öë úÖµÖÔ µÖÖ ˆÃ֍êú ³ÖÖÖ (•ÖÆüÖÓ ‹êÃÖê ³ÖÖÖ êúú
×»Ö‹ ¯Öé£Öú ºþ¯Ö ÃÖê úÖµÖÔ ¯ÖæÖÔŸÖÖ ÃÖ´ÖµÖ ×¾Ö×ÆüŸÖ ׍úµÖÖ ÖµÖÖ ÆüÖê) úÖê úÖµÖÔ †Ö¤êü¿Ö ´Öë ¾ÖÙÖŸÖ †Öî¸ü
ÃÖÓ×¾Ö¤üÖ êú ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë êú †­Öãºþ¯Ö ¯Öæ¸üÖ ×úµÖÖ •ÖÖ­ÖÖ ÆüÖê…
1.1.9 "ÃÖÓ×¾Ö¤üÖ ¤üßÖÖ¾Öê•Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖÓ×¾Ö¤üÖ ú¸üÖ¸ü ´Öë ÃÖ³Öß ¯ÖύúÖ¸ü êú ÃÖÓ¿ÖÖê¬Ö­ÖÖë ÃÖ×ÆüŸÖ ÃÖæ“Öß²Ö¨ü ׍ú‹ Ö‹
ú֐֕ÖÖŸÖÖë ÃÖê Æîü…
1.1.10 "ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ˆ¯Öú¸üÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö ¾Ö ˆÃ֍úÖê ¯ÖæÖÔ ú¸ü­Öê †Öî¸ü ˆÃÖ´Öë †Ö‡Ô
׍úÃÖß ŸÖ¸üÆü úß Ö¸üÖ²Öß úÖê ¤æü¸ü ú¸ü­Öê êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖ´ÖÃŸÖ ˆ¯Öú¸üÖ, ´Ö¿Öß­Ö¸üß, ¾ÖÖÆü­Ö †Öî¸ü
†­µÖ ¾ÖßÖã†Öë ÃÖê Æîü… ŸÖ£ÖÖׯÖ, ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ˆ¯Öú¸üÖÖêÓ ´Öë †Ã£ÖÖ‡Ô úÖµÖÔ, ×­ÖµÖÖꌟÖÖ êú ˆ¯Öú¸üÖ
(µÖפü úÖê‡Ô ÆüÖê), ÃÖÓµÖÓ¡Ö, ÃÖִ֐ÖÏß †Öî¸ü úÖê‡Ô †­µÖ ¾ÖßÖã •ÖÖê úÖµÖÔ úÖ ³ÖÖÖ ÆüÖê µÖÖ ²Ö­Ö Ã֍úŸÖß ÆüÖê,
¿ÖÖ×´Ö»Ö ­ÖÆüà Æïü…
1.1.11 "ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¯ÖÏןÖ×­Ö׬Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ­ÖÖ×´ÖŸÖ µÖÖ ×­ÖµÖãŒŸÖ ˆ­Ö
¾µÖÛŒŸÖµÖÖë ÃÖê Æîü •ÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß †Öê¸ü ÃÖê úÖµÖÔ ú¸üŸÖê Æïü…

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
1.1.12 “Corporations’ Tools & Plants” means the apparatus, machinery, tools,
and vehicles (if any) made available by the Corporation for the use
of the contractor in the execution of the work but it does not include
plants which has not been taken over by the Corporation.
1.1.13 “Country” means the country in which the site is located where the works
are to be executed.
1.1.14 “Date of Commencement” means the date when the contractor shal
commence execution of the works as mentioned in the work order and
the completion time for the work shal be reckoned from this date.
1.1.15 A “Day” means a day of 24 hours from mid-night to mid-night irrespective of
the number of hours worked in that day, a “Week” means seven days,
a “Month” means a calendar month and a “Year” means 365 days
without regard to the number of hours worked in any day.
1.1.16 The “Defect Liability Period” is the period defined in the Schedule “A”
during which the contractor is responsible for defects with respect to
the works as provided in GCC clause No. 9 (Defect Liability).
1.1.17 “Defect” means any part of the Works not executed in accordance with the
Contract.
1.1.18 “Drawings” means the drawings of the works, as included in the
Contract, and any additional and modified drawings issued by (or on
behalf of) the Corporation in accordance with the Contract.
1.1.19 “DRB” means the Dispute Resolution Board appointed under sub-clause
17.3(Appointment of the Dispute Resolution Board).
1.1.20 "Engineer-in-Charge" shall mean the Officer appointed by the
Corporation or his duly authorized representative who shall direct,
supervise and be in charge of the works for purposes of this Contract.
1.1.21 "Excepted Risks", are the risks due to riots (other than that among
Contractor's employees) and civil commotion (in so far as both these
are uninsurable), war (whether declared or not), invasion, act of foreign
enemies, global terrorism, civil war, rebellion, munitions of war, explosive
materials, ionizing radiation or contamination by radio activity, revolution,
insurrection, military or usurped power, any acts of Government,
damage from aircrafts, sabotage, acts of God such as earthquake,
lightning, cyclones, Tsunami and unprecedented floods and other causes
over which the Contractor has no control and accepted as such by the
Accepting Authority or causes solely due to use or occupation by the
"Corporation" of the part of Works in respect of which a certificate of
completion has been issued.
1.1.22 “GCC” means the General Conditions of Contract.
1.1.23 “Latent Defects” shall mean any defects which exists but has not surfaced at
the time of testing and has not manifested during defect liability period.
1.1.24 “Laws” means all national (or state) legislation, statutes, ordinances and
other laws and regulations and by-laws of any legally constituted public
authority.
6

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
1.1.12 "×­ÖÖ´Ö êú †Öî•ÖÖ¸ü ¾Ö ÃÖÓµÖÓ¡Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ×­ÖÖ´Ö «üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö ÆêüŸÖã ˆ¯ÖµÖÖêÖ ׍ú‹
•ÖÖ­Öê êú ×»Ö‹ ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ Ö‹ ˆ¯Öú¸üÖ, ´Ö¿Öß­Ö¸üß, †Öî•ÖÖ¸ü, ÃÖÓµÖÓ¡Ö †Öî¸ü ¾ÖÖÆü­Ö (µÖפü úÖê‡Ô ÆüÖê ŸÖÖê) †Öפü ÃÖê Æîü
¯Ö¸ÓüŸÖã ×­ÖÖ´Ö †×³ÖÖé×ÆüŸÖ ­Ö ׍ú‹ Ö‹ ÃÖÓµÖÓ¡Ö ‡ÃÖ´Öë ¿ÖÖ×´Ö»Ö ­ÖÆüà Æïü …
1.1.13 "¤êü¿Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ˆÃÖ ¤êü¿Ö ÃÖê Æîü •ÖÆüÖÓ úÖµÖÔ ×­Ö¯ÖÖפüŸÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê úÖµÖÔ úÖ Ã£Ö»Ö †¾ÖÛÃ£ÖŸÖ Æîü…
1.1.14 "¯ÖÏÖ¸Óü³Ö úß ŸÖÖ¸üߏÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ˆÃÖ ŸÖÖ¸üßÖ ÃÖê Æîü •Ö²Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔ †Ö¤êü¿Ö ´Öë פü‹ Ö‹ ¾ÖÖÔ­Ö êú †­ÖãÃÖÖ¸ü
úÖµÖÔ úÖ ×­Ö¯ÖÖ¤ü­Ö ¯ÖÏÖ¸Óü³Ö ú¸üŸÖÖ Æîü †Öî¸ü úÖµÖÔ êú ¯ÖæÖÔ ×ú‹ •ÖÖ­Öê êú ÃÖ´ÖµÖ úÖ ×­Ö¬ÖÖÔ¸üÖ ‡ÃÖß ŸÖÖ¸üßÖ ÃÖê ׍úµÖÖ
•ÖÖ‹ÖÖ…
1.1.15 ‹ú "פü­Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ †¬ÖÔ¸üÖ×¡Ö ÃÖê †¬ÖÔ¸üÖ×¡Ö ŸÖú 24 ‘ÖÓ™êü ¾ÖÖ»Öê ‹ú פü­Ö ÃÖê Æîü †Öî¸ü ‡ÃÖÃÖê ˆÃÖ ×¤ü­Ö ׍ú‹ Ö‹
úÖµÖÔ êú ‘ÖÓ™üÖê ÃÖê úÖê‡Ô ´ÖŸÖ»Ö²Ö ­ÖÆüà Æîü, ‹ú "ÃÖ¯ŸÖÖÆü" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖÖŸÖ ×¤ü­ÖÖë ÃÖê Æîü, ‹ú "´ÖÖÆü" úÖ †£ÖÔ ‹ú
îú»Öë›ü¸ü ´ÖÖÆü ÃÖê Æîü †î¸ü ‹ú "¾ÖÂÖÔ" úÖ †£ÖÔ ×úÃÖß ‹ú פü­Ö ´Öë ׍ú‹ Ö‹ úÖµÖÔ êú ‘ÖÓ™üÖê ÃÖê ×­Ö¸ü¯ÖêÖ 365 פü­ÖÖë ÃÖê
Æîü…
1.1.16 "¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö׬Ö" †­ÖãÃÖæ“Öß"‹" ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ ¾ÖÆü †¾Ö×¬Ö Æîü וÖÃÖ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü •ÖßÃÖßÃÖß ˆ¯Ö²ÖÓ¬Ö 9
(¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ) êú †­ÖãÃÖÖ¸ü úÖµÖÔ ´Öë ¯ÖÖ‹ Ö‹ ¤üÖêÂÖÖë êú ×»Ö‹ וִ´Öê¤üÖ¸ü Æîü…
1.1.17 "¤üÖêÂÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ úÖµÖÔ êú ׍úÃÖß ³ÖÖÖ úÖê ÃÖÓ×¾Ö¤üÖ úß ¿ÖŸÖÖí êú †­Öãºþ¯Ö ¯Öæ¸üÖ ­Ö ׍ú‹ •ÖÖ­Öê ÃÖê Æîü…
1.1.18 "¸êüÖÖד֡Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖÓ×¾Ö¤üÖ ´Öë ¿ÖÖ×´Ö»Ö ×ú‹ Ö‹ úÖµÖÔ ÃÖÓ²ÖÓ¬Öß ¸êüÖÖד֡ÖÖë †Öî¸ü ÃÖÓ×¾Ö¤üÖ úß ¿ÖŸÖÖí êú †­Öãºþ¯Ö
×­ÖÖ´Ö «üÖ¸üÖ •ÖÖ¸üß ×ú‹ Ö‹ †×ŸÖ׸üŒŸÖ ¾Ö ÃÖÓ¿ÖÖê×¬ÖŸÖ ¸êüÖÖד֡ÖÖë ÃÖê Æîü…
1.1.19 "›ü߆ָü²Öß" ÃÖê ŸÖÖŸ¯ÖµÖÔ ˆ¯ÖÖ›ü 17.3 (×¾Ö¾ÖÖ¤ü ×­Ö¯Ö™üÖ­Ö ²ÖÖê›Ôü úß ×­ÖµÖãÛŒŸÖ)êú †¬Öß­Ö ×­ÖµÖãŒŸÖ ×›üïµÖæ™ü
׸üÃÖÖ껵Öæ¿Ö­Ö ²ÖÖê›Ôü µÖÖ ×¾Ö¾ÖÖ¤ü ×­Ö¯Ö™üÖ­Ö ²ÖÖê›Ôü/´Ö›ü»Ö ÃÖê Æîü…
1.1.20 "¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ×­ÖÖ´Ö µÖÖ ˆÃ֍êú «üÖ¸üÖ ×¾Ö׬־֟ÖË ¯ÖÏÖ׬֍éúŸÖ ¯ÖÏןÖ×­Ö×¬Ö «üÖ¸üÖ ×­ÖµÖãŒŸÖ †×¬ÖúÖ¸üß ÃÖê
Æîü •ÖÖê ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú úÖµÖÖí úÖê ×­Ö¤êü׿֟Ö, ¯ÖµÖÔ¾Öê×ÖŸÖ ú¸êüÖÖ ¾Ö ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú ×»Ö‹ úÖµÖÔ ¯ÖϳÖÖ¸üß ÆüÖêÖÖ…
1.1.21 "ÃÖÓ³ÖÖ×¾ÖŸÖ •ÖÖê׏ִÖ" ¤ÓüÖê (ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ׸üµÖÖë êú ²Öß“Ö ³Ö›Íüêú ¤ÓüÖê êú †»ÖÖ¾ÖÖ)†Öî¸ü ­Ö֐Ö׸üú ÃÖӁÖÖê³Ö
(†³Öß ŸÖú ‡­Ö ¤üÖê­ÖÖë êú ×»Ö‹ ²Öß´ÖÖ ¾µÖ¾ÖãÖÖ ­ÖÆüà Æîü), µÖã¨ü (“ÖÖÆêü ‘ÖÖê×ÂÖŸÖ ÆüÖê µÖÖ †‘ÖÖê×ÂÖŸÖ), Æü´Ö»ÖÖ, ×¾Ö¤êü¿Öß
¤ãü¿´Ö­ÖÖë «üÖ¸üÖ úß Ö‡Ô úÖ¸Ôü¾ÖÖ‡Ô, ¾ÖîÛÀ¾Öú †ÖŸÖӍú¾ÖÖ¤ü, ÖéÆüµÖã¨ü, ×¾Ö¦üÖêÆü, µÖã¨ü úß ²Ö´Ö²ÖÖ¸üß, ×¾ÖñúÖê™üú ÃÖִ֐ÖÏß,
†ÖµÖ­ÖߍéúŸÖ ׾֍ú¸üÖ µÖÖ ¸êü×›üµÖÖê ÃÖ׍ÎúµÖŸÖÖ êú úÖ¸üÖ ÃÖÓ¤æüÂ֝Ö, ×¾Ö¦üÖêÆü, ¸üÖ•Ö¦üÖêÆ,ü ÃÖê­ÖÖ µÖÖ Æü›Íü¯Ö­Öê ¾ÖÖ»Öß ¿ÖÛŒŸÖµÖÖÓ,
ÃÖ¸üúÖ¸ü êú ׍úÃÖß éúŸµÖ, Æü¾ÖÖ‡Ô ×¾Ö‘¾ÖÓÃÖ, ŸÖÖê›Íü±úÖê›Íü, ¯ÖÏ֍éúן֍ú †Ö¯Ö¤üÖ†Öë •ÖîÃÖê ³ÖæÓú¯Ö, ײֻ֕Öß, ŸÖæ±úÖ­Ö, ÃÖã­ÖÖ´Öß
¾Ö †³ÖæŸÖ¯Öæ¾ÖÔ ²ÖÖœÍü ¾Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ×­ÖµÖÓ¡ÖÖ ÃÖê ¯Ö¸êü †­µÖ úÖ¸üÖ ו֭Æëü þÖߍú¸üÖ †×¬ÖúÖ¸üß «üÖ¸üÖ ‹êÃÖÖ Ã¾ÖߍúÖ¸ü
׍úµÖÖ ÖµÖÖ ÆüÖê µÖÖ ×•ÖÃÖ úÖµÖÔ êú ³ÖÖÖ êú ×»Ö‹ úÖµÖÔ ¯ÖæÖÔŸÖÖ ¯ÖÏ´ÖÖÖ ¯Ö¡Ö •ÖÖ¸üß ×úµÖ •ÖÖ “ÖãúÖ ÆüÖê ˆÃÖê "׭֐ִÖ" êú
þֵÖÓ êú ¯ÖϵÖÖêÖ µÖÖ Ã¾ÖÖ×´ÖŸ¾Ö úß ¾Ö•ÖÆü ÃÖê ˆŸ¯Ö®Ö ÆüÖê­Öê ¾ÖÖ»Öê •ÖÖê×Ö´Ö Æïü …
1.1.22 "•ÖßÃÖßÃÖß" úÖ ŸÖÖŸ¯ÖµÖÔ Æîü •Ö­Ö¸ü»Ö Óú›üß¿Ö­Ö †Öò±ú úÖÓ™ÒîüŒ™ü µÖÖ ÃÖÓ×¾Ö¤üÖ úß ÃÖÖ´ÖÖ­µÖ ¿ÖŸÖí…
1.1.23 "†¯Öύú™ü ¤üÖêÂÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ‹êÃÖê ¤üÖêÂÖÖë ÃÖê Æîü •ÖÖê ´ÖÖî•Öæ¤ü ÆüÖê­Öê êú ²ÖÖ¾Ö•Öæ¤ü ¯Ö¸üßÖÖ êú ÃÖ´ÖµÖ ¯Öύú™ü ­ÖÆüà Æãü‹ †Öî¸ü
¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö ×•Ö­Ö ¯Ö¸ü úÖµÖÔ ­Ö ׍úµÖÖ ÖµÖÖ ÆüÖê…
1.1.24 "úÖ­Öæ­Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖ³Öß ¸üÖ™ÒüßµÖ (µÖÖ ¸ü֕֍úßµÖ) úÖ­Öæ­ÖÖë, ÃÖÓ×¾Ö׬ֵÖÖë, †¬µÖÖ¤êü¿ÖÖë †Öî¸ü †­µÖ
úÖ­Öæ­ÖÖë ŸÖ£ÖÖ ×¾Ö×­ÖµÖ´ÖÖë ¾Ö ×¾Ö×¬Ö ÃÖ´´ÖŸÖ ׍úÃÖß ­Ö֐Ö׸üú ¯ÖÏÖ׬֍ú¸üÖ «üÖ¸üÖ ²Ö­ÖÖ‹ Ö‹ ˆ¯Ö-úÖ­Öæ­ÖÖë ÃÖê Æîü…

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
1.1.25 “Local Currency” means the currency of India. “Foreign Currency” means a
currency in which part (or all) of the Contract Price is paid in currency
otherthan the Local Currency.
1.1.26 "Market Rate” shall be the rate as decided by the Engineer-In-Charge on
the basis of the cost of materials and labour at the Site where the work
is to be executed, plus 10 % to cover al overheads and profit. For material
issued by the Corporation, the overheads and profit percentage shal be al
owed @ 2.5%.
1.1.27 “Minimum Wages” shall be the minimum wages declared from time to time by
the state or central government, whichever is higher.
1.1.28 “Near Relatives” means wife, husband, parents and grand parents, children
and grand children, brothers and sisters, uncles and aunts, cousins and their
corresponding in-laws.
1.1.29 “Part Completion Certificate” means the certificate issued by the Corporation
on completion of items or group of items for which separate period of
completion have been specified in the contract, issued in accordance with
Sub clause 8.1(Completion Certificate).
1.1.30 “Party” shall mean Corporation or Contractor, as the context requires.
1.1.31 “Performance Guarantee” is the guarantee to be submitted by the Contractor
to the Corporation in accordance with sub-clause No. 4.2.3
(Performance Guarantee).
1.1.32 “Pre-Commissioning” means the testing, checking and other requirements
specified in the technical specifications that are to be carried out by
the contractor in preparation for commissioning.
1.1.33 “Retention Money” means the accumulated retention money which the
Corporation retains from the Running Bills as specified in sub-clause No.
4.2.5
(Retention Money)
1.1.34 “Schedule(s)” referred to in these conditions shall mean the relevant
schedule (s) annexed to the tender papers issued by the Corporation.
1.1.35 “Scheduled Commercial Bank” in India as per definition of Reserve Bank of
India shall include of the following bank groups (i) State Bank of India and its
associates, (ii) Nationalized Banks, (iii) Regional Rural Banks, (iv) Foreign
Banks and (v) Other Indian Scheduled Commercial Banks (in the private
sector).
1.1.36 “Site” means the places where Works are to be executed, including storage
and working areas, and to which Plant and Materials are to be
delivered and any other places as may be specified in the Contract as
forming part of the Site .
1.1.37 “Specification” means the specification of the works included in the
contract and any modification / addition made or approved by the Engineer-
in-charge.
1.1.38 “Sub-Contractor” means any person named in the Contract as a
Sub-Contractor, or any person appointed as a Sub-Contractor, for a part of
the Works; and the legal successors in title to each of these persons.
Piece rate Contractors are not to be considered as Sub-Contractor.
1.1.39 "Temporary Works” shall mean al temporary works of every kind required in
or about the execution, completion or maintenance of the Works.

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
1.1.25"ãÖÖ­ÖßµÖ ´Öã¦üÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ³ÖÖ¸üŸÖ úß ´Öã¦üÖ ÃÖê Æîü… "×¾Ö¤êü¿Öß ´Öã¦üÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ Ã£ÖÖ­ÖßµÖ ´Öã¦üÖ êú †»ÖÖ¾ÖÖ ˆÃÖ ´Öã¦üÖ
ÃÖê Æîü וÖÃÖ´Öë ÃÖÓ×¾Ö¤üÖ úß úß´ÖŸÖ úê ‹ú ×ÆüÃÃÖê (µÖÖ ¯Öæ¸ß úß´ÖŸÖü) úÖ ³ÖãÖŸÖÖ­Ö ×úµÖÖ ÖµÖÖ ÆüÖê…
1.1.26 "²ÖÖ•ÖÖ¸ü ¤ü¸ü" ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ úÖµÖÔ ×ú‹ •ÖÖ­Öê ¾ÖÖ»Öê Ã£Ö»Ö ¯Ö¸ü ÃÖִ֐ÖÏß †Öî¸ü ´Ö•Ö¤æü¸üß úß úß´ÖŸÖ êú
†Ö¬ÖÖ¸ü ¯Ö¸ü ×­ÖÛ¿“ÖŸÖ úß Ö‡Ô ¤ü¸ü ŸÖ£ÖÖ ÃÖ³Öß ‰ú¯Ö¸ü êú Ö“ÖÔ ¾Ö »ÖÖ³Ö úÖê ¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹ 10% •ÖÖê›Íü ú¸ü
׭֍úÖ»Öß •ÖÖ‹Öß… ×­ÖÖ´Ö «üÖ¸üÖ •ÖÖ¸üß úß Ö‡Ô ÃÖִ֐ÖÏß êú ×»Ö‹ 2.5 % úß ¤ü¸ü ÃÖê ‰ú¯Ö¸üß Ö“ÖÔ ¾Ö »ÖÖ³Ö ¯ÖÏןֿ֟Ö
†­Öã´Ö­µÖ ÆüÖêÖÖ…
1.1.27"­µÖæ­ÖŸÖ´Ö ´Ö•Ö¤üæ¸üß"ÃÖê ŸÖÖŸ¯ÖµÖÔ ¸üÖ•µÖ ¾Ö ëú¦ü ÃÖ¸üúÖ¸üÖë «üÖ¸üÖ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ‘ÖÖê×ÂÖŸÖ ­µÖæ­ÖŸÖ´Ö ´Ö•Ö¤æü¸üß ´Öë ÃÖê •ÖÖê ³Öß
†×¬Öú ÆüÖ,ê ÃÖê Æîü…
1.1.28"׭֍ú™ü ÃÖÓ²ÖÓ¬Öß" ÃÖê ŸÖÖŸ¯ÖµÖÔ ¯ÖŸ­Öß, ¯ÖןÖ, ´ÖÖŸÖÖ-ׯ֟ÖÖ ¾Ö ¤üÖ¤üÖ-¤üÖ¤üß, ÃÖÓŸÖÖ­ÖÖë ¾Ö ­ÖÖŸÖß-¯ÖÖêŸÖê, ³ÖÖ‡Ô ¾Ö ²ÖÆü­ÖÓê, “ÖÖ“ÖÖ-
“ÖÖ“Öß, “Ö“Öê¸êü ³ÖÖ‡Ô-²ÖÆü­Ö ¾Ö ‡­Öêú Ãִ֍úÖ ÃÖÃÖã¸üÖ»Ö ¯ÖÖ êú »ÖÖêÖÖë ÃÖê Æîü…
1.1.29"³ÖÖÖ ¯ÖæÖÔŸÖÖ ¯ÖÏ´ÖÖÖ ¯Ö¡Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ×­ÖÖ´Ö «üÖ¸üÖ úÖµÖÔ úß ´Ö¤üÖë µÖÖ ‹êÃÖß ´Ö¤üÖë êú ÃÖ´ÖæÆü êú ×»Ö‹ •ÖÖ¸üß ×ú‹ Ö‹
‹êÃÖê ¯ÖÏ´ÖÖÖ¯Ö¡Ö ÃÖê Æîü ו֭֍êú ×»Ö‹ ÃÖÓ×¾Ö¤üÖ ´Öë ˆ¯ÖÖ›ü 8.1 êú †­Öãºþ¯Ö (¯ÖæÖÔŸÖÖ ¯ÖÏ´Ö֝֯֡Ö) ¯Öé£Öú ¯ÖæÖÔŸÖÖ †¾Ö׬Ö
×¾Ö×­Ö¤ìü×¿ÖŸÖ úß Ö‡Ô ÆüÖê…
1.1.30 "¯ÖÖ" úÖ ŸÖÖŸ¯ÖµÖÔ ÃÖÓ¤ü³ÖÔ êú †­ÖãÃÖÖ¸ü ×­ÖÖ´Ö µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÆüÖêÖÖ…
1.1.31 "úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üß" ¾ÖÆü ÖÖ¸Óü™üß Æîü •ÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­ÖÖ´Ö êú ¯ÖÖÃÖ ˆ¯ÖÖ›ü 4.2.3(úÖµÖÔ×­Ö¯ÖÖ¤ü­Ö
ÖÖ¸Óü™üß) •Ö´ÖÖ ú¸üÖ‡Ô •ÖÖ­Öß Æîü…
1.1.32"ú´Öß¿Öح֐Ö-¯Öæ¾ÖÔ" úÖ †£ÖÔ ú´Öß¿ÖØ­ÖÖ úß ŸÖîµÖÖ¸üß ú¸üŸÖê ÃÖ´ÖµÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ŸÖú­Öߍúß ×¾Ö×­Ö¤ìü¿ÖÖë êú
†­ÖãÃÖÖ¸ü ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ¯Ö¸ü߁֝Ö, •ÖÖÓ“Ö ¾Ö †­µÖ †Ö¾Ö¿µÖúŸÖÖ‹Ó Æïü…
1.1.33"¯ÖÏן֬ÖÖ¸üÖ ¸üÖ׿Ö" úÖ ŸÖÖŸ¯ÖµÖÔ ˆÃÖ ÃÖÓ×“ÖŸÖ ¸üÖ×¿Ö ÃÖê Æîü •ÖÖê ×­ÖÖ´Ö ˆ¯ÖÖ›ü 4.2.5 (¯ÖÏן֬ÖÖ¸üÖ ¸üÖ׿Ö)
êú ×¾Ö×­Ö¤ìü¿ÖÖë êú †­Öãºþ¯Ö “ÖÖ»Öæ ײֻÖÖë ´ÖêÓ ÃÖê ¸üÖêú »ÖêŸÖÖ Æîü…
1.1.34"†­ÖãÃÖæ“Öß(†­ÖãÃÖæדֵÖÖÓ)" ‡­Ö ¿ÖŸÖÖíÓ ´Öë †­ÖãÃÖæ“Öß (µÖÖë) ÃÖê ÃÖÓ¤ü³ÖÔ ×­ÖÖ´Ö «üÖ¸üÖ •ÖÖ¸üß ×ú‹ Ö‹ ×­Ö×¾Ö¤üÖ ú֐֕ÖÖŸÖÖë
êú ÃÖÖ£Ö ÃÖӻ֐­Ö úß Ö‡Ô ŸÖŸÃÖÓ²ÖÓ¬Öß †­ÖãÃÖæ“Öß (µÖÖë) ÃÖê ÆüÖêÖÖ…
1.1.35"†­ÖãÃÖæ×“ÖŸÖ ¾ÖÖםÖÛ•µÖú ²Öïú " ³ÖÖ¸üŸÖßµÖ ×¸ü•Ö¾ÖÔ ²Öïú †Öò±ú ‡Ó×›üµÖÖ úß ¯Ö׸ü³ÖÖÂÖÖ êú †­ÖãÃÖÖ¸ü ³ÖÖ¸üŸÖ ´Öë
×­Ö´­Ö×»Ö×ÖŸÖ ²Öïú ÃÖ´ÖæÆüÖë úÖê ¿ÖÖ×´Ö»Ö ×úµÖÖ ÖµÖÖ Æîü- (i) Ùêü™ü ²Öïú †Öò±ú ‡Ó×›üµÖÖ ¾Ö ‡Ã֍êú ÃÖÆüµÖÖêÖß ²Öïú (ii)
¸üÖ™Òüߵ֍éúŸÖ ²Öïú, (iii) Öê¡ÖßµÖ ÖÏÖ´ÖßÖ ²Öïú, (iv) ×¾Ö¤êü¿Öß ²Öïú †Öî¸ü (v) †­µÖ ³ÖÖ¸üŸÖßµÖ †­ÖãÃÖæ×“ÖŸÖ ¾ÖÖםÖÛ•µÖú
²Öïú (×­Ö•Öß Öê¡ÖÖë êú)…
1.1.36"ãֻÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ Æîü ¾ÖÆü •ÖÖÆü •ÖÆüÖÓ ³ÖÓ›üÖ¸ü ¾Ö úÖµÖԁÖê¡Ö êú ÃÖÖ£Ö-ÃÖÖ£Ö úÖµÖÔ ×úµÖÖ •ÖÖ­ÖÖ ÆüÖê †Öî¸ü •ÖÆüÖÓ ¯Ö¸ü ÃÖÓµÖÓ¡Ö
µÖÖ ÃÖִ֐ÖÏß úß ÃÖã¯Öã¤ÔüÖß úß •ÖÖ­Öß ÆüÖê ŸÖ£ÖÖ ÃÖÓ×¾Ö¤üÖ ´Öë ×¾Ö×­Ö¤ìü×¿ÖŸÖ úÖê‡Ô †­µÖ ãÖÖ­Ö ×•ÖÃÖê Ã£Ö»Ö êú ³ÖÖÖ êú ºþ¯Ö
´Öë ´ÖÖ­ÖÖ ÖµÖÖ ÆüÖê…
1.1.37"×¾Ö×­Ö¤ìü¿Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖÓ×¾Ö¤üÖ ´Öë ¿ÖÖ×´Ö»Ö úÖµÖÔ †Öî¸ü ˆ­Ö´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×ú‹ Ö‹ †£Ö¾ÖÖ †­Öã´ÖÖêפüŸÖ
׍úÃÖß ¯ÖύúÖ¸ü êú ÃÖÓ¿ÖÖê¬Ö­Ö/ ¯Ö׸ü¾ÖŸÖÔ­ÖÖë êú ×¾Ö×­Ö¤ìü¿ÖÖë ÃÖê Æîü …
1.1.38"ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖÓ×¾Ö¤üÖ ´Öë ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ºþ¯Ö ´Öë ­ÖÖ×´ÖŸÖ, †£Ö¾ÖÖ úÖµÖÔ êú ׍úÃÖß ³ÖÖÖ êú ×»Ö‹
ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ºþ¯Ö ´Öë ×­ÖµÖãŒŸÖ ×úÃÖß ¾µÖÛŒŸÖ ÃÖê Æîü; †Öî¸ü ×¾Ö»ÖêÖ ´Öë ˆÛ»»Ö×ÖŸÖ ‡­Ö ¾µÖÛŒŸÖµÖÖë êú úÖ­Öæ­Öß
ˆ¢Ö¸üÖ׬֍úÖ׸µÖÖë ÃÖê Æîü… ‡úÖ‡Ô ¤ü¸ü (¯ÖßÃÖ ¸êü™ü) ¯Ö¸ü úÖµÖÔ ú¸ü­Öê ¾ÖÖ»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë úÖê ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü ­ÖÆüà ´ÖÖ­ÖÖ
•ÖÖ‹ÖÖ…
1.1.39"†Ã£ÖÖ‡Ô úÖµÖÔ" ÃÖê ŸÖÖŸ¯ÖµÖÔ úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö, úÖµÖÔ¯ÖæÖÔŸÖÖ µÖÖ úÖµÖÔ êú †­Öã¸üÖÖ ÃÖÓ²ÖÓ¬Öß úÖµÖÖí êú ×»Ö‹ ׍ú‹ •ÖÖ­Öê
¾ÖÖ»Öê Æü¸ü ¯ÖύúÖ¸ü êú †Ã£ÖÖ‡Ô úÖµÖÖí ÃÖê ÆüÖêÖÖ…
7

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
1.1.40 "Urgent Works" shall mean any urgent measures which, in the opinion
of Engineer-in-Charge, become necessary during the progress of Work
to obviate risk of accident or failure or which become necessary for security
and safety.
1.1.41 A “Variation” is an instruction / communication given by Engineer-in-charge
or his representative, which varies the works.
1.1.42 “WCMS” shall mean the Work contract Management system software used
by NPCIL for handling works contract.
1.1.43 “Work order” is the formal communication by the Corporation to
the bidder whose bid has been accepted
1.1.44 “Works” shal mean the works to be executed in accordance with the
Contract or part(s) thereof as the case may be and shall include all extra
or additional, altered or substituted works as required for execution of
the Contract. It shal include variations and urgent works.
Any term which is not defined herein but defined under different
enactment shall be construed to have the same meaning as defined in the act.
1.2 Interpretation
In the Contract, except where the context requires otherwise:
(a) Words indicating one gender include all genders;
(b) Words indicating the singular also include the plural and vice versa;
(c) the word “tender” is synonymous with “bid”, “tenderer” with “bidder”
and “tender documents” with “bidding documents”; and
(d) ‘Written’ or ‘in writing’ means hand-written, type-written, printed or
electronically made, which would be produced physically as an
evidence for the communication.
The marginal words and other headings shall not be taken into consideration
in the interpretation of these Conditions.
1.3 Law and Language
1.3.1 The contract shall be governed by the law of the country or other jurisdiction
stated in the contract. The country unless otherwise stated in the contract shall be
India.
1.3.2 The ruling language of the contract shall be English unless otherwise stated in the
Contract.
1.4 Priority of Documents
1.4.1 In the case of discrepancy between Schedule of Quantities, the special
conditions, the Specifications and/or the Drawings, the following order of
preference shall be observed:
(a) Description in Schedule of Quantities and rates
(b) Special Conditions of Contract, if any
(c) Drawings

8
1.1.40"ŸÖÖŸúÖ׻֍ú úÖµÖÔ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ‹êÃÖê ŸÖÖŸúÖ׻֍ú ˆ¯ÖÖµÖÖë ÃÖê ÆüÖêÖÖ ×•Ö­ÆêüÓ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¸üÖµÖ
´Öë úÖµÖÔ úß ¯ÖϐÖ×ŸÖ êú ¤üÖî¸üÖ­Ö ¤ãü‘ÖÔ™ü­ÖÖ êú •ÖÖê×Ö´Ö úÖê ú´Ö ú¸ü­Öê µÖÖ †ÃÖ±ú»ÖŸÖÖ ÃÖê ²Ö“Ö­Öê †£Ö¾ÖÖ
ÃÖã¸üÖÖ ¾Ö ÃÖÓ¸üÖÖ êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖ´Ö—ÖÖ ÖµÖÖ ÆüÖê…
1.1.41"×¾Ö“Ö»Ö­Ö" ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ µÖÖ ˆÃ֍êú ¯ÖÏןÖ×­Ö×¬Ö «üÖ¸üÖ ×¤üµÖÖ •ÖÖ­Öê ¾ÖÖ»ÖÖ ×­Ö¤ìü¿Ö/ ¯Ö¡ÖÖ“ÖÖ¸ü Æîü וÖÃ֍êú
úÖ¸üÖ úÖµÖÔ ´Öë ²Ö¤ü»ÖÖ¾Ö †Ö •ÖÖŸÖÖ Æîü…
1.1.42"›ü²»µÖæÃÖß‹´Ö‹ÃÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ¾ÖÔú úÖò­™ÒîüŒ™ü ´Öî­Öê•Ö´Öë™ü ×ÃÖÙü´Ö ÃÖÖò°™ü¾ÖêµÖ¸ü µÖÖ úÖµÖÔ ÃÖÓ×¾Ö¤üÖ ¯ÖϲÖÓ¬Ö­Ö
¯ÖϝÖÖ»Öß ÃÖÖò°™ü¾ÖêµÖ¸ü Æî וÖÃÖê ‹­Ö¯ÖßÃÖ߆ևԋ»Ö «üÖ¸üÖ úÖµÖÔ ÃÖÓ×¾Ö¤üÖ†Öë úê ÃÖÓ“ÖÖ»Ö­Ö êú ×»Ö‹ ¯ÖϵÖÖêÖ
׍úµÖÖ •ÖÖŸÖÖ Æîü…
1.1.43"úÖµÖÔ †Ö¤êü¿Ö" וÖÃÖ ²ÖÖê»ÖߍúŸÖÖÔ úß ²ÖÖê»Öß Ã¾ÖߍúÖ¸ü ÆüÖê •ÖÖŸÖß Æîü ˆÃ֍êú ÃÖÖ£Ö ü×­ÖÖ´Ö «üÖ¸üÖ ×úµÖÖ
•ÖÖ­Öê ¾ÖÖ»ÖÖ †Öî¯Ö“ÖÖ׸üú ¯Ö¡ÖÖ“ÖÖ¸üü Æîü…
1.1.44"úÖµÖÔ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖÓ×¾Ö¤üÖ µÖÖ ˆÃ֍êú ׍úÃÖß ³Ö֐Ö(³Ö֐ÖÖë) •ÖîÃÖÖ ³Öß ´ÖÖ´Ö»ÖÖ ÆüÖ,ê êú †­Öãºþ¯Ö
×­Ö¯ÖÖפüŸÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê úÖµÖÔ ÃÖê Æîü †Öî¸ü ‡ÃÖ´Öë ÃÖÓ×¾Ö¤üÖ êú ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ †Ö¾Ö¿µÖú †»ÖÖ
ÃÖê µÖÖ •ÖÖê›ÍüÖ ÖµÖÖ, ¯Ö׸ü¾ÖÙŸÖŸÖ µÖÖ Ã£ÖÖ­ÖÖ¯Ö®Ö úÖµÖÔ ³Öß ¿ÖÖ×´Ö»Ö Æîü… ‡ÃÖ´Öë ×¾Ö“Ö»Ö­Ö ¾Ö ŸÖÖŸúÖ׻֍ú
úÖµÖÔ ¿ÖÖ×´Ö»Ö ÆüÖÓêÖê…
וÖÃÖ ¿Ö²¤üÖ¾Ö»Öß úÖê µÖÆüÖÓ ¯Ö׸ü³ÖÖ×ÂÖŸÖ ­ÖÆüà ׍úµÖÖ ÖµÖÖ Æîü ²ÖÛ»ú †­µÖ †×¬Ö×­ÖµÖ´Ö­Ö ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ ×úµÖÖ
ÖµÖÖ Æîü, ˆ­ÖúÖ †£ÖÔ †×¬Ö×­ÖµÖ´Ö ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ †£ÖÔ êú ÃÖ´ÖÖ­Ö ÆüÖêÖÖ…
1.2 ¾µÖ֏µÖÖ
ÃÖÓ×¾Ö¤üÖ ´Öë, •Ö²Ö ŸÖú ׍ú ÃÖÓ¤ü³ÖÔ ÃÖê †­µÖ£ÖÖ †¯Öê×ÖŸÖ ­Ö ÆüÖê :
(‹) ׍úÃÖß ‹ú Ø»ÖÖ ´Öë ׻֏Öê Ö‹ ¿Ö²¤ü ÃÖ³Öß Ø»ÖÖÖë êú ×»Ö‹ »Ö֐Öæ ÆüÖëÖê…
(²Öß) ‹ú ¾Ö“Ö­Ö ´Öë ׻֏Öê Ö‹ ¿Ö²¤üÖë ´Öë ²ÖÆãü¾Ö“Ö­Ö ŸÖ£ÖÖ ²ÖÆãü¾Ö“Ö­Ö ¾ÖÖ»Öê ¿Ö²¤üÖë ´Öë ‹ú ¾Ö“Ö­Ö ³Öß ¿ÖÖ×´Ö»Ö Æî…úú
(ÃÖß) "×­Ö×¾Ö¤üÖ" ¿Ö²¤ü "²ÖÖê»Öß" úÖ, "²ÖÖê»ÖߍúŸÖÖÔ" ¿Ö²¤ü "²ÖÖê»ÖߤüÖŸÖÖ" úÖ †Öî¸ü "×­Ö×¾Ö¤üÖ ¤üßÖÖ¾Öê•Ö" ¿Ö²¤ü
"²ÖÖê»Öß ¤üßÖÖ¾Öê•Ö" ¿Ö²¤ü úÖ ÃÖ´ÖÖ­ÖÖ£Öá Æîü…
(›üß) "×»Ö׏֟Ö" µÖÖ "×»Ö×ÖŸÖ ´Öë" ¿Ö²¤ü úÖ †£ÖÔ ÆüßÖ-×»Ö׏֟Ö, ™Óü׍úŸÖ, ´ÖãצüŸÖ µÖÖ ‡»ÖꌙÒüÖò׭֍ú ¸üß×ŸÖ ÃÖê ×­ÖÙ´ÖŸÖ
¿Ö²¤ü Æîü •ÖÖê ׍ú ¯Ö¡ÖÖ“ÖÖ¸üü êú ÃÖցµÖ êú ºþ¯Ö ´Öë ³ÖÖîן֍ú ºþ¯Ö ´Öë ¯ÖÏßÖãŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
‡­Ö ¿ÖŸÖÖí úß ¾µÖ֏µÖÖ êú ×»Ö‹ ÆüÖ׿֋ êú ¿Ö²¤üÖë ¾Ö †­µÖ ¿ÖßÂÖÔ »ÖêÖ­ÖÖë ¯Ö¸ü ×¾Ö“ÖÖ¸ü ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ…
1.3 úÖ­Öæ­Ö ¾Ö ³ÖÖÂÖÖ
1.3.1 ÃÖÓ×¾Ö¤üÖü ¤êü¿Ö êú úÖ­Öæ­Ö µÖÖ ÃÖÓ×¾Ö¤üÖ ´Öë ˆÛ»»Ö×ÖŸÖ †­µÖ †×¬ÖúÖ¸ü Öê¡Ö «üÖ¸üÖ ¿ÖÖ×ÃÖŸÖ Æü֐ê Öß… •Ö²Ö ŸÖú ׍ú
ÃÖÓ×¾Ö¤üÖ ´Öë †­µÖ£ÖÖ ˆÛ»»Ö×ÖŸÖ ­Ö ׍úµÖÖ •ÖÖ‹, ¤êü¿Ö ÃÖê ŸÖÖŸ¯ÖµÖÔ ³ÖÖ¸üŸÖ ÃÖê ÆüÖêÖÖ…
1.3.2 •Ö²Ö ŸÖú ׍ú ÃÖÓ×¾Ö¤üÖ ´Öë †­µÖ£ÖÖ ˆÛ»»Ö×ÖŸÖ ­Ö ׍úµÖÖ •ÖÖ‹, ÃÖÓ×¾Ö¤üÖ úÖê ×­ÖµÖ×´ÖŸÖ ú¸ü­Öê ¾ÖÖ»Öß ³ÖÖÂÖÖ
†ÓÖÏê•Öß ÆüÖêÖß…
1.4 ¤üßÖÖ¾Öê•ÖÖë úÖ ¯ÖÏÖ£Ö״֍úŸÖÖ Îú´Ö
1.4.1 µÖפü ´ÖÖ¡ÖÖ úß †­ÖãÃÖæ“Öß, ×¾Ö¿ÖêÂÖ ¿ÖŸÖÖí, ×¾Ö×­Ö¤ìü¿ÖÖë †Öî¸ü/†£Ö¾ÖÖ ¸êüÖÖד֡ÖÖë †Öפü ´Öë úÖê‡Ô ×¾ÖÃÖӐÖ×ŸÖ ¯ÖÖ‡Ô
•ÖÖŸÖß Æîü ŸÖÖê ×­Ö´­Ö×»Ö×ÖŸÖ ¯ÖÏÖ£Ö״֍úŸÖÖ Îú´Ö úÖ ¯ÖÖ»Ö­Ö ×úµÖÖ •ÖÖ‹ÖÖ :
(‹) ´ÖÖ¡ÖÖ ¾Ö ¤ü¸ü †­ÖãÃÖæ“Öß ´Öë פüµÖÖ ÖµÖÖ ×¾Ö¾Ö¸üÖ
(²Öß) ÃÖÓ×¾Ö¤üÖ úß ×¾Ö¿ÖêÂÖ ¿ÖŸÖí, µÖפü úÖê‡Ô ÆüÖë
(ÃÖß) ¸êüÖÖד֡Ö

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(d) Technical specifications
(e) General Conditions of Contracts
1.4.2 Any inadvertent error in description, quantity or rate in Schedule of Quantities
or any omission there from shall not vitiate the Contract or release the
Contractor from the execution of the whole or any part of the works
comprised therein according to terms and conditions or from any of his
obligations under the Contract.
1.4.3 If there are varying or conflicting provisions made in any one document
forming part of the contract, the Accepting Authority shall be the deciding
authority with regard to the intention of the document.
1.5 Contractor’s Documents for use by Corporation
1.5.1 The Contractor shall maintain at his Site Office all drawings, specifications
and other Contract documents and any other supplementary data
complete with all the latest revisions thereto. The Contractor shall also
maintain, in addition, the continuous record of all changes to the above
Contract documents, drawings, specifications, supplementary data, etc.
effected at the site. Whenever called by Engineer-in-charge, the Contractor
shall incorporate all such changes on the drawings and other engineering
data to indicate actual construction/fabrication and erection carried out
under the Contract. Two copies of such revised / updated drawings and
engineering data shall be submitted to the Engineer-in-Charge along with the
soft copies on completion of his total assignment or the milestones as
specified under the Contract.
1.5.2 The Contractor shall be deemed (by signing the Contract) to give to the
Corporation a non-terminable transferable non-exclusive royalty-free license
to copy, use and communicate the Contractor’s Documents, including
making and using modifications of them. This license shall:
(a) apply throughout the actual or intended working life (whichever is longer) of
the relevant parts of the Works,
(b) entitle any person in lawful possession of the relevant part of the Works to
copy, use and communicate the Contractor’s Documents for the purposes of
completing, operating, maintaining, altering, adjusting, repairing and
demolishing the Works, and
(c) in the case of Contractor’s Documents, which are recorded in computer
programs and other software, permit the access to the data through any
computer on the Site.
1.5.3 The Contractor’s Documents and other design documents made by (or on
behalf of) the Contractor shall not, without the Contractor’s consent, be used,
copied or communicated to a third party by (or on behalf of) the Corporation
for purposes other than those permitted under this sub-clause.
1.6 Corporation’s Documents for use by Contractor
1.6.1 The Corporation shall retain copyright and other intellectual property rights of
their Specification, the Drawings and other documents made by (or on behalf
of) the Corporation. The Contractor may, at his cost, copy, use, and obtain
communication of these documents for the

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(›üß) ŸÖú­Öߍúß ×¾Ö×­Ö¤ìü¿Ö
(‡Ô) ÃÖÓ×¾Ö¤üÖ úß ÃÖÖ´ÖÖ­µÖ ¿ÖŸÖí
1.4.2 ×¾Ö¾Ö¸üÖ, ´ÖÖ¡ÖÖ †­ÖãÃÖæ“Öß ´Öë ´ÖÖ¡ÖÖ µÖÖ ¤ü¸ü ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úß ³Öæ»Ö-“Öæú †£Ö¾ÖÖ ˆÃÖ´Öë ãú”û ”æû™ü •ÖÖ­Öê êú
úÖ¸üÖ ÃÖÓ×¾Ö¤üÖ ¯ÖϳÖÖ¾ÖÆüß­Ö ­ÖÆüà ÆüÖêÖß †Öî¸ü ­Ö Æüß ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖÓ×¾Ö¤üÖ ´Öê ¾ÖÙÖŸÖ úÖµÖÔ êú ¯ÖæÖÔ ºþ¯Ö ÃÖê
µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ úÖê ×­ÖµÖ´Ö ¾Ö ¿ÖŸÖÖí êú †­ÖãÃÖÖ¸ü ×­Ö¯ÖÖ¤ü­Ö ÃÖê †£Ö¾ÖÖ ×úÃÖß ¯ÖύúÖ¸ü úß ²ÖÖ¬µÖŸÖÖ ÃÖê
´ÖãŒŸÖ ú¸êüÖß …
1.4.3 µÖפü ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú ׍úÃÖß ³ÖÖÖ êú ׍úÃÖß ³Öß ¤üßÖÖ¾Öê•Ö ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úß úÖê‡Ô ׳֮֟ÖÖ µÖÖ
×¾Ö¸üÖê¬ÖÖ³ÖÖÃÖ ÆüÖêŸÖÖ Æîü ŸÖÖê, ÃÖÆü´Ö×ŸÖ ¯ÖÏÖ׬֍úÖ¸üß úÖê ˆÃÖ ú֐֕ÖÖŸÖ êú ´Ö­ŸÖ¾µÖ êú ²ÖÖ¸êü ´Öë ׭֝ÖÔµÖ »Öê­Öê úÖ
†×¬ÖúÖ¸ü ÆüÖêÖÖ…
1.5 ×­ÖÖ´Ö «üÖ¸üÖ ¯ÖϵÖÖêÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¤üßÖÖ¾Öê•Ö
1.5.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê úÖµÖÔÃ£Ö»Ö úÖµÖÖÔ»ÖµÖ ´Öë ÃÖ³Öß ¸êüÖÖד֡Ö, ×¾Ö×­Ö¤ìü¿ÖÖë ¾Ö †­µÖ ÃÖÓ×¾Ö¤üÖ
ú֐֕ÖÖŸÖÖë †Öî¸ü ­Ö¾Öß­ÖŸÖ´Ö ÃÖÓ¿ÖÖê¬Ö­ÖÖë ÃÖ×ÆüŸÖ †­µÖ ¯Öæ¸üú †ÖӍú›ÍüÖêÓ úÖê †ªŸÖ­Ö ¸üÖëÖê… ‡Ã֍êú ÃÖÖ£Ö-ÃÖÖ£Ö
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆ¯ÖµÖãÔŒŸÖ ÃÖÓ×¾Ö¤üÖ ¤üßÖÖ¾Öê•ÖÖë, ¸êüÖÖד֡ÖÖë, ×¾Ö×­Ö¤ìü¿ÖÖë, ¯Öæ¸üú †ÖӍú›ÍüÖë †Öפü ´Öë úÖµÖÔÃ£Ö»Ö ´Öë
׍ú‹ Ö‹ ÃÖ³Öß ¯Ö׸ü¾ÖŸÖÔ­ÖÖë êú ׸üúÖ›Ôü ¸üÖëüÖê… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ²ÖŸÖÖ‹ •ÖÖ­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ
ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ †Ö­Öê ¾ÖÖ»Öê ‹êÃÖê ÃÖ³Öß ¯Ö׸ü¾ÖŸÖÔ­ÖÖë úÖê ¸êüÖÖ×“Ö¡Ö ´Öë ¯ÖϤüÙ¿ÖŸÖ ú¸ü ¾Ö ¾ÖÖßÖ׾֍ú
×­Ö´ÖÖԝÖ/ÖœÍüÖ‡Ô ¾Ö ãÖÖ¯Ö­Ö †Öפü êú †­µÖ ÃÖ³Öß †×³ÖµÖÖÓס֍úß †ÖӍú›ÍüÖë úÖê ÃÖÓ¸üÖê×¬ÖŸÖ ú¸ëüÖê… ÃÖÓ×¾Ö¤üÖ ´Öë
×¾Ö×­Ö¤ìü×¿ÖŸÖ ×úü‹ Ö‹ úÖµÖÔ µÖÖ Ö›ü-úÖµÖÔ úÖê ¯Öæ¸üÖ ú¸ü­Öê êú ¯Ö¿“ÖÖŸÖ ‹êÃÖê ÃÖÓ¿ÖÖê׬֟Ö/†ªŸÖ­Ö ¸êüÖÖד֡ÖÖë
¾Ö †×³ÖµÖÖÓס֍úß †ÖӍú›ÍüÖë úß ÃÖÖò°™ü ¯ÖÏ×ŸÖ ÃÖ×ÆüŸÖ ¤üÖê ¯ÖÏןֵÖÖÓ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ¯ÖÖÃÖ ¯ÖÏßÖãŸÖ úß
•Ö֋ӐÖß…
1.5.2 ÃÖÓ×¾Ö¤üÖ ¯Ö¸ü ÆüßÖցָü ú¸üŸÖê Æüß µÖÆü ´ÖÖ­Ö ×»ÖµÖÖ •ÖÖ‹ÖÖ ×ú ÃÖÓ×¾Ö¤ü֍úÖ¸ü ­Öê ×­ÖÖ´Ö úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú
ú֐֕ÖÖŸÖÖë úÖê ²Ö­ÖÖ­Öê †Öî¸ü ˆ­Ö´Öë ÃÖÓ¿ÖÖê¬Ö­Ö ú¸ü­Öê ÃÖ×ÆüŸÖ ¯ÖÏןÖ×»Ö×¯Ö ²Ö­ÖÖ­Öê, ¯ÖϵÖÖêÖ ú¸ü­Öê ¾Ö ¯ÖÏÃÖÖ׸üŸÖ ú¸ü­Öê
êú ×»Ö‹ †ÃÖ´ÖÖ¯µÖ ÆüßÖÖÓŸÖ¸üÖßµÖ †¯Öé£Öú¸üÖßµÖ ¸üÖòµÖ»™üß-´ÖãŒŸÖ »ÖÖ‡ÃÖëÃÖ ¤êü פüµÖÖ Æîü… µÖÆü »ÖÖ‡ÃÖëÃÖ :
(‹) ÃÖÓ¯ÖæÖÔ ¾ÖÖßÖ׾֍ú µÖÖ úÖµÖÔ êú ÃÖÓ²ÖÓ×¬ÖŸÖ ³ÖÖÖ úß ¾ÖÖÓ×”ûŸÖ úÖµÖÖÔ¾Ö×¬Ö (•ÖÖê ³Öß ²ÖÖ¤ü ´Öë ÆüÖê)
êú ×»Ö‹ »Ö֐Öæ ¸üÆêüÖÖ,
(²Öß) úÖµÖÔ êú ÃÖÓ²ÖÓ×¬ÖŸÖ ³ÖÖÖ êú úÖ­Öæ­Öß Ã¾ÖÖ´Öß úÖê úÖµÖÔ ¯Öæ¸üÖ ú¸ü­Öê, ¯ÖÏ“ÖÖ×»ÖŸÖ ú¸ü­Öê, †­Öã¸üÖÖ
ú¸ü­Öê, ¯Ö׸ü¾ÖŸÖÔ­Ö ú¸ü­Öê, ÃÖ´ÖÖµÖÖê×•ÖŸÖ ú¸ü­Öê, ´Ö¸ü´´ÖŸÖ ú¸ü­Öê ¾Ö ŸÖÖê›Íü-±úÖê›Íü ú¸ü­Öê êú ×»Ö‹
ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¤üßÖÖ¾Öê•ÖÖë úß ¯ÖÏןÖ×»Ö×¯Ö ˆŸÖÖ¸ü­Öê, ¯ÖϵÖÖêÖ ¾Ö ¯ÖÏÃÖÖ¸üÖ ú¸ü­Öê úÖ †×¬ÖúÖ¸ü ¤êüÖÖ,
†Öî¸ü
(ÃÖß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ‹êÃÖê ¤üßÖÖ¾Öê•ÖÖë êú ´ÖÖ´Ö»Öê ´Öë, ו֭Æëü Óú¯µÖæ™ü¸ü ¯ÖÏÖêÖÏÖ´Ö µÖÖ †­µÖ ÃÖÖò°™ü¾ÖêµÖ¸ü ´Öë ¤ü•ÖÔ
׍úµÖÖ ÖµÖÖ ÆüÖ,ê †ÖӍú›ÍüÖë úÖê Ã£Ö»Ö êú ׍úÃÖß ³Öß Óú¯µÖæ™ü¸ü ÃÖê ¯ÖÏÖ¯ŸÖ ú¸ü­Öê úß †­Öã´Ö×ŸÖ ¤êüÖÖ…
1.5.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¤üßÖÖ¾Öê•Ö ¾Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ (µÖÖ ˆ­Öúß †Öê¸ü ÃÖê) ŸÖîµÖÖ¸ü ׍ú‹ Ö‹ †­µÖ
†×³Öú»¯Ö­Ö ¤üßÖÖ¾Öê•ÖÖêÓ úÖê ×­ÖÖ´Ö «üÖ¸üÖ (µÖÖ ˆ­Öúß †Öê¸ü ÃÖê) ‡ÃÖ ˆ¯Ö-Ö›ü ´Öë †­Öã´ÖêµÖ
ˆ§êü¿µÖÖë êú †»ÖÖ¾ÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ÃÖÆü´Ö×ŸÖ êú ²ÖÖî¸ü ­Ö ŸÖÖê ˆ¯ÖµÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ, ­Ö ¯ÖÏןֵÖÖÓ
²Ö­ÖÖ‡Ô •Ö֋ӐÖß †Öî¸ü ­Ö Æüß ×úÃÖß ŸÖßÃÖ¸êü ¯ÖÖ úÖê ÃÖÓ¯ÖÏê×ÂÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…
1.6 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖϵÖÖêÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ×­ÖÖ´Ö êú ¤üßÖÖ¾Öê•Ö
1.6.1 ×­ÖÖ´Ö úÖê †¯Ö­Öê ×¾Ö×­Ö¤ìü¿ÖÖë, ¸êüÖÖד֡ÖÖë ¾Ö ×­ÖÖ´Ö «üÖ¸üÖ ŸÖîµÖÖ¸ü ׍ú‹ Ö‹ (µÖÖ ×­ÖÖ´Ö úß †Öê¸ü ÃÖê)
†­µÖ ¤üßÖÖ¾Öê•ÖÖë úÖ úÖò¯Ö߸üÖ‡™ü ¾Ö †­µÖ ²ÖÖîרüú ÃÖÓ¯Ö¤üÖ †×¬ÖúÖ¸üÖë úÖê †¯Ö­Öê ¯ÖÖÃÖ ÃÖã¸üׁ֟Ö
¸üÖ­Öê úÖ †×¬ÖúÖ¸ü
9

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
purposes of the Contract. They shall not, without the Corporation’s consent in
writing, be copied, used or communicated to a third party by the
Contractor.
1.7 Confidential Details
1.7.1 The Contractor shall take necessary steps to ensure that all
persons employed on any work in connection with this Contract
have noticed that the Indian Official Secrets Act, 1923 (XIX of
1923) applies to them and shall continue to apply even after the
execution of such works under the Contract.
1.7.2 The Contractor’s and the Corporation’s Personnel shall disclose all
such confidential and other information as may be reasonably
required in order to verify compliance with the Contract and
allow its proper implementation.
1.7.3 Each of them shall treat the details of the Contract as private and
confidential, except to the extent necessary to carry out their
respective obligations under the Contract or to comply with
applicable Laws. Each of them shall not publish or disclose any
particulars of the Works prepared by the other Party without the
previous agreement of the other Party. However, the Contractor
shall be permitted to disclose any publicly available information,
or information otherwise required to establish his qualifications to
compete for other projects.
1.8 Compliance with Law
1.8.1 The Contractor shall, in executing the Contract, comply with
applicable Laws. Unless otherwise stated:
(a)the Corporation shall have obtained (or shall obtain) the planning,
zoning, building permit or similar permission for the Permanent Works,
and any other permissions described in the Specification as having
been (or to be) obtained by the Corporation; and the Corporation
shall indemnify and hold the Contractor harmless against and from
the consequences of any failure to do so; and
(b)the Contractor shall give all notices, pay all taxes, duties and fees,
and obtain all permits, licenses and approvals, as required by the
Laws in relation to the execution and completion of the Works and
the remedying of any defects; and the Contractor shall indemnify
and hold the Corporation harmless against and from the
consequences of any failure to do so, unless the Contractor is
impeded to accomplish these actions and shows evidence of its
diligence.
1.9 Changes in Constitution
1.9.1 Where the Contractor is a partnership firm, Joint Venture, collaborate or
consortium, prior approval in writing of the Accepting Authority
(defined

10

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
ÆüÖêÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü “ÖÖÆêü ŸÖÖê ÃÖÓ×¾Ö¤üÖ êú úÖµÖÖí ÆêüŸÖæ †¯Ö­Öê Ö“Öì ¯Ö¸ü ‡­Ö ¤üßÖÖ¾Öê•ÖÖë úß ¯ÖÏןÖ×»Ö¯Ö ŸÖîµÖÖ¸ü ú¸ü¾ÖÖ
Ã֍úŸÖÖ Æîü, ˆ¯ÖµÖÖêÖ ú¸ü Ã֍úŸÖÖ Æîü †£Ö¾ÖÖ ‡­Æëü ¯ÖÏÖ¯ŸÖ ú¸ü Ã֍úŸÖÖ Æîü… ×­ÖÖ´Ö úß ×»Ö×ÖŸÖ †­Öã´Ö×ŸÖ êú ²ÖÖî¸ü
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ŸÖßÃÖ¸êü ¯ÖÖ êú ×»Ö‹ ‡­ÖúÖ ¯ÖÏןÖ×»Ö¯Öߍú¸üÖ, ˆ¯ÖµÖÖêÖ µÖÖ ¯ÖÏÃÖÖ¸üÖ ­ÖÆüà ú¸êüÖÖ…
1.7 ÖÖê¯Ö­ÖßµÖ ×¾Ö¾Ö¸üÖ
1.7.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ ÃÖÓ×¾Ö¤üÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ×úÃÖß ³Öß úÖµÖÔ êú ×»Ö‹ ×­ÖµÖãŒŸÖ ×ú‹ Ö‹ ú´ÖÔ“ÖÖ׸üµÖÖë úÖê
µÖÆü ÃÖæ“Ö­ÖÖ ¯ÖÏÖׯŸÖ ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­Öê êú ×»Ö‹ ÃÖ³Öß †Ö¾Ö¿µÖú ú¤ü´Ö ˆšü֋ӐÖê ׍ú ˆ­Öú¯Ö¸ü
³ÖÖ¸üŸÖßµÖ úÖµÖÖÔ»ÖµÖß­Ö ÖÖê¯Ö­ÖßµÖŸÖÖ †×¬Ö×­ÖµÖ´Ö, 1923 (1923 úÖ 19¾ÖÖÓ) »Ö֐Öæ ÆüÖêŸÖÖ Æîü †Öî¸ü
µÖÆü ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú ÃÖ´ÖÖ¯ŸÖ ÆüÖê •ÖÖ­Öê êú ²ÖÖ¤ü ³Öß ˆ­Ö ¯Ö¸ü »Ö֐Öæ ¸üÆêüÖÖ…
1.7.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¾Ö ×­ÖÖ´Ö êú ú´ÖÔ“ÖÖ¸üß ÃÖÓ×¾Ö¤üÖ êú †­Öã¯ÖÖ»Ö­Ö úß ¯ÖãÛ™ü †Öî¸ü ˆ×“ÖŸÖ œÓüÖ ÃÖê »Ö֐Öæ
׍ú‹ •ÖÖ­Öê êú ×»Ö‹ ‹êÃÖß ÃÖ³Öß ÖÖê¯Ö­ÖßµÖ ‹¾ÖÓ †­µÖ ÃÖæ“Ö­ÖÖ‹Ó ×•Ö­Öêú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ †Öîד֟µÖ ÆüÖ,ê
ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê …
1.7.3 ¤üÖê­ÖÖë ´Öë ÃÖê ¯ÖÏŸµÖêú ÃÖÓ×¾Ö¤üÖ êú †¬Öß­Ö µÖÖ »Ö֐Öæ úÖ­Öæ­ÖÖë êú †­Öã¯ÖÖ»Ö­Ö êú Îú´Ö ´Öë †¯Ö­Öß
וִ´Öê¤üÖ׸üµÖÖë êú ×­Ö¾ÖÔÆü­Ö ú¸üŸÖê ÃÖ´ÖµÖ †Ö¾Ö¿µÖú ÆüÖê­Öê úß üÛãÖ×ŸÖ êú †»ÖÖ¾ÖÖ ÃÖÓ×¾Ö¤üÖ êú
×¾Ö¾Ö¸üÖ úÖê ¾µÖÛŒŸÖÖŸÖ ¾Ö ÖÖê¯Ö­ÖßµÖ ÃÖ´Ö—ÖëÖê… ˆ­Ö´Öë ÃÖê ¯ÖÏŸµÖêú ¾µÖÛŒŸÖ ׍úÃÖß †­µÖ ¯ÖÖ «üÖ¸üÖ
ŸÖîµÖÖ¸ü ׍ú‹ Ö‹ úÖµÖÔ êú ×¾Ö¾Ö¸üÖ úÖê †­µÖ ¯ÖÖ úßü ¯Öæ¾ÖÔ ÃÖÆü´Ö×ŸÖ êú ²ÖÖî¸ü ­Ö ŸÖÖê ¯ÖύúÖ׿֟Ö
ú¸êüÖÖ †Öî¸ü ­Ö Æüß ×úÃÖß úÖê ²ÖŸÖÖ‹ÖÖ… ŸÖ£ÖÖ×¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü †Ö´Ö •Ö­ÖŸÖÖ êú ×»Ö‹ ˆ¯Ö»Ö²¬Ö
ÃÖæ“Ö­ÖÖ†Öë †£Ö¾ÖÖ †­µÖ ׍úÃÖß ¯Ö׸üµÖÖê•Ö­ÖÖ êú ×»Ö‹ ¯ÖÏןÖï֬ÖÖÔ ú¸üŸÖê ÃÖ´ÖµÖ †¯Ö­Öß µÖÖꐵ֟ÖÖ
×ÃÖ¨ü ú¸ü­Öê êú ×»Ö‹ ÃÖæ“Ö­ÖÖ ¤êü Ã֍êúÖÖ…
1.8 úÖ­Öæ­Ö úÖ †­Öã¯ÖÖ»Ö­Ö
1.8.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü, ÃÖÓ×¾Ö¤üÖ êú ×­Ö¯ÖÖ¤ü­Ö êú ¤üÖî¸üÖ­Ö, »Ö֐Öæ úÖ­Öæ­ÖÖë úÖ †­Öã¯ÖÖ»Ö­Ö ú¸êüÖÖ… •Ö²Ö ŸÖú
׍ú †­µÖ£ÖÖ ­Ö úÆüÖ •ÖÖ‹ :
(‹) ×­ÖÖ´Ö «üÖ¸üÖ µÖÖê•Ö­ÖÖ, Öê¡Öߍú¸üÖ, ×­Ö´ÖÖÔÖ úß †­Öã´Ö×ŸÖ »Öê »Öß ÆüÖê (µÖÖ »Öê ¸üÆüÖ ÆüÖê)†£Ö¾ÖÖ
×­ÖÖ´Ö «üÖ¸üÖ Ã£ÖÖ‡Ô úÖµÖÔ êú ×»Ö‹ ‡ÃÖß ¯ÖύúÖ¸ü úß †­Öã´Ö×ŸÖ †Öî¸ü ×¾Ö×­Ö¤ìü¿ÖÖë ´Öë ¾ÖÙÖŸÖ úÖê‡Ô
†­µÖ †­Öã´Ö×ŸÖ ¯ÖÏÖ¯ŸÖ úß •ÖÖ “Öãúß ÆüÖê(ÆüÖê­Öê ¾ÖÖ»Öß ÆüÖê): †Öî¸ü ‹êÃÖÖ ­Ö ú¸ü ¯ÖÖ­Öê úß ¤ü¿ÖÖ êú
¯Ö׸üÖÖ´ÖÖë ÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍úÃÖß ¯ÖύúÖ¸ü úÖ ­ÖãúÃÖÖ­Ö ­Ö ÆüÖê­Öê ¤êü­Öê êú ×»Ö‹ ×­ÖÖ´Ö Öן֯ÖæÙŸÖ
úß ÖÖ¸Óü™üß ¤êüÖÖ: †Öî¸ü
(²Öß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖ³Öß ­ÖÖê×™üÃÖ ¤ëüÖê, ÃÖ³Öß ú¸üÖë, ¯ÖϳÖÖ¸üÖë ¾Ö ¿Ö㻍úÖë úÖ ³ÖãÖŸÖÖ­Ö ú¸ëüÖê †Öî¸ü úÖµÖÔ
êú ×­Ö¯ÖÖ¤ü­Ö ¾Ö ¯ÖæÖÔŸÖÖ ŸÖ£ÖÖ ¤üÖêÂÖÖë úÖê ¤æü¸ü ú¸ü­Öê ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ úÖµÖÖí êú ×»Ö‹ úÖ­Öæ­Öß ºþ¯Ö ÃÖê
†Ö¾Ö¿µÖú ÃÖ³Öß ¯Ö¸ü×´Ö™ü, »ÖÖ‡ÃÖëÃÖ ŸÖ£ÖÖ †­Öã´ÖÖê¤ü­Ö ¯ÖÏÖ¯ŸÖ ú¸ëüÖê: †Öî¸ü •Ö²Ö ŸÖú ׍ú
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‡­Ö úÖ¸Ôü¾ÖÖ‡ÔµÖÖë úÖê ¯Öæ¸üÖ ú¸ü­Öê ÃÖê ¸üÖêúÖ ­Ö •ÖÖ‹, †Öî¸ü †¯Ö­Öß ˆª×´ÖŸÖÖ êú
¯ÖÏ´Ö֝Öþֺþ¯Ö ‹êÃÖÖ ­Ö ú¸ü ¯ÖÖ­Öê úß ¤ü¿ÖÖ êú ¯Ö׸üÖÖ´ÖÖë ÃÖê ×­ÖÖ´Ö úÖê ׍úÃÖß ¯ÖύúÖ¸ü úÖ
­ÖãúÃÖÖ­Ö ­Ö ÆüÖê­Öê ¤êü­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü Öן֯ÖæÙŸÖ úß ÖÖ¸Óü™üß ¤êüÖÖ…
1.9 ÃÖÓ×¾Ö¬ÖÖ­Ö ´Öë ¯Ö׸ü¾ÖŸÖÔ­Ö
1.9.1 •ÖÆüÖÓ ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹ú ³Ö֐ÖߤüÖ¸üß ¾ÖÖ»Öß ±ú´ÖÔ, ÃÖÓµÖãŒŸÖ ˆª´Ö, ÃÖÆü³Ö֐Öß µÖÖ ÃÖÆüÖµÖŸÖÖ ÃÖÓ‘Ö ÆüÖ,ê
±ú´ÖÔ êú ÃÖÓ×¾Ö¬ÖÖ­Ö ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úÖ ¯Ö׸ü¾ÖŸÖÔ­Ö ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ÃÖÆü´Öן֤üÖŸÖÖ ¯ÖÏÖ׬֍úÖ¸üß (׭֐ִÖ
«üÖ¸üÖ ¯Ö׸ü³ÖÖ×ÂÖŸÖ) ÃÖê ×»Ö×ÖŸÖ ºþ¯Ö ´Öë ¯Öæ¾ÖÔ †­Öã´ÖÖê¤ü­Ö ¯ÖÏÖ¯ŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ… •ÖÆüÖÓ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê‡Ô
¾µÖÛŒŸÖ
10

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
by the Corporation) shall be obtained before any change is made in the
constitution of the firm. Where the Contractor is an individual or a Hindu
Undivided Family business concern such approval as aforesaid shall
likewise be obtained before the Contractor enters into any partnership
firm which would have the right to carry out the work hereby undertaken
by the Contractor.
1.9.2 Where the Contractor is a partnership firm, Joint Venture, collaborate or
consortium partnership the Contractor shall intimate the Corporation of
any change or modifications in the terms within their partnerships,
which could happen between the submission of bids and awarding of
bid. The Contractor shall obtain prior approval in case of any such
change or modification happens during the currency of the contract.
1.9.3 If prior approval as aforesaid is not obtained, the Contract shall be
deemed to have been assigned in contravention thereof and the
same action may be taken as provided for in the said clause 13.2
(Determination/Cancellation of Contract).
1.10 Conflict of Interest
1.10.1 The Contractor shall not be permitted to tender for works in the NPCIL
units (responsible for award and execution of work) in which his near
relative is posted as an officer in any capacity.
1.10.2 He shall also intimate the names of persons who are working with him in
any capacity or are subsequently employed by him and who are near
relatives of any officer in the NPCIL.
1.10.3 He shall also intimate if any employee of the Corporation has or
develops a financial or other interest of either with the Contractor or his
company during the execution of the contract.
1.10.4 The Contractor shall also intimate if any of the employee of NPCIL has
any financial interest in the Contractor’s firm or company.
Any breach of the above conditions by the Contractor would render
him liable for cancellation of the Contract.
1.11 Patent Indemnity
1.11.1 The contractor shall fully indemnify the Corporation against any action,
claim or proceeding relating to infringement or use of any patent or
design or any alleged patent or design rights and shall pay any
royalties which may be payable in respect of any article or part thereof
included in the contract. In the event of any claims made under an
action brought against Corporation in respect of any such matters as
aforesaid the contractor shall be immediately notified thereof and the
contractor shall be at liberty, at his own expense, to settle any dispute
or to conduct any litigation that may arise therefrom. Provided that the
contractor shall not be liable to indemnify the Corporation in the
infringement of the patent or design or any alleged patent or design
right is the direct result of an order passed by the Engineer-in-charge.

11

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
†£Ö¾ÖÖ †×¾Ö³ÖÖ×•ÖŸÖ ØÆü¤æü ¾µÖÖ¯ÖÖ¸üß ¯Ö׸ü¾ÖÖ¸ü ÆüÖê ¾ÖÆüÖÓ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×úÃÖß ‹êÃÖß ÃÖÆü³Ö֐Öß ±ú´ÖÔ ×•ÖÃ֍êú ¯ÖÖÃÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ‹ŸÖ¤Ëü«üÖ¸üÖ ×»Ö‹ Ö‹ úÖµÖÔ úÖê ú¸ü­Öê úÖ †×¬ÖúÖ¸ü ÆüÖ,ê êú ÃÖÖ£Ö ×úÃÖß ³Öß ¯ÖύúÖ¸ü úß
ÃÖÆü³ÖÖא֟ÖÖ ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ˆ¯ÖµÖãÔŒŸÖ úß Æüß ŸÖ¸üÆü úÖ †­Öã´ÖÖê¤ü­Ö ×»ÖµÖÖ •ÖÖ‹ÖÖ…
1.9.1 •ÖÆüÖÓ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹ú ³Ö֐ÖߤüÖ¸üß ¾ÖÖ»Öß ±ú´ÖÔ, ÃÖÓµÖãŒŸÖ ˆª´Ö, ÃÖÆü³Ö֐Öß µÖÖ ÃÖÆüÖµÖŸÖÖ ÃÖÓ‘Ö ÆüÖ,ê ¾ÖÆüÖÓ
ˆ­Öúß ³Ö֐ÖߤüÖ¸üß úß ¿ÖŸÖÖí ´Öë úÖê‡Ô ¯Ö׸ü¾ÖŸÖÔ­Ö ÆüÖê­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­ÖÖ´Ö úÖê ÃÖæ×“ÖŸÖ ú¸ëüÖê •ÖÖê׍ú
ˆ­Öêú ²ÖÖê»Öß •Ö´ÖÖ ú¸ü­Öê †Öî¸ü ²ÖÖê»Öß †¾ÖÖ›Ôü ú¸ü­Öê êú †ÓŸÖ¸üÖ»Ö ´Öë ÃÖÓ³Ö¾Ö Æîü… µÖפü ÃÖÓ×¾Ö¤üÖ †¾Ö×¬Ö êú
¤üÖî¸üÖ­Ö ‹êÃÖÖ úÖê‡Ô ¯Ö׸ü¾ÖŸÖÔ­Ö µÖÖ ÃÖÓ¿ÖÖê¬Ö­Ö ÆüÖêŸÖÖ Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¯Öæ¾ÖÖÔ­Öã´Ö×ŸÖ »Öê­Öß ÆüÖêÖß…
1.9.2 µÖפü ˆ¯ÖµÖãÔŒŸÖ êú †­ÖãÃÖÖ¸ü †­Öã´ÖÖê¤ü­Ö ­ÖÆüà ¯ÖÏÖ¯ŸÖ ׍úµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ÃÖÓ×¾Ö¤üÖ úÖ •ÖÖ¸üß ¸üÖÖ •ÖÖ­ÖÖ
ˆ»»ÖÓ‘Ö­Ö ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ †Öî¸ü ˆŒŸÖ Ö›ü 13.2 (ÃÖÓ×¾Ö¤üÖ úÖ ×­Ö¬ÖÖÔ¸üÖ/×­Ö¸üßÖߍú¸üÖ) êú ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë
êú †­ÖãÃÖÖ¸ü úÖ¸Ôü¾ÖÖ‡Ô úß •ÖÖ Ã֍úŸÖß Æîü…
1.10 ×ÆüŸÖÖë úÖ ™üú¸üÖ¾Ö
1.10.1 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ úÖê‡Ô ׭֍ú™ü ÃÖÓ²ÖÓ¬Öß ‹­Ö¯ÖßÃÖ߆ևԋ»Ö úß ×úÃÖß ‡úÖ‡Ô (úÖµÖÔ úÖê †¾ÖÖ›Ôü
ú¸ü­Öê ¾Ö ×­Ö¯ÖÖ¤ü­Ö) ´Öë ׍úÃÖß ³Öß Æîü×ÃÖµÖŸÖ êú †×¬ÖúÖ¸üß êú ¯Ö¤ü ¯Ö¸ü, úÖµÖÔ ú¸ü ¸üÆüÖ ÆüÖê ŸÖÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ˆÃÖ ‡úÖ‡Ô ´Öë úÖµÖÔ êú ×»Ö‹ ×­Ö×¾Ö¤üÖ ú¸ü­Öê úß †­Öã´Ö×ŸÖ ­ÖÆüà ÆüÖêÖß…
1.10.2 ¾ÖÆü †¯Ö­Öê ÃÖÖ£Ö ×úÃÖß ³Öß Æîü×ÃÖµÖŸÖ ´Öëü úÖ´Ö ú¸ü ¸üÆêü µÖÖ ²ÖÖ¤ü ´Öë ˆ­Öêú «üÖ¸üÖ ×­ÖµÖãŒŸÖ ×ú‹ •ÖÖ­Öê
¾ÖÖ»Öê ˆ­Ö ¾µÖÛŒŸÖµÖÖë •ÖÖê ‹­Ö¯ÖßÃÖ߆ևԋ»Ö êú ׍úÃÖß †×¬ÖúÖ¸üß êú ׭֍ú™ü ÃÖÓ²ÖÓ¬Öß Æïü, êú ­ÖÖ´ÖÖêÓ
úß ÃÖæ“Ö­ÖÖ ³Öß ¤ëüÖê…
1.10.3 ¾ÖÆü ×­ÖÖ´Ö êú ‹êÃÖê ú´ÖÔ“ÖÖ׸üµÖÖë ו֭֍êú, ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖÖ ˆ­Öúß Óú¯Ö­Öß êú ÃÖÖ£Ö, ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú
×­Ö¯ÖÖ¤ü­Ö êú ¤üÖî¸üÖ­Ö ×¾Ö¢ÖßµÖ µÖÖ †­µÖ ׍úÃÖß ¯ÖύúÖ¸ü êú ×ÆüŸÖ •Öã›ÍüŸÖê Æïü, úß ³Öß ÃÖæ“Ö­ÖÖ ¤ëüÖê…
1.10.4 µÖפü ‹­Ö¯ÖßÃÖ߆ևԋ»Ö êú ׍úÃÖß ú´ÖÔ“ÖÖ¸üß êú ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ±ú´ÖÔ µÖÖ Óú¯Ö­Öß êú ÃÖÖ£Ö ×úÃÖß
¯ÖύúÖ¸ü êú ×¾Ö¢ÖßµÖ ×ÆüŸÖ •Öã›Íêü ÆüÖë ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖê ³Öß ÃÖæ×“ÖŸÖ ú¸ëüÖê…
ˆ¯ÖµÖãÔŒŸÖ ¿ÖŸÖÖì ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úÖ ˆ»»ÖÓ‘Ö­Ö ×ú‹ •ÖÖ­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ÃÖÓ×¾Ö¤üÖ úÖê ×­Ö¸üßÖ
׍úµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü…
1.11 ¯Öê™ëü™ü ÃÖã¸üÖÖ
1.11.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ׍úÃÖß ¯Öê™ëü™ü µÖÖ †×³Öú»¯Ö µÖÖ úÖê‡Ô ŸÖ£Ö֍ú×£ÖŸÖ ¯Öê™ëü™ü µÖÖ †×³Öú»¯Ö †×¬ÖúÖ¸üÖë úÖ
¯ÖϵÖÖêÖ ú¸üŸÖÖ Æîü µÖÖ ˆ»»ÖÓ‘Ö­Ö ú¸üŸÖÖ Æîü ŸÖÖê ˆÃÖÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ×úÃÖß úÖµÖÔ¾ÖÖÆüß, ¤üÖ¾Öê µÖÖ úÖ­Öæ­Öß
úÖ¸Ôü¾ÖÖ‡Ô ÃÖê ÃÖÓ¯ÖæÖÔ ÃÖã¸üÖÖ ú¸êüÖÖ †Öî¸ü ׍úÃÖß »ÖêÖ µÖÖ ˆÃ֍êú ³ÖÖÖ êú ²ÖÖ¸êü ´Öë ÃÖÓ×¾Ö¤üÖ êú
ˆ»»ÖêÖ êú †­ÖãÃÖÖ¸ü ¤êüµÖ ׍úÃÖß ¸üÖòµÖ»™üß úÖ ³ÖãÖŸÖÖ­Ö ú¸êüÖÖ… µÖפü ˆ¯ÖµÖãÔŒŸÖ ׍úÃÖß ³Öß ´ÖÖ´Ö»Öê
´Öë ×­ÖÖ´Ö êú ×¾Ö¹ý¨ü ׍úÃÖß úÖ¸Ôü¾ÖÖ‡Ô êú †ÓŸÖÖÔŸÖ úÖê‡Ô ¤üÖ¾ÖÖ ¯ÖÏßÖãŸÖ ׍úµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ˆÃ֍êú
²ÖÖ¸êü ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ŸÖŸúÖ»Ö ÃÖæ×“ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †¯Ö­Öê Ö“Öì ¯Ö¸ü ‹êÃÖê
×¾Ö¾ÖÖ¤üÖë úÖê ÃÖã»Ö—ÖÖ­Öê µÖÖ úÖê‡Ô úÖ­Öæ­Öß ¯ÖÏ׍ÎúµÖÖ ú¸ü­Öê úß Ã¾ÖŸÖÓ¡ÖŸÖÖ ÆüÖêÖß… ¯Ö¸ÓüŸÖã µÖפü ‹êÃÖê ¯Öê™ëü™ü
µÖÖ †×³Öú»¯Ö †£Ö¾ÖÖ úÖê‡Ô ŸÖ£Ö֍ú×£ÖŸÖ ¯Öê™ëü™ü µÖÖ †×³Öú»¯Ö †×¬ÖúÖ¸ü úÖ ˆ»»ÖÓ‘Ö­Ö ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ êú «üÖ¸üÖ ¯ÖÖ׸üŸÖ †Ö¤êü¿Ö êú ïÖ™ü ¯Ö׸üÖÖ´Öþֺþ¯Ö Æãü†Ö ÆüÖê ŸÖÖê, ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­ÖÖ´Ö úÖê
׍úÃÖß ¯ÖύúÖ¸ü úß Öן֯ÖæÙŸÖ ú¸ü­Öê êú ×»Ö‹ ²ÖÖ¬µÖ ­ÖÆüà ÆüÖêÖÖ…

11

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
2 THE CORPORATION
2.1 Possession of Site
2.1.1 The Contractor shall not be permitted to enter on (other than for
inspection purposes) or take possession of the site until instructed to do
so by the Engineer-in-Charge in writing. The portion of the Site to be
occupied by the Contractor shall be defined and /or marked on the
Site Plan, failing which these shall be indicated by the Engineer-in-
Charge at site and the Contractor shall on no account be allowed to
extend his operations beyond these areas.
2.1.2 It is deemed that the Contractor has inspected and has full knowledge
of the site.
2.1.3 The Engineer-in-charge shall give the Contractor right of access to and
possession of, part or all parts of the Site (as deemed necessary) within
the time specified in the Schedule A.
2.1.4 If no such time is stated in the Contract, the Corporation shall give the
Contractor right of access to, and possession of, the Site within such
times as required to enable the Contractor to proceed without
disruption in accordance with the program submitted.
2.1.5 The Corporation may withhold the action on giving the right of access
to and possession of site to the Contractor till the Performance
Guarantee and acceptance of work order has been received.
2.2 Permits, Licenses or Approvals
2.2.1 The Corporation shall provide, at the request of the Contractor, such
reasonable assistance or direction, which shall be limited to the issue of
necessary certificates as required under law so as to allow the
Contractor to obtain the following:
(a) copies of the Laws of the Country which are relevant to the
Contract but are not readily available, and
(b) any permits, licenses or approvals required by the Laws of the
Country which the Contractor is required to obtain under sub-
clause 1.8 [Compliance with Law], for the delivery of Goods,
including clearance through customs, and or the export of
Contractor’s Equipment when it is removed from the Site.
2.2.2 However, no claims can be made by the Contractor with respect to
this clause.
2.3 Corporation’s Personnel
2.3.1 The Corporation shall be responsible for ensuring that the Corporation’s
Personnel and the other Contractors deputed by Corporation at the
Site:
(a) co-operate with the Contractor’s efforts under sub-clause 4.21
[Co-operation and Facilities to Other Contractors], and
(b) take or facilitate actions similar to those which the Contractor is
required to take under Sub-Clause 5.6 [Health and Industrial
Safety] and Sub-Clause 4.13 [Protection of the Environment].
12

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
2. ׭֐ִÖ
2.1 Ã£Ö»Ö úÖ ú²•ÖÖ
2.1.1 •Ö²Ö ŸÖú ׍ú ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ úÖê‡Ô ×»Ö×ÖŸÖ †Ö¤êü¿Ö ­Ö פüµÖÖ •ÖÖ‹, ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê
úÖµÖÔÃ£Ö»Ö ´Öë ¯ÖϾÖê¿Ö ú¸ü­Öê (×­Ö¸üßÖÖ úÖµÖÔ êú †»ÖÖ¾ÖÖ) µÖÖ úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ú²•ÖÖ »Öê­Öê úß
†­Öã´Ö×ŸÖ ­ÖÆüà ÆüÖêÖß… ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆ¯ÖµÖÖêÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ÃÖÓµÖÓ¡Ö Ã£Ö»Ö êú ³ÖÖÖ úÖê ãֻÖ
µÖÖê•Ö­ÖÖ ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ/ דÖÛÅ­ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü µÖפü ‹êÃÖÖ ­Ö ׍úµÖÖ ÖµÖÖ ÆüÖê ŸÖÖê ãֻÖ
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ‡ÃÖê דÖÛÅ­ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍úÃÖß ³Öß ¤ü¿ÖÖ ´Öë, ‡­Ö
Öê¡ÖÖë êú ²ÖÖÆü¸ü úÖµÖÔ ­ÖÆüà ú¸ü­Öê פüµÖÖ •ÖÖ‹ÖÖ…
2.1.2 µÖÆü ´ÖÖ­Ö ×»ÖµÖÖ •ÖÖŸÖÖ Æîü ׍ú ÃÖÓ×¾Ö¤ü֍úÖ¸ü ­Öê úÖµÖÔÃ£Ö»Ö úÖ ×­Ö¸üßÖÖ ú¸ü ×»ÖµÖÖ Æîü †Öî¸ü ˆÃÖê
úÖµÖÔÃ£Ö»Ö úß ¯Öæ¸üß •Ö֭֍úÖ¸üß Æîü…
2.1.3 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ †­ÖãÃÖæ“Öß ‹ ´Öë ×¾Ö×­Ö¤ìü×¿ÖŸÖ ÃÖ´ÖµÖ ÃÖß´ÖÖ ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖµÖÔÃ£Ö»Ö êú
ÃÖÓ¯ÖæÖÔ ³ÖÖÖ µÖÖ ˆÃ֍êú ‹ú ×ÆüÃÃÖê (•ÖîÃÖÖ ³Öß †Ö¾Ö¿µÖú ÆüÖê) úß ˆ¯Ö»Ö²¬ÖŸÖÖ ŸÖ£ÖÖ ¯ÖϾÖê¿Ö úÖ
†×¬ÖúÖ¸ü ¯ÖϤüÖ­Ö ú¸ëüÖê…
2.1.4 µÖפü ÃÖÓ×¾Ö¤üÖ ´Öë ‹êÃÖß ÃÖ´ÖµÖ ÃÖß´ÖÖ ŸÖµÖ ­Ö úß Ö‡Ô ÆüÖê ŸÖÖê, ×­ÖÖ´Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖµÖÔÃ£Ö»Ö ¯ÖϾÖê¿Ö
úÖ †×¬ÖúÖ¸ü †Öî¸ü ú²•ÖÖ ‹êÃÖß †¾Ö×¬Ö ´Öë ¤êüÖÖ ×•ÖÃÖÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ²ÖÖî¸ü ׍úÃÖß ¹ýúÖ¾Ö™ü êú
†¯Ö­Öê úÖµÖԍÎú´Ö úÖê úÖµÖÖÔÛ­¾ÖŸÖ ú¸ü Ã֍êú…
2.1.5 ×­ÖÖ´Ö úÖµÖÔ×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üß †Öî¸ü úÖµÖÔ†Ö¤êü¿Ö ÃÖÆü´Ö×ŸÖ ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ŸÖú ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê
úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ¯ÖϾÖê¿Ö ¾Ö ú²•ÖÖ ¤êü­Öê ÃÖÓ²ÖÓ¬Öß úÖ¸Ôü¾ÖÖ‡Ô úÖê ¸üÖêêú ¸üÖ Ã֍úŸÖÖ Æîü…
2.2 ¯Ö׸ü´Ö™ü, »ÖÖ‡ÃÖëÃÖ µÖÖ †­Öã´ÖÖê¤ü­Ö
2.2.1 ׭֐ִÖ, ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú †­Öã¸üÖê¬Ö ¯Ö¸ü ‹êÃÖß ŸÖÔúÃÖÓÖŸÖ ÃÖÆüÖµÖŸÖÖ µÖÖ ×­Ö¤êü¿Ö •ÖÖê úÖ­Öæ­ÖÖë êú †¬Öß­Ö
†Ö¾Ö¿µÖú ¯ÖÏ´ÖÖÖ¯Ö¡Ö †Öפü •ÖÖ¸üß ú¸ü­Öê ´ÖÖ¡Ö ŸÖú Æüß ÃÖß×´ÖŸÖ ÆüÖ,ê ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ÖÖ ŸÖÖ׍ú
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­Ö´­Ö×»Ö×ÖŸÖ úÖê ¯ÖÏÖ¯ŸÖ ú¸ü Ã֍êú :
(‹) ÃÖÓ×¾Ö¤üÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ¤êü¿Ö êú úÖ­Öæ­ÖÖë úß †ÖÃÖÖ­Öß ÃÖê ˆ¯Ö»Ö²¬Ö ­Ö ÆüÖê­Öê ¾ÖÖ»Öß ¯ÖÏןֵÖÖÓ
†Öî¸ü
(²Öß) ¤êü¿Ö êú úÖ­Öæ­ÖÖë êú †­ÖãÃÖÖ¸ü †Ö¾Ö¿µÖú úÖê‡Ô ¯Ö¸ü×´Ö™ü, »ÖÖ‡ÃÖëÃÖ µÖÖ †­Öã´ÖÖê¤ü­Ö וÖÃÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ˆ¯Ö Ö›ü 1.8 (úÖ­Öæ­ÖÖë úÖ †­Öã¯ÖÖ»Ö­Ö) êú †¬Öß­Ö ÃÖß´ÖÖ¿Ö㻍ú ׭֍úÖÃÖß
ÃÖ×ÆüŸÖ ÃÖÖ´ÖÖ­Ö úß ÃÖã¯Öã¤ÔüÖß †Öî¸ü †£Ö¾ÖÖ úÖµÖÔÃ£Ö»Ö ÃÖê Æü™üÖ­Öê êú ²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ˆ¯Öú¸üÖÖë
úÖê ²ÖÖÆü¸ü »Öê •ÖÖ­Öê ú¸ü­Öê êú ×»Ö‹, ¯ÖÏÖ¯ŸÖ ú¸ü­ÖÖ †Ö¾Ö¿µÖú ÆüÖê…
2.2.2 ŸÖ£ÖÖׯÖ, ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ‡ÃÖ Ö›ü ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ úÖê‡Ô ¤üÖ¾ÖÖ ­ÖÆüà ׍úµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü…
2.3 ×­ÖÖ´Ö êú ú´ÖÔ“ÖÖ¸üß
2.3.1 ×­ÖÖ´Ö «üÖ¸üÖ úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ¯ÖÏןÖ×­ÖµÖãŒŸÖ ×ú‹ Ö‹ ×­ÖÖ´Ö êú ú´ÖÔ“ÖÖ¸üß ŸÖ£ÖÖ †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë
êú ²ÖÖ¸êü ´Öë µÖÆü ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­ÖÖ ×­ÖÖ´Ö úß ×•Ö´´Öê¤üÖ¸üß ÆüÖêÖß ×ú :
(‹) ¾Öê ˆ¯ÖÖ› ü4.21(†­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë ÃÖê ÃÖÆüµÖÖêÖ ¾Ö ÃÖã×¾Ö¬ÖÖ‹Ó) êú †¬Öß­Ö úÖµÖÖí ´Öë
ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÃÖÖ£Ö ÃÖÆüµÖÖêÖ ú¸ëü, †Öî¸ü
(²Öß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆ¯ÖÖ›ü 5.6 (þÖÖãµÖ †Öî¸ü †ÖîªÖêא֍ú ÃÖÓ¸üÖÖ) †Öî¸ü ˆ¯ÖÖ›ü
4.13 (¯ÖµÖÖÔ¾Ö¸üÖ ÃÖÓ¸üÖÖ) êú †¬Öß­Ö ×ú‹ •ÖÖ­Öê ¾ÖÖ»Öê úÖµÖÖí ¯Ö¸ü úÖ¸Ôü¾ÖÖ‡Ô ú¸ü­ÖÖ µÖÖ
ÃÖã×¾Ö¬ÖÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ­ÖÖ…
12

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
2.4 Corporation Claims
2.4.1 If the Corporation considers itself to be entitled to any payment
under any Clause of these Conditions or otherwise in connection
with the Contract, and/or to any extension of the defect liability
period, the Engineer-in-charge shall give notice and particulars to
the Contractor. However, notice is not required for payments due
under Electricity, Water and Gas, Corporation’s Equipment, Free-
Issue Material and municipal taxes on land utilized for colony or
for other services rendered by the Corporation.
2.4.2 The notice shall be given as soon as practicable after the
Corporation became aware of the event or circumstances giving
rise to the claim. A notice relating to any extension of the Defects
Liability Period shall be given before the expiry of such period.
2.4.3 The particulars shall specify the Clause or other basis of the claim,
and shall include substantiation of the amount and/or extension
to which the Corporation considers itself to be entitled in
connection with the Contract. The Corporation shall set off or
deduct against amount due, or otherwise to claim against the
Contractor.
3 THE ENGINEER-IN-CHARGE
3.1 Engineer-In-Charge’s Duties and Authority
3.1.1 The Corporation shall nominate the Engineer-in-charge, who shall
carry out the duties assigned to him in the Contract. The Engineer-in-
charge’s staff shall include suitably qualified engineers and other
professionals who are competent to carry out these duties.
3.1.2 The Engineer-in-Charge is entitled to watch and supervise the works
and to test and examine any materials to be used or workmen
employed in connection with the works.
3.1.3 Engineer-in-charge shall also certify and release payments for the
work done and make deductions as per the contract.
3.1.4 The Engineer-in-charge may exercise the authority attributable to
the Engineer-in-charge as specified in or necessarily to be implied
from the Contract. The Corporation shall promptly inform the
Contractor of any change to the authority attributed to the
Engineer-in-charge.
3.1.5 Except as otherwise stated in these Conditions:
(a) Whenever carrying out duties or exercising authority, specified in or
implied by the Contract, the Engineer-in-charge shall be deemed to
act for and behalf of the Corporation;
(b) Any approval, check, certificate, consent, examination, inspection,
instruction, notice, proposal, request, test, supervision or similar act
by the Engineer-in-charge (including absence of disapproval) shall
not relieve the Contractor from any responsibility he has under the
Contract, including responsibility for errors, omissions, discrepancies
and non-compliances.
13

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
2.4 ×­ÖÖ´Ö êú ¤üÖ¾Öê
2.4.1 µÖפü ×­ÖÖ´Ö µÖÆü ÃÖÖê“ÖŸÖÖ Æîü ׍ú ¾ÖÆü ‡­Ö ¿ÖŸÖÖí êú ׍úÃÖß Ö›ü êú †ÓŸÖÖÔŸÖ µÖÖ †­µÖ£ÖÖ ÃÖÓ×¾Ö¤üÖ ÃÖê
ÃÖÓ²ÖÓ×¬ÖŸÖ ×úÃÖß ³ÖãÖŸÖÖ­Ö †Öî¸ü/†£Ö¾ÖÖ ×úÃÖß ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö êú ²ÖœÍüÖ‹ •ÖÖ­Öê úÖ Æüú¤üÖ¸ü Æî
ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ­ÖÖê×™üÃÖ †Öî¸ü ×¾Ö¾Ö¸üÖ ¤ëüÖê… ŸÖ£ÖÖ×¯Ö ×²Ö•Ö»Öß Ö“ÖÔ, ¯ÖÖ­Öß ¾Ö
ÖîÃÖ, ×­ÖÖ´Ö êú ˆ¯Öú¸üÖ, ´Öã°ŸÖ •ÖÖ¸üß ÃÖִ֐ÖÏß †Öî¸ü úÖò»ÖÖê­Öß µÖÖ ×­ÖÖ´Ö «üÖ¸üÖ ¯ÖϤü¢Ö †­µÖ
ÃÖã×¾Ö¬ÖÖ†Öë êú ×»Ö‹ ˆ¯ÖµÖÖêÖ úß Ö‡Ô •Ö´Öß­Ö ¯Ö¸ü ­ÖÖ¸ü ¯ÖÖ׻֍úÖ ú¸üÖë êú ×»Ö‹ ­ÖÖê×™üÃÖ ×¤üµÖÖ •ÖÖ­ÖÖ
†Ö¾Ö¿µÖú ­ÖÆüà Æîü…
2.4.2 µÖÆü ­ÖÖê×™üÃÖ ×­ÖÖ´Ö «üÖ¸üÖ ˆ­Ö ¯Ö׸üÛãÖןֵÖÖë ¾Ö ‘Ö™ü­ÖÖ†Öë ו֭֍êú úÖ¸üÖ µÖÆü ¤üÖ¾ÖÖ ²Ö­ÖŸÖÖ Æîü, úß
•Ö֭֍úÖ¸üß ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú ²ÖÖ¤ü µÖ£ÖÖ ¾µÖ¾ÖÆüÖµÖÔ ¿Öß‘ÖÐ ÃÖê ¿Öß‘ÖÐ ¤üß •ÖÖ‹Öß… ׍úÃÖß ³Öß ¯ÖύúÖ¸ü úß
¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö úÖê ²ÖœÍüÖ­Öê ÃÖÓ²ÖÓ¬Öß ­ÖÖê×™üÃÖ ‹êÃÖß †¾Ö×¬Ö úß ÃÖ´ÖÖׯŸÖ ÃÖê ¯ÖÆü»Öê ¤üß •ÖÖ‹Öß…
2.4.3 ÃÖÓ×¾Ö¤üÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö¾Ö¸üÖ ´ÖÓê ¤üÖ¾Öê êú †Ö¬ÖÖ¸ü úê ¯ÖÏÖ¾Ö¬ÖÖ­Ö Ö›ü úÖê ×¾Ö×­Ö¤êüÙ¿ÖŸÖ ×úµÖÖ
•ÖÖ‹ÖÖ †Öî¸ ‡ÃÖ´Öë ˆÃÖ ¸üÖ׿Öü/†Öî¸ü µÖÖ †¾Ö×¬Ö ×¾ÖßÖÖ¸ü êú ¤üÖ¾Öê úÖê ´Ö•Ö²ÖæŸÖ ú¸ü­Öê ¾ÖÖ»Öê ÃÖցµÖ
פü‹ •Ö֋ӐÖê ו֭֍êú †Ö¬ÖÖ¸ü ¯Ö¸ü ×­ÖÖ´Ö Ã¾ÖµÖÓ úÖê Æüú¤üÖ¸ü ÃÖ´Ö—ÖŸÖÖ Æîü… ×­ÖÖ´Ö †¯Ö­Öê ¤üÖ¾Öê úß
¸üÖ×¿Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ³ÖãÖŸÖÖ­Ö µÖÖêµÖ ¤êüµÖ ¸üÖ×¿Ö ÃÖê ²Ö¸üÖ²Ö¸ü ú¸êüÖÖ µÖÖ úÖ™ü »ÖêÖÖ…
3. ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
3.1 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú úŸÖÔ¾µÖ ¾Ö ¯ÖÏÖ׬֍úÖ¸ü
3.1.1 ×­ÖÖ´Ö ‹ú ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ­ÖÖ×´ÖŸÖ ú¸êüÖÖ, •ÖÖê ÃÖÓ×¾Ö¤üÖ ´Öë ˆ­Öêú ×»Ö‹ ¾ÖÙÖŸÖ úÖµÖÖí êú
†­ÖãÃÖÖ¸ü úÖµÖÔ ú¸ëüÖê… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ÙüÖ±ú ´Öë ˆ¯ÖµÖãŒŸÖ µÖÖꐵ֟ÖÖ ¯ÖÏÖ¯ŸÖ †×³ÖµÖÓŸÖÖ ¾Ö ‡­Ö
úÖµÖÖí úÖê ú¸ü­Öê ´Öë ÃÖÖ´Ö †­µÖ ãú¿Ö»Ö ú´ÖÔ“ÖÖ¸üß ÆüÖëÖê…
3.1.2 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖµÖÔ úß ×­ÖÖ¸üÖ­Öß ¾Ö ¯ÖµÖÔ¾ÖêÖÖ ú¸ü­Öê ¾Ö úÖµÖÔ ´Öë ¯ÖϵÖÖêÖ úß •ÖÖ­Öê ¾ÖÖ»Öß
׍úÃÖß ³Öß ÃÖִ֐ÖÏß µÖÖ ×­ÖµÖÖê×•ÖŸÖ ú´ÖÔ“ÖÖ׸üµÖÖë úß úÖµÖÔ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ •ÖÖÓ“Ö ú¸ü Ã֍ëúÖê…
3.1.3 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤üÖ êú †­ÖãÃÖÖ¸ü ¯ÖæÖÔ ×ú‹ Ö‹ úÖµÖÔ êú ×»Ö‹ ¯ÖÏ´ÖÖÖ ¯Ö¡Ö ¾Ö ³ÖãÖŸÖÖ­Ö ³Öß
•ÖÖ¸üß ú¸ëüÖê ŸÖ£ÖÖ ú™üÖîןֵÖÖÓ ú¸ëüÖê…
3.1.4 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ˆ­Æëü µÖ£ÖÖ ×¾Ö×­Ö¤ìü×¿ÖŸÖ µÖÖ ÃÖÓ×¾Ö¤Ö ´Öê ÃÖê †×­Ö¾ÖÖµÖÔŸÖ: »Ö֐Öæ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
êú ºþ¯Ö ´Öë ¯ÖϤü¢Ö ¯ÖÏÖ׬֍úÖ¸üÖë úÖ ¯ÖϵÖÖêÖ ú¸ü Ã֍úŸÖê Æï… ×­ÖÖ´Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ¯ÖÏÖ׬֍úÖ¸üÖë ´Öë
׍úÃÖß ¯ÖύúÖ¸ü úê ¯Ö׸ü¾ÖŸÖÔ­ÖÖë úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ŸÖŸúÖ»Ö ÃÖæ×“ÖŸÖ ú¸êüÖÖ… ü
3.1.5 µÖפü ‡­Ö ¿ÖŸÖÖí ´Öë ‡ÃÖê †­µÖ£ÖÖ ˆ¨éüŸÖ ­Ö ׍úµÖÖ ÖµÖÖ ÆüÖê :
(‹) •Ö²Ö ú³Öß ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤üÖ «üÖ¸üÖ »Ö֐Öæ µÖÖ ÃÖÓ×¾Ö¤üÖ ´Öë ×¾Ö×­Ö¤ìü×¿ÖŸÖ úŸÖÔ¾µÖÖë úÖê
µÖÖ †¯Ö­Öê ¯ÖÏÖ׬֍úÖ¸ü úÖ ¯ÖϵÖÖêÖ ú¸ëüÖê ŸÖÖê µÖÆü ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ ×ú ¾ÖÆü ‡ÃÖê ×­ÖÖ´Ö êú ×»Ö‹
†Öî¸ü ×­ÖÖ´Ö úß †Öê¸ü ÃÖê ú¸ü ¸üÆêü Æïü…
(²Öß) ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×ú‹ Ö‹ ׍úÃÖß †­Öã´ÖÖê¤ü­Ö, •ÖÖÓ“Ö, ¯ÖÏ´Ö֝֯֡Ö, ÃÖÆü´ÖןÖ,
¯Ö¸ü߁֝Ö, ×­Ö¸ü߁֝Ö, ×­Ö¤ìü¿Ö, ­ÖÖê×™üÃÖ, ¯ÖÏßÖÖ¾Ö, †­Öã¸üÖê¬Ö, ¯Ö¸ü߁ÖÖ, ¯ÖµÖÔ¾ÖêÖÖ µÖÖ ÃÖ´ÖÖ­Ö
¯ÖύúÖ¸ü êú úÖµÖÔ (†­Öã´ÖÖê¤ü­Ö ­Ö ÆüÖê­Öê ¯Ö¸ü ³Öß) êú ²ÖÖ¾Ö•Öæ¤ü ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †¬Öß­Ö
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ³Öæ»Ö, “Öæú, ×¾ÖÃÖӐÖןֵÖÖë †Öî¸ü †­Ö­Öã¯ÖÖ»Ö­Ö ÃÖ×ÆüŸÖ, úÖê‡Ô ³Öß ×•Ö´´Öê¤üÖ¸ßü
ˆ­´ÖÖê×“ÖŸÖ ­ÖÆüà ÆüÖêÖß…

13

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(c) Any act by the Engineer-in-charge in response to a Contractor’s request
except otherwise expressly specified shall be notified in writing to the
Contractor within 30 days of receipt.
3.2 Instructions of the Engineer-In-Charge
3.2.1 Subject as otherwise provided in this Contract, all notices to be given on
behalf of the Corporation and all other actions to be taken on its behalf
shall be given or taken by the Engineer-in-Charge or any Officer for the
time being entrusted with the functions, duties and powers of the
Engineer-in-Charge.
3.2.2 All instructions, notices and communications, etc. under the Contract shall
be given in writing and if sent by registered / Speed post to the last known
place of abode or business of the Contractor, shall be deemed to have
been served.
3.2.3 The Contractor or his Agent shall be in attendance at the Site(s) during
all working hours and shall supervise the execution of the Works with
such additional assistance in each trade as the Engineer-in-Charge may
consider necessary. Orders given to the Contractor's Agent shall be
considered to have the same force as if they had been given to the
Contractor himself.
3.2.4 The Contractor shall comply with the instructions given by the Engineer-in-
charge or delegated representative, on any matter related to the
Contract. Whenever practicable, their instructions shall be given in writing.
If the Engineer-in-charge or a delegated representative:
(a) gives an oral instruction,
(b) receives a written confirmation of the instruction, from the Contractor,
within 2 working days after giving the instruction, and
(c) does not reply by issuing a written rejection and/or instruction within 7
working days after receiving the confirmation, then the confirmation
shall constitute the written instruction of the Engineer-in-charge or
delegated representative (as the case may be).
3.3 Replacement of the Engineer-In-Charge
3.3.1 If the Corporation intends to replace the Engineer-in-charge the
Corporation shall intimate the Contractor of the name and designation of
the intended replacement Engineer-in-charge.
4 THE CONTRACTOR
4.1 Contract Documents
4.1.1 The Specification and Drawings shall be in the custody and care of
the Corporation. unless otherwise stated in the Contract, two copies of
the Contract documents and three copies of each drawings shall be
supplied to the Contractor free of charge.
4.1.2 Each of the Contractor’s Documents shall be in the custody and
care of the Contractor. The Contractor shall keep, on the Site,
14

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(ÃÖß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ׍úÃÖß †­Öã¸üÖê¬Ö êú ¯ÖÏŸµÖã¢Ö¸ü ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×¤üµÖÖ •ÖÖ­Öê ¾ÖÖ»ÖÖ •Ö¾ÖÖ²Ö
×¾Ö¿ÖêÂÖ ºþ¯Ö ÃÖê †­µÖ£ÖÖ ×¾Ö×­Ö¤ìü×¿ÖŸÖ ­Ö ÆüÖê­Öê ¯Ö¸ü ‹êÃÖê †­Öã¸üÖê¬Ö êú ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú 30 פü­ÖÖëÓ êú
³Öߟָü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê פüµÖÖ •ÖÖ‹ÖÖ…
3.2 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ×­Ö¤ìü¿Ö
3.2.1 ‡ÃÖ ÃÖÓ×¾Ö¤üÖ ´Öë †­µÖ£ÖÖ ¯ÖÏÖ¾Ö¬ÖÖ­Ö ×ú‹ Ö‹ ×¾ÖÂÖµÖÖë êú †»ÖÖ¾ÖÖ, ÃÖ³Öß ­ÖÖê×™üÃÖë ×­ÖÖ´Ö úß †Öê¸ü ÃÖê •ÖÖ¸üß
úß •Ö֋ӐÖß †Öî¸ü ‡Ã֍úß †Öê¸ü ÃÖê úß •ÖÖ­Öê ¾ÖÖ»Öß †­µÖ ÃÖ³Öß úÖ¸Ôü¾ÖÖ‡µÖÖÓ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ µÖÖ ŸÖŸÃÖ´ÖµÖ
êú ×»Ö‹ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú úÖµÖÔ, ¤üÖ×µÖŸ¾ÖÖë ¾Ö ¿ÖÛŒŸÖµÖÖë êú ¯ÖϵÖÖêÖ úß ×•Ö´´Öê¤üÖ¸üß ¯ÖÏÖ¯ŸÖ †×¬ÖúÖ¸üß
«üÖ¸üÖ úß µÖÖ »Öß •Ö֋ӐÖß…
3.2.2 ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †¬Öß­Ö ÃÖ³Öß ×­Ö¤ìü¿Ö, ­ÖÖê×™üÃÖë †Öî¸ü ¯Ö¡ÖÖ“ÖÖ¸ü †Öפü ×»Ö×ÖŸÖ ºþ¯Ö ´Öë פü‹ •Ö֋ӐÖê †Öî¸ü µÖפü
ˆ­Æëü ¯ÖÓ•ÖߍéúŸÖ/ïÖß›ü ›ü֍ú «üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü †Ö׏ָüß –ÖÖŸÖ šüÆü¸ü­Öê µÖÖ ¾µÖÖ¯ÖÖ׸üú ¯ÖÏןÖšüÖ­Ö êú ¯ÖŸÖê ¯Ö¸ü
³Öê•ÖÖ ÖµÖÖ ÆüÖê ŸÖÖê ˆ­Æëü ¯ÖÏÖ¯ŸÖ ׍úµÖÖ ÖµÖÖ ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ…
3.2.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖÖ ˆ­Öêú ‹•Öë™ü úÖê ÃÖ´ÖÃŸÖ úÖµÖÔ‘ÖÓ™üÖë ´Öë úÖµÖÔãֻÖ(ãֻÖÖë) ¯Ö¸ü ˆ¯ÖÛÃ£ÖŸÖ ¸üÆü­ÖÖ ÆüÖêÖÖ †Öî¸ü
¯ÖÏŸµÖêú ™Òêü›ü ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ´ÖŸÖÖ­ÖãÃÖÖ¸ü †Ö¾Ö¿µÖú †×ŸÖ׸üŒŸÖ ÃÖÆüֵ֍úÖë êú ÃÖÖ£Ö úÖµÖÔ êú
×­Ö¯ÖÖ¤ü­Ö úÖ ¯ÖµÖÔ¾ÖêÖÖ ú¸ü­ÖÖ ÆüÖêÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ‹•Öë™ü úÖê פü‹ Ö‹ ×­Ö¤ìü¿ÖÖë úÖê ˆŸÖ­ÖÖ Æüß
¯ÖϳÖÖ¾Ö¿ÖÖ»Öß ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ ×•ÖŸÖ­ÖÖ ‡­Æëü Öã¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê פü‹ •ÖÖ­Öê ¯Ö¸ü ÆüÖêŸÖÖ…
3.2.4 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÓ×¾Ö¤üÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ×úÃÖß ³Öß ´ÖÖ´Ö»Öê ¯Ö¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ µÖÖ ¿ÖÛŒŸÖ ¯ÖϤü¢Ö ¯ÖÏןÖ×­Ö×¬Ö «üÖ¸üÖ
פü‹ •ÖÖ­Öê ¾ÖÖ»Öê ×­Ö¤ìü¿ÖÖë úÖ †­Öã¯ÖÖ»Ö­Ö ú¸ëüÖê… •ÖÆüÖÓ úÆüà ¾µÖ¾ÖÆüÖµÖÔ ÆüÖê, ¾Öê ×»Ö×ÖŸÖ ºþ¯Ö ´Öë ×­Ö¤ìü¿Ö ¤ëüÖê…
µÖפü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ µÖÖ ¿ÖÛŒŸÖ ¯ÖϤü¢Ö ¯ÖÏןÖ×­Ö×¬Ö (•ÖîÃÖÖ ³Öß ´ÖÖ´Ö»ÖÖ ÆüÖê) :
(‹) ´ÖÖî׏֍ú ×­Ö¤ìü¿Ö ¤êüŸÖê Æï,ü
(²Öß) ×­Ö¤ìü¿Ö פü‹ •ÖÖ­Öê êú ¤üÖê úÖµÖÔ ×¤ü¾ÖÃÖÖë êú ²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê ×­Ö¤ìü¿ÖÖë úß ×»Ö×ÖŸÖ ¯ÖãÛ™ü
¯ÖÏÖ¯ŸÖ ú¸üŸÖê Æïü, †Öî¸ü
(ÃÖß) ‡Ã֍êú ¯ÖÏןֈ¢Ö¸ü ´Öë ¯ÖãÛ™ü ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú 7 פü­ÖÖë êú ³Öߟָ ‡ÃÖê ×»Ö×ÖŸÖ ´Öë †Ã¾ÖߍúÖ¸ü †Öî¸ü/
†£Ö¾ÖÖ ×­Ö¤ìü¿ÖÖë úÖê •ÖÖ¸üß ­ÖÆüà ú¸üŸÖê Æïü ŸÖÖê ˆÃÖ ¯ÖãÛ™ü úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ µÖÖ ¿ÖÛŒŸÖ ¯ÖϤü¢Ö
¯ÖÏןÖ×­Ö×¬Ö (•ÖîÃÖÖ ³Öß ´ÖÖ´Ö»ÖÖ ÆüÖ)ê «üÖ¸üÖ •ÖÖ¸üß ×úµÖÖ ÖµÖÖ ×»Ö×ÖŸÖ ×­Ö¤ìü¿Ö ´ÖÖ­Ö ×»ÖµÖÖ •ÖÖ‹ÖÖ…
3.3 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ²Ö¤ü»Ö­ÖÖ
3.3.1 µÖפü ×­ÖÖ´Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ²Ö¤ü»Ö­ÖÖ “ÖÖÆüŸÖÖ Æîü ŸÖÖê ˆÃÖê ²Ö¤ü»Öê •ÖÖ­Öê ¾ÖÖ»Öê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
úÖ ­ÖÖ´Ö ¾Ö ¯Ö¤ü­ÖÖ´Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖæ×“ÖŸÖ ú¸ü­ÖÖ ÆüÖêÖÖ…
4. ÃÖÓ×¾Ö¤ü֍úÖ¸ü
4.1 ÃÖÓ×¾Ö¤üÖ êú ¤üßÖÖ¾Öê•Ö
4.1.1 ×¾Ö×­Ö¤ìü¿Ö ¾Ö ¸êüÖÖ×“Ö¡Ö ×­ÖÖ´Ö úß †×³Ö¸üÖÖ ¾Ö ׭֐ָüÖ­Öß ´Öë ¸üÆëüÖê… •Ö²Ö ŸÖú ׍ú ÃÖÓ×¾Ö¤üÖ ´Öë
†­µÖ£ÖÖ ¾ÖÙÖŸÖ ­Ö ÆüÖê, ÃÖÓ×¾Ö¤üÖ ¤üßÖÖ¾Öê•Ö úß ¤üÖê ¯ÖÏןֵÖÖÓ ¾Ö ¯ÖÏŸµÖêú ¸êüÖÖ×“Ö¡Ö úß ŸÖß­Ö ¯ÖÏןֵÖÖÓ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ×­Ö:¿Ö㻍ú †Ö¯ÖæŸÖÔ úß •Ö֋ӐÖß…
4.1.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ¯ÖÏŸµÖêú ¤üßÖÖ¾Öê•Ö ÃÖÓ×¾Ö¤ÖüúÖ¸ü úß †×³Ö¸üÖÖ ¾Ö ׭֐ָüÖ­Öß ´Öë ¸üÆêüÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü
úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ÃÖÓ×¾Ö¤üÖ úß ‹ú ¯ÖÏןÖ, ×¾Ö×­Ö¤ìü¿ÖÖë ´Öë ²ÖŸÖÖ‹ Ö‹ ¯ÖύúÖ¿Ö­ÖÖë, ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú
¤üßÖÖ¾Öê•Ö(µÖפü úÖê‡Ô ÆüÖê), ¸êüÖÖ×“Ö¡Ö ¾Ö ×¾Ö“Ö»Ö­Ö ¾Ö ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ †Ö­Öê ¾ÖÖ»Öê †­µÖ ¯Ö¡Ö
¾µÖ¾ÖÆüÖ¸ü †Öפü ¸üÖêÖÖ… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ‡­Ö ¤üßÖÖ¾Öê•ÖÖë úÖê ׍úÃÖß ³Öß ˆ¯ÖµÖãŒŸÖ ÃÖ´ÖµÖ ¯Ö¸ü
‡­Æëü ¤êüÖ­Öê úÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ…
14

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
a copy of the Contract, publications named in the Specification, the
Contractor’s Documents (if any), the Drawings and Variations and other
communications given under the Contract. The Engineer-in-charge shall have
the right of access to all these documents at all reasonable times.
4.1.3 If a Party becomes aware of an error or defect in a document which was
prepared for use in executing the Works, the Party shall promptly give
notice to the other Party of such error or defect
4.2 Security Deposit
4.2.1 Total Security Deposit (SD) shall be calculated as under
(i) Contract value up to Rs.100 Crores - 10% of Contract Value.
(ii) Contract value more than Rs. 100 Crores – 5% of Contract Value subject to
a minimum of Rs 10 Crores.
Note: The contract value for the purpose of this clause shall be taken as the
value of the contract awarded.
4.2.2 Security Deposit as calculated based on above parameters shall be split in
the following of two parts and furnished accordingly;
a) Performance Guarantee to be submitted on award of work (50%
of Security Deposit), and
b) Retention money to be recovered from Running Bills (50% of
Security Deposit).
4.2.3 Performance Guarantee: The Contractor shall deliver the Performance
Guarantee to the Corporation within 30 days after issue of work order. The
Performance guarantee shall be issued by an entity and from within the
country approved by the Employer, and shall be in the form of Bank
Guarantee or FDR or any other form of deposit stipulated by the
Corporation.
4.2.4 Failure of the successful bidder to comply with furnishing the performance
guarantee within 30 days as stated above shall constitute sufficient
grounds for cancellation of the award of work.
4.2.5 Retention Money: Retention Money shall be deducted at the rate of 6% of
the value of work done from Running Bills till the 50% of Security Deposit
amount so calculated as above, is built up. Total of Performance
Guarantee & Retention Money should not exceed the amount of security
deposit calculated as above.
4.2.6 When the retention money reaches the limit of 5 lakhs, the Contractor, if he
so desires, may convert the amount into a Bank Guarantees as aforesaid.
4.2.7 In case a Fixed Deposit Receipt of any bank is furnished by the
Contractor to the Corporation as part of the Security Deposit and the
bank goes into liquidation or for any other reasons is likely to be unable to
make payment against the said Fixed Deposit Receipt, the loss caused
thereby shall be borne by the Contractor and the Contractor shall
forthwith or on demand furnish additional security to the Corporation to
make good the deficit.
4.2.8 The Corporation may deduct any sum of money payable by the
Contractor under the terms of this Contract or any other Contract or any
other account whatsoever from his security deposit. In the event of his
security deposit amount being reduced by reasons of such deduction as
aforesaid, the Contractor shall within 10 days of receipt of notice of
demand from the Engineer-in-Charge make good the deficit.
15

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.1.3 µÖפü ׍úÃÖß ¯ÖÖ úÖê úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ ŸÖîµÖÖ¸ü ׍ú‹ Ö‹ ¤üßÖÖ¾Öê•ÖÖë ´Öë úÖê‡Ô ³Öæ»Ö µÖÖ ¤üÖêÂÖ úÖ ¯ÖŸÖÖ
“Ö»ÖŸÖÖ Æîü ŸÖÖê ¾ÖÆü ¯ÖÖ †­µÖ ¯ÖÖ úÖê ‹êÃÖß ³Öæ»Ö µÖÖ ¤üÖêÂÖ êú ²ÖÖ¸êü ´Öë ŸÖŸúÖ»Ö ÃÖæ×“ÖŸÖ ú¸êüÖÖ…
4.2 ¯ÖÏןֳÖæ •Ö´ÖÖ
4.2.1 ãú»Ö ¯ÖÏןֳÖæ •Ö´ÖÖ úß ÖÖ­ÖÖ ×­Ö´­Ö×»Ö×ÖŸÖ êú †­ÖãÃÖÖ¸ü úß •ÖÖ‹Öß :
(i) 100 ú¸üÖê›Íü ¹ý¯Ö‹ ŸÖú êú ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú ×»Ö‹ - ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úÖ 10%
(ii) 100 ú¸üÖê›Íü ¹ý¯Ö‹ ÃÖê †×¬Öú êú ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú ×»Ö‹ - ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úÖ 5% ¯Ö¸ÓüŸÖãæ
ú´Ö ÃÖê ú´Ö 10 ú¸üÖê›Íü ¹ý¯Ö‹…
­ÖÖê™ü : ‡ÃÖ ¯ÖÏÖ¾Ö¬ÖÖ­Ö êú ˆ§êü¿µÖ ÃÖê ÃÖÓ×¾Ö¤üÖ úê ´Öæ»µÖ úß ÖÖ­ÖÖ †¾ÖÖ›Ôü úß Ö‡Ô ÃÖÓ×¾Ö¤üÖ êú
´Ö滵ÖÖ­ÖãÃÖÖ¸ü úß •ÖÖ‹Öß…
4.2.2 ˆ¯ÖµÖãÔŒŸÖ ú£Ö­Ö êú †Ö¬ÖÖ¸ü ¯Ö¸ü ¯Ö׸üú×»ÖŸÖ ¯ÖÏןֳÖæ •Ö´ÖÖ úÖê ×­Ö´­Ö×»Ö×ÖŸÖ ¤üÖê ³Ö֐ÖÖë ´Öë ²ÖÖÓ™ü ú¸ü
ŸÖ¤ü­ÖãÃÖÖ¸ü •Ö´ÖÖ ×úµÖÖ •ÖÖ‹ÖÖ :
‹) úÖµÖÔ †¾ÖÖ›Ôü ÆüÖê­Öê êú ¯Ö¿“ÖÖŸÖ úÖµÖÔ×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üß •Ö´ÖÖ úß •ÖÖ‹Öß (¯ÖÏןֳÖæ •Ö´ÖÖ úÖ
50 %) †Öî¸ü
²Öß) ¯ÖÏן֬ÖÖ¸üÖ ¸üÖ×¿Ö úÖê “ÖÖ»Öæ ײֻÖÖë ÃÖê ¾ÖÃÖæ»Ö ׍úµÖÖ •ÖÖ‹ÖÖ(¯ÖÏןֳÖæ •Ö´ÖÖ úÖ 50 % )…
4.2.3 úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üß : ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔ †Ö¤êü¿Ö •ÖÖ¸üß ÆüÖê­Öê êú ²ÖÖ¤ü 30 פü­ÖÖë êú ³Öߟָü
×­ÖÖ´Ö úÖê úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üß ¤ëüÖê… úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üß ×­ÖµÖÖꌟÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ¤êü¿Ö êú
Æüß ×úÃÖß ÃÖÓãÖÖ­Ö «üÖ¸üÖ •ÖÖ¸üß úß •ÖÖ‹Öß †Öî¸ü µÖÆü ²Öïú ÖÖ¸Óü™üß µÖÖ ‹±ú›ü߆ָü µÖÖ ×­ÖÖ´Ö «üÖ¸üÖ
ŸÖµÖ ׍ú‹ Ö‹ †­µÖ ׍úÃÖß •Ö´ÖÖ ºþ¯Ö ´Öë ÆüÖê­Öß “ÖÖ×Æü‹…
4.2.4 ÃÖ±ú»Ö ²ÖÖê»ÖߤüÖŸÖÖ «üÖ¸üÖ úÖµÖÔ×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üß úÖê ˆ¯ÖµÖãÔŒŸÖ êú †­ÖãÃÖÖ¸ü 30 פü­ÖÖë úß †¾Ö×¬Ö êú
³Öߟָü •Ö´ÖÖ ­Ö ú¸ü ¯ÖÖ­ÖÖ úÖµÖÔ †¾ÖÖ›Ôü úÖê ×­Ö¸üÃŸÖ ú¸ü­Öê êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ úÖ¸üÖ ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ…
4.2.5 ¯ÖÏן֬ÖÖ¸üÖ ¸üÖ×¿Ö : ¯ÖÏן֬ÖÖ¸üÖ ¸üÖ×¿Ö úß ú™üÖîŸÖß ãú»Ö ׍ú‹ Ö‹ úÖµÖÔ êú ´Öæ»µÖ êú 6 % úß
¤ü¸ü ÃÖê “ÖÖ»Öæ ײֻÖÖë ´Öë ÃÖê ŸÖ²ÖŸÖú úß •ÖÖ‹Öß •Ö²ÖŸÖú ׍ú ˆ¯ÖµÖãÔŒŸÖ êú †­ÖãÃÖÖ¸ü ¯Ö׸üú×»ÖŸÖ 50
% úß ¯ÖÏןֳÖæ ¸üÖ×¿Ö ¯Öæ¸üß ­ÖÆüà ÆüÖê •ÖÖŸÖß… úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üß †Öî¸ü ¯ÖÏן֬ÖÖ¸üÖ ¸üÖ×¿Ö úÖ µÖÖêÖ
ˆ¯ÖµÖãÔŒŸÖ êú †­ÖãÃÖÖ¸ü ¯Ö׸üú×»ÖŸÖ ¯ÖÏןֳÖæ ¸üÖ×¿Ö ÃÖê †×¬Öú ­ÖÆüà ÆüÖê­ÖÖ “ÖÖ×Æü‹…
4.2.6 ¯ÖÏן֬ÖÖ¸üÖ ¸üÖ×¿Ö 5 »ÖÖÖ ¹ý¯Ö‹ ÆüÖê •ÖÖ­Öê êú ²ÖÖ¤ü µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü “ÖÖÆêü ŸÖÖê ‡ÃÖ ¸üÖ×¿Ö úÖê
ˆ¯ÖµÖãÔŒŸÖ êú †­ÖãÃÖÖ¸ü ²Öïêú ÖÖ¸Óü™üß ´Öë ¯Ö׸ü¾ÖÙŸÖŸÖ ú¸ü Ã֍úŸÖÖ Æîü…
4.2.7 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖÏןֳÖæ •Ö´ÖÖ êú ‹ú ³ÖÖÖ êú ºþ¯Ö ´Öë ׍úÃÖß ²Öïú úß ×´ÖµÖÖ¤üß •Ö´ÖÖ ¸üÃÖߤü
¯ÖÏßÖãŸÖ úß Ö‡Ô ÆüÖê †Öî¸ü ˆÃÖ ²Öïú úÖ ¯Ö׸üÃÖ´ÖÖ¯Ö­Ö ÆüÖê •ÖÖŸÖÖ Æîü µÖÖ †­µÖ ׍ú­Æüà úÖ¸üÖÖë ÃÖê ²Öïú
ˆŒŸÖ ×´ÖµÖÖ¤üß •Ö´ÖÖ ¸üÃÖߤü úÖ ³ÖãÖŸÖÖ­Ö ú¸ü­Öê ´Öë †ÃÖ´Ö£ÖÔ ÆüÖê •ÖÖŸÖÖ Æîü ŸÖÖê ‡Ã֍êú úÖ¸üÖ ÆüÖê­Öê
¾ÖÖ»Öê ­ÖãúÃÖÖ­Ö úß ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ³Ö¸ü¯ÖÖ‡Ô ú¸ü­Öß ÆüÖêÖß †Öî¸ü ‡ÃÖ ‘ÖÖ™ê úÖê ¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ŸÖŸúÖ»Ö µÖÖ ´ÖÖӐÖê •ÖÖ­Öê ¯Ö¸ü ×­ÖÖ´Ö úÖê †×ŸÖ׸üŒŸÖ ¯ÖÏןֳÖæ ¯ÖÏßÖãŸÖ ú¸êüÖÖ…
4.2.8 ×­ÖÖ´Ö ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ µÖÖ ×úÃÖß †­µÖ ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ µÖÖ †­µÖ ׍ú­Æüà úÖ¸üÖÖë ÃÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¤êüµÖ ׍úÃÖß ¸üÖ×¿Ö úÖê ˆÃ֍êú ¯ÖÏןֳÖæ •Ö´ÖÖ ÃÖê úÖ™ü Ã֍úŸÖÖ Æîü… µÖפü ‡ÃÖ ¯ÖύúÖ¸ü
ÃÖê ú™üÖîŸÖß ×ú‹ •ÖÖ­Öê êú úÖ¸üÖ ˆÃ֍úß ¯ÖÏןֳÖæ •Ö´ÖÖ ¸üÖ×¿Ö ú´Ö ÆüÖê •ÖÖŸÖß Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ‡Ã֍úß ´ÖÖÓÖ ×ú‹ •ÖÖ­Öê úß ­ÖÖê×™üÃÖ êú ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú 10 פü­ÖÖë êú ³Öߟָü
‡ÃÖ ú´Öß úÖê ¯Öæ¸üÖ ú¸êüÖÖ…

15

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.2.9 FDR / Bank Guarantee shall be accepted only from Scheduled
commercial banks in India.
4.2.10 No interest will be paid on Security Deposit (Performance Guarantee and
Retention Money).
4.3 Refund of Security Deposit
4.3.1 The retention money will be refunded to the Contractor after one month
from the date of issue of Completion Certificate on receipt of request from
the contractor, if as per the Engineer-In-Charge the balance amount of
security deposit (Performance Guarantee) is sufficient to cover the
Liabilities.
4.3.2 After the expiry of the Defects Liability Period, the balance amount of
security deposit i.e. the Performance Guarantee shall be refunded by the
Engineer-in-Charge to the Contractor. However, if any work remains to be
executed under Clause 9 [Defects Liability], the Engineer-in-Charge shall
withhold the estimated cost of such rectification work until it is executed.
4.4 Sub-contracts
4.4.1 The Contractor shall not sub-contract the work or any portion of the work
without the prior written approval of the Engineer-in-Charge. Piece rate
work shall not be deemed as sub-contract. Sub contracting does not alter
the Contractor’s obligations and responsibilities.
4.4.2 The Contractor shall not employ Sub-Contractor against whom the
Engineer-in-charge raises reasonable objection by notice to the Contractor
with supporting particulars.
4.4.3 The Contractor shall pay to the Sub-Contractor the amounts shown on the
Sub-Contractor’s invoices approved by the Contractor. The Corporation
may pay, direct to the Sub-Contractor, part or all of such amounts which
are due to the Sub-Contractor and for which the Contractor has failed to
make the payment. The Contractor shall then repay, to the Corporation,
the amount which the Sub-Contractor was directly paid by the
Corporation with interest at prevailing rate. If the Contractor fails to repay,
the same shall be adjusted against any dues payable to the Contractor
along with interest for the intervening period. In this regard the decision of
the Engineer-in-charge shall be final.
4.5 Construction Coordination
4.5.1 The field activities of the Contractors working at Site will be coordinated
by the Engineer-in-Charge and his decision shall be final in resolving any
disputes or conflicts between the Contractor and other Contractors
regarding scheduling and co-ordination of work.
4.5.2 Engineer-in-Charge shall hold periodic meetings with the Contractors
working at Site, at a time and a place to be designated by him. The
Contractor shall attend such meetings and shall strictly adhere to the
decisions taken during the meeting in executing his works.

16

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.2.9 êú¾Ö»Ö ³ÖÖ¸üŸÖ êú †­ÖãÃÖæ×“ÖŸÖ ²ÖïúÖê úß ×´ÖµÖÖ¤üß •Ö´ÖÖ ¸üÃÖߤü/²Öïú ÖÖ¸Óü™üß Æüß Ã¾ÖߍúÖ¸ü úß •ÖÖ‹Öß…
4.2.10 ¯ÖÏןֳÖæ •Ö´ÖÖ ¸üÖ×¿Ö ¯Ö¸ü úÖê‡Ô ²µÖÖ•Ö ¤êüµÖ ­ÖÆüà ÆüÖêÖÖ (úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üß †Öî¸ü ¯ÖÏן֬ÖÖ¸üÖ
¸üÖ׿Ö)…
4.3 ¯ÖÏןֳÖæ •Ö´ÖÖ ¸üÖ×¿Ö úß ¾ÖÖ¯ÖÃÖß
4.3.1 ¯ÖÏן֬ÖÖ¸üÖ ¸üÖ׿Ö, µÖפü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú †­ÖãÃÖÖ¸ü ¯ÖÏןֳÖæ •Ö´ÖÖ úß ¿ÖêÂÖ ¸üÖ×¿Ö (úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö
ÖÖ¸Óü™üß) ²ÖÖ¬µÖŸÖÖ†Öë úÖê ¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ ¯ÖÖ‡Ô •ÖÖŸÖß Æîü ŸÖÖê, ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ†­Öã¸üÖê¬Ö
¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ¯Ö¸ü úÖµÖÔ ¯ÖæÖÔŸÖÖ ¯ÖÏ´ÖÖÖ ¯Ö¡Ö êú •ÖÖ¸üß ×ú‹ •ÖÖ­Öê úß ŸÖÖ¸üßÖ êú ‹ú ´ÖÖÆü êú ²ÖÖ¤ü
¾ÖÖ¯ÖÃÖ úß •ÖÖ‹Öß …ü
4.3.2 ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö êú ¯Öæ¸üÖ ÆüÖê •ÖÖ­Öê êú ¯Ö¿“ÖÖŸÖ ¯ÖÏןֳÖæ •Ö´ÖÖ úß ¿ÖêÂÖ ¸üÖ×¿Ö †£ÖÖÔŸÖ úÖµÖÔ
×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üßü, ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¾ÖÖ¯ÖÃÖ úß •ÖÖ‹Öß… ŸÖ£ÖÖ×¯Ö Ö›ü 9
(¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ) êú ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë êú †­ÖãÃÖÖ¸ü úÖê‡Ô úÖµÖÔ ¯Öæ¸üÖ ×ú‹ •ÖÖ­Öê ÃÖê ²Ö“Ö •ÖÖŸÖÖ Æîü ŸÖÖê ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ ‹êÃÖê ´Ö¸ü´´ÖŸÖ úÖµÖÔ êú ×»Ö‹ †­Öã´ÖÖ×­ÖŸÖ »ÖÖÖŸÖ úÖê ‡ÃÖ úÖµÖÔ êú ¯Öæ¸üÖ ÆüÖê­Öê ŸÖú ¸üÖêêú
¸üÖëÖê…
4.4 ˆ¯Ö-ÃÖÓ×¾Ö¤üÖ‹Ó
4.4.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ×»Ö×ÖŸÖ ¯Öæ¾ÖÖÔ­Öã´Ö×ŸÖ êú ²ÖÖî¸ü úÖµÖÔ µÖÖ úÖµÖÔ êú ׍úÃÖß ³Ö֐Ö
úÖê ˆ¯Ö-ÃÖÓ×¾Ö¤üÖ ¯Ö¸ü ­ÖÆüà ¤ëüÖê… ‡úÖ‡Ô ¤ü¸ü úÖµÖÔ úÖµÖÔ úÖê ˆ¯Ö-ÃÖÓ×¾Ö¤üÖ úÖ úÖµÖÔ ­ÖÆüà ´ÖÖ­ÖÖ
•ÖÖ‹ÖÖ… úÖµÖÔ úÖê ˆ¯Ö-ÃÖÓ×¾Ö¤üÖ ¯Ö¸ü פü‹ •ÖÖ­Öê ÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ²ÖÖ¬µÖŸÖÖ†Öë †Öî¸ü וִ´Öê¤üÖ׸üµÖÖë
´Öë úÖê‡Ô ¯Ö׸ü¾ÖÔŸÖ­Ö ­ÖÆüà ÆüÖêÖÖ…
4.4.2 µÖפü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ‹ú ­ÖÖê×™üÃÖ êú ´ÖÖ¬µÖ´Ö ÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍úÃÖß ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ²ÖÖ¸êü
´Öë ÃÖցµÖ ÃÖ×ÆüŸÖ ¯ÖµÖÖÔ¯ŸÖ úÖ¸üÖ ²ÖŸÖÖŸÖê Æãü‹ †Ö¯Ö×¢Ö ¾µÖŒŸÖ ú¸üŸÖê Æïü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹êÃÖê ˆ¯Ö
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ×­ÖµÖãŒŸÖ ­ÖÆüà ú¸ëüÖê…
4.4.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ‡­Ö¾ÖÖ‡ÃÖÖë ´Öë ׻֏Öß ¸üÖ׿Ö
úÖ ³ÖãÖŸÖÖ­Ö ú¸ëüÖê… µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ×úÃÖß ¸üÖ×¿Ö úÖ ³ÖãÖŸÖÖ­Ö ­ÖÆüà ú¸üŸÖÖ
Æîü ŸÖÖê ×­ÖÖ´Ö ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤êüµÖ ‡ÃÖ ¯Öæ¸üß ¸üÖ×¿Ö µÖÖ ˆÃ֍êú ³ÖÖÖ úÖ ÃÖ߬Öê ³ÖãÖŸÖÖ­Ö ú¸ü
Ã֍úŸÖÖ Æîü… ˆÃÖ ÛãÖ×ŸÖ ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ˆÃÖ ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖ߬Öê ³ÖãÖŸÖÖ­Ö úß Ö‡Ô ‡ÃÖ
¸üÖ×¿Ö úÖê »Ö֐Öæ ¤ü¸ü êú ²µÖÖ•Ö ÃÖ×ÆüŸÖ ×­ÖÖ´Ö úÖê †¤üÖ ú¸ü­ÖÖ ÆüÖêÖÖ… µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖÆü ³ÖãÖŸÖÖ­Ö
ú¸ü­Öê ´Öë †ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü ŸÖÖê ‡ÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤êüµÖ ¸üÖ×¿Ö ´Öë ÃÖê ‡ÃÖ ²Öß“Ö úß †¾Ö×¬Ö êú
²µÖÖ•Ö ÃÖ×ÆüŸÖ úÖ™ü ×»ÖµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖ ÃÖÓ²ÖÓ¬Ö ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ÆüÖêÖÖ…
4.5 ×­Ö´ÖÖÔÖ ÃÖ´Ö­¾ÖµÖ
4.5.1 úÖµÖÔ Ã£Ö»Ö ¯Ö¸ü úÖ´Ö ú¸ü ¸üÆêü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¾Ö †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú ²Öß“Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ
ÃÖ´Ö­¾ÖµÖ ãÖÖ×¯ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü úÖµÖÔ ÃÖ´ÖµÖ ¾Ö úÖµÖÖí êú ²Öß“Ö †Ö¯ÖÃÖß ÃÖ´Ö­¾ÖµÖ úÖê »Öêú¸ü
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¾Ö †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú ²Öß“Ö êú ×¾Ö¾ÖÖ¤ü µÖÖ ´ÖŸÖ³Öê¤üÖë úÖê ÃÖã»Ö—ÖÖ­Öê êú ×»Ö‹ ˆ­ÖúÖ
׭֝ÖÔµÖ †Ó×ŸÖ´Ö ÆüÖêÖÖ…
4.5.2 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü úÖµÖÔÃ£Ö»Ö ¯Ö¸ü úÖµÖÔ ú¸ü ¸üÆêü ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú ÃÖÖ£Ö ²ÖîšüúÖë úÖ
†ÖµÖÖê•Ö­Ö ú¸ëüÖê… ‡­Ö ²ÖîšüúÖë úÖ ÃÖ´ÖµÖ ¾Ö ãÖÖ­Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×­Ö¬ÖÖÔ׸üŸÖ ׍úµÖÖ
•ÖÖ‹ÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡­Ö ²ÖîšüúÖë ´Öë ³ÖÖÖ »ÖëÖê †Öî¸ü †¯Ö­Öê úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö ´Öë ‡­Ö ²ÖîšüúÖë ´Öë ×»Ö‹
Ö‹ ׭֝ÖÔµÖÖë úÖ ú›ÍüÖ‡Ô ÃÖê †­Öã¯ÖÖ»Ö­Ö ú¸ëüÖê…

16

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.6 Setting out the Work
4.6.1 The Engineer-in-Charge shall supply dimensioned drawings, levels and
provide all necessary information to enable the Contractor to set out the
works. The contractor shall make reasonable efforts to verify its accuracy
before its use and the Corporation shall not be responsible for any error at
a subsequent stage unless it is found that such error has crept in as a result
of incorrect data furnished in writing by the Engineer-in-charge. The
Contractor shall protect and preserve all reference baseline and bench
marks used in setting out the works till end of the Defects Liability Period
unless the Engineer-in-Charge directs their earlier removal.
4.7 Quality Compliance
4.7.1 The construction/fabrication and erection of works under the scope of this
Contract shall be executed in accordance with the specifications and
drawings. The Contractor shall adopt suitable quality assurance program,
commensurate with NPCIL QA program.
4.8 Sufficiency of the Accepted Contract Amount
4.8.1 The Contractor shall be deemed to have satisfied himself before tendering
as to the correctness and sufficiency of his tender for the works and of the
rates and prices quoted in the Schedule of Quantities. The rates and prices
quoted by the Contractor in the Schedule of Quantities shall, except as
otherwise provided, cover all his obligations under the Contract and all
matters and resources necessary for the proper execution and completion
of the Works and the remedying of any defects till the end of defect
liability period.
4.9 Reporting of Hindrances
4.9.1 The Contractor shall record hindrances if any, in the Hindrance register as
specified in the sub clause 7.4 [Hindrances]. Hindrances recorded and
accepted by the Engineer-in-charge in the register shall be the basis for
granting extension of time. The hindrance register shall be in the custody of
the Engineer-in-charge.
4.10 Supply of Goods
4.10.1 The Contractor shall place purchase order well in time for supply of goods
as deemed necessary as per the contract. He shall arrange to give notice
sufficient in advance for necessary quality assurance at the place of
manufacturing. The contractor shall submit an unpriced copy of Purchase
order to Engineer-in-charge in order to ensure that all the requirements of
technical specifications have been met.
4.11 Transport of Goods
4.11.1 Unless otherwise stated:
a) the Contractor shall give the Engineer-in-charge not less than 10 days
notice of the date on which any Plant or a major item of other Goods will
be delivered to the Site;
b) the Contractor shall be responsible for packing, loading, transporting,
receiving, unloading, storing and protecting all Goods and other things
required for the Works.

17

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.6 úÖµÖÔ úÖ ¯ÖÏÖ¸Óü³Ö
4.6.1 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ×¾ÖßÖéŸÖ ¸êüÖÖד֡Ö, ŸÖ»Ö †Öפü úß †Ö¯ÖæÙŸÖ ú¸ëüÖê †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖµÖÔ
†Ö¸Óü³Ö ú¸ü­Öê êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖ³Öß †Ö¾Ö¿µÖú ÃÖæ“Ö­ÖÖ‹Ó ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü
‡­ÖúÖ ¯ÖϵÖÖêÖ ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ‡Ã֍úß ÃÖ™üߍúŸÖÖ úß •ÖÖÓ“Ö êú ¯ÖµÖÖÔ¯ŸÖ ¯ÖϵÖÖÃÖ ú¸ëüÖê †Öî¸ü ×ÃÖ¾ÖÖ‹
ŸÖ²Ö •Ö²Ö׍ú ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ²ÖŸÖÖµÖÖ •ÖÖŸÖÖ Æîü ׍ú µÖÆü ³Öæ»Ö ×»Ö×ÖŸÖ ºþ¯Ö ´Öë Ö»ÖŸÖ †ÖӍú›ÍüÖë
êú úÖ¸üÖ Æãü‡Ô Æîü, ²ÖÖ¤ü ´Öë ׍úÃÖß ÃÖ´ÖµÖ ×­ÖÖ´Ö ×úÃÖß ¯ÖύúÖ¸ü úß Ö»ÖŸÖß êú ×»Ö‹ וִ´Öê¤üÖ¸ü ­ÖÆüà
ÆüÖêÖÖ… •Ö²Ö ŸÖú ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ˆ­Öêú ÃÖ´ÖµÖ-¯Öæ¾ÖÔ ×­ÖßÖÖ¸üÖ êú ×»Ö‹ ×­Ö¤êü¿Ö ­Ö פüµÖÖ
•ÖÖ‹, ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê êú ÃÖ´ÖµÖ ÃÖê »Öêú¸ü ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö úß ÃÖ´ÖÖÛ¯ŸÖ ŸÖú
úÖµÖÔ ¯ÖÏÖ¸Óü³Ö êú ×»Ö‹ ¯ÖϵÖÖêÖ ׍ú‹ Ö‹ ÃÖ³Öß ÃÖÓ¤ü³ÖÔ†Ö¬ÖÖ¸ü ¾Ö ´Ö֭֍ú ز֤ãü†Öë úÖê ¯Ö׸ü¸üׁ֟Ö
¸üÖëÖê…
4.7 ÖãÖ¾Ö¢ÖÖ †­Öã¯ÖÖ»Ö­Ö
4.7.1 ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú úÖµÖԁÖê¡Ö êú †ÓŸÖÖÔŸÖ †Ö­Öê ¾ÖÖ»Öê ×­Ö´ÖÖԝÖ/×¾Ö¸ü“Ö­Ö ¾Ö ãÖÖ¯Ö­Ö úÖµÖÖí úÖê ×¾Ö×­Ö¤ìü¿ÖÖë
¾Ö ¸êüÖÖד֡ÖÖë êú †­ÖãÃÖÖ¸ü ×­Ö¯ÖÖפüŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹­Ö¯ÖßÃÖ߆ևԋ»Ö êú ÖãÖ¾Ö¢ÖÖ
†ÖÀ¾ÖÖÃÖ­Ö úÖµÖԍÎú´Ö êú †­Öãºþ¯Ö ˆ¯ÖµÖãŒŸÖ ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö úÖµÖԍÎú´Ö †¯Ö­Ö֋ӐÖê…
4.8 þÖߍúÖ¸ü ÃÖÓ×¾Ö¤üÖ ¸üÖ×¿Ö úß ¯ÖµÖÖÔ¯ŸÖŸÖÖ
4.8.1 µÖÆü ´ÖÖ­Ö ×»ÖµÖÖ •ÖÖŸÖÖ Æîü ׍ú ÃÖÓ×¾Ö¤ü֍úÖ¸ü ­Öê ×­Ö×¾Ö¤üÖ ú¸ü­Öê ÃÖê ¯ÖÆü»Öê úÖµÖÔ úß †¯Ö­Öß ×­Ö×¾Ö¤üÖ
†Öî¸ü ´ÖÖ¡ÖÖ †­ÖãÃÖæ“Öß ´Öë ˆ¨éüŸÖ ¤ü¸üÖë †Öî¸ü úß´ÖŸÖ êú šüߍú ÆüÖê­Öê †Öî¸ü ¯ÖµÖÖÔ¯ŸÖ ÆüÖê­Öê úß Ã¾ÖµÖÓ
ÃÖÓŸÖãÛ™ü ú¸ü »Öß Æîü … ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ´ÖÖ¡ÖÖ †­ÖãÃÖæ“Öß ´Öë ˆ¨éüŸÖ ¤ü¸ü ‹¾ÖÓ úß´ÖŸÖ, •Ö²Ö ŸÖú
†­µÖ£ÖÖ ¾ÖÙÖŸÖ ­Ö ÆüÖê, ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ ˆ­Öúß ÃÖ´ÖÃŸÖ ²ÖÖ¬µÖŸÖÖ†Öë †Öî¸ü ‡ÃÖ úÖµÖÔ êú
ˆ×“ÖŸÖ ×­Ö¯ÖÖ¤ü­Ö ¾Ö úÖµÖÔ úÖê ¯ÖæÖÔ ú¸ü­Öê êú ×»Ö‹ †Öî¸ü ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö êú †ÓŸÖ ŸÖú ׍úÃÖß
³Öß ŸÖ¸üÆü úß ú´Öß úÖê ¤æü¸ü ú¸ü­Öê êú ×»Ö‹ Æîü …
4.9 ²ÖÖ¬ÖÖ†Öë úß ×¸ü¯ÖÖêÚ™üÖ
4.9.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÃÖ´ÖÖ µÖפü úÖê‡Ô ²ÖÖ¬ÖÖ †ÖŸÖß Æîü ŸÖÖê ¾ÖÆü ˆÃÖê ˆ¯Ö Ö›ü 7.4 (²ÖÖ¬ÖÖ‹Ó) ´Öë פü‹
Ö‹ ×¾Ö×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü ²ÖÖ¬ÖÖ ¸üוÖÙü¸ü ´Öë ¤ü•ÖÔ ú¸êüÖÖ… ‡ÃÖ ¸üוÖÙü¸ü ´Öë ¤ü•ÖÔ úß Æãü‡Ô †Öî¸ü
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ÃÖÆü´Ö×ŸÖ ¯ÖϤüÖ­Ö úß Æãü‡Ô ²ÖÖ¬ÖÖ‹Ó ÃÖ´ÖµÖ ÃÖß´ÖÖ ×¾ÖßÖÖ¸ü êú ×»Ö‹ †Ö¬ÖÖ¸ü
ÆüÖëÖß… ²ÖÖ¬ÖÖ ¸üוÖÙü¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß †×³Ö¸üÖÖ ´Öë ¸üÖÖ •ÖÖ‹ÖÖ…
4.10 ÃÖÖ´ÖÖ­ÖÖë úß †Ö¯ÖæÙŸÖ
4.10.1 ÃÖÓ×¾Ö¤üÖ êú †­ÖãÃÖÖ¸ü µÖ£ÖÖ †Ö¾Ö¿µÖú ÃÖÖ´ÖÖ­ÖÖë úß †Ö¯ÖæÙŸÖ êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖ´ÖµÖ ¸üÆüŸÖê
ÎúµÖ †Ö¤êü¿Ö ›üÖ»Ö ¤êü­ÖÖ “ÖÖ×Æü‹… ˆ­Æëü ×­Ö´ÖÖÔŸÖÖ úÖ¸üÖÖ­ÖÖë ´Öë †Ö¾Ö¿µÖú ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö úß
­ÖÖê×™üÃÖ ×³Ö•Ö¾ÖÖ­Öê úß ¾µÖ¾ÖãÖÖ ú¸ü­Öß ÆüÖêÖß… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÎúµÖ †Ö¤êü¿Ö úß úß´ÖŸÖ¸ü×ÆüŸÖ ¯ÖÏ×ŸÖ úÖê
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ¯ÖÏßÖãŸÖ ú¸ëüÖê ŸÖÖ׍ú ŸÖú­Öߍúß ×¾Ö×­Ö¤ìü¿ÖÖë úß ÃÖ´ÖÃŸÖ †Ö¾Ö¿µÖúŸÖÖ†Öë úÖê
ÃÖã×­ÖÛ¿“ÖŸÖ ×úµÖÖ •ÖÖ Ã֍êú…
4.11 ÃÖÖ´ÖÖ­ÖÖë úÖ ¯Ö׸ü¾ÖÆü­Ö
4.11.1 •Ö²Ö ŸÖú †­µÖ£ÖÖ ¾ÖÙÖŸÖ ­Ö ÆüÖê :
‹) ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍úÃÖß ÃÖÓµÖÓ¡Ö µÖÖ ²Ö›Íêü ÃÖÖ´ÖÖ­Ö úß úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ÃÖã¯Öã¤ÔüÖß ¯ÖÏÖ¯ŸÖ ú¸ü­Öê úß
ŸÖÖ¸üßÖ êú ú´Ö ÃÖê ú´Ö 10 פü­Ö ¯ÖÆü»Öê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖæ“Ö­ÖÖ ¤êü­Öß ÆüÖêÖß :
²Öß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔ êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖÖ´ÖÖ­Ö ¾Ö †­µÖ ¾ÖßÖã†Öë úß ¯Öî؍úÖ, »ÖÖêØ›üÖ,
¯Ö׸ü¾ÖÆü­Ö, ¯ÖÏÖÛ¯ŸÖ, ˆŸÖ¸üÖ‡Ô, ³ÖÓ›üÖ¸üÖ †Öî¸ü ÃÖã¸üÖÖ úÖ ×•Ö´´Öê¤üÖ¸ü ÆüÖêÖÖ…
17

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.11.2 The Contractor shall indemnify and hold the Corporation harmless against
and from all damages, losses and expenses (including legal fees and
expenses) resulting from the transport of Goods, and pay all claims arising
from their transport.
4.12 Contractor’s Equipment
4.12.1 The Contractor shall bring only the required equipments for the execution
of works and shall be responsible for all his equipments. The equipments
when brought to the site shall be in working condition and deemed to be
exclusively intended for the execution of this Works. The Contractor shall
not remove from the Site any major items of his Equipment without the
written consent of the Engineer-in-charge. List of equipments brought to
site shall be submitted to the Engineer-in-charge.
4.13 Protection of the Environment
4.13.1 The Contractor shall take all reasonable steps to protect the environment
(both on and off the Site) and to avoid damage and nuisance to any
people and property resulting from pollution, noise and other
consequences of his operations.
4.13.2 Contractor shall not at any time do, cause or permit any nuisance on site
or do anything which shall cause unnecessary disturbance to owners,
tenants or occupants of other properties near the site and to the general
public.
4.13.3 The Contractor shall ensure that emissions, surface discharges and effluent
from the Contractor’s activities shall not exceed the values stated in the
Specification, if any, or prescribed by applicable Law of the land.
4.14 Electricity
4.14.1 Electric power, if available (Refer Schedule A), will be provided by the
Corporation at one point (the farthest distance from the work site would be
100 meters). All distribution system and metering unit should be arranged
for by the Contractor himself at his own cost, complying with all relevant
act/regulations. Charges for energy consumed shall be as per Schedule
`A'. For the purpose of planning, the bidder shall furnish along with his bid,
the estimated requirement of electric power for execution of work in terms
of maximum demand and daily energy in kWh.
4.14.2 Disruption in supply or non-availability of electricity shall not entitle the
Contractor for any claim for compensation either in time or money. He shall
make prior arrangements for such contingency to carry on with the work
without interruption.
4.14.3 Load required can be changed twice on the request of Contractor during
the currency of contract subject to prior approval by Engineer-In-Charge.
4.14.4 Electric power, if available can be provided to one or more places, in case
in the opinion of Engineer-in-charge it is absolutely necessary and will
accelerate the work.
18

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.11.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÖ´Ö­Ö êú ¯Ö׸ü¾ÖÆü­Ö êú ¯Ö׸üÖÖ´Öþֺþ¯Ö ÆüÖê­Öê ¾ÖÖ»Öß ÃÖ³Öß ¯ÖύúÖ¸ü úß ™æü™ü-±æú™ü,
­ÖãúÃÖÖ­Ö †Öî¸ü Ö“ÖÔ (úÖ­Öæ­Öß ¿Ö㻍ú ¾Ö Ö“ÖÔ ÃÖ×ÆüŸÖ) êú ×¾Ö¹ý¨ü ×­ÖÖ´Ö úÖê ÃÖã¸ü×ÖŸÖ ¸üÖëÖê †Öî¸ü
¯Ö׸ü¾ÖÆü­Ö ÃÖê ˆŸ¯Ö®Ö Æãü‹ ÃÖ³Öß ¤üÖ¾ÖÖë úÖê †¤üÖ ú¸ëüÖê…
4.12 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ˆ¯Öú¸üÖ
4.12.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú¾Ö»Ö úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ †Ö¾Ö¿µÖú ˆ¯Öú¸üÖ Æüß »Ö֋ӐÖê †Öî¸ü †¯Ö­Öê
ˆ¯Öú¸üÖÖë êú ×»Ö‹ þֵÖÓ ×•Ö´´Öê¤üÖ¸ü ÆüÖëÖê… úÖµÖÔÃ£Ö»Ö ¯Ö¸ü »ÖÖŸÖê ÃÖ´ÖµÖ ˆ¯Öú¸üÖ “ÖÖ»Öæ ÆüÖ»ÖŸÖ ´Öë
ÆüÖê­Öê “ÖÖ×Æü‹ †Öî¸ü µÖÆü ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ ×ú ˆ­Æëü ‡ÃÖ úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ Æüß »ÖÖµÖÖ ÖµÖÖ Æîü…
ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê ˆ¯Öú¸üÖ êú ׍úÃÖß ²Ö›Íêü ú»Ö¯Öã•Öì úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ×»Ö×ÖŸÖ †­Öã´ÖןÖ
êú ²ÖÖî¸ü úÖµÖÔÃ£Ö»Ö ÃÖê ­ÖÆüß Æü™ü֋ӐÖê… úÖµÖÔÃ£Ö»Ö ¯Ö¸ü »ÖÖ‹ Ö‹ ˆ¯Öú¸üÖÖë úß ÃÖæ“Öß ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ êú ¯ÖÖÃÖ •Ö´ÖÖ úß •ÖÖ‹Öß…
4.13 ¯ÖµÖÖÔ¾Ö¸üÖ úÖ ÃÖÓ¸üÖÖ
4.13.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö êú ¯Ö׸üÖÖ´Öþֺþ¯Ö ÆüÖê­Öê ¾ÖÖ»Öê ¯ÖϤæüÂ֝Ö, ¬¾Ö×­Ö ¾Ö †­µÖ úÖ¸üÖÖë
ÃÖê ׍úÃÖß ³Öß ¾µÖÛŒŸÖ †Öî¸ü ÃÖÓ¯Ö×¢Ö úÖê ÆüÖê­Öê ¾ÖÖ»Öê ­ÖãúÃÖÖ­Ö †Öî¸ü ˆ¯Ö¦ü¾Ö ÃÖê ²Ö“Ö֋ӐÖê †Öî¸ü
¯ÖµÖÖÔ¾Ö¸üÖ úÖê ÃÖÓ¸ü×ÖŸÖ ú¸ü­Öê êú ×»Ö‹ (úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ¾Ö úÖµÖÔÃ£Ö»Ö ÃÖê ¯Ö¸êü ¤üÖê­ÖÖë •ÖÖÆüÖë ¯Ö¸ü) Æü¸ü
ÃÖÓ³Ö¾Ö ¯Öϵ֟­Ö ú¸ëüÖê…
4.13.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ׍úÃÖß ³Öß ÃÖ´ÖµÖ ×úÃÖß ³Öß ¯ÖύúÖ¸ü úÖ ˆ¯Ö¦ü¾Ö ­Ö ŸÖÖê ú¸ëüÖê ­Ö ˆÃ֍úÖ
úÖ¸üÖ ²Ö­ÖëÖê †Öî¸ü ­Ö Æüß †­Öã´Ö×ŸÖ ¤ëüÖê †£Ö¾ÖÖ ‹êÃÖÖ ãú”û ú¸ëüÖê •ÖÖê ׍ú úÖµÖÔÃ£Ö»Ö êú †ÖÃÖ-¯ÖÖÃÖ
êú ´ÖúÖ­Ö-´ÖÖ׻֍úÖê,Ó ×ú¸üÖ‹¤üÖ¸ÖêÓü µÖÖ †­µÖ ÃÖ´¯Ö×¢ÖµÖÖë ´Öë ¸üÆü ¸üÆêü »ÖÖêÖÖë µÖÖ †Ö´Ö •Ö­ÖŸÖÖ úÖê
²Öê¾Ö•ÖÆü ¯Ö¸êü¿ÖÖ­Ö ú¸êü…
4.13.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê ׍ú ˆ­Öúß ÖןÖ×¾Ö׬ֵÖÖë ÃÖê ˆŸ¯Ö®Ö ÆüÖê­Öê ¾ÖÖ»ÖÖ ˆ¤Ëü³ÖÖÃÖ­Ö ÃÖŸÖÆüß
׸üÃÖÖ¾Ö †Öî¸ü ²Ö×Æü-ÄÖÖ¾Öß µÖפü ×¾Ö×­Ö¤ìü¿ÖÖë ´Öë ˆÛ»»Ö×ÖŸÖ ÆüÖê ŸÖÖê ˆÃ֍úß ´ÖÖ¡ÖÖ ÃÖê †×¬Öú ­Ö ÆüÖê
†£Ö¾ÖÖ ¤êü¿Ö êú úÖ­Öæ­ÖÖë êú †­ÖãÃÖÖ¸ü †­Öã´Ö­µÖ ÃÖê †×¬Öú ­Ö ÆüÖê…
4.14 ײֻ֕Öß
4.14.1 µÖפü ײֻ֕Öß ˆ¯Ö»Ö²¬Ö Æãü‡Ô (†­ÖãÃÖæ“Öß ‹ úÖ ÃÖÓ¤ü³ÖÔ »Öë) ŸÖÖê ×­ÖÖ´Ö «üÖ¸üÖ ‹ú ز֤ãü ¯Ö¸ü ˆ¯Ö»Ö²¬Ö
ú¸üÖ‡Ô •ÖÖ‹Öß (úÖµÖÔÃ£Ö»Ö ÃÖê †×¬ÖúŸÖ´Ö ¤æü¸üß 100 ´Öß™ü¸ü ÆüÖêÖß)… ÃÖ´ÖÃŸÖ ×¾ÖŸÖ¸üÖ ¯ÖϝÖÖ»Öß †Öî¸ü
´ÖÖ¯Ö­Ö µÖæ×­Ö™ü †Öפü úß ¾µÖ¾ÖãÖÖ, ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ †¯Ö­Öê Ö“Öì ¯Ö¸,ü ÃÖ³Öß ÃÖÓ²ÖÓ׬֟Ö
úÖ­Öæ­ÖÖë/×¾Ö×­ÖµÖ´ÖÖë úÖ †­Öã¯ÖÖ»Ö­Ö ú¸üŸÖê Æãü‹, þֵÖÓ úß •ÖÖ‹Öß… ˆ¯Ö³ÖÖêÖ úß Ö‡Ô ײֻ֕Öß úÖ
¯ÖϳÖÖ¸ü †­ÖãÃÖæ“Öß "‹" êú †­ÖãÃÖÖ¸ü ×»ÖµÖÖ •ÖÖ‹ÖÖ… †ÖµÖÖê•Ö­ÖÖ êú ˆ§êü¿µÖ ÃÖê ²ÖÖê»ÖߤüÖŸÖÖ úÖê ‡ÃÖ
úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ ײֻ֕Öß úß †­Öã´ÖÖ×­ÖŸÖ †×¬ÖúŸÖ´Ö †Öî¸ü ¯ÖÏןÖפü­Ö úß †Ö¾Ö¿µÖúŸÖÖ
úÖê †¯Ö­Öß ²ÖÖê»Öß êú ÃÖÖ£Ö Æüß ×ú»ÖÖê¾ÖÖ™ü ¯ÖÏן֑ÖÓ™üÖ êú †­ÖãÃÖÖ¸ü ˆ¨éüŸÖ ú¸ü­ÖÖ ÆüÖêÖÖ…
4.14.2 ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖ ´Öë ²ÖÖ¬ÖÖ µÖÖ ×¾ÖªãŸÖ úß †­Öã¯Ö»Ö²¬ÖŸÖÖ êú úÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖ´ÖµÖ ×¾ÖßÖÖ¸ü
µÖÖ †Ö٣֍ú,׍úÃÖß ¯ÖύúÖ¸ü úß Öן֯ÖæÙŸÖ úÖ †×¬ÖúÖ¸ü ­ÖÆüà ÆüÖêÖÖ… ˆ­Æëü ‡ÃÖ ¯ÖύúÖ¸ü úß †Ö¯ÖÖŸÖË
ÛãÖ×ŸÖ ´Öë ×­Ö²ÖÖÔ¬Ö ºþ¯Ö ÃÖê úÖµÖÔ ú¸ü­Öê úß ¯ÖÆü»Öê ÃÖê Æüß ¾µÖ¾ÖãÖÖ ú¸ü­Öß ÆüÖêÖß…
4.14.3 ÃÖÓ×¾Ö¤üÖ úß †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¯Öæ¾ÖÖÔ­Öã´Ö×ŸÖ ÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤üÖê ²ÖÖ¸ü »ÖÖê›ü
²Ö¤ü»Ö­Öê úß †­Öã´Ö×ŸÖ ¯ÖϤüÖ­Ö úß •ÖÖ Ã֍úŸÖß Æîü…
4.14.4 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¸üÖµÖ ´Öë †×ŸÖ†Ö¾Ö¿µÖú ÆüÖê­Öê †Öî¸ü úÖµÖÔ úß Ö×ŸÖ ´Öë ŸÖê•Öß »ÖÖ­Öê êú ×»Ö‹
µÖפü ײֻ֕Öß ˆ¯Ö»Ö²¬Ö ÆüÖê ŸÖÖê ‹ú µÖÖ †×¬Öú ãÖÖ­ÖÖë ¯Ö¸ü ³Öß ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •ÖÖ Ã֍úŸÖß Æîü…
18

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.15 Work during Night or on Sundays and Holidays
4.15.1 Prior written permission of the Engineer-in-Charge shall be taken whenever
any works are proposed to be carried out during night or on Sundays or on
authorized Holidays except when the work is unavoidable or absolutely
necessary for safety of life or property of works, in which case the Contractor
shall immediately inform the Engineer-in-Charge accordingly.
4.16 Material obtained from Excavation
4.16.1 Materials of any kind obtained from dismantling of a structure, excavation
on the Site etc. shall remain the property of the Corporation and shall be
disposed off as the Engineer-in-Charge may direct.
4.17 Treasure, Trove, Fossils, etc.
4.17.1 All fossils, coins, articles of value or antiquity, and structures and other
remains or items of geological or archaeological interest found on the Site
from dismantling of structure, excavation etc shall be placed under the care
and authority of the Corporation. The Contractor shall take reasonable
precautions to prevent Contractor’s Personnel or other persons from removing
or damaging any of these findings. Incase where in the work or part thereof is
suspended by the Corporation for protection of such articles, then the sub-
clause 7.9(Suspension of Work for a period up to 90 days) or sub-clause 7.10
(Prolonged Suspension of Work (beyond 90 days)) shall be applicable, as the
case may be.
4.18 Site Drainage
4.18.1 All water which may accumulate on the Site during the progress of the
works, or in trenches and excavated areas, from causes other than the
Excepted Risks (as defined in the Definitions) shall be removed from the Site to
the satisfaction of the Engineer-in-Charge and at cost of the Contractor.
4.19 Protection of Trees
4.19.1 Trees designated by the Engineer-in-Charge shall be protected from
damage during the course of the works and earth level within 1 metre of
each such tree shall not be changed. Where necessary, such trees shall be
protected by providing temporary fencing. Where tree uprooting is
unavoidable, procedures as directed by the Engineer-in-Charge shall be
strictly complied with.
4.19.2 The Contractor shall plant and maintain trees during the currency of
Contract, as specified in schedule A.
4.20 Security of the site
4.20.1 The Contractor shall provide and maintain at his own expense all lights,
guards, fencing, watch and ward when and where necessary or required by
the Engineer-in-Charge for protection of materials and the works or for the
safety and convenience of those employed on the Works or the public.
4.20.2 The Contractor shall be responsible for keeping unauthorized persons off
the site.
4.21 Co-operation and Facilities to Other Contractors
4.21.1 The Contractor shall co-operate and share the Site with other Contractors,
public authorities, utilities, and with the Corporation as instructed by the
Engineer-in-charge during the currency of the contract. The Corporation may
modify the schedule of work for other Contractors and shall notify the
Contractor of any such modification.

19

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.15 ¸üÖ×¡Ö ´Öë µÖÖ ¸ü×¾Ö¾ÖÖ¸ü †Öî¸ü †¾ÖúÖ¿Ö êú פü­ÖÖë ´Öë úÖµÖÔ
4.15.1 •Ö²Ö ú³Öß ¸üÖ×¡Ö ´Öë µÖÖ ¸ü×¾Ö¾ÖÖ¸ü úÖê µÖÖ ¯ÖÏÖ׬֍éúŸÖ †¾ÖúÖ¿Ö ¾ÖÖ»Öê פü­Ö ׍úÃÖß úÖµÖÔ úÖê ׍úµÖÖ •ÖÖ­ÖÖ ¯ÖÏßÖÖ×¾ÖŸÖ
ÆüÖê ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¯Öæ¾ÖÖÔ­Öã´Ö×ŸÖ »Öß •ÖÖ‹Öß, ×ÃÖ¾ÖÖ‹ ŸÖ²Ö •Ö²Ö׍ú úÖµÖÔ ú¸ü­ÖÖ †¯Ö׸üÆüÖµÖÔ †£Ö¾ÖÖ •Öß¾Ö­Ö
úß ¸üÖÖ µÖÖ úÖµÖÔ úß ÃÖÓ¯Ö×¢Ö úß ¸üÖÖ êú ×»Ö‹ †ŸµÖÓŸÖ †Ö¾Ö¿µÖú ÆüÖê †Öî¸ü ‹êÃÖß ¯Ö׸üÛãÖ×ŸÖ ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü
ŸÖ¤ü­ÖãÃÖÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ŸÖŸúÖ»Ö ÃÖæ×“ÖŸÖ ú¸êüÖÖ…
4.16 Öã¤üÖ‡Ô ´Öë ¯ÖÏÖ¯ŸÖ ¾ÖßÖã‹Ó
4.16.1 ׍úÃÖß œüÖÓ“Öê úÖê אָüÖŸÖê ÃÖ´ÖµÖ µÖÖ Ã£Ö»Ö úß Öã¤üÖ‡Ô †Öפü ú¸üŸÖê ÃÖ´ÖµÖ ¯ÖÏÖ¯ŸÖ ÃÖ´ÖÃŸÖ ¾ÖßÖã‹Ó ×­ÖÖ´Ö úß ÃÖÓ¯Ö×¢Ö
ÆüÖëÖß †Öî¸ü ˆ­ÖúÖ ×­Ö¯Ö™üÖ­Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ×­Ö¤êü¿ÖÖ­ÖãÃÖÖ¸ü ׍úµÖÖ •ÖÖ‹ÖÖ…
4.17 ÃÖÓ¯Ö¤üÖ, Ö•ÖÖ­ÖÖ, ¯Öã¸üÖŸÖ­Ö ¾ÖßÖã‹Ó †Öפü
4.17.1 Ã£Ö»Ö ´Öë œüÖÓ“ÖÖê úÖê אָüÖŸÖê ÃÖ´ÖµÖ, Öã¤üÖ‡Ô †Öפü ú¸üŸÖê ÃÖ´ÖµÖ Ã£Ö»Ö ÃÖê ¯ÖÏÖ¯ŸÖ ÃÖ³Öß ¯ÖÏÖ“Öß­Ö ¾ÖßÖã‹,Ó ×ÃÖŒêú,
¯Öã¸üÖŸÖ­Ö ´Öæ»µÖ ¾ÖÖ»Öê ÃÖÖ´ÖÖ­Ö, †Öî¸ü ³ÖæÖ³ÖÔ ¿ÖÖÃ¡Ö µÖÖ ¯Öã¸üÖŸÖ­Ö ¿ÖÖÃ¡Ö úß ¹ý×“Ö ¾ÖÖ»Öß ¾ÖßÖã‹Ó ×­ÖÖ´Ö úß ×­ÖÖ¸üÖ­Öß
¾Ö ¯ÖÏÖ׬֍úÖ¸ü ´Öë ¸üÖß •Ö֋ӐÖß… ‹êÃÖß ¯ÖÏÖ¯ŸÖ ¾ÖßÖã†Öë úÖê †¯Ö­Öê †Ö¤ü×´ÖµÖÖë µÖÖ †­µÖ ¾µÖÛŒŸÖµÖÖë «üÖ¸üÖ †­µÖ¡Ö »Öê
•ÖÖ­Öê µÖÖ Ö×ŸÖ ¯ÖÓÆãü“ÖÖ­Öê ÃÖê ²Ö“ÖÖ­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¯ÖµÖÖÔ¯ŸÖ ˆ¯ÖÖµÖ ú¸ü­Öê ÆüÖëÖê… •Ö²Ö ú³Öß ‹êÃÖß ¾ÖßÖã†Öë
úÖê ²Ö“ÖÖ­Öê êú ×»Ö‹ ×­ÖÖ´Ö úÖµÖÔ úÖê µÖÖ ˆÃ֍êú ³ÖÖÖ úÖê ¸üÖêú ¤êüŸÖÖ Æîü ŸÖÖê ˆ¯ÖÖ›ü 7.9 (90 פü­ÖÖë úß †¾ÖÛ¬Ö
ŸÖú úÖµÖÔ úÖ ×­Ö»ÖÓ²Ö­Ö) µÖÖ ˆ¯ÖÖ›ü 7.10 (¤üß‘ÖÖÔ¾Ö×¬Ö êú ×»Ö‹ úÖµÖÔ úÖ ×­Ö»ÖÓ²Ö­Ö), •ÖîÃÖÖ ³Öß ´ÖÖ´Ö»ÖÖ ÆüÖ,ê
»Ö֐Öæ ÆüÖêÖÖ…
4.18 úÖµÖÔ Ã£Ö»Ö úß •Ö»Ö ׭֍úÖÃÖß
4.18.1 úÖµÖÔ úß ¯ÖϐÖ×ŸÖ êú ¤üÖî¸üÖ­Ö ÃÖÓ³ÖÖ×¾ÖŸÖ ÖŸÖ¸üÖë (•ÖÖê ¯Ö׸ü³ÖÖÂÖÖ Ö›ü ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ ×ú‹ Ö‹ Æïü) êú †»ÖÖ¾ÖÖ µÖÖ
ÖÖ‡µÖÖë †Öî¸ü Öã¤üÖ‡Ô ¾ÖÖ»Öê ãÖÖ­ÖÖë ´Öë •ÖÖê ³Öß ¯ÖÖ­Öß ‡ú½üÖ ÆüÖêŸÖÖ Æîü, ˆÃÖêü, ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ÃÖÓŸÖãÛ™ü êú ßָü
ŸÖú †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“Öì ¯Ö¸ úÖµÖÔÃ£Ö»Ö ÃÖê ׭֍úÖ»ÖÖ •ÖÖ‹ÖÖ…
4.19 ¯Öê›ÍüÖë úÖ ²Ö“ÖÖ¾Ö
4.19.1 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×“ÖÛÅ­ÖŸÖ ×ú‹ Ö‹ ¯Öê›ÍüÖë úß úÖµÖÔ êú ¤üÖî¸üÖ­Ö ¸üÖÖ úß •ÖÖ‹Öß †Öî¸ü ‹êÃÖê ¯ÖÏŸµÖêú ¯Öê›Íü êú
“ÖÖ¸üÖë ŸÖ¸ü±ú 1 ´Öß™ü¸ü úß ¤æü¸üß ŸÖú úê ³Öæ×´Ö ŸÖ»Ö úÖê ¯Ö׸ü¾ÖÙŸÖŸÖ ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ… •ÖÆüÖÓ úÆüà †Ö¾Ö¿µÖú ÆüÖ,ê
‹êÃÖê ¯Öê›ÍüÖë êú “ÖÖ¸üÖê ŸÖ¸ü±ú †Ã£ÖÖ‡Ô ²ÖÖ›Íü »ÖÖ֍ú¸ü ˆ­Öúß ¸üÖÖ úß •ÖÖ‹Öß… •ÖÆüÖÓ úÆüà ¯Öê›ÍüÖë úÖê •Ö›Íü ÃÖê ˆÖÖ›Íü­ÖÖ
†×­Ö¾ÖÖµÖÔ ÆüÖ,ê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ²ÖŸÖÖ‡Ô Ö‡Ô ¯ÖÏ׍ÎúµÖÖ úÖ ú›ÍüÖ‡Ô ÃÖê ¯ÖÖ»Ö­Ö ×úµÖÖ •ÖÖ‹ÖÖ…
4.19.2 ÃÖÓ×¾Ö¤üÖ úß †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü †­ÖãÃÖæ“Öß "‹" êú ×¾Ö×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü ¯Öê›Íü »ÖÖ֋ӐÖê †Öî¸ü
†­Öã¸üÖÖ ú¸ëüÖê…
4.20 úÖµÖÔ Ã£Ö»Ö úß ÃÖã¸üÖÖ
4.20.1 •Ö²Ö ú³Öß ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖִ֐ÖÏß †Öî¸ü úÖµÖÔ †£Ö¾ÖÖ úÖµÖÔ êú ×»Ö‹ ×­ÖµÖãŒŸÖ ×ú‹ Ö‹ ú´ÖÔ“ÖÖ׸üµÖÖë µÖÖ †Ö´Ö
•Ö­ÖŸÖÖ úß ÃÖã¸üÖÖ †Öî¸ü ÃÖÆæü×»ÖµÖŸÖ êú ×»Ö‹ †Ö¾Ö¿µÖú µÖÖ †×­Ö¾ÖÖµÖÔ ÃÖ´Ö—ÖêÓ ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †¯Ö­Öê Ö“Öì
¯Ö¸ü ÃÖ´ÖÃŸÖ ¸üÖê¿Ö­Öß, ÖÖ›Ôü, ²ÖÖ›Íü, ׭֐ָüÖ­Öß ¤ü»Ö ˆ¯Ö»Ö²¬Ö ú¸üÖ­ÖÖ ÆüÖêÖÖ †Öî¸ü ‡ÃÖê ²Ö­ÖÖ‹ ¸üÖ­ÖÖ ÆüÖêÖÖ…
4.20.2 †­Ö׬֍éúŸÖ ¾µÖÛŒŸÖµÖÖë úÖê úÖµÖÔÃ£Ö»Ö ÃÖê ¤æü¸ü ¸üÖ­Öê úß ×•Ö´´Öê¤üÖ¸üß ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ÆüÖêÖß…
4.21 †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú ÃÖÖ£Ö ÃÖÆüµÖÖêÖ ¾Ö ÃÖã×¾Ö¬ÖÖ‹Ó
4.21.1 ÃÖÓ×¾Ö¤üÖ úß úÖµÖÖÔ¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖ,ë
ÃÖ¸üúÖ¸üß ¯ÖÏÖ׬֍úÖ׸üµÖÖë, ÃÖã×¾Ö¬ÖÖ¤üÖŸÖÖ†Öë †Öî¸ü ×­ÖÖ´Ö êú ÃÖÖ£Ö ÃÖÆüµÖÖêÖ †Öî¸ü ÃÖÖ—ÖÖ ú¸ëüÖê… ×­ÖÖ´Ö †­µÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú úÖµÖÔ úß ÃÖ´ÖµÖ-ÃÖæ“Öß ´Öë ÃÖÓ¿ÖÖê¬Ö­Ö ú¸ü Ã֍úŸÖÖ Æîü †Öî¸ü µÖפü úÖê‡Ô ‹êêÃÖÖ ÃÖÓ¿ÖÖê¬Ö­Ö ׍úµÖÖ •ÖÖŸÖÖ Æîü
ŸÖÖê ˆÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖæ×“ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…

19

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.21.2 The Contractor shall, in accordance with the requirements of the Engineer-
in-Charge, afford all reasonable facilities to other Contractors engaged
contemporaneously on separate contracts. Similarly the departmental
labour and labour of any other authorized agency or statutory body which
may be employed or deployed at the Site for execution of any other work
may also be extended co-operation and facility by the contractor.
4.22 Training of Apprentice
4.22.1 The Contractor as well as his Sub-Contractor shall provide training during
the currency of the Contract, to such number of Apprentices (given in
Schedule A) as engaged/employed by the Corporation. The Contractor
shall train them as required under The Apprentices Act, 1961. The
Corporation shall make payment to apprentices as required under the Act.
4.23 Water Supply
4.23.1 Water Supply: The Contractor shall make his own arrangements for water
required for the work and nothing will be paid for the same. This will be
subject to the following conditions:
(i) That the water used by the Contractor shall be sufficient for construction
purposes to the satisfaction of the Engineer-in-Charge. The quality of water
shall be in accordance with the specifications.
(ii) The Engineer-in-Charge shall make alternative arrangements for supply of
water at the risk and cost of the Contractor if the arrangements made by
the Contractor for procurement of water are in the opinion of the Engineer-
in-Charge, unsatisfactory.
4.23.2 Departmental Water Supply: Water, if available, (Refer schedule A) may be
supplied to the Contractor by the Corporation subject to the following
conditions:
(i) The water charges as stipulated in Schedule A shall be recovered from
the Contractor.
(ii) The Contractor shall make his own arrangement for water connection and
laying of pipelines from existing mains of source of supply and metering.
The distance of the available water supply shall not be more than 100
metres from the work site.
(iii) The Corporation do not guarantee to maintain uninterrupted supply of
water and it will be incumbent on the Contractor to make alternative
arrangements for water at his own cost in the event of any temporary
breakdown in the Corporation’s water mains so that the progress of his
work is not held up for want of water. No claim of damage or
refund/reimbursement of water charges will be entertained on account of
such breakdown.
4.24 Land
4.24.1 Land for Contractor’s Office, Stores, Workshop etc.: The Engineer-in-
Charge shall, at his discretion and for the duration of the Contract, make
available at site, land for construction of Contractor's field office,
workshop, stores, assembling yard, etc required for execution of the
Contract. Leveling and dressing of site, any construction of temporary
roads, offices, workshops, etc. as per plan approved by the Engineer-in-
Charge shall be done by the Contractor at his own cost.
20

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.21.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß †Ö¾Ö¿µÖúŸÖÖ†Öë êú †­Öãºþ¯Ö ŸÖÔúÃÖÓÖŸÖ ÃÖã×¾Ö¬ÖÖ†Öë úÖê ˆÃÖ ÃÖÓ×¾Ö¤üÖ êú
ÃÖÖ£Ö-ÃÖÖ£Ö ¯Öé£Öú ÃÖÓ×¾Ö¤üÖ ¯Ö¸ü úÖµÖÔ ú¸ü ¸üÆêü †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú ÃÖÖ£Ö ¾ÖÆü­Ö ú¸ëüÖê… ‡ÃÖß ¯ÖύúÖ¸ü
×¾Ö³Ö֐ÖßµÖ ´Ö•Ö¤æü¸ü µÖÖ ×úÃÖß †­µÖ ¯ÖÏÖ׬֍éúŸÖ ‹•ÖëÃÖß µÖÖ Ã¾ÖÖµÖ¢Ö ×­ÖúÖµÖ, ו֭Æëü úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ׍úÃÖß
†­µÖ úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ »ÖÖÖµÖÖ ÖµÖÖ ÆüÖê, «üÖ¸üÖ ×­ÖµÖÖê×•ÖŸÖ µÖÖ ŸÖî­ÖÖŸÖ ´Ö•Ö¤æü¸üÖë úÖê ³Öß ÃÖÓ×¾Ö¤ü֍úÖ¸ü
«üÖ¸üÖ ÃÖÆüµÖÖêÖ ¾Ö ÃÖã×¾Ö¬ÖÖ‹Ó ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •Ö֋ӐÖß…
4.22 ¯ÖÏ׿ցÖã†Öë úÖ ¯ÖÏ׿ց֝Ö
4.22.1 ÃÖÓ×¾Ö¤üÖ úß †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü †Öî¸ü ˆÃ֍êú ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­ÖÖ´Ö «üÖ¸üÖ úÖµÖÔ ¯Ö¸ü »ÖÖÖ‹
Ö‹/×­ÖµÖãŒŸÖ ×ú‹ Ö‹ ¯ÖÏ׿ցÖã†Öë úÖê (†­ÖãÃÖæ“Öß ‹ ´Öë ²ÖŸÖÖµÖÖ ÖµÖÖ Æîü) ¯ÖÏ×¿ÖÖÖ ¯ÖϤüÖ­Ö ú¸ëüÖê…
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆ­Æëü ¯ÖÏ׿ցÖ㠆׬Ö×­ÖµÖ´Ö, 1961 êú †­ÖãÃÖÖ¸ü ¯ÖÏ׿Ö×ÖŸÖ ú¸ëüÖê… ×­ÖÖ´Ö ‡ÃÖ †×¬Ö×­ÖµÖ´Ö êú
†­ÖãÃÖÖ¸ü ¯ÖÏ׿ցÖã†Öë úÖê ³ÖãÖŸÖÖ­Ö ú¸êüÖÖ…
4.23 •Ö»Ö †Ö¯ÖæÙŸÖ
4.23.1 •Ö»ÖÖ¯ÖæÙŸÖ:úÖµÖÔ êú ×»Ö‹ †Ö¾Ö¿µÖú ¯ÖÖ­Öß †Ö¯ÖæÙŸÖ úß ¾µÖ¾ÖãÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê þֵÖÓ ú¸ü­Öß ÆüÖêÖß †Öî¸ü
‡Ã֍êú ×»Ö‹ úÖê‡Ô ³ÖãÖŸÖÖ­Ö ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ… µÖÆü ×­Ö´­Ö×»Ö×ÖŸÖ ¿ÖŸÖÖí êú †¬Öß­Ö ÆüÖêÖÖ :
Í(i) ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­Ö´ÖÖÔÖ úÖµÖÔ êú ×»Ö‹ ˆ¯ÖµÖÖêÖ ׍úµÖÖ •ÖÖ­Öê ¾ÖÖ»ÖÖ ¯ÖÖ­Öß ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú
ÃÖÓŸÖÖêÂÖ êú †­Öãºþ¯Ö ÃÖ´Öã×“ÖŸÖ ´ÖÖ¡ÖÖ ´Öë ÆüÖêÖÖ… ¯ÖÖ­Öß úß ÖãÖ¾Ö¢ÖÖ ×¾Ö×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü ÆüÖêÖß…
(ii) µÖפü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¸üÖµÖ ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖÖ­Öß êú ¯ÖÏÖ¯ÖÖ êú ×»Ö‹ úß Ö‡Ô ¾µÖ¾ÖãÖÖ
ÃÖÓŸÖÖêÂÖ¯ÖϤü ­ÖÆüà Æüî ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“ÖÔ †Öî¸ü וִ´Öê¤üÖ¸üß ¯Ö¸ü ¯ÖÖ­Öß úß
†Ö¯ÖæÙŸÖ úß ¾ÖîúÛ»¯Öú ¾µÖ¾ÖãÖÖ ú¸ëüÖê…
4.23.2 ×¾Ö³Ö֐ÖßµÖ •Ö»ÖÖ¯ÖæÙŸÖ: µÖפü ¯ÖÖ­Öß ˆ¯Ö»Ö²¬Ö ÆüÖê (†­ÖãÃÖæ“Öß ‹ úÖ ÃÖÓ¤ü³ÖÔ »Öë) ŸÖÖê, ×­ÖÖ´Ö «üÖ¸üÖ ×­Ö´­Ö
¿ÖŸÖÖí êú †­ÖãÃÖÖ¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¯ÖÖ­Öß úß †Ö¯ÖæÙŸÖ úß •ÖÖ Ã֍úŸÖß Æî ü:
(i) ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê †­ÖãÃÖæ“Öß ‹ êú †­ÖãÃÖÖ¸ü •Ö»Ö ¯ÖϳÖÖ¸ü úß ¾ÖÃÖæ»Öß úß •ÖÖ‹Öß…
(ii) ¯ÖÖ­Öß úß †Ö¯ÖæÙŸÖ êú ×»Ö‹ ˆ¯Ö»Ö²¬Ö ´ÖãµÖ ÄÖÖêŸÖ ÃÖê •Ö»Ö ÃÖӯ֍Ôú ¾Ö ¯ÖÖ‡¯Ö »ÖÖ‡­Ö ײ֔ûÖ­Öê
êú úÖµÖÔ †Öî¸ü ´Öß™ü¸ü »ÖÖÖ­Öê úß ¾µÖ¾ÖãÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ Ã¾ÖµÖÓ úß •ÖÖ‹Öß… ˆ¯Ö»Ö²¬Ö
¯ÖÖ­Öß êú ´ÖãµÖ ÄÖÖêŸÖ ÃÖê úÖµÖÔÃ£Ö»Ö úß ¤æü¸üß 100 ´Öß™ü¸ü ÃÖê †×¬Öú ­ÖÆüà ÆüÖêÖß…
(iii) ×­ÖÖ´Ö ×­Ö²ÖÖÔ¬Ö •Ö»ÖÖ¯ÖæÙŸÖ úß ÖÖ¸Óü™üß ­ÖÆüà ¤êüŸÖÖ Æîü †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ×­ÖÖ´Ö êú ´ÖãµÖ •Ö»ÖÄÖÖêŸÖ
ÃÖê †Ö¯ÖæÙŸÖ êú †Ã£ÖÖ‡Ô ºþ¯Ö ÃÖê ²ÖÓ¤ü ÆüÖê •ÖÖ­Öê úß ÛãÖ×ŸÖ ´Öë †¯Ö­Öê Ö“ÖÔ ¯Ö¸ü ¯ÖÖ­Öß úß
¾ÖîúÛ»¯Öú ¾µÖ¾ÖãÖÖ ú¸ü­Öß ÆüÖêÖß ŸÖÖ׍ú ¯ÖÖ­Öß úß ú´Öß êú úÖ¸üÖ ˆ­Öêú úÖµÖÔ úß ¯ÖϐÖ×ŸÖ ­Ö
¹ýêú… ‡ÃÖ ¯ÖύúÖ¸ü úß ºþúÖ¾Ö™ü êú úÖ¸üÖ Ö×ŸÖ µÖÖ •Ö»Ö ¯ÖϳÖÖ¸ü úß ¾ÖÖ¯ÖÃÖß/¯ÖÏן֯ÖæÙŸÖ êú ׍úÃÖß
¤üÖ¾Öê ¯Ö¸ü ×¾Ö“ÖÖ¸ü ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ…
4.24 ³Öæ×´Ö
4.24.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úÖµÖÖÔ»ÖµÖ, ³ÖÓ›üÖ¸ü, úÖµÖÔ¿ÖÖ»ÖÖ †Öפü êú ×»Ö‹ ³Öæ×´Ö : ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ Ã¾Ö×¾Ö¾Öêú ÃÖê
†Öî¸ü ÃÖÓ×¾Ö¤üÖ úß †¾Ö×¬Ö êú ×»Ö‹ ÃÖÓ×¾Ö¤üÖ êú ×­Ö¯ÖÖ¤ü­Ö ÆêüŸÖã †Ö¾Ö¿µÖú ÃÖÓ×¾Ö¤ü֍úÖ¸ü úê úÖµÖÔãֻÖ
úÖµÖÖÔ»ÖµÖ, úÖµÖÔ¿ÖÖ»ÖÖ, ³ÖÓ›üÖ¸ü, ‹ÃÖë²ÖØ»ÖÖ µÖÖ›Ôü †Öפü êú ×­Ö´ÖÖÔÖ êú ×»Ö‹ Ã£Ö»Ö ¯Ö¸ü ³Öæ×´Ö ˆ¯Ö»Ö²¬Ö
ú¸ü֋ӐÖê… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ­ÖŒ¿Öê êú †­ÖãÃÖÖ¸ü Ã£Ö»Ö úÖ ÃÖ´ÖŸÖ»Öߍú¸üÖ ÃÖÖ±ú-ÃÖ±úÖ‡Ô,
׍úÃÖß ³Öß †Ã£ÖÖ‡Ô ÃÖ›Íüú, úÖµÖÖÔ»ÖµÖÖê,Ó úÖµÖÔ¿ÖÖ»ÖÖ†Öë †Öפü úÖ ×­Ö´ÖÖÔÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú †¯Ö­Öê Ö“ÖÔ ¯Ö¸ü
׍úµÖÖ •ÖÖ‹ÖÖ…
20

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.24.2 Land for Contractor’s Colony: Land will be given, if available, (Refer
schedule A) by the Corporation for the Contractor’s colony. Where ever
applicable the Contractor may indicate the requirement of land for the
colony along with his tender. Land will be made available for the period of
Contract. The Contractor shall make his own arrangement for water supply,
electric supply, sanitation, access road and general cleanliness of his
colony. All these amenities shall be got approved by the Engineer-in-
Charge prior to construction of the camp. The Contractor shall not permit
any of his personnel to maintain any living quarters within the Corporation’s
land other than the land allotted for colony. In case the land allotted for
setting up the camp / colony is on lease, the contractor shall pay the
appropriate municipal taxes / duties as applicable.
4.24.3 In respect of any land allotted to the Contractor for purposes of or in
connection with the Contract, the Contractor shall be a licensee subject
to the following and such other terms and conditions as may be imposed
by licenser:-
(i) that he shall pay a nominal license fee of Re.1 per hectare per year or
part of a year for use and occupation, in respect of each and every
separate area of land allotted to him.
(ii) that such use or occupation shall not confer any right of tenancy of the
land to the Contractor.
(iii) that the Contractor shall be liable to vacate the land on demand by the
Engineer-in-Charge.
(iv) that the Contractor shall have no right to any construction over this
land without the written permission of the Engineer-in-Charge. In case, he
is allowed to construct any structure he shall have to demolish and clear
the same before handing over the completed work unless agreed to the
contrary.
On completion of work, the Contractor shall handover the land duly cleaned to
the Engineer-in-Charge. Until and unless the Contractor has handed over
the vacant possession of land allotted to him for the above purposes,
the payment of his final bill shall not be made. The Contractor shall be
made liable to pay at the rate of Rs. 5,000 per week as a penalty for the
use and occupation of land beyond 6 months from the date of physical
completion of work.
5 STAFF, LABOUR AND INDUSTRIAL SAFETY
5.1 Engagement of Staff and Labour
5.1.1 The Contractor shall not employ any person who has not completed
eighteen years of age. He shall employ labour in sufficient numbers to
maintain the required rate of progress and to complete the contract in the
stipulated completion time. He shall engage skilled and experienced
workmen to the satisfaction of the Engineer-in-Charge to ensure
workmanship as per the Contract.
21

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.24.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß úÖò»ÖÖê­Öß êú ×»Ö‹ ³Öæ×´Ö : µÖפü ˆ¯Ö»Ö²¬Ö ÆüÖê (†­ÖãÃÖæ“Öß ‹ úÖ ÃÖÓ¤ü³ÖÔ »Öë) ŸÖÖê, ׭֐ִÖ
«üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß úÖò»ÖÖê­Öß êú ×»Ö‹ ³Öæ×´Ö ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •ÖÖ‹Öß… •ÖÆüÖÓ úÆüà »Ö֐Öæ ÆüÖê,
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖò»ÖÖê­Öß êú ×»Ö‹ †Ö¾Ö¿µÖú ³Öæ×´Ö úß ÃÖæ“Ö­ÖÖ †¯Ö­Öß ×­Ö×¾Ö¤üÖ êú ÃÖÖ£Ö ¤êü Ã֍úŸÖÖ
Æîü… µÖÆü ³Öæ×´Ö ÃÖÓ×¾Ö¤üÖ úß †¾Ö×¬Ö ŸÖú êú ×»Ö‹ ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •ÖÖ‹Öß… •Ö»Ö †Ö¯ÖæÙŸÖ, ײֻ֕Öß
úß †Ö¯ÖæÙŸÖ, ¿ÖÖî“ÖÖ»ÖµÖ, †Ö¾ÖÖÖ´Ö­Ö ´Ö֐ÖÔ †Öî¸ü †¯Ö­Öß úÖò»ÖÖê­Öß úß ÃÖÖ±ú-ÃÖ±úÖ‡Ô úß ¾µÖ¾ÖãÖÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê þֵÖÓ ú¸ü­Öß ÆüÖêÖß… îú´¯Ö ´Öë ‡­Ö ÃÖ³Öß ´Öæ»Ö³ÖæŸÖ ÃÖã×¾Ö¬ÖÖ†Öë úÖ ×­Ö´ÖÖÔÖ ú¸ü­Öê ÃÖê
¯ÖÆü»Öê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ †­Öã´ÖÖê¤ü­Ö ×»ÖµÖÖ •ÖÖ‹ÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê ׍úÃÖß ú´ÖÔ“ÖÖ¸üß úÖê
úÖò»ÖÖê­Öß êú ×»Ö‹ †Ö²ÖÓ×™üŸÖ ³Öæ×´Ö êú †»ÖÖ¾ÖÖ ×­ÖÖ´Ö úß ³Öæ×´Ö ¯Ö¸ü ׍úÃÖß ¯ÖύúÖ¸ü úß †Ö¾ÖÖÃÖßµÖ
¾µÖ¾ÖãÖÖ ú¸ü­Öê úß †­Öã´Ö×ŸÖ ­ÖÆüà ¤ëüÖê… µÖפü ‡ÃÖ ïú¯Ö/úÖò»ÖÖê­Öß êú ×»Ö‹ †Ö²ÖÓ×™üŸÖ úß Ö‡Ô ³Öæ×´Ö
¯Ö¼êü ¯Ö¸ü »Öß Ö‡Ô ÆüÖê ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖ£ÖÖ †Ö¾Ö¿µÖú ˆ¯ÖµÖãŒŸÖ ¯ÖÖ׻֍úÖ ú¸ü/¿Ö㻍úÖë úÖ ³ÖãÖŸÖÖ­Ö
ú¸ëüÖê…
4.24.3 ÃÖÓ×¾Ö¤üÖ êú úÖµÖÔ êú ×»Ö‹ †£Ö¾ÖÖ ÃÖÓ×¾Ö¤üÖ êú ÃÖÓ²ÖÓ¬Ö ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †Ö²ÖÓ×™üŸÖ ³Öæ×´Ö êú ×»Ö‹
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹ú »ÖÖ‡ÃÖëÃÖß ÆüÖëÖê †Öî¸ü µÖÆü ×­Ö´­Ö×»Ö×ÖŸÖ ×­Ö²ÖÓ¬Ö­ÖÖë ¾Ö ¿ÖŸÖÖí ŸÖ£ÖÖ »ÖÖ‡ÃÖëÃÖ ¯ÖϤüÖŸÖÖ
«üÖ¸üÖ »ÖÖÖ‡Ô Ö‡ÔÓ ‹êÃÖß Æüß †­µÖ ×­Ö²ÖÓ¬Ö­Ö ¾Ö ¿ÖŸÖÖí êú †¬Öß­Ö ÆüÖêÖÖ :
(i) ˆ­Æëü †Ö²ÖÓ×™üŸÖ ׍ú‹ Ö‹ ¯ÖÏŸµÖêú Öê¡Ö úß ³Öæ×´Ö êú ˆ¯ÖµÖÖêÖ ¾Ö ú²•Öê êú ×»Ö‹ ¯ÖÏן־ÖÂÖÔ µÖÖ
ˆÃÖÃÖê ú´Ö †¾Ö×¬Ö êú ×»Ö‹ ¯Öé£Öú-¯Öé£Öú 1 ¹ý¯ÖµÖÖ ¯ÖÏ×ŸÖ ÆêüŒ™êüµÖ¸ úß ¤ü¸ü ÃÖê ­ÖÖ´Ö´ÖÖ¡Ö
úÖ »ÖÖ‡ÃÖëÃÖ ¿Ö㻍ú †¤üÖ ú¸ü­ÖÖ ÆüÖêÖÖ…
(ii) ‡ÃÖ ¯ÖύúÖ¸ü êú ˆ¯ÖµÖÖêÖ µÖÖ ú²•Öê êú úÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ˆÃÖ •Ö´Öß­Ö úß ×ú¸üÖ‹¤üÖ¸üß
úÖ úÖê‡Ô †×¬ÖúÖ¸ü ¯ÖÏÖ¯ŸÖ ­ÖÆüà ÆüÖêÖÖ…
(iii) ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †Ö¤êü×¿ÖŸÖ ×ú‹ •ÖÖ­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆÃÖ ³Öæ×´Ö úÖê ÖÖ»Öß ú¸ü­Öê
êú ×»Ö‹ ²ÖÖ¬µÖ ÆüÖêÖÖ…
(iv) ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ×»Ö×ÖŸÖ †­Öã´Ö×ŸÖ êú ²ÖÖî¸ü ‡ÃÖ ³Öæ×´Ö ¯Ö¸ü ׍úÃÖß
³Öß ¯ÖύúÖ¸ü êú ×­Ö´ÖÖÔÖ ú¸ü­Öê úÖ †×¬ÖúÖ¸ü ­ÖÆüà ÆüÖêÖÖ… µÖפü, ˆÃÖê ׍úÃÖß ¯ÖύúÖ¸ü êú
×­Ö´ÖÖÔÖ úß †­Öã´Ö×ŸÖ ¤üß •ÖÖŸÖß Æîü ŸÖÖê ¾ÖÆ †¯Ö­Öê ¯ÖæÖÔ ×ú‹ Ö‹ úÖµÖÔ úß ÃÖã¯Öã¤ÔüÖß êú ²ÖÖ¤ü
•Ö²Ö ŸÖú ׍ú ãú” †­µÖ£ÖÖ ­Ö úÆüÖ •ÖÖ‹, ‡ÃÖê אָüÖ ¤êüêÖê…
úÖµÖÔ ÃÖ´ÖÖ¯ŸÖ ÆüÖê •ÖÖ­Öê úê ²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ •Ö´Öß­Ö úß ×¾Ö׬־֟ÖË ÃÖÖ±ú-ÃÖ±úÖ‡Ô ú¸üÖ ú¸ü
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖã¯Öã¤Ôü ú¸ëüÖê… •Ö²Ö ŸÖú ׍ú ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆ¯ÖµÖãÔŒŸÖ úÖµÖÖí êú ×»Ö‹
ˆ­ÖúÖê †Ö²ÖÓ×™üŸÖ ³Öæ×´Ö úÖ ÆüßÖÖÓŸÖ¸üÖ ú¸ü ˆÃÖê ÖÖ»Öß ­ÖÆüà ú¸üŸÖê, ˆ­Öêú †Ó×ŸÖ´Ö ×²Ö»Ö úÖ
³ÖãÖŸÖÖ­Ö ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖµÖÔ êú ³ÖÖîן֍ú ºþ¯Ö ÃÖê ¯Öæ¸üÖ ÆüÖê •ÖÖ­Öê êú 6
´ÖÖÆü êú ²ÖÖ¤ü ³Öæ×´Ö êú ˆ¯ÖµÖÖêÖ ¾Ö ú²•Öê êú ×»Ö‹ ¹ý. 5,000 ¯ÖÏ×ŸÖ ÃÖ¯ŸÖÖÆü úß ¤ü¸ü ÃÖê ¯Öê­ÖÖò»™üß
¸üÖ×¿Ö “ÖãúÖ­Öß ÆüÖêÖß…
5. ú´ÖÔ“ÖÖ¸üß, ´Ö•Ö¤æü¸ü ¾Ö †ÖîªÖêא֍ú ÃÖÓ¸üÖÖ
5.1 ú´ÖÔ“ÖÖ¸üß ¾Ö ´Ö•Ö¤æü¸üÖë úÖê úÖ´Ö ¯Ö¸ü »ÖÖÖ­ÖÖ
5.1.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü 18 ¾ÖÂÖÔ ÃÖê ú´Ö †ÖµÖã ¾ÖÖ»Öê ׍úÃÖß ¾µÖÛŒŸÖ úÖê úÖ´Ö ¯Ö¸ü ­ÖÆüà ¸üÖëÖê… úÖµÖÔ úß
†Ö¾Ö¿µÖú Ö×ŸÖ úÖê ²Ö­ÖÖ‹ ¸üÖ­Öê ¾Ö úÖµÖÔ úÖê ×­Ö¬ÖÖÔ׸üŸÖ ÃÖ´ÖµÖ-ÃÖß´ÖÖ ´Öë ¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹ ˆ­Æëü
¯ÖµÖÖÔ¯ŸÖ ÃÖӏµÖÖ ´Öë ´Ö•Ö¤æü¸üÖë úß ³ÖŸÖá ú¸ü­Öß ÆüÖêÖß… ¾Öê úÖµÖÔ úÖê ÃÖÓ×¾Ö¤üÖ êú †­Öãºþ¯Ö ¯Öæ¸üÖ ×úµÖÖ
•ÖÖ­ÖÖ ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­Öê êú ×»Ö‹ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖÓŸÖÖêÂÖ¯ÖϤü »ÖÖ­Öê ¾ÖÖ»Öê ãú¿Ö»Ö ¾Ö
†­Öã³Ö¾Öß úִ֐ÖÖ¸üÖë úß ³ÖŸÖá ú¸ëüÖê…
21

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.1.2 The Contractor shall, unless otherwise provided in the Contract, make his
own arrangements for the engagement of all staff and labour (local or
other) and for their payment, housing, catering,transport etc.
5.1.3 Contractor shall employ their workmen, preferably from amongst the
project affected eligible persons. Contractor, if asked by Engineer-In-
Charge shall submit regularly in a prescribed performa, a list of such project
affected persons employed by him throughout the contract period.
5.1.4 The contractor shall indemnify that the labour / workmen engaged by him
are trained and certified for intended work.
5.2 Rates of Wages and Conditions of Labour
5.2.1 The Contractor shall pay to labour employed by him either directly or
through Sub-Contractors wages in accordance with the rules, regulations
and the law in force relating to the payment of wages for the workers.
5.2.2 The Contractor shall pay not less than the minimum wages declared from
time to time by Central or State Government, whichever is higher.
5.2.3 The Contractor shall intimate the Engineer-in-charge well in advance the
date of payment to the workers. A representative on behalf of Engineer-in-
charge shall be present at the time of payment disbursement. Contractor
shall obtain certificate of witness of payment by representative of
Engineer-in-charge.
5.3 Persons in the Service of Corporation and other Contractors
5.3.1 The Contractor shall not recruit, or attempt to recruit, staff and labour from
amongst the Corporation’s Personnel without prior approval of Engineer-in-
charge.
5.3.2 The Contractor shall not recruit, either on full-time or part-time basis, the
staff and labour from other Contractors, working with the Corporation,
without prior approval of Engineer-in-charge.
5.4 Labour Laws
5.4.1 The Contractor and his Sub-Contractors shall abide at all times by all
existing labour enactment and rules, regulations, notifications,
amendments and bye laws etc. issued by the State or Central Government
or local administrative authorities applicable therein issued from time to
time during the subsistence of contract. The Contractor shall keep the
Corporation indemnified, in case any action is taken against the
Corporation by the competent authority on account of contravention of
any of the provisions of any Act or rules made there under, regulations or
notifications including amendments.
5.4.2 In the event of the Contractor committing a default or breach of any
of the provisions of the aforesaid Contractor's Labour Regulations as
amended from time to time the corporation may impose penalty for
each of such default as necessary. The Engineer-in-charge shall deduct
such amount from bills or security deposit of the Contractor. The decision
of the Engineer-in-Charge in this respect shall be final and binding.
22

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.1.2 •Ö²Ö ŸÖú ÃÖÓ×¾Ö¤üÖ ´Öë †­µÖ£ÖÖ ¾ÖÙÖŸÖ ­Ö ÆüÖ,ê ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê ú´ÖÔ“ÖÖ׸üµÖÖë ¾Ö ´Ö•Ö¤æü¸üÖë (ãÖÖ­ÖßµÖ
†£Ö¾ÖÖ †­µÖ) úß ³ÖŸÖá þֵÖÓ ú¸ëüÖê †Öî¸ü ˆ­Öêú ¾ÖêŸÖ­Ö, †Ö¾ÖÖÃÖ, ³ÖÖê•Ö­Ö, ¯Ö׸ü¾ÖÆü­Ö †Öפü úß
¾µÖ¾ÖãÖÖ Ã¾ÖµÖÓ ú¸ëüÖê…
5.1.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê úִ֐ÖÖ¸üÖë úß ³ÖŸÖá ´Öë ¯Ö׸üµÖÖê•Ö­ÖÖ ÃÖê ¯ÖϳÖÖ×¾ÖŸÖ, µÖÖêµÖ »ÖÖêÖÖë úÖê ¾Ö¸üßµÖŸÖÖ
¤ëüÖê… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ´ÖÖӐÖê •ÖÖ­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê ¯ÖÖÃÖ ×­ÖµÖãŒŸÖ ×ú‹ Ö‹ ‹êÃÖê
¯Ö׸üµÖÖê•Ö­ÖÖ ¯ÖϳÖÖ×¾ÖŸÖ »ÖÖêÖÖë úß ÃÖæ“Öß ×­Ö¬ÖÖÔ׸üŸÖ ¯ÖÏ¯Ö¡Ö ´Öë ³Ö¸üú¸ü ¯Öæ¸üß ÃÖÓ×¾Ö¤üÖ †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö
×­ÖµÖ×´ÖŸÖ ºþ¯Ö ÃÖê ¯ÖÏßÖãŸÖ ú¸ëüÖê…
5.1.4 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ ²ÖÖŸÖ úß ÖÖ¸Óü™üß ¤ëüÖê ׍ú ˆ­Öêú «üÖ¸üÖ úÖ´Ö ¯Ö¸ü »ÖÖÖ‹ Ö‹ ´Ö•Ö¤æü¸ü/úִ֐ÖÖ¸ü ˆÃÖ
úÖ´Ö êú ×»Ö‹ ¯ÖÏ׿Ö×ÖŸÖ ¾Ö ¯ÖÏ´ÖÖ×ÖŸÖ Æïü…
5.2 ´Ö•Ö¤æü¸üß úß ¤ü¸ëü ¾Ö ¿ÖŸÖí
5.2.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖ߬Öê þֵÖÓ «üÖ¸üÖ µÖÖ ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ´ÖÖ¬µÖ´Ö ÃÖê ×­ÖµÖÖê×•ÖŸÖ ×ú‹ Ö‹ ´Ö•Ö¤æü¸üÖë úÖê
úִ֐ÖÖ¸üÖë úß ´Ö•Ö¤æü¸üß êú ÃÖÓ²ÖÓ¬Ö ´Öë »Ö֐Öæ ×­ÖµÖ´ÖÖë, ×¾Ö×­ÖµÖ´ÖÖë ¾Ö úÖ­Öæ­ÖÖë êú †­ÖãÃÖÖ¸ü ´Ö•Ö¤æü¸üß úÖ
³ÖãÖŸÖÖ­Ö ú¸ëüÖê…
5.2.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü, ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ëú¦ü ¾Ö ¸üÖ•µÖ ÃÖ¸üúÖ¸üÖë «üÖ¸üÖ ‘ÖÖê×ÂÖŸÖ úß Ö‡Ô ­µÖæ­ÖŸÖ´Ö ´Ö•Ö¤æü¸üß ÃÖê
•ÖÖê ³Öß †×¬Öú ÆüÖ,ê ˆÃÖÃÖê ú´Ö ´Ö•Ö¤æü¸üß úÖ ³ÖãÖŸÖÖ­Ö ­ÖÆüà ú¸ëüÖê…
5.2.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê úִ֐ÖÖ¸üÖë úÖê ³ÖãÖŸÖÖ­Ö ×ú‹ •ÖÖ­Öê úß ŸÖÖ¸üßÖ êú ²ÖÖ¸êü ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
úÖê ÃÖ´ÖµÖ ¸üÆüŸÖê ÃÖæ“Ö­ÖÖ ¤ëüÖê… ³ÖãÖŸÖÖ­Ö ×¾ÖŸÖ¸üÖ êú ÃÖ´ÖµÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ ‹ú ¯ÖÏןÖ×­Ö׬Ö
ˆ¯ÖÛÃ£ÖŸÖ ¸üÆêüÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ‡ÃÖ ¯ÖÏןÖ×­Ö×¬Ö ÃÖê ³ÖãÖŸÖÖ­Ö ×ú‹ •ÖÖ­Öê úÖ
¯ÖÏ´ÖÖÖ¯Ö¡Ö ¯ÖÏÖ¯ŸÖ ú¸ëüÖê…
5.3 ×­ÖÖ´Ö ¾Ö †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú †¬Öß­Ö úÖµÖÔ ú¸ü­Öê ¾ÖÖ»Öê ¾µÖÛŒŸÖ
5.3.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¯Öæ¾ÖÖÔ­Öã´Ö×ŸÖ êú ²ÖÖî¸ü ×­ÖÖ´Ö êú ¾µÖÛŒŸÖµÖÖë ´Öë ÃÖê †¯Ö­Öê ÙüÖò±ú
µÖÖ ´Ö•Ö¤æü¸üÖë úß ­Ö ŸÖÖê ³ÖŸÖá ú¸ëüÖê †Öî¸ü ­Ö Æüß ³ÖŸÖá úÖ ¯ÖϵÖÖÃÖ ú¸ëüÖê…
5.3.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¯Öæ¾ÖÖÔ­Öã´Ö×ŸÖ êú ²ÖÖî¸ü ×­ÖÖ´Ö êú ×»Ö‹ úÖµÖÔ ú¸ü ¸üÆêü ׍úÃÖß †­µÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ׸üµÖÖë ¾Ö ´Ö•Ö¤æü¸üÖë úß ¯ÖæÖԍúÖ׻֍ú †£Ö¾ÖÖ †Ó¿ÖúÖ׻֍ú, ׍úÃÖß ¯ÖύúÖ¸ü úß
³ÖŸÖá ­ÖÆüà ú¸ëüÖê…
5.4 ÁÖ´Ö úÖ­Öæ­Ö
5.4.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¾Ö ˆÃ֍êú ˆ¯ÖÃÖÓ×¾Ö¤ü֍úÖ¸üÖë úÖê ÃÖÓ×¾Ö¤üÖ úß †¾Ö×¬Ö ´Öë ¸üÖ•µÖ µÖÖ ëú¦ü ÃÖ¸üúÖ¸ü µÖÖ
ãÖÖ­ÖßµÖ ¯ÖÏ¿ÖÖÃÖ­Ö «üÖ¸üÖ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü •ÖÖ¸üß †Öî¸ü ˆ­Ö ¯Ö¸ü Æü´Öê¿ÖÖ »Ö֐Öæ ÆüÖê­Öê ¾ÖÖ»Öê ÁÖ´Ö
†×¬Ö×­ÖµÖ´ÖÖë ¾Ö ×­ÖµÖ´ÖÖë, ×¾Ö×­ÖµÖ´ÖÖë, †×¬ÖÃÖæ“Ö­ÖÖ†Öë, ÃÖÓ¿ÖÖê¬Ö­ÖÖë ¾Ö ˆ¯Ö úÖ­Öæ­ÖÖë úÖ †­Öã¯ÖÖ»Ö­Ö
ú¸ü­ÖÖ ÆüÖêÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü, ׍úÃÖß †×¬Ö×­ÖµÖ´Ö µÖÖ ˆÃ֍êú †ÓŸÖÖÔŸÖ ²Ö­ÖÖ‹ Ö‹ ×­ÖµÖ´ÖÖë, ×¾Ö×­ÖµÖ´ÖÖë
µÖÖ †×¬ÖÃÖæ“Ö­ÖÖ†ÖêÓ ¾Ö ÃÖÓ¿ÖÖê¬Ö­ÖÖë êú ׍úÃÖß ¯ÖÏÖ¾Ö¬ÖÖ­Ö êú ˆ»»ÖÓ‘Ö­Ö êú úÖ¸üÖ ×­ÖÖ´Ö êú ×¾Öºþ¨ü
úß •ÖÖ­Öê ¾ÖÖ»Öß úÖ¸Ôü¾ÖÖ‡Ô ÃÖê ÆüÖê­Öê ¾ÖÖ»Öê ­ÖãúÃÖÖ­Ö ÃÖê ÃÖã¸ü×ÖŸÖ ¸üÖêÖÖ…
5.4.2 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆ¯ÖµÖãÔŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ´Ö•Ö¤æü¸üÖë ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ÃÖÓ¿ÖÖê׬֟Ö
×¾Ö×­ÖµÖ´ÖÖë êú ׍ú­Æüà ³Öß ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë úÖ ¯ÖÖ»Ö­Ö ­ÖÆüà ú¸üŸÖÖ Æîü µÖÖ ˆ­ÖúÖ ˆ»»ÖÓ‘Ö­Ö ú¸üŸÖÖ Æîü ŸÖÖê ×­ÖÖ´Ö ‹êÃÖê
¯ÖÏŸµÖêú ˆ»»ÖÓ‘Ö­Ö êú ×»Ö‹ µÖ£ÖÖ †Ö¾Ö¿µÖú ¯Öê­ÖÖò»™üß †×¬Ö¸üÖê×¯ÖŸÖ ú¸ü Ã֍úŸÖÖ Æîü… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ‡ÃÖ
¸üÖ×¿Ö úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ¯ÖÏןֳÖæ •Ö´ÖÖ ¸üÖ×¿Ö ´Öë ÃÖê úÖ™ü »ÖëÖê… ‡ÃÖ ÃÖÓ²ÖÓ¬Ö ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ ×­ÖÖÔµÖ
†Ó×ŸÖ´Ö ¾Ö ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…
22

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.4.3 The employees of the Contractor and the Sub-Contractor in no case shall
be treated as the employees of the Corporation at any point of time.
5.4.4 List of some of the Major laws applicable to establishments engaged in
building and other construction work are listed below. For details, latest
versions of relevant Acts and laws should be referred.
 Workmen Compensation Act, 1923
 Payment of Gratuity Act, 1972
 Employees P.F and Miscellaneous Provision Act, 1952:
 Maternity Benefit Act, 1951:
 Contract Labour (Regulation & Abolition) Act, 1970
 Minimum Wages Act, 1948
 Payment of Wages Act, 1936
 Equal Remuneration Act, 1979
 Payment of Bonus Act, 1965:
 Industrial Disputes Act, 1947
 Industrial Employment’s (Standing Orders) Act, 1946:
 Trade Unions Act, 1926:
 Child Labour (Prohibition & Regulation) Act, 1986:
 Inter-State Migrant workmen’s (Regulation of Employment & Conditions of
Service) Act, 1979
 The Building and Other Construction workers (Regulation of Employment
and Conditions of Service) Act, 1996 and the Cess Act, 1996
 Factories Act, 1948
 Employees State Insurance Act, 1948
 Atomic Energy Factories Rules, 1996
5.4.5 Contractor shall at his own expense comply with or cause to be
complied with Model Rules for Labour Welfare as appended to these
conditions or rules framed by the Government from time to time for the
protection of health and for making sanitary arrangements for
workers employed directly or indirectly on the works. In case the
Contractor fails to make arrangements as aforesaid, the Engineer-in-
Charge shall be entitled to do so and recover the cost thereof from the
Contractor.
5.4.6 Failure to comply with Model Rules for Labour Welfare (as annexed)
and to grant of maternity benefits to female workers shall make the
Contractor liable to pay to the Corporation as a penalty an amount not
exceeding Rs.5000/- for each default or materially incorrect statement.
5.4.7 The Contractor shall be liable to pay his contribution and the employees
contribution to the State Insurance Scheme in respect of all labour
employed by him for the execution of the Contract, in accordance with
the provisions of "The Employees State Insurance Act, 1948" as amended
from time to time. The Contractor shall submit to the Corporation the copy
of monthly Challans of payments made for PF and ESI.

23

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.4.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †Öî¸ü ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ¸üß ×úÃÖß ³Öß ÃÖ´ÖµÖ ¯Ö¸ü ׍úÃÖß ³Öß ºþ¯Ö ´Öë ×­ÖÖ´Ö êú
ú´ÖÔ“ÖÖ¸üß ­ÖÆüà ´ÖÖ­Öê •Ö֋ӐÖê…
5.4.4 ‡´ÖÖ¸üŸÖÖë ¾Ö †­µÖ ×­Ö´ÖÖÔÖ úÖµÖÖí ´Öë ¸üŸÖ ãÖÖ¯Ö­ÖÖ†Öë êú ×»Ö‹ »Ö֐Öæ ãú”û ¯ÖÏ´ÖãÖ úÖ­Öæ­ÖÖë úß ÃÖæ“Öß ­Öß“Öê ¤üß
•ÖÖ ¸üÆüß Æîü… ×¾ÖßÖéŸÖ ×¾Ö¾Ö¸üÖ êú ×»Ö‹ ÃÖÓ²ÖÓ×¬ÖŸÖ †×¬Ö×­ÖµÖ´ÖÖë êú †ªŸÖ­Ö ÃÖÓÍú¸üÖ úÖ ÃÖÓ¤ü³ÖÔ ×»ÖµÖÖ •ÖÖ­ÖÖ
“ÖÖ×Æü‹…
 úִ֐ÖÖ¸ü Öן֯ÖæÙŸÖ †×¬Ö×­ÖµÖ´Ö, 1923
 ˆ¯Ö¤üÖ­Ö úÖ ³ÖãÖŸÖÖ­Ö †×¬Ö×­ÖµÖ´Ö, 1972
 ú´ÖÔ“ÖÖ¸üß ³Ö×¾ÖÂµÖ ×­Ö×¬Ö ¾Ö ×¾Ö×¾Ö¬Ö ¯ÖÏÖ¾Ö¬ÖÖ­Ö †×¬Ö×­ÖµÖ´Ö, 1952
 ´ÖÖŸÖéŸ¾Ö »ÖÖ³Ö †×¬Ö×­ÖµÖ´Ö, 1951
 šêüúÖ ÁÖ´Ö (×¾Ö×­ÖµÖ´Ö ¾Ö ˆ­´Öæ»Ö­Ö) †×¬Ö×­ÖµÖ´Ö, 1970
 ­µÖæ­ÖŸÖ´Ö ´Ö•Ö¤æü¸üß †×¬Ö×­ÖµÖ´Ö, 1948
 ´Ö•Ö¤æü¸üß ³ÖãÖŸÖÖ­Ö †×¬Ö×­ÖµÖ´Ö, 1936
 ÃÖ´ÖÖ­Ö ¯ÖÖ׸üÁÖ״֍ú †×¬Ö×­ÖµÖ´Ö, 1979
 ²ÖÖê­ÖÃÖ ³ÖãÖŸÖÖ­Ö †×¬Ö×­ÖµÖ´Ö, 1965
 †ÖîªÖêא֍ú ×¾Ö¾ÖÖ¤ü †×¬Ö×­ÖµÖ´Ö, 1947
 †ÖîªÖêא֍ú ×­ÖµÖÖê•Ö­Ö úÖ (ãÖÖ‡Ô †Ö¤êü¿Ö) †×¬Ö×­ÖµÖ´Ö, 1946
 ÁÖ״֍ú ÃÖÓ‘Ö †×¬Ö×­ÖµÖ´Ö, 1926
 ²ÖÖ»Ö ÁÖ´Ö (×­ÖÂÖê¬Ö ¾Ö ×¾Ö×­ÖµÖ´Ö) †×¬Ö×­ÖµÖ´Ö, 1986
 †ÓŸÖ¸ü-¸üÖ•µÖ ×­Ö¾ÖÖÔ×ÃÖŸÖ úִ֐ÖÖ¸ü (×­ÖµÖÖê•Ö­Ö ¾Ö ÃÖê¾ÖÖ ¿ÖŸÖÖí úÖ ×¾Ö×­ÖµÖ´Ö­Ö) †×¬Ö×­ÖµÖ´Ö, 1979
 ‡´ÖÖ¸üŸÖß ¾Ö †­µÖ ×­Ö´ÖÖÔÖ úÖµÖÔ ÁÖ״֍ú (×­ÖµÖÖê•Ö­Ö ¾Ö ÃÖê¾ÖÖ ¿ÖŸÖÖí úÖ ×¾Ö×­ÖµÖ´Ö) †×¬Ö×­ÖµÖ´Ö, 1996 †Öî¸ü †×¬Ö³ÖÖ¸ü
†×¬Ö×­ÖµÖ´Ö 1996
 ±îúŒ™ü¸üß †×¬Ö×­ÖµÖ´Ö, 1948
 ú´ÖÔ“ÖÖ¸üß ¸üÖ•µÖ ²Öß´ÖÖ †×¬Ö×­ÖµÖ´Ö, 1948
 ¯Ö¸ü´Ö֝Öã ‰ú•ÖÖÔ ±îúŒ™ü¸üß ×­ÖµÖ´ÖÖ¾Ö»Öß, 1996
5.4.5 úÖµÖÔ êú ×»Ö‹ ¯ÖÏŸµÖÖ µÖÖ †¯ÖÏŸµÖÖ ºþ¯Ö ÃÖê ×­ÖµÖãŒŸÖ ×ú‹ Ö‹ úִ֐ÖÖ¸üÖë êú þÖÖãµÖ úß ¸üÖÖ †Öî¸ü ÃÖÖ±ú-
ÃÖ±úÖ‡Ô úÖ ‡ÓŸÖ•ÖÖ´Ö ú¸ü­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ´Ö•Ö¤æü¸üÖë êú ú»µÖÖÖ êú ×»Ö‹ ²Ö­ÖÖ‹ Ö‹ ¾Ö ‡­Ö ¿ÖŸÖÖí êú
ÃÖÖ£Ö-ÃÖÖ£Ö ÃÖӻ֐­Ö ׍ú‹ Ö‹ †Ö¤ü¿ÖÔ ×­ÖµÖ´ÖÖë µÖÖ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ÃÖ¸üúÖ¸ü «üÖ¸üÖ ²Ö­ÖÖ‹ Ö‹ ×­ÖµÖ´ÖÖë úÖ
þֵÖÓ êú Ö“Öì ¯Ö¸ü †­Öã¯ÖÖ»Ö­Ö ú¸ëüÖê µÖÖ †­Öã¯ÖÖ»Ö­Ö ú¸ü¾Ö֋ӐÖê… µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆ¯ÖµÖãÔŒŸÖ êú †­ÖãÃÖÖ¸ü
¾µÖ¾ÖãÖÖ ú¸ü­Öê ´Öë †ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ‡ÃÖ ¯ÖύúÖ¸ü úß ¾µÖ¾ÖãÖÖ ú¸ü­Öê úÖ
†×¬ÖúÖ¸ü ÆüÖêÖÖ ‡ÃÖ ¯Ö¸ü †Ö­Öê ¾ÖÖ»Öß »ÖÖÖŸÖ úÖê ÃÖÓ×¾Ö¤üúÖ¸ü ÃÖê ¾ÖÃÖæ»Ö ׍úµÖÖ •ÖÖ‹ÖÖ…
5.4.6 ´Ö•Ö¤æü¸üÖë êú ú»µÖÖÖ êú ×»Ö‹ ²Ö­ÖÖ‹ Ö‹ †Ö¤ü¿ÖÔ ×­ÖµÖ´ÖÖë (¯Ö׸ü׿Ö™ü êú †­ÖãÃÖÖ¸ü) úÖ †­Öã¯ÖÖ»Ö­Ö ­Ö ú¸ü­Öê
¯Ö¸ü µÖÖ ´Ö×Æü»ÖÖ úִ֐ÖÖ¸üÖë úÖê ´ÖÖŸÖéŸ¾Ö »ÖÖ³ÖÖë úÖê ­Ö ¤êü­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü, ‹êÃÖß ¯ÖÏŸµÖêú Ö»ÖŸÖß µÖÖ Ö»ÖŸÖ
ŸÖ£µÖ ×¾Ö¾Ö¸üÖ êú ×»Ö‹ ×»Ö‹ ×­ÖÖ´Ö úÖê †×¬ÖúŸÖ´Ö 5000/- úß ¯Öê­ÖÖò»™üß “ÖãúÖ­Öê êú ×»Ö‹ ²ÖÖ¬µÖ ÆüÖëÖê…
5.4.7 ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ÃÖÓ¿ÖÖê×¬ÖŸÖ " ú´ÖÔ“ÖÖ¸üß ¸üÖ•µÖ ²Öß´ÖÖ †×¬Ö×­ÖµÖ´Ö, 1948" êú ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë êú †­Öºþ¯Ö
ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ †¯Ö­Öê †Ó¿Ö¤üÖ­Ö ¾Ö ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ ˆ­Öêú «üÖ¸üÖ ×­ÖµÖÖê×•ÖŸÖ ×ú‹ Ö‹
´Ö•Ö¤æü¸üÖë úÖ †Ó¿Ö¤üÖ­Ö ¸üÖ•µÖ ²Öß´ÖÖ ´Öë ¤êü­Öê êú ×»Ö‹ ²ÖÖ¬µÖ ÆüÖëÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×ú‹ Ö‹ •Öß¾Ö­Ö ²Öß´ÖÖ ¾Ö
ú´ÖÔ“ÖÖ¸üß ÃÖã¸üÖÖ ²Öß´ÖÖ êú ³ÖãÖŸÖÖ­Ö êú ´ÖÖ×Ã֍ú “ÖÖ»ÖÖ­Ö úß ¯ÖÏ×ŸÖ ×­ÖÖ´Ö êú ¯ÖÖÃÖ •Ö´ÖÖ úß •ÖÖ‹Öß…
23

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.4.8 The Engineer-in-Charge shall have the powers to deduct any sum from the
amount due to contractor for making good the loss suffered by worker(s)
by reason of non-fulfillment of the conditions of contract or non-payment /
short payment of wages or non-observance of the Labour laws /
regulations.
5.4.9 In every case in which by virtue of the provisions sub-section(1) of Section
12, of the Workmen's Compensation Act,1923, the Corporation is obliged
to pay compensation to a workman employed by the Contractor, in
execution of the works, the Corporation without prejudice to its right under
sub-section (2) of section 12 of the said act, shall be at liberty to recover
such amount or any part thereof by deducting it from the security deposit
or from any sum due by the Corporation to the Contractor whether under
this contract or any other contract at the same unit or any other units of
the Corporation.
5.4.10 The decision of the Engineer-in-Charge in such matters based on
reports from the Inspecting Officers as defined in the Contractor's Labour
Regulation as appended to these conditions shall be final and binding
and deduction(s) for recovery of such penalty may be made from any
amount payable to the Contractor.
5.5 Facilities for Staff and Labour
5.5.1 Unless otherwise stated, the Contractor shall provide and maintain all
necessary accommodation and welfare facilities for the Contractor’s
Personnel. Model Rules for Labour Welfare, as annexed shall be referred in
this regard.
5.6 Health and Industrial Safety
5.6.1 The Contractor shall at all times take all reasonable precautions to
maintain the health and safety of the Contractor’s Personnel. The
Contractor shall ensure first-aid facilities available at all times at the work
site. Other facilities in collaboration with local health authorities like
medical staff, sick bay, ambulance, etc. shall be provided as required. The
Contractor shall also make suitable arrangements for necessary welfare
and hygiene requirements and for the prevention of epidemics.
5.6.2 The Contractor shall comply, as statutory requirement, to all provisions of
“AERB (Atomic Energy Regulatory Board) Safety Guide for Works Contract”
i.e., document No. AERB/SG/IS-1 amended from time to time and other
safety requirements as applicable to specific site. A copy of guide is
attached herewith. In addition to the above the following requirements of
Industrial safety be complied with.
5.6.3 The Contractor shall at his own expense arrange & provide for the safety
provisions as appended to these conditions (AERB Safety Guide) and the
facilities in respect of all labour directly or indirectly employed for execution
of the works or as required by the Engineer-in-Charge. In case, the
Contractor fails to make arrangements and provide necessary facilities as
per guidelines, the Engineer-in-Charge shall be entitled to do so at the risk
and cost of the contractor and recover the cost from the Contractor with
penalty as defined in Schedule (A). The total amount of penalties for non-
compliance under this Para 5.6.3, shall be subject to a maximum of 2% of
the contract value.
24

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.4.8 ÃÖÓ×¾Ö¤üÖ úß ¿ÖŸÖÖí úÖê ¯Öæ¸üÖ ­Ö ú¸ü­Öê µÖÖ ´Ö•Ö¤æü¸üß úÖ ³ÖãÖŸÖÖ­Ö ­Ö ú¸ü­Öê/ú´Ö ³ÖãÖŸÖÖ­Ö ú¸ü­Öê µÖÖ ÁÖ´Ö
úÖ­Öæ­ÖÖê/×¾Ö×­ÖµÖ´ÖÖë úÖ †­Öã¯ÖÖ»Ö­Ö ­Ö ú¸ü­Öê êú úÖ¸üÖ ´Ö•Ö¤æü¸üÖë úÖê ÆüÖê­Öê ¾ÖÖ»Öê ­ÖãúÃÖÖ­Ö úß ³Ö¸ü¯ÖÖ‡Ô êú ×»Ö‹
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤êüµÖ ¸üÖ×¿Ö ´Öë ÃÖê ׍úÃÖß ³Öß ¸üÖ×¿Ö úß ú™üÖîŸÖß ú¸ü­Öê úÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê †×¬ÖúÖ¸ü
ÆüÖêÖÖ…
5.4.9 ‹êÃÖê ¯ÖÏŸµÖêú ´ÖÖ´Ö»Öê ´Öë •ÖÆüÖÓ úִ֐ÖÖ¸ü Öן֯ÖæÙŸÖ †×¬Ö×­ÖµÖ´Ö, 1923 úß ¬ÖÖ¸üÖ 12 úß ˆ¯Ö ¬ÖÖ¸üÖü (1) êú
¯ÖϾÖé¢Ö ÆüÖê­Öê êú úÖ¸üÖ ׭֐ִÖ, ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ‡ÃÖ úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ ×­ÖµÖÖê×•ÖŸÖ ×ú‹ Ö‹
ú´ÖÔ“ÖÖ¸üß úÖê Öן֯ÖæÙŸÖ ¤êü­Öê êú ×»Ö‹ ²ÖÖ¬µÖ ÆüÖêŸÖÖ Æîü ŸÖÖê ׭֐ִÖ, ˆ¯ÖµÖãÔŒŸÖ †×¬Ö×­ÖµÖ´Ö êú †­Öã“”êû¤ü 12 úß
ˆ¯Ö¬ÖÖ¸üÖ (2) êú †ÓŸÖÖÔŸÖ ‡Ã֍úÖê ¯ÖÏÖ¯ŸÖ †×¬ÖúÖ¸ü êú ¯Öæ¾ÖÖԐÖÏÆü êú ²ÖÖî¸ü ‡ÃÖ ¸üÖ×¿Ö úÖê µÖÖ ˆÃ֍êú ׍úÃÖß ³Ö֐Ö
úÖê ¯ÖÏןֳÖæ •Ö´ÖÖ µÖÖ ×­ÖÖ´Ö «üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ úÖê ‡ÃÖ ÃÖÓ×¾Ö¤üÖ µÖÖ ˆÃÖß ‡úÖ‡Ô úß †­µÖ ÃÖÓ×¾Ö¤üÖ †£Ö¾ÖÖ ×­ÖÖ´Ö
úß ×úÃÖß †­µÖ ‡úÖ‡Ô ´Öë “Ö»Ö ¸üÆüß ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ ¤êüµÖ ׍úÃÖß ¸üÖ×¿Ö ´Öë ÃÖê ú™üÖîŸÖß ú¸ü­Öê üúß Ã¾ÖŸÖÓ¡ÖŸÖÖ
ÆüÖêÖß…
5.4.10 ‹êÃÖê ´ÖÖ´Ö»ÖÖë ´Öë, ‡­Ö ¿ÖŸÖÖí ´Öë ˆ¨éüŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÁÖ´Ö ×¾Ö×­ÖµÖ´ÖÖë êú †ÓŸÖÖÔŸÖ ¯Ö׸ü³ÖÖ×ÂÖŸÖ •ÖÖÓ“Ö †×¬ÖúÖ¸üß
úß ×¸ü¯ÖÖê™Ôü êú †Ö¬ÖÖ¸ü ¯Ö¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×»ÖµÖÖ ÖµÖÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ¾Ö ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ †Öî¸ü ‹êÃÖß
¯Öê­ÖÖò»™üß úß ¾ÖÃÖæ»Öß êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤êüµÖ ¸üÖ×¿Ö ´Öë ÃÖê ú™üÖîŸÖß (ú™üÖîןֵÖÖÓ) úß •ÖÖ Ã֍úŸÖß Æïü…

5.5 ÙüÖò±ú ¾Ö ´Ö•Ö¤æü¸üÖë êú ×»Ö‹ ÃÖã×¾Ö¬ÖÖ‹Ó


5.5.1 •Ö²Ö ŸÖú ׍ú †­µÖ£ÖÖ ¾ÖÙÖŸÖ ­Ö ÆüÖ,ê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ׸üµÖÖë êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ÃÖ³Öß †Ö¾Ö¿µÖú
†Ö¾ÖÖÃÖßµÖ ¾Ö ú»µÖ֝֍úÖ¸üß ÃÖã×¾Ö¬ÖÖ‹Ó ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •Ö֋ӐÖß… ‡ÃÖ ÃÖÓ²ÖÓ¬Ö ´Öë ÁÖ״֍ú ú»µÖÖÖ êú ×»Ö‹
ÃÖӻ֐­Ö †Ö¤ü¿ÖÔ ×­ÖµÖ´ÖÖë úÖ ÃÖÓ¤ü³ÖÔ ×»ÖµÖÖ •ÖÖ‹ÖÖ…
5.6 þÖÖãµÖ ‹¾ÖÓ †ÖîªÖêא֍ú ÃÖÓ¸üÖÖ
5.6.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê úÖٴ֍úÖë úê þÖÖãµÖ †Öî¸ü ÃÖÓ¸üÖÖ êú ×»Ö‹ Æü¸üÃÖÓ³Ö¾Ö ÃÖÖ¾Ö¬ÖÖ­Öß ²Ö¸üŸÖëÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü
úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ÃÖ¤îü¾Ö ¯ÖÏÖ£Ö״֍ú ˆ¯Ö“ÖÖ¸ü úß ÃÖã×¾Ö¬ÖÖ úß ˆ¯Ö»Ö²¬ÖŸÖÖ ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê… µÖ£ÖÖ †Ö¾Ö¿µÖú
†­µÖ ÃÖã×¾Ö¬ÖÖ‹Ó •ÖîÃÖê דÖ׍úŸÃÖÖ Ã™üÖò±ú, ×Ã֍ú²Öê, ‹´²Öã»ÖëÃÖ †Öפü ãÖÖ­ÖßµÖ Ã¾ÖÖãµÖ ¯ÖÏÖ׬֍úÖ׸üµÖÖë êú ÃÖÆüµÖÖêÖ
ÃÖê ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •Ö֋ӐÖß… ÃÖÓ×¾Ö¤ü֍úÖ¸ü †Ö¾Ö¿µÖú ú»µÖ֝֍úÖ¸üß ¾Ö ÃÖÖ±ú-ÃÖ±úÖ‡Ô ÃÖÓ²ÖÓ¬Öß †Ö¾Ö¿µÖúŸÖÖ†Öë
ŸÖ£ÖÖ ´ÖÆüÖ´ÖÖ¸üß úÖê ±îú»Ö­Öê ÃÖê ¸üÖêú­Öê êú ×»Ö‹ ³Öß ˆ×“ÖŸÖ ¾µÖ¾ÖãÖÖ úÖ ¯ÖϲÖÓ¬Ö ú¸ëüÖê…
5.6.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ÃÖÓ¿ÖÖê×¬ÖŸÖ "úÖµÖÔ ÃÖÓ×¾Ö¤üÖ†Öë êú ×»Ö‹ ‹‡Ô†Ö¸ü²Öß (¯Ö¸ü´Ö֝Öã ‰ú•ÖÖÔ ×­ÖµÖִ֍ú
¯Ö׸üÂÖ¤ü) ÃÖÓ¸üÖÖ ×¤ü¤üٿ֍úÖ" וÖÃ֍úß ¤üßÖÖ¾Öê•Ö ÃÖӏµÖÖ ‹‡Ô†Ö¸ü²Öß/‹ÃÖ•Öß/†Ö‡Ô‹ÃÖ-1 Æîü, êú ÃÖ´ÖßÖ
¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë †Öî¸ü ÃÖÓµÖÓ¡Ö Ã£Ö»Ö ×¾Ö¿ÖêÂÖ êú ×»Ö‹ »Ö֐Öæ †­µÖ ÃÖÓ¸üÖÖ †Ö¾Ö¿µÖúŸÖÖ†Öë úÖ ÃÖÖÓ×¾Ö׬֍ú
†Ö¾Ö¿µÖúŸÖÖ êú ºþ¯Ö ´Öë †­Öã¯ÖÖ»Ö­Ö ú¸ëüÖê… ‡ÃÖ ×¤ü¤üٿ֍úÖ úß ‹ú ¯ÖÏ×ŸÖ úÖê ‡Ã֍êú ÃÖÖ£Ö ÃÖӻ֐­Ö ׍úµÖÖ
ÖµÖÖ Æîü… ˆ¯ÖµÖãÔŒŸÖ êú †×ŸÖ׸üŒŸÖ †ÖîªÖêא֍ú ÃÖÓ¸üÖÖ ÃÖÓ²ÖÓ¬Öß ×­Ö´­Ö×»Ö×ÖŸÖ †Ö¾Ö¿µÖúŸÖÖ†Öë úÖ ³Öß
†­Öã¯ÖÖ»Ö­Ö ×úµÖÖ •ÖÖ‹ÖÖ…
5.6.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‡ÃÖ úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ ¯ÖÏŸµÖÖ µÖÖ †¯ÖÏŸµÖÖ ºþ¯Ö ÃÖê ×­ÖµÖÖê×•ÖŸÖ ´Ö•Ö¤æü¸üÖë êú ×»Ö‹
†¯Ö­Öê Ö“ÖÔ ¯Ö¸ü ‡­Ö ¿ÖŸÖÖí (‹‡Ô†Ö¸ü²Öß ÃÖÓ¸üÖÖ ×¤ü¤üٿ֍úÖ) êú ÃÖÖ£Ö ˆÛ»»Ö×ÖŸÖ ÃÖÓ¸üÖÖ ˆ¯ÖÖµÖÖë †£Ö¾ÖÖ ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ úß †Ö¾Ö¿µÖúŸÖÖ êú †­ÖãÃÖÖ¸ü ¾µÖ¾ÖãÖÖ ú¸ëüÖê ¾Ö ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê… µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖÆü
¾µÖ¾ÖãÖÖ ú¸ü­Öê †Öî¸ü פü¿ÖÖ×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü †Ö¾Ö¿µÖú ÃÖã×¾Ö¬ÖÖ‹Ó ˆ¯Ö»Ö²¬Ö ú¸üÖ­Öê ´Öë †ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü
ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“ÖÔ ¾Ö •ÖÖê×Ö´Ö ¯Ö¸ü µÖÆü ¾µÖ¾ÖãÖÖ ú¸ü­Öê †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê
†­ÖãÃÖæ“Öß (‹) úß ¯Ö׸ü³ÖÖÂÖÖ êú †­ÖãÃÖÖ¸ü ¯Öê­ÖÖ»™üßü ÃÖ×ÆüŸÖ ‡Ã֍úß úß´ÖŸÖ ¾ÖÃÖæ»Ö­Öê úÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ… ‡ÃÖ
¯Öî¸üÖ 5.6.3 êú †­ÖãÃÖÖ¸ü †­Öã¯ÖÖ»Ö­Ö ­Ö ú¸ü­Öê ¯Ö¸ü »ÖÖÖ‡Ô Ö‡Ô ¯Öê­ÖÖ»™üß úß ãú»Ö ¸üÖ×¿Ö ãú»Ö ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úß
†×¬ÖúŸÖ´Ö 2 % ŸÖú ÆüÖê Ã֍úŸÖß Æîü…
24

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.6.4 The Contractor shall provide mandatory Industrial Safety Training to all
workmen. In case, where it is specified in the schedule A, the same shall be
provided by the Corporation.
5.6.5. The Contractor shall provide and maintain all lights, fencing, guards,
warning signs and caution board and similar items as required to ensure
safe working conditions at work site.
5.6.6 The Contractor and his Sub-Contractor shall comply with the instructions
given by departmental safety officer or his representative(s) regarding
safety precautions, protection measures and housekeeping, etc.
5.6.7 The Contractor shall provide proper access and working platforms for all
place of work as per laid down standards or as advised by Engineer-in-
charge.
5.6.8 The Contractor shall ensure all floor openings in his work are guarded /
barricaded during the course of work and at the end of each day’s work.
5.6.9 All Contractors, working at plant site, must meet statutory requirements as
well as regulatory requirements applicable to the plant in general and
NPCIL in particular, especially the requirements as per Factory Act, Atomic
Energy Factories Rule-1996 (AEFR-1996), safety guidelines for Job Hazard
Analysis (JHA) & AERB notifications on Industrial & Fire safety.
5.6.10 All Contractors’ safety professionals must be well aware about Acts, Rules,
concerned with Industrial Safety and practices particularly applicable to
the plant and to that effect they have to undergo an assessment at the
plant within 7 days of their placement at the plant and that will be at the
cost of the Contractor and then only he / she would be given permanent
entry pass to plant and considered in the required strength of safety
professionals.
5.6.11 All Personal Protection Equipments (PPE) procured and provided to workers
shall conform to relevant Indian Standards and should be maintained in
good condition by suitable storage, maintenance and inspection.
Contractor shall promote safe work practices at work in plant.
5.6.12 The Contractor shall be held responsible for non-compliance of any of the
safety measures, injuries, fatalities and compensation arising out of such
situations or accidents.
5.6.13 Contractor shall be responsible for safety of all his employees during
execution of the contract. As per Workmen’s Compensation Act, 1923
(amended in 2000), the Contractor will ensure the payment of
compensation to his employees in case of an accident as early as possible
within the time frame permitted by the law of land.
5.6.14 The Contractor shall employ sufficient number of qualified safety
professionals required for the safe execution of the job. The minimum
number shall not be less than the minimum number that is specified in
Schedule (A).
5.6.15The Contractor should deploy safety professionals as defined above, failing
which the Corporation shall outsource or deploy such person at the cost
and risk of the Contractor. Penalty, as defined in Schedule (A) shall also be
recovered in addition to the cost for non-deployment of safety
professionals.

25

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.6.4 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê ÃÖ³Öß úִ֐ÖÖ¸üÖë úÖê †×­Ö¾ÖÖµÖÔ †ÖîªÖêא֍ú ÃÖÓ¸üÖÖ ¯ÖÏ×¿ÖÖÖ ×¤ü»Ö¾Ö֋ӐÖê… •ÖÆüÖÓ úÆüà
†­ÖãÃÖæ“Öß ‹ ´Öë ×¾Ö×­Ö¤êüÙ¿ÖŸÖ ÆüÖ,ê µÖÆü ¯ÖÏ×¿ÖÖÖ ×­ÖÖ´Ö «üÖ¸üÖ ×¤ü»ÖÖµÖÖ •ÖÖ‹ÖÖ…
5.6.5 úÖµÖÔ Ã£Ö»Ö ¯Ö¸ü ÃÖã¸ü×ÖŸÖ úÖµÖÔ ¤ü¿ÖÖ‹Ó ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ÃÖ´ÖÃŸÖ »ÖÖ‡™ëü, ²ÖÖ›Íü,
“ÖêŸÖÖ¾Ö­Öß ×“ÖÅ­Ö †Öî¸ü ÃÖÖ¾Ö¬ÖÖ­Ö ²ÖÖê›Ôü ¾Ö ‡ÃÖß ¯ÖύúÖ¸ü êú †­µÖ †Ö¾Ö¿µÖú ÃÖÖ´ÖÖ­Ö ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê ¾Ö
†­Öã¸ü×ÖŸÖ ×ú‹ •Ö֋ӐÖê…
5.6.6 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¾Ö ˆ¯ÖÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ×¾Ö³Ö֐ÖßµÖ ÃÖÓ¸üÖÖ †×¬ÖúÖ¸üß µÖÖ ˆ­Öêú ¯ÖÏןÖ×­Ö׬Ö(µÖÖë)«üÖ¸üÖ ÃÖÓ¸üÖÖ
ÃÖÖ¾Ö¬ÖÖ­Öß, ²Ö“ÖÖ¾Ö êú ˆ¯ÖÖµÖÖë ¾Ö ÖéÆüÃÖ••ÖÖ †Öפü êú ÃÖÓ²ÖÓ¬Ö ´Öë פü‹ Ö‹ ×­Ö¤ìü¿ÖÖë úÖ †­Öã¯ÖÖ»Ö­Ö ú¸ü­ÖÖ ÆüÖêÖÖ…
5.6.7 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔ ú¸ü­Öê êú ÃÖ´ÖÃŸÖ Ã£ÖÖ­ÖÖë ¯Ö¸ü ×­Ö¬ÖÖÔ׸üŸÖ פü¿ÖÖ ×­Ö¤ìü¿ÖÖë µÖÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ÃÖ»ÖÖÆü êú
†­ÖãÃÖÖ¸ü ˆ×“ÖŸÖ ¸üÖßÖê ¾Ö úÖµÖÔ ú¸ü­Öê úÖ ¯»Öê™ü±úÖ´ÖÔ ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê…
5.6.8 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê ׍ú ˆ­Öêú úÖµÖÔ êú ŸÖ»Ö êú ÃÖ³Öß Öã»Öê ãÖÖ­ÖÖë ¯Ö¸ü úÖµÖÔ êú ¤üÖî¸üÖ­Ö ¾Ö úÖµÖÔ
úß ÃÖ´ÖÖÛ¯ŸÖ êú ²ÖÖ¤ü ²Öî¸üߍêúØ™üÖ µÖÖ ÖÖÚ›üÖ »ÖÖß ÆüÖê…
5.6.9 ÃÖÓµÖÓ¡Ö Ã£Ö»Ö ¯Ö¸ü úÖµÖÔ ú¸ü­Öê ¾ÖÖ»Öê ÃÖ³Öß ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë úÖê ÃÖÓµÖÓ¡Ö êú ×»Ö‹ ÃÖÖ´ÖÖ­µÖ ºþ¯Ö ÃÖê †Öî¸ü ×¾Ö¿ÖêÂÖ ºþ¯Ö
ÃÖê ‹­Ö¯ÖßÃÖ߆ևԋ»Ö êú ×»Ö‹ »Ö֐Öæ ÃÖÖÓ×¾Ö׬֍ú †Öî¸ü ×¾Ö×­ÖµÖ´Ö­Ö †Ö¾Ö¿µÖúŸÖÖ†Öë ×¾Ö¿ÖêÂÖŸÖ: ±îúŒ™ü¸üß ‹êŒ™ü,
¯Ö¸ü´Ö֝Öã ‰ú•ÖÖÔ ±îúŒ™ü¸üß ×­ÖµÖ´ÖÖ¾Ö»Öß-1996 (‹‡Ô‹±ú†Ö¸ü-1996), úÖµÖÔ êú ÖŸÖ¸üÖë úÖ ×¾Ö¿»ÖêÂ֝Ö
(•Öê‹“Ö‹) ¾Ö †ÖîªÖêא֍ú ‹¾ÖÓ †Û­Ö¿Ö´Ö­Ö ÃÖÓ¸üÖÖ ¯Ö¸ü ‹‡Ô†Ö¸ü²Öß úß †×¬ÖÃÖæ“Ö­ÖÖ úß †Ö¾Ö¿µÖúŸÖÖ†Öë úÖê
¯Öæ¸üÖ ú¸ü­ÖÖ ÆüÖêÖÖ…
5.6.10 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÃÖÓ¸üÖÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ÃÖ³Öß ú´ÖÔ“ÖÖ׸üµÖÖë úÖê †ÖîªÖêא֍ú ÃÖÓ¸üÖÖ †Öî¸ü †­Öã¯ÖÖ»Ö­Ö ÃÖê ÃÖÓ²ÖÓ׬֟Ö
ÃÖ³Öß †×¬Ö×­ÖµÖ´ÖÖë, ×­ÖµÖ´ÖÖë †Öפü úß, ×¾Ö¿ÖêÂÖŸÖ: ÃÖÓµÖÓ¡Ö ÃÖÓ²ÖÓ¬Öß ¯Öæ¸üß •Ö֭֍úÖ¸üß ÆüÖê­Öß “ÖÖ×Æü‹ †Öî¸ü ÃÖÓµÖÓ¡Ö
Ã£Ö»Ö ¯Ö¸ü ×­ÖµÖãÛŒŸÖ êú 7 פü­ÖÖë êú ³Öߟָü ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“Öì ¯Ö¸ü ˆ­ÖúÖ ´Ö滵ÖÖӍú­Ö ׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü
êú¾Ö»Ö ‡Ã֍êú ²ÖÖ¤ü Æüß ˆ­Æëü ÃÖÓµÖÓ¡Ö ´Öë ¯ÖϾÖê¿Ö ú¸ü­Öê êú ×»Ö‹ ãÖÖ‡Ô ¯ÖϾÖê¿Ö ü¯Ö¡Ö •ÖÖ¸üß ×úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ˆ­Æëü
ÃÖÓ¸üÖÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ú´ÖÔ“ÖÖ¸üß êú ºþ¯Ö ´Öë ´ÖÖ­µÖŸÖÖ ¤üß •ÖÖ‹Öß…
5.6.11 úִ֐ÖÖ¸üÖêÓ ÆêüŸÖã ¯ÖÏÖ¯ÖÖ ×ú‹ Ö‹ ¾Ö ˆ­Æëü ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ Ö‹ ÃÖ´ÖÃŸÖ ¾µÖÛŒŸÖÖŸÖ ÃÖã¸üÖÖ ˆ¯Öú¸üÖ (¯Ö߯Ö߇Ô)
³ÖÖ¸üŸÖßµÖ ´Ö֭֍úÖë êú †­Öãºþ¯Ö ÆüÖê­Öê “ÖÖ×Æü‹ †Öî¸ü ‡­ÖúÖ ˆ×“ÖŸÖ ³ÖÓ›üÖ¸üÖ, †­Öã¸üÖÖ ¾Ö ×­Ö¸üßÖÖ †Öפü ú¸üŸÖê
Æãü‹ †“”ûß ÛãÖ×ŸÖ ´Öë ²Ö­ÖÖ‹ ¸üÖÖ •ÖÖ­ÖÖ “ÖÖ×Æü‹… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÓµÖÓ¡Ö Ã£Ö»Ö ´Öë úÖµÖÔ ú¸ü­Öê êú ¤üÖî¸üÖ­Ö ÃÖã¸üׁ֟Ö
úÖµÖÔ ¯ÖϝÖÖ»Öß úÖê ²ÖœÍüÖ¾ÖÖ ¤ëüÖê…
5.6.12 ׍úÃÖß ³Öß ¯ÖύúÖ¸ü êú ÃÖÓ¸üÖÖ ˆ¯ÖÖµÖÖë êú †­Öã¯ÖÖ»Ö­Ö ­Ö ú¸ü­Öê, “ÖÖê™ü »ÖÖ­Öê, ÖÓ³Ö߸ü ºþ¯Ö ÃÖê ‘ÖÖµÖ»Ö ÆüÖê­Öê †Öî¸ü
‹êÃÖß ×úÃÖß ³Öß ÛãÖ×ŸÖ µÖÖ ¤ãü‘ÖÔ™ü­ÖÖ êú úÖ¸üÖ ¤üß •ÖÖ­Öê ¾ÖÖ»Öê Öן֯ÖæÙŸÖ úê ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü וִ´Öê¤üÖ¸ü ÆüÖëÖê…
5.6.13 ÃÖÓ×¾Ö¤üÖ êú ×­Ö¯ÖÖ¤ü­Ö úß †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê ÃÖ³Öß ú´ÖÔ“ÖÖ׸üµÖÖë úß ÃÖã¸üÖÖ êú ×»Ö‹
וִ´Öê¤üÖ¸ü ÆüÖëÖê… úִ֐ÖÖ¸ü Öן֯ÖæÙŸÖ †×¬Ö×­ÖµÖ´Ö, 1923 (¾ÖÂÖÔ 2000 ´Öë ÃÖÓ¿ÖÖê׬֟Ö) êú †­ÖãÃÖÖ¸ü
ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê ׍úÃÖß ú´ÖÔ“ÖÖ¸üß êú ÃÖÖ£Ö ‘Ö×™üŸÖ ¤ãü‘ÖÔ™ü­ÖÖ úß Öן֯ÖæÙŸÖ úÖ ³ÖãÖŸÖÖ­Ö ¤êü¿Ö êú úÖ­Öæ­ÖÖë «üÖ¸üÖ
×­Ö¬ÖÖÔ׸üŸÖ †­Öã´Ö­µÖ ÃÖ´ÖµÖ-ÃÖß´ÖÖ ´Öë µÖ£ÖÖ¿Öß‘ÖР׍úµÖÖ •ÖÖ­ÖÖ ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê…
5.6.14 ÃÖÓ×¾Ö¤ü֍úÖ¸ü פü‹ Ö‹ úÖ´Ö úÖê ÃÖã¸ü×ÖŸÖ œÓüÖ ÃÖê ¯ÖæÖÔ ú¸ü­Öê êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ ÃÖӏµÖÖ ´Öë †ÆÔüŸÖÖ¯ÖÏÖ¯ŸÖ ÃÖÓ¸üÖÖ
úÖٴ֍úÖë úÖ ×­ÖµÖÖê•Ö­Ö ú¸ëüÖê… ‹êÃÖß ×­ÖµÖãÛŒŸÖµÖÖë úß ­µÖæ­ÖŸÖ´Ö ÃÖӏµÖÖ †­ÖãÃÖæ“Öß (‹) ´Öë ×¾Ö×­Ö¤ìü×¿ÖŸÖ ­µÖæ­ÖŸÖ´Ö
ÃÖӏµÖÖ ÃÖê ú´Ö ­ÖÆüà ÆüÖêÖß…
5.6.15 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆ¯Ö׸ü¯Ö׸ü³ÖÖ×ÂÖŸÖ ÃÖÓ¸üÖÖ ú´ÖÔ“ÖÖ׸üµÖÖë úÖê úÖ´Ö ¯Ö¸ü »ÖÖÖµÖÖ •ÖÖ­ÖÖ “ÖÖ×Æü‹, ‹êÃÖÖ ­Ö ú¸ü­Öê
¯Ö¸ü ×­ÖÖ´Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“ÖÔ ¾Ö •ÖÖê×Ö´Ö ¯Ö¸ü ‡­Ö ú´ÖÔ“ÖÖ׸üµÖÖë úß ²ÖÖÆü¸ü ÃÖê ×­ÖµÖãÛŒŸÖ ú¸êüÖÖ… ÃÖÓ¸üÖÖ
ú´ÖÔ“ÖÖ׸üµÖÖë úß ŸÖî­ÖÖŸÖß ­Ö ú¸ü­Öê êú úÖ¸üÖ ÆüÖê­Öê ¾ÖÖ»Öê Ö“ÖÔ úß ¾ÖÃÖæ»Öß êú ÃÖÖ£Ö-ÃÖÖ£Ö †­ÖãÃÖæ“Öß (‹) ´Öë
¯Ö׸ü³ÖÖ×ÂÖŸÖ ¯Öê­ÖÖ»™üß ³Öß ¾ÖÃÖæ»Ö úß •ÖÖ‹Öß…
25

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.6.16 The Contractor shall prepare industrial safety procedure for approval by
corporation and ensure the industrial safety requirements have been
established prior to execution of whole or part of work.
5.7 Contractor’s Supervision for compliance
5.7.1 The Contractor shall provide all necessary supervision to plan, arrange,
direct, manage, inspect and test the work for acceptance by Engineer-in-
charge throughout the execution of the Works, and as long thereafter as is
necessary to fulfill the Contractor’s obligations.
5.7.2 Supervision shall be done by a sufficient number of qualified persons
having adequate knowledge of the language for communications
(defined in Sub-Clause 1.3 [Law and Language]) and of the operations to
be carried out (including the methods and techniques required, the
hazards likely to be encountered and methods of preventing accidents),
for the satisfactory and safe execution of the Works.
5.8 Contractor’s Personnel
5.8.1 The Contractor shall employ the key personnel as per the Schedule of Key
Personnel as referred to at the time of submission of tender document to
carry out or supervise the functions stated in the Schedule or other
personnel approved by the Engineer-in-charge. If the Contractor himself
not have sufficient knowledge and experience to be capable of
receiving instructions or cannot give his full attention to the works, the
Contractor shall at his own expense, employ his accredited agent as
Site-in-charge approved by the Engineer-In-Charge. The Engineer-in-
charge shall have full powers to suspend execution of work in case of
violation of this clause and the contractor shall be held responsible for such
delay.
5.8.2 The Contractor’s Personnel shall be appropriately qualified, skilled and
experienced in their respective trades or occupations. The Engineer-in-
charge may require the Contractor to remove (or cause to be removed)
any person employed on the Site or Works, including the Contractor’s
Representative if applicable, who:
(a) persists in any misconduct or lack of care,
(b) carries out duties incompetently or negligently,
(c) fails to conform with any provisions of the Contract, or
(d) persists in any conduct which is prejudicial to safety, health, or the
protection of the environment.
The Contractor shall then appoint (or cause to be appointed) a suitable
replacement person.
5.9 Records of Contractor’s Personnel
5.9.1 The Contractor shall furnish to the Engineer-in-Charge, fortnightly, a
distribution return of the number and description by trades of the
workers employed on the works. Along with this return, the
Contractor shall also submit a statement of number of local people
employed, to the Engineer-in-charge.
26

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.6.16 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­ÖÖ´Ö ÃÖê †­Öã´ÖÖê¤ü­Ö ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ×»Ö‹ †ÖîªÖêא֍ú ÃÖÓ¸üÖÖ ¯ÖÏ׍ÎúµÖÖ ŸÖîµÖÖ¸ü ú¸ëüÖê †Öî¸ü
ÃÖÓ¯ÖæÖÔ úÖµÖÔ µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ úÖ úÖ´Ö ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê ÃÖê ¯ÖÆü»Öê †ÖîªÖêא֍ú ÃÖÓ¸üÖÖ ÃÖÓ²ÖÓ¬Öß
†Ö¾Ö¿µÖúŸÖÖ†Öë úß Ã£ÖÖ¯Ö­ÖÖ ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê…
5.7 †­Öã¯ÖÖ»Ö­Ö ÆêüŸÖã ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ¯ÖµÖÔ¾ÖêÖÖ
5.7.1 úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö úß ÃÖÓ¯ÖæÖÔ †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß Ã¾Öߍéú×ŸÖ ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ×»Ö‹
ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ úÖµÖÔ úß µÖÖê•Ö­ÖÖ, ¾µÖ¾ÖãÖÖ, ×­Ö¤ìü¿Ö­Ö, ¯ÖϲÖÓ¬Ö, ×­Ö¸üßÖÖ †Öî¸ü ¯Ö¸üßÖÖ †Öפü êú ×»Ö‹
†Ö¾Ö¿µÖú ¯ÖµÖÔ¾ÖêÖÖ ˆ¯Ö»Ö²¬Ö ú¸üÖµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ‡ÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ²ÖÖ¬µÖŸÖÖ êú ¯Öæ¸üÖ ÆüÖê­Öê ŸÖú •ÖÖ¸üß
¸üÖÖ •ÖÖ‹ÖÖ…
5.7.2 ¯ÖµÖÔ¾ÖêÖÖ ú¸ü­Öê êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ ÃÖӏµÖÖ ´Öë ‹êÃÖê µÖÖꐵ֟ÖÖ ¯ÖÏÖ¯ŸÖ ú´ÖÔ“ÖÖ׸üµÖÖë úÖê »ÖÖÖµÖÖ •ÖÖ‹ÖÖ ×•Ö­Æëü
úÖµÖÔ úÖê ÃÖÓŸÖÖêÂÖ¯ÖϤü ¾Ö ÃÖã¸ü×ÖŸÖ œÓüÖ ÃÖê ¯ÖæÖÔ ú¸ü­Öê êú ×»Ö‹ †Ö¾Ö¿µÖú ¾ÖÖŸÖÖÔ»ÖÖ¯Ö êú ×»Ö‹ ´ÖÖ‘µÖ´Ö ³ÖÖÂÖÖ
(ˆ¯Ö Ö›ü 1.3 (úÖ­Öæ­Ö †Öî¸ü ³ÖÖÂÖÖ) ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ ) †Öî¸ü ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê úÖµÖÔ (úÖµÖÔ ú¸ü­Öê êú ×»Ö‹
†Ö¾Ö¿µÖú ×¾Ö×¬Ö ¾Ö ŸÖú­Öߍú, úÖµÖÔ êú ¤üÖî¸üÖ­Ö †Ö­Öê ¾ÖÖ»Öê ÃÖÓ³ÖÖ×¾ÖŸÖ ÖŸÖ¸êü †Öî¸ü ¤ãü‘ÖÔ™ü­ÖÖ†Öë ÃÖê ²Ö“Ö­Öê êú
ŸÖ¸üߍêú ÃÖ×ÆüŸÖ ) †Öפü úß ¯ÖµÖÖÔ¯ŸÖ •Ö֭֍úÖ¸üß ÆüÖê…
5.8 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ¸üß
5.8.1 †­ÖãÃÖæ“Öß ´Öë פü‹ Ö‹ úÖµÖÖí úÖ ¯ÖµÖÔ¾ÖêÖÖ ú¸ü­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ «üÖ¸üÖ, ×­Ö×¾Ö¤üÖ úÖê •Ö´ÖÖ ú¸üŸÖê
ÃÖ´ÖµÖ ×­Ö×¾Ö¤üÖ ¤üßÖÖ¾Öê•Ö úß ¯ÖÏ´ÖãÖ-ú´ÖÔ“ÖÖ¸üß-†­ÖãÃÖæ“Öß ü´Öë ׍ú‹ Ö‹ ˆ»»ÖêÖ êú †­ÖãÃÖÖ¸ü ¯ÖÏ´ÖãÖ
ú´ÖÔ“ÖÖ׸üµÖÖë úß †£Ö¾ÖÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ †­µÖ ú´ÖÔ“ÖÖ׸üµÖÖë úÖê ×­ÖµÖÖê×•ÖŸÖ ×úµÖÖ
•ÖÖ‹ÖÖ… µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¯ÖÖÃÖ Ã¾ÖµÖÓ ×­Ö¤ìü¿ÖÖë úÖê ÃÖ´Ö—Ö­Öê µÖÖ úÖµÖÔ ¯Ö¸ü ¯Öæ¸üÖ ¬µÖÖ­Ö ¤êü ¯ÖÖ­Öê úß ¯ÖµÖÖÔ¯ŸÖ
Ö´ÖŸÖÖ êú ×»Ö‹ †Ö¾Ö¿µÖú –ÖÖ­Ö ¾Ö †­Öã³Ö¾Ö ­Ö ÆüÖê ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †¯Ö­Öê Ö“ÖÔ ¯Ö¸,ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
«üÖ¸üÖ †­Öã´ÖÖêפüŸÖ, ‹ú ¯ÖÏןÖ×­Ö×¬Ö úß úÖµÖÔÃ£Ö»Ö ¯ÖϳÖÖ¸üß êú ºþ¯Ö ´Öë ×­ÖµÖãÛŒŸÖ ú¸ü­Öß ÆüÖêÖß… ‡ÃÖ ¯ÖÏÖ¾Ö¬ÖÖ­Ö
úÖ ˆ»»ÖÓ‘Ö­Ö ÆüÖê­Öê ¯Ö¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê úÖµÖÔ×­Ö¯ÖÖ¤ü­Ö ×­Ö»ÖÓ×²ÖŸÖ ú¸ü­Öê úÖ ¯Öæ¸üÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ †Öî¸ü
‡Ã֍êú úÖ¸üÖ ÆüÖê­Öê ¾ÖÖ»Öê ×¾Ö»ÖÓ²Ö êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü וִ´Öê¤üÖ¸ü ÆüÖêÖÖ…
5.8.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ׸üµÖÖë úÖê ˆ­Öúß ™Òêü›ü µÖÖ ×­ÖµÖãŒŸÖ ×ú‹ Ö‹ úÖ´Ö êú ×»Ö‹ ˆ×“ÖŸÖ ºþ¯Ö ÃÖê µÖÖꐵ֟ÖÖ
¯ÖÏÖ¯ŸÖ, úÖµÖÔ-ãú¿Ö»Ö ¾Ö †­Öã³Ö¾Öß ÆüÖê­ÖÖ “ÖÖ×Æü‹… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ †Ö¾Ö¿µÖú ÆüÖê­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê,
×­ÖµÖÖê×•ÖŸÖ ×ú‹ Ö‹ ׍úÃÖß ú´ÖÔ“ÖÖ¸üß úÖê úÖµÖÔ-Ã£Ö»Ö µÖÖ úÖµÖÔ ÃÖê Æü™üÖ­Öê (µÖÖ Æü™üÖ­Öê úÖ ¯ÖϵÖÖê•Ö­Ö) êú ×»Ö‹
úÆü Ã֍úŸÖê Æïü… µÖפü »Ö֐Öæ ÆüÖê ŸÖÖê ‡ÃÖ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¾Öê ¯ÖÏןÖ×­Ö×¬Ö ³Öß ¿ÖÖ×´Ö»Ö ÆüÖëÖê •ÖÖê :
(‹) ׍úÃÖß ¯ÖύúÖ¸ü êú ú¤üÖ“ÖÖ¸ü ´Öë ¿ÖÖ×´Ö»Ö ÆüÖë µÖÖ •ÖÖê ÃÖÖ¾Ö¬ÖÖ­Öß ­Ö ²Ö¸üŸÖŸÖê ÆüÖë,
(²Öß) †¯Ö­Öê úÖµÖÖí úÖê †ãú¿Ö»ÖŸÖÖ µÖÖ »ÖÖ¯Ö¸ü¾ÖÖÆüß ÃÖê ú¸üŸÖê ÆüÖë
(ÃÖß) ÃÖÓ×¾Ö¤üÖ êú ׍ú­Æüß ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë êú †­ÖãÃÖÖ¸ü ˆ¯ÖµÖãŒŸÖ ­Ö ÆüÖë
(›üß) ÃÖÓ¸üÖÖ, þÖÖãµÖ µÖÖ ¯ÖµÖÖÔ¾Ö¸üÖ ÃÖÓ¸üÖÖ êú ×ÆüŸÖÖë êú ×¾Ö¯Ö¸üßŸÖ úÖê‡Ô †Ö“Ö¸üÖ ú¸üŸÖê ÆüÖë,
‹êÃÖß ÛãÖ×ŸÖ ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‹ú ˆ¯ÖµÖãŒŸÖ ¾ÖîúÛ»¯Öú ×­ÖµÖãÛŒŸÖ(×­ÖµÖãÛŒŸÖ ´Öë ÃÖÆüÖµÖŸÖÖ) ú¸ü­Öß ÆüÖêÖß… ú
5.9 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ׸üµÖÖë úÖ ×¸üúÖ›Ôü
5.9.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ úÖµÖÔ êú ×»Ö‹ †¯Ö­Öê µÖÆüÖÓ ×­ÖµÖÖê×•ÖŸÖ ú´ÖÔ“ÖÖ׸üµÖÖë úß ÃÖӏµÖÖ †Öî¸ †Ö²ÖÓ×™üŸÖ ü ™Òêü›ü
×¾Ö¾Ö¸üÖ ÃÖ×ÆüŸÖ ׸ü¯ÖÖê™Ôü úÖê ¯ÖÏŸµÖêú ¯ÖÖ¾ÖÖ›Íêü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ÃÖ´ÖÖ ¯ÖÏßÖãŸÖ ú¸êüÖÖ… ‡ÃÖ
׸ü¯ÖÖê™Ôü êú ÃÖÖ£Ö-ÃÖÖ£Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê µÖÆüÖÓ ×­ÖµÖÖê×•ÖŸÖ ×ú‹ Ö‹ ãÖÖ­ÖßµÖ ú´ÖÔ“ÖÖ׸üµÖÖë úß
ÃÖӏµÖÖ ³Öß ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ¯ÖÏßÖãŸÖ ú¸êüÖÖ…

26

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.9.2 The Contractor shall also submit on the 4th and 19th of every month to the
Engineer-in-charge a true statement showing in respect of the preceding
fortnight,
(i) the accidents that occurred during the said fortnight showing the
circumstances under which they happened and the extent of damage
and injury caused by them and
(ii) the number of female workers who have been allowed maternity benefit
as provided in the Maternity Benefit Act, 1961 or Rules made there under
and the amount paid to them.
5.9.3 The Contractor shall submit the compliance report in the format
appended.
5.10 Disorderly Conduct
5.10.1 The Contractor shall at all times take all reasonable precautions to prevent
any unlawful, riotous or disorderly conduct by or amongst the Contractor’s
Personnel, and to preserve peace and protection of persons and property
on and near the Site.
5.11 Foreign Personnel
5.11.1 The Contractor may depute in to the country any foreign personnel who
are necessary for the execution of the Works to the extent allowed by the
applicable Laws. The Contractor shall ensure that these personnel are
provided with the required residence visas and work permits. The
Corporation will, if requested by the Contractor, use its best endeavours
with regards to issuing of necessary letters in a timely and expeditious
manner to assist the Contractor in obtaining any local, state, national, or
government permission required for bringing in the Contractor’s personnel.
5.11.2 The foreign personnel shall have to comply with the security procedures of
the corporation.
5.11.3 The Contractor shall be responsible for the return of all such staff and
labour to the place from where they were recruited or to their domicile.
The Contractor shall be responsible till the time they have left the country.
5.12 Other Compliance
5.12.1 The Contractor shall fulfill and comply with all the requirements, if any,
notified by the government or municipal authorities or agencies so
authorized in this regard, in respect of supply of foodstuff, water and to
take measures against insect & pest nuisance. Failure, on the part of the
Contractor shall attract penalty in addition to the action as may be
initiated by the state government or municipal authorities or agencies so
authorized by the Government.
The Contractor shall not do anything or permit its employees or worker
deployed by him, at the site or office, which is specifically or generally
prohibited by law, rules or regulations framed by the central or state
government or Municipal authorities.
The rules and regulations framed by the government authorized agencies,
state or central government in regards to alcoholic liquor, Arms and
ammunitions and the labor legislation shall be followed /complied in its
letter & spirit, by the Contractor.
27

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.9.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ׯ֔û»Öê ¯ÖÖ¾ÖÖ›üÍê úß ×­Ö´­Ö×»Ö×ÖŸÖ ÃÖŸµÖ •Ö֭֍úÖ¸üß ³Öß Æü¸ü ´ÖÖÆü úß 4£Öß ¾Ö 19¾Öà ŸÖÖ¸üߏÖ
úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ÃÖ´ÖÖ ¯ÖÏßÖãŸÖ ú¸êüÖÖ:
(i) ˆŒŸÖ ¯ÖÖ¾ÖÖ›Íêü ´Öë ‘Ö×™üŸÖ Æã‡Ô ¤ãü‘ÖÔ™ü­ÖÖ†Öë וִ֭Öë ˆ­Ö ¯Ö׸üÛãÖןֵÖÖë úÖ ×¾Ö¾Ö¸üÖ ³Öß ×¤üµÖÖ •ÖÖ‹ ו֭֍êú
úÖ¸üÖ µÖÆü ¤ãü‘ÖÔ™ü­ÖÖ‹Ó Æãü‡Õ †Öî¸ü ‡­Öêú úÖ¸üÖ Æãü‹ ­ÖãúÃÖÖ­Ö ¾Ö “ÖÖê™ü †Öפü úÖ ×¾Ö¾Ö¸üÖ ŸÖ£ÖÖ
(ii) ˆ­Ö ´Ö×Æü»ÖÖ ú´ÖÔ“ÖÖ׸üµÖÖë úß ÃÖӏµÖÖ ×•Ö­Æëü ´ÖÖŸÖéŸ¾Ö »ÖÖ³Ö †×¬Ö×­ÖµÖ´Ö, 1961 µÖÖ ˆÃ֍êú †ÓŸÖÖÔŸÖ ²Ö­ÖÖ‹
Ö‹ ×­ÖµÖ´ÖÖë êú ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë êú †­ÖãÃÖÖ¸ü ´ÖÖŸÖéŸ¾Ö »ÖÖ³Ö ¯ÖϤüÖ­Ö ×úµÖÖ ÖµÖÖ †Öî¸ü ˆ­ÆêÓ ³ÖãÖŸÖÖ­Ö úß Ö‡Ô ãú»Ö
¬Ö­Ö¸üÖ׿օ
5.10 †­Öã¿ÖÖÃÖ­ÖÆüß­Ö †Ö“Ö¸üÖ
5.10.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔÃ£Ö»Ö ¾Ö ‡Ã֍êú †ÖÃÖ-¯ÖÖÃÖ †¯Ö­Öê ú´ÖÔ“ÖÖ׸üµÖÖë êú ²Öß“Ö ÆüÖê­Öê ¾ÖÖ»Öê ׍úÃÖß ³Öß Öî¸üúÖ­Öæ­Öß,
ˆÖϾÖÖ¤üß µÖÖ †­Öã¿ÖÖÃÖ­ÖÆüß­Ö †Ö“Ö¸üÖ úÖê ¸üÖêú­Öê †Öî¸ü ¿ÖÖÓ×ŸÖ ²Ö­ÖÖ‹ ¸üÖ­Öê ¾Ö •ÖÖ­Ö-´ÖÖ»Ö úß ¸üÖÖ êú
×»Ö‹ ÃÖ¤îü¾Ö Æü¸ü ÃÖÓ³Ö¾Ö ¯ÖϵÖÖÃÖ ú¸ëüÖê…
5.11 ×¾Ö¤êü¿Öß úÖٴ֍ú
5.11.1 ÃÖÓ×¾Ö¤ü֍úÖ¸, µÖפü úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ †Ö¾Ö¿µÖú ÆüÖê ŸÖÖê »Ö֐Öæ úÖ­Öæ­ÖÖë úß ÃÖß´ÖÖ ´Öë ׍úÃÖß
×¾Ö¤êü¿Öß ¾µÖÛŒŸÖ úÖê ¯ÖÏןÖ×­ÖµÖãŒŸÖ ú¸ü Ã֍úŸÖÖ Æîü… ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê µÖÆü ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­ÖÖ ÆüÖêÖÖ ×ú ‡­Ö
»ÖÖêÖÖêÓ êú ¯ÖÖÃÖ †Ö¾Ö¿µÖú ×­Ö¾ÖÖÃÖ ¾Öß•ÖÖ ¾Ö úÖµÖÔ ¯Ö¸ü×´Ö™ü ÆüÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ †­Öã¸üÖê¬Ö ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ¯Ö¸ü
×­ÖÖ´Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ׸üµÖÖë úÖê ¤êü¿Ö ´Öë »ÖÖ­Öê êú ×»Ö‹ †Ö¾Ö¿µÖú ãÖÖ­ÖßµÖ, ¸üÖ•µÖ, ¸üÖ™ÒüßµÖ µÖÖ
ÃÖ¸üúÖ¸üß †­Öã´Ö×ŸÖ ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ×»Ö‹ †Ö¾Ö¿µÖú ¯Ö¡Ö †Öפü ¿Öß‘ÖÐÖןֿÖß‘ÖÐ •ÖÖ¸üß ú¸ü­Öê úÖ ¯Öæ¸üÖ ¯ÖϵÖÖÃÖ
ú¸êüÖÖ…
5.11.2 ×¾Ö¤êü¿Öß ¾µÖÛŒŸÖµÖÖë úÖê ×­ÖÖ´Ö úß ÃÖã¸üÖÖ ¯ÖÏ׍ÎúµÖÖ úÖ ¯ÖÖ»Ö­Ö ú¸ü­ÖÖ ÆüÖêÖÖ…

5.11.3 ‹êÃÖê ÃÖ´ÖÃŸÖ Ã™üÖò±ú ¾Ö ´Ö•Ö¤æü¸üÖë úÖê ¾ÖÖ¯ÖÃÖ •ÖÆüÖÓ ÃÖê ¾ÖÆü †Ö‹ £Öê µÖÖ ˆ­Öêú ×­Ö¾ÖÖÃÖ ŸÖú ¯ÖÆãÓü“ÖÖ­ÖÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ×•Ö´´Öê¤üÖ¸üß ÆüÖêÖß… ˆ­Öêú ¤êü¿Ö ”ûÖê›Íü ú¸ü •ÖÖ­Öê ŸÖú ÃÖÓ×¾Ö¤ü֍úÖ¸ü וִ´Öê¤üÖ¸ü ¸üÆêüÖÖ…

5.12 †­µÖ †­Öã¯ÖÖ»Ö­Ö


5.12.1 ÖÖª ¯Ö¤üÖ£ÖÔ, •Ö»Ö úß †Ö¯ÖæÙŸÖ †Öî¸ü úß›Íêü-´ÖúÖê›ÍüÖë †Öפü ÃÖê ²Ö“ÖÖ¾Ö êú ×»Ö‹ ÃÖ¸üúÖ¸ü µÖÖ ­ÖÖ¸ü¯ÖÖ׻֍úÖ
¯ÖÏÖ׬֍úÖ׸üµÖÖë «üÖ¸üÖ ¯ÖÏÖ׬֍éúŸÖ ‹•Öë×ÃÖµÖÖë µÖÖ ¯ÖÏÖ׬֍úÖ׸üµÖÖë «üÖ¸üÖ µÖפü úÖê‡Ô †×¬ÖÃÖæ“Ö­ÖÖ •ÖÖ¸üß úß •ÖÖŸÖß Æîü ŸÖÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆ­Ö †Ö¾Ö¿µÖúŸÖÖ†Öë úÖê ¯Öæ¸üÖ ú¸êüÖÖ ¾Ö ˆÃ֍úÖ †­Öã¯ÖÖ»Ö­Ö ú¸êüÖÖ… ‹êÃÖÖ ­Ö ú¸ü ¯ÖÖ­Öê úß
ÛãÖ×ŸÖ ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯Ö¸ ü¯Öê­ÖÖ»™üß »ÖÖÖ‡Ô •ÖÖ Ã֍úŸÖß Æîü †Öî¸ü ÃÖ¸üúÖ¸ü µÖÖ ­ÖÖ¸ü ¯ÖÖ׻֍úÖ «üÖ¸üÖ µÖÖ ÃÖ¸üúÖ¸ü
«üÖ¸üÖ ¯ÖÏÖ׬֍éúŸÖ ‹•ÖëÃÖß «üÖ¸üÖ ˆÃ֍êú ×¾Ö¹ý¨ü úÖ¸Ôü¾ÖÖ‡Ô úß •ÖÖ Ã֍úŸÖß Æîü…

ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔÃ£Ö»Ö ¯Ö¸ü †£Ö¾ÖÖ †¯Ö­Öê úÖµÖÖÔ»ÖµÖ ´Öë ×¾Ö¿ÖêÂÖ ºþ¯Ö ÃÖê µÖÖ ÃÖÖ´ÖÖ­µÖ ºþ¯Ö ÃÖê ëú¦ü µÖÖ ¸üÖ•µÖ
ÃÖ¸üúÖ¸ü µÖÖ ­ÖÖ¸ü¯ÖÖ׻֍úÖ ¯ÖÏÖ׬֍úÖ׸üµÖÖë «üÖ¸üÖ ²Ö­ÖÖ‹ Ö‹ úÖ­Öæ­Ö, ×­ÖµÖ´ÖÖë µÖÖ ×¾Ö×­ÖµÖ´ÖÖë êú †ÓŸÖÖÔŸÖ ×­Ö×ÂÖ¨ü
׍ú‹ Ö‹ ׍úÃÖß úÖµÖÔ úÖê ­Ö ŸÖÖê þֵÖÓ ú¸ëüÖê †Öî¸ü ­Ö Æüß ‡ÃÖ úÖµÖÔ êú ×»Ö‹ »ÖÖÖ‹ Ö‹ †¯Ö­Öê ú´ÖÔ“ÖÖ׸üµÖÖë
µÖÖ úִ֐ÖÖ¸üÖë úÖê ‹êÃÖÖ úÖê‡Ô úÖµÖÔ ú¸ü­Öê úß †­Öã´Ö×ŸÖ ¤ëüÖê…

ÃÖÓ×¾Ö¤ü֍úÖ¸ü, ÃÖ¸üúÖ¸ü «üÖ¸üÖ ¯ÖÏÖ׬֍éúŸÖ ‹•Öë×ÃÖµÖÖë, ¸üÖ•µÖ µÖÖ ëú¦ü ÃÖ¸üúÖ¸ «üÖ¸üÖ ü¿Ö¸üÖ²Ö, †Ã¡Ö-¿ÖÃ¡Ö †Öî¸ü
ÁÖ´Ö úÖ­Öæ­Ö úÖ ¯ÖæÖÔºþ¯ÖêÖ ¯ÖÖ»Ö­Ö ú¸ëüÖê…
27

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.13 House Keeping
5.13.1 The contractor shall maintain the cleanliness of the work site and labour
colony on a day to day basis. Failing to maintain cleanliness of work place,
Engineer-in-charge will have full power to maintain the cleanliness at the
risk and cost of the contractor.
6 PLANT, MATERIALS AND QUALITY ASSURANCE
6.1 Tools, Plants & Equipments
6.1.1 The Contractor shall arrange at his own expense all tools, plant and
equipment (hereinafter referred to as T&P) required for execution of the
work, except the item listed in Schedule (C) which may be given to him on
hire(if the same can be spared) by the Corporation at rates shown in that
Schedule. In case the Contractor require some or all items of T&P listed
in Schedule (C), he shall indicate his requirements at the time of
submitting his tender. The Corporation's T&P hired by the Contractor shall
be transported at his expense from the place of issue to the Site and back.
6.1.2 If the Contractor requires any item of T&P on hire from the Corporation over
and above the requirements indicated by him at the time of submitting his
tender, the Corporation will, if such item is available, hire it to the
Contractor at a rate to be fixed by the Engineer- in-Charge.
6.1.3 When T&P is hired on daily rates, the period of hire will be reckoned from
the commencement of the day of issue upto the end of the day of return
(including all holidays) irrespective of the actual hour of issue and return.
Daily hire charges will be based on eight working hours or part thereof
per day and for any additional use of T&P at rates fixed for the
purpose. The Contractor will be exempted from levy of any charges for the
number of days he is called upon in writing by the Engineer-in-charge to
suspend execution of the work, provided the Corporation's T&P in question
has, in fact remained idle with the Contractor due to suspension.
6.1.4 The Contractor shall be responsible for care and custody of the
Corporation's T&P (including employment of security guards) during the
period for which the Corporation’s T&P remains with him. Any damage (fair
wear and tear excepted) to any of the equipments shall be made good
at the Contractor's expense to the satisfaction of the Engineer-in-
Charge unless such damage is caused because of negligence of crew
provided by the Corporation. The Contractor responsibility shall exclude
any damage due to Excepted Risks, provided always that the
Contractor has taken precautions necessary to protect it from such
risks.
6.1.5 The Corporation's T&P hired to the Contractor shall be returned to the
place of issue (unless otherwise directed by the Engineer-in-charge) on
completion /termination of the work or relevant section of the work. The
Corporation shall be entitled to terminate the hire after giving 7 days
notice without assigning any reason whatsoever and the Contractor shall
have no claim to any payment of compensation or otherwise
whatsoever on account of termination of hire of the Corporation's T&P
by the Corporation.

28

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
5.13 ÖéÆü ÃÖ••ÖÖ
5.13.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔÃ£Ö»Ö ¾Ö ´Ö•Ö¤æü¸üÖë úß úÖò»ÖÖê­Öß úß ¤îü׭֍ú ÃÖÖ±ú-ÃÖ±úÖ‡Ô ú¸ü¾Ö֋ӐÖê… úÖµÖÔÃ£Ö»Ö úß ÃÖÖ±ú-
ÃÖ±úÖ‡Ô ­Ö ¸üÖ­Öê ¯Ö¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú •ÖÖê×Ö´Ö ¾Ö Ö“ÖÔ ¯Ö¸ü ÃÖÖ±ú-ÃÖ±úÖ‡Ô ú¸ü¾ÖÖ­Öê úÖ
¯ÖæÖÔ †×¬ÖúÖ¸ü ÆüÖêÖÖ…
6. ÃÖÓµÖÓ¡Ö, ÃÖִ֐ÖÏß †Öî¸ü ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö
6.1 †Öî•ÖÖ¸,ü ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ
6.1.1úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖ´ÖÃŸÖ †Öî•ÖÖ¸üÖ,ë ÃÖÓµÖÓ¡ÖÖë ¾Ö ˆ¯Öú¸üÖÖë (ו֭Æëü ‡Ã֍êú ²ÖÖ¤ü ™üß ‹›ü ¯Öß
úÆüÖ ÖµÖÖ Æîü) úß ¾µÖ¾ÖãÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê þֵÖÓ †Öî¸ü †¯Ö­Öê Ö“ÖÔ ¯Ö¸ü ú¸ü­Öß ÆüÖêÖß… ×­ÖÖ´Ö «üÖ¸üÖ †­ÖãÃÖæ“Öß
(ÃÖß) ´Öë †­ÖãÃÖæ×“ÖŸÖ ™üß ‹›ü ¯Öß úÖê ˆ­Æëü ‡ÃÖ †­ÖãÃÖæ“Öß ´Öë ¾ÖÙÖŸÖ ¤ü¸üÖë ¯Ö¸ü ׍ú¸üÖ‹ ¯Ö¸ü ˆ¯Ö»Ö²¬Ö ú¸üÖµÖÖ •ÖÖ
Ã֍úŸÖÖ (²Ö¿ÖŸÖì ׍ú µÖê ÖÖ»Öß ÆüÖ)ë Æîü… µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †­ÖãÃÖæ“Öß (ÃÖß) ´Öë †­ÖãÃÖæ×“ÖŸÖ ™üß‹›ü¯Öß ´Öë ÃÖê ãú”û
ÃÖÖ´ÖÖ­Ö µÖÖ ÃÖ³Öß ÃÖÖ´ÖÖ­Ö úß †Ö¾Ö¿µÖúŸÖÖ Æîü ŸÖÖê ˆ­Æëü †¯Ö­Öß †Ö¾Ö¿µÖúŸÖÖ†Öë úÖê ×­Ö×¾Ö¤üÖ •Ö´ÖÖ ú¸üŸÖê ÃÖ´ÖµÖ
¤ü¿ÖÖÔ­ÖÖ ÆüÖêÖÖ1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×ú¸üÖ‹ ¯Ö¸ü »Öß Ö‡Ô ×­ÖÖ´Ö úß ™üß ‹›ü ¯Öß úÖê •ÖÖ¸üß ú¸ü­Öê êú ãÖÖ­Ö ÃÖê »Öêú¸ü
úÖµÖÔÃ£Ö»Ö ŸÖú »Öê •ÖÖ­Öê †Öî¸ü úÖµÖÔÃ£Ö»Ö ÃÖê ¾ÖÖ¯ÖÃÖ »ÖÖ­Öê êú ×»Ö‹ ¯Ö׸ü¾ÖÆü­Ö úß ¾µÖ¾ÖãÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê
†¯Ö­Öê Ö“ÖÔ ¯Ö¸ü ú¸ü­Öß ÆüÖêÖß…
6.1.2µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öß ×­Ö×¾Ö¤üÖ ´Öë ¤ü¿ÖÖÔ‹ Ö‡Ô ™üß ‹›ü ¯Öß êú †×ŸÖ׸üŒŸÖ úÖê‡Ô †­µÖ ÃÖÖ´ÖÖ­Ö ×­ÖÖ´Ö ÃÖê ׍ú¸üÖ‹
¯Ö¸ü »Öê­ÖÖ “ÖÖÆüŸÖÖ Æîü †Öî¸ü µÖפü ¾ÖÆü ÃÖÖ´ÖÖ­Ö ˆ¯Ö»Ö²¬Ö Æîü ŸÖÖê ×­ÖÖ´Ö ‡ÃÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ŸÖµÖ úß Ö‡Ô ¤ü¸üÖë
¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍ú¸üÖ‹ ¯Ö¸ü ¤êüÖÖ…
6.1.3•ÖÆüÖÓ ¯Ö¸ü ™üß ‹›ü ¯Öß úÖê ¤îü׭֍ú †Ö¬ÖÖ¸ü ¯Ö¸ü ׍ú¸üÖ‹ ¯Ö¸ü פüµÖÖ •ÖÖŸÖÖ Æîü ¾ÖÆüÖÓ ×ú¸üÖ‹ úÖ ÃÖ´ÖµÖ •ÖÖ¸üß ×ú‹ •ÖÖ­Öê
¾ÖÖ»Öê פü­Ö ÃÖê »Öêú¸ü ¾ÖÖ¯ÖÃÖß ¾ÖÖ»Öê פü­Ö ŸÖú (ÃÖ³Öß ”ãû×¼üµÖÖë ÃÖ×ÆüŸÖ) •ÖÖê›ÍüÖ •ÖÖ‹ÖÖ †Öî¸ü µÖÆü ¾ÖÖßÖ׾֍ú ºþ¯Ö ÃÖê
ÃÖÖ´ÖÖ­Ö •ÖÖ¸üß ú¸ü­Öê µÖÖ ¾ÖÖ¯ÖÃÖ ú¸ü­Öê êú ÃÖ´ÖµÖ êú †Ö¬ÖÖ¸ü ¯Ö¸ü ­ÖÆüà ÆüÖêÖÖ… ¤îü׭֍ú ׍ú¸üÖ‹ úÖ ¿Ö㻍ú ‹ú פü­Ö
êú †Öšü úÖµÖÔ ‘ÖÓ™êü µÖÖ ¯ÖÏןÖפü­Ö ˆÃ֍êú ׍úÃÖß ³ÖÖÖ êú †Ö¬ÖÖ¸ü ¯Ö¸ü ÆüÖêÖÖ †Öî¸ü ™üß ‹›ü ¯Öß êú ‡ÃÖ †¾Ö×¬Ö êú
²ÖÖ¤ü êú ˆ¯ÖµÖÖêÖ úÖ ¿Ö㻍ú ˆÃ֍êú ×»Ö‹ ŸÖµÖ úß Ö‡Ô ¤ü¸üÖë êú †Ö¬ÖÖ¸ü ¯Ö¸ü ×­ÖÛ¿“ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ… •Ö²Ö ú³Öß
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×»Ö×ÖŸÖ ºþ¯Ö ÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö ²ÖÓ¤ü ú¸ü­Öê êú ×»Ö‹ úÆüÖ •ÖÖŸÖÖ Æîü ŸÖ²Ö
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ˆŸÖ­Öê פü­ÖÖë êú ׍ú¸üÖµÖÖ ¿Ö㻍ú ÃÖê ”æû™ü ¤üß •ÖÖ‹Öß ¾Ö¿ÖŸÖì ׍ú ‹êÃÖê ×­Ö»ÖÓ²Ö­Ö êú úÖ¸üÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤üß Ö‡Ô ×­ÖÖ´Ö úß ¾ÖÆü ™üß ‹›ü ¯Öß ¾ÖÖÃŸÖ¾Ö ´Öë úÖ´Ö ´Öë ­Ö »Öß Ö‡Ô ÆüÖê…
6.1.4•Ö²Ö ŸÖú ×­ÖÖ´Ö úß ™üß ‹›ü ¯Öß ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¯ÖÖÃÖ ¸üÆüŸÖß Æîü ŸÖ²Ö ŸÖú ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆÃ֍úß ÃÖã¸üÖÖ ¾Ö
¤êüÖ³ÖÖ»Ö (ÃÖã¸üÖÖ ÖÖ›üÖí úß ×­ÖµÖãÛŒŸÖ ÃÖ×ÆüŸÖ) êú ×»Ö‹ וִ´Öê¤üÖ¸ü ÆüÖêÖÖ… ׍úÃÖß ³Öß ˆ¯Öú¸üÖ úÖê ÆüÖê­Öê ¾ÖÖ»Öß
׍úÃÖß ³Öß ¯ÖύúÖ¸ü úß Ö×ŸÖ (ÃÖÖ´ÖÖ­µÖ בÖÃÖÖ¾Ö™ü †Öפü úÖê ”ûÖê›Íüú¸ü), ×ÃÖ¾ÖÖ‹ ŸÖ²Ö •Ö²Ö ׍ú ‹êÃÖß Ö×ŸÖ ×­ÖÖ´Ö
«üÖ¸üÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ Ö‹ ˆÃÖ ˆ¯Öú¸üÖ êú ú´Öá úß »ÖÖ¯Ö¸ü¾ÖÖÆüß êú úÖ¸üÖ ÆüÖê, úÖê ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß
ÃÖÓŸÖãÛ™ü êú ßָü ŸÖú ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê Ö“ÖÔ ¯Ö¸ šüߍú ú¸üÖ‹ÖÖ… µÖפü úÖê‡Ô Ö×ŸÖ ÃÖÓ³ÖÖ¾µÖ •ÖÖê×Ö´Ö êú úÖ¸üÖ
ÆüÖêŸÖß Æîü †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆÃÖ •ÖÖê×Ö´Ö ÃÖê ²Ö“Ö­Öê êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖÖ¾Ö¬ÖÖ×­ÖµÖÖÓ ²Ö¸üŸÖŸÖÖ Æîü ŸÖÖê µÖÆü ÖןÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ×•Ö´´Öê¤üÖ¸üß ´Öë ­ÖÆüà †Ö‹Öß…
6.1.5úÖµÖÔ µÖÖ úÖµÖÔ êú ÃÖÓ²ÖÓ×¬ÖŸÖ ³ÖÖÖ êú ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê/ ×­Ö¸üÃŸÖ ×ú‹ •ÖÖ­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍ú¸üÖ‹ ¯Ö¸ü ¤üß Ö‡Ô
×­ÖÖ´Ö úß ™üß ‹›ü ¯Öß úÖê •ÖÖ¸üß ×ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ãÖÖ­Ö ¯Ö¸ü Æüß ¾ÖÖ¯ÖÃÖ (•Ö²Ö ŸÖú ׍ú ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ
†­µÖ£ÖÖ ×­Ö¤êü¿Ö ­Ö פü‹ •ÖÖ‹Ó) ׍úµÖÖ •ÖÖ‹ÖÖ… ×­ÖÖ´Ö úÖê ‡ÃÖ ×ú¸üÖ‹ úê ¯ÖÏßÖÖ¾Ö úÖê 7 פü­ÖÖë úÖ ­ÖÖê×™üÃÖ ¤êü
ú¸,ü ²ÖÖî¸ü úÖê‡Ô úÖ¸üÖ ²ÖŸÖÖ‹ ×­Ö¸üÃŸÖ ú¸ü­Öê úÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ †Öî¸ü ×­ÖÖ´Ö «üÖ¸üÖ ×­ÖÖ´Ö úß ™üß ‹›ü ¯Öß úÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍ú¸üÖ‹ ¯Ö¸ü פüµÖÖ •ÖÖ­ÖÖ ×­Ö¸üÃŸÖ ú¸ü­Öê êú úÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ׍úÃÖß ¯ÖύúÖ¸ü úß Öן֯ÖæÙŸÖ µÖÖ
†­µÖ£ÖÖ ˆÃ֍êú úÖ¸üÖ ׍úÃÖß ¯ÖύúÖ¸ü úÖ Öן֯ÖæÙŸÖ ³ÖãÖŸÖÖ­Ö úÖ ¤üÖ¾ÖÖ ú¸ü­Öê úÖ †×¬ÖúÖ¸ßü ­ÖÆüà ÆüÖêÖÖ…
28

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6.1.6When the T&P is hired on hourly rates, a Log Book shall be maintained by
the Engineer-in-charge or any representative of the Engineer- in-Charge, for
recording hours during which the items have been utilized for each day.
The log book shall be daily attested by the Contractor or his
authorized representative. In case the Contractor contests correctness of
any entry and/or fails to sign the Log Book, the decision of the Engineer-in-
Charge shall be final and binding on him. Hire charges shall be calculated
in accordance with the entries in the Log Book. Hourly rate specified shall be
charged for every hour or part thereof.
6.1.7The hire charges (along with the taxes as applicable) payable by the
Contractor shall be recovered from the Contractor's running account / final
bills.
6.1.8If the Corporation / other Contractors hire T&P from the Contractor, a
reasonable rate as mutually agreed between the Contractor and the
Engineer-in-charge shall be payable.
6.2 Workmanship
6.2.1The Contractor shall execute the whole and every part of the work in the
most substantial and workman like manner both as regards materials and
otherwise in every respect in strict accordance with the specifications. The
Contractor shall also confirm compliance to the design, drawings and
instructions in writing in respect of the work to the Engineer-in-Charge for his
acceptance.
6.2.2The works to be carried out under the Contract shall, except as otherwise
provided in these conditions, include all labour, materials, tools, plant and
equipment, and transport, which may be required in execution and
completion of the works. The descriptions given in the Schedule of Quantities
shall, unless otherwise stated, be held to include waste on materials,
carriage and cartage, carrying in return of empties, hoisting, setting, fitting
and fixing in position and all other labour necessary in and for the full and
entire execution and completion as aforesaid in accordance with good
engineering practice and recognized principles.
6.2.3In the case of any class of work for which there is no such specifications as
referred to above, such work shall be carried out in accordance with Bureau
of Indian Standards Specifications. In case there is no such specification in
Bureau of Indian Standards, the work shall be carried out as per ASTM/ BS or
manufacturers' specifications. In case there are no such specifications as
referred to the above the work shall be carried out in all respects in
accordance with the instructions and requirements of the Engineer-in-
Charge.
6.2.4The furnishing of engineering data by the Contractor shall be in accordance
with the Schedule as specified in the technical specifications. The review of
engineering data by the Engineer-in-charge shall not limit the Contractor
towards any of his responsibilities and liabilities for mistakes and deviations, if
any, from the requirements specified under these specifications and
documents.
29

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6.1.6 •Ö²Ö ú³Öß ™üß ‹›ü ¯Öß úÖê ‘ÖÓ™üÖë êú †Ö¬ÖÖ¸ü ¯Ö¸ü ׍ú¸üÖ‹ ¯Ö¸ü פüµÖÖ •ÖÖ‹, ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ µÖÖ
ˆÃ֍êú ׍úÃÖß ¯ÖÏןÖ×­Ö×¬Ö «üÖ¸üÖ ‹ú »ÖÖòÖ ²Öãú ´Öë ˆÃÖ ÃÖÖ´ÖÖ­Ö êú ¯ÖÏןÖפü­Ö ¯ÖϵÖÖêÖ êú ‘ÖÓ™üÖë úÖê ¤ü•ÖÔ
׍úµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖ »ÖÖòÖ ²Öãú úÖê ¯ÖÏןÖפü­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖÖ ˆÃ֍êú †×¬ÖéúŸÖ ¯ÖÏןÖ×­Ö×¬Ö «üÖ¸üÖ
ÃÖŸµÖÖ×¯ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ… µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ »ÖÖòÖ²Öãú ´Öë úß Ö‡Ô ׍úÃÖß ¯ÖÏ×¾ÖÛ™ü úß ÃÖŸµÖŸÖÖ
¯Ö¸ü ¯ÖÏ¿­Ö ˆšüÖŸÖÖ Æîü µÖÖ »ÖÖòÖ ²Öãú ¯Ö¸ü ÆüßÖցָü ­ÖÆüà ú¸üŸÖÖ Æîü ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×»ÖµÖÖ
ÖµÖÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ¾Ö ˆÃÖ ¯Ö¸ü ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ… ׍ú¸üÖ‹ êú ¿Ö㻍ú úÖ †Öú»Ö­Ö »ÖÖòÖ ²Öãú ´Öë
¤ü•ÖÔ ¯ÖÏ×¾ÖÛ™üµÖÖë êú †Ö¬ÖÖ¸ü ¯Ö¸ü ׍úµÖÖ •ÖÖ‹ÖÖ… ×¾Ö×­ÖÙ¤ü™ü úß Ö‡Ô ¯ÖÏ×ŸÖ ‘ÖÓ™üÖ ¤ü¸ü úÖê ¯ÖÏŸµÖêú ‘ÖÓ™êü
µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ êú ×»Ö‹ »ÖÖÖµÖÖ •ÖÖ‹ÖÖ…
6.1.7 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¤êüµÖ ׍ú¸üÖµÖÖ ¯ÖϳÖÖ¸ü úÖê (ÃÖ´ÖÃŸÖ »Ö֐Öæ ú¸üÖë ÃÖ×ÆüŸÖ) ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú “ÖÖ»Öæ
ÖÖŸÖê/†Ó×ŸÖ´Ö ×²Ö»Ö ÃÖê ¾ÖÃÖæ»Ö ׍úµÖÖ •ÖÖ‹ÖÖ…
6.1.8 µÖפü ×­ÖÖ´Ö µÖÖ †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë «üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê ™üß ‹›ü ¯Öß úÖê ׍ú¸üÖ‹ ¯Ö¸ü ×»ÖµÖÖ •ÖÖŸÖÖ
Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¾Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †Ö¯ÖÃÖß ×¾Ö“ÖÖ¸ü-×¾Ö´Ö¿ÖÔ ÃÖê ŸÖµÖ úß Ö‡Ô ŸÖÖٍúú ¤ü¸ü
¤êüµÖ ÆüÖêÖß…
6.2 úÖµÖԍãú¿Ö»ÖŸÖÖ
6.2.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÓ¯ÖæÖ úÖµÖÔ †Öî¸ü úÖµÖÔ êú ¯ÖÏŸµÖêú ³ÖÖÖ úÖê “ÖÖÆêü ¾ÖÆü ÃÖִ֐ÖÏß ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ÆüÖê †£Ö¾ÖÖ
¯ÖÏŸµÖêú ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö×­Ö¤ìü¿ÖÖë ÃÖê, úÖ Ã֏ŸÖß ÃÖê ¯ÖÖ»Ö­Ö ú¸üŸÖê Æãü‹ ‡Â™üŸÖ´Ö ¾Ö ¯Öæ¸üß ãú¿Ö»ÖŸÖÖ êú
ÃÖÖ£Ö ú¸ëüÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü †×³Öú»¯Ö, ¸êüÖÖ×“Ö¡Ö †Öî¸ü úÖµÖÔ êú ÃÖÓ²ÖÓ¬Ö ´Öë פü‹ Ö‹ ×»Ö׏֟Ö
†­Öã¤êü¿ÖÖë úÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß Ã¾Öߍéú×ŸÖ êú ßָü ŸÖú †­Öã¯ÖÖ»Ö­Ö ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê…
6.2.2 •Ö²Ö ŸÖú ‡­Ö ¿ÖŸÖÖì ´Öë †­µÖ£ÖÖ ¾ÖÙÖŸÖ ­Ö ÆüÖê, ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ ×ú‹ •ÖÖ­Öê ¾ÖÖ»Öê úÖµÖÔ ´Öë
úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö †Öî¸ü ¯ÖæÖÔŸÖÖ êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖ³Öß ´Ö•Ö¤æü¸ü, ÃÖִ֐ÖÏß, †Öî•ÖÖ¸ü, ÃÖÓµÖÓ¡Ö †Öî¸ü
ˆ¯Öú¸üÖ, ŸÖ£ÖÖ ¯Ö׸ü¾ÖÆü­Ö ¿ÖÖ×´Ö»Ö Æïü… •Ö²Ö ŸÖú †­µÖ£ÖÖ ¾ÖÙÖŸÖ ­Ö ÆüÖ,ê ´ÖÖ¡ÖÖ †­ÖãÃÖæ“Öß ´Öë פü‹
Ö‹ ×¾Ö¾Ö¸üÖ ´Öë, ÃÖִ֐ÖÏß úÖ ú“Ö¸üÖ, îú׸ü•Ö ‹¾ÖÓ úÖÙ™ü•Ö, ÖÖ»Öß ›ü²²ÖÖë úÖê Æü™üÖ­ÖÖ, ‰ú¯Ö¸ü
ˆšüÖ­ÖÖ, »ÖÖÖ­ÖÖ, ×±úŒÃÖ ú¸ü­ÖÖ †Öî¸ü †­µÖ ÃÖ³Öß ¯ÖύúÖ¸ü êú úÖµÖÔ •ÖÖê ׍ú ˆ¯Ö¸üÖêŒŸÖ úÖµÖÔ úÖê
²ÖêÆüŸÖ¸üß­Ö ‡Ó•Öß­ÖµÖ¸üß ú»ÖÖ †Öî¸ü ´ÖÖ­µÖ ×ÃÖ¨üÖÓŸÖÖë êú †­ÖãÃÖÖ¸ü Æü¸ü ¯ÖύúÖ¸ü ÃÖê ¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹
†Ö¾Ö¿µÖú ÆüÖ,ë ¿ÖÖ×´Ö»Ö Æïü…
6.2.3 µÖפü úÖµÖÔ úß ×úÃÖß ÁÖêÖß êú ×»Ö‹ ˆ¯ÖµÖãÔŒŸÖ úß ŸÖ¸üÆü úÖê‡Ô ×¾Ö×­Ö¤ìü¿Ö ˆ¯Ö»Ö²¬Ö ­ÖÆüà Æïü ŸÖÖê ˆÃÖ
úÖµÖÔ úÖê ³ÖÖ¸üŸÖßµÖ ´Ö֭֍ú ²µÖæ¸üÖê êú ×¾Ö×­Ö¤ìü¿ÖÖ­ÖãÃÖÖ¸ü ¯Öæ¸üÖ ×úµÖÖ •ÖÖ‹ÖÖ… µÖפü ³ÖÖ¸üŸÖßµÖ ´Ö֭֍ú
²µÖæ¸üÖë êú ×¾Ö×­Ö¤ìü¿Ö ­Ö ÆüÖë ŸÖÖê ˆÃÖ úÖµÖÔ úÖê ‹‹ÃÖ™üß‹´Ö/´Ö֭֍ú ²µÖæ¸üÖê µÖÖ ×­Ö´ÖÖÔŸÖÖ êú ×¾Ö×­Ö¤ìü¿ÖÖë êú
†­ÖãÃÖÖ¸ü ׍úµÖÖ •ÖÖ‹ÖÖ… µÖפü ˆ¯ÖµÖãÔŒŸÖ ´Öë ÃÖê úÖê‡Ô ³Öß ×¾Ö×­Ö¤ìü¿Ö ˆ¯Ö»Ö²¬Ö ­Ö ÆüÖë ŸÖÖê ˆÃÖ úÖµÖÔ úÖê
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ×­Ö¤ìü¿ÖÖë ¾Ö †Ö¾Ö¿µÖúŸÖÖ êú †­ÖãÃÖÖ¸ü ¯Öæ¸üÖ ×úµÖÖ •ÖÖ‹ÖÖ…
6.2.4 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖÏßÖãŸÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê †×³ÖµÖÖÓס֍úß †ÖӍú›Íêü ŸÖú­Öߍúß ×¾Ö×­Ö¤ìü¿ÖÖë ´Öë
×¾Ö×­Ö¤ìü×¿ÖŸÖ †­ÖãÃÖæ“Öß êú †­Öãºþ¯Ö ÆüÖê­Öê “ÖÖ×Æü‹…†×³ÖµÖÖÓס֍ú †ÖӍú›ÍüÖë úß ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ
úß Ö‡Ô ÃÖ´Ö߁ÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‡­Ö ×¾Ö×­Ö¤ìü¿ÖÖë ¾Ö ¤üßÖÖ¾Öê•ÖÖë ´Öë ¾µÖŒŸÖ úß Ö‡Ô †Ö¾Ö¿µÖúŸÖÖ†Öë
´Öë µÖפü ׍úÃÖß ¯ÖύúÖ¸ü úß ³Öæ»Ö µÖÖ ×¾Ö“Ö»Ö­Ö Æãü†Ö ÆüÖê ŸÖÖê, ˆ­Öêú ¯ÖÏ×ŸÖ ˆÃ֍úß ×úÃÖß ³Öß
וִ´Öê¤üÖ׸üµÖÖë ¾Ö ²ÖÖ¬µÖŸÖÖ†Öë úÖê ú´Ö ­ÖÆüà ú¸üŸÖß Æîü…

29

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6.2.5 The Contractor shall carry out the manufacture of Plant, the production
and manufacture of Materials, and all other execution of the Works:
(a) In the manner (if any) specified in the Contract,
(b) In a proper workmanlike and careful manner, in accordance with
recognized good practices, and
(c) With properly equipped facilities.
6.3 Quality Assurance
6.3.1 To ensure that the construction/fabrication and erection of works under
the scope of this Contract whether executed within the Contractor's
works or at any other place of work are in accordance with the
specifications, the Contractor shall adopt suitable quality assurance
program commensurate with NPCIL QA program to control such
activities at all stages necessary. Such program shall be outlined by the
Contractor in a QA Manual and shall be finally accepted by the Engineer-
in-Charge after discussions before commencement of work. A quality
assurance program of the Contractor shall generally cover but not limited
to the following:
(a) His organisation structure for the management and implementation of the
proposed quality assurance program including interfaces.
(b) Documentation control system.
(c) Qualification and certification data for Contractor's key personnel.
(d) The procedure for purchase of materials, parts, components and selection
of Sub-Contractors' services including vendor selection, source inspection,
incoming raw material inspection, verification of materials purchased etc.
(e) System for construction / fabrication and site erection controls through QA
plans.
(f) Control of non-conforming items and system for corrective and preventive
actions.
(g) Inspection and test procedures both for construction and erection.
(h) Control of calibration and testing of inspection measuring and testing
equipment.
(i) System of indication and appraisal of inspection status.
(j) System of quality audits
(k) System of intimation by the Contractor and approval by the Engineer-in-
Charge of stages of inspection.
(l) System for maintenance of records.
(m) System for handling, storage, preservation and delivery of items
(n) A quality assurance plan detailing out the specific quality control
procedure to be adopted for controlling the quality characteristics
relevant to each item of work.
The Contractor shall deploy personnel as per QA Structure defined in special
conditions of contract, failing which the Corporation shall outsource or
deploy such person at the cost and risk of the Contractor.

30

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6.2.5 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÓµÖÓ¡Ö úÖ ×­Ö´ÖÖԝÖ, ˆŸ¯ÖÖ¤ü­Ö †Öî¸ü ÃÖִ֐ÖÏß úÖ ×­Ö´ÖÖÔÖ ŸÖ£ÖÖ †­µÖ úÖµÖÖí úÖ
×­Ö¯ÖÖ¤ü­Ö :
(‹) ÃÖÓ×¾Ö¤üÖ ´Öë ¾ÖÙÖŸÖ ¸üß×ŸÖ (µÖפü úÖê‡Ô ÆüÖê) ÃÖê ú¸ëüÖê…
(²Öß) ´ÖÖ­µÖ ²ÖêÆüŸÖ¸ü ×¾Ö×¬Ö ÃÖê ¯Öæ¸üß ãú¿Ö»ÖŸÖÖ ¾Ö ÃÖÖ¾Ö¬ÖÖ­Öß ¯Öæ¾Öԍú †Öî¸ü
(ÃÖß) ˆ×“ÖŸÖ ˆ¯Öú¸üÖÖë úß ÃÖÆüÖµÖŸÖÖ ÃÖê ú¸ëüÖê…
6.3 ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö
6.3.1 ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú úÖµÖԁÖê¡Ö êú †ÓŸÖÖÔŸÖ ×ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ×­Ö´ÖÖԝÖ/×¾Ö¸ü“Ö­Ö ¾Ö ãÖÖ¯Ö­Ö êú úÖµÖÖí úÖ,
“ÖÖÆêü ¾Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úÖµÖÔÃ£Ö»Ö ´Öë ׍ú‹ •ÖÖ‹Ó µÖÖ †­µÖ ׍úÃÖß úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ׍ú‹ •ÖÖ‹Ó, úÖ
×¾Ö×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü ¯ÖæÖÔ ×úµÖÖ •ÖÖ­ÖÖ ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê
‹­Ö¯ÖßÃÖ߆ևԋ»Ö êú ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö úÖµÖԍÎú´Ö êú †­Öãºþ¯Ö úÖê‡Ô ˆ¯ÖµÖãŒŸÖ ÖãÖ¾Ö¢ÖÖ
†ÖÀ¾ÖÖÃÖ­Ö úÖµÖԍÎú´Ö †¯Ö­ÖÖ­ÖÖ ÆüÖêÖÖ ŸÖÖ׍ú ÃÖ³Öß “Ö¸üÖÖë ´Öë ‡ÃÖ ¯ÖύúÖ¸ü úß ÖןÖ×¾Ö׬ֵÖÖë ¯Ö¸ü
†×­Ö¾ÖÖµÖÔ ºþ¯Ö ÃÖê ×­ÖµÖÓ¡ÖÖ ¸üÖÖ •ÖÖ Ã֍êú… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹ú ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö ¯ÖãÛß֍úÖ ´Öë
‹êÃÖê ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö úß ºþ¯Ö¸êüÖÖ ŸÖîµÖÖ¸ü ú¸ëüÖê †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ÆüÖê­Öê ÃÖê
¯ÖÆü»Öê ‡ÃÖ ¯Ö¸ü ×¾Ö“ÖÖ¸ü-×¾Ö´Ö¿ÖÔ ú¸ü ‡ÃÖê †Ó×ŸÖ´Ö Ã¾Öߍéú×ŸÖ ¤ëüÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÖãÖ¾Ö¢ÖÖ úÖµÖԍÎú´Ö
´Öë ÃÖÖ´ÖÖ­µÖŸÖµÖÖ ×­Ö´­Ö×»Ö×ÖŸÖ ²ÖÖŸÖë ¿ÖÖ×´Ö»Ö ÆüÖê­Öß “ÖÖ×Æü‹Ó ¯Ö¸ÓüŸÖã µÖÆü êú¾Ö»Ö µÖÆüà ŸÖú ÃÖß×´ÖŸÖ ­ÖÆüà
ÆüÖêÖÖ :
(‹) ‡Ó™ü¸±êúÃÖ ÃÖ×ÆüŸÖ ¯ÖÏßÖÖ×¾ÖŸÖ ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö úÖµÖԍÎú´Ö úÖê »Ö֐Öæ ú¸ü­Öê ¾Ö ˆÃ֍úÖ ¯ÖϲÖÓ¬Ö­Ö ú¸ü­Öê êú
×»Ö‹ ˆ­ÖúÖ ÃÖӐ֚ü­ÖÖŸ´Öú œüÖÓ“ÖÖ…
(²Öß) ¯ÖÏ»ÖêÖߍú¸üÖ ×­ÖµÖÓ¡ÖÖ ¯ÖϝÖÖ»Öß
(ÃÖß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¯ÖÏ´ÖãÖ ¾µÖÛŒŸÖµÖÖë úß ¿Öîׁ֍ú µÖÖꐵ֟ÖÖ ¾Ö ¯ÖÏ´ÖÖÖ­Ö êú †ÖӍú›Íêü
(›üß) ÃÖִ֐ÖÏß, ¯ÖÖ™ËüÃÖÔ, ú»Ö-¯Öã•Öì †Öפü Ö¸üߤü­Öê úß ×¾Ö×¬Ö †Öî¸ü ¾Öë›ü¸ü “ÖµÖ­Ö ÃÖ×ÆüŸÖ ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü “Öã­Ö­Öê úÖ
ŸÖ¸üߍúÖ, ÄÖÖêŸÖ úß •ÖÖÓ“Ö, ×»Ö‹ •ÖÖ­Öê ¾ÖÖ»Öê ú““Öê ´ÖÖ»Ö úß •ÖÖÓ“Ö, ÎúµÖ úß Ö‡Ô ÃÖִ֐ÖÏß úÖ ÃÖŸµÖÖ¯Ö­Ö
†Öפü…
(‡Ô) ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö µÖÖê•Ö­ÖÖ êú ´ÖÖ¬µÖ´Ö ÃÖê ×­Ö´ÖÖԝÖ/×¾Ö¸ü“Ö­Ö †Öî¸ü Ã£Ö»Ö Ã£ÖÖ¯Ö­Ö êú ×»Ö‹ ¯ÖϝÖÖ»Öß…
(‹±ú) †×¾ÖÀ¾ÖÃÖ­ÖßµÖ ÃÖÖ´ÖÖ­ÖÖë úÖ ×­ÖµÖÓ¡ÖÖ †Öî¸ü ˆÃ֍êú ×»Ö‹ ˆ¯Ö“ÖÖ¸üß ¾Ö ×­Ö¸üÖê¬Öú úÖ¸Ôü¾ÖÖ‡Ô êú ×»Ö‹ ¯ÖϝÖÖ»Öß…
(•Öß) ×­Ö´ÖÖÔÖ ¾Ö ãÖÖ¯Ö­Ö ¤üÖê­ÖÖë êú ×»Ö‹ ×­Ö¸üßÖÖ ¾Ö ¯Ö¸üßÖÖ ¯ÖÏ׍ÎúµÖÖ…
(‹“Ö) ×­Ö¸üßÖÖ ´ÖÖ¯Ö­Ö ¾Ö ¯Ö¸üßÖÖ ˆ¯Öú¸üÖÖëÓ êú îú×»Ö²ÖÎê¿Ö­Ö ¾Ö ¯Ö¸üßÖÖ úÖ ×­ÖµÖӡ֝օ
(†Ö‡Ô) ×­Ö¸üßÖÖ ÛãÖ×ŸÖ úÖê ¤ü¿ÖÖÔ­Öê ¾Ö ´Ö滵ÖÖӍú­Ö ú¸ü­Öê úß ¯ÖϝÖÖ»Öß…
(•Öê) ÖãÖ¾Ö¢ÖÖ †Öò×›ü›ü úß ¯ÖϝÖÖ»Öß…
(êú) ×­Ö¸üßÖÖ êú ×¾Ö×³Ö®Ö “Ö¸üÖÖë úß ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ •Ö֭֍úÖ¸üß ¤êü­Öê †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖê¤ü­Ö
¤êü­Öê úß ¯ÖϝÖÖ»Öß…
(‹»Ö) ׸üúÖ›üÖí êú †­Öã¸üÖÖ úß ¯ÖϝÖÖ»Öß…
(‹´Ö) ÃÖÖ´ÖÖ­Ö úß Æïü›üػ֐Ö, ³ÖÓ›üÖ¸üÖ, ¯Ö׸ü¸üÖÖ †Öî¸ü ÃÖã¯Öã¤ãÔüÖß úß ¯ÖϝÖÖ»Öß…
(‹­Ö) úÖµÖÔ êú ¯ÖÏŸµÖêú ´Ö¤ü êú †­Öãºþ¯Ö ÖãÖ¾Ö¢ÖÖ ×¾Ö¿ÖêÂÖŸÖÖ úÖê ×­ÖµÖÓ×¡ÖŸÖ ú¸ü­Öê êú ×»Ö‹ †¯Ö­ÖÖ‡Ô •ÖÖ­Öê ¾ÖÖ»Öß
×¾Ö׿Ö™ü ×­ÖµÖÓ¡ÖÖ ¯ÖÏ׍ÎúµÖÖ úÖ ×¾ÖßÖéŸÖ ×¾Ö¾Ö¸üÖ ¯ÖÏßÖãŸÖ ú¸ü­Öê ¾ÖÖ»Öß ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö µÖÖê•Ö­ÖÖ…
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÓ×¾Ö¤üÖ úß ×¾Ö¿ÖêÂÖ ¿ÖŸÖÖí ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö œüÖÓ“Öê êú †­ÖãÃÖÖ¸ü ¾µÖÛŒŸÖµÖÖë úÖê ×­ÖµÖ㌟Ö
ú¸ëüÖê… ‹êÃÖÖ ­Ö ú¸ü­Öê ¯Ö¸ü ×­ÖÖ´Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“ÖÔ ¾Ö •ÖÖê×Ö´Ö ¯Ö¸ü ‹êÃÖê ¾µÖÛŒŸÖµÖÖë úß ×­ÖµÖãÛŒŸÖ ú¸êüÖÖ…
30

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6.3.2 The Contractor shall be required to submit the relevant Quality Assurance
Document within three weeks of completion of works which shall
include relevant test reports connected with all engineering controls
adopted by him during the construction. The Engineer-in-Charge or his
duly authorized representative reserves the right to carry out Quality Audit
and Quality Surveillance of the systems and procedures of the Quality
Management and Control Activities of the Contractor / his vendor.
6.3.3 The QA Manager appointed by the Contractor shall report administratively
to Project Manager but functionally (on technical matters) to the Head
Quarters of the Contractor’s Company. QA staff shall be responsible only
for quality control and they should not be deployed for execution of the
work.
6.4 Materials & Samples
6.4.1 The Contractor shall, at his own expense, provide all materials required for
the works, other than the material which are to be issued by the
Corporation.
6.4.2 The Contractor shall, at his own expense and without delay, supply to
the Engineer-in-Charge samples in accordance with QA program of
materials proposed to be used in the works. The Engineer-in-Charge shall,
within 7days of supply of samples or within such further period as he
may require, intimate to the Contractor in writing, whether samples are
approved by him or not. If samples are not approved, the Contractor
shall forthwith arrange to supply to the Engineer-in-Charge for his
approval fresh samples complying with the specifications laid down in
the Contract at his cost.
6.5 Inspection
6.5.1 The Corporation’s Personnel shall at all reasonable times:
a) Have full access to all parts of the Site and to all places from which natural
Materials are being obtained, and
b) During production, manufacture and construction (at the Site and
elsewhere), be entitled to examine, inspect, measure and test the
materials and workmanship, and to check the progress of manufacture of
Plant and production and manufacture of Materials.
6.5.2 The Contractor shall give the Corporation’s Personnel full opportunity to
carry out these activities, including providing access, facilities, permissions
and safety equipment along with required manpower. No such activity
shall relieve the Contractor from any obligation or responsibility.
6.5.3 The Contractor shall give notice to the Engineer-in-charge whenever any
work is ready and before it is covered up, put out of sight, or packaged for
storage or transport. The Engineer-in-charge shall then either carry out the
examination, inspection, measurement or testing without unreasonable
delay, or promptly give notice to the Contractor that the Engineer-in-
charge does not require to do so. If the Contractor fails to give the notice,
he shall, if and when required by the Engineer-in-charge uncover the work
and thereafter reinstate and make good, all at the Contractor’s cost.

31

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6.3.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖµÖÔ ¯ÖæÖÔ ÆüÖê •ÖÖ­Öê êú ŸÖß­Ö ÃÖ¯ŸÖÖÆü êú ³Öߟָü ÃÖÓ²ÖÓ×¬ÖŸÖ ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö ¤üßÖÖ¾Öê•Ö
•Ö´ÖÖ ú¸ü­Öê ÆüÖëÖê וִ֭Öë ×­Ö´ÖÖÔÖ úÖµÖÔ êú ¤üÖî¸üÖ­Ö ˆ­Öêú «üÖ¸üÖ ˆ¯ÖµÖÖêÖ ´Öë ×»Ö‹ Ö‹ ÃÖ³Öß †×³ÖµÖÖÓס֍ú
×­ÖµÖӡ֝ÖÖë ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ¯Ö¸üßÖÖ ×¸ü¯ÖÖê™íüÓ ¿ÖÖ×´Ö»Ö ÆüÖëÖß… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ µÖÖ ˆ­Öêú ×¾Ö׬־֟ÖË ¯ÖÏÖ׬֍éúŸÖ
¯ÖÏןÖ×­Ö×¬Ö úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü/ˆÃ֍êú ¾Öë›ü¸ü êú ÖãÖ¾Ö¢ÖÖ ¯ÖϲÖÓ¬Ö­Ö †Öî¸ü ×­ÖµÖÓ¡ÖÖ ¯ÖÏ׍ÎúµÖÖ ¯ÖϝÖÖ×»ÖµÖÖë †Öî¸ü
×¾Ö׬ֵÖÖë úÖ ÖãÖ¾Ö¢ÖÖ †Öò×›ü™ü †Öî¸ü ÖãÖ¾Ö¢ÖÖ ×­ÖÖ¸üÖ­Öß ú¸ü­Öê úÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ…
6.3.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­ÖµÖãŒŸÖ ×ú‹ Ö‹ ÖãÖ¾Ö¢ÖÖ ¯ÖϲÖӬ֍ú ¯ÖÏ¿ÖÖÃ֍úßµÖ ¯ÖϵÖÖê•Ö­ÖÖë êú ×»Ö‹ ¯Ö׸üµÖÖê•Ö­ÖÖ ¯ÖϲÖӬ֍ú
úÖê ׸ü¯ÖÖê™Ôü ú¸ëüÖê ¯Ö¸ÓüŸÖ㠍úÖµÖÖÔŸ´Öú ´ÖÖ´Ö»ÖÖë êú ×»Ö‹ (ŸÖú­Öߍúß ´ÖÖ´Ö»ÖÖë êú ×»Ö‹) ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß Óú¯Ö­Öß
êú ´Ö㏵ÖÖ»ÖµÖ úÖê ׸ü¯ÖÖê™Ôü ú¸ëüÖê… ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö Ã™üÖ±ú êú¾Ö»Ö ÖãÖ¾Ö¢ÖÖ ×­ÖµÖÓ¡ÖÖ êú ×»Ö‹ ˆ¢Ö¸ü¤üÖ‡Ô
ÆüÖêÖÖ †Öî¸ü ˆÃÖê úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ úÖ´Ö ¯Ö¸ü ­ÖÆüà »ÖÖÖµÖÖ •ÖÖ­ÖÖ “ÖÖ×Æü‹…
6.4 ÃÖִ֐ÖÏß †Öî¸ü ­Ö´Öæ­Öê
6.4.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü, êú¾Ö»Ö ×­ÖÖ´Ö «üÖ¸üÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •ÖÖ­Öê ¾ÖÖ»Öß ÃÖִ֐ÖÏß úê †»ÖÖ¾ÖÖ úÖµÖÔ êú ×»Ö‹
†Ö¾Ö¿µÖú ÃÖ³Öß ÃÖִ֐ÖÏß †¯Ö­Öê Ö“ÖÔ ¯Ö¸ü ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê…
6.4.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê Ö“Öì ¯Ö¸ü, ²ÖÖî¸ü ׍úÃÖß ×¾Ö»ÖÓ²Ö êú, úÖµÖÔ êú ×»Ö‹ ¯ÖϵÖÖêÖ úß •ÖÖ­Öê ¾ÖÖ»Öß
¯ÖÏßÖÖ×¾ÖŸÖ ÃÖִ֐ÖÏß êú ­Ö´Öæ­ÖÖë úÖê ÖãÖ¾Ö¢ÖÖ †ÖÀ¾ÖÖÃÖ­Ö úÖµÖԍÎú´Ö êú †­ÖãÃÖÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
úÖê ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ÖÖ… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ‡­Ö ­Ö´Öæ­ÖÖë úß ¯ÖÏÖÛ¯ŸÖ êú 7 פü­ÖÖë êú †Ó¤ü¸ü µÖÖ •ÖÖê ³Öß
ÃÖ´ÖµÖ ˆ­Æëü †Ö¾Ö¿µÖú ÆüÖê, êú ³Öߟָüü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ×»Ö×ÖŸÖ ºþ¯Ö ÃÖê ÃÖæ×“ÖŸÖ ú¸ëüÖê ׍ú ¾Öê ‡­Ö
­Ö´Öæ­ÖÖë úÖê †­Öã´ÖÖêפüŸÖ ú¸üŸÖê Æïü †£Ö¾ÖÖ ­ÖÆüà… µÖפü ­Ö´Öæ­ÖÖë úÖ †­Öã´ÖÖê¤ü­Ö ­ÖÆüà ׍úµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê Ö“ÖÔ ¯Ö¸ü, ÃÖÓ×¾Ö¤üÖ ´Öë ¾ÖÙÖŸÖ ×¾Ö×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü ŸÖŸúÖ»Ö ­Ö‹ ­Ö´Öæ­ÖÖë úÖê
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú †­Öã´ÖÖê¤ü­Ö êú ×»Ö‹ ³Öê•Ö­Öê úß ¾µÖ¾ÖãÖÖ ú¸ëüÖê…
6.5 ×­Ö¸ü߁֝Ö
6.5.1 ×­ÖÖ´Ö êú ú´ÖÔ“ÖÖ׸üµÖÖë úÖê ÃÖ³Öß †Öîד֟µÖ¯ÖæÖÔ ÃÖ´ÖµÖ ¯Ö¸ ü:
(‹) úÖµÖÔÃ£Ö»Ö êú ÃÖ³Öß Ã£ÖÖ­ÖÖë †Öî¸ü ¯ÖÏ֍éúן֍ú ÃÖִ֐ÖÏß ¯ÖÏÖ¯ŸÖ ú¸ü­Öê ¾ÖÖ»Öê ãÖÖ­ÖÖë ¯Ö¸ü ¯ÖϾÖê¿Ö úß ÃÖã×¾Ö¬ÖÖ
ÆüÖêÖß, †Öî¸ü
(²Öß) ˆŸ¯ÖÖ¤ü­Ö, ×¾Ö×­Ö´ÖÖÔÖ †Öî¸ü ×­Ö´ÖÖÔÖ êú ÃÖ´ÖµÖ (úÖµÖÔÃ£Ö»Ö ¾Ö †­µÖ •ÖÖÆüÖë ¯Ö¸ü) ÃÖִ֐ÖÏß ¾Ö úÖµÖԍãú¿Ö»ÖŸÖÖ
êú ¯Ö¸ü߁֝Ö, ×­Ö¸ü߁֝Ö, ´ÖÖ¯Ö­Ö †Öî¸ü •ÖÖÓ“Ö úÖ ŸÖ£ÖÖ ÃÖÓµÖÓ¡Ö êú ×­Ö´ÖÖÔÖ ¾Ö ÃÖִ֐ÖÏß êú ˆŸ¯ÖÖ¤ü­Ö †Öî¸ü
×¾Ö×­Ö´ÖÖÔÖ úß ×­ÖÖ¸üÖ­Öß úÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ…
6.5.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡­Ö úÖ¸Ôü¾ÖÖ‡µÖÖë úÖê ú¸ü­Öê êú ×»Ö‹ ×­ÖÖ´Ö êú ú´ÖÔ“ÖÖ׸üµÖÖë úÖê ÁÖ´Ö ¿ÖÛŒŸÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ­Öê êú
ÃÖÖ£Ö-ÃÖÖ£Ö ¯ÖϾÖê¿Ö, ÃÖã×¾Ö¬ÖÖ‹Ó, †­Öã´Ö×ŸÖ †Öî¸ü ÃÖÓ¸üÖÖ ˆ¯Öú¸üÖ †Öפü ˆ¯Ö»Ö²¬Ö ú¸üÖ­Öê ÃÖ×ÆüŸÖ Æü¸ü ÃÖÓ³Ö¾Ö
ÃÖÆüÖµÖŸÖÖ ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê… ‹êÃÖß ×úÃÖß ³Öß úÖ¸Ôü¾ÖÖ‡Ô êú úÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ׍úÃÖß ×•Ö´´Öê¤üÖ¸üß †Öî¸ü
²ÖÖ¬µÖŸÖÖ ÃÖê ˆ­´ÖÖê×“ÖŸÖ ­ÖÆüà ÆüÖëÖê…
6.5.3 •Ö²Ö úÖê‡Ô úÖµÖÔ ¯ÖæÖÔ ÆüÖê •ÖÖŸÖÖ Æîü ŸÖÖê ˆÃÖê œüêú •ÖÖ­Öê, ­Ö•Ö¸üÖë ÃÖê †Öê—Ö»Ö ×ú‹ •ÖÖ­Öê µÖÖ ³ÖÓ›üÖ¸üÖ †£Ö¾ÖÖ
¯Ö׸ü¾ÖÆü­Ö êú ×»Ö‹ ¯Öîú ׍ú‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ­ÖÖê×™üÃÖ ¤ëüÖê… ŸÖ²Ö ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ µÖÖ ŸÖÖê ²ÖÖî¸ü ׍úÃÖß †­ÖÖ¾Ö¿µÖú ×¾Ö»ÖÓ²Ö êú ¯Ö¸ü߁֝Ö, ×­Ö¸ü߁֝Ö, ´ÖÖ¯Ö­Ö, µÖÖ •ÖÖÓ“Ö ú¸ëüÖê †£Ö¾ÖÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ŸÖŸúÖ»Ö ÃÖæ×“ÖŸÖ ú¸ëüÖê ׍ú ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ‹êÃÖÖ ú¸ü­Öê úß †Ö¾Ö¿µÖúŸÖÖ ­ÖÆüà Æîü…
µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖæ“Ö­ÖÖ ­ÖÆüà ¤êüŸÖÖ Æîü ŸÖÖê •Ö²Ö ú³Öß ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ úÆüÖ •ÖÖ‹, ˆÃÖê †¯Ö­Öê Ö“ÖÔ
¯Ö¸ü úÖµÖÔ úÖê ¾ÖÖ¯ÖÃÖ ÖÖê»Ö­ÖÖ ÆüÖêÖÖ †Öî¸ü ¯Öã­Ö: µÖ£ÖÖãÖÖ­Ö †“”ûß ÆüÖ»ÖŸÖ ´Öë »ÖÖÖ­ÖÖ ÆüÖêÖÖ…

31

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6.6 Testing
6.6.1 This Sub-Clause shall apply to all tests specified in the Contract.
6.6.2 Except as otherwise specified in the Contract, the Contractor shall provide
all apparatus, assistance, documents and other information, electricity,
equipment, fuel, consumables, instruments, labour, materials, and suitably
qualified and experienced staff, as are necessary to carry out the specified
tests efficiently. The Contractor shall agree, with the Engineer-in-charge the
time and place for the specified testing of any Plant, Materials and other
parts of the Works.
6.6.3 The Engineer-in-charge shall give the Contractor not less than 24 hours’
notice of the Engineer’s intention to attend the tests. If the Engineer-in-
charge does not attend at the time and place agreed, the Contractor
may proceed with the tests, unless otherwise instructed by the Engineer-in-
charge.
6.6.4 If the Engineer-in-charge requires this Plant, Materials or workmanship to be
retested, in case of any doubt, the tests shall be repeated under the same
terms and conditions. The cost of such additional tests shall be mutually
agreed upon.
6.7 Rejection
6.7.1 The Engineer-in-Charge shall have full powers to instruct the removal of
any or all of the materials brought to Site by the Contractor which are not
in accordance with the Contract specifications or do not conform in
character or quality to samples approved by him. In case of default on
the part of the Contractor in removing rejected materials, the Engineer-in-
Charge shall be at liberty to have them removed by other means. The
Engineer-in-Charge shall have full powers to procure other proper
materials to be substituted for rejected materials, in the event of the
Contractor refusing to comply. All costs, which may accrue upon such
removal and/or substitution, shall be borne by the Contractor. The decision
of Engineer-in-charge shall be final and binding.
6.8 Remedial Work
6.8.1 The Engineer-in-charge may instruct the Contractor to:
(a) Remove from the Site and replace any Plant or Materials which is not in
accordance with the Contract,
(b) Remove and re-execute any other work which is not in accordance with
the Contract, and
(c) Execute any work which is urgently required for the safety of the Works,
whether because of an accident, unforeseeable event or otherwise.
6.8.2 The Contractor shall comply with the instruction within a reasonable time,
or immediately if urgency is specified under sub-paragraph (c) above.
6.8.3 If the Contractor fails to comply with the instruction, the Corporation shall
be entitled to employ and pay other persons to carry out the work at the
risk and cost of the Contractor.
6.9 Ownership of Plant and Materials
6.9.1 Except otherwise specified in the Contract, each item of Plant and
Materials shall, to the extent consistent with the Laws of the Country,
become the property of the Corporation at whichever is the earlier of the
following times, free from liens and other encumbrances:
32

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6.6 ¯Ö¸ü߁֝Ö
6.6.1 µÖÆü ˆ¯Ö-Ö›ü ÃÖÓ×¾Ö¤üÖ ´Öë ×¾Ö×­Ö¤ìü×¿ÖŸÖ ÃÖ³Öß ŸÖ¸üÆü êú ¯Ö¸ü߁֝ÖÖÓê ¯Ö¸ü »Ö֐Öæ ÆüÖêŸÖÖ Æîü…
6.6.2 •Ö²Ö ŸÖú ׍ú ÃÖÓ×¾Ö¤üÖ ´Öë †­µÖ£ÖÖ ¾ÖÙÖŸÖ ­Ö ÆüÖ,ê ÃÖÓ×¾Ö¤ü֍úÖ¸ü, ×¾Ö×­Ö¤ìü×¿ÖŸÖ ¯Ö¸ü߁֝ÖÖë úÖê ãú¿Ö»ÖŸÖÖ¯Öæ¾Öԍú
¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖ³Öß †Öî•ÖÖ¸ü, ÃÖÆüÖµÖŸÖÖ, ú֐֕ÖÖŸÖ ¾Ö †­µÖ ÃÖæ“Ö­ÖÖ‹Ó, ײֻ֕Öß, ˆ¯Öú¸üÖ,
‡Õ¬Ö­Ö, ˆ¯Ö³ÖÖê•µÖ ÃÖִ֐ÖÏß, µÖÓ¡Ö, ÁÖ´Ö¿ÖÛŒŸÖ, ÃÖִ֐ÖÏß †Öî¸ü ˆ¯ÖµÖãŒŸÖ µÖÖꐵ֟ÖÖ ¯ÖÏÖ¯ŸÖ ‹¾ÖÓ †­Öã³Ö¾Öß Ã™üÖò±ú
†Öפü ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍úÃÖß ÃÖÓµÖÓ¡Ö, ÃÖִ֐ÖÏß ¾Ö úÖµÖÔ êú †­µÖ ³Ö֐ÖÖë êú ×¾Ö×­Ö¤ìü׿֟Ö
¯Ö¸üßÖÖ êú ÃÖ´ÖµÖ ¾Ö ãÖÖ­Ö êú ²ÖÖ¸êü ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖê ÃÖÆü´ÖŸÖ ÆüÖê­ÖÖ ÆüÖêÖÖ…
6.6.3 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¯Ö¸üßÖÖ ú¸ü­Öê êú ú´Ö ÃÖê ú´Ö 24 ‘ÖÓ™êü ¯ÖÆü»Öê ­ÖÖê×™üÃÖ ¤ëüÖê… µÖפü ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ ÃÖÆü´ÖŸÖ Æãü‹ ÃÖ´ÖµÖ †Öî¸ü ãÖÖ­Ö ¯Ö¸ü ­ÖÆüà ¯ÖÆãÓü“ÖŸÖê Æïü ŸÖÖê •Ö²Ö ŸÖú ׍ú ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ
†­µÖ£ÖÖ ×­Ö¤ìü×¿ÖŸÖ ­Ö ׍úµÖüÖ •ÖÖ‹, ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯Ö¸üßÖÖ ¿Öãºþ ú¸ü Ã֍úŸÖê Æïü…
6.6.4 µÖפü ׍úÃÖß ÃÖÓ¤êüÆü êú úÖ¸üÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ‡ÃÖ ÃÖÓµÖÓ¡Ö, ÃÖִ֐ÖÏß µÖÖ úÖµÖԍãú¿Ö»ÖŸÖÖ úÖ ¯Öã­Ö: ¯Ö¸ü߁֝Ö
ú¸ü­ÖÖ “ÖÖÆëü ŸÖÖê ‹êÃÖÖ ¯Ö¸üßÖÖ ˆ­Æüà ¿ÖŸÖÖí ¾Ö ×­Ö²ÖÓ¬Ö­ÖÖë êú †¬Öß­Ö ÆüÖêÖÖ… ‹êÃÖê †×ŸÖ׸üŒŸÖ ¯Ö¸üßÖÖ êú Ö“ÖÔ
êú ×»Ö‹ †Ö¯ÖÃÖß ²ÖÖŸÖ“ÖßŸÖ ÃÖê ÃÖÆü´Ö×ŸÖ ²Ö­ÖÖ‡Ô •ÖÖ Ã֍úŸÖß Æîü…
6.7 †Ã¾ÖߍéúןÖ
6.7.1 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ÃÖÓµÖÓ¡Ö ¯Ö¸ü »ÖÖ‡Ô Ö‡Ô ׍úÃÖß ‹êÃÖß µÖÖ ÃÖ³Öß ÃÖִ֐ÖÏß •ÖÖê ÃÖÓ×¾Ö¤üÖ êú
×¾Ö×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü ­Ö ÆüÖê †£Ö¾ÖÖ ˆ­Öêú «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ­Ö´Öæ­ÖÖë êú ÖãÖ-¬Ö´ÖÔ êú †­Öãºþ¯Ö ­Ö ÆüÖ,ê úÖê
Æü™üÖ‹ •ÖÖ­Öê úÖ ×­Ö¤ìü¿Ö ¤êü­Öê úÖ ¯ÖæÖÔ †×¬ÖúÖ¸ü ÆüÖêÖÖ… µÖפü ‡­Ö †Ã¾ÖߍúÖ¸ü úß Ö‡Ô ÃÖִ֐ÖÏß úÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ­ÖÆüà Æü™üÖŸÖÖ Æîü ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ˆÃÖê ׍úÃÖß †­µÖ ÃÖÖ¬Ö­Ö ÃÖê Æü™ü¾ÖÖ­Öê úß ”æû™ü ÆüÖêÖß…
µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü †­Öã¯ÖÖ»Ö­Ö ú¸ü­Öê ÃÖê ´Ö­ÖÖ ú¸üŸÖÖ Æîü ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê †Ã¾ÖߍúÖ¸ü úß Ö‡Ô ÃÖִ֐ÖÏß
êú ׾֍ú»¯Ö êú ºþ¯Ö ´Öë ˆ×“ÖŸÖ ÃÖִ֐ÖÏß úÖ ¯ÖÏÖ¯ÖÖ ú¸ü­Öê úÖ ¯ÖæÖÔ †×¬ÖúÖ¸ü ÆüÖêÖÖ… ‡ÃÖ ¯ÖύúÖ¸ü ÃÖê ÃÖִ֐ÖÏß
úÖê Æü™üÖ‹ •ÖÖ­Öê/ ¾ÖîúÛ»¯Öú ¾µÖ¾ÖãÖÖ ×ú‹ •ÖÖ­Öê êú úÖ¸üÖ ÆüÖê­Öê ¾ÖÖ»Öêê ÃÖ´ÖÃŸÖ Ö“ÖÔ úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ
¾ÖÆü­Ö ׍úµÖÖ •ÖÖ‹ÖÖ… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ¾Ö ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…
6.8 ˆ¯Ö“ÖÖ¸üß úÖµÖÔ
6.8.1 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ×­Ö¤ìü¿Ö ¤êü Ã֍úŸÖê Æïü :
(‹) ¾ÖÆü ‹êÃÖê ÃÖÓµÖÓ¡Ö µÖÖ ÃÖִ֐ÖÏß úÖê úÖµÖÔÃ£Ö»Ö ÃÖê Æü™üÖ‹ •ÖÖê ׍ú ÃÖÓ×¾Ö¤üÖ êú †­Öãºþ¯Ö ­ÖÆüà Æîü,ê
(²Öß) ÃÖÓ×¾Ö¤üÖ êú †­Öãºþ¯Ö ­Ö ׍ú‹ Ö‹ ׍úÃÖß úÖµÖÔ úÖê Æü™üÖ­Öê †£Ö¾ÖÖ ¯Öã­Ö: ׍ú‹ •ÖÖ­Öê êú ×»Ö‹,
ŸÖ£ÖÖ
(ÃÖß) ׍úÃÖß ‹êÃÖê úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ •ÖÖê ׍úÃÖß ¤ãü‘ÖÔ™ü­ÖÖ, ¯Öæ¾ÖÖÔ­Öã´ÖÖ­Ö ­Ö úß •ÖÖ Ã֍ú­Öê
¾ÖÖ»Öß ‘Ö™ü­ÖÖ†Öë µÖÖ †­µÖ ׍úÃÖß úÖ¸üÖ ÃÖê úÖµÖÔ úß ÃÖÓ¸üÖÖ êú ×»Ö‹ ŸÖŸúÖ»Ö †Ö¾Ö¿µÖú ÆüÖê…
6.8.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ˆ×“ÖŸÖ ÃÖ´ÖµÖ-ÃÖß´ÖÖ ´Öë ×­Ö¤ìü¿ÖÖë úÖ †­Öã¯ÖÖ»Ö­Ö ú¸ü­ÖÖ ÆüÖêÖÖ µÖÖ ‰ú¯Ö¸ü ÃÖ²Ö-¯Öî¸üÖ (ÃÖß) ´Öë
ˆÛ»»Ö×ÖŸÖ †Ö¯ÖÖŸÖË ÛãÖ×ŸÖ ÆüÖê ŸÖÖê ŸÖŸúÖ»Ö †­Öã¯ÖÖ»Ö­Ö ú¸ü­ÖÖ ÆüÖêÖÖ…
6.8.3 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­Ö¤ìü¿ÖÖë úÖ †­Öã¯ÖÖ»Ö­Ö ú¸ü­Öê ´Öë †ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü ŸÖÖê ×­ÖÖ´Ö úÖê µÖÆü úÖµÖÔ ú¸ü­Öê êú
×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú •ÖÖê×Ö´Ö ¾Ö Ö“ÖÔ ¯Ö¸ü ׍úÃÖß †­µÖ ¾µÖÛŒŸÖ úÖê ×­ÖµÖãŒŸÖ ú¸ü­Öê ¾Ö ³ÖãÖŸÖÖ­Ö ú¸ü­Öê úÖ
†×¬ÖúÖ¸ü ÆüÖêÖÖ…
6.9 ÃÖÓµÖÓ¡Ö ¾Ö ÃÖִ֐ÖÏß úÖ Ã¾ÖÖ×´ÖŸ¾Ö
6.9.1 •Ö²Ö ŸÖú ׍ú ÃÖÓ×¾Ö¤üÖ ´Öë †­µÖ£ÖÖ ×¾Ö×­Ö¤ìü×¿ÖŸÖ ­Ö ÆüÖê, ¤êü¿Ö êú úÖ­Öæ­ÖÖë «üÖ¸üÖ †­Öã´Ö­µÖ ÃÖß´ÖÖ êú †­Öãæú»Öü
ÃÖÓµÖÓ¡Ö ¾Ö ÃÖִ֐ÖÏß úÖ ¯ÖÏŸµÖêú ÃÖÖ´ÖÖ­Ö ×­Ö´­Ö×»Ö×ÖŸÖ ÃÖ´ÖµÖ ´Öë ÃÖê •ÖÖê ³Öß ¯ÖÆü»Öê ÆüÖê, ˆÃÖ ÃÖ´ÖµÖ ÃÖê
¬ÖÖ¸üÖÖ׬֍úÖ¸ü †Öî¸ü †­µÖ ŠúÖ³ÖÖ¸ü ÃÖê ´Ö㌟Ö, ×­ÖÖ´Ö úß ÃÖÓ¯Ö×¢Ö ÆüÖê •ÖÖŸÖÖ Æîü :
32

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(a) When it is incorporated in the Works;
(b) When the Contractor is paid the corresponding value of the Plant and
Materials.
(c) When the secured advance is paid for materials received.
6.9.2 Material issued by the Corporation to the Contractor for incorporating in
the work either free of cost or chargeable basis shall remains the property
of Corporation.
6.10 Octroi, Cess, Taxes, Royalties, etc.
6.10.1 All charges on account of octroi, cess, VAT, service tax, royalty, terminal or
Sales Tax and other duties on materials obtained for the works from any
source (excluding materials supplied by the Corporation) shall be borne by
the Contractor.
6.10.2 In pursuant to or under any law, notification or order any royalty, cess or
the like becomes payable by the Corporation in respect of any material
used by the Contractor in the works then in such a case, the Corporation
shall be entitled to recover the amount paid in the circumstances as
aforesaid from dues of the Contractor.
6.10.3 Any increase in rate of or new statutory levies, customs duty, VAT, service
tax, octroi and other duties during the currency of the contract shall be
reimbursed by the Corporation on submission of documentary proof for
payments.
6.11 Urgent Works
6.11.1 If, by reason of an emergency arising in connection with and during the
execution of the Contract, any protective or remedial work is necessary as
a matter of urgency to prevent damage to the Works, the Contractor shall
immediately carry out such work.
6.11.2 If the Contractor is unable or unwilling to do such work immediately, the
Corporation may do or cause such work to be done as the Corporation
may determine is necessary in order to prevent damage to the Works.
6.11.3 If the work done by the Corporation was to be executed by the Contractor
under the Contract, the reasonable costs incurred by the Corporation in
connection therewith shall be paid by the Contractor to the Corporation.
6.12 Materials Issued by the Corporation
6.12.1 Materials to be supplied by the Corporation are shown in Schedule B which
also stipulates quantum, place of issue and rate(s) to be charged in
respect thereof. The Corporation shall, at its risk and cost, provide these
materials at the time and place specified in the Contract. The Contractor
shall then visually inspect them, and shall promptly give notice to the
Engineer-in-charge of any shortage, defect or default in these materials.
Unless otherwise agreed by both Parties, the Corporation shall immediately
rectify the notified shortage, defect or default.
6.12.2 The Contractor shall bear the cost of loading, transporting to Site,
unloading, storing under cover as required, assembling and joining the
several parts together as necessary and incorporating or fixing materials
in the works including all preparatory work of whatever description as may
be required.

33

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(‹) •Ö²Ö µÖÆü úÖµÖÔ ´Öë ¿ÖÖ×´Ö»Ö ×úµÖÖ •ÖÖ‹
(²Öß) •Ö²Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖÓµÖÓ¡Ö ¾Ö ÃÖִ֐ÖÏß úÖ ´Öæ»µÖ ³ÖãÖŸÖÖ­Ö ú¸ü פüµÖÖ ÖµÖÖ ÆüÖê…
(ÃÖß) •Ö²Ö ¯ÖÏÖ¯ŸÖ úß Ö‡Ô ÃÖִ֐ÖÏß úÖ ¯ÖÏןֳÖæ×ŸÖ †×ÖÏ´Ö ³ÖãÖŸÖÖ­Ö ú¸ü פüµÖÖ ÖµÖÖ ÆüÖê…
6.9.2 ×­ÖÖ´Ö «üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖ´Ö ´Öë ˆ¯ÖµÖÖêÖ ú¸ü­Öê êú ×»Ö‹ ×­Ö:¿Ö㻍ú µÖÖ ¯ÖϳÖÖ¸ü †Ö¬ÖÖ¸ü ¯Ö¸ü •ÖÖ¸üß úß
Ö‡Ô ÃÖִ֐ÖÏß ×­ÖÖ´Ö úß ÃÖÓ¯Ö×¢Ö ²Ö­Öß ¸üÆêüÖß…
6.10 “ÖãӐÖß, ˆ¯Öú¸üü, ú¸ü, ¸üÖòµÖ»™üß †Öפü
6.10.1 úÖµÖÔ êú ×»Ö‹ ׍úÃÖß ³Öß ÄÖÖêŸÖ ÃÖê ¯ÖÏÖ¯ŸÖ úß Ö‡Ô ÃÖִ֐ÖÏß (×­ÖÖ´Ö «üÖ¸üÖ †Ö¯ÖæŸÖÔ úß Ö‡Ô ÃÖִ֐ÖÏß úÖê
”ûÖê›Íüú¸ü) ¯Ö¸ü »ÖÖ­Öê ¾ÖÖ»Öê “ÖãӐÖß, ˆ¯Öú¸üü, ¾Öî™ü, ÃÖê¾Ö֍ú¸ü, ¸üÖòµÖ»™üß, ™üÙ´Ö­Ö»Ö µÖÖ ×²ÖÎúߍú¸ü ¾Ö †­µÖ ¿Ö㻍úÖêÓ
úÖ ¾ÖÆü­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×úµÖÖ •ÖÖ‹ÖÖ…
6.10.2 µÖפü ÃÖÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ úÖµÖÔ êú ×»Ö‹ ˆ¯ÖµÖÖêÖ úß •ÖÖ ¸üÆüß ×úÃÖß ÃÖִ֐ÖÏß êú ×»Ö‹ ׍úÃÖß úÖ­Öæ­Ö,
†×¬ÖÃÖæ“Ö­ÖÖ µÖÖ †Ö¤êü¿Ö êú †¬Öß­Ö µÖÖ ˆ­Öêú †­Öã¯ÖÖ»Ö­Ö ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úß ¸üÖòµÖ»™üß, ˆ¯Öú¸ü µÖÖ ‡ÃÖß
¯ÖύúÖ¸ü úÖ †­µÖ úÖê‡Ô ³ÖãÖŸÖÖ­Ö ×­ÖÖ´Ö «üÖ¸üÖ ³ÖãÖŸÖÖ­ÖµÖÖêµÖ ²Ö­ÖŸÖÖ Æîü ŸÖÖê ‹êÃÖê ´ÖÖ´Ö»Öê ´Öë ×­ÖÖ´Ö úÖê ˆ¯ÖµÖãÔŒŸÖ
¯Ö׸üÛãÖןֵÖÖë ´Öë ³ÖãÖŸÖÖ­Ö úß Ö‡Ô ¸üÖ×¿Ö úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤êüµÖ ¸üÖ×¿Ö ´Öë ÃÖê ¾ÖÃÖæ»Ö ú¸ü­Öê úÖ †×¬ÖúÖ¸ü
ÆüÖêÖÖ…
6.10.3 ÃÖÓ×¾Ö¤üÖ úß †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö úÖê‡Ô ­ÖµÖÖ ÃÖÖÓ×¾Ö׬֍ú ¿Ö㻍ú, ÃÖß´ÖÖ¿Ö㻍ú, ¾Öî™ü, ÃÖê¾Ö֍ú¸ü, “ÖãӐÖß †Öפü †Ö­Öê
†£Ö¾ÖÖ ˆ­Öúß ¤ü¸üÖë ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úß ²ÖœÍüÖê¢Ö¸üß µÖÖ ¯Ö׸ü¾ÖŸÖÔ­Ö ÆüÖê­Öê úß ÛãÖ×ŸÖ ´Öë ³ÖãÖŸÖÖ­Ö êú ú֐֕ÖÖŸÖß
ÃÖցµÖ ¯ÖÏßÖãŸÖ ׍ú‹ •ÖÖ­Öê ¯Ö¸ü ×­ÖÖ´Ö «üÖ¸üÖ ‡Ã֍úß ¯ÖÏן֯ÖæÙŸÖ úß •ÖÖ‹Öß…
6.11 ŸÖÖŸúÖ׻֍ú úÖµÖÔ
6.11.1 µÖפü ÃÖÓ×¾Ö¤üÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ †Öî¸ü ÃÖÓ×¾Ö¤üÖ ×­Ö¯ÖÖ¤ü­Ö úß †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö úÖê‡Ô †Ö¯ÖÖŸÖ ÛãÖ×ŸÖ ˆŸ¯Ö®Ö ÆüÖê­Öê
êú úÖ¸üÖ úÖµÖÔ úÖê ÆüÖê­Öê ¾ÖÖ»Öê ­ÖãúÃÖÖ­Ö ÃÖê ²Ö“ÖÖ­Öê êú ×»Ö‹ ׍úÃÖß ²Ö“ÖÖ¾Ö µÖÖ ˆ¯Ö“ÖÖ¸üß úÖµÖÔ úÖê ŸÖŸúÖ»Ö
†Ö¬ÖÖ¸ü ¯Ö¸ü ׍ú‹ •ÖÖ­Öê úß †Ö¾Ö¿µÖúŸÖÖ ÆüÖêŸÖß Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‹êÃÖÖ úÖµÖÔ ŸÖŸúÖ»Ö ú¸ü­ÖÖ ÆüÖêÖÖ…
6.11.2 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹êÃÖê úÖµÖÔ úÖê ŸÖŸúÖ»Ö ú¸ü­Öê úÖ ‡“”ãûú ­ÖÆüà Æîü µÖÖ ú¸ü­Öê ´Öë †ÃÖ´Ö£ÖÔ Æîü ŸÖÖê ˆÃÖ úÖµÖÔ
úÖê ­ÖãúÃÖÖ­Ö ÃÖê ²Ö“ÖÖ­Öê êú ×»Ö‹ ×­ÖÖ´Ö ˆÃÖ úÖµÖÔ úÖê •ÖîÃÖÖ ¾ÖÆü ˆ×“ÖŸÖ ÃÖ´Ö—Öê, þֵÖÓ ú¸ü Ã֍úŸÖÖ Æîü µÖÖ
¤æüÃÖ¸êü ÃÖê ú¸ü¾ÖÖ Ã֍úŸÖÖ Æîü …
6.11.3 µÖפü ×­ÖÖ´Ö «üÖ¸üÖ ×ú‹ Ö‹ úÖµÖÔ úÖê ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­Ö¯ÖÖפüŸÖ ׍úµÖÖ •ÖÖ­ÖÖ £ÖÖ ŸÖÖê
ˆÃÖ úÖµÖÔ úÖê ú¸ü¾ÖÖ­Öê ´Öë ×­ÖÖ´Ö «üÖ¸üÖ Ö“ÖÔ úß Ö‡Ô †Öîד֟µÖ¯ÖæÖÔ ¸üÖ×¿Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­ÖÖ´Ö úÖê
³ÖãÖŸÖÖ­Ö úß •ÖÖ‹Öß…
6.12 ×­ÖÖ´Ö «üÖ¸üÖ •ÖÖ¸üß ÃÖִ֐ÖÏß
6.12.1 ×­ÖÖ´Ö «üÖ¸üÖ •ÖÖ¸üß úß •ÖÖ­Öê ¾ÖÖ»Öß ÃÖִ֐ÖÏß úÖê †­ÖãÃÖæ“Öß ²Öß ´Öë ¤ü¿ÖÖÔµÖÖ ÖµÖÖ Æîü וÖÃÖ´Öë ´ÖÖ¡ÖÖ, •ÖÖ¸üß ×ú‹
•ÖÖ­Öê úÖ Ã£ÖÖ­Ö †Öî¸ü ˆÃÖ ¯Ö¸ü »ÖÖÖ‹ •ÖÖ­Öê ¾ÖÖ»Öê ¯ÖϳÖÖ¸ü úß ¤ü¸ü êú ²ÖÖ¸êü ´Öë ³Öß ˆ»»ÖêÖ ׍úµÖÖ ÖµÖÖ Æîü…
×­ÖÖ´Ö ‡ÃÖ ÃÖִ֐ÖÏß úÖê †¯Ö­Öê •ÖÖê×Ö´Ö ¾Ö Ö“Öì ¯Ö¸ü ÃÖÓ×¾Ö¤üÖ ´Öë ×¾Ö×­Ö¤ìü×¿ÖŸÖ ÃÖ´ÖµÖ ¾Ö ãÖÖ­Ö ¯Ö¸ü ˆ¯Ö»Ö²¬Ö
ú¸üÖ‹ÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆÃÖß ÃÖ´ÖµÖ ‡ÃÖê ¤êüÖ ú¸ü ×­Ö¸üßÖÖ ú¸ëüÖê †Öî¸ü µÖפü ‡ÃÖ ÃÖִ֐ÖÏß úß ´ÖÖ¡ÖÖ ´Öë úÖê‡Ô
ú´Öß, ¤üÖêÂÖ µÖÖ Ö¸üÖ²Öß ÆüÖê ŸÖÖê ŸÖŸúÖ»Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖæ×“ÖŸÖ ú¸ëüÖê… •Ö²Ö ŸÖú ׍ú ¤üÖê­ÖÖë ¯ÖÖÖë «üÖ¸üÖ
†­µÖ£ÖÖ ÃÖÆü´Ö×ŸÖ ­Ö Æãü‡Ô ÆüÖê, ×­ÖÖ´Ö ÃÖæ×“ÖŸÖ úß Ö‡Ô ´ÖÖ¡ÖÖ ´Öë ú´Öß, ¤üÖêÂÖ µÖÖ Ö¸üÖ²Öß úÖê ŸÖŸúÖ»Ö ¤æü¸ü
ú¸êüÖÖ…
6.12.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü »Ö¤üÖ‡Ô, úÖµÖÔÃ£Ö»Ö ŸÖú ¯Ö׸ü¾ÖÆü­Ö, ˆŸÖ¸üÖ‡Ô, µÖ£ÖÖ†Ö¾Ö¿µÖú ú¾Ö¸µÖ㌟Öü ³ÖÓ›üÖ¸üÖ,
µÖ£ÖÖ†Ö¾Ö¿µÖú ×¾Ö×³Ö®Ö ³Ö֐ÖÖë úÖê ‹ú ÃÖÖ£Ö »ÖÖÖ­ÖÖ ¾Ö •ÖÖê›Íü­ÖÖ µÖÖ úÖµÖÔ ´Öë ÃÖִ֐ÖÏß úÖê ×±úŒÃÖ ú¸ü­ÖÖ ¾Ö
ÃÖ³Öß úÖµÖÔ¯Öæ¾ÖÔ-ŸÖîµÖÖ׸üµÖÖë ÃÖ×ÆüŸÖ †Ö¾Ö¿µÖú ÃÖ³Öß úÖµÖÖí úß »ÖÖÖŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¾ÖÆü­Ö ú¸ü­Öß ÆüÖêÖß …
33

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6.13 Material Accounting
6.13.1 The contractor shall account for all materials issued as free /
chargeable by the Corporation. He shall also maintain account for
the materials suggested by the Engineer-in-charge and procured by
him. The material account must be submitted as and when required
by the engineer-in-charge and on completion of the contract.
Retention money shall be released only after completion of material
accounting.
6.13.2 The actual consumption of quantity of materials shall be calculated
based on the measurements with reference to the standard formula
/Bureau of Indian Standards/approved cutting plan as applicable on
the basis of drawings and specifications. The permissible returnable
wastage and invisible wastage shall be as per schedule ‘B’.
6.13.3 In case of supply and erection package, the details of returnable
wastage / quantities shall be discussed during pre bid meetings for
all the items involved.
6.13.4 The contractor shall prepare and submit reconciliation statement
indicating the quantities of material issued to him and/or procured
by him and the quantities of material consumed as per design and
drawings including permissible wastage to the satisfaction of the
Engineer-in-charge within 15 days of the issue of written notice by
him.
6.13.5 The contractor shall be liable to be charged penalty in addition to
the cost of material at market rate landing at NPCIL stores incase he
fails to submit the reconciliation statement and/or deposit the excess
material issued to him over the theoretical consumption including
the permissible wastage back to the NPCIL stores.

6.14 Mega Power Project Concessions


6.14.1 The Contractor shall include all concessions in taxes and duties
available under Mega Power Project, if applicable as per NIT. The
Corporation’s responsibility will be limited to the extent of issuing
necessary certificates. Contractor shall arrange all the other
requisites for availing the benefits under the Mega Power Project at
no extra cost to the Corporation.
7 COMMENCEMENT, DELAYS AND SUSPENSION
7.1 Commencement of Work and completion time
7.1.1 The execution of the works shall commence from the date of
commencement as mentioned in the work order and the
completion period for the work shall also be reckoned from the said
date. The time allowed for execution of the works or the extended
time in accordance with these conditions shall be the essence of the
Contract.

34

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6.13 ÃÖִ֐ÖÏß úÖ »ÖêÖ֍ú¸üÖ
6.13.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­ÖÖ´Ö «üÖ¸üÖ •ÖÖ¸üß ×ú‹ Ö‹ ×­Ö:¿Ö㻍ú/¿Öã» úµÖÖêµÖ ÃÖ³Öß ÃÖִ֐ÖÏß úÖ »ÖêÖÖ-•ÖÖêÖÖ
¸üÖëÖê… ¾ÖÆü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ¯Ö¸üÖ´ÖÙ¿ÖŸÖ ¾Ö ˆ­Öêú «üÖ¸üÖ ¯ÖÏÖ¯ÖÖ úß Ö‡Ô ÃÖִ֐ÖÏß úÖ ³Öß
»ÖêÖÖ-•ÖÖêÖÖ ¸üÖëÖê… ÃÖִ֐ÖÏß úÖ µÖÆü »ÖêÖÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ´ÖÖӐÖê •ÖÖ­Öê ¯Ö¸ †Öî¸ü ÃÖÓ×¾Ö¤üÖ
úß ÃÖ´ÖÖÛ¯ŸÖ êú ÃÖ´ÖµÖü ¯ÖÏßÖãŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ÃÖִ֐ÖÏß »ÖêÖ֍ú¸üÖ ¯ÖæÖÔ ÆüÖê •ÖÖ­Öê êú ²ÖÖ¤ü Æüß
¬ÖÖ׸üŸÖ ¸üÖ×¿Ö ¾ÖÖ¯ÖÃÖ úß •ÖÖ‹Öß…
6.13.2 ÃÖִ֐ÖÏß úß ¾ÖÖßÖ׾֍ú ˆ¯ÖµÖÖêÖ úß Ö‡Ô ´ÖÖ¡ÖÖ úß ÖÖ­ÖÖ ¸êüÖÖ×“Ö¡Ö †Öî¸ü ×¾Ö×­Ö¤êü¿ÖÖí êú †­ÖãÃÖÖ¸ü
´Ö֭֍ú ÃÖæ¡Ö/³ÖÖ¸üŸÖßµÖ ´Ö֭֍ú ²µÖæ¸üÖ/ê †­Öã´ÖÖêפüŸÖ úØ™üÖ ¯»ÖÖ­Ö, •ÖÖê ³Öß »Ö֐Öæ ÆüÖ,ê êú †Ö¬ÖÖ¸ü ¯Ö¸ü
׍úµÖÖ •ÖÖ‹ÖÖ… †­Öã–ÖêµÖ ¾ÖÖ¯ÖÃÖßµÖÖêµÖ ú“Ö¸üÖ †Öî¸ü †¥ü¿µÖ ú“Ö¸üÖ †­ÖãÃÖæ“Öß "²Öß" êú †­ÖãÃÖÖ¸ü
ÆüÖêÖÖ…
6.13.3 †Ö¯ÖæÙŸÖ ¾Ö œüÖÓ“ÖÖ Ö›ÍüÖ ú¸ü­Öê úÖ ¯Öîêú•Ö ÆüÖê­Öê úß ÛãÖ×ŸÖ ´Öë ¾ÖÖ¯ÖÃÖßµÖÖêµÖ ú“Ö¸êü êú ×¾Ö¾Ö¸üÖ/´ÖÖ¡ÖÖ
êú ²ÖÖ¸êü ´Öë ÃÖ³Öß ¿ÖÖ×´Ö»Ö ´Ö¤üÖë êú ×»Ö‹ †ÖµÖÖê×•ÖŸÖ úß •ÖÖ­Öê ¾ÖÖ»Öß ²ÖÖê»Öß ¯Öæ¾ÖÔ ²Öîšüú ´Öë “Ö“ÖÖÔ úß
•ÖÖ‹Öß…
6.13.4 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ­ÖÖê×™üÃÖ ×¤ü‹ •ÖÖ­Öê êú 15 פü­ÖÖë êú ³Öߟָü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆÃÖê •ÖÖ¸üß
׍ú‹ Ö‹/ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖÏÖ¯ÖÖ ×ú‹ Ö‹ ÃÖÖ´ÖÖ­Ö ŸÖ£ÖÖ †×³Öú»¯Ö ¾Ö ¸êüÖÖד֡ÖÖë êú †­ÖãÃÖÖ¸ü
†­Öã–ÖêµÖ ú“Ö¸êü ÃÖ×ÆüŸÖ ˆ¯ÖµÖÖêÖ ´Öë ×»Ö‹ Ö‹ ÃÖÖ´ÖÖ­Ö úß ´ÖÖ¡ÖÖ úÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖÓŸÖã™ü
ú¸ü­Öê µÖÖêµÖ ×´Ö»ÖÖ­Ö ×¾Ö¾Ö¸üÖ ŸÖîµÖÖ¸ü ׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ¯ÖÏßÖãŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
6.13.5 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×´Ö»ÖÖ­Ö ×¾Ö¾Ö¸üÖ ¯ÖÏßÖãŸÖ ­ÖÆüà ú¸üŸÖÖ Æîü ŸÖ£ÖÖ †£Ö¾ÖÖ/†­Öã–ÖêµÖ ú“Ö¸êü ÃÖ×ÆüŸÖ
ÃÖî¨üÖÓן֍ú ºþ¯Ö ÃÖê ˆ¯ÖµÖÖêÖ úß Ö‡Ô ´ÖÖ¡ÖÖ ÃÖê †×¬Öú ´ÖÖ¡ÖÖ úÖê ¾ÖÖ¯ÖÃÖ ‹­Ö¯ÖßÃÖ߆ևԋ»Ö ³ÖÓ›üÖ¸ü ´Öë
•Ö´ÖÖ ­ÖÆüà ú¸üŸÖÖ Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯Ö¸ü ˆÃÖ ÃÖִ֐ÖÏß úß ²ÖÖ•ÖÖ¸ü ¤ü¸ü êú †­ÖãÃÖÖ¸ü
‹­Ö¯ÖßÃÖ߆ևԋ»Ö ³ÖÓ›üÖ¸ü ´Öë ¯ÖÓÆãü“ÖÖ­Öê úß úß´ÖŸÖ êú ÃÖÖ£Ö-ÃÖÖ£Ö ¤ü›ü ³Öß †×¬Ö¸üÖê×¯ÖŸÖ ×úµÖÖ •ÖÖ
Ã֍úŸÖÖ Æîü…
6.14 ´ÖêÖÖ ¯ÖÖ¾Ö¸ü ¯Ö׸üµÖÖê•Ö­ÖÖ ×¸üµÖÖµÖŸÖ
6.14.1 µÖפü ×­Ö×¾Ö¤üÖ †Ö´ÖÓ¡ÖÖ ÃÖæ“Ö­ÖÖ êú †­ÖãÃÖÖ¸ü »Ö֐Öæ ÆüÖê ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ú¸üÖë ¾Ö ¿Ö㻍úÖë ´Öë ×´Ö»Ö­Öê
¾ÖÖ»Öê ÃÖ´ÖÃŸÖ ´ÖêÖÖ¯ÖÖ¾Ö¸ü ¯Ö׸üµÖÖê•Ö­ÖÖ ×¸üµÖÖµÖŸÖÖë úÖê ¿ÖÖ×´Ö»Ö ú¸ëüÖê… ×­ÖÖ´Ö úß ×•Ö´´Öê¤üÖ¸üß êú¾Ö»Ö
†Ö¾Ö¿µÖú ¯ÖÏ´ÖÖÖ¯Ö¡Ö •ÖÖ¸üß ú¸ü­Öê ŸÖú Æüß ÃÖß×´ÖŸÖ ÆüÖêÖß… ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ´ÖêÖÖ¯ÖÖ¾Ö¸ü ¯Ö׸üµÖÖê•Ö­ÖÖ
׸üµÖÖµÖŸÖë ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ×»Ö‹ ¿ÖêÂÖ †Ö¾Ö¿µÖúŸÖÖ‹Ó Ã¾ÖµÖÓ ¯Öæ¸üß ú¸ü­Öß ÆüÖêÖß †Öî¸ü ‡Ã֍êú ×»Ö‹
×­ÖÖ´Ö úÖê‡Ô †×ŸÖ׸üŒŸÖ Ö“ÖÔ ­ÖÆüà ú¸êüÖÖ…
7. ¯ÖÏÖ¸Óü³Ö, ×¾Ö»ÖÓ²Ö †Öî¸ü ×­Ö»ÖÓ²Ö­Ö
7.1 úÖµÖÔ úÖ ¯ÖÏÖ¸Óü³Ö ¾Ö ¯ÖæÖÔŸÖÖ ÃÖ´ÖµÖ
7.1.1 úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö úÖ ¯ÖÏÖ¸Óü³Ö úÖµÖÔ †Ö¤êü¿Ö ´Öë ¾ÖÙÖŸÖ úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê úß ŸÖÖ¸üßÖ ÃÖê
׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü úÖµÖÔ ÃÖ´ÖÖÛ¯ŸÖ úÖ ÃÖ´ÖµÖ ³Öß ˆŒŸÖ ŸÖÖ¸üßÖ ÃÖê Æüß ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ… úÖµÖÔ
×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ †­Öã´Ö­µÖ ÃÖ´ÖµÖ µÖÖ ‡­Ö ¿ÖŸÖÖí êú †­ÖãÃÖÖ¸ü ×¾ÖßÖÖ׸üŸÖ ÃÖ´ÖµÖ ÃÖÓ×¾Ö¤üÖ úÖ ŸÖŸ¾Ö
ÆüÖêÖß…

34

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7.1.2 If the Contractor commits default in commencing the execution of the
work as aforesaid; the Corporation shall without prejudice to any other
right or remedy be at liberty to forfeit the Bid security absolutely.
7.2 Program
7.2.1 The Contractor shall submit a detailed resource based time program for
physical & financial progress of the Works to the Engineer-in-charge for his
approval, within 30 days after Commencement of Works as defined in sub-
clause 7.1. The Contractor shall also submit a revised program whenever
the previous program is inconsistent with actual progress or with the
Contractor’s obligations.
7.2.2 Each program shall include:
(a) the order in which the Contractor intends to carry out the Works, including
the anticipated timing of each stage or activity or milestone of design,
submission of Contractor’s Documents, procurement, manufacture of
Plant, delivery to Site, construction, erection and testing including resource
mobilization details,
(b) Sub-Contractor wise detailed breakup of the above stages of work,
(c) the sequence and timing of inspections and tests specified in the Contract,
and
(d) a supporting report which includes:
(i) a general description of the working methodology which the Contractor
intends to adopt for the major stages / activities, in the execution of the
Works, and
(ii) Contractor’s resource mobilization details stating reasonable estimate of
the number of each class of Contractor’s Personnel and of each type of
Contractor’s Equipment, required on the Site for each major stage/
activity.
7.2.3 The program shall define as mentioned above, intermediate milestones
which will form the basis for, monitoring the progress and initiating such
corrective measures as may be decided by the Engineer-in-charge which
shall be final and binding.
7.2.4 Within 15 days of receipt of the program, the Engineer-in-charge shall give
notice to the Contractor, stating the extent to which the program does not
comply with the Contract. In absence of the same, the Contractor shall
proceed in accordance with the program, subject to his other obligations
under the Contract.
7.2.5 The Corporation’s Personnel shall be entitled to rely upon such program
when planning their activities.
7.2.6 If, at any time, the Engineer-in-charge gives notice to the Contractor that a
program fails to comply with the Contract or to be consistent with actual
progress and the Contractor’s stated intentions, the Contractor shall submit
a revised program to the Engineer without any further delay.
7.2.7 It is expected that e-governance will be largely adopted for submission of
programs / reports during execution of work.

35

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7.1.2 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆ¯ÖµÖãÔŒŸÖ êú †­ÖãÃÖÖ¸ü úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö †Ö¸Óü³Ö ú¸ü­Öê ´Öë †ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü ŸÖÖê ׭֐ִÖ
׍úÃÖß †­µÖ †×¬ÖúÖ¸ü µÖÖ ˆ¯Ö“ÖÖ¸üß ˆ¯ÖÖµÖ êú ¯Öæ¾ÖÖԐÖÏÆü êú ²ÖÖî¸ü ²ÖÖê»Öß ¯ÖÏןֳÖæ ¸üÖ×¿Ö úÖê •Ö²ŸÖ ú¸ü­Öê êú
×»Ö‹ þ֟ÖÓ¡Ö ÆüÖêÖÖ…
7.2 úÖµÖԍÎú´Ö
7.2.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆ¯Ö-Ö›ü 7.1´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ÆüÖê­Öê êú 30 פü­ÖÖë êú †Ó¤ü¸ü ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ ê †­Öã´ÖÖê¤ü­Ö ÆêüŸÖ㠍úÖµÖÔ úÖ ÃÖÓÃÖÖ¬Ö­Ö †Ö¬ÖÖ׸üŸÖ ×¾ÖßÖéŸÖ ³ÖÖîן֍ú ¾Ö ×¾Ö¢ÖßµÖ ¯ÖϐÖ×ŸÖ úÖ
ÃÖ´ÖµÖ úÖµÖԍÎú´Ö ¯ÖÏßÖãŸÖ ú¸êüÖÖ… •Ö²Ö ú³Öß ×¯Ö”û»ÖÖ úÖµÖԍÎú´Ö ¾ÖÖßÖ׾֍ú ¯ÖϐÖ×ŸÖ µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü
úß ²ÖÖ¬µÖŸÖÖ†Öë ÃÖê ×³Ö®Ö ÆüÖê •ÖÖ‹ ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‹ú ÃÖÓ¿ÖÖê×¬ÖŸÖ úÖµÖԍÎú´Ö ³Öß ¯ÖÏßÖãŸÖ ú¸ü­ÖÖ
ÆüÖêÖÖ…
7.2.2 ¯ÖÏŸµÖêú úÖµÖԍÎú´Ö ´Öë ×­Ö´­Ö×»Ö×ÖŸÖ ¿ÖÖ×´Ö»Ö ÆüÖëÖê :
(‹) ¯ÖÏŸµÖêú “Ö¸üÖ µÖÖ úÖ¸Ôü¾ÖÖ‡Ô µÖÖ †×³Öú»¯Ö êú ´Öß»ÖßÖÓ³Ö ´Öë »ÖÖ­Öê ¾ÖÖ»ÖÖ ÃÖÓ³ÖÖ×¾ÖŸÖ ÃÖ´ÖµÖ,
ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¤üßÖÖ¾Öê•ÖÖêÓ úÖ ¯ÖÏßÖãŸÖߍú¸üÖ, ¯ÖÏ֯֝Ö, ÃÖÓµÖÓ¡Ö êú ×­Ö´ÖÖԝÖ, úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ÃÖã¯Öã¤ÔüÖß,
×­Ö´ÖÖԝÖ, ãÖÖ¯Ö­Ö ¾Ö ÃÖÓÃÖÖ¬Ö­Ö •Öã™üÖ­Öê êú ×¾Ö¾Ö¸üÖ ‹¾ÖÓ ¯Ö¸üßÖÖ ÃÖ×ÆüŸÖ ¾ÖÆü Îú´Ö וÖÃ֍êú †­ÖãÃÖÖ¸ü
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔ ¯Öæ¸üÖ ú¸ü­ÖÖ “ÖÖÆüŸÖÖ Æîü…
(²Öß) úÖµÖÔ êú ˆ¯ÖµÖãÔŒŸÖ “Ö¸üÖÖë úÖ ˆ¯Ö-ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¾ÖÖ¸ü ×¾ÖßÖéŸÖ ×¾Ö¾Ö¸üÖ…
(ÃÖß) ÃÖÓ×¾Ö¤üÖ êú ×¾Ö×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü ×­Ö¸ü߁֝ÖÖêÓ ¾Ö ¯Ö¸ü߁֝ÖÖë úÖ Îú´Ö ¾Ö ÃÖ´ÖµÖ ŸÖ£ÖÖ
(›üß) ‹ú ÃÖÆüֵ֍ú ׸ü¯ÖÖê™Ôü וÖÃÖ´Öë ×­Ö´­Ö×»Ö×ÖŸÖ ¿ÖÖ×´Ö»Ö ÆüÖë :
(i) úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö ´Öë ¯ÖÏ´ÖãÖ “Ö¸üÖÖë/ÖןÖ×¾Ö׬ֵÖÖë êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ†¯Ö­ÖÖ‡Ô •ÖÖ­Öê
¾ÖÖ»Öß úÖµÖÔ¯Ö¨ü×ŸÖ úÖ ÃÖÖ´ÖÖ­µÖ ×¾Ö¾Ö¸üÖ †Öî¸ü
(ii) ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ÃÖÓÃÖÖ¬Ö­Ö ÃÖӐÖÏÆüÖ ×¾Ö¾Ö¸üÖ וÖÃÖ´Öë úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ¯ÖÏŸµÖêú ¯ÖÏ´ÖãÖ
“Ö¸üÖ/ÖןÖ×¾Ö×¬Ö êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ׸üµÖÖë úß ¯ÖÏŸµÖêú ÁÖêÖß †Öî¸ü
ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¯ÖÏŸµÖêú ׍úÃ´Ö êú ˆ¯Öú¸üÖ úÖ ˆ×“ÖŸÖ †Öú»Ö­Ö ¿ÖÖ×´Ö»Ö ÆüÖê…
7.2.3 •ÖîÃÖÖ ×ú ‰ú¯Ö¸ü ²ÖŸÖÖµÖÖ ÖµÖÖ Æîü,ú úÖµÖԍÎú´Ö ´Öë úÖµÖÔ úß ¯ÖϐÖ×ŸÖ êú ´ÖÖ­Öß™ü¸ü­Ö †Öî¸ü ˆ­Ö ×­Ö¾ÖÖ¸üú
ˆ¯ÖÖµÖÖêÓ, ו֭Æëü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ×­Ö¬ÖÖÔ׸üŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü •ÖÖê †ÓןִÖ
¾Ö ²ÖÖ¬µÖúÖ¸üß ÆüÖëÖê, êú ×»Ö‹ †Ö¬ÖÖ¸ü úÖ úÖµÖÔ ú¸ü­Öê ¾ÖÖ»Öê ´ÖÖ¬µÖ״֍ú ´Öß»ÖßÖÓ³ÖÖêÓ úÖê ¯Ö׸ü³ÖÖ×ÂÖŸÖ
׍úµÖÖ •ÖÖ‹ÖÖ…
7.2.4 µÖÆü úÖµÖԍÎú´Ö ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú 15 פü­ÖÖë êú ³Öߟָü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ­ÖÖê×™üÃÖ ¤ëüÖê
וÖÃÖ´Öë ²ÖŸÖÖµÖÖ •ÖÖ‹ÖÖ ×ú µÖÆü úÖµÖԍÎú´Ö ׍úÃÖ Æü¤ü ŸÖú ÃÖÓ×¾Ö¤üÖ úÖ †­ÖãÃÖ¸üÖ ­ÖÆüà ú¸üŸÖÖ Æîü…
µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê µÖÆü ­ÖÖê×™üÃÖ ¯ÖÏÖ¯ŸÖ ­ÖÆüà ÆüÖêŸÖÖ Æîü ŸÖÖê ¾ÖÆü úÖµÖԍÎú´Ö êú †­ÖãÃÖÖ¸ü †¯Ö­ÖÖ úÖµÖÔ
†ÖÖê ²ÖœÍüÖ Ã֍úŸÖÖ Æîü ¯Ö¸ÓüŸÖã µÖÆü ‡ÃÖ ÃÖÓ×¾Ö¤üÖ úß ˆÃ֍úß †­µÖ ²ÖÖ¬µÖŸÖÖ†Öë êú †¬Öß­Ö ÆüÖêÖÖ…
7.2.5 ×­ÖÖ´Ö êú ú´ÖÔ“ÖÖ׸üµÖÖë úÖê †¯Ö­Öß úÖ¸Ôü¾ÖÖ‡Ô µÖÖê•Ö­ÖÖ ²Ö­ÖÖŸÖê ÃÖ´ÖµÖ ‡ÃÖ úÖµÖԍÎú´Ö úÖê ¬µÖÖ­Ö ´Öë
¸üÖ­ÖÖ ÆüÖêÖÖ…
7.2.6 µÖפü ׍úÃÖß ÃÖ´ÖµÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ­ÖÖê×™üÃÖ ¤êüŸÖê Æïü ׍ú †´Öãú úÖµÖԍÎú´Ö ÃÖÓ×¾Ö¤üÖ
úê †­ÖãÃÖÖ¸ü ­ÖÆüà “Ö»Ö ¸üÆüÖ Æîü µÖÖ ¾ÖÖßÖ׾֍ú ¯ÖϐÖ×ŸÖ †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×¤ü‹ Ö‹ ú£Ö­Ö êú
†­Öãºþ¯Ö ­ÖÆüà Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ²ÖÖî¸ü úÖê‡Ô †Öî¸ü ×¾Ö»ÖÓ²Ö ×ú‹ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ÃÖ´ÖÖ ‹ú
ÃÖÓ¿ÖÖê×¬ÖŸÖ úÖµÖԍÎú´Ö ¯ÖÏßÖãŸÖ ú¸ëüÖê…
7.2.7 †¯ÖêÖÖ úß •ÖÖŸÖß Æîü ׍ú úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö êú ¤üÖî¸üÖ­Ö úÖµÖԍÎú´Ö/׸ü¯ÖÖê™Ôü úÖê ¯ÖÏßÖãŸÖ ú¸ü­Öê êú ×»Ö‹
´ÖãµÖ ºþ¯Ö ÃÖê ‡Ô-Ö¾Ö­ÖíÃÖ úÖê †¯Ö­ÖÖµÖÖ •ÖÖ‹ÖÖ…
35

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7.3 Early Detection of Hindrances
7.3.1 The Contractor shall intimate the Engineer-in-charge at the earliest
opportunity, of specific likely future events or circumstances that may
adversely affect the quality of the work, increase in the Contract Price or
delay the execution of works. The Engineer-in-charge may require the
Contractor to provide an estimate of the expected effect of the event or
circumstance on the Contract Price and Completion Date. The estimate is
to be provided by the Contractor as soon as reasonably possible.
7.3.2 The information provided by the Contractor can be used by the Engineer-
in-Charge for considering his proposals to overcome the eventualities or
reduce the effect on execution and completion of work as per contract
conditions.
7.4 Hindrances
7.4.1 The Contractor is required to record the hindrance if any, while carrying
out the construction work as well as executing the work in respect of
design, engineering, procurement and supply related issues, in the
hindrance register maintained by the Engineer-in-charge. The Contractor
shall record hindrances in the Hindrance Register(s) and get it approved/
endorsed by the Engineer-in-Charge, as the case may be.
7.4.2 Hindrances recorded in the register shall form the basis for granting
extension of time. The format of the hindrance register is annexed.
7.5 Rate of Progress
7.5.1 The Contractor shall submit a report on rate of progress of work at the
desired frequency, as requested by engineer-in charge.
If, at any time Engineer-in-charge notices that the:
(a) Actual progress is too slow to complete within the Time for Completion,
and/or
(b) Progress has fallen or will fall behind the current program under Sub-Clause
7.2
then the Engineer-in-charge may instruct the Contractor to submit the revised
program, as envisaged in Sub-Clause 7.2, along with supporting report
describing the revised methods which the Contractor proposes to adopt in
order to expedite progress and complete the interim milestones as per the
given schedule as well as complete the whole work within the time
stipulated in the contract.
7.5.2 Unless the Engineer-in-charge notifies otherwise, the Contractor shall adopt
these revised methods, which may require increases in the working hours
and/or in the numbers of Contractor’s Personnel and/or Goods, at the risk
and cost of the Contractor.
7.6 Extension of Time for Completion
7.6.1 Request for extension of time, has to be made by the Contractor in writing
within 15 days of the occurrence of the event causing delay. The
Contractor shall indicate the period for which extension is desired, in such
request.
36

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7.3 ¯ÖÏןֲÖÖ¬ÖÖ†ÖêêÓ úß µÖ£ÖÖ¿Öß‘ÖÐ ¯ÖÆü“ÖÖ­Ö
7.3.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔ úß ÖãÖ¾Ö¢ÖÖ ¯Ö¸ü ¯ÖÏן֍æú»Ö ¯ÖϳÖÖ¾Ö ›üÖ»Ö­Öê ¾ÖÖ»Öß, ÃÖÓ×¾Ö¤üÖ úß úß´ÖŸÖ úÖê ²ÖœÍüÖ­Öê
¾ÖÖ»Öß µÖÖ úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö ´Öë ×¾Ö»ÖÓ²Ö ú¸ü Ã֍ú­Öê ¾ÖÖ»Öß ×úÃÖß ÃÖÓ³ÖÖ×¾ÖŸÖ ×¾Ö׿Ö™ü ‘Ö™ü­ÖÖ µÖÖ
¯Ö׸üÛãÖןֵÖÖêÓ úß ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê µÖ£ÖÖ ¿Öß‘ÖÐ ÃÖæ“Ö­ÖÖ ¤ëüÖê… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê
‹êÃÖß ‘Ö™ü­ÖÖ µÖÖ ¯Ö׸üÛãÖ×ŸÖ êú úÖ¸üÖ ÃÖÓ×¾Ö¤üÖ úß úß´ÖŸÖ ´Öë ÆüÖê­Öê ¾ÖÖ»Öß ¾Öéרü µÖÖ úÖµÖÔ¯ÖæÖÔŸÖÖ ´Öë
ÆüÖê­Öê ¾ÖÖ»Öê ×¾Ö»ÖÓ²Ö úÖ †­Öã´ÖÖ­Ö ´ÖÖÓÖ Ã֍úŸÖê Æïü… ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ו֭֟ÖÖ •Ö»¤üß ÃÖÓ³Ö¾Ö ÆüÖ,ê µÖÆü
†­Öã´ÖÖ­Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ˆ¯Ö»Ö²¬Ö ú¸üÖ­ÖÖ ÆüÖêÖÖ…
7.3.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô Ö‡Ô ÃÖæ“Ö­ÖÖ úÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ‹êÃÖß ‘Ö™ü­ÖÖ†Öë êú úÖ¸üÖ
úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö †Öî¸ü ÃÖÓ×¾Ö¤üÖ úß ¿ÖŸÖÖí êú †­ÖãÃÖÖ¸ü úÖµÖÔ¯ÖæÖÔŸÖÖ ¯Ö¸ü ¯Ö›Íü­Öê ¾ÖÖ»Öê ¯ÖϳÖÖ¾Ö úÖê ¤æü¸ü
ú¸ü­Öê µÖÖ ˆÃÖê ­µÖæ­ÖŸÖ´Ö ¸üÖ­Öê êú ¯ÖÏßÖÖ¾ÖÖêÓ ¯Ö¸ü ×¾Ö“ÖÖ¸ü ú¸üŸÖê ÃÖ´ÖµÖ ˆ¯ÖµÖÖêÖ ú¸ü Ã֍úŸÖê Æïü…
7.4 ¯ÖÏןֲÖÖ¬ÖÖ‹Ó
7.4.1 ×­Ö´ÖÖÔÖ úÖµÖÔ êú ¤üÖî¸üÖ­Ö †£Ö¾ÖÖ úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö êú ¤üÖî¸üÖ­Ö †×³Öú»¯Ö, †×³ÖµÖӡ֝Ö, ¯ÖÏÖ¯ÖÖ ¾Ö
†Ö¯ÖæÙŸÖ ÃÖÓ²ÖÓ¬Öß ´Öã§üÖë ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ µÖפü úÖê‡Ô ¯ÖÏןֲÖÖ¬ÖÖ‹Ó †ÖŸÖß Æïü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆ­Æëü ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ «üÖ¸üÖ ¸üÖê Ö‹ ¯ÖÏןֲÖÖ¬ÖÖ ¸üוÖÙü¸ü (¸üÖ)ë ´Öë ¤ü•ÖÔ ú¸ëüÖê †Öî¸ü ‡ÃÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ
†­Öã´ÖÖêפüŸÖ/¯ÖéšüÖÓ׍úŸÖ, •ÖîÃÖÖ ³Öß ´ÖÖ´Ö»ÖÖ ÆüÖ,ê ú¸ü¾Ö֋ӐÖê…
7.4.2 ‡ÃÖ ¸üוÖÙü¸ü ´Öë ¤ü•ÖÔ úß Ö‡Ô ¯ÖÏןֲÖÖ¬ÖÖ†Öë êú †Ö¬ÖÖ¸ü ¯Ö¸ü Æüß ÃÖ´ÖµÖ úÖ ×¾ÖßÖÖ¸ü ¤êü­Öê ¯Ö¸ü ×¾Ö“ÖÖ¸ü
׍úµÖÖ •ÖÖ‹ÖÖ… ¯ÖÏןֲÖÖ¬ÖÖ ¸üוÖÙü¸ü úÖ ¯ÖÏÖºþ¯Ö ¯Ö׸ü׿Ö™ü ´Öë פüµÖÖ ÖµÖÖ Æîü…
7.5 ¯ÖϐÖ×ŸÖ úß ¤ü¸ü
7.5.1 ÃÖÓ×¾Ö¤ü֍úÖ¸,ü úÖµÖÔ ¯ÖϐÖ×ŸÖ ¤ü¸ü úß ×¸ü¯ÖÖê™Ôü úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ¾ÖÖÓ×”ûŸÖ †Ö¾Öé×¢Ö ¯Ö¸ü ¯ÖÏßÖãŸÖ
ú¸êüÖÖ…
µÖפü ׍úÃÖß ÃÖ´ÖµÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ÃÖÓ–ÖÖ­Ö ´Öë †ÖŸÖÖ Æîü ׍ú :
(‹) ¾ÖÖßÖ׾֍ú ¯ÖϐÖ×ŸÖ úÖµÖÔ úÖê ÃÖ´ÖµÖ ¯Ö¸ü ¯ÖæÖÔ ú¸ü­Öê êú ×ÆüÃÖÖ²Ö ÃÖê úÖ±úß ¬Öß´Öß Æîü †Öî¸ü/µÖÖ
(²Öß) ¯ÖϐÖ×ŸÖ ˆ¯ÖÖ›ü 7.2 êú †¬Öß­Ö ¾ÖŸÖÔ´ÖÖ­Ö úÖµÖԍÎú´Ö ÃÖê ¬Öß´Öß ¯Ö›Íü Ö‡Ô Æîü µÖÖ ¬Öß´Öß ÆüÖê­Öê
¾ÖÖ»Öß Æîü
ŸÖÖê, ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ˆ¯ÖÖ›ü 7.2 êú †­ÖãÃÖÖ¸ü ÃÖÓ¿ÖÖê×¬ÖŸÖ úÖµÖԍÎú´Ö ¯ÖÏßÖãŸÖ
ú¸ü­Öê úÖ ×­Ö¤êü¿Ö ¤êü Ã֍úŸÖê Æïü… ‡Ã֍êú ÃÖÖ£Ö Æüß ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖÆüֵ֍ú ׸ü¯ÖÖê™Ôü ³Öß ¯ÖÏßÖãŸÖ ú¸ü­Öß
ÆüÖêÖß ×•ÖÃÖ´Öë úÖµÖÔ ¯ÖϐÖ×ŸÖ ¤ü¸ü úÖê ŸÖê•Ö ú¸ü­Öê †Öî¸ü ¤üß Ö‡Ô †­ÖãÃÖæ“Öß êú †­ÖãÃÖÖ¸ü ´ÖÖ¬µÖ״֍ú
´Öß»ÖßÖÓ³ÖÖêÓ úÖê ¯Öæ¸üÖ ú¸ü­Öê †Öî¸ü ÃÖÖ£Ö Æüß ÃÖ´¯ÖæÖÔ úÖµÖÔ úÖê ÃÖÓ×¾Ö¤üÖ ´Öë ²ÖŸÖÖ‡Ô Ö‡Ô †¾Ö×¬Ö êú ³Öߟָü
¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ †¯Ö­ÖÖ‡Ô •ÖÖ­Öê ¾ÖÖ»Öß ¯ÖÏßÖÖ×¾ÖŸÖ ÃÖÓ¿ÖÖê×¬ÖŸÖ ×¾Ö×¬Ö úÖ
×¾Ö¾Ö¸üÖ פüµÖÖ •ÖÖ‹ÖÖ…
7.5.2 •Ö²Ö ŸÖú ׍ú ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­µÖ£ÖÖ †×¬ÖÃÖæ×“ÖŸÖ ­Ö ׍úµÖÖ •ÖÖ‹, ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡­Ö
ÃÖÓ¿ÖÖê×¬ÖŸÖ ×¾Ö׬ֵÖÖë úÖê †¯Ö­Ö֋ӐÖê… ‡ÃÖ´Öë úÖµÖÔ‘ÖÓ™êü ²ÖœÍüÖ­Öê †Öî¸ü/†£Ö¾ÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úִ֐ÖÖ¸üÖë
úß ÃÖӏµÖÖ ²ÖœÍüÖ­Öê †Öî¸ü/†£Ö¾ÖÖ ÃÖÖ´ÖÖ­Ö ²ÖœÍüÖ­Öê †Öפü úß †Ö¾Ö¿µÖúŸÖÖ ¯Ö›Íü Ã֍úŸÖß Æîü †Öî¸ü ‡ÃÖê
ÃÖÓÓ×¾Ö¤ü֍úÖ¸ü êú •ÖÖê×Ö´Ö ¾Ö Ö“ÖÔ ¯Ö¸ü ׍úµÖÖ •ÖÖ‹ÖÖ…
7.6 úÖµÖÔ¯ÖæÖÔŸÖÖ ÃÖ´ÖµÖ úÖ ×¾ÖßÖÖ¸ü
7.6.1 ÃÖ´ÖµÖ êú ×¾ÖßÖÖ¸ü úÖ †­Öã¸üÖê¬Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×¾Ö»ÖÓ²Ö ú¸ü­Öê ¾ÖÖ»Öß ‘Ö™ü­ÖÖ ‘Ö×™üŸÖ ÆüÖê­Öê êú 15
פü­ÖÖë êú ³Öߟָü ×»Ö×ÖŸÖ ºþ¯Ö ÃÖê ׍úµÖÖ •ÖÖ‹ÖÖ… ‹êÃÖê †­Öã¸üÖê¬Ö ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ´ÖÖӐÖß •ÖÖ­Öê
¾ÖÖ»Öß ×¾ÖßÖÖ¸ü-†¾Ö×¬Ö úÖ ¾ÖÖÔ­Ö ³Öß ú¸ü­ÖÖ ÆüÖêÖÖ…
36

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7.6.2 All such events or requests shall be considered and analysed by the
Engineer-in-charge within 30 days before completion period of the
contract and the decision regarding the extension of time is to be
communicated to the Contractor before completion date.
7.6.3 The absence of any request or application from the Contractor for
extension of time shall not be a bar for giving a fair and reasonable
extension by the Engineer-in-charge and this shall be binding on the
Contractor.
7.7 Compensation for delay
7.7.1 Compensation for delay shall be levied in the contracts where the
estimated cost put to tender is above Rs. 5 Lakhs.
7.7.2 If the Contractor fails to maintain the required progress or to complete
the work and clear the site on or before the Contract or agreed extended
date of completion, the Contractor shall, without prejudice to any other
right or remedy of the Corporation on account of such breach, pay as
agreed compensation amount calculated as stipulated below or such
smaller amount as be fixed by the Corporation on the Contract Value
of the work for every week that the progress remains below that
specified in contract document or that the work remains incomplete.
7.7.3 These delay damages shall be the amount calculated by the Corporation
on the Contract Value of the work for every week that the progress
remains below that specified in contract document or that the work
remains incomplete.
7.7.4 The term `Contract Value' shall be the value at contract rates of the work
as ordered. This shall exclude the value of the part of works which has been
taken over and put in use by the Corporation.
7.7.5 The delay damages would be as follow:-
(a) Completion period (originally stipulated) not exceeding 1 year - 1% of
Contract Value per week.
(b) Completion period (originally stipulated) exceeding 1 year and not
exceeding 3 years -1/2% of the Contract Value per week.
(c) Completion period (originally stipulated) exceeding 3 years – 1/4% of
Contract Value per week.
7.7.6 However, the total amount due under this Sub-Clause shall not exceed 5%
of the total value of the Contract value or of the Contract Value of the
item or group of items of work for which a separate period of
completion is specified.
7.7.7 These delay damages shall be the only damages due from the Contractor
for such default, other than in the event of termination under Clause 13
[Contract Termination by Corporation] prior to completion of the Works.
These damages shall not relieve the Contractor from his obligation to
complete the Works, or from any other duties, obligations or responsibilities
which he may have under the Contract.
7.7.8 The amount of compensation shall be adjusted or set off against any sum
payable to the Contractor under this or any other contract(s) with same
unit or any other unit(s) of the Corporation.

37

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7.6.2 ‹êÃÖß ÃÖ³Öß ‘Ö™ü­ÖÖ†Öë µÖÖ †­Öã¸üÖê¬ÖÖë ¯Ö¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖÓ×¾Ö¤üÖ ÃÖ´ÖÖׯŸÖ úß ŸÖÖ¸üßÖ êú 30 פü­ÖÖë ÃÖê
¯ÖÆü»Öê Æüß ×¾Ö“ÖÖ¸ü ú¸ü­ÖÖ ÆüÖêÖÖ †Öî¸ü ÃÖ´ÖµÖ-×¾ÖßÖÖ¸ü êú ²ÖÖ¸êü ´Öë ×»Ö‹ Ö‹ ׭֝ÖÔµÖ ÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê
ÃÖÓ×¾Ö¤üÖ-¯ÖæÖÔŸÖÖ ŸÖÖ¸üßÖ ÃÖê ¯ÖÆü»Öê †¾ÖÖŸÖ ú¸ü­ÖÖ ÆüÖêÖÖ…
7.6.3 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ˆ×“ÖŸÖ ¾Ö ŸÖÔú¯ÖæÖÔ ÃÖ´ÖµÖ-×¾ÖßÖÖ¸ü ¤êü­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê ׍úÃÖß ¯ÖύúÖ¸ü úÖ
†­Öã¸üÖê¬Ö µÖÖ †Ö¾Öê¤ü­Ö ¯ÖÏÖ¯ŸÖ ÆüÖê­ÖÖ úÖê‡Ô ¿ÖŸÖÔ ­ÖÆüà Æîü †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡Ã֍úÖ ¯ÖÖ»Ö­Ö ú¸ü­Öê êú ×»Ö‹ ²ÖÖ¬µÖ
ÆüÖêÖÖ…
7.7 ×¾Ö»ÖÓ²Ö úß Öן֯ÖæÙŸÖ
7.7.1 ×•Ö­Ö ÃÖÓ×¾Ö¤üÖ†Öë êú ×»Ö‹ ×­Ö×¾Ö¤üÖ ´Öë פüµÖÖ ÖµÖÖ ´Öæ»µÖ ¹ý. 5 »ÖÖÖ ÃÖê †×¬Öú ÆüÖê, ˆ­Ö ÃÖÓ×¾Ö¤üÖ†Öë ´Öë
×¾Ö»ÖÓ²Ö úß Öן֯ÖæÙŸÖ úÖ ¯ÖϳÖÖ¸ü •ÖÖê›ÍüÖ •ÖÖ‹ÖÖ…
7.7.2 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü †Ö¾Ö¿µÖú ¯ÖϐÖ×ŸÖ ²Ö­ÖÖ‹ ¸üÖ­Öê ´Öë µÖÖ ÃÖÓ×¾Ö¤üÖ úß ¯ÖæÖÔŸÖÖ ŸÖÖ¸üßÖ †£Ö¾ÖÖ ×¾ÖßÖÖ׸üŸÖ
ÃÖ´ÖµÖ úß ŸÖÖ¸üßÖ ŸÖú úÖµÖÔ ¯Öæ¸üÖ ú¸ü úÖµÖÔÃ£Ö»Ö úÖê ÖÖ»Öß ú¸ü­Öê ´Öë †ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü ŸÖÖê, ‹êÃÖê
ˆ»»ÖÓ‘Ö­Ö êú ×»Ö‹ ×­ÖÖ´Ö êú ׍úÃÖß †­µÖ †×¬ÖúÖ¸ü µÖÖ ˆ¯Ö“ÖÖ¸üß ˆ¯ÖÖµÖ êú ¯Öæ¾ÖÖԐÖÏÆ êú ²ÖÖî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü
†ÖÖê ²ÖŸÖÖ‹ Ö‹ †Öú»Ö­Ö êú ×ÆüÃÖÖ²Ö ÃÖê †£Ö¾ÖÖ ×­ÖÖ´Ö «üÖ¸üÖ ×­Ö¬ÖÖÔ׸üŸÖ úß Ö‡Ô †»¯ÖŸÖ¸ü Öן֯ÖæÙŸÖ ¸üÖ׿Ö
úÖ ³ÖãÖŸÖÖ­Ö ú¸êüÖÖ µÖÖ ‹êÃÖê ¯ÖÏŸµÖêú ÃÖ¯ŸÖÖÆü וÖÃÖ´Öë úÖµÖÔ ¯ÖϐÖ×ŸÖ ¤ü¸ü ÃÖÓ×¾Ö¤üÖ ¤üßÖÖ¾Öê•Ö ´Öë פü‹ Ö‹
×¾Ö×­Ö¤ìü¿ÖÖêÓ úß †¯ÖêÖÖ ¬Öß´Öß ¸üÆüß Æîü µÖÖ úÖµÖÔ ¯ÖæÖÔ ­Ö ÆüÖê­Öê úß ÛãÖ×ŸÖ ´Öë ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ ¯Ö¸ü ×­ÖÖ´Ö «üÖ¸üÖ ŸÖµÖ
úß Ö‡Ô ¸üÖ×¿Ö úÖ ³ÖãÖŸÖÖ­Ö ú¸êüÖÖ…
7.7.3 µÖê ×¾Ö»ÖÓ²Ö ÖןֵÖÖÓ ¾ÖÆü ¸üÖ×¿Ö ÆüÖêÖß •ÖÖê ×­ÖÖ´Ö «üÖ¸üÖ ÃÖÓ×¾Ö¤üÖ ¤üßÖÖ¾Öê•Ö êú ×¾Ö×­ÖÙ¤ü¿ÖÖë êú †­ÖãÃÖÖ¸ü ¯ÖÏŸµÖêú
ÃÖ¯ŸÖÖÆü úß ¬Öß´Öß ¯ÖϐÖ×ŸÖ êú †£Ö¾ÖÖ †¯ÖæÖÔ úÖµÖÔ êú ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú ×ÆüÃÖÖ²Ö ÃÖê †Öú×»ÖŸÖ úß •ÖÖ‹…
7.7.4 "ÃÖÓ×¾Ö¤üÖ ´Ö滵Ö" ¿Ö²¤ü ÃÖê ŸÖÖŸ¯ÖµÖÔ µÖ£ÖÖ †Ö¤êü×¿ÖŸÖ úÖµÖÔ úß ÃÖÓ×¾Ö¤üÖ ¤ü¸ü êú ´Öæ»µÖ ÃÖê Æîü… ‡ÃÖ´Öë úÖµÖÔ úÖ
¾ÖÆü ³ÖÖÖ ¿ÖÖ×´Ö»Ö ­ÖÆüà Æîü וÖÃÖê ×­ÖÖ´Ö «üÖ¸üÖ †¯Ö­Öê †×¬ÖúÖ¸ü ´Öë »Öêú¸ü ˆ¯ÖµÖÖêÖ ׍úµÖÖ •ÖÖ­ÖÖ ¯ÖÏÖ¸Óü³Ö ׍úµÖÖ
•ÖÖ “ÖãúÖ ÆüÖê…
7.7.5 ×¾Ö»ÖÓ²Ö ÖןֵÖÖÓ ×­Ö´­Ö×»Ö×ÖŸÖ ÆüÖëÖß :-
(‹) úÖµÖÔ¯ÖæÖÔŸÖÖ ÃÖ´ÖµÖ (´Öæ»ÖŸÖ: †­Öã²Ö¨ü) 1 ¾ÖÂÖÔ ÃÖê †×¬Öú ­Ö ÆüÖê - ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úÖ 1 %
¯ÖÏ×ŸÖ ÃÖ¯ŸÖÖÆü…
(²Öß) úÖµÖÔ¯ÖæÖÔŸÖÖ ÃÖ´ÖµÖ (´Öæ»ÖŸÖ: †­Öã²Ö¨ü) 1 ¾ÖÂÖÔ ÃÖê †×¬Öú ¯Ö¸ÓüŸÖã 3 ¾ÖÂÖÔ ÃÖê †×¬Öú ­Ö ÆüÖê-
ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úÖ 1/2 % ¯ÖÏ×ŸÖ ÃÖ¯ŸÖÖÆü…
(ÃÖß) úúÖµÖÔ¯ÖæÖÔŸÖÖ ÃÖ´ÖµÖ (´Öæ»ÖŸÖ: †­Öã²Ö¨ü) 3 ¾ÖÂÖÔ ÃÖê †×¬Öú ÆüÖê- ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úÖ 1/4 % ¯ÖÏןÖ
ÃÖ¯ŸÖÖÆü…
7.7.6 ŸÖ£ÖÖ×¯Ö ‡ÃÖ ˆ¯ÖÖ›ü êú †ÓŸÖÖÔŸÖ ¤êüµÖ ãú»Ö ¸üÖ×¿Ö ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ †£Ö¾ÖÖ ×úÃÖß ´Ö¤ü µÖÖ ´Ö¤ü ÃÖ´ÖæÆü וÖÃ֍êú
×»Ö‹ ¯Öé£Öú úÖµÖÔ¯ÖæÖÔŸÖÖ ÃÖ´ÖµÖ ×­Ö¬ÖÖÔ׸üŸÖ ׍úµÖÖ ÖµÖÖ ÆüÖ,ê úê ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úß ãú»Ö ¸üÖ×¿Ö ÃÖê 5% ÃÖê
†×¬Öú ­ÖÆüà ÆüÖê­Öß “ÖÖ×Æü‹…
7.7.7 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ³ÖãÖŸÖÖ­Ö úß •ÖÖ­Öê ¾ÖÖ»Öß µÖê ÖןֵÖÖÓ êú¾Ö»Ö ¾ÖÆüß ÖןֵÖÖÓ ÆüÖëÖß •ÖÖê Ö›ü 13 (׭֐ִÖ
«üÖ¸üÖ ÃÖÓ×¾Ö¤üÖ úÖê ×­Ö¸üÃŸÖ ×úµÖÖ •ÖÖ­ÖÖ) êú †ÓŸÖÖÔŸÖ úÖµÖÔ ÃÖ´ÖÛ¯ŸÖ ÃÖê ¯ÖÆü»Öê ×­Ö¸üÃŸÖ ×ú‹ •ÖÖ­Öê êú †»ÖÖ¾ÖÖ
ÆüÖë… µÖê ÖןֵÖÖÓ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖµÖÔ ÃÖ´ÖÖ¯ŸÖ ú¸ü­Öê úß ²ÖÖ¬µÖŸÖÖ †£Ö¾ÖÖ ÃÖÓ×¾Ö¤üÖ êú †¬Öß­Ö ¯ÖϤü¢Ö ׍ú­Æüà
†­µÖ ¤üÖ×µÖŸ¾ÖÖë, ²ÖÖ¬µÖŸÖÖ†Öë µÖÖ ×•Ö´´Öê¤üÖ׸üµÖÖë ÃÖê ˆ­´ÖÖê×“ÖŸÖ ­ÖÆüà ú¸êӐÖß …
7.7.8 Öן֯ÖæÙŸÖ úß ¸üÖ×¿Ö úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †¬Öß­Ö µÖÖ ˆÃÖß ‡úÖ‡Ô †£Ö¾ÖÖ ×­ÖÖ´Ö úß ×úÃÖß
†­µÖ ‡úÖ‡Ô (µÖÖë) ´Öë ¤êüµÖ ¸üÖ×¿Ö ´Öë ÃÖ´ÖÖµÖÖê×•ÖŸÖ úß •ÖÖ‹Öß †£Ö¾ÖÖ ‘Ö™üÖ ¤üß •ÖÖ‹Öß…

37

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7.8 Incentives
7.8.1 The time allowed for execution of the works as specified in the work
order is the essence of the contract. However if the work is required
to be completed in compressed period before the stipulated date of
completion then the contractor may be eligible for the incentive.
Refer Schedule A for applicability of the Incentive clause. This clause
shall be operated only with prior approval of CMD, NPCIL.
7.8.2 For early completion of the contract work before the stipulated date
of completion, an incentive amount / percentage which shall be
decided by the Engineer-in-charge will be paid. If the incentive is to
be apportioned between the various milestones to complete the
work the same shall be decided by the Engineer-in-charge while
drawing the construction schedule. The incentive amount shall be
subject to a maximum percentage (as specified in Schedule A) of
the contract value.
For this purpose the term `Contract Value' shall be the value at
contract rates of the work as agreed upon in the contract.
7.9 Suspension of work for period upto 90 days
7.9.1 The Engineer-in-charge may at any time instruct the Contractor to
suspend progress of part or all of the Works. During such suspension,
the Contractor shall protect, store and secure such part or all of the
Works against any deterioration, loss or damage. No compensation
shall be paid for suspension upto the period of 30 days.
7.9.2 The Contractor shall, on receipt of the order in writing of the
Engineer-in-Charge, suspend the progress of the works or any part
thereof for such time and in such manner as the Engineer-in-Charge
may consider necessary for any of the following reasons:
(i) On account of any default of the Contractor, or
(ii) For proper execution of the Works or part thereof for reasons
other than the default of the Contractor;
7.9.3 If the suspension is ordered for reasons (ii) above ,
(i) Contractor shall be entitled to an extension of the time equal
to the period of each such suspension plus 25% for completion
of the item or group of items of work for which a separate
period of completion is specified in the contract and of which
the suspended work forms a part, and;
(ii) if the total cumulative period of all such suspension
exceeds 30 days, the Contractor shall, in addition, be
entitled to compensation for the period of suspension beyond
30 days, as mentioned in the Schedule A.
However the Contractor shall submit within 10 days his claim to
the Engineer-in-Charge for every 15 days of suspension, over
and above 30 days.
38

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7.8 ¯ÖÏÖêŸÃÖÖÆü­Ö
7.8.1 úÖµÖÔ †Ö¤êü¿Ö ´Öë úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ ×¾Ö×­ÖÙ¤ü™ü †­Öã´ÖŸÖ ÃÖ´ÖµÖ ÃÖÓ×¾Ö¤üÖ úÖ ŸÖŸ¾Ö Æîü…
ŸÖ£ÖÖ×¯Ö µÖפü úÖµÖÔ úÖê ×­Ö¬ÖÖÔ׸üŸÖ ÃÖ´ÖµÖ ÃÖê ú´Ö ÃÖ´ÖµÖ ´Öë ¯Öæ¸üÖ ×úµÖÖ •ÖÖ­ÖÖ ÆüÖê ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü
¯ÖÏÖêŸÃÖÖÆü­Ö úÖ Æüú¤üÖ¸ü ´ÖÖ­ÖÖ •ÖÖ Ã֍úŸÖÖ Æîü… ¯ÖÏÖêŸÃÖÖÆü­Ö Ö›ü êú »Ö֐Öæ ÆüÖê­Öê êú ²ÖÖ¸êü ´Öë †­ÖãÃÖæ“Öß
‹ úÖ ÃÖÓ¤ü³ÖÔ »Öë… ‡ÃÖ Ö›ü úÖê êú¾Ö»Ö ‹­Ö¯ÖßÃÖ߆ևԋ»Ö êú †¬µÖÖ ‹¾ÖÓ ¯ÖϲÖÓ¬Ö ×­Ö¤êü¿Öú úê
¯Öæ¾ÖÖÔ­Öã´ÖÖê¤ü­Ö ¯Ö¸ü Æüß »Ö֐Öæ ׍úµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü…
7.8.2 ÃÖÓ×¾Ö¤üÖ úÖµÖÔ úÖê úÖµÖÔ¯ÖæÖÔŸÖÖ úß ×­Ö¬ÖÖÔ׸üŸÖ ŸÖÖ¸ßÖ ÃÖê ¯ÖÆü»Öê ¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹ ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×­ÖÛ¿“ÖŸÖ úß Ö‡Ô ‹ú ¯ÖÏÖêŸÃÖÖÆü­Ö ¸üÖ׿Ö/¯ÖÏןֿ֟Ö, úÖ ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ‹ÖÖ…
üµÖפü ¯ÖÏÖêŸÃÖÖÆü­Ö ¸üÖ×¿Ö úÖê úÖµÖÔ ¯ÖæÖÔ ú¸ü­Öê êú ×»Ö‹ ŸÖµÖ ׍ú‹ Ö‹ ×¾Ö×³Ö®Ö ´Öß»Ö ÃŸÖÓ³ÖÖêÓ ´Öë ²ÖÖÓ™üÖ
•ÖÖ­ÖÖ ÆüÖê ŸÖÖê µÖÆü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×­Ö´ÖÖÔÖ †­ÖãÃÖæ“Öß ²Ö­ÖÖŸÖê ÃÖ´ÖµÖ ×­Ö¬ÖÖÔ׸üŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
¯ÖÏÖêŸÃÖÖÆü­Ö ¸üÖ×¿Ö ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú †×¬ÖúŸÖ´Ö ¯ÖÏ×ŸÖ¿ÖŸÖ (†­ÖãÃÖæ“Öß ‹ êú ×¾Ö×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü)
ŸÖú Æü֐ê Öß…
‡ÃÖ ¯ÖϵÖÖê•Ö­Ö êú ×»Ö‹ "ÃÖÓ×¾Ö¤üÖ ´Ö滵Ö" ¿Ö²¤ü ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖÓ×¾Ö¤üÖ ´Öê ŸÖµÖ ×ú‹ Ö‹ úÖµÖÔ úß
ÃÖÓ×¾Ö¤üÖ ¤ü¸ü úÖ ´Öæ»µÖ ÆüÖêÖÖ…
7.9 90 פü­ÖÖë úß †¾Ö×¬Ö ŸÖú úÖµÖÔ úÖ ×­Ö»ÖÓ²Ö­Ö
7.9.1 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ×úÃÖß ³Öß ÃÖ´ÖµÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê úÖµÖÔ êú ׍úÃÖß ³ÖÖÖ µÖÖ ¯Öæ¸êü úÖµÖÔ úÖ Æüß úÖ´Ö
¸üÖêú ¤êü­Öê êú ×»Ö‹ ×­Ö¤ìü×¿ÖŸÖ ú¸ü Ã֍úŸÖê Æïü… ‹êÃÖê ×­Ö»ÖÓ²Ö­Ö ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖµÖÔ êú ˆÃÖ ³Ö֐Ö
µÖÖ ¯Öæ¸êü úÖµÖÔ úÖê Ö¸üÖ²Ö ÆüÖê­Öê, ­ÖãúÃÖÖ­Ö ÆüÖê­Öê µÖÖ Öן֐ÖÏÃŸÖ ÆüÖê­Öê ÃÖê ²Ö“ÖÖ­Öê êú ×»Ö‹ ˆÃ֍úÖ
¯Ö׸ü¸üÖÖ, ³ÖÓ›üÖ¸üÖ ¾Ö ÃÖã¸üÖÖ ú¸ü­Öß ÆüÖêÖß… 30 פü­ÖÖë ŸÖú úÖµÖÔ úÖê ×­Ö»ÖÓ×²ÖŸÖ ¸üÖ­Öê êú ×»Ö‹
úÖê‡Ô Öן֯ÖæÙŸÖ ¤êüµÖ ­ÖÆüà ÆüÖêÖß…
7.9.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖê ×»Ö×ÖŸÖ †Ö¤êü¿Ö ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú ²ÖÖ¤ü †¯Ö­Öê úÖ´Ö úÖê µÖÖ
úÖµÖÔ êú ³ÖÖÖ úÖê ˆÃÖ ÃÖ´ÖµÖ ŸÖú †Öî¸ü ˆÃÖ ¸üß×ŸÖ ÃÖê ²ÖÓ¤ü ú¸ü­ÖÖ ÆüÖêÖÖ •ÖîÃÖÖ ×ú ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ ×­Ö´­Ö×»Ö×ÖŸÖ ´Öë ÃÖê ׍úÃÖß ‹ú úÖ¸üÖ úß ¾Ö•ÖÆü ÃÖê †Ö¾Ö¿µÖú ÃÖ´Ö—ÖŸÖê ÆüÖë :-
(i) ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ×úÃÖß Ö»ÖŸÖß êú úÖ¸üÖ, µÖÖ
(ii) ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ×úÃÖß Ö»ÖŸÖß úÖê ”ûÖê›Íüú¸ü †­µÖ ׍úÃÖß úÖ¸üÖ ÃÖê úÖµÖÔ µÖÖ ˆÃ֍êú ³Ö֐Ö
êú ˆ×“ÖŸÖ úÖµÖÔ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹…
7.9.3 µÖפü ×­Ö»ÖÓ²Ö­Ö †Ö¤êü¿Ö ˆ¯ÖµÖãÔŒŸÖ úÖ¸üÖ (ii) êú ´Ö§êü­Ö•Ö¸ü פüµÖÖ ÖµÖÖ ÆüÖê ŸÖÖê,
(i) ‹êÃÖê ¯ÖÏŸµÖêú ×­Ö»ÖÓ²Ö­Ö êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­Ö»ÖÓ²Ö­Ö †¾Ö×¬Ö êú ²Ö¸üÖ²Ö¸ü êú ÃÖ´ÖµÖ
×¾ÖßÖÖ¸ü úÖ Æüú¤üÖ¸ü ÆüÖêÖÖ †Öî¸ü ‡Ã֍êú ÃÖÖ£Ö-ÃÖÖ£Ö ˆÃÖê ÃÖÓ×¾Ö¤üÖ ´Öë ¯Öé£Öú ºþ¯Ö ÃÖê
×¾Ö×­ÖÙ¤ü™ü †¾Ö×¬Ö ¾ÖÖ»Öß †Öî¸ü ×­Ö»ÖÓ×²ÖŸÖ úÖµÖÔ ×•Ö­ÖúÖ ‹ú ³ÖÖÖ Æî,ü ´Ö¤üÖë µÖÖ ´Ö¤üÖë êú
ÃÖ´ÖæÆü êú úÖµÖÔ úÖê ¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹ 25 % †Öî¸ü ÃÖ´ÖµÖ ×¤üµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ;
(ii) µÖפü ‡ÃÖ ¯ÖύúÖ¸ü êú ×­Ö»ÖÓ²Ö­Ö úß ãú»Ö ÃÖÓ×“ÖŸÖ †¾Ö×¬Ö 30 פü­ÖÖë ÃÖê †×¬Öú ÆüÖêŸÖß Æîü ŸÖÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡Ã֍êú ÃÖÖ£Ö-ÃÖÖ£Ö 30 פü­ÖÖë ÃÖê †×¬Öú úß ÃÖ´ÖµÖÖ¾Ö×¬Ö êú ×»Ö‹ †­ÖãÃÖæ“Öß ‹
êú ¾ÖÖÔ­Ö êú †­ÖãÃÖÖ¸ü Öן֯ÖæÙŸÖ úÖ Æüú¤üÖ¸ü ÆüÖêÖÖ…
ŸÖ£ÖÖ×¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê 30 פü­ÖÖë ÃÖê †×¬Öú úß †¾Ö×¬Ö êú ¯ÖÏŸµÖêú 15 פü­ÖÖë êú ×»Ö‹
†¯Ö­ÖÖ ¤üÖ¾ÖÖ 10 פü­ÖÖë êú ³Öߟָü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ¯ÖÏßÖãŸÖ ú¸ü­ÖÖ ÆüÖêÖÖ…
38

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
, 7.10 Prolonged Suspension of work (beyond 90 days)

7.10.1 If the works or part thereof is suspended on the orders of the Engineer-in-Charge
for more than 90 days at a time, except when suspension is ordered for reason
7.9.2 (i) above, the Contractor may after receipt of such order serve a written
notice to the Engineer-in-Charge requiring permission from him, to treat the
suspension, where it affects only a part of the works as deletion of such part
and if the same is accepted by Engineer-in-charge then it will be dealt under
Clause 11[Variations and Adjustments] and no compensation on account of
suspension shall be paid.
7.10.2 Where the suspension affects the whole of the Works or part there of and the
suspension of the part of the work is not treated as deletion as above, then the
Contractor may serve a notice to Engineer-in-charge requiring permission within
10 days from the date of receipt of said notice by Engineer-in-charge to
demobilize the labour/staff and remove plant and equipment or any part
thereof.
7.10.3 In case Engineer-in-charge agrees to the Contractor’s request then the
Contractor shall be at liberty to demobilize the labour/staff and remove plant
and equipment or any part thereof hypothecated to the Corporation under
this contract to any other works site of the Contractor for carrying on his other
works, after giving an undertaking through an indemnity bond to bring back to
the Site the labour /staff and plant and equipment as may be necessary for
completion of the works, immediately after the suspension is revoked. If such
plant and equipment are not brought back, the Contractor shall forthwith repay
the amount of the loan outstanding with interest. The security deposit from the
contractor may also be forfeited.
7.10.4 In case the Engineer-in-charge does not agree to the contractor’s request to
demobilize, the contractor shall be continued to be paid the compensation as
per sub-clause 7.9.3 (ii) provided the Contractor submits his claim in accordance
to the clause supported by details to the Engineer-in-Charge.
7.10.5 In addition to above compensation the Contractor shall be entitled to an
extension of the time equal to the period of such suspension plus 25% for
completion of the item or group of items of work for which a separate period of
completion is specified in the contract and of which the suspended work forms a
part.

7.11 Payment for Plant and Materials in Event of Suspension

7.11.1 The Contractor shall be entitled to payment of the value of Plant and/or Materials,
meant to be incorporated in works which have not been delivered to Site, if:

(a) the work on Plant or delivery of Plant and/or Materials has been suspended for
more than the 30 days except when suspension is ordered for reason 7.9.2 (i)
above and
(b) the Contractor has marked the Plant and/or Materials as the Corporation’s
property in accordance with the Engineer’s instructions.

Under the above situation Corporation shall make payment to the Contractor on
production of documentary evidence to the effect that he has marked/ purchased
these items for Corporation and make him responsible to deliver these items to
Corporation either during suspension or after revoking suspension.

39

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7.10 úÖµÖÔ úÖ ¤üß‘ÖÔ †¾Ö×¬Ö êú ×»Ö‹ ×­Ö»ÖÓ²Ö­Ö (90 פü­ÖÖë ÃÖê †×¬Öú)

7.10.1 µÖפü ˆ¯ÖµÖãÔŒŸÖ 7.9.2 (i) ´Öë ²ÖŸÖÖ‹ Ö‹ úÖ¸üÖÖë ÃÖê ×³Ö®Ö †­µÖ ׍úÃÖß úÖ¸üÖ ÃÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú †Ö¤êü¿Ö
¯Ö¸ü úÖµÖÔ µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ úÖê 90 פü­ÖÖë ÃÖê †×¬Öú úß †¾Ö×¬Ö êú ×»Ö‹ ×­Ö»ÖÓ×²ÖŸÖ ×úµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ‹êÃÖÖ
†Ö¤êü¿Ö ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú ¯Ö¿“ÖÖŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê, µÖפü µÖÆü ×­Ö»ÖÓ²Ö­Ö êú¾Ö»Ö úÖµÖÔ êú ׍úÃÖß ‹ú
³ÖÖÖ úÖê ¯ÖϳÖÖ×¾ÖŸÖ ú¸üŸÖÖ ÆüÖê ŸÖÖê ‹êÃÖê ³ÖÖÖ úÖê ×­Ö¸üÃŸÖ ×ú‹ •ÖÖ­Öê úß †­Öã´Ö×ŸÖ ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ×»Ö‹ ×»Ö׏֟Ö
­ÖÖê×™üÃÖ ³Öê•Ö Ã֍úŸÖÖ Æîü †Öî¸ü µÖפü ‡ÃÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ Ã¾ÖߍúÖ¸ü ú¸ü ×»ÖµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ÃÖÓ²ÖÓ׬֟Ö
úÖ¸Ôü¾ÖÖ‡Ô Ö›ü 11 (×¾Ö“Ö»Ö­Ö ¾Ö ÃÖ´ÖÖµÖÖê•Ö­Ö) êú †ÓŸÖÖÔŸÖ úß •ÖÖ‹Öß †Öî¸ü ×­Ö»ÖÓ²Ö­Ö êú ×»Ö‹ ׍úÃÖß Öן֯ÖæÙŸÖ
úÖ ³ÖãÖŸÖÖ­Ö ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ…
7.10.2 •Ö²Ö ×­Ö»ÖÓ²Ö­Ö ÃÖÓ¯ÖæÖÔ úÖµÖÔ úÖê µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ úÖê ¯ÖϳÖÖ×¾ÖŸÖ ú¸üŸÖÖ Æîü †Öî¸ü úÖµÖÔ êú ˆÃÖ ³ÖÖÖ êú
×­Ö»ÖÓ²Ö­Ö úÖê ˆ¯ÖµÖãÔŒŸÖ ŸÖ¸üߍêú ÃÖê ×­Ö¸üÃŸÖ ­ÖÆüà ´ÖÖ­ÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖê ˆŒŸÖ ­ÖÖê×™üÃÖ
¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú 10 פü­ÖÖë êú ³Öߟָü †¯Ö­Öê ú´ÖÔ“ÖÖ׸üµÖÖë/´Ö•Ö¤æü¸üÖë úÖê ¾ÖÖ¯ÖÃÖ ³Öê•Ö­Öê ¾Ö ÃÖÓµÖÓ¡Ö †Öî¸ü ˆ¯Öú¸üÖ µÖÖ
ˆ­Öêú ׍úÃÖß ³ÖÖÖ úÖê Æü™üÖ­Öê úß †­Öã´Ö×ŸÖ ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ×»Ö‹ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ­ÖÖê×™üÃÖ ³Öê•Ö Ã֍úŸÖÖ Æîü…
7.10.3 µÖפü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú †­Öã¸üÖê¬Ö ÃÖê ÃÖÆü´ÖŸÖ ÆüÖê •ÖÖŸÖê Æïü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸,ü †¯Ö­Öê
ú´ÖÔ“ÖÖ׸üµÖÖë/´Ö•Ö¤æü¸üÖë úÖê ¾ÖÖ¯ÖÃÖ ³Öê•Ö­Öê ¾Ö ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ ×­ÖÖ´Ö êú ¯ÖÖÃÖ ²ÖӬ֍ú ¸üÖê Ö‹ ÃÖÓµÖÓ¡Ö †Öî¸ü
ˆ¯Öú¸üÖ µÖÖ ˆ­Öêú ׍úÃÖß ³ÖÖÖ úÖê, ‹ú ²ÖÓ¬Ö¯Ö¡Ö êú ´ÖÖ¬µÖ´Ö ÃÖê ¾Ö“Ö­Ö ¤êüŸÖê Æãü‹ ׍ú ×­Ö»ÖÓ²Ö­Ö ÃÖ´ÖÖ¯ŸÖ ׍ú‹ •ÖÖ­Öê
êú ŸÖŸúÖ»Ö ²ÖÖ¤ü úÖµÖÔ úÖê ¯ÖæÖÔ ú¸ü­Öê êú ×»Ö‹ †Ö¾Ö¿µÖú ú´ÖÔ“ÖÖ׸üµÖÖë/´Ö•Ö¤æü¸üÖë †Öî¸ü ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖÖêÓ úÖê
úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ¾ÖÖ¯ÖÃÖ »ÖÖµÖÖ •ÖÖ‹ÖÖ, †¯Ö­Öê ׍úÃÖß †­µÖ úÖµÖÔÃ£Ö»Ö ¯Ö¸ü úÖ´Ö ú¸ü­Öê êú ×»Ö‹ ³Öê•Ö­Öê ÆêüŸÖã þ֟ÖÓ¡Ö
ÆüÖêÖÖ… µÖפü ‹êÃÖê ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ ¾ÖÖ¯ÖÃÖ ­ÖÆüà »ÖÖ‹ •ÖÖŸÖê Æïü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×»Ö‹ Ö‹ ŠúÖ úÖ ²µÖÖ•Ö ÃÖ´ÖêŸÖ
ŸÖŸúÖ»Ö ³ÖãÖŸÖÖ­Ö ú¸êüÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ •Ö´ÖÖ úß Ö‡Ô ¯ÖÏןֳÖæ ¸üÖ×¿Ö ³Öß •Ö²ŸÖ úß •ÖÖ Ã֍úŸÖß Æîü…
7.10.4 µÖפü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¾ÖÖ¯ÖÃÖß êú ‡ÃÖ †­Öã¸üÖê¬Ö ÃÖê ÃÖÆü´ÖŸÖ ­ÖÆüà ÆüÖêŸÖê Æïü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ˆ¯Ö
Ö›ü 7.9.3 (ii) êú †­ÖãÃÖÖ¸ü Öן֯ÖæÙŸÖ úß •ÖÖŸÖß ¸üÆêüÖß ²Ö¿ÖŸÖì ׍ú ¾ÖÆü ‡ÃÖ Ö›ü êú †­ÖãÃÖÖ¸ü ×¾Ö¾Ö¸üÖ ÃÖ×ÆüŸÖ
†¯Ö­ÖÖ ¤üÖ¾ÖÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ÃÖ´ÖÖ ¯ÖÏßÖãŸÖ ú¸êü…
7.10.5 ˆ¯ÖµÖãÔŒŸÖ Öן֯ÖæÙŸÖ êú ÃÖÖ£Ö-ÃÖÖ£Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­Ö»ÖÓ²Ó Ö­Ö úß †¾Ö×¬Ö êú ²Ö¸üÖ²Ö¸ü úß †¾Ö×¬Ö êú ÃÖ´ÖµÖ ×¾ÖßÖÖ¸ü
†Öî¸ü úÖµÖÔ úß ˆ­Ö ´Ö¤üÖë µÖÖ ´Ö¤ü ÃÖ´ÖæÆüÖë ו֭֍êú ×»Ö‹ ÃÖÓ×¾Ö¤üÖ ´Öë †»ÖÖ ÃÖê ÃÖ´ÖµÖ úÖ ×¾Ö×­Ö¤ìü¿Ö פüµÖÖ ÖµÖÖ ÆüÖê
†Öî¸ü ×­Ö»ÖÓ×²ÖŸÖ úÖµÖÔ ×•ÖÃ֍úÖ ‹ú ³ÖÖÖ ÆüÖ,ê ˆÃÖ úÖµÖÔ úÖê ¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹ 25 % †Öî¸ü †×¬Öú ÃÖ´ÖµÖ úÖ
Æüú¤üÖ¸ü ÆüÖêÖÖ…

7.11 ×­Ö»ÖÓ²Ö­Ö úß ÛãÖ×ŸÖ ´Öë ÃÖÓµÖÓ¡Ö ¾Ö ÃÖִ֐ÖÏß êú ×»Ö‹ ³ÖãÖŸÖÖ­Ö
7.11.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ¯ÖÏÖ¯ŸÖ ­Ö ׍ú‹ Ö‹ ‹êÃÖê ÃÖÓµÖÓ¡Ö †Öî¸/ü µÖÖ ÃÖִ֐ÖÏß ×•ÖÃÖê úÖµÖÔ ´Öë ¿ÖÖ×´Ö»Ö ×úµÖÖ •ÖÖ­ÖÖ
£ÖÖ, êú ´Öæ»µÖ êú ³ÖãÖŸÖÖ­Ö úÖ Æüú¤üÖ¸ü ÆüÖêÖÖ ²Ö¿ÖŸÖì ׍ú :

(‹) ÃÖÓµÖÓ¡Ö ¯Ö¸ü úÖµÖÔ µÖÖ ÃÖÓµÖÓ¡Ö †Öî¸ü/µÖÖ ÃÖִ֐ÖÏß úß ÃÖã¯Öã¤ÔüÖß úÖê 30 פü­ÖÖë ÃÖê †×¬Öú ÃÖ´ÖµÖ êú ×»Ö‹ ×­Ö»ÖÓ×²ÖŸÖ ú¸ü
פüµÖÖ ÖµÖÖ ÆüÖ,ê ×ÃÖ¾ÖÖµÖ ŸÖ²Ö •Ö²Ö ׍ú ×­Ö»ÖÓ²Ö­Ö ˆ¯ÖµÖãÔŒŸÖ 7.9.2(i) êú úÖ¸üÖ †Ö¤êü¿Ö ׍úüµÖÖ ÖµÖÖ ÆüÖê †Öî¸ü
(²Öß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü ­Öê ÃÖÓµÖÓ¡Ö †Öî¸ü/µÖÖ ÃÖִ֐ÖÏß úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ×­Ö¤ìü¿ÖÖêÓ êú †­Öãºþ¯Ö ×­ÖÖ´Ö úß ÃÖÓ¯Ö×¢Ö êú ºþ¯Ö
´Öë דÖÛÅ­ÖŸÖ ú¸ü פüµÖÖ ÆüÖê…

ˆ¯ÖµÖãÔŒŸÖ ¯Ö׸üÛãÖןֵÖÖë êú †ÓŸÖÖÔŸÖ ×­ÖÖ´Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‡­Ö ¾ÖßÖã†Öë úÖê ×­ÖÖ´Ö êú ×»Ö‹ דÖÛÅ­ÖŸÖ/ÎúµÖ ú¸ü­Öê êú
¤üßÖÖ¾Öê•Öß ÃÖցµÖ ¯ÖÏßÖãŸÖ ú¸ü­Öê ¯Ö¸ü ³ÖãÖŸÖÖ­Ö ú¸êüÖÖ †Öî¸ü ‡­Ö ¾ÖßÖã†Öë úÖê µÖÖ ŸÖÖê ×­Ö»ÖÓ²Ö­Ö úß †¾Ö×¬Ö ´Öê †£Ö¾ÖÖ ×­Ö»ÖÓ²Ö­Ö
¾ÖÖ¯ÖÃÖ ×»Ö‹ •ÖÖ­Öê êú ²ÖÖ¤ü ×­ÖÖ´Ö úÖê ÃÖã¯Öã¤Ôü ׍ú‹ •ÖÖ­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ×•Ö´´Öê¤üÖ¸üß ×­ÖÛ¿“ÖŸÖ ú¸êüÖÖ…
39

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7.12 Resumption of Work
7.12.1 After the permission or instruction to proceed with the work is given,
the Contractor and the Engineer-in-charge shall jointly examine the
Works and the Plant and Materials affected by the suspension. The
Contractor shall make good any deterioration or defect in or loss of
the Works or Plant or Materials, which has occurred during the
suspension after receiving from the Engineer-in-charge an instruction
to this effect.
8 CORPORATION’S TAKING OVER
8.1 Completion Certificate
8.1.1. The Contractor shall as soon as the work is complete in all respects
give notice to the Engineer-in-charge for his acceptance. The
Engineer shall, within 30 days after receiving the Contractor’s
application:
i) Shall inspect the work and shall furnish the Contractor with a
certificate of completion indicating
(a) Date of completion
(b) Defects to be rectified by the Contractor and/ or
(c) Items for which payment shall be made at reduced rates.
When separate periods of completion have been specified for
items or groups of items, the Engineer-in-Charge shall issue
separate completion certificates for such item or groups of items.
ii) Reject the application, giving reasons and specifying the work
required to be done by the Contractor to enable to Completion
Certificate to be issued. The Contractor shall then complete this work
before issuing a further notice under this Sub-Clause.
8.1.2 The contractor shall remove all the temporary material/equipment
and clear the work place as per the directives of Engineer-in-charge.
Contractor shall also ensure that all permanent structure has been
adequately cleaned for use by others, failing which the Engineer-in-
charge will have sufficient reasons to make the place good to use at
the risk and cost of the contractor.
9 DEFECTS LIABILITY
9.1 Rectification of Defects
9.1.1 The defect liability period shall commence from the date of
completion as certified by the Engineer-in-charge. The Contractor
shall be responsible to make good and rectify at his own expense
within such period as may be stipulated by the Engineer-in-Charge
in his communication to Contractor, any defect which may
develop or may be noticed before the expiry of the defect liability
period as mentioned in Schedule (A).
40

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7.12 úÖµÖÔ úÖ ¯Öã­Ö:¯ÖÏÖ¸Óü³Ö
7.12.1 úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê úß †­Öã´Ö×ŸÖ µÖÖ ×­Ö¤ìü¿Ö פü‹ •ÖÖ­Öê êú ¯Ö¿“ÖÖŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¾Ö ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ ÃÖÓµÖãŒŸÖ ºþ¯Ö ÃÖê úÖµÖÔ úÖ †Öî¸ü ×­Ö»ÖÓ²Ö­Ö êú úÖ¸üÖ ¯ÖϳÖÖ×¾ÖŸÖ ÃÖÓµÖÓ¡Ö ¾Ö ÃÖִ֐ÖÏß úÖ
¯Ö¸üßÖÖ ú¸ëüÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×­Ö¤ìü¿Ö ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ¯Ö¸ü ×­Ö»ÖÓ²Ö­Ö úß †¾Ö×¬Ö ´Öë
úÖµÖÔ µÖÖ ÃÖÓµÖÓ¡Ö µÖÖ ÃÖִ֐ÖÏß ´Öë †Ö‡Ô ×úÃÖß ³Öß Ö¸üÖ²Öß µÖÖ ¤üÖêÂÖ µÖÖ ­ÖãúÃÖÖ­Ö úÖê šüߍú ú¸ëüÖê…
8. ×­ÖÖ´Ö «üÖ¸üÖ ÖÏÆüÖ
8.1 ¯ÖæÖÔŸÖÖ ¯ÖÏ´Ö֝֯֡Ö
8.1.1 •ÖîÃÖê Æüß úÖµÖÔ ÃÖ³Öß ¯ÖύúÖ¸ü ÃÖê ¯ÖæÖÔ ÆüÖê •ÖÖŸÖÖ Æîü, ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ‡ÃÖê þÖߍúÖ¸ü
ú¸ü­Öê úÖ ­ÖÖê×™üÃÖ ¤êüÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ †Ö¾Öê¤ü­Ö ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú 30 פü­ÖÖë êú ³Öߟָü ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ :
(i) úÖµÖÔ úÖ ×­Ö¸üßÖÖ ú¸ëüÖê †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‹ú úÖµÖÔ ¯ÖæÖÔŸÖÖ úÖ ¯ÖÏ´ÖÖÖ ¯Ö¡Ö ¤ëüÖê וÖÃÖ´Öë
×­Ö´­Ö×»Ö×ÖŸÖ ¤ü¿ÖÖÔ‹ •Ö֋ӐÖê
(‹) úÖµÖÔ ¯ÖæÖÔŸÖÖ úß ŸÖÖ¸üߏÖ
(²Öß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¤æü¸ü ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ¤üÖêÂÖ †Öî¸ü/µÖÖ
(ÃÖß) ˆ­Ö ´Ö¤üÖë úÖ ­ÖÖ´Ö ×•Ö­Öêú ×»Ö‹ ú´Ö ¤ü¸üÖë ¯Ö¸ü ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ­ÖÖ Æîü…
•Ö²Ö ׍ú­Æüà ´Ö¤üÖë µÖÖ ´Ö¤üÖë êú ÃÖ´ÖæÆüÖë êú ×»Ö‹ †»ÖÖ ÃÖê úÖµÖÔ ¯ÖæÖÔŸÖÖ úß †¾Ö×¬Ö ×¾Ö×­ÖÙ¤ü™ü úß
Ö‡Ô ÆüÖê ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ‹êÃÖß ´Ö¤üÖë µÖÖ ´Ö¤üÖë êú ÃÖ´ÖæÆüÖë êú ×»Ö‹ ¯Öé£Öú úÖµÖÔ ¯ÖæÖÔŸÖÖ ¯ÖÏ´Ö֝֯֡Ö
•ÖÖ¸üß ú¸ëüÖê…
(ii) úÖ¸üÖ ²ÖŸÖÖŸÖê Æãü‹ †Öî¸ü úÖµÖÔ¯ÖæÖÔŸÖÖ ¯ÖÏ´ÖÖÖ ¯Ö¡Ö ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×ú‹ •ÖÖ­Öê
êú ×»Ö‹ ¿ÖêÂÖ úÖµÖÔ úÖ ×¾Ö׿Ö™ü ˆ»»ÖêÖ ú¸üŸÖê Æãü‹ †Ö¾Öê¤ü­Ö úÖê ×­Ö¸üÃŸÖ ú¸ü Ã֍úŸÖê Æïü… ŸÖ²Ö ‡ÃÖ
ˆ¯Ö-Ö›ü êú †ÓŸÖÖÔŸÖ †ÖÖê úÖê‡Ô ­ÖÖê×™üÃÖ ³Öê•Ö­Öê ÃÖê ¯ÖÆü»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê µÖÆü úÖµÖÔ ¯Öæ¸üÖ ú¸ü­ÖÖ
ÆüÖêÖÖ…
8.1.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖ³Öß †Ã£ÖÖ‡Ô ÃÖִ֐ÖÏß/ˆ¯Öú¸üÖ úÖê Æü™üÖ­ÖÖ ÆüÖêÖÖ †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú
×­Ö¤êü¿ÖÖ­ÖãÃÖÖ¸ü úÖµÖÔÃ£Ö»Ö úÖê ÃÖÖ±ú ú¸ü­ÖÖ ÆüÖêÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê µÖÆü ³Öß ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­ÖÖ ÆüÖêÖÖ
׍ú ÃÖ³Öß Ã£ÖÖ‡Ô œüÖÓ“Öê ¤æüÃÖ¸üÖë êú ˆ¯ÖµÖÖêÖ êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ ÃÖÖ±ú ׍ú‹ Ö‹ ÆüÖë… ‹êÃÖÖ ­Ö ú¸ü­Öê ¯Ö¸ü
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ¯ÖÖÃÖ ˆÃÖ Ã£ÖÖ­Ö úÖê ¯ÖϵÖÖêÖ ÆêüŸÖã ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“ÖÔ ¾Ö •ÖÖê×Ö´Ö ¯Ö¸ü šüߍú
ú¸ü¾ÖÖ­Öê êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ úÖ¸üÖ ÆüÖëÖê…
9. ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ
9.1 ¤üÖêÂÖÖë úÖê ¤æü¸ü ú¸ü­ÖÖ
9.1.1 ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ úÖµÖÔ ¯ÖæÖÔŸÖÖ ¯ÖÏ´ÖÖ×ÖŸÖ ×ú‹ •ÖÖ­Öê úß ŸÖÖ¸üßÖ ÃÖê
¯ÖÏÖ¸Óü³Ö ÆüÖêÖß… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤üß Ö‡Ô ÃÖæ“Ö­ÖÖ ´Öë ¾ÖÙÖŸÖ †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö
ÆüÖê­Öê ¾ÖÖ»Öß ×úÃÖß ¯ÖύúÖ¸ü úß Ö¸üÖ²Öß µÖÖ †­ÖãÃÖæ“Öß (‹) ´Öë ¾ÖÙÖŸÖ ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö êú
ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê ÃÖê ¯ÖÆü»Öê ÃÖÓ–ÖÖ­Ö ´Öë †Ö‡Ô ×úÃÖß Ö¸üÖ²Öß úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê Ö“ÖÔ ¯Ö¸ü šüߍú
ú¸ü¾ÖÖ­Öê †Öî¸ü ˆÃÖ ú´Öß úÖê ¤æü¸ü ú¸ü­Öê úÖ ×•Ö´´Öê¤üÖ¸ü ÆüÖêÖÖ…

40

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
9.1.2 The Contractor shall on receiving the intimation shall execute all work
required to rectify defects or damage, as may be notified by the
Corporation on or before the expiry date of the Defects Liability
Period for the Works.
9.1.3 If the Contractor fails to carry out the aforesaid work within the
period fixed by the Engineer-in-charge after serving the notice to the
Contractor, all work referred to in this Sub-Clause shall be executed
at the risk and cost of the Contractor.
9.1.4 The Corporation shall be entitled to an extension of the Defects
Liability Period for the Works or a section of work for a period equal to
the period during which the Works or section of work cannot be
used by the Corporation due to reasons of a defect or by reason of
a damage attributable to the Contractor.
9.1.5 Any rectification of defect which is not attributable to the Contractor
but requested by the Engineer-in-charge for doing so, shall be
carried out by the Contractor at the cost of Corporation on a
mutually agreed basis.
9.1.6 Unless otherwise specified in the contract, at the end of Defect
Liability period the contractors liability ceases except for Latent
Defects, if applicable as per Schedule “A”. The latent defect for this
purpose shall mean any defects which exists but has not surfaced at
the time of testing and has not manifested during defect liability
period. The Contractors liability for Latent Defects warranty for the
plant and equipment including spares shall be limited to a period of
5 (five) years from the end of Defect Liability period of the respective
plant and equipment including spares. A written communication in
this regards shall be submitted by the contractor.
10 MEASUREMENT AND EVALUATION
10.1 Records & Measurement
10.1.1 Engineer-in-Charge shall, except as otherwise stated, ascertain
and determine by measurement the value of work done in
accordance with the Contract.
10.1.2 All items having a financial value shall be entered in
Measurement Book, Field Book etc. prescribed by the
Corporation so that a complete record is obtained of all work
executed under the Contract. However, where the
computerized system is used for billing by the Corporation, all
above records will be maintained in the computer system
(WCMS) and a hard copy generated will be kept as a record
after the acceptance by the Contractor.
10.1.3 Measurement shall be taken jointly by the Engineer-in-Charge or
his authorized representative and by the Contractor or his
authorized representative from time to time.

41

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
9.1.2 úÖµÖÔ úß ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö êú ¯Öæ¸üÖ ÆüÖê­Öê ¾ÖÖ»Öê פü­Ö µÖÖ ˆÃÖÃÖê ¯ÖÆü»Öê µÖפü ×­ÖÖ´Ö «üÖ¸üÖ
†×¬ÖÃÖæ×“ÖŸÖ ×úµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ‹êÃÖß ÃÖæ“Ö­ÖÖ ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹êÃÖê ÃÖ´ÖÃŸÖ ¤üÖêÂÖÖë µÖÖ
­ÖãúÃÖÖ­Ö úÖê ¤æü¸ü ú¸ü­Öê êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖ³Öß úÖµÖÖí úÖ ×­Ö¯ÖÖ¤ü­Ö ú¸êüÖÖ…
9.1.3 µÖפü ˆ¯ÖµÖãÔŒŸÖ úÖµÖÔ úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †×¬ÖÃÖæ×“ÖŸÖ ×ú‹ •ÖÖ­Öê êú ²ÖÖ¤ü
ŸÖµÖ úß Ö‡Ô ÃÖ´ÖµÖ-ÃÖß´ÖÖ ´Öë ¯Öæ¸üÖ ­ÖÆüà ׍úµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ‡ÃÖ ˆ¯ÖÖ›ü ´Öë ÃÖÓ¤üÙ³ÖŸÖ ÃÖ´ÖÃŸÖ úÖµÖÔ
úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú •ÖÖê×Ö´Ö ¾Ö Ö“ÖÔ ¯Ö¸ü ¯Öæ¸üÖ ×úµÖÖ •ÖÖ‹ÖÖ…
9.1.4 ×­ÖÖ´Ö úÖê úÖµÖÔ µÖÖ úÖµÖÔ êú ׍úÃÖß ³ÖÖÖ úß ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö úÖê, ׍úÃÖß ¤üÖêÂÖ êú úÖ¸üÖ
µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ¾Ö•ÖÆü ÃÖê úÖµÖÔ úÖê Æãü‹ ­ÖãúÃÖÖ­Ö êú úÖ¸üÖ úÖµÖÔ µÖÖ úÖµÖÔ êú ׍úÃÖß ³ÖÖÖ úÖ
×­ÖÖ´Ö «üÖ¸üÖ ¯ÖϵÖÖêÖ ­Ö ׍ú‹ •ÖÖ Ã֍ú­Öê êú ÃÖ´ÖµÖ êú ²Ö¸üÖ²Ö¸ü úß †¾Ö×¬Ö ŸÖú êú ×»Ö‹, ×¾ÖßÖÖ׸üŸÖ
ú¸ü­Öê úÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ…
9.1.5 úÖê‡Ô ¤üÖêÂÖ ×•ÖÃ֍êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü וִ´Öê¤üÖ¸ü ­ÖÆüà Æîü ¯Ö¸ÓüŸÖã ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ˆÃÖê šüߍú
ú¸ü­Öê úÖ †­Öã¸üÖê¬Ö ׍úµÖÖ •ÖÖ‹ ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ‹êÃÖê ¤üÖêÂÖ úÖê †Ö¯ÖÃÖß ÃÖÆü´Ö×ŸÖ úê †Ö¬ÖÖ¸ü
¯Ö¸ü ŸÖµÖ ×­ÖÖ´Ö êú Ö“ÖÔ ¯Ö¸ü šüߍú ׍úµÖÖ •ÖÖ‹ÖÖ…
9.1.6 •Ö²Ö ŸÖú ׍ú ÃÖÓ×¾Ö¤üÖ ´Öë †­µÖ£ÖÖ ¾ÖÙÖŸÖ ­Ö ÆüÖê, †­ÖãÃÖæ“Öß "‹" êú †­ÖãÃÖÖ¸ü »Ö֐Öæ ÆüÖê­Öê ¯Ö¸ü Ö㯟Ö
¤üÖêÂÖÖë êú ×ÃÖ¾ÖÖ‹ ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö úß ÃÖ´ÖÖÛ¯ŸÖ êú ²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ×•Ö´´Öê¤üÖ¸üß ÃÖ´ÖÖ¯ŸÖ
ÆüÖê •ÖÖŸÖß Æîü… ‡ÃÖ ¯ÖϵÖÖê•Ö­Ö ÃÖê Öã¯ŸÖ ¤üÖêÂÖÖë ÃÖê ŸÖÖŸ¯ÖµÖÔ ˆ­Ö ¤üÖêÂÖÖë ÃÖê Æîü •ÖÖê ´ÖÖî•Öæ¤ü ŸÖÖê £Öê ¯Ö¸ÓüŸÖã
¯Ö¸üßÖÖ êú ¤üÖî¸üÖ­Ö ­ÖÆüà פüÖê †Öî¸ü ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö ¯Öύú™ü ­ÖÆüà Æãü‹… ÃÖÓ×¾Ö¤ü֍úÖ¸ü
úß ÃÖÓµÖÓ¡Ö †Öî¸ü ïÖêµÖ¸ü ÃÖ×ÆüŸÖ ˆ¯Öú¸üÖÖêÓ êú ×»Ö‹ Öã¯ŸÖ ¤üÖêÂÖ ¾ÖÖ¸Óü™üß ²ÖÖ¬µÖŸÖÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ÃÖÓµÖÓ¡Ö ¾Ö
ïÖêµÖ¸ü ÃÖ×ÆüŸÖ ˆ¯Öú¸üÖÖë úß ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö êú ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê êú ²ÖÖ¤ü ÃÖê 5 ¾ÖÂÖÔ ŸÖú êú
×»Ö‹ ÃÖß×´ÖŸÖ ÆüÖêÖß… ‡ÃÖ ÃÖÓ²ÖÓ¬Ö ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×»Ö×ÖŸÖ ÃÖæ“Ö­ÖÖ ¯ÖÏßÖãŸÖ úß •ÖÖ‹Öß…
10. ´ÖÖ¯Ö­Ö ¾Ö ´Ö滵ÖÖӍú­Ö
10.1 †×³Ö»ÖêÖ ¾Ö ´ÖÖ¯Ö­Ö
10.1.1 •Ö²Ö ŸÖú †­µÖ£ÖÖ ¾ÖÙÖŸÖ ­Ö ÆüÖê, ÃÖÓ×¾Ö¤üÖ êú †­ÖãÃÖÖ¸ü ׍ú‹ Ö‹ úÖµÖÔ úÖ ´Öæ»µÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
«üÖ¸üÖ ´ÖÖ¯Ö­Ö ú¸ü †×³Ö×­ÖÛ¿“ÖŸÖ ¾Ö †¾Ö¬ÖÖ׸üŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
10.1.2 ×¾Ö¢ÖßµÖ ´Öæ»µÖ ¾ÖÖ»Öß ÃÖ³Öß ´Ö¤üÖë úÖê ×­ÖÖ´Ö «üÖ¸üÖ ×¾Ö×ÆüŸÖ ´ÖÖ¯Ö­Ö ¯ÖãÛß֍úÖ, ±úß»›ü ¯ÖãÛß֍úÖ †Öפü
´Öë ¤ü•ÖÔ ×úµÖÖ •ÖÖ‹ÖÖ ŸÖÖ׍ú ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ ×ú‹ Ö‹ ÃÖ´ÖÃŸÖ úÖµÖÖí úÖ ¯Öæ¸üÖ ×¸üúÖò›Ôü
¯ÖÏÖ¯ŸÖ ׍úµÖÖ •ÖÖ Ã֍êú… ŸÖ£ÖÖׯÖ, •ÖÆüÖÓ ¯Ö¸ü ײÖØ»ÖÖ †Öפü úê ×»Ö‹ ×­ÖÖ´Ö «üÖ¸üÖ úÓ¯µÖæ™ü¸üߍéúŸÖ
¯ÖϝÖÖ»Öß úÖ ˆ¯ÖµÖÖêÖ ׍úµÖÖ •ÖÖ ¸üÆüÖ Æîü ¾ÖÆüÖÓ ¯Ö¸ü ÃÖ³Öß ˆ¯ÖµÖãÔŒŸÖ ׸üúÖò›üÖí úÖê úÓ¯µÖæ™ü¸ü ¯ÖϝÖÖ»Öß
(›ü²»µÖæ ÃÖß ‹´Ö ‹ÃÖ) ´Öë ¸üÖÖ •ÖÖ‹ÖÖ †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß Ã¾Öߍéú×ŸÖ êú ²ÖÖ¤ü ‹ú ÆüÖ›Ôü úÖò¯Öß
ŸÖîµÖÖ¸ü ú¸ü ׸üúÖ›Ôü êú ºþ¯Ö ´Öë ¸üÖß •ÖÖ‹Öß…
10.1.3 µÖÆü ´ÖÖ¯Ö­Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ µÖÖ ˆÃ֍êú †×¬ÖéúŸÖ ¯ÖÏןÖ×­Ö×¬Ö ŸÖ£ÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖÖ ˆÃ֍êú
¯ÖÏÖ׬֍éúŸÖ ¯ÖÏןÖ×­Ö×¬Ö «üÖ¸üÖ ÃÖÓµÖãŒŸÖ ºþ¯Ö ÃÖê ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ׍úµÖÖ •ÖÖ‹ÖÖ…

41

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
10.1.4 Whenever the Engineer-in-charge requires any part of the Works to be
measured, reasonable notice shall be given to the Contractor’s
Representative, who shall:
(a) Promptly assist the Engineer-in-charge in making the measurement
along with a qualified official, and
(b) supply any particulars requested by the Engineer-in-charge
10.1.5 The Contractor shall without extra charge, provide all assistance such
as appliance, labour and other things necessary for measurements.
10.1.6 Measurements shall be signed and dated by both the parties from
time to time on the Site during the progress of the Work.
10.1.7 If the Contractor objects to any of the measurements recorded
on behalf of the Corporation, a notice to that effect shall be
made with reasons and submitted to Engineer-in-charge for decision in
this regard. After receiving this notice, the Engineer-in-charge shall
review the records and either confirms or varies them and certifies the
payment of the undisputed part. The decision of Engineer-in-Charge on
such dispute or difference or interpretation shall be final and binding
on both the parties.
10.1.8 If the Contractor fails to attend or send his authorized representative
for measurement after such a notice or fails to counter-sign or to
record his objections within a week from the date of measurement,
then measurements taken by the Engineer-in-Charge or by his
authorized representative shall be taken to be the correct
measurement of the work.
10.1.9 When the contract includes lump-sums in respect of parts of the work,
the Contractor shall be entitled for payment in respect of such items
of work involved or the part of the work in question, at the same
lumpsum price as are payable under this contract for such items.
10.1.10If in the opinion of the Engineer-in-Charge, part of the work in question
is not payable by measurements; the Engineer-in-Charge may pay the
amount commensurate to the value of work done based on lumpsum
amount quoted. In such a case, the Engineer-in-Charge would provide
a certificate which shall be final and conclusive against the
Contractor with regard to any sum or sums payable to him under
the provisions of the clause.
10.1.11Recording of measurements will not relieve the Contractor of his
responsibilities and liabilities over any recorded excess measurements
or noticed defects till the completion of the defect liability period.
10.2 Method of Measurement
10.2.1 Except where any general or detailed description of the work in quantities
expressly shows to the contrary, schedule of quantities shall be deemed to
have been prepared and measurements taken in accordance with the
procedure set forth in Schedule of Rates /Specification, not withstanding
any provision in the relevant Standard Method of Measurement or any
general or local custom.
42

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
10.1.4 •Ö²Ö ú³Öß ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê úÖµÖÔ êú ׍úÃÖß ³ÖÖÖ êú ´ÖÖ¯Ö­Ö úß †Ö¾Ö¿µÖúŸÖÖ ¯Ö›ÍüŸÖß Æîü, ¾ÖÆü
ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¯ÖÏןÖ×­Ö×¬Ö úÖê †Öîד֟µÖ¯ÖæÖÔ ­ÖÖê×™üÃÖ ¤ëüÖê †Öî¸ü ¾ÖÆü :
(‹) ŸÖã¸ÓüŸÖ ‹ú µÖÖêµÖ ú´ÖÔ“ÖÖ¸üß êú ÃÖÖ£Ö ´ÖÖ¯Ö­Ö úÖµÖÔ ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ÃÖÆüÖµÖŸÖÖ ú¸ëüÖê
†Öî¸ü
(²Öß) ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ´ÖÖӐÖß Ö‡Ô úÖê‡Ô ³Öß •Ö֭֍úÖ¸üß ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê…
10.1.5 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ²ÖÖî¸ü ׍úÃÖß †×ŸÖ׸üŒŸÖ ¿Ö㻍ú êú ´ÖÖ¯Ö­Ö êú ×»Ö‹ †Ö¾Ö¿µÖú Æü¸ü ¯ÖύúÖ¸ü úß ÃÖÆüÖµÖŸÖÖ
•ÖîÃÖê µÖÓ¡Öü, ´Ö•Ö¤æü¸ü ¾Ö †­µÖ “Öß•Öë ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê…
10.1.6 úÖµÖÔÃ£Ö»Ö ¯Ö¸ü úÖµÖÔ úß ¯ÖϐÖ×ŸÖ êú ¤üÖî¸üÖ­Ö ¤üÖê­ÖÖë ¯ÖÖÖë «üÖ¸üÖ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ´ÖÖ¯Ö­Ö ¯Ö¸ü ÆüßÖցָ
׍ú‹ •Ö֋ӐÖêü ¾Ö ŸÖÖ¸üßÖ ›üÖ»Öß •ÖÖ‹Öß…
10.1.7 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­ÖÖ´Ö úß †Öê¸ü ÃÖê ׍ú‹ Ö‹ ׍úÃÖß ´ÖÖ¯Ö­Ö ¯Ö¸ü †Ö¯Ö×¢Ö úß •ÖÖŸÖß Æîü ŸÖÖê
‡ÃÖ ÃÖÓ²ÖÓ¬Ö ´Öë úÖ¸üÖ ²ÖŸÖÖŸÖê Æãü‹ ‹ú ­ÖÖê×™üÃÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ׭֝ÖÔµÖ ÆêüŸÖã ¯ÖÏßÖãŸÖ ׍úµÖÖ
•ÖÖ‹ÖÖ… µÖÆü ­ÖÖê×™üÃÖ ×´Ö»Ö­Öê êú ²ÖÖ¤ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ×¸üúÖò›üÖí úß ÃÖ´Ö߁ÖÖ ú¸ëüÖê †Öî¸ü µÖÖ ŸÖÖê
ˆÃ֍úß ¯ÖãÛ™ü ú¸ëüÖê †£Ö¾ÖÖ ×³Ö®Ö ¸üÖµÖ ÆüÖê­Öê úß ÛãÖ×ŸÖ ´Öë †×¾Ö¾ÖÖפüŸÖ ³ÖÖÖ êú ³ÖãÖŸÖÖ­Ö êú ×»Ö‹
¯ÖÏ´ÖÖÖ¯Ö¡Ö •ÖÖ¸üß ú¸ëüÖê… ‹êÃÖê ×¾Ö¾ÖÖ¤üÖë µÖÖ ×³Ö®ÖŸÖÖ†Öë ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ÆüÖêÖÖ
¾Ö ¤üÖê­ÖÖë ¯ÖÖÖë êú ×»Ö‹ ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…
10.1.8 µÖפü ‡ÃÖ ¯ÖύúÖ¸ü úÖ ­ÖÖê×™üÃÖ ×¤ü‹ •ÖÖ­Öê êú ²ÖÖæ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ´ÖÖ¯Ö­Ö êú ×»Ö‹ ˆ¯ÖÛÃ£ÖŸÖ ­ÖÆüà ÆüÖêŸÖÖ Æîü
µÖÖ †¯Ö­Öê ¯ÖÏÖ׬֍éúŸÖ ¯ÖÏןÖ×­Ö×¬Ö úÖê ­ÖÆüà ³Öê•ÖŸÖÖ Æîü †£Ö¾ÖÖ ¯ÖÏןÖÆüßÖցָü ­ÖÆüà ú¸üŸÖÖ Æîü µÖÖ ´ÖÖ¯Ö­Ö
úß ŸÖÖ¸üßÖ ÃÖê ‹ú ÃÖ¯ŸÖÖÆü êú ³Öߟָü †¯Ö­Öß †Ö¯Ö×¢ÖµÖÖë úÖê ¤ü•ÖÔ ­ÖÆüà ú¸ü¾ÖÖŸÖÖ Æîü ŸÖÖê ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ µÖÖ ˆ­Öêú ¯ÖÏÖ׬֍éúŸÖ ¯ÖÏןÖ×­Ö×¬Ö «üÖ¸üÖ ×úµÖÖ ÖµÖÖ ´ÖÖ¯Ö­Ö úÖµÖÔ úÖ ÃÖÆüß ´ÖÖ¯Ö­Ö ´ÖÖ­ÖÖ
•ÖÖ‹ÖÖ…
10.1.9 µÖפü úÖµÖÔ êú ׍úÃÖß ³ÖÖÖ êú ×»Ö‹ ÃÖÓ×¾Ö¤üÖ ´Öë ‹ú´Öã¿ŸÖ ¸üÖ×¿Ö úÖê ¿ÖÖ×´Ö»Ö ×úµÖÖ ÖµÖÖ ÆüÖê ŸÖÖê
¿ÖÖ×´Ö»Ö úÖµÖÔ úß ˆÃÖ ´Ö¤ü êú ×»Ö‹ †£Ö¾ÖÖ ¯ÖÏ¿­ÖÖŸÖ úÖµÖÔ êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹êÃÖß ´Ö¤ü êú
×»Ö‹ ÃÖÓ×¾Ö¤üÖ ´Öë ¤êüµÖ ˆÃÖß ‹ú´Öã¿ŸÖ ¸üÖ×¿Ö êú ³ÖãÖŸÖÖ­Ö úÖ Æüú¤üÖ¸ü ÆüÖêÖÖ…
10.1.10 µÖפü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¸üÖµÖ ´Öë ¯ÖÏ¿­ÖÖŸÖ úÖµÖÔ úÖ ³ÖÖÖ ´ÖÖ¯Ö­Ö êú †­ÖãÃÖÖ¸ü ³ÖãÖŸÖÖ­ÖµÖÖêµÖ ­ÖÆüà
Æîü ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ¯ÖæÖÔ ×ú‹ Ö‹ úÖµÖÔ úÖê ˆ¨éüŸÖ ‹ú´Öã¿ŸÖ ¸üÖ×¿Ö êú ×ÆüÃÖÖ²Ö ÃÖê †Öú×»ÖŸÖ
ú¸ü ŸÖ¤ü­Öãºþ¯Ö ¸üÖ×¿Ö úÖ ³ÖãÖŸÖÖ­Ö ú¸ü Ã֍úŸÖê Æïü… ‹êÃÖê ׍úÃÖß ´ÖÖ´Ö»Öê ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ‡ÃÖ
¯ÖÏÖ¾Ö¬ÖÖ­Ö êú †ÓŸÖÖÔŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤êüµÖ ¸üÖ×¿Ö µÖÖ ¸üÖ׿ֵÖÖë êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¯ÖÖ ´Öë ‹ú
†Ó×ŸÖ´Ö ¾Ö ׭֍úÂÖá ¯ÖÏ´ÖÖÖ¯Ö¡Ö •ÖÖ¸üß ú¸ëüÖê…
10.1.11 ´ÖÖ¯Ö­Ö ¤ü•ÖÔ ÆüÖê •ÖÖ­Öê êú úÖ¸üÖ ׍úÃÖß ¯ÖύúÖ¸ü úÖ †×¬Öú ´ÖÖ¯Ö­Ö ¤ü•ÖÔ ÆüÖê •ÖÖ­Öê µÖÖ ÃÖÓ–ÖÖ­Ö ´Öë †Ö‡Ô
Ö¸üÖײֵÖÖë êú ¯ÖÏ×ŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ×•Ö´´Öê¤üÖ׸üµÖÖÓ ¾Ö ²ÖÖ¬µÖŸÖÖ‹Ó ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö ŸÖú ÃÖ´ÖÖ¯ŸÖ
­ÖÆüà ÆüÖëÖß…
10.2 ´ÖÖ¯Ö­Ö úß ×¾Ö׬ֵÖÖÓ
10.2.1 •Ö²Ö ŸÖú ׍ú úÖµÖÔ úß ÃÖÖ´ÖÖ­µÖ ¾Ö ×¾ÖßÖéŸÖ ´ÖÖ¡ÖÖ†Öë ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úß Ã¯Ö™ü ¯ÖÏן֍æú»ÖŸÖÖ ­Ö
פüÖÖ‡Ô ¤êü, µÖÆü ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ ×ú ´ÖÖ¡ÖÖ †­ÖãÃÖæ“Öß úÖê ²ÖŸÖÖ‡Ô Ö‡Ô ¤ü¸ü/×¾Ö×­Ö¤ìü¿Ö †­ÖãÃÖæ“Öß êú
†­Öãºþ¯Ö ŸÖîµÖÖ¸ü ׍úµÖÖ ¾Ö ´ÖÖ¯Ö­Ö ×úµÖÖ ÖµÖÖ Æîü… µÖÆü ÃÖÓ²ÖÓ×¬ÖŸÖ ´Ö֭֍ú ´ÖÖ¯Ö­Ö úß ×¾Ö×¬Ö µÖÖ †­µÖ
ÃÖÖ´ÖÖ­µÖ µÖÖ Ã£ÖÖ­ÖßµÖ ´ÖÖ¯Ö­Ö ¸üßןֵÖÖë êú ׍úÃÖß ³Öß ¯ÖÏÖ¾Ö¬ÖÖ­Ö ÃÖê ´ÖãŒŸÖ ÆüÖêÖÖ…

42

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
10.2.2 In the case of items which are not covered by the Schedule of
Rates / Specification, measurement shall be taken in accordance
with the relevant Standard Method of Measurement issued by the
Bureau of Indian Standards and if for any item no such standard is
available, then a mutually agreed method shall be followed.
11 VARIATIONS AND ADJUSTMENTS
11.1 Right to Vary
11.1.1 Variations may be initiated by the Engineer-in-charge at any time prior to
issuing the Completion Certificate for the Works, by an instruction for the
Contractor to submit a proposal. The Contractor shall submit a proposal for
variation for approval of Engineer-in-charge.
11.1.2 Each Variation may include:
a) changes to the quantities of any item of work included in the Contract,
b) changes to the quality and other characteristics of any item of work,
c) deletion of any work which forms part of the scope given in the contract,
or
d) any additional work, Plant, Materials or services necessary for the Works,
including any associated Tests on Completion and exploratory work.
11.1.3 The time for completion of the works shall, in the event of variations
resulting in additional cost over the Contract value being ordered be
extended as follows, if requested by the Contractor:
(a) in the proportion which the additional cost of the extra, additional or
substituted work, bears to the original Contract Sum; plus
(b) 25% of the time calculated in (a) above or such further additional time as
may be considered reasonable by the Engineer-in-Charge.
11.2 Payment for Variations
11.2.1 Variation permitted beyond the tendered quantity for individual items shall
be as follows,
 Excavation items : +100%
 All other items : +50%
11.2.2 Any variation above the tendered quantity but within the above specified
limit shall be paid as per the rates as provided in the contract in the
Schedule of quantities.
11.2.3 In case the quantities to be executed is beyond the variation limits above
or extra, additional or substituted work, the contractor shall give notice to
the corporation of his intention to claim a varied rate or price supported by
proper analysis within 14 days of the date of instruction for executing
varied work, extra, additional work or substituted work, and before the
commencement of such work.

43

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
10.2.2 •ÖÖê ´Ö¤ëü ¤ü¸ü/×¾Ö×­Ö¤ìü¿Ö úß †­ÖãÃÖæ“Öß êú †ÓŸÖÖÔŸÖ ¿ÖÖ×´Ö»Ö ­ÖÆüà Æïü, ˆ­ÖúÖ ´ÖÖ¯Ö­Ö ³ÖÖ¸üŸÖßµÖ ´Ö֭֍ú ²µÖæ¸üÖê
«üÖ¸üÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ´ÖÖ¯Ö­Ö êú ×»Ö‹ •ÖÖ¸üß ´Ö֭֍ú ´ÖÖ¯Ö­Ö ×¾Ö×¬Ö ÃÖê ׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü µÖפü ׍úÃÖß ´Ö¤ü êú ×»Ö‹
‡ÃÖ ¯ÖύúÖ¸ü úÖ ´Ö֭֍ú ˆ¯Ö»Ö²¬Ö ­Ö ÆüÖê ŸÖÖê †Ö¯ÖÃÖß ÃÖÆü´Ö×ŸÖ êú †Ö¬ÖÖ¸ü ¯Ö¸ü ŸÖµÖ úß Ö‡Ô ×¾Ö×¬Ö úÖ ¯ÖϵÖÖêÖ
׍úµÖÖ •ÖÖ‹ÖÖ…
11 ×¾Ö“Ö»Ö­Ö ¾Ö ÃÖ´ÖÖµÖÖê•Ö­Ö
11.1 ×¾Ö“Ö»Ö­Ö úÖ †×¬ÖúÖ¸ü
11.1.1 úÖµÖÔ-¯ÖæÖÔŸÖÖ ¯ÖÏ´ÖÖÖ¯Ö¡Ö úÖê •ÖÖ¸üß ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ׍úÃÖß ³Öß ÃÖ´ÖµÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê
¯ÖÏßÖÖ¾Ö ¯ÖÏßÖãŸÖ ú¸ü­Öê úÖ ×­Ö¤ìü¿Ö ¤êüú¸ü ×¾Ö“Ö»Ö­Ö úß ¯ÖÆü»Ö úß •ÖÖ Ã֍úŸÖß Æîü… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×¾Ö“Ö»Ö­Ö êú
×»Ö‹ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú †­Öã´ÖÖê¤ü­Ö ÆêüŸÖã ‹ú ¯ÖÏßÖÖ¾Ö ¯ÖÏßÖãŸÖ ú¸ëüÖê…
11.1.2 ¯ÖÏŸµÖêú ×¾Ö“Ö»Ö­Ö ´Öë ×­Ö´­Ö×»Ö×ÖŸÖ ¿ÖÖ×´Ö»Ö ×ú‹ •ÖÖ Ã֍úŸÖê Æïü :
‹) ÃÖÓ×¾Ö¤üÖ ´Öë ¿ÖÖ×´Ö»Ö ×úÃÖß úÖµÖÔ úß ´Ö¤ü úß ´ÖÖ¡Ö ´Öë ¯Ö׸ü¾ÖŸÖÔ­Ö
²Öß) úÖµÖÔ úß ×úÃÖß ´Ö¤ü úß ÖãÖ¾Ö¢ÖÖ ¾Ö †­µÖ ×¾Ö¿ÖêÂÖŸÖÖ†Öë ´Öë ¯Ö׸ü¾ÖŸÖÔ­Ö
ÃÖß) ÃÖÓ×¾Ö¤üÖ ´Öë פü‹ Ö‹ úÖµÖԁÖê¡Ö êú ׍úÃÖß ³ÖÖÖ êú úÖµÖÔ úÖê ¸ü§ü ú¸ü­ÖÖ, µÖÖ
›üß) úÖµÖÔ ¯ÖæÖÔ ÆüÖê­Öê ¯Ö¸ü úÖê‡Ô ÃÖÓ²Ö¨ü †Öî¸ü †­¾ÖêÂÖÖ úÖµÖÔ ÃÖ×ÆüŸÖ úÖµÖÔ êú ×»Ö‹ †Ö¾Ö¿µÖú úÖê‡Ô
†×ŸÖ׸üŒŸÖ úÖµÖÔ, ÃÖÓµÖÓ¡Ö, ÃÖִ֐ÖÏß µÖÖ ÃÖê¾ÖÖ‹Ó…
11.1.3 µÖפü ×¾Ö“Ö»Ö­Ö êú úÖ¸üÖ ÃÖÓ×¾Ö¤üÖ †Ö¤êü×¿ÖŸÖ ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ ´Öë ¾Öéרü ÆüÖêŸÖß Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ
†­Öã¸üÖê¬Ö ׍ú‹ •ÖÖ­Öê ¯Ö¸ü úÖµÖÔ úß ¯ÖæÖÔŸÖÖ ÃÖ´ÖµÖÖ¾Ö×¬Ö úÖê ×­Ö´­Ö×»Ö×ÖŸÖ ¯ÖύúÖ¸ü ÃÖê ²ÖœÍüÖµÖÖ •ÖÖ‹ÖÖ :-
(‹) †×ŸÖ׸üŒŸÖ, ×¾ÖßÖÖ׸üŸÖ †£Ö¾ÖÖ ‹¾Ö•Öß úÖµÖÔ úß †×ŸÖ׸üŒŸÖ úß´ÖŸÖ úÖ ÃÖÓ×¾Ö¤üÖ úß ´Öæ»Ö úß´ÖŸÖ êú
†­Öã¯ÖÖŸÖ ´Öë ; ‡Ã֍êú ÃÖÖ£Ö-ÃÖÖ£Ö
(²Öß) ˆ¯ÖµÖãÔŒŸÖ (‹) êú †­ÖãÃÖÖ¸ü †Öú×»ÖŸÖ ÃÖ´ÖµÖ úÖ 25 % µÖÖ ‡ÃÖÃÖê †×¬Öú ÃÖ´ÖµÖ •ÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
«üÖ¸üÖ ˆ×“ÖŸÖ ÃÖ´Ö—ÖÖ •ÖÖ‹…
11.2 ×¾Ö“Ö»Ö­Ö êú ×»Ö‹ ³ÖãÖŸÖÖ­Ö
11.2.1 ¯ÖÏŸµÖêú ´Ö¤ü ×¾Ö¿ÖêÂÖ êú ×»Ö‹ ×­Ö×¾Ö¤üÖ ´ÖÖ¡ÖÖ ÃÖê †×¬Öú †­Öã´ÖŸÖ ×¾Ö“Ö»Ö­Ö ×­Ö´­Ö×»Ö×ÖŸÖ Æîü :-
 Öã¤üÖ‡Ô ¾ÖÖ»Öê úÖ´ÖÖë êú ×»Ö‹ : + 100 %
 †­µÖ ÃÖ³Öß ´Ö¤üÖë êú ×»Ö‹ : + 50 %

11.2.2 ×­Ö×¾Ö¤üÖ ´ÖÖ¡ÖÖ ÃÖê †×¬Öú ؍úŸÖã ˆ¯ÖµÖãÔŒŸÖ ×¾Ö×­ÖÙ¤ü™ü ÃÖß´ÖÖ êú ³Öߟָü ׍ú‹ Ö‹ ׍úÃÖß ×¾Ö“Ö»Ö­Ö êú ×»Ö‹
ÃÖÓ×¾Ö¤üÖ úß ´ÖÖ¡ÖÖ †­ÖãÃÖæ“Öß ´Öë ŸÖµÖ úß Ö‡Ô ¤ü¸üÖë êú ×ÆüÃÖÖ²Ö ÃÖê ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ‹ÖÖ…
11.2.3 µÖפü ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê úÖµÖÔ úß ´ÖÖ¡ÖÖ ×¾Ö“Ö»Ö­Ö ´ÖÖ¡ÖÖ ÃÖê †×¬Öú Æîü µÖÖ †×ŸÖ׸üŒŸÖ, ×¾ÖßÖÖ׸üŸÖ †£Ö¾ÖÖ
‹¾Ö•Öß Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×¾Ö“Ö»Ö­Ö, †×ŸÖ׸üŒŸÖ, ×¾ÖßÖÖ׸üŸÖ †£Ö¾ÖÖ ‹¾Ö•Öß úÖµÖÔ úÖê ×­Ö¯ÖÖפüŸÖ ú¸ü­Öê úÖ
×­Ö¤ìü¿Ö ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú 14 פü­ÖÖë êú ³Öߟָü †Öî¸ü ‹êÃÖê úÖµÖÔ úÖê ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ×¾Ö“Ö»Ö­Ö ¤ü¸ü ÃÖê µÖÖ
ˆ×“ÖŸÖ ×¾Ö¿»ÖêÂÖÖ êú ÃÖ´Ö£ÖÔ­Ö êú †Ö¬ÖÖ¸ü ¯Ö¸ü ¤üÖ¾ÖÖ ú¸ü­Öê êú †¯Ö­Öê ‡¸üÖ¤êü êú ²ÖÖ¸êü ´Öë ×­ÖÖ´Ö úÖê ÃÖæד֟Ö
ú¸êüÖÖ…

43

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
11.2.4 In case of quantities beyond variation limits, the Engineer-in-charge shall
determine the rates, after due consideration to the rate analysis submitted
by the contractor. These provisions shall also be applicable for decrease in
rates.
11.2.5 For determining the rates for extra, altered or substituted item, where in
such item with similar specification is available in the schedule of quantities
then the same rate shall be applied. In case the item is not available within
the same schedule of quantities but are available in other parts / modules
of the contract, then the lowest rate among the rates in other part /
module shall be considered.
11.2.6 Incase the rates for extra, altered or substituted item are not available in
any part or Module of Schedule of quantities then the rate shall be
determined based on Market rates, approved by the Engineer-in-charge.
11.2.7 Deletion of any item / any part of work of schedule of quantities shall also
form part of the variation limit.
11.2.8 If the over all net contract value is less than 75% of the contract value, then
a suitable compensation shall be assessed mutually and paid to the
contractor based on case to case basis.
11.2.9 In case the quoted rates are more than 25% of the estimated
departmental rates the corporation has got a right to negotiate such rates
with prospective bidder for execution of quantity beyond the tendered
quantity before award of work.
11.3 Contract Price Adjustment
11.3.1 The rates quoted by the tenderer shall be the Base Price, which will be
subjected to PRICE ADJUSTMENTS in accordance with the conditions and
formula prescribed herein and further subject to satisfying the requirements
specified in this clause only. This clause is applicable only to the contracts
where stipulated completion period is more than 12 months.
11.3.2 For contract(s) where completion period as stipulated in NIT or work order is
less than and upto 12 (twelve) months and where there is a delay which is
attributed to the Corporation, due to which the period of the contract
exceeds 12 months, the contract price adjustments is applicable for the
extended period. (For example, where the original contract period is 10
months and there is extension for 3 months, then adjustment is payable for
one month i.e.13th month only). However the Subscript value of “0” defined
in 11.3.4 above shall be the indices of the month in which the Mid period
(50% in terms of days) of the extended contract period falls on.
11.3.3 The "Contract Price" as awarded shall be the Base Price, unless other wise
specified.
A certain fixed percentage of the base price shall not be subject to any
price adjustment. The balance percentage to be specified shall be of
Identified Components towards Labour, Material(s) (not being material
supplied/or services rendered at fixed prices by the Corporation) and
P.O.L. and shall be subjected to Price Adjustment. The fixed component
shall be 15% of the contract value, and is not subjected to price
adjustments. However other components shall vary from contract to
contract depending upon the scope of work(s) and this information is
furnished by the Corporation in Schedule A(refer clause 11.3.4).
44

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
11.2.4 µÖפü ´ÖÖ¡ÖÖ ×¾Ö“Ö»Ö­Ö ÃÖß´ÖÖ ÃÖê †×¬Öú ÆüÖê ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖÏßÖãŸÖ ׍ú‹ Ö‹ ¤ü¸ü
×¾Ö¿»ÖêÂÖÖ ¯Ö¸ü ÃÖ´Öã×“ÖŸÖ ×¾Ö“ÖÖ¸ü ú¸ü ¤ü¸ëü ×­ÖÛ¿“ÖŸÖ ú¸ëüÖê… µÖÆüß ¯ÖÏÖ¾Ö¬ÖÖ­Ö ¤ü¸üÖë úÖê ‘Ö™üÖ­Öê êú ×»Ö‹ ³Öß »Ö֐Öæ
ÆüÖëÖê…
11.2.5 †×ŸÖ׸üŒŸÖ, ×¾ÖßÖÖ׸üŸÖ †£Ö¾ÖÖ ‹¾Ö•Öß ´Ö¤üÖë úß ¤ü¸üÖë êú ×­Ö¬ÖÖÔ¸üÖ êú ×»Ö‹ µÖפü ÃÖ´ÖÖ­Ö ¯ÖύúÖ¸ü êú
×¾Ö×­Ö¤ìü¿ÖÖë ¾ÖÖ»Öß ´Ö¤ëü ´ÖÖ¡ÖÖ †­ÖãÃÖæ“Öß ´Öë ˆ¯Ö»Ö²¬Ö ÆüÖë ŸÖÖê ¾ÖÆüß ¤ü¸ëü »Ö֐Öæ úß •Ö֋ӐÖß… µÖפü µÖê ´Ö¤ëü ˆÃÖ ´ÖÖ¡ÖÖ
†­ÖãÃÖæ“Öß ´Öë ˆ¯Ö»Ö²¬Ö ­Ö ÆüÖë ¯Ö¸ÓüŸÖã ÃÖÓ×¾Ö¤üÖ êú †­µÖ ³Ö֐Ö/ ´ÖÖê›ü¶æ»Ö ´Öë ˆ¯Ö»Ö²¬Ö ÆüÖë ŸÖÖê †­µÖ
³Ö֐Ö/´ÖÖê›ü¶æ»Ö úß ¤ü¸üÖë ´Öë ÃÖê ­µÖæ­ÖŸÖ´Ö ¤ü¸üÖë ¯Ö¸ü ×¾Ö“ÖÖ¸ü ׍úµÖÖ •ÖÖ‹ÖÖ…
11.2.6 µÖפü †×ŸÖ׸üŒŸÖ, ×¾ÖßÖÖ׸üŸÖ †£Ö¾ÖÖ ‹¾Ö•Öß ´Ö¤üÖë êú ×»Ö‹ ´ÖÖ¡ÖÖ †­ÖãÃÖæ“Öß êú ׍úÃÖß ³Öß ³ÖÖÖ µÖÖ ´ÖÖê›ü¶æ»Ö
´Öë ¤ü¸ëü ˆ¯Ö»Ö²¬Ö ­Ö ÆüÖë ŸÖÖê ¤ü¸üÖë úÖ ×­Ö¬ÖÖÔ¸üÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú †­Öã´ÖÖê¤ü­Ö ÃÖê ²ÖÖ•ÖÖ¸ü ¤ü¸ü ¯Ö¸ü ׍úµÖÖ
•ÖÖ‹ÖÖ…
11.2.7 ´ÖÖ¡ÖÖ †­ÖãÃÖæ“Öß úß ×úÃÖß ´Ö¤ü/ ׍úÃÖß ³ÖÖÖ µÖÖ ´ÖÖê›ü¶æ»Ö úÖê ¸ü§ü ׍úµÖÖ •ÖÖ­ÖÖ ³Öß ×¾Ö“Ö»Ö­Ö ÃÖß´ÖÖ úÖ ‹ú
×ÆüÃÃÖÖ ÆüÖêÖÖ…
11.2.8 µÖפü Ã֍ú»Ö ×­Ö¾Ö»Ö ÃÖÓ×¾Ö¤üÖ ´Ö滵Ö, ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú 75 % ÃÖê ú´Ö ÆüÖê ŸÖÖê ´ÖÖ´Ö»ÖÖ-¤ü¸ü-´ÖÖ´Ö»ÖÖ †Ö¬ÖÖ¸ü
¯Ö¸ü ¤üÖê­ÖÖê ¯ÖÖÖë «üÖ¸üÖ †Ö¯ÖÃÖß ÃÖÆü´Ö×ŸÖ ÃÖê ˆ¯ÖµÖãŒŸÖ Öן֯ÖæÙŸÖ úÖ †Öú»Ö­Ö ׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ‹ÖÖ…
11.2.9 µÖפü ˆ¨éüŸÖ ¤ü¸ëü ×¾Ö³Ö֐ÖßµÖ †­Öã´ÖÖ­ÖÖë ÃÖê 25% ÃÖê †×¬Öú ÆüÖê ŸÖÖê úÖµÖÔ úÖ †¾ÖÖ›Ôü ׍ú‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê
×­Ö×¾Ö¤üÖ úß Ö‡Ô ´ÖÖ¡ÖÖ ÃÖê †×¬Öú ´ÖÖ¡ÖÖ êú ×­Ö¯ÖÖ¤ü­Ö úß ¤ü¸üÖë êú ²ÖÖ¸êü ´Öë ×­ÖÖ´Ö úÖê ¯ÖÏŸµÖÖ¿Öß
²ÖÖê»ÖߤüÖŸÖÖ†Öë êú ÃÖÖ£Ö ´ÖÖê»Ö-³ÖÖ¾Ö ú¸ü­Öê úÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ…
11.3 ÃÖÓ×¾Ö¤üÖ úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö
11.3.1 ×­Ö×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆ¨éüŸÖ ¤ü¸ëü †Ö¬ÖÖ¸ü úß´ÖŸÖ ÆüÖëÖß •ÖÖê ׍ú †ÖÖê ²ÖŸÖÖ‡Ô Ö‡Ô ¿ÖŸÖÖí ¾Ö ÃÖæ¡Ö êú †­ÖãÃÖÖ¸ü
úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö êú ×¾ÖÂÖµÖÖ¬Öß­Ö ÆüÖëÖß †Öî¸ü ÃÖÖ£Ö Æüß êú¾Ö»Ö ‡ÃÖ Ö›ü êú †ÓŸÖÖÔŸÖ ×¾Ö×­ÖÙ¤ü™ü
†Ö¾Ö¿µÖúŸÖÖ†Öë úÖê ¯Öæ¸üÖ ú¸ü­Öê êú †¬Öß­Ö ³Öß ÆüÖëÖß… µÖÆü Ö›ü êú¾Ö»Ö ˆ­Æüà ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú ×»Ö‹ »Ö֐Öæ
Æîü ו֭֍úÖ úÖµÖÔ¯ÖæÖÔŸÖÖ ÃÖ´ÖµÖ 12 ´ÖÖÆü ÃÖê †×¬Öú ×­Ö¬ÖÖÔ׸üŸÖ ׍úµÖÖ ÖµÖÖ Æîü…
11.3.2 ‹êÃÖß ÃÖÓ×¾Ö¤üÖ (†Öë) ו֭֍úÖ ×­Ö×¾Ö¤üÖ †Ö´ÖÓ¡ÖÖ ÃÖæ“Ö­ÖÖ µÖÖ úÖµÖÔ †Ö¤êü¿Ö ´Öë ×­Ö¬ÖÖÔ׸üŸÖ ÃÖ´ÖµÖ 12 ´ÖÖÆü µÖÖ
ˆÃÖÃÖê ú´Ö Æîü †Öî¸ü •ÖÆüÖÓ ×­ÖÖ´Ö úß ¾Ö•ÖÆü ÃÖê Æãü‹ ×¾Ö»ÖÓ²Ö êú úÖ¸üÖ ÃÖÓ×¾Ö¤üÖ úÖ ÃÖ´ÖµÖ 12 ´ÖÖÆü ÃÖê
†×¬Öú ÆüÖê ÖµÖÖ ÆüÖê, ÃÖÓ×¾Ö¤üÖ úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö ×¾ÖßÖÖ׸üŸÖ ÃÖ´ÖµÖ êú ×»Ö‹ ³Öß »Ö֐Öæ ÆüÖêÖÖ… (ˆ¤üÖÆü¸üÖ êú
×»Ö‹ µÖפü ÃÖÓ×¾Ö¤üÖ úÖ ´Öæ»Ö ÃÖ´ÖµÖ 10 ´ÖÖÆü Æîü †Öî¸ü 3 ´ÖÖÆü úÖ ÃÖ´ÖµÖ-×¾ÖßÖÖ¸ü פüµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê êú¾Ö»Ö 1
´ÖÖÆü êú ×»Ö‹ †£ÖÖÔŸÖ 13¾Öë ´ÖÆüß­Öê êú ×»Ö‹ ÃÖ´ÖÖµÖÖê•Ö­Ö úÖ ³ÖãÖŸÖÖ­Ö ¤êüµÖ ÆüÖêÖÖ)… ŸÖ£ÖÖ×¯Ö ˆ¯ÖµÖãÔŒŸÖ
11.3.4 ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ "0" úÖ †¬ÖÖê×»Ö×ÖŸÖ ´Öæ»µÖ ×¾ÖßÖÖ׸üŸÖ ÃÖÓ×¾Ö¤üÖ ÃÖ´ÖµÖ êú ´Ö¬µÖ ´Öë (ãú»Ö פü­ÖÖë
úÖ 50 % ) •ÖÖê ´ÖÖÆü †Ö ¸üÆüÖ ÆüÖ,ê ˆÃÖ ´ÖÖÆü úÖ Ã£ÖÖ­Ö ´ÖÖ­Ö ÆüÖêÖÖ…
11.3.3 •Ö²Ö ŸÖú ׍ú †­µÖ£ÖÖ ×¾Ö×­ÖÙ¤ü™ü ­Ö ׍úµÖÖ •ÖÖ‹, †¾ÖÖ›Ôü úß Ö‡Ô "ÃÖÓ×¾Ö¤üÖ úß´ÖŸÖ" †Ö¬ÖÖ¸ü úß´ÖŸÖ ÆüÖêÖß…
†Ö¬ÖÖ¸ü úß´ÖŸÖ úÖ ‹ú ×­ÖÛ¿“ÖŸÖ ŸÖµÖ ¯ÖÏ×ŸÖ¿ÖŸÖ ×úÃÖß ¯ÖύúÖ¸ü êú ÃÖ´ÖÖµÖÖê•Ö­Ö êú ×¾ÖÂÖµÖÖ¬Öß­Ö ­ÖÆüà ÆüÖêÖÖ…
×¾Ö×­ÖÙ¤ü™ü ׍úµÖÖ •ÖÖ­Öê ¾ÖÖ»ÖÖ ¿ÖêÂÖ ¯ÖÏ×ŸÖ¿ÖŸÖ ´Ö•Ö¤æü¸üß, ¾ÖßÖã (‹Ó) (¾Öê ¾ÖßÖã‹Ó •ÖÖê ×­ÖÖ´Ö «üÖ¸üÖ †Ö¯ÖæŸÖÔ ­ÖÆüà
úß •ÖÖ ¸üÆüß Æïü/ ×­ÖÛ¿“ÖŸÖ ¤ü¸üÖë ¯Ö¸ü ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •ÖÖ­Öê ¾ÖÖ»Öß ÃÖê¾ÖÖ‹Ó) †Öî¸ü ¯Öê™ÒüÖê»Ö, ŸÖê»Ö, íÖêÆüúÖë êú
×»Ö‹ דÖÛÅ­ÖŸÖ ‘Ö™üú ÆüÖëÖê †Öî¸ü úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö êú ×¾ÖÂÖµÖÖ¬Öß­Ö ÆüÖëÖê… ŸÖµÖ ‘Ö™üú ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úÖ
15 % ÆüÖëÖê †Öî¸ü úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö êú ×¾ÖÂÖµÖÖ¬Öß­Ö ­ÖÆüà ÆüÖëÖê… ŸÖ£ÖÖ×¯Ö †­µÖ ‘Ö™üú ¯ÖÏŸµÖêú ÃÖÓ×¾Ö¤üÖ êú
úÖµÖԁÖê¡Ö êú †­ÖãÃÖÖ¸ü †»ÖÖ-†»ÖÖ ÆüÖëÖê †Öî¸ü µÖÆü ÃÖæ“Ö­ÖÖ ×­ÖÖ´Ö «üÖ¸Ö †­ÖãÃÖæ“Öß ‹ (éú¯ÖµÖÖ Ö›ü
11.3.4 úÖ ÃÖÓ¤ü³ÖÔ »Öë ) ´Öë ¾ÖÙÖŸÖ úß Ö‡Ô Æîü…
44

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
11.3.4 The actual amount of price adjustment shall be determined by satisfying
the conditions specified herein.
The price adjustment formula for the various components of the Contract
Price shall be construed as stipulated hereinafter. The formula designed for
governing and calculating the price adjustment to be applied to the
contract price shall be as follows:
ACV1 = CV (F + l uLu1/Lu0 + l sLs1/Ls0 + mM1/M0 + nN1/N0 + oO1/O0 + pP1/P0
+ qQ1/Q0 + dD1/D0)
Where:
ACV1 - Adjusted contract price i.e., value of work done after application of
above price adjustment formula.
CV Base contract price, subject to price adjustment, i.e. the value of the
work done in the given period for which the Price Adjustment is to be
calculated excluding cost of material supplied or services rendered
at fixed prices by the Corporation and the cost of extra items, rates
for which have been worked out based on market rates.
F - Fixed component i.e. 15% of contract value, which is not subjected
to any adjustment under this formula or otherwise.
lu - Unskilled Labour component (Defined in Schedule A) expressed as
percentage of the contract value which will be subjected to
adjustment.
ls - Skilled labour component (Defined in Schedule A) expressed as
percentage of the contract value which will be subject to
adjustment.
m,n,o,p - Various material component (bought by the contractor) expressed
as percentage of the contract value(defined in Schedule A), which
will be subject to adjustment. The sum of m,n,o,p along with F, d ,
labour (lu and ls) and q should sum up to one.
‘q - Component for all the other materials (other than m, n, o, and p)
expressed as percentage of contract value, as defined in Schedule
A.
d- P. O. L. component expressed as percentage of the contract value,
as defined in Schedule A, which will be subject to adjustment.
M, N, O, P - Corresponding published price indices of various materials based on
All India Wholesale Price Index for Individual Commodities /Group
Items for the period under consideration published by Economic
advisor to Government of India, Ministry of Industry & Commerce.
Q- Wholesale price indices applicable to all commodities for the period
under consideration as published by Economic Advisor to
Government of India, Ministry of Industry & Commerce.

45

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
11.3.4 úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö úß ¾ÖÖßÖ׾֍ú ¸üÖ×¿Ö úÖê µÖÆüÖÓ †ÖÖê ¾ÖÙÖŸÖ ¿ÖŸÖÖí êú †Ö¬ÖÖ¸ü ¯Ö¸ü ×­Ö¬ÖÖÔ׸üŸÖ ׍úµÖÖ
•ÖÖ‹ÖÖ…
ÃÖÓ×¾Ö¤üÖ úß´ÖŸÖ êú ×¾Ö×³Ö®Ö ‘Ö™üúÖë úÖ úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö ÃÖæ¡Ö úÖ †£ÖÔ ‡Ã֍êú †ÖÖê פü‹ Ö‹ ¾ÖÖÔ­Ö êú
†­ÖãÃÖÖ¸ü ÆüÖêÖÖ… ÃÖÓ×¾Ö¤üÖ úß´ÖŸÖ êú úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö úÖê ¿ÖÖ×ÃÖŸÖ ú¸ü­Öê ¾Ö ˆÃ֍úß ÖÖ­ÖÖ ú¸ü­Öê êú
×»Ö‹ ²Ö­ÖÖµÖÖ ÖµÖÖ »Ö֐Öæ ÃÖæ¡Ö ×­Ö´­Ö×»Ö×ÖŸÖ Æîü :
ACV1= CV( F+ lu x Lu1/Lu0 + ls x Ls1/Ls0 + m x M1/M0 + n x N1/N0
+ O x O1/O0 + p x P1/P0 + q x Q1/Q0 + d x D1/D0 )
•ÖÆüÖÓ ¯Ö¸ü :
ACV1 - ÃÖ´ÖÖµÖÖê×•ÖŸÖ ÃÖÓ×¾Ö¤üÖ úß´ÖŸÖ †£ÖÖÔŸÖ ˆ¯ÖµÖãÔŒŸÖ úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö ÃÖæ¡Ö »ÖÖÖ­Öê êú
²ÖÖ¤ü ׍ú‹ Ö‹ úÖµÖÔ úÖ ´Ö滵օ
CV - úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö êú ×¾ÖÂÖµÖÖ¬Öß­Ö †Ö¬ÖÖ¸ü ÃÖÓ×¾Ö¤üÖ úß´ÖŸÖ †£ÖÖÔŸÖ ‹ú ×­ÖÛ¿“ÖŸÖ ÃÖ´ÖµÖ ´Öë ׍ú‹
Ö‹ úÖµÖÔ úÖ ´Öæ»µÖ ×•ÖÃ֍êú ×»Ö‹ úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö úß ÖÖ­ÖÖ úß •ÖÖ­Öß Æîü… ‡ÃÖ´Öë ׭֐ִÖ
«üÖ¸üÖ ×­ÖÛ¿“ÖŸÖ ¤ü¸üÖë ¯Ö¸ü ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô Ö‡Ô ÃÖִ֐ÖÏß ¾Ö ¯ÖϤü¢Ö ÃÖê¾ÖÖ‹Ó †Öî¸ü †×ŸÖ׸üŒŸÖ ´Ö¤üÖë úß
úß´ÖŸÖ ×•Ö­Öúß ¤ü¸üÖë úß ÖÖ­ÖÖ ²ÖÖ•ÖÖ¸ü ¤ü¸ü êú †Ö¬ÖÖ¸ü ¯Ö¸ü úß Ö‡Ô Æîü, ¿ÖÖ×´Ö»Ö ­ÖÆüà Æïü…
F - ×­ÖÛ¿“ÖŸÖ ‘Ö™üú †£ÖÖÔŸÖ ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úÖ 15 % •ÖÖê ‡ÃÖ ÃÖæ¡Ö †£Ö¾ÖÖ †­µÖ£ÖÖ ×úÃÖß ²ÖÖŸÖ êú
×¾ÖÂÖµÖÖ¬Öß­Ö ­ÖÆüà Æîü…
lu - †ãú¿Ö»Ö ´Ö•Ö¤æü¸ü ‘Ö™üú (†­ÖãÃÖæ“Öß ‹ ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ) וÖÃÖê ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú ¯ÖÏ×ŸÖ¿ÖŸÖ ´Öë ¾µÖŒŸÖ
׍úµÖÖ ÖµÖÖ Æîü †Öî¸ü •ÖÖê ÃÖ´ÖÖµÖÖê•Ö­Ö êú ×¾ÖÂÖµÖÖ¬Öß­Ö ÆüÖêÖÖ…
ls - ãú¿Ö»Ö ´Ö•Ö¤æü¸ü ‘Ö™üú (†­ÖãÃÖæ“Öß ‹ ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ) וÖÃÖê ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú ¯ÖÏ×ŸÖ¿ÖŸÖ ´Öë ¾µÖŒŸÖ
׍úµÖÖ ÖµÖÖ Æîü †Öî¸ü •ÖÖê ÃÖ´ÖÖµÖÖê•Ö­Ö êú ×¾ÖÂÖµÖÖ¬Öß­Ö ÆüÖêÖÖ…
m,n,o,p - ×¾Ö×³Ö®Ö ÃÖִ֐ÖÏß ‘Ö™üú (ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ Ö¸üߤêü Ö‹) וÖÃÖê ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú ¯ÖÏ×ŸÖ¿ÖŸÖ (†­ÖãÃÖæ“Öß
‹ ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ) ´Öë ¾µÖŒŸÖ ׍úµÖÖ ÖµÖÖ Æîü †Öî¸ü •ÖÖê ÃÖ´ÖÖµÖÖê•Ö­Ö êú ×¾ÖÂÖµÖÖ¬Öß­Ö ÆüÖêÖÖ… F,
d, ´Ö•Ö¤æü¸ü ( lu †Öî¸ü ls) êú ÃÖÖ£Ö m.n.o.p úÖ µÖÖêÖ †Öî¸ü q úÖ ´ÖÖ­Ö ‹ú ÆüÖê­ÖÖ “ÖÖ×Æü‹…
q - ÃÖ´ÖÃŸÖ †­µÖ ÃÖÖ´ÖאÖϵÖÖë úÖ ‘Ö™üú (m.n.o †Öî¸ü p êú †»ÖÖ¾ÖÖ) וÖÃÖê †­ÖãÃÖæ“Öß ‹ ´Öë
¯Ö׸ü³ÖÖ×ÂÖŸÖ ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú ¯ÖÏ×ŸÖ¿ÖŸÖ ´Öë ¾µÖŒŸÖ ׍úµÖÖ ÖµÖÖ Æîü…
d - P.O.L ‘Ö™üú וÖÃÖê †­ÖãÃÖæ“Öß ‹ ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú ¯ÖÏ×ŸÖ¿ÖŸÖ ´Öë ¾µÖŒŸÖ ׍úµÖÖ ÖµÖÖ
Æîü †Öî¸ü •ÖÖê ÃÖ´ÖÖµÖÖê•Ö­Ö êú ×¾ÖÂÖµÖÖ¬Öß­Ö ÆüÖêÖÖ…
M,.N,.O,.P - ×¾Ö×³Ö®Ö ÃÖÖ´ÖאÖϵÖÖë êú ×»Ö‹ ³ÖÖ¸üŸÖ ÃÖ¸üúÖ¸ü êú ˆªÖêÖ ‹¾ÖÓ ¾ÖÖם֕µÖ ´ÖÓ¡ÖÖ»ÖµÖ êú †Ö٣֍ú
ÃÖ»ÖÖÆüúÖ¸ü «üÖ¸üÖ ×¾Ö׿Ö™ü ´ÖÖ»Ö/ ÃÖ´ÖæÆü ´Ö¤üÖë úß ×¾Ö“ÖÖ¸üÖ¬Öß­Ö †¾Ö×¬Ö êú ×»Ö‹ ¯ÖύúÖ׿֟Ö
†×Ö»Ö ³ÖÖ¸üŸÖßµÖ £ÖÖêú ´Öæ»µÖ ÃÖæ“֍úÖӍú êú †Ö¬ÖÖ¸ü ¯Ö¸ü ŸÖ¤ü­Öãºþ¯Ö ¯ÖύúÖ×¿ÖŸÖ úß´ÖŸÖ ÃÖæ“Öß…
Q - ×¾Ö“ÖÖ¸üÖ¬Öß­Ö †¾Ö×¬Ö êú ×»Ö‹ ³ÖÖ¸üŸÖ ÃÖ¸üúÖ¸ü êú ˆªÖêÖ ‹¾ÖÓ ¾ÖÖם֕µÖ ´ÖÓ¡ÖÖ»ÖµÖ êú †Ö٣֍ú
ÃÖ»ÖÖÆüúÖ¸ü «üÖ¸üÖ ¯ÖύúÖ×¿ÖŸÖ ‹¾ÖÓ ÃÖ³Öß ¾ÖßÖã†Öë ¯Ö¸ü »Ö֐Öæ ÆüÖê­Öê ¾ÖÖ»Öß £ÖÖêú ´Öæ»µÖ ÃÖæ“Öß…

45

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
L- Minimum wages in Rupees of a labour fixed under any law, statutory rule or
order as applicable on the last date of the month under consideration
(where in subscript ‘u’ and ‘s’ denotes the unskilled and skilled labour
respectively).
D- Petrol prices of the nearest petrol pump (defined in Schedule A)
applicable as on the last date of the month under consideration.
SUBSCRIPT:
‘0’ - refers to the values of the above-mentioned Minimum Wages/ Material
indices/ Petrol price applicable to previous month prior to the date of
submission of tenders (In case of two part tender the date of submission of
Part 1 shall be taken).
‘1’ - refers to the values of corresponding Minimum Wages, Material indices/
petrol price as applicable for the month prior to the month in which the
work is executed for which adjustment is applicable, respectively.
11.3.5 The value of fixed component `F' will remain unchanged and fixed and
shall not be disputed.
11.3.6 Price Adjustment(s) shall be calculated for the quantum of works executed
during the month of the bill.
11.3.7 Additional, altered or substituted items of work, derived from the agreed Bill
of quantities and rates attached in work order will also attract price
adjustment as per this clause. No price adjustment for the cost of material
issued and/or services provided by the Corporation shall be applicable,
which are issued at fixed rates to the Contractor. Extra, altered or
substituted item for which the rate has been derived from the market rate,
shall not be subject to price adjustment within 12 months from the actual
commencement of execution or date of its communication to the
contractor whichever is earlier.
11.3.8 In the case of materials brought to site for which any secured advance is
included in the bill, the full assessed value of such advance shall be added
to the cost of work shown in the bill for operation of this Clause. Similarly,
when such materials are incorporated in the work and secured advance is
deducted from the bill, the full assessed value should be deducted from
the cost of the work shown in the bill, running or final.
11.3.9 In case of advance payment is given for the work done but not measured
the full value of such unmeasured work shall be added to the cost of work
shown in the bill for operation of this Clause. When such work is measured
and paid the full value of such work shall be deducted from the cost of
work shown in the bill, running or final.
11.3.10Every month after the award of Contract, the Contractor shall submit to
the Engineer-in-Charge, a written notice of the changes, if any, that have
occurred in the specified indices of Material/petrol prices and in minimum
wages for labour during the previous month containing the effective date
of such change, the extent of change etc. with authenticated
documentary evidence (as described above) of the relevant published
indices/petrol price/minimum wages to substantiate the price
adjustment claim.
46

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
L - ׍úÃÖß úÖ­Öæ­Ö êú, ÃÖÖÓ×¾Ö׬֍ú ×­ÖµÖ´Ö µÖÖ †Ö¤êü¿Ö êú †¬Öß­Ö ×¾Ö“ÖÖ¸üÖ¬Öß­Ö ´ÖÖÆü úß †Ó×ŸÖ´Ö ŸÖÖ¸üߏÖ
úÖê »Ö֐Öæ ÆüÖê­Öê ¾ÖÖ»Öß ‹ú ´Ö•Ö¤æü¸ü úß ¹ý¯ÖµÖÖë ´Öë ­µÖæ­ÖŸÖ´Ö ´Ö•Ö¤æü¸üß (•ÖÆüÖÓ ¯Ö¸ü ˆ¯Öցָü "u" †Öî¸ü
"s" Îú´Ö¿Ö: †ãú¿Ö»Ö ¾Ö ãú¿Ö»Ö ´Ö•Ö¤æü¸üÖë úÖê ¾µÖŒŸÖ ú¸üŸÖê Æïü… )
D - ×¾Ö“ÖÖ¸üÖ¬Öß­Ö ´ÖÖÆü úß †Ó×ŸÖ´Ö ŸÖÖ¸üßÖ úÖê ׭֍ú™üŸÖ´Ö ¯Öê™ÒüÖê»Ö ¯ÖÓ¯Ö (†­ÖãÃÖæ“Öß ‹ ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ) ´Öë
ˆ¯Ö»Ö²¬Ö ¯Öê™ÒüÖê»Ö úß úß´ÖŸÖ ¤ü¸ü…
ˆ¯Öցָü :
'o' - ÃÖê ÃÖÓ¤ü³ÖÔ ×­Ö×¾Ö¤üÖ •Ö´ÖÖ ú¸ü­Öê úß ŸÖÖ¸üßÖ (¤üÖê ³Ö֐ÖÖë ¾ÖÖ»Öß ×­Ö×¾Ö¤üÖ êú ´ÖÖ´Ö»Öê ´Öë ³Ö֐Ö-1 úÖê
•Ö´ÖÖ ú¸ü­Öê úß ŸÖÖ¸üßÖ ´ÖÖ­Öß •ÖÖ‹Öß…) êú ¯ÖÆü»Öê ¾ÖÖ»Öê ´ÖÖÆü ´Öê »Ö֐Öæ ˆ¯ÖµÖãÔŒŸÖ ­µÖæ­ÖŸÖ´Ö
´Ö•Ö¤æü¸üß/ÃÖִ֐ÖÏß ÃÖæ“Öß/ ¯Öê™ÒüÖê»Ö úß úß´ÖŸÖ ¤ü¸ü êú ´Öæ»µÖ ÃÖê Æîü…
'l' - ÃÖê ÃÖÓ¤ü³ÖÔ Îú´Ö¿Ö: ˆÃÖ ŸÖ¤ü­Öãºþ¯Ö ­µÖæ­ÖŸÖ´Ö ´Ö•Ö¤æü¸üß/ÃÖִ֐ÖÏß ÃÖæ“Öß/¯Öê™ÒüÖê»Ö úß´ÖŸÖ ¤ü¸ü ÃÖê Æîü •ÖÖê
ÃÖ´ÖÖµÖÖê•Ö­Ö µÖÖêµÖ úÖµÖÔ úÖ ×­Ö¯ÖÖ¤ü­Ö ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ´ÖÆüß­Öê ÃÖê ¯ÖÆü»Öê ¾ÖÖ»Öê ´ÖÖÆü ´Öë £Öß…
11.3.5 ×­ÖÛ¿“ÖŸÖ ‘Ö™üú "F" úÖ ´Öæ»µÖ †¯Ö׸ü¾ÖÙŸÖŸÖ ¾Ö ×­ÖÛ¿“ÖŸÖ ¸üÆêüÖÖ †Öî¸ü ‡ÃÖ ¯Ö¸ü úÖê‡Ô ×¾Ö¾ÖÖ¤ü ­ÖÆüß ×úµÖÖ
•ÖÖ‹ÖÖ…
11.3.6 úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö(­ÖÖë) úß ÖÖ­ÖÖ ×²Ö»Ö ×¤ü‹ •ÖÖ­Öê ¾ÖÖ»Öê ´ÖÖÆü êú ¤üÖî¸üÖ­Ö ×­Ö¯ÖÖפüŸÖ úÖµÖÔ úß ´ÖÖ¡ÖÖ êú
†Ö¬ÖÖ¸ü ¯Ö¸ü ׍úµÖÖ •ÖÖ‹ÖÖ…
11.3.7 ‡ÃÖ Ö›ü êú †­ÖãÃÖÖ¸ü úÖµÖÔ †Ö¤êü¿Ö êú ÃÖÖ£Ö ÃÖӻ֐­Ö ´ÖÖ¡ÖÖ †Öî¸ü ¤ü¸ü êú ÃÖÆü´ÖŸÖ ×²Ö»Ö ´Öë ÃÖê ׭֍úÖ»Öß Ö‡Ô
†×ŸÖ׸üŒŸÖ, ¯Ö׸ü¾ÖÙŸÖŸÖ µÖÖ ‹¾Ö•Öß úÖµÖÔ úß ´Ö¤üÖë ¯Ö¸ü ³Öß úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö »Ö֐Öæ ÆüÖêÖÖ… ×­ÖÖ´Ö «üÖ¸üÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ×­ÖÛ¿“ÖŸÖ úß´ÖŸÖ ¯Ö¸ü •ÖÖ¸üß úß Ö‡Ô ÃÖִ֐ÖÏß †Öî¸ü/µÖÖ ¯ÖϤü¢Ö ÃÖã×¾Ö¬ÖÖ†Öë úß úß´ÖŸÖÖë ¯Ö¸ü
úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö »Ö֐Öæ ­ÖÆüà ÆüÖêÖÖ… ˆ­Ö †×ŸÖ׸üŒŸÖ, ¯Ö׸ü¾ÖÙŸÖŸÖ µÖÖ ‹¾Ö•Öß úÖµÖÔ úß ´Ö¤üÖë ו֭֍êú ×»Ö‹
¤ü¸üÖë úÖê ²ÖÖ•ÖÖ¸ü ¤ü¸ü êú †Ö¬ÖÖ¸ü ¯Ö¸ ×»ÖµÖÖ ÖµÖÖ Æîü, úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö †Ö¸Óü³Ö êú ¾ÖÖßÖ׾֍ú ÃÖ´ÖµÖ µÖÖ ‡Ã֍êú
×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖæ×“ÖŸÖ ×ú‹ •ÖÖ­Öê úß ŸÖÖ¸üßÖ ´Öë ÃÖê •ÖÖê ³Öß ¯ÖÆü»Öê ÆüÖê, êú 12 ´ÖÆüß­ÖÖë ŸÖú úß´ÖŸÖ
ÃÖ´ÖÖµÖÖê•Ö­Ö êú ×¾ÖÂÖµÖÖ¬Öß­Ö ­ÖÆüà ÆüÖëÖß…
11.3.8 µÖפü úÖµÖÔÃ£Ö»Ö ¯Ö¸ü úÖê‡Ô ‹êÃÖß ÃÖִ֐ÖÏß »ÖÖ‡Ô •ÖÖŸÖß Æîü וÖÃ֍êú ×»Ö‹ ¯ÖÏÖ¯ŸÖ ׍ú‹ Ö‹ ¯ÖÏןֳÖæŸÖ †×ÖÏ´Ö úÖê
×²Ö»Ö ´Öë •ÖÖê›ÍüÖ ÖµÖÖ ÆüÖê ŸÖÖê ‡ÃÖ Ö›ü úÖê »Ö֐Öæ ú¸ü­Öê êú ×»Ö‹ ‹êÃÖê †×ÖÏ´Ö úê ÃÖÓ¯ÖæÖÔ †Öú×»ÖŸÖ ´Öæ»µÖ úÖê
×²Ö»Ö ´Öë ¤ü¿ÖÖÔ‡Ô Ö‡Ô úÖµÖÔ úß úß´ÖŸÖ ´Öë •ÖÖê›Íü פüµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖß ¯ÖύúÖ¸ü •Ö²Ö ‹êÃÖß ÃÖִ֐ÖÏß úÖê úÖµÖÔ ´Öë
•ÖÖê›Íü ×»ÖµÖÖ ÖµÖÖ ÆüÖê †Öî¸ü ×»Ö‹ Ö‹ ¯ÖÏןֳÖæŸÖ †×ÖÏ´Ö úÖê ×²Ö»Ö ÃÖê ‘Ö™üÖ ×¤üµÖÖ ÖµÖÖ ÆüÖê ŸÖÖê ÃÖÓ¯ÖæÖÔ †Öú×»ÖŸÖ
´Öæ»µÖ úÖê “ÖÖ»Öæ µÖÖ †Ó×ŸÖ´Ö ×²Ö»Ö ´Öë ¤ü¿ÖÖÔ‡Ô Ö‡Ô úÖµÖÔ úß úß´ÖŸÖ ´Öë ÃÖê ‘Ö™üÖ ×¤üµÖÖ •ÖÖ‹ÖÖ…
11.3.9 µÖפü ׍ú‹ Ö‹ úÖµÖÔ êú ×»Ö‹ †×ÖÏ´Ö ³ÖãÖŸÖÖ­Ö ×úµÖÖ ÖµÖÖ ÆüÖê ¯Ö¸ÓüŸÖã ˆÃ֍úÖ ´ÖÖ¯Ö­Ö ­Ö ׍úµÖÖ ÖµÖÖ ÆüÖê ŸÖÖê
‡ÃÖ Ö›ü úÖê ¯ÖϳÖÖ¾Öß ú¸ü­Öê êú ×»Ö‹ ‹êÃÖê ´ÖÖ¯Ö­Ö ­Ö ׍ú‹ Ö‹ úÖµÖÔ úê ÃÖÓ¯ÖæÖÔ ´Öæ»µÖ úÖê ×²Ö»Ö ´Öë ¤ü¿ÖÖÔ‹
Ö‹ úÖµÖÔ úß úß´ÖŸÖ ´Öë •ÖÖê›Íü פüµÖÖ •ÖÖ‹ÖÖ… µÖפü ‹êÃÖê úÖµÖÔ úÖ ´ÖÖ¯Ö­Ö ú¸ü ×»ÖµÖÖ ÖµÖÖ ÆüÖê †Öî¸ü ³ÖãÖŸÖÖ­Ö
ú¸ü פüµÖÖ ÖµÖÖ ÆüÖê ŸÖÖê ‡ÃÖ úÖµÖÔ úê ÃÖÓ¯ÖæÖÔ ´Öæ»µÖ úÖê “ÖÖ»Öæ µÖÖ †Ó×ŸÖ´Ö ×²Ö»Ö ´Öë ¤ü¿ÖÖÔ‡Ô Ö‡Ô úÖµÖÔ úß úß´ÖŸÖ
´Öë ÃÖê ‘Ö™üÖ ×¤üµÖÖ •ÖÖ‹ÖÖ…
11.3.10 ÃÖÓ×¾Ö¤üÖ †¾ÖÖ›Ôü ÆüÖê­Öê êú ²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü, Æü¸ü ´ÖÖÆü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ÃÖ´ÖÖ ×¯Ö”û»Öê ´ÖÖÆü
ÃÖִ֐ÖÏß/¯Öê™ÒüÖê»Ö ¤ü¸üÖë µÖÖ ´Ö•Ö¤æü¸üÖë êú ×»Ö‹ ­µÖæ­ÖŸÖ´Ö ´Ö•Ö¤æü¸üß úß ×¾Ö׿Ö™ü ÃÖæ“Öß ´Öë Æãü‹ ¯Ö׸ü¾ÖÔŸÖ­ÖÖë úß
•Ö֭֍úÖ¸üß, ‹êÃÖê ¯Ö׸ü¾ÖŸÖÔ­ÖÖë úß ¯ÖϳÖÖ¾Öß ŸÖÖ¸üߏÖ, ¯Ö׸ü¾ÖŸÖÔ­Ö úß ÃÖß´ÖÖ, ¯ÖύúÖ×¿ÖŸÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ÃÖæ“Öß/¯Öê™ÒüÖê»Ö ¤ü¸ü/
­µÖæ­ÖŸÖ´Ö ´Ö•Ö¤æü¸üß úÖ †×¬Ö¯ÖÏ´ÖÖ×ÖŸÖ ¤üßÖÖ¾Öê•Öß ÃÖցµÖ (µÖ£ÖÖ ˆ¯ÖµÖãÔŒŸÖ) ŸÖÖ׍ú úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö ¤üÖ¾Öê
úÖê ´Ö•Ö²ÖæŸÖß ×´Ö»Ö Ã֍êú, †Öפü úß •Ö֭֍úÖ¸üß ¾ÖÖ»Öß ×»Ö×ÖŸÖ ÃÖæ“Ö­ÖÖ ¯ÖÏßÖãŸÖ ú¸êüÖÖ…

46

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
11.3.11Provided further that such payment/refund shall not be operative and
payable after the Schedule expiry of the contract period including
authorized extended contract period.
11.3.12In case where the reasons for extension of the contract is attributable to
the force majeure and Contractor, the Contractor shall be paid the
contract price adjustment for the extended period at the frozen indices
applicable for the month preceding to the last date of stipulated
completion period or extended completion period attributable to
Corporation whichever is later. In case the prevailing price indices are
lower than the frozen indices, as stated above, the lower shall be
considered.
11.3.13For this purpose, the total delayed period shall be apportioned between
delays due to the Corporation, force majeure events and / or the
Contractor in the following order:
1. Delay caused by the Corporation will be allowed considering as if this delay
due to the Corporation happened first, immediately after stipulated
contract completion period, irrespective of actual point in time in which
such delay by Corporation occurs.
2. Followed by delay due to Force Majuere,
3. Delay due to Contractor
11.3.14The total adjusted contract price shall be:
(Sigma) ACV1 + Other elements of Contract Price, if any
11.3.15Except as provided herein, no other expenditure incurred by the
Contractor, under any Clause(s) / item(s) due to any reason whatsoever,
shall be payable to the Contractor.
11.3.16Bids specifying provisions other than those specified above run the risk of
rejection.
12 CONTRACT PRICE AND PAYMENT
12.1 Mobilisation Advance
12.1.1 Mobilisation Advance shall be granted to the Contractor, if required by
him, with the conditions mention herein being fulfilled.
12.1.2 Advance shall be granted where the estimated cost of work put to tender
is Rs.10 Crores or more.
12.1.3 The amount of mobilisation advance shall be limited to 15% of the contract
value and shall be granted under following two categories:
i) Lumpsum Advance against a non-revokable Bank guarantee acceptable
to the Corporation which shall be 10% of the contract value.
ii) over and above (i) an Advance at 90% of the purchase price of New
Plant and Equipment acquired for the work and brought to site, against
production of documents in support thereof and that such plant and
equipment are hypothecated in favour of the Corporation in the form
required by the Corporation. Further this new plant and equipment
47

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
11.3.11 ÃÖÖ£Ö Æüß µÖÆü ³Öß ×ú ‡ÃÖ ¯ÖύúÖ¸ü úÖ ³ÖãÖŸÖÖ­Ö/ ¬Ö­Ö ¾ÖÖ¯ÖÃÖß ¯ÖÏÖ׬֍éúŸÖ ×¾ÖßÖÖ׸üŸÖ ÃÖÓ×¾Ö¤üÖ †¾Ö׬Ö
ÃÖ×ÆüŸÖ ÃÖÓ×¾Ö¤üÖ †¾Ö×¬Ö úß †­ÖãÃÖæ×“ÖŸÖ ÃÖ´ÖÖÛ¯ŸÖ ŸÖÖ¸üßÖ êú ²ÖÖ¤ü »Ö֐Öæ †Öî¸ü ¤êüµÖ ­ÖÆüà ÆüÖêÖÖ…
11.3.12 ˆ­Ö ´ÖÖ´Ö»ÖÖë ´Öë •ÖÆüÖÓ ÃÖÓ×¾Ö¤üÖ ÃÖ´ÖµÖ úÖ ×¾ÖßÖÖ¸ü †¯Ö׸üÆüÖµÖÔ úÖ¸üÖÖêÓ †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úÖ¸üÖ
Æãü†Ö ÆüÖê, ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ×¾ÖßÖÖ׸üŸÖ †¾Ö×¬Ö êú ×»Ö‹ ÃÖÓ×¾Ö¤üÖ úß´ÖŸÖ ÃÖ´ÖÖµÖÖê•Ö­Ö úÖ ³ÖãÖŸÖÖ­Ö,
¾ÖÙÖŸÖ úÖµÖÔ ¯ÖæÖÔŸÖÖ †¾Ö×¬Ö úß †Ö׏ָüß ŸÖÖ¸üßÖ µÖÖ ×­ÖÖ´Ö úß ¾Ö•ÖÆü ÃÖê ×¾ÖßÖÖ׸üŸÖ úÖµÖÔ ¯ÖæÖÔŸÖÖ
†¾Ö×¬Ö úß †Ö׏ָüß ŸÖÖ¸üßÖ ´Öë ÃÖê •ÖÖê ŸÖÖ¸üßÖ ²ÖÖ¤ü ´Öë ¯Ö›ÍüŸÖß ÆüÖ,ê ˆÃÖ ŸÖÖ¸üßÖ ÃÖê ¯ÖÆü»Öê ¾ÖÖ»Öê
´ÖÆüß­Öê úß »Ö֐Öæ ÃÖæ“Öß úÖê †Ó×ŸÖ´Ö ´ÖÖ­ÖŸÖê Æãü‹ ׍úµÖÖ •ÖÖ‹ÖÖ… µÖפü ¾ÖŸÖÔ´ÖÖ­Ö úß´ÖŸÖë ˆ¯ÖµÖãÔŒŸÖ
ú£Ö­Ö êú †­ÖãÃÖÖ¸ü ²Ö­Ö­Öê ¾ÖÖ»Öß úß´ÖŸÖÖë ÃÖê ú´Ö ÆüÖë ŸÖÖê ú´Ö ¾ÖÖ»Öß úß´ÖŸÖÖë ¯Ö¸ü ×¾Ö“ÖÖ¸ü ׍úµÖÖ
•ÖÖ‹ÖÖ…
11.3.13 ‡ÃÖ ˆ§êü¿µÖ ÃÖê ãú»Ö ×¾Ö»ÖÓ×²ÖŸÖ †¾Ö×¬Ö úÖê ×­ÖÖ´Ö êú úÖ¸üÖ Æãü‹ ×¾Ö»ÖÓ²Ö, †¯Ö׸üÆüÖµÖÔ ‘Ö™ü­ÖÖ†Öë
êú úÖ¸üÖ Æüã‹ ×¾Ö»ÖÓ²Ö †Öî¸ü/µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úÖ¸üÖ Æãü‹ ×¾Ö»ÖÓ²Ö ´Öë ×­Ö´­Ö×»Ö×ÖŸÖ Îú´Ö ÃÖê
×¾Ö³ÖÖ×•ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ :
1. ×­ÖÖ´Ö êú úÖ¸üÖ Æãü‹ ×¾Ö»ÖÓ²Ö úÖê ‡ÃÖ ¯ÖύúÖ¸ü ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ ×ú ´ÖÖ­ÖÖê µÖÆü ×¾Ö»ÖÓ²Ö ˆ¨éüŸÖ
ÃÖÓ×¾Ö¤üÖ †¾Ö×¬Ö êú ±úÖî¸ü­Ö ²ÖÖ¤ü ÃÖ²ÖÃÖê ¯ÖÆü»Öê Æãü†Ö ÆüÖê… ³Ö»Öê Æüß ×­ÖÖ´Ö êú úÖ¸üÖ Æãü†Ö
µÖÆü ×¾Ö»ÖÓ²Ö ¾ÖÖßÖ׾֍úŸÖÖ ´Öë ׍úÃÖß ³Öß ÃÖ´ÖµÖ Æãü†Ö ÆüÖê…
2. ‡Ã֍êú ²ÖÖ¤ü †¯Ö׸üÆüÖµÖÔ úÖ¸üÖÖë ÃÖê Æãü†Ö ×¾Ö»ÖÓ²Ö ×»ÖµÖÖ •ÖÖ‹ÖÖ…
3. ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úÖ¸üÖ Æãü†Ö ×¾Ö»ÖÓ²Ö…
11.3.14 ãú»Ö ÃÖ´ÖÖµÖÖê×•ÖŸÖ ÃÖÓ×¾Ö¤üÖ úß´ÖŸÖ ×­Ö´­Ö×»Ö×ÖŸÖ ÆüÖêÖß :
(×Ã֐ִÖÖ) ACV1 + ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú †­µÖ úÖê‡Ô ‘Ö™üú, µÖפü ÆüÖë ŸÖÖê…
11.3.15 ×ÃÖ¾ÖÖµÖ ŸÖ²Ö •Ö²Ö׍ú µÖÆüÖÓ ²ÖŸÖÖµÖÖ ÖµÖÖ ÆüÖê, ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×úÃÖß ³Öß †­µÖ Ö›ü (›üÖë)/´Ö¤üÖêÓ
êú †¬Öß­Ö “ÖÖÆêü ׍úÃÖß ³Öß úÖ¸üÖ ÃÖê ŒµÖÖë ­Ö ÆüÖ,ê Ö“ÖÔ úß Ö‡Ô ¸üÖ×¿Ö úÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê
³ÖãÖŸÖÖ­Ö ­ÖÆüßÓ ×úµÖÖ •ÖÖ‹ÖÖ…
11.3.16 ×•Ö­Ö ²ÖÖê×»ÖµÖÖë ´Öë ˆ¯ÖµÖãÔŒŸÖ ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë ÃÖê ‡ŸÖ¸ü †­µÖ ¯ÖÏÖ¾Ö¬ÖÖ­Ö ×¾Ö×­ÖÙ¤ü™ü ׍ú‹ Ö‹ ÆüÖ,ë úÖê
×­Ö¸üÃŸÖ ×ú‹ •ÖÖ­Öê úß ÃÖÓ³ÖÖ¾Ö­ÖÖ Æîü…
12. ÃÖÓ×¾Ö¤üÖ úß´ÖŸÖ ¾Ö ³ÖãÖŸÖÖ­Ö
12.1 ÃÖӐÖÏÆü Ö †×ÖÏ´Ö
12.1.1 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †Ö¾Ö¿µÖúŸÖÖ ÆüÖê ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †ÖÖê ²ÖŸÖÖ‡Ô Ö‡Ô ¿ÖŸÖÖìÖ úÖê ¯Öæ¸üÖ ú¸ü­Öê
¯Ö¸ü ÃÖӐÖÏÆüÖ †×ÖÏ´Ö ×¤üµÖÖ •ÖÖ‹ÖÖ…
12.1.2 ÃÖӐÖÏÆüÖ †×ÖÏ´Ö úß ´ÖÓ•Öæ¸üß ŸÖ²Ö ¤üß •ÖÖ‹Öß •Ö²Ö ×­Ö×¾Ö¤üÖ ´Öë úÖµÖÔ úß †­Öã´ÖÖ×­ÖŸÖ »ÖÖÖŸÖ 10
ú¸üÖê›Íü ¹ý¯Ö‹ µÖÖ ‡ÃÖÃÖê †×¬Öú ÆüÖ,ê …
12.1.3 ÃÖӐÖÏÆüÖ †×ÖÏ´Ö úß †×¬ÖúŸÖ´Ö ¸üÖ×¿Ö ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úÖ 15 % ÆüÖêÖß †Öî¸ü ‡Ã֍úß ´ÖÓ•Öæ¸üß
×­Ö´­Ö×»Ö×ÖŸÖ ¤üÖê ÁÖêםֵÖÖë ´Öë úß •ÖÖ‹Öß :
i) ×­ÖÖ´Ö úÖê þÖߍúÖ¸üµÖÖêµÖ ãú»Ö ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úß 10 % ¸üÖ×¿Ö úß †¯ÖÏןÖÆüßÖÖÓŸÖ¸üÖßµÖ ²Öïú-
ÖÖ¸Óü™üß êú ×¾Ö¹ý¨ü ‹ú´Öã¿ŸÖ †×ÖÏ´Ö…
ii) úÖµÖÔ êú ×»Ö‹ Ö¸üߤêü Ö‹ †Öî¸ü úÖµÖÔ-Ã£Ö»Ö ¯Ö¸ü »ÖÖ‹ Ö‹ ­Ö‹ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ úß ˆ¯ÖµÖãÔŒŸÖ
(i) êú †×ŸÖ׸üŒŸÖ, úÖµÖÔ êú ×»Ö‹ Ö¸üߤêü Ö‹ †Öî¸ü úÖµÖÔÃ£Ö»Ö ¯Ö¸ü »ÖÖ‹ Ö‹ ­Ö‹ ÃÖÓµÖÓ¡Ö ¾Ö
ˆ¯Öú¸üÖ êú ¤üßÖÖ¾Öê•Öß ÃÖցµÖ ¯ÖÏßÖãŸÖ ú¸ü­Öê †Öî¸ü ˆÃÖ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ úÖê ×­ÖÖ´Ö êú ¯ÖÖÃÖ
×­ÖÖ´Ö êú ¯ÖÖÃÖ ¾ÖÖÓ×”ûŸÖ ºþ¯Ö ´Öë ²ÖӬ֍ú ¸üÖ­Öê ¯Ö¸ü ÎúµÖ úß´ÖŸÖ úÖ 90 % †×ÖÏ´Ö…
47

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
for which mobilisation advance applied for are not in excess of
requirement and price there of considered to be reasonable by the
Engineer-in-Charge. (Subject to maximum of 5% of the contract value)
12.1.4 The mobilization advance shall be interest bearing, and simple interest rate
shall be charged on mobilization advance. The rate of interest to be
charged on mobilization advance shall be as mentioned in the Schedule
A.
12.1.5 The Contractor shall ensure that the bank guarantee is valid and
enforceable until the advance payment has been repaid, but its amount
shall be progressively reduced by the amount repaid by the Contractor as
indicated in the Payment Certificates. If the terms of the bank guarantee
specify its expiry date, and the advance payment has not been repaid
within 30 days prior to the expiry date, the Contractor shall extend the
validity of the guarantee till the advance payment is repaid failing the
Bank guarantee may be encashed by the Corporation.
12.1.6 When advance granted is more than Rs.2 Crores, it shall be released in two
or more equal installments as deemed necessary. The subsequent
installments shall be released only on submission of proof of bonafide
utilisation of earlier installments by the Contractor and to the satisfaction of
Engineer-in-Charge
12.1.7 Unless stated otherwise in the Contract, the advance payment shall be
repaid through percentage deductions from the payments against the
running bills determined by the Engineer-in-charge. as follows:
The recovery of advances shall be regulated in suitable installments
commencing from 2nd RA bill or after 10% of the work is completed
whichever is earlier. The payment of mobilization advance by itself shall
not be considered as one of RA bill for this purpose. The entire amount of
advance with interest shall be recovered before 80% of the work is
completed.
12.1.8 Interest on the advance shall be calculated on each installment of
recovery from the date of its payment as Mobilisation Advance till the
preceding day of recovery from running / final bills.
12.1.9 Where advance payment to Contractor against running bills is to be
made after effecting the recovery of Mobilisation Advance installment
from the bill, the interest for advance payment shall be calculated till the
preceding day of passing the bill.
12.1.10If the amount payable under any interim bill is not sufficient to cover all
deduction to be made for sums advanced and other sums deductible
therefrom, the balance outstanding shall be deducted from subsequent
bills.
12.2 Payment of Running Bills
12.2.1 Running bills shall be submitted, monthly by the Contractor for the work
executed during the previous month along with all supporting documents
on the format prescribed by the Corporation. The Engineer-in-Charge
shall then arrange to have the bill verified. Where ever applicable (as
48

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
ÃÖÖ£Ö Æüß µÖÆü ׍ú וÖÃÖ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ êú ×»Ö‹ ÃÖӐÖÏÆüÖ †×ÖÏ´Ö úÖ †Ö¾Öê¤ü­Ö ׍úµÖÖ ÖµÖÖ Æîü ¾Öê †Ö¾Ö¿µÖúŸÖÖ ÃÖê
†×¬Öú ­ÖÆüà Æïü †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ˆ­Öúß ÎúµÖ úß´ÖŸÖ úÖê †Öîד֟µÖ¯ÖæÖÔ ´ÖÖ­ÖŸÖê ÆüÖë… (ãú»Ö ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úÖ
†×¬ÖúŸÖ´Ö 5 % êú ×¾ÖÂÖµÖÖ¬Öß­Ö)
12.1.4 ÃÖӐÖÏÆüÖ †×ÖÏ´Ö ²µÖÖ•ÖµÖãŒŸÖ ÆüÖêÖÖ †Öî¸ü ‡ÃÖ ¯Ö¸ü ÃÖÖ¬ÖÖ¸üÖ ²µÖÖ•Ö »ÖÖÖµÖÖ •ÖÖ‹ÖÖ… ÃÖӐÖÏÆüÖ †×ÖÏ´Ö ¯Ö¸ü
»ÖÖ­Öê ¾ÖÖ»Öê ²µÖÖ•Ö êú ²ÖÖ¸êü ´Öë †­ÖãÃÖæ“Öß ‹ ´Öë ²ÖŸÖÖµÖÖ ÖµÖÖ Æîü…
12.1.5 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê µÖÆü ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­ÖÖ “ÖÖ×Æü‹ ׍ú ÃÖӐÖÏÆüÖ †×ÖÏ´Ö úß “ÖãúÖîŸÖß ×ú‹ •ÖÖ­Öê ŸÖú ²Öïú
ÖÖ¸Óü™üß ¾Öî¬Ö †Öî¸ü ¯ÖϾ֟ÖÔ­ÖßµÖ ÆüÖê ¯Ö¸ÓüŸÖã ‡Ã֍úß ×•ÖŸÖ­Öß ¸üÖ×¿Ö úÖê Îú´Ö¿Ö: •ÖîÃÖê •ÖîÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü “ÖãúÖŸÖÖ
•ÖÖ‹ÖÖ, ³ÖãÖŸÖÖ­Ö ¯ÖÏ´ÖÖÖ ¯Ö¡Ö êú ¾ÖÖÔ­Ö êú †­ÖãÃÖÖ¸ü ˆŸÖ­Öß ¸üÖ×¿Ö úÖê ú´Ö ׍úµÖÖ •ÖÖ‹ÖÖ… µÖפü ²Öïú ÖÖ¸Óü™üß
´Öë ‡Ã֍úß ÃÖ´ÖÖÛ¯ŸÖ úß ŸÖÖ¸üßÖ ×¾Ö×­ÖÙ¤ü™ü ÆüÖê †Öî¸ü ÃÖӐÖÏÆüÖ †×ÖÏ´Ö ¸üÖ×¿Ö úß “ÖãúÖîŸÖß ‡Ã֍úß ÃÖ´ÖÖÛ¯ŸÖ úß
ŸÖÖ¸üßÖ ÃÖê 30 פü­ÖÖë ÃÖê ¯ÖÆü»Öê ­Ö úß Ö‡Ô ÆüÖê ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ²Öïú ÖÖ¸Óü™üß úß ÃÖ´ÖµÖ ÃÖß´ÖÖ ŸÖ²Ö ŸÖú êú
×»Ö‹ ²ÖœÍü¾ÖÖ­Öß ÆüÖêÖß •Ö²Ö ŸÖú ׍ú ÃÖӐÖÏÆüÖ †×ÖÏ´Ö úß “ÖãúÖîŸÖß ­Ö ÆüÖê •ÖÖ‹… ‹êÃÖÖ ­Ö ú¸ü­Öê ¯Ö¸ü ×­ÖÖ´Ö «üÖ¸üÖ
²Öïú ÖÖ¸Óü™üß úÖê ­Öú¤üߍéúŸÖ ú¸üÖµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü…
12.1.6 •Ö²Ö ´ÖÓ•Öæ¸ü ׍ú‹ Ö‹ †×ÖÏ´Ö úß ¸üÖ×¿Ö 2 ú¸üÖê›Íü ¹ý¯Ö‹ ÃÖê †×¬Öú ÆüÖê ŸÖÖê ‡ÃÖê ¤üÖê µÖÖ †×¬Öú ׍ú¿ŸÖÖë ´Öë,
•ÖîÃÖÖ ³Öß ˆ×“ÖŸÖ ÃÖ´Ö—ÖÖ •ÖÖ‹, ׸ü»Öß•ÖÌ ×úµÖÖ •ÖÖ‹ÖÖ… ²ÖÖ¤ü ¾ÖÖ»Öß ×ú¿ŸÖÖë úÖê êú¾Ö»Ö ŸÖ²Ö Æüß ×¸ü»Öß•ÖÌ
׍úµÖÖ •ÖÖ‹ÖÖ •Ö²Ö׍ú ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖÆü»Öê •ÖÖ¸üß úß Ö‡Ô ׍ú¿ŸÖ êú ¾ÖÖßÖ׾֍ú ˆ¯ÖµÖÖêÖ úê ÃÖցµÖ ÃÖê
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖÓŸÖã™ü ú¸ü ¤êü…
12.1.7 •Ö²Ö ŸÖú ׍ú †­µÖ£ÖÖ ¾ÖÙÖŸÖ ­Ö ÆüÖê, †×ÖÏ´Ö ³ÖãÖŸÖÖ­Ö úß ¾ÖÖ¯ÖÃÖß úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ×­Ö¬ÖÖÔ¸üÖ êú
†­ÖãÃÖÖ¸ü “ÖÖ»Öæ ײֻÖÖë ÃÖê ¯ÖÏ×ŸÖ¿ÖŸÖ ú™üÖîŸÖß êú ´ÖÖ¬µÖ´Ö ÃÖê ×­Ö´­Ö×»Ö×ÖŸÖ ×¾Ö×¬Ö ÃÖê ×»ÖµÖÖ •ÖÖ‹ÖÖ :
†×ÖÏ´Ö úß ¾ÖÃÖæ»Öß úÖ ×¾Ö×­ÖµÖ´Ö­Ö ˆ×“ÖŸÖ ×ú¿ŸÖÖë ´Öë ¤æüÃÖ¸êü “ÖÖ»Öæ ×²Ö»Ö µÖÖ úÖµÖÔ úÖ 10 % ³ÖÖÖ ¯Öæ¸üÖ ÆüÖê
•ÖÖ­Öê êú ²ÖÖ¤ü, ‡­Ö´Öë ÃÖê •ÖÖê ³Öß ¯ÖÆü»Öê ÆüÖê, ÃÖê †Ö¸Óü³Ö ׍úµÖÖ •ÖÖ‹ÖÖ… ÃÖӐÖÏÆüÖ †×ÖÏ´Ö úÖ ³ÖãÖŸÖÖ­Ö Ã¾ÖµÖÓ ´Öë
‡ÃÖ úÖµÖÔ êú ×»Ö‹ “ÖÖ»Öæ ×²Ö»Ö ­ÖÆüà ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ… †×ÖÏ´Ö úß ²µÖÖ•Ö ÃÖ×ÆüŸÖ ¯Öæ¸üß ¸üÖ×¿Ö úÖê úÖµÖÔ úÖ 80
% ³ÖÖÖ ¯Öæ¸üÖ ÆüÖê­Öê ÃÖê ¯ÖÆü»Öê ¾ÖÃÖæ»Ö ú¸ü ×»ÖµÖÖ •ÖÖ‹ÖÖ…
12.1.8 †×ÖÏ´Ö ¯Ö¸ü »ÖÖ­Öê ¾ÖÖ»Öê ²µÖÖ•Ö úß ÖÖ­ÖÖ ÃÖӐÖÏÆüÖ †×ÖÏ´Ö êú ³ÖãÖŸÖÖ­Ö ¾ÖÖ»Öß ŸÖÖ¸üßÖ ÃÖê »Öêú¸ü “ÖÖ»Öæ
/†Ó×ŸÖ´Ö ×²Ö»Ö êú ³ÖãÖŸÖÖ­Ö ÃÖê ¯ÖÆü»Öê ¾ÖÖ»Öß ŸÖÖ¸üßÖ ŸÖú ¯ÖÏŸµÖêú ¾ÖÃÖæ»Öß ×ú¿ŸÖ ¯Ö¸ü úß •ÖÖ‹Öß…
12.1.9 •Ö²Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍úÃÖß “ÖÖ»Öæ ×²Ö»Ö êú ×¾Ö¹ý¨ü †×ÖÏ´Ö ¸üÖ×¿Ö úÖ ³ÖãÖŸÖÖ­Ö ×²Ö»Ö ÃÖê ÃÖӐÖÏÆüÖ †×ÖÏ´Ö úß
׍ú¿ŸÖ úß ¾ÖÃÖæ»Öß êú ²ÖÖ¤ü ׍úµÖÖ •ÖÖ­ÖÖ ÆüÖê ŸÖÖê †×ÖÏ´Ö ³ÖãÖŸÖÖ­Ö ¸üÖ×¿Ö ¯Ö¸ü »ÖÖ­Öê ¾ÖÖ»Öê ²µÖÖ•Ö úß ÖÖ­ÖÖ
×²Ö»Ö ¯ÖÖÃÖ ×ú‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê ¾ÖÖ»Öß ŸÖÖ¸üßÖ ŸÖú úß •ÖÖ‹Öß…
12.1.10 µÖפü ׍úÃÖß †ÓŸÖ׸ü´Ö ×²Ö»Ö êú ³ÖãÖŸÖÖ­Ö úß ¸üÖ×¿Ö ×¤ü‹ Ö‹ ÃÖ³Öß †×ÖÏ´ÖÖë êú ×»Ö‹ úß •ÖÖ­Öê ¾ÖÖ»Öß
ú™üÖîןֵÖÖë ŸÖ£ÖÖ †­µÖ ú™üÖîןֵÖÖÓ êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ ­Ö ÆüÖê ŸÖÖê ¿ÖêÂÖ ¤êüµÖ ¸üÖ×¿Ö úß ú™üÖîŸÖß †Ö»Öê ײֻÖÖë ÃÖê úß
•ÖÖ‹Öß…
12.2 “ÖÖ»Öæ ײֻÖÖë úÖ ³ÖãÖŸÖÖ­Ö
12.2.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×¯Ö”û»Öê ´ÖÖÆü ×­Ö¯ÖÖפüŸÖ ׍ú‹ Ö‹ úÖµÖÔ úê “ÖÖ»Öæ ×²Ö»Ö úÖê ÃÖ´ÖÃŸÖ ÃÖÆüֵ֍ú ¤üßÖÖ¾Öê•ÖÖë
êú ÃÖÖ£Ö ×­ÖÖ´Ö «üÖ¸üÖ ×¾Ö×ÆüŸÖ ¯ÖÏ¯Ö¡Ö ´Öë ³Ö¸üú¸ü ¯ÖÏßÖãŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ‡Ã֍êú ²ÖÖ¤ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ‡ÃÖ
×²Ö»Ö úÖ ÃÖŸµÖÖ¯Ö­Ö ú¸üÖ­Öê úß ¾µÖ¾ÖãÖÖ ú¸ëüÖê…

48

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
defined in Schedule A) the Contractor will submit the bills in a soft form, which
shall be in the format as required by the Engineer-in-charge.
12.2.2 Payment "On Account" for amount admissible shall be made upon the
Engineer-in-Charge certifying the sum to which the Contractor is
considered entitled by way of interim payment for the following:-
(a) For Works :All work executed, after deducting there from the
amounts already paid, the retention money and such other amounts as
may be deductible or recoverable in terms of the Contract.
(b) For Materials: The Contractor on signing an indenture in the form to
be specified by the Engineer-in-charge 75% percent of the cost (as
assessed by the Engineer-in-Charge) of any materials which are in the
opinion of the Engineer-in-Charge reasonably required in accordance
with the Contract and have been brought to Site for incorporation
in the Works and are safeguarded against loss due to any cause
whatsoever to the satisfaction of the Engineer-in-Charge but have not
been so incorporated. However, in case of perishable materials the
Contractor shall provide an insurance cover for the full cost. No secured
advance shall be payable on high risk material such as glass, sand, petrol/
diesel etc. The advance payments under this shall be adjusted as and
when materials are utilised in the Works.
12.2.3 Payment of the Contractor's on account bill shall be made by the
Corporation within 25 days from the date of submission of the bill by the
Contractor along with all the supporting documents subject to the
certification of the same by the Engineer-in-charge. If in the opinion of the
Engineer-in-Charge it is likely to take more time for payment, an advance
payment of 75% of the net bill amount shall be released to the Contractor,
within 3 working days and balance payment shall be released within 30
days from the date of submission of bill.
12.2.4 Any interim bill paid, relating to work done or materials delivered, may
be modified or corrected by any subsequent interim bills or by the final
bill. Any Certificate of the Engineer-in-Charge supporting an interim
payment shall not be conclusive evidence that any work or materials to
which it relates is/are in accordance with the Contract.
12.3 Over payments and Under Payments
12.3.1 Wherever any claim for the payment of a sum of money to the
Corporation arises under this Contract against the Contractor, the same
may be deducted from any sum due to the Contractor under this
Contract or any other Contract with the Corporation or from his security
deposit; or he shall pay the claim on demand.
12.3.2 The Corporation reserves the right to carry out post payment audit and
technical examination of the final bill including all supporting vouchers,
abstracts etc. The Corporation further reserves the right to enforce
recovery of any overpayment when detected, not withstanding the
fact that the amount of the final bill may be included by one of the
parties as an item of dispute before the dispute resolution board for this
Contract.

49

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
•ÖÆüÖÓ úÆüà »Ö֐Öæ ÆüÖê (•ÖîÃÖÖ ×ú †­ÖãÃÖæ“Öß ‹ ´Öë ²ÖŸÖÖµÖÖ ÖµÖÖ Æîü) ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê ײֻÖÖë úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
«üÖ¸üÖ †¯Öê×ÖŸÖ ¯ÖÏÖºþ¯Ö êú †­ÖãÃÖÖ¸ü ÃÖÖò°™ü ¯ÖÏ×ŸÖ úê ºþ¯Ö ´Öë ¯ÖÏßÖãŸÖ ú¸ëüÖê …
12.2.2 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ¯ÖÏ´ÖÖ×ÖŸÖ ×ú‹ •ÖÖ­Öê êú ²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤êüµÖ "†Öò­Ö ‹úÖˆÓ™ü" ³ÖãÖŸÖÖ­Ö ¸üÖ׿Ö
úÖê †ÓŸÖ׸ü´Ö ³ÖãÖŸÖÖ­Ö êú ºþ¯Ö ´Öë ×­Ö´­Ö×»Ö×ÖŸÖ ŸÖ¸üߍêú ÃÖê ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ‹ÖÖ : -
(‹) úÖµÖÖí êú ×»Ö‹ : ¯ÖÆü»Öê ³ÖãÖŸÖÖ­Ö úß •ÖÖ “Öãúß ¸üÖ׿Ö, ¯ÖÏן֬ÖÖ¸üÖ ¸üÖ×¿Ö †Öî¸ü ÃÖÓ×¾Ö¤üÖ úß ¿ÖŸÖÖí êú †­ÖãÃÖÖ¸ü
†­µÖ úÖê‡Ô ‘Ö™üÖ‡Ô •ÖÖ­Öê ¾ÖÖ»Öß µÖÖ ¾ÖÃÖæ»Öß •ÖÖ­Öê ¾ÖÖ»Öß ¸üÖ×¿Ö úÖê ‘Ö™ü֍ú¸ ÃÖ³Öß ×­Ö¯ÖÖפüŸÖ úÖµÖÖí êú ×»Ö‹ü…
(²Öß) ÃÖִ֐ÖÏß êú ×»Ö‹ : ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×¾Ö×­Ö¤ìü×¿ÖŸÖ ŸÖ¸üߍêú ÃÖê ŸÖîµÖÖ¸ü ׍ú‹ Ö‹ ú¸üÖ¸ü­ÖÖ´Öê ¯Ö¸ü
ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ÆüßÖցָü ú¸ü­Öê ¯Ö¸ü úÖê‡Ô ‹êÃÖß ÃÖִ֐ÖÏß, וÖÃ֍úß ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¸üÖµÖ ´Öë ÃÖÓ×¾Ö¤üÖ
êú †­ÖãÃÖÖ¸ü ŸÖÔúÃÖ´´ÖŸÖ †Ö¾Ö¿µÖúŸÖÖ Æîü †Öî¸ü וÖÃÖê úÖµÖÖí ´Öë ¿ÖÖ×´Ö»Ö ú¸ü­Öê êú ×»Ö‹ úÖµÖÔÃ£Ö»Ö ¯Ö¸ü
»ÖÖµÖÖ •ÖÖ “ÖãúÖ Æîü †Öî¸ü •ÖÖê ׍úÃÖß ³Öß úÖ¸üÖ ÃÖê ÆüÖê­Öê ¾ÖÖ»Öê ­ÖãúÃÖÖ­Ö ÃÖê ²Ö“ÖÖ¾Ö êú ×»Ö‹ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
úß ÃÖÓŸÖãÛ™ü êú †­ÖãÃÖÖ¸ü ÃÖã¸ü×ÖŸÖ úß •ÖÖ “Öãúß Æîü ¯Ö¸ÓüŸÖã †³Öß ŸÖú úÖµÖÔ ´Öë ¿ÖÖ×´Ö»Ö ­ÖÆüà úß Ö‡Ô Æîü, úß
úß´ÖŸÖ (¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ´Ö滵ÖÖӍú­Ö êú †­ÖãÃÖÖ¸ü) úÖ 75 % … ŸÖ£ÖÖ×¯Ö Ö¸üÖ²Ö ÆüÖê •ÖÖ­Öê ¾ÖÖ»Öß
ÃÖִ֐ÖÏß êú ´ÖÖ´Ö»Öê ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¯Öæ¸üß úß´ÖŸÖ úÖ ²Öß´ÖÖ ú¾Ö¸ü ˆ¯Ö»Ö²¬Ö ú¸üÖ­ÖÖ ÆüÖêÖÖ… ˆ““Ö •ÖÖê׏ִÖ
¾ÖÖ»Öß ÃÖִ֐ÖÏß •ÖîÃÖê »ÖÖÃÖ, ²ÖÖ»Öæ, ¯Öê™ÒüÖê»Ö/›üß•Ö»Ö †Öפü êú ×»Ö‹ úÖê‡Ô ×­ÖÛ¿“ÖŸÖ ¯ÖÏןֳÖæ×ŸÖ †×ÖÏ´Ö ¤êüµÖ ­ÖÆüà
ÆüÖêÖÖ… ‡Ã֍êú †¬Öß­Ö †×ÖÏ´Ö ³ÖãÖŸÖÖ­Ö úÖê ÃÖִ֐ÖÏß úÖ úÖµÖÔ êú ×»Ö‹ ¯ÖϵÖÖêÖ ׍ú‹ •ÖÖŸÖê ÃÖ´ÖµÖ ÃÖ´ÖÖµÖÖê•Ö­Ö
׍úµÖÖ •ÖÖ‹ÖÖ…
12.2.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú "†Öò­Ö ‹úÖˆÓ™ü" ×²Ö»Ö úÖ ³ÖãÖŸÖÖ­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ÃÖ³Öß ÃÖÓ²ÖÓ×¬ÖŸÖ ¤üßÖÖ¾Öê•ÖÖë ÃÖ×ÆüŸÖ
×²Ö»Ö •Ö´ÖÖ ú¸ü­Öê †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖ «üÖ¸üÖ ¯ÖÏ´ÖÖ×ÖŸÖ ×ú‹ •ÖÖ­Öê ¯Ö¸ü ×²Ö»Ö •Ö´ÖÖ ú¸ü­Öê êú ²ÖÖ¤ü ÃÖê 25
פü­ÖÖë êú †Ó¤ü¸ü ×­ÖÖ´Ö «üÖ¸üÖ ×úµÖÖ •ÖÖ‹ÖÖ… µÖפü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¸üÖµÖ ´Öë ×²Ö»Ö êú ³ÖãÖŸÖÖ­Ö ´Öë ‡ÃÖÃÖê
†×¬Öú ÃÖ´ÖµÖ »ÖÖ­Öê úß ÃÖÓ³ÖÖ¾Ö­ÖÖ ÆüÖê ŸÖÖê 3 úÖµÖÔפü¾ÖÃÖÖë êú ³Öߟָü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †×ÖÏ´Ö êú ºþ¯Ö ´Öë
×­Ö¾Ö»Ö ×²Ö»Ö ¸üÖ×¿Ö úß 75 % ¸üÖ×¿Ö ×¸ü»Öß•ÖÌ ú¸ü ¤üß •ÖÖ‹Öß †Öî¸ü ¿ÖêÂÖ ¸üÖ×¿Ö úÖ ³ÖãÖŸÖÖ­Ö ×²Ö»Ö •Ö´ÖÖ
ú¸ü­Öê úß ŸÖÖ¸üßÖ ÃÖê 30 פü­ÖÖë êú ³Öߟָü ׍úµÖÖ •ÖÖ‹ÖÖ…
12.2.4 ׍ú‹ Ö‹ úÖµÖÔ µÖÖ ÃÖÖï¯Öß Ö‡Ô ÃÖִ֐ÖÏß ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ×úÃÖß ³Öß ³ÖãÖŸÖ֭֍éúŸÖ †ÓŸÖ׸ü´Ö ×²Ö»Ö úÖê ²ÖÖ¤ü ´Öë
׍úÃÖß ³Öß †ÓŸÖ׸ü´Ö ×²Ö»Ö ÃÖê µÖÖ †Ó×ŸÖ´Ö ×²Ö»Ö ÃÖê ÃÖÓ¿ÖÖê×¬ÖŸÖ ×úµÖÖ µÖÖ ÃÖã¬ÖÖ¸üÖ •ÖÖ Ã֍úŸÖÖ Æîü… ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ «üÖ¸üÖ †ÓŸÖ׸ü´Ö ³ÖãÖŸÖÖ­Ö êú ÃÖ´Ö£ÖÔ­Ö ´Öë •ÖÖ¸üß ×úµÖÖ ÖµÖÖ ¯ÖÏ´ÖÖÖ¯Ö¡Ö ‡ÃÖ ²ÖÖŸÖ úÖ †Ó×ŸÖ´Ö ÃÖցµÖ
­ÖÆüà ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ ×ú †´Öãú ×²Ö»Ö ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ úÖµÖÔ µÖÖ ÃÖִ֐ÖÏß ÃÖÓ×¾Ö¤üÖ êú †­Öãºþ¯Ö Æîü/Æïü…
12.3 †×¬Öú ³ÖãÖŸÖÖ­Ö µÖÖ ú´Ö ³ÖãÖŸÖÖ­Ö
12.3.1Í ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †¬Öß­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ×¾Ö¹ý¨ü ×­ÖÖ´Ö úÖê ³ÖãÖŸÖÖ­Ö úß •ÖÖ­Öê ¾ÖÖ»Öß ×úÃÖß ¸üÖ×¿Ö úÖ •Ö²Ö
ú³Öß úÖê‡Ô ¤üÖ¾ÖÖ ²Ö­Öê ŸÖÖê ¾ÖÆü ¸üÖ×¿Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‡ÃÖ ÃÖÓ×¾Ö¤üÖ µÖÖ ×­ÖÖ´Ö êú †¬Öß­Ö ×úÃÖß †­µÖ ÃÖÓ×¾Ö¤üÖ
êú †ÓŸÖÖÔŸÖ ¤êüµÖ ׍úÃÖß ¸üÖ×¿Ö µÖÖ ˆÃ֍úß ¯ÖÏןֳÖæ •Ö´ÖÖ ¸üÖ×¿Ö ´Öë ÃÖê úÖ™ß •ÖÖ Ã֍úŸÖß Æîü ; †£Ö¾ÖÖ ´ÖÖӐÖê •ÖÖ­Öê
¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ ¤üÖ¾Öê úÖ ³ÖãÖŸÖÖ­Ö ú¸êüÖÖ…
12.3.2 ×­ÖÖ´Ö êú ¯ÖÖÃÖ ÃÖ³Öß ÃÖÆüֵ֍ú ¾ÖÖˆ“Ö¸üÖ,ë ÃÖÖ¸ü ÃÖӁÖê¯ÖÖë ÃÖ×ÆüŸÖ †Ó×ŸÖ´Ö ×²Ö»Ö úÖ ³ÖãÖŸÖÖ­Ö ¯Ö¿“Ö »ÖêÖÖ
¯Ö¸üßÖÖ ¾Ö ŸÖú­Öߍúß ¯Ö¸üßÖÖ ú¸üÖ­Öê úÖ †×¬ÖúÖ¸ü ÃÖã¸ü×ÖŸÖ Æîü… ‡Ã֍êú †»ÖÖ¾ÖÖ †Ó×ŸÖ´Ö ×²Ö»Ö úÖê ‡ÃÖ
ÃÖÓ×¾Ö¤üÖ êú ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü êú ÃÖ´ÖÖ ¤üÖê­ÖÖêÓ ´Öë ÃÖê ׍úÃÖß ¯ÖÖ «üÖ¸üÖ ‹ú ×¾Ö¾ÖÖפüŸÖ ´Öã§üÖ ²Ö­ÖÖ‹ •ÖÖ
Ã֍ú­Öê úß ¾ÖÖßÖ׾֍úŸÖÖ êú ²ÖÖ¾Ö•Öæ¤ü ³Öß –ÖÖŸÖ ÆüÖê­Öê ¯Ö¸ü †×¬Öú ³ÖãÖŸÖÖ­Ö úß Ö‡Ô ¸üÖ×¿Ö úß ¾ÖÃÖæ»Öß úÖ
×­ÖÖ´Ö úÖ †×¬ÖúÖ¸ü ÃÖã¸ü×ÖŸÖ Æîü…

49

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
12.3.3 If as a result of such audit and technical examination any overpayment
is discovered in respect of any work done by the Contractor or alleged to
have been done by him under the Contract, it shall be recovered by
the Corporation from the Contractor by any or all of the legal methods
prescribed above. If any under-payment is discovered, the amount shall
be duly paid to the Contractor by the Corporation.
12.3.4 Provided that the aforesaid right of the Corporation to adjust over
payments against amounts due to the Contractor under any other
Contract with the Corporation shall not extend beyond the period of
three years from the date of payment of the final bill or in case the final
bill is a MINUS bill, from the date the amount payable by the Contractor
under the MINUS final bill is communicated to the Contractor.
12.3.5 Any amount due to the Contractor under this Contract for under-
payment may be adjusted against any amount then due or which may
at any time thereafter become due before payment is made to the
Contractor, from him to the Corporation on any other Contract or
account whatsoever.
12.4 Time limit for Payment of Final Bill
12.4.1 The final bill shall be submitted by the Contractor within 90 days of physical
completion of the works. Payment of those items of the bill in respect of
which there is no dispute and of items in dispute, for quantities and at rates
as approved by the Engineer-in-Charge, shall be made within the period
specified hereunder. The period shall be reckoned from the date of receipt
of the bill by the Engineer-in- Charge along with the all acceptable
supporting documents.
(i) If the tendered value of work is upto Rs. 5 Crores : 3 months
(ii) If the tendered value of work exceeds Rs. 5 Crores : 6 months
12.4.2 The engineer-in-charge shall intimate for, if any, corrections in the final bill
to Contractor. The Contractor should re-submit the bill, with corrections
within the 30 days of its return by the Engineer-in-charge .The re-submitted
bill will be checked and paid within the period as indicated in sub-clause
12.4.1 (i) and (ii) above (as the case may be).
12.4.3 After payment of the amount of the final bill as aforesaid has been
made, the Contractor may, if he so desires, reconsider his position in
respect of the disputed portion of the final bill and if he fails to do so
within 90 days, his disputed claim shall be dealt with as provided in the
Contract.
12.5 Delayed Payment
12.5.1 Interest at a pre-specified rate (as defined in Schedule A) shall be paid on
the balance amount of the bill if not paid within the time limit specified for
running and final bills as specified in sub-clause 12.2 and sub-clause 12.4
respectively. Disputed portion of bill (if any) will not attract any interest.

50

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
12.3.3 µÖפü ‡ÃÖ ¯ÖύúÖ¸ü êú »ÖêÖÖ ¾Ö ŸÖú­Öߍúß ¯Ö¸ü߁֝ÖÖë ÃÖê ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×ú‹ Ö‹
׍úÃÖß úÖµÖÔ êú ×»Ö‹ †×¬Öú ³ÖãÖŸÖÖ­Ö ×ú‹ •ÖÖ­Öê µÖÖ ˆÃ֍êú «üÖ¸üÖ ×»Ö‹ •ÖÖ­Öê êú †Ö¸üÖê¯Ö úÖ ´ÖÖ´Ö»ÖÖ
ÃÖÖ´Ö­Öê †ÖŸÖÖ Æîü ŸÖÖê ˆ¯ÖµÖãÔŒŸÖ ¾ÖÙÖŸÖ ÃÖ³Öß µÖÖ ×úÃÖß ‹ú úÖ­Öæ­Öß ¯ÖÏ׍ÎúµÖÖ êú ´ÖÖ¬µÖ´Ö ÃÖê ×­ÖÖ´Ö «üÖ¸üÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê ‡Ã֍úß ¾ÖÃÖæ»Öß úß •ÖÖ‹Öß… µÖפü úÖê‡Ô ú´Ö ³ÖãÖŸÖÖ­Ö ×ú‹ •ÖÖ­Öê úê ´ÖÖ´Ö»Öê úÖ ¯ÖŸÖÖ
“Ö»ÖŸÖÖ Æîü ŸÖÖê ×­ÖÖ´Ö «üÖ¸üÖ ¾ÖÆü ¸üÖ×¿Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ×¾Ö׬־֟ÖË ³ÖãÖŸÖÖ­Ö úß •ÖÖ‹Öß…
12.3.4 ²Ö¿ÖŸÖì ׍ú ×­ÖÖ´Ö êú ÃÖÖ£Ö úß Ö‡Ô ׍úÃÖß †­µÖ ÃÖÓ×¾Ö¤üÖ êú †ÓŸÖÖÔŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¤êüµÖ †×¬Öú
³ÖãÖŸÖÖ­Ö úß Ö‡Ô ¸üÖ×¿Ö êú ÃÖ´ÖÖµÖÖê•Ö­Ö úÖ ×­ÖÖ´Ö úÖ ˆ¯ÖµÖãÔŒŸÖ †×¬ÖúÖ¸ü †Ó×ŸÖ´Ö ×²Ö»Ö ³ÖãÖŸÖÖ­Ö ×ú‹
•ÖÖ­Öê úß ŸÖÖ¸üßÖ ÃÖê †£Ö¾ÖÖ µÖפü †Ó×ŸÖ´Ö ×²Ö»Ö ŠúÖÖŸ´Öú ×²Ö»Ö ÆüÖê ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‡ÃÖ ŠúÖÖŸ´Öú
×²Ö»Ö êú ³ÖãÖŸÖÖ­Ö êú ×»Ö‹ •ÖÖ¸üß úß Ö‡Ô ÃÖæ“Ö­ÖÖ úß ŸÖÖ¸üßÖ ÃÖê 3 ¾ÖÂÖÔ úß †¾Ö×¬Ö ÃÖê †×¬Öú ­Ö ÆüÖê…
12.3.5 ú´Ö ³ÖãÖŸÖÖ­Ö ×ú‹ •ÖÖ­Öê úß ÛãÖ×ŸÖ ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤êüµÖ ¸üÖ×¿Ö úÖê, ˆÃÖ ÃÖ´ÖµÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ‰ú¯Ö¸ü
²ÖúÖµÖÖ ×úÃÖß ¸üÖ×¿Ö †£Ö¾ÖÖ ‡Ã֍êú ²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ³ÖãÖŸÖÖ­Ö ×ú‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê ׍úÃÖß ³Öß ÃÖ´ÖµÖ
µÖפü ׍úÃÖß †­µÖ ÃÖÓ×¾Ö¤üÖ µÖÖ ÖÖŸÖê êú †ÓŸÖÖÔŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­ÖÖ´Ö úÖê ׍úÃÖß ¸üÖ×¿Ö úÖ ³ÖãÖŸÖÖ­Ö
׍úµÖÖ •ÖÖ­ÖÖ ÆüÖê ŸÖÖê, ˆÃ֍êú ÃÖÖ£Ö ÃÖ´ÖÖµÖÖê×•ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…
12.4 †Ó×ŸÖ´Ö ×²Ö»Ö êú ³ÖãÖŸÖÖ­Ö úß ÃÖ´ÖµÖ ÃÖß´ÖÖ
12.4.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü, úÖµÖÔ êú ¾ÖÖßÖ׾֍ú ÃÖ´ÖÖ¯Ö­Ö êú 90 פü­ÖÖë êú ³Öߟָü †Ó×ŸÖ´Ö ×²Ö»Ö ¯ÖÏßÖãŸÖ ú¸ëüÖê… ×²Ö»Ö úß
Öî¸ü-×¾Ö¾ÖÖפüŸÖ ´Ö¤üÖë †Öî¸ü ×¾Ö¾ÖÖפüŸÖ ´Ö¤üÖë êú ×»Ö‹ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ´ÖÖ¡ÖÖ ¾Ö ¤ü¸üÖë êú
†Ö¬ÖÖ¸ü ¯Ö¸ü †ÖÖê ×¾Ö×­ÖÙ¤ü™ü ÃÖ´ÖµÖ-ÃÖß´ÖÖ êú ³Öߟָü ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖ †¾Ö×¬Ö úÖ ¯ÖÏÖ¸Óü³Ö
ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ÃÖ³Öß Ã¾ÖߍúÖ¸üµÖÖêµÖ ¤üßÖÖ¾Öê•ÖÖë ÃÖ×ÆüŸÖ †Ó×ŸÖ´Ö ×²Ö»Ö úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ¯ÖÖÃÖ •Ö´ÖÖ
׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öß ŸÖÖ¸üßÖ ÃÖê ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ…
(i) 5 ú¸üÖê›Íü ¹ý¯Ö‹ ŸÖú êú ´Öæ»µÖ ¾ÖÖ»Öß ×­Ö×¾Ö¤üÖ†Öë êú ×»Ö‹ : 3 ´ÖÖÆü
(ii) 5 ú¸üÖê›Íü ¹ý¯Ö‹ ÃÖê †×¬Öú ´Öæ»µÖ ¾ÖÖ»Öß ×­Ö×¾Ö¤üÖ†Öë êú ×»Ö‹ : 6 ´ÖÖÆü
12.4.2 µÖפü †Ó×ŸÖ´Ö ×²Ö»Ö ´Öë úÖê‡Ô ÃÖã¬ÖÖ¸ü ׍úµÖÖ •ÖÖ­ÖÖ ÆüÖê ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‡Ã֍úß
ÃÖæ“Ö­ÖÖ ¤ëüÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ ×²Ö»Ö ´Öë ÃÖÓ¿ÖÖê¬Ö­Ö ú¸ü ‡ÃÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ¾ÖÖ¯ÖÃÖ ×ú‹ •ÖÖ­Öê úß
ŸÖÖ¸üßÖ ÃÖê 30 פü­ÖÖë êú ³Öߟָü ¯Öã­Ö: ¯ÖÏßÖãŸÖ ú¸ëüÖê… ‡ÃÖ ¯Öã­Ö: ¯ÖÏßÖãŸÖ ׍ú‹ Ö‹ ×²Ö»Ö úß •ÖÖÓ“Ö úß •ÖÖ‹Öß
†Öî¸ü ˆ¯ÖµÖãÔŒŸÖ ˆ¯ÖÖ›ü 12.4.1(i) ¾Ö (ii) (•ÖîÃÖÖ ³Öß ´ÖÖ´Ö»ÖÖ ÆüÖ)ê ´Öë ¾ÖÙÖŸÖ †¾Ö×¬Ö êú ³Öߟָü ‡Ã֍úÖ
³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ‹ÖÖ…
12.4.3 ˆ¯ÖµÖãÔŒŸÖ ×¾Ö×¬Ö ÃÖê †Ó×ŸÖ´Ö ×²Ö»Ö êú ³ÖãÖŸÖÖ­Ö êú ²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖפü “ÖÖÆêü ŸÖÖê †Ó×ŸÖ´Ö ×²Ö»Ö êú
×¾Ö¾ÖÖפüŸÖ ³ÖÖÖ êú ²ÖÖ¸êü ´Öë †¯Ö­Öß ÛãÖ×ŸÖ ¯Ö¸ü ¯Öã­Ö:×¾Ö“ÖÖ¸ü ú¸ü Ã֍úŸÖÖ Æîü †Öî¸ü µÖפü ¾ÖÆü 90 פü­ÖÖë êú ³Öߟָü
‹êÃÖÖ ­ÖÆüà ú¸ü ¯ÖÖŸÖÖ Æî ŸÖÖê ˆÃ֍úê ×¾Ö¾ÖÖפüŸÖ ¤üÖ¾Öê ¯Ö¸ü ÃÖÓ×¾Ö¤üÖ êú ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë êú †­ÖãÃÖÖ¸ü ×¾Ö“ÖÖ¸ü ׍úµÖÖ
•ÖÖ‹ÖÖ…
12.5 ×¾Ö»ÖÓ×²ÖŸÖ ³ÖãÖŸÖÖ­Ö
12.5.1 µÖפü “ÖÖ»Öæ †Öî¸ü †Ó×ŸÖ´Ö ×²Ö»ÖÖë úÖ ³ÖãÖŸÖÖ­Ö Îú´Ö¿Ö:ˆ¯Ö Ö›ü 12.2 ‹¾ÖÓ 12.4 ´Öë ¾ÖÙÖŸÖ ÃÖ´ÖµÖ-†¾Ö׬Ö
êú ³Öߟָü ­ÖÆüà ׍úµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ¿ÖêÂÖ ¤êüµÖ ¸üÖ×¿Ö ¯Ö¸ü ¯Öæ¾ÖÔ-×¾Ö×­ÖÙ¤ü™ü ¤ü¸ü (†­ÖãÃÖæ“Öß ‹ úß ¯Ö׸ü³ÖÖÂÖÖ êú
†­ÖãÃÖÖ¸ü) ÃÖê ²µÖÖ•Ö úÖ ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ‹ÖÖ… ×²Ö»Ö êú ×¾Ö¾ÖÖפüŸÖ ³ÖÖÖ (µÖפü úÖê‡Ô ÆüÖê ŸÖÖê) êú ×»Ö‹
úÖê‡Ô ³Öß ²µÖÖ•Ö ¤êüµÖ ­ÖÆüà ÆüÖêÖÖ…

50

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
13 CONTRACT TERMINATION BY CORPORATION
13.1 Foreclosure of contract
13.1.1 If at any time after acceptance of the tender / during execution of work
the Corporation shall decide to abandon or reduce the scope of the
works for any reason whatsoever and hence not require the whole or any
part of the works to be carried out, the Engineer-in-Charge shall give
notice in writing to that effect to the Contractor and the Contractor shall
have no claim to any payment of compensation or otherwise
whatsoever, on account of any profit or advantage which he might
have derived from the execution of the works in full, but which he did not
derive in consequence of the foreclosure of the whole or part of the
works.
13.1.2 The Contractor shall be paid at contract rates full amount for works
executed at Site, on submission of the claim and review & approval of the
claim by the Engineer-in-Charge.
13.1.3 The Corporation may in addition to above, compensate a reasonable
amount to the Contractor on mutual agreement basis based on
submission of the claim and review of the claim by the Engineer-in-Charge.
13.2 Determination/Cancellation of Contract
13.2.1 If the Contractor :
(a) at any time makes default in proceeding with the works with due diligence
and continues to do so after 7 days notice in writing from the Engineer-in-
Charge; or
(b) commits default in complying with any of the terms and conditions of the
Contract and does not remedy it or take effective steps to remedy it
within 7 days after a notice in writing is given to him in that behalf by the
Engineer-in-Charge; or
(c) fails to complete the works or items of work with individual dates of
completion, on or before the date(s) of completion, and does not
complete them within the period specified in a notice given in writing in
that behalf by the Engineer-in-Charge; or
(d) shall offer, or give or agree to give to any person in the Corporation's
service or to any other person on his behalf any gift, bribe, gratuity,
commission, other thing of value or consideration of any kind as an
inducement or reward for doing or forbearing to do or having done
or forborne to do any act in relation to the obtaining or execution of
this or any other Contract for the Corporation; or
(e) shall enter into a contract with the Corporation in connection with which
commission has been paid or agreed to be paid by him or to his
knowledge, unless the particulars of any such commission and the terms
of payment thereof have previously been disclosed in writing to the
Accepting Authority/Engineer-in-Charge; or
(f) shall obtain a Contract with the Corporation as a result of wrong tendering
or other non-bonafide methods of competitive tendering; or

51

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
13 ×­ÖÖ´Ö «üÖ¸üÖ ÃÖÓ×¾Ö¤üÖ ×­Ö¸üÃŸÖ ú¸ü­ÖÖ
13.1 ÃÖÓ×¾Ö¤üÖ úÖ ÃÖ´ÖµÖ¯Öæ¾ÖÔ ÃÖ´ÖÖ¯Ö­Ö
13.1.1 µÖפü ×­Ö×¾Ö¤üÖ êú þÖߍúÖ¸ü ׍ú‹ •ÖÖ­Öê/úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö êú ¤üÖî¸üÖ­Ö ×ú­Æüà úÖ¸üÖÖë ÃÖê ×­ÖÖ´Ö úÖµÖÔ úÖê
²ÖÓ¤ü ú¸ü­Öê †£Ö¾ÖÖ ÃÖß×´ÖŸÖ ú¸ü­Öê úÖ ×­ÖÖÔµÖ »ÖêŸÖÖ Æîü †Öî¸ü וÖÃ֍êú úÖ¸üÖ úÖµÖÔ µÖÖ ˆÃ֍êú ׍úÃÖß
³ÖÖÖ úÖê •ÖÖ¸üß ¸üÖ­Öê úß †Ö¾Ö¿µÖúŸÖÖ ÃÖ´ÖÖ¯ŸÖ ÆüÖê •ÖÖŸÖß Æîü ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê
‡ÃÖ †Ö¿ÖµÖ úÖ ­ÖÖê×™üÃÖ ¤ëüÖê †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü, ‡ÃÖ ÃÖÓ×¾Ö¤üÖ úÖê ¯ÖæÖÔ ºþ¯Ö ÃÖê ×­Ö¯ÖÖפüŸÖ ú¸ü­Öê ¯Ö¸ü
•ÖÖê ³Öß »ÖÖ³Ö µÖÖ ±úÖµÖ¤üÖ ¯ÖÏÖ¯ŸÖ ú¸üŸÖê ¯Ö¸ÓüŸÖã ‡ÃÖ úÖµÖÔ úÖ ¯Öæ¾ÖÔÃÖ´ÖÖ¯Ö­Ö ×ú‹ •ÖÖ­Öê êú úÖ¸üÖ ˆÃÖê
¾ÖÆü »ÖÖ³Ö ­Ö ÆüÖê­Öê úß Öן֯ÖæÙŸÖ êú ׍úÃÖß ¤üÖ¾Öê êú Æüú¤üÖ¸ü ­ÖÆüà ÆüÖëÖê…
13.1.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸ü ¤üÖ¾ÖÖ ¯ÖÏßÖãŸÖ ׍ú‹ •ÖÖ­Öê †Öî¸ü ˆÃÖ ¤üÖ¾Öê úß ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ÃÖ´Ö߁ÖÖ ¾Ö
†­Öã´ÖÖê¤ü­Ö ׍ú‹ •ÖÖ­Öê ¯Ö¸ü úÖµÖÔ Ã£Ö»Ö ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­Ö¯ÖÖפüŸÖ ׍ú‹ •ÖÖ “Öãêú úÖµÖÔ êú ×»Ö‹
ÃÖÓ×¾Ö¤üÖ úß ¤ü¸üÖë ¯Ö¸ü ¯Öæ¸üß ¸üÖ×¿Ö úÖ ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ‹ÖÖ…
13.1.3 ˆ¯ÖµÖãÔŒŸÖ êú ÃÖÖ£Ö-ÃÖÖ£Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¤üÖ¾ÖÖ ¯ÖÏßÖãŸÖ ׍ú‹ •ÖÖ­Öê †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ
ÃÖ´Ö߁ÖÖ ×ú‹ •ÖÖ­Öê êú ²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê Æãü‹ ­ÖãúÃÖÖ­Ö úß Öן֯ÖæÙŸÖ êú ×»Ö‹ †Ö¯ÖÃÖß ÃÖÆü´ÖןÖ
êú †Ö¬ÖÖ¸ü ¯Ö¸ü ŸÖµÖ úß Ö‡Ô †Öîד֟µÖ¯ÖæÖÔ ¸üÖ×¿Ö úÖ ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü…
13.2 ÃÖÓ×¾Ö¤üÖ úÖ ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ/×­Ö¸üßÖߍú¸üÖ
13.2.1 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü :
(‹) ׍úÃÖß ³Öß ÃÖ´ÖµÖ †¯Ö­Öê úÖµÖÔ úÖê ¾ÖÖÓ×”ûŸÖ †¬µÖ¾ÖÃÖÖµÖ¯Öæ¾Öԍú ×­Ö¯ÖÖפüŸÖ ­Ö ú¸ü­Öê úÖ ¤üÖêÂÖß
¯ÖÖµÖÖ •ÖÖŸÖÖ Æîü †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ 7 פü­ÖÖë úÖ ×»Ö×ÖŸÖ ­ÖÖê×™üÃÖ ¤êü­Öê êú ²ÖÖ¤ü ³Öß
»ÖÖÖŸÖÖ¸ü ‹êÃÖß Ö»ÖןֵÖÖÓ ú¸üŸÖÖ ¸üÆüŸÖÖ Æîü ; µÖÖ
(²Öß) ÃÖÓ×¾Ö¤üÖ êú ׍ú­Æüà ×­Ö²ÖÓ¬Ö­Ö ¾Ö ¿ÖŸÖÖí úÖ †­Öã¯ÖÖ»Ö­Ö ­Ö ú¸ü­Öê úÖ ¤üÖêÂÖß ¯ÖÖµÖÖ •ÖÖŸÖÖ Æîü †Öî¸ü ‡­Ö
Ö»ÖןֵÖÖë ´Öë ÃÖã¬ÖÖ¸ü ­ÖÆüà ú¸üŸÖÖ Æîü µÖÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ 7 פü­ÖÖë úÖ ×»Ö×ÖŸÖ ­ÖÖê×™üÃÖ ×¤ü‹
•ÖÖ­Öê êú ²ÖÖ¤ü ³Öß ÃÖã¬ÖÖ¸ü êú ×»Ö‹ ¯ÖϳÖÖ¾Öß ú¤ü´Ö ­ÖÆüßÓ ˆšüÖŸÖÖ Æîü ; µÖÖ
(ÃÖß) úÖµÖÔ úÖê ¯ÖæÖÔ ú¸ü­Öê ´Öë µÖÖ úÖµÖÔ úß ´Ö¤üÖë úÖê ŸÖÖ¸üߏ־ÖÖ¸ü úÖµÖÔ¯ÖæÖÔŸÖÖ ŸÖÖ¸üßÖ (ÖÖë) ¯Ö¸ü µÖÖ
ˆÃÖÃÖê ¯ÖÆü»Öê ¯ÖæÖÔ ú¸ü­Öê ´Öë †ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü †Öî¸ü ‡ÃÖ ÃÖÓ²ÖÓ¬Ö ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ‹ú
­ÖÖê×™üÃÖ êú ´ÖÖ¬µÖ´Ö ÃÖê ¤üß Ö‡Ô ×¾Ö×­ÖÙ¤ü™ü †¾Ö×¬Ö ´Öë ¯ÖæÖÔ ­ÖÆüà ú¸üŸÖÖ Æîü ; µÖÖ
(›üß) ×­ÖÖ´Ö úß ÃÖê¾ÖÖ ´Öë ×­ÖµÖãŒŸÖ ×úÃÖß ¾µÖÛŒŸÖ úÖê µÖÖ ˆÃ֍úß †Öê¸ü ÃÖê ׍úÃÖß ¾µÖÛŒŸÖ úÖê úÖê‡Ô
ˆ¯ÖÆüÖ¸ü, ‘ÖæÃÖ, ˆ¯Ö¤üÖ­Ö, ú´Öß¿Ö­Ö, µÖÖ úÖê‡Ô †­µÖ ´Ö滵־ÖÖ­Ö ¾ÖßÖã µÖÖ ×úÃÖß ¯ÖύúÖ¸ü úÖ ×¾Ö¿ÖêÂÖ
´ÖÆüŸ¾Ö úÖ ¯ÖÏ»ÖÖê³Ö­Ö µÖÖ úÖµÖÔ ú¸ü­Öê µÖÖ úÖµÖÔ ú¸ü­Öê êú ×»Ö‹ ŸÖîµÖÖ¸ü ÆüÖê­Öê µÖÖ úÖµÖÔ ú¸ü ¤êü­Öê ¯Ö¸ü
µÖÖ ×­ÖÖ´Ö úß ‡ÃÖ ÃÖÓ×¾Ö¤üÖ µÖÖ ×úÃÖß †­µÖ ÃÖÓ×¾Ö¤üÖ úÖê פü»ÖÖ­Öê µÖÖ ×­Ö¯ÖÖ¤ü­Ö ú¸üÖ­Öê ÃÖê ÃÖÓ²ÖÓ׬֟Ö
׍úÃÖß úÖµÖÔ êú ×»Ö‹ ŸÖŸ¯Ö¸ü ÆüÖê­Öê êú ×»Ö‹ ¯ÖÖ׸üŸÖÖê×Â֍ú úÖ ¯ÖÏßÖÖ¾Ö, µÖÖ ¯ÖϤüÖ­Ö µÖÖ ¯ÖϤüÖ­Ö ú¸ü­Öê
êú ×»Ö‹ ÃÖÆü´ÖŸÖ ÆüÖêÖÖ; µÖÖ
(‡Ô) ×­ÖÖ´Ö êú ÃÖÖ£Ö úÖê‡Ô ‹êÃÖß ÃÖÓ×¾Ö¤üÖ ú¸üŸÖÖ Æîü וÖÃÖ´Öë ‹êÃÖê ú´Öß¿Ö­Ö úÖ ³ÖãÖŸÖÖ­Ö ×úµÖÖ ÖµÖÖ Æîü
µÖÖ ˆÃ֍êú «üÖ¸üÖ µÖÖ ˆÃ֍úß •Ö֭֍úÖ¸üß ´Öë ³ÖãÖŸÖÖ­Ö ×ú‹ •ÖÖ­Öê úß ÃÖÆü´Ö×ŸÖ Æãü‡Ô Æîü וÖÃÖ´Öë ˆÃÖ
ú´Öß¿Ö­Ö †Öî¸ü ˆÃ֍êú ³ÖãÖŸÖÖ­Ö êú ×­Ö²ÖÓ¬Ö­ÖÖë †Öî¸ü ¿ÖŸÖÖí êú ²ÖÖ¸êü ´Öë þÖߍéú×ŸÖ ¯ÖÏÖ׬֍úÖ¸üß/¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ úÖê ×»Ö×ÖŸÖ ´Öë ¯Öæ¾ÖÔÃÖæ×“ÖŸÖ ­Ö ׍úµÖÖ ÖµÖÖ ÆüÖê ; µÖÖ
(‹±ú) Ö»ÖŸÖ ×­Ö×¾Ö¤üÖ µÖÖ ¯ÖÏןÖï֬ÖÖÔŸ´Öú ×­Ö×¾Ö¤üÖ ¯ÖÏ׍ÎúµÖÖ êú †­µÖ †´ÖÖ­µÖ ŸÖ¸üߍêú †¯Ö­ÖÖ­Öê úêú
¯Ö׸üÖÖ´Öþֺþ¯Ö ×­ÖÖ´Ö êú ÃÖÖ£Ö ÃÖÓ×¾Ö¤üÖ ¯ÖÏÖ¯ŸÖ úß Ö‡Ô ÆüÖê ; µÖÖ

51

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(g) being an individual, or if a firm, any partner thereof, shall at any time
be adjudged insolvent or have a receiving order or order for
administration of his estate made against him or shall take any
proceedings for liquidation or composition (other than a voluntary
liquidation for purpose of amalgamation or reconstruction) under any
insolvency Act for the time being in force or make any conveyance
or assignment of his effects or composition or arrangement for the
benefit of his creditors or purport so to do, or if any application be made
under any insolvency Act for the time being in force for the sequestration
of his estate or if a trust deed be executed by him for benefit of his
creditors; or
(h) being a company, shall pass a resolution or the Court shall make an
order for the liquidation of its affairs, or a receiver or manager on behalf
of the debenture holders shall be appointed or circumstances shall arise
which entitle the Court or debenture holders to appoint a receiver or
manager; or
(i) shall suffer an execution being levied on his goods and allow it to be
continued for a period of 21 days; or
(j) assigns, transfers, sublets (engagement of labour on a piece-work basis or
of labour with materials not to be incorporated in the work shall not be
deemed to be subletting) or attempts to assign, transfer or sublet the
entire works or any portion thereof without the prior written approval of
the Engineer-in-Charge; or
(k) indulges in criminal proceedings / activities with the employees of the
Corporation or any other sub contractor;
the Engineer-in-charge may, upon giving 7 days’ notice to the Contractor,
terminate the Contract and expel the Contractor from the Site. The
Corporation’s election to terminate the Contract shall not prejudice any
other rights of the Corporation, under the Contract or otherwise.
13.2.2 The Engineer–in-charge shall on such determination / cancellation have
powers to:
(a) take possession of the Site and any materials, constructional plant,
implements, stores, etc. thereon; and /or
(b) carry out the incomplete work by any means at the risk and cost of the
Contractor.
13.2.3 On giving a notice to the Contractor, the Engineer-in-Charge by virtue of
the powers vested in him can;
(a) take possession of or
(b) use as on hire
all or any tools, plants, materials and stores, in or upon the works or the Site
thereof belonging to the Contractor and intended to be used for the
execution of the works or any part thereof.
The payments for the above would be as per the contract rates or in the
case of these not being applicable, at current market rates to be certified by
the Engineer-in-Charge, whose certificate thereof shall be final, and binding
on the Contractor.

52

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(•Öß) ¾µÖÛŒŸÖÖŸÖ ºþ¯Ö ÃÖê µÖÖ µÖפü ±ú´ÖÔ Æîü ŸÖÖê ˆÃ֍êú ³Ö֐ÖߤüÖ¸ü úÖê ׍úÃÖß ³Öß ÃÖ´ÖµÖ ¤üß¾ÖÖ×»ÖµÖÖ
‘ÖÖê×ÂÖŸÖ ú¸ü פüµÖÖ •ÖÖ‹ µÖÖ ˆÃ֍úß ¯Ö׸üÃÖÓ¯Ö×¢Ö êú ×»Ö‹ ׸üÃÖß¾Ö¸ü ×­ÖµÖãŒŸÖ ú¸ü פüµÖÖ •ÖÖ‹ µÖÖ
ˆÃ֍êú ¯ÖÏ¿ÖÖÃÖ­Ö úÖ †Ö¤êü¿Ö ¯ÖÖ׸üŸÖ ú¸ü פüµÖÖ •ÖÖ‹ µÖÖ ŸÖŸÃÖ´ÖµÖ ¯ÖϳÖÖ¾Öß ×úÃÖß ¤üß¾ÖÖ×»ÖµÖÖ
úÖ­Öæ­Ö êú †¬Öß­Ö ¯Ö׸üÃÖ´ÖÖ¯Ö­Ö µÖÖ ¯ÖÏ¿Ö´Ö­Ö úß úÖ¸Ôü¾ÖÖ‡Ô ¯ÖÏÖ¸Óü³Ö ú¸ü ¤üß •ÖÖ‹ (ÃÖ´ÖÖ´Öê»Ö­Ö µÖÖ
¯Öã­ÖÖÔšü­Ö êú ×»Ö‹ þÖîÛ“”ûú ¯Ö׸üÃÖ´ÖÖ¯Ö­Ö êú †»ÖÖ¾ÖÖ) µÖÖ Ã¾ÖµÖÓ úß ÃÖÆæü×»ÖµÖŸÖ µÖÖ ×ÆüŸÖÖë êú
ÃÖ´Ö­Öã¤êü¿Ö­Ö µÖÖ †¯Ö­Öê ŠúÖ¤üÖŸÖÖ†Öë êú »ÖÖ³Ö êú ×»Ö‹ ¯ÖÏ¿Ö´Ö­Ö µÖÖ ¾µÖ¾ÖãÖÖ ú¸êü µÖÖ ‹êÃÖÖ ú¸ü­Öê
úÖ ŸÖÖŸ¯ÖµÖÔ ÆüÖê µÖÖ ŸÖŸÃÖ´ÖµÖ »Ö֐Öæ ׍úÃÖß ¤üß¾ÖÖ×»ÖµÖÖ úÖ­Öæ­Ö êú †ÓŸÖÖÔŸÖ ˆÃ֍úß ¯Ö׸üÃÖÓ¯Ö×¢ÖµÖÖë
úß •Ö²ŸÖß úÖ úÖê‡Ô †Ö¾Öê¤ü­Ö ׍úµÖÖ ÖµÖÖ ÆüÖê µÖÖ ˆÃ֍êú ŠúÖ¤üÖŸÖÖ†Öë êú »ÖÖ³Ö êú ×»Ö‹ úÖê‡Ô
™ÒüÙü ×¾Ö»ÖêÖ ׍úµÖÖ •ÖÖ‹ ; µÖÖ
(‹“Ö) Óú¯Ö­Öß ÆüÖê­Öê êú ­ÖÖŸÖê, úÖê‡Ô ÃÖӍú»¯Ö ¯ÖÖ׸üŸÖ ׍úµÖÖ •ÖÖ‹ µÖÖ ­µÖÖµÖÖ»ÖµÖ «üÖ¸üÖ Óú¯Ö­Öß êú ´ÖÖ´Ö»ÖÖŸÖ
êú ¯Ö׸üÃÖ´ÖÖ¯ÖÖ­Ö úÖ †Ö¤êü¿Ö ¯ÖÖ׸üŸÖ ׍úµÖÖ •ÖÖ‹, µÖÖ ×›ü²Öë“Ö¸ü ¬ÖÖ¸üúÖë úß ŸÖ¸ü±ú ÃÖê úÖê‡Ô
׸üÃÖß¾Ö¸ü µÖÖ ¯ÖϲÖӬ֍ú ×­ÖµÖãŒŸÖ ×úµÖÖ •ÖÖ‹ µÖÖ ‹êÃÖß ¯Ö׸üÛãÖןֵÖÖÓ ˆŸ¯Ö®Ö ÆüÖê •ÖÖ‹Ó ×•Ö­Öêú úÖ¸üÖ
­µÖÖµÖÖ»ÖµÖ µÖÖ ×›ü²Öë“Ö¸ü ¬ÖÖ¸üúÖë úÖê ׸üÃÖß¾Ö¸ü µÖÖ ¯ÖϲÖӬ֍ú ×­ÖµÖãŒŸÖ ú¸ü­ÖÖ ¯Ö›Íêü ; µÖÖ
(†Ö‡Ô) ˆÃ֍êú ÃÖÖ´ÖÖ­Ö ¯Ö¸ü ¿Ö㻍ú ŸÖÖ´Öᯙ ÆüÖê •ÖÖ‹ †Öî¸ü µÖÆü 21 פü­ÖÖë úß †¾Ö×¬Ö ŸÖú »ÖÖÖ ¸üÆêü ; µÖÖ
(•Öê) ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ¯Öæ¾ÖÔ ×»Ö×ÖŸÖ †­Öã´ÖÖê¤ü­Ö êú ²ÖÖî¸ü úÖµÖÔ µÖÖ úÖµÖÔ êú ׍úÃÖß ³ÖÖÖ úÖê
ÃÖÖï¯Ö­Öê, †ÓŸÖ¸üÖ ú¸ü­Öê, ׍ú¸üÖ‹ ¯Ö¸ü ¤êü­Öê (¯ÖÏןÖ-úÖµÖÔ †Ö¬ÖÖ¸ü ¯Ö¸ü ´Ö•Ö¤æü¸üÖë úÖê úÖ´Ö ¯Ö¸ü »ÖÖÖ­ÖÖ
µÖÖ ÃÖִ֐ÖÏß ÃÖ×ÆüŸÖ ´Ö•Ö¤æü¸üÖë úÖê úÖ´Ö ¯Ö¸ü ­Ö »ÖÖÖµÖÖ •ÖÖ­ÖÖ úÖ´Ö úÖê ׍ú¸üÖ‹ ¯Ö¸ü ¤êü­ÖÖ ­ÖÆüà ´ÖÖ­ÖÖ
•ÖÖ‹ÖÖ ) µÖÖ ÃÖÖï¯Ö­Öê, †ÓŸÖ¸üÖ ú¸ü­Öê µÖÖ ×ú¸üÖ‹ ¯Ö¸ü ¤êü­Öê úÖ ¯ÖϵÖÖÃÖ ú¸êü ; µÖÖ
(êú) ×­ÖÖ´Ö êú ú´ÖÔ“ÖÖ׸üµÖÖë µÖÖ ×úÃÖß †­µÖ ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ú´ÖÔ“ÖÖ׸üµÖÖë êú ÃÖÖ£Ö †Ö¯Ö¸üÖ׬֍ú
¯ÖϾÖé×¢ÖµÖÖë/ÖןÖ×¾Ö׬ֵÖÖë ´Öë ×»Ö¯ŸÖ ÆüÖê •ÖÖŸÖÖ Æîü ;
ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê 7 פü­ÖÖë úÖ ­ÖÖê×™üÃÖ ¤êüú¸ü ÃÖÓ×¾Ö¤üÖ úÖê ×­Ö¸üÃŸÖ ú¸ü Ã֍úŸÖê Æïü
†Öî¸ü
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖµÖÔÃ£Ö»Ö ÃÖê ׭֍úÖ×ÃÖŸÖ ú¸ü Ã֍úŸÖê Æïü… ×­ÖÖ´Ö «üÖ¸üÖ ÃÖÓ×¾Ö¤üÖ úÖê ×­Ö¸üÃŸÖ ú¸ü­Öê
êú “ÖµÖ­Ö ÃÖê ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †¬Öß­Ö µÖÖ †­µÖ£ÖÖ ×­ÖÖ´Ö êú ׍úÃÖß †­µÖ †×¬ÖúÖ¸ü ¯Ö¸ü ¯ÖÏן֍æú»Ö
¯ÖϳÖÖ¾Ö ­ÖÆüà ¯Ö›ÍêüÖÖ…
13.2.2 ‹êÃÖê ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ/×­Ö¸üßÖߍú¸üÖ êú ²ÖÖ¤ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê †×¬ÖúÖ¸ü ÆüÖêÖÖ ×ú ¾Öêü :
(‹) úÖµÖÔÃ£Ö»Ö †Öî¸ü ׍úÃÖß ÃÖִ֐ÖÏß, ×­Ö´ÖÖÔÖ ÃÖÓµÖÓ¡Ö, »ÖÖÖ‹ •ÖÖ­Öê ¾ÖÖ»Öê ˆ¯Öú¸üÖ, ³ÖÓ›üÖ¸ü
†Öפü úÖê ˆÃÖ ÃÖ´ÖµÖ ÃÖê †¯Ö­Öê ú²•Öê ´Öë »Öê »Öë; †Öî¸ü/µÖÖ
(²Öß) †¯ÖæÖÔ úÖµÖÔ úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú •ÖÖê×Ö´Ö ¾Ö Ö“ÖÔ ¯Ö¸ü ׍úÃÖß ³Öß ŸÖ¸üÆü ¯Öæ¸üÖ ú¸ü¾ÖÖ‹Ó…
13.2.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ­ÖÖê×™üÃÖ ×¤ü‹ •ÖÖ­Öê êú ²ÖÖ¤ü, ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ˆ­Æëü ¯ÖÏŸµÖÖµÖÖê×•ÖŸÖ ¿ÖÛŒŸÖµÖÖë êú
†Ö¬ÖÖ¸ü ¯Ö¸ü ;
úÖµÖÔ ´Öë µÖÖ úÖµÖÔ êú ×»Ö‹ ¯ÖϵÖãŒŸÖ µÖÖ úÖµÖÔÃ£Ö»Ö ¯Ö¸ü »ÖÖê µÖÖ úÖµÖÔ †Öî¸ü úÖµÖÔ êú ׍úÃÖß ³ÖÖÖ êú
×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÃÖ³Öß µÖÖ ×ú­Æüà †Öî•ÖÖ¸üÖë, ÃÖÓµÖÓ¡ÖÖë, ÃÖִ֐ÖÏß ¾Ö ³ÖÓ›üÖ¸ü úÖ
(‹) ú²•ÖÖ »Öê Ã֍úŸÖê Æïü µÖÖ
(²Öß) ׍ú¸üÖ‹ ¯Ö¸ü »Öê­Öê úß ŸÖ¸üÆü ¯ÖϵÖÖêÖ ú¸ü Ã֍úŸÖê Æïü
ˆ¯ÖµÖãÔŒŸÖ úÖ ³ÖãÖŸÖÖ­Ö ÃÖÓ×¾Ö¤üÖ úß ¤ü¸üÖë êú †Ö¬ÖÖ¸ü ¯Ö¸ü ׍úµÖÖ •ÖÖ‹ÖÖ µÖÖ µÖפü µÖÆü »Ö֐Öæ ­Ö ÆüÖê ŸÖÖê
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ¯ÖÏ´ÖÖ×ÖŸÖ ú¸ü­Öê êú ²ÖÖ¤ü ŸÖŸúÖ»Öß­Ö ²ÖÖ•ÖÖ¸ü ¤ü¸ü ¯Ö¸ü ׍úµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖ
ÃÖÓ²ÖÓ¬Ö ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ ¯ÖÏ´ÖÖÖ¯Ö¡Ö †Ó×ŸÖ´Ö ÆüÖêÖÖ ¾Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ×»Ö‹ ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…
52

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
13.2.4 Otherwise the Engineer-in-Charge may order the Contractor to remove
such tools, plant, materials or stores from the premises. If the Contractor
fails to comply with any such requisition, the Engineer-in-Charge may
remove them at the Contractor's expense or sell them on account of the
Contractor and his risk in all respects.
In such case, the certificate of the Engineer-in-Charge as to the
expenses of any such removal and the amount of the proceeds and
expense of any such sale shall be final and conclusive against the
Contractor.
13.2.5 On determination/ cancellation of the Contract in full or in part, the
Engineer-in-charge shall determine what amount, if any, is recoverable
from the Contractor for completion of works or part of the works or in
case the works or part of the works is not completed, the loss or damage
suffered by the Corporation. In determining the amount, credit shall be
given to the Contractor for the value of the work executed by him upto
the time of cancellation, the value of Contractor’s material taken over
and incorporated in the work, and use of tools, tackles and machinery
belonging to the Contractor.
13.2.6 Any excess expenditure incurred or to be incurred by the Corporation in
completing the works or part of the works or the loss or damage suffered or
may be suffered by the Corporation as aforesaid after allowing such credit
shall be recovered from any money due to the Contractor on any
account, and if such money is not sufficient the Contractor shall be called
upon in writing to pay the same within 30 days.
13.2.7 If the Contractor shall fail to pay the required sum within the aforesaid
period of 30 days, the Engineer-in-Charge shall have the right to retain any
or all of the Contractor's unused materials, construction plant,
implements, temporary buildings etc. till the balance outstanding from
the Contractor is recovered in accordance with the provisions of the
Contract.
13.2.8 In the event of anyone or more of the above courses being adopted
by the Engineer-in-Charge, the Contractor shall have no claim to
compensation for any loss sustained by him by reasons of his having
purchased or procured any materials or entered into any engagements
or made any advances on account or with a view to the execution of
the work or the performance of the Contract. In case action is taken
under any of the provision aforesaid, the Contractor shall not be entitled
to recover or be paid any sum for any work thereof or actually executed
under this Contract unless and until the Engineer-in-Charge has certified
in writing the performance of such work and the value payable in
respect thereof and he shall only be entitled to be paid so certified.
13.2.9.Any sums in excess of the amounts due to the Corporation and unsold
materials, construction plant, etc, shall be returned to the Contractor,
provided, always that the cost or anticipated cost of completion by
the Corporation of the works or part of the works is less than the
amount which the Contractor would have been paid had he
53

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
13.2.4†­µÖ£ÖÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‡­Ö ÃÖ³Öß †Öî•ÖÖ¸üÖë, ÃÖÓµÖÓ¡Ö, ÃÖִ֐ÖÏß µÖÖ ³ÖÓ›üÖ¸ü úÖê ˆÃÖ
Öê¡Ö ÃÖê Æü™üÖ­Öê úÖ †Ö¤êü¿Ö ¤êü Ã֍úŸÖê Æïü… µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹êÃÖß ×úÃÖß †Ö¾Ö¿µÖúŸÖÖ úÖê ¯ÖæÖÔ ú¸ü­Öê
´Öë †ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê µÖÆü ÃÖÖ´ÖÖ­Ö Æü™ü¾ÖÖ­Öê µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß †Öê¸ü ÃÖê ¾Ö
ˆÃ֍êú •ÖÖê×Ö´Ö ¯Ö¸ü ²Öê“Ö­Öê úÖ Æü¸ü ¯ÖύúÖ¸ü ÃÖê †×¬ÖúÖ¸ ÆüÖêÖÖ…
‹êÃÖê ´ÖÖ´Ö»ÖÖë ´Öë ‡ÃÖ ¯ÖύúÖ¸ü ÃÖÖ´ÖÖ­Ö Æü™üÖ­Öê ¯Ö¸ü ׍ú‹ Ö‹ ¾µÖµÖ †Öî¸ü ‡Ã֍úß ×²ÖÎúß ÃÖê ¯ÖÏÖ¯ŸÖ ¬Ö­Ö ¾Ö
Ö“ÖÔ êú ²ÖÖ¸êü ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×¤üµÖÖ •ÖÖ­Öê ¾ÖÖ»ÖÖ ¯ÖÏ´ÖÖÖ¯Ö¡Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ×»Ö‹ †Ó×ŸÖ´Ö ¾Ö
×­Ö¬ÖÖÔ¸üú ÆüÖêÖÖ…
13.2.5 ‹êÃÖß ÃÖÓ×¾Ö¤üÖ êú ¯ÖæÖÔºþ¯ÖêÖ µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ êú ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ/×­Ö¸üßÖߍú¸üÖ ׍ú‹ •ÖÖ­Öê ¯Ö¸ü
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ˆÃÖ ¯Öæ¸êü úÖµÖÔ µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ úÖê ¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹ †£Ö¾ÖÖ µÖפü úÖµÖÔ
µÖÖ ˆÃ֍úê ׍úÃÖß ³ÖÖÖ úÖ úÖµÖÔ ¯ÖæÖÔ ­Ö ׍úµÖÖ ÖµÖÖ ÆüÖê ŸÖÖê ‡Ã֍êú úÖ¸üÖ ×­ÖÖ´Ö úÖê ÆüÖê­Öê ¾ÖÖ»Öê
­ÖãúÃÖÖ­Ö µÖÖ Ö×ŸÖ êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê ¾ÖÃÖæ»ÖßµÖÖêµÖ ¸üÖ×¿Ö úÖ ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ ú¸ëüÖê… ‡ÃÖ ¸üÖ׿Ö
úÖ ×­Ö¬ÖÖÔ¸üÖ ú¸üŸÖê ÃÖ´ÖµÖ ×­Ö¸üÃŸÖ ×ú‹ •ÖÖ­Öê ŸÖú ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­Ö¯ÖÖפüŸÖ úÖµÖÔ úÖ ´Ö滵Ö,
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß •Ö²ŸÖ úß Ö‡Ô ¾Ö úÖµÖÔ ´Öë ¯ÖϵÖÖêÖ úß Ö‡Ô ÃÖִ֐ÖÏß †Öî¸ü ˆ¯ÖµÖÖêÖ ´Öë »ÖÖ‹ Ö‹
ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú †Öî•ÖÖ¸üÖë ¾Ö ´Ö¿Öß­Ö¸üß †Öפü úê ´Öæ»µÖ úÖ ³Öß ×ÆüÃÖÖ²Ö »ÖÖÖµÖÖ •ÖÖ‹ÖÖ…
13.2.6 ˆ¯ÖµÖãÔŒŸÖ ¯ÖύúÖ¸ü ÃÖê ×ÆüÃÖÖ²Ö »ÖÖÖ­Öê êú ²ÖÖ¤ü úÖµÖÔ µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ úÖê ¯ÖæÖÔ ú¸ü­Öê êú ×»Ö‹
†£Ö¾ÖÖ ×­ÖÖ´Ö úÖê Æãü‹ †£Ö¾ÖÖ ÃÖÓ³ÖÖ×¾ÖŸÖ ­ÖãúÃÖÖ­Ö µÖÖ Ö×ŸÖ úß ¾ÖÃÖæ»Öß ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍úÃÖß ³Öß
¯ÖύúÖ¸ü úß ¤êüµÖ ׍úÃÖß ¸üÖ×¿Ö ´Öë ÃÖê úß •ÖÖ‹Öß †Öî¸ü µÖפü µÖÆü ¸üÖ×¿Ö ¯ÖµÖÖÔ¯ŸÖ ­ÖÆüà ÆüÖêŸÖß Æîü ŸÖÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‡ÃÖ ¸üÖ×¿Ö úÖê 30 פü­ÖÖë êú ³Öߟָü ³ÖãÖŸÖÖ­Ö ú¸ü­Öê êú ×»Ö‹ úÆüÖ •ÖÖ‹ÖÖ…
13.2.7 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆ¯ÖµÖãÔŒŸÖ 30 פü­ÖÖë úß †¾Ö×¬Ö ´ÖêÓ ¾ÖÖÓ×”ûŸÖ ³ÖãÖŸÖÖ­Ö ú¸ü­Öê ´Öë †ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü ŸÖÖê
•Ö²Ö ŸÖú ÃÖÓ×¾Ö¤üÖ êú ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë êú †­ÖãÃÖÖ¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê ¾ÖÃÖæ»Ö úß •ÖÖ­Öê ¾ÖÖ»Öß ¿ÖêÂÖ ¸üÖ×¿Ö ¯ÖÏÖ¯ŸÖ
­Ö ÆüÖê •ÖÖ‹, ŸÖ²Ö ŸÖú êú ×»Ö‹ ü¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß †¯ÖϵÖãŒŸÖ ×úÃÖß µÖÖ ÃÖ´ÖßÖ
ÃÖִ֐ÖÏß, ×­Ö´ÖÖÔÖ ÃÖÓµÖÓ¡Ö, †Öî•ÖÖ¸ü, †Ã£ÖÖ‡Ô ³Ö¾Ö­Ö †Öפü úÖê •Ö²ŸÖ ú¸ü­Öê úÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ…
13.2.8 µÖפü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ˆ¯ÖµÖãÔŒŸÖ ´Öë ÃÖê úÖê‡Ô ‹ú µÖÖ †×¬Öú ¯ÖÏ׍ÎúµÖÖ‹Ó †¯Ö­ÖÖ‡Ô •ÖÖŸÖß ÆîüÓ ŸÖÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü, ׍úÃÖß ÃÖִ֐ÖÏß úß Ö¸üߤü¤üÖ¸üß µÖÖ ¯ÖÏÖ¯ÖÖ †£Ö¾ÖÖ úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö úÖê ¬µÖÖ­Ö ´Öë ¸üÖŸÖê
Æãü‹ ׍ú‹ Ö‹ ׍úÃÖß ú¸üÖ¸ü µÖÖ ÃÖÓ×¾Ö¤üÖ êú ×»Ö‹ פü‹ Ö‹ ׍úÃÖß †×ÖÏ´Ö †Öפü ÃÖÓ²ÖÓ¬Öß ×úÃÖß
­ÖãúÃÖÖ­Ö úß Öן֯ÖæÙŸÖ úÖ ¤üÖ¾ÖÖ ­ÖÆüà ú¸ü Ã֍êúÖÖ… µÖפü ˆ¯ÖµÖãÔŒŸÖ ׍úÃÖß ¯ÖÏÖ¾Ö¬ÖÖ­Ö êú †ÓŸÖÖÔŸÖ úÖê‡Ô
úÖ¸Ôü¾ÖÖ‡Ô úß •ÖÖŸÖß Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê, ‡ÃÖ ÃÖÓ²ÖÓ¬Ö ´Öë ׍ú‹ Ö‹ †£Ö¾ÖÖ ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †¬Öß­Ö
×­Ö¯ÖÖפüŸÖ ׍úÃÖß úÖµÖÔ êú ×»Ö‹ ׍úÃÖß ¸üÖ×¿Ö úß ¾ÖÃÖæ»Öß µÖÖ ³ÖãÖŸÖÖ­Ö úÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ
úÖµÖÔ úÖ ×­Ö¯ÖÖ¤ü­Ö †Öî¸ü ³ÖãÖŸÖÖ­Ö µÖÖêµÖ ´Öæ»µÖ úÖ ×»Ö×ÖŸÖ ¯ÖÏ´ÖÖÖ­Ö ×ú‹ •ÖÖ­Öê ŸÖú †×¬ÖúÖ¸ü ­ÖÆüà
ÆüÖêÖÖ †Öî¸ü ¾ÖÆü êú¾Ö»Ö ¯ÖÏ´ÖÖ×ÖŸÖ ¬Ö­Ö¸üÖ×¿Ö úÖ ³ÖãÖŸÖüÖ­Ö ¯ÖÖ­Öê úÖ Æüß Æüú¤üÖ¸ü ÆüÖêÖÖ…
13.2.9 ×­ÖÖ´Ö úÖê ¤êüµÖ ׍úÃÖß ¸üÖ×¿Ö ÃÖê †×¬Öú ¸üÖ×¿Ö †Öî¸ü ²Öê“Öß ­Ö Ö‡Ô ÃÖִ֐ÖÏß, ×­Ö´ÖÖÔÖ ÃÖÓµÖÓ¡Ö †Öפü
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¾ÖÖ¯ÖÃÖ ×ú‹ •Ö֋ӐÖê ²Ö¿ÖŸÖì ׍ú ×­ÖÖ´Ö «üÖ¸üÖ ¯ÖæÖÔ ú¸üÖ‹ •ÖÖ­Öê ¾ÖÖ»Öê úÖµÖÔ µÖÖ úÖµÖÔ
êú ³ÖÖÖ úß úß´ÖŸÖ ‡ÃÖ úÖµÖÔ úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖæÖÔ ×ú‹ •ÖÖ­Öê ¯Ö¸ü ˆÃÖê ³ÖãÖŸÖÖ­Ö úß •ÖÖ­Öê
¾ÖÖ»Öß úß´ÖŸÖ ÃÖê Æü¸ü ÆüÖ»ÖŸÖ ´Öë ú´Ö ÆüÖê… µÖÆü »ÖÖ³Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¯ÖÏÖê¤Ëü³ÖæŸÖ ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ…

53

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
completed the works or part of the works, such benefit shall not accrue to the
Contractor.
13.2.10 Incase any of the powers conferred upon the Engineer-in-Charge by this
clause become exercisable and the same are not exercised, the non-
exercise thereof shall not constitute a waiver of any of the conditions
hereof and such powers shall not withstanding be exercisable in the
event of any future case of default by the Contractor and the liability of
the Contractor for compensation shall remain unaffected.
13.3 Termination of Contract on death
13.3.1 If the Contractor is an individual or a proprietary concern and the
individual or the proprietor dies and if the Contractor is a partnership
concern and one of the partners dies, then, unless the Engineer-in-Charge
is satisfied that the legal representatives of the individual Contractor or
of the proprietor of the proprietary concern and in the case of
partnership, the surviving partners, are capable of carrying out and
completing the Contract, the Engineer-in-Charge shall be entitled to
cancel the Contract as to its incomplete part without the Corporation
being in any way liable to payment of any compensation to the estate
of the deceased Contractor and /or to the surviving partners of the
Contractor's firm on account of the cancellation of the contract.

13.3.2 The decision of the Engineer-in-Charge that the legal representatives of


the deceased Contractor or the surviving partners of the Contractor's firm
cannot carry out and complete the Contract shall be final and binding on
the parties in the event of such cancellation, the Corporation shall not hold
the estate of the deceased Contractor and/or the surviving partners of the
Contractor's firm liable for damages for not completing the Contract.
14 RISK AND RESPONSIBILITY
14.1 Liability for damage, defects or imperfections and rectifications thereof
14.1.1 If the Contractor or his workman or employees shall injure or destroy any
part of the building in which they may be working or any building, road,
fence, etc. contiguous to the premises on which the work or any part of it
is being executed, or if any damage shall happen to the work while in
progress, the Contractor shall, upon receipt of a notice in writing in that
behalf make the same good at his own expense.
14.1.2 If it shall appear to the Engineer-in-Charge or his Representative at any
time during construction or re-construction or prior to the expiration of the
Defects Liability Period, that any work has been executed with unsound,
imperfect or unskilled workmanship or that any materials or articles
provided by the Contractor for execution of the work are not in
accordance with the Contract, the contractor shall forthwith rectify or
remove and re-construct the work so specified in whole or in part within
the time limit specified by the Engineer-in-charge.

54

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
13.2.10 µÖפü ‡ÃÖ Ö›ü «üÖ¸üÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ¯ÖϤü¢Ö ¿ÖÛŒŸÖµÖÖÓ ¯ÖϵÖÖêÖµÖÖêµÖ ÆüÖê •ÖÖŸÖß Æïü †Öî¸ü ˆ­ÖúÖ
¯ÖϵÖÖêÖ ­ÖÆüà ׍úµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ‡­Ö ¿ÖÛŒŸÖµÖÖë úÖ ¯ÖϵÖÖêÖ ­Ö ׍úµÖÖ •ÖÖ­ÖÖ ‡­Ö´Öë ÃÖê ׍ú­Æüà ¿ÖŸÖÖí úÖ
´ÖÖ±ú ׍úµÖÖ •ÖÖ­ÖÖ ­ÖÆüà ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ †Öî¸ü ³Ö×¾Ö嵅 ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ úß Ö‡Ô ׍úÃÖß Ö»ÖŸÖß êú
×»Ö‹ ‡­ÖúÖ ¯ÖϵÖÖêÖµÖÖêµÖ ÆüÖê­ÖÖ ÃÖ´ÖÖ¯ŸÖ ­ÖÆüà ÆüÖêÖÖ †Öî¸ü Öן֯ÖæÙŸÖ êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ²ÖÖ¬µÖŸÖÖ
¯Ö¸ü ‡Ã֍úÖ úÖê‡Ô ¯ÖϳÖÖ¾Ö ­ÖÆüà ¯Ö›ÍêüÖÖ…
13.3 ´Ö韵Öã ÆüÖê­Öê úß ¤ü¿ÖÖ ´Öë ÃÖÓ×¾Ö¤üÖ úß ÃÖ´ÖÖÛ¯ŸÖ
13.3.1 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê‡Ô ¾µÖÛŒŸÖ µÖÖ Ã¾ÖÖ×´ÖŸ¾Ö ±ú´ÖÔ Æîü †Öî¸ü µÖפü ˆÃÖ ¾µÖÛŒŸÖ µÖÖ Ã¾ÖÖ´Öß úß ´Ö韵Öã ÆüÖê
•ÖÖŸÖß Æîü †Öî¸ü µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê‡Ô ÃÖÖ—Öê¤üÖ¸üß ±ú´ÖÔ Æîü †Öî¸ü ˆÃ֍êú ׍úÃÖß ‹ú ³Ö֐ÖߤüÖ¸ü úß ´Ö韵Öã
ÆüÖê •ÖÖŸÖß Æîü ŸÖÖê •Ö²Ö ŸÖú ׍ú ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓŸÖã™ü ­ÖÆüà ÆüÖêŸÖê Æïü ׍ú ¾µÖÛŒŸÖÖŸÖ ºþ¯Ö ÃÖê ˆÃÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖÖ Ã¾ÖÖ×´ÖŸ¾Ö ±ú´ÖÔ úÖ úÖ­Öæ­Öß ¯ÖÏןÖ×­Ö×¬Ö †Öî¸ü ÃÖÖ—Öê¤üÖ¸üß ±ú´ÖÔ êú ´ÖÖ´Ö»Öê ´Öë •Öß×¾ÖŸÖ
³Ö֐ÖߤüÖ¸,ü ‡ÃÖ ÃÖÓ×¾Ö¤üÖ úÖê “Ö»ÖÖ­Öê ¾Ö ¯ÖæÖÔ ú¸ü­Öê ´Öë ÃÖÖ´Ö Æîü, ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖÓ×¾Ö¤ü֍úÖµÖÔ êú
¿ÖêÂÖ ³ÖÖÖ úÖê ¸ü§ü ú¸ü­Öê úÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ †Öî¸ü ×­ÖÖ´Ö ×úÃÖß ³Öß ¯ÖύúÖ¸ü ÃÖê פü¾ÖÓÖŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü
êú ˆ¢Ö¸üÖ׬֍úÖ¸üß úÖê †Öî¸ü/µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ±ú´ÖÔ êú •Öß×¾ÖŸÖ ³Ö֐ÖߤüÖ¸ü úÖê ÃÖÓ×¾Ö¤üÖ êú ¸ü§ü ׍ú‹
•ÖÖ­Öê êú úÖ¸üÖ ׍úÃÖß ¯ÖύúÖ¸ü úß Öן֯ÖæÙŸÖ êú ³ÖãÖŸÖÖ­Ö êú ×»Ö‹ ²ÖÖ¬µÖ ­ÖÆüà ÆüÖêÖÖ…
13.3.2 פü¾ÖÓÖŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úÖ­Öæ­Öß ¯ÖÏןÖ×­Ö×¬Ö µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ±ú´ÖÔ êú ³Ö֐ÖߤüÖ¸ü úÖ ÃÖÓ×¾Ö¤üÖ úÖê
“Ö»ÖÖ­Öê ¾Ö ¯ÖæÖÔ ú¸ü­Öê ´Öë ÃÖÖ´Ö ­Ö ÆüÖê­Öê úÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ¾Ö ¤üÖê­ÖÖë ¯ÖÖÖë ¯Ö¸ü
²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ… ÃÖÓ×¾Ö¤üÖ úÖê ‡ÃÖ ¯ÖύúÖ¸ü ¸ü§ü ׍ú‹ •ÖÖ­Öê ¯Ö¸ü ×­ÖÖ´Ö ×¤ü¾ÖÓÖŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú
ˆ¢Ö¸üÖ׬֍úÖ¸üß †Öî¸ü/µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ±ú´ÖÔ êú •Öß×¾ÖŸÖ ³Ö֐ÖߤüÖ¸ü úÖê ÃÖÓ×¾Ö¤üÖ ¯ÖæÖÔ ­Ö ׍ú‹ •ÖÖ­Öê
úß Öן֯ÖæÙŸÖ êú ×»Ö‹ וִ´Öê¤üÖ¸ü ­ÖÆüà šüÆü¸üÖ‹ÖÖ…

14 •ÖÖê×Ö´Ö ¾Ö וִ´Öê¤üÖ¸üß

14.1 ÖןÖ, ¤üÖêÂÖ µÖÖ ú´Öß †Öî¸ü ˆÃÖê ¤æü¸ü ú¸ü­Öê úß ×•Ö´´Öê¤üÖ¸üß

14.1.1 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖÖ ˆÃ֍êú úִ֐ÖÖ¸ü µÖÖ ú´ÖÔ“ÖÖ¸üß, וÖÃÖ ³Ö¾Ö­Ö ´Öë úÖµÖÔ ú¸ü ¸üÆêü Æïü ˆÃÖ ³Ö¾Ö­Ö êú ׍úÃÖß
³ÖÖÖ µÖÖ úÖµÖÔ µÖÖ úÖµÖÔ êú ׍úÃÖß ³ÖÖÖ úÖê ×­Ö¯ÖÖפüŸÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ¯Ö׸üÃÖ¸ü êú ׭֍ú™ü ÛÃ£ÖŸÖ ×úÃÖß
³Ö¾Ö­Ö, ÃÖ›Íüú, “ÖÖ¸üפü¾ÖÖ¸üß †Öפü úÖê ­ÖãúÃÖÖ­Ö ¯ÖÆãÓü“ÖÖŸÖê Æïü µÖÖ ­Ö™ü ú¸üŸÖê Æïü µÖÖ úÖµÖÔ êú ¤üÖî¸üÖ­Ö úÖê‡Ô ÖןÖ
ÆüÖê •ÖÖŸÖß Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ ÃÖÓ²ÖÓ¬Ö ´Öë ×»Ö×ÖŸÖ ­ÖÖê×™üÃÖ ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ¯Ö¸ü ˆÃÖê †¯Ö­Öê Ö“ÖÔ ¯Ö¸ü ¤ãü¹ýßÖ
ú¸ü֋ӐÖê…
14.1.2 µÖפü ×­Ö´ÖÖÔÖ êú ¤üÖî¸üÖ­Ö µÖÖ ¯Öã­ÖÔ×­Ö´ÖÖÔÖ êú ¤üÖî¸üÖ­Ö µÖÖ ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö êú ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê ÃÖê ¯ÖÆü»Öê
׍úÃÖß ³Öß ÃÖ´ÖµÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ µÖÖ ˆÃ֍êú ¯ÖÏÖ׬֍éúŸÖ ¯ÖÏןÖ×­Ö×¬Ö úÖê ¯ÖÏŸÖßŸÖ ÆüÖêŸÖÖ Æîü ׍ú úÖµÖÔ úÖê ÃÖ±úÖ‡Ô
ÃÖê, šüߍú ¯ÖύúÖ¸ü ÃÖê µÖÖ ãú¿Ö»ÖŸÖÖ¯Öæ¾Öԍú ×­Ö¯ÖÖפüŸÖ ­ÖÆüà ׍úµÖÖ ÖµÖÖ Æîü µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ úÖµÖÔ êú
×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô Ö‡Ô úÖê‡Ô ÃÖִ֐ÖÏß µÖÖ ¾ÖßÖã ÃÖÓ×¾Ö¤üÖ úê †­Öãºþ¯Ö ­ÖÆüà Æîü ŸÖÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ŸÖŸúÖ»Ö ‹êÃÖê ×¾Ö×­ÖÙ¤ü™ü úÖµÖÔ úÖê ¯ÖæÖÔºþ¯ÖêÖ µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
«üÖ¸üÖ ×¾Ö×­ÖÙ¤ü™ü ÃÖ´ÖµÖ-ÃÖß´ÖÖ êú ³Öߟָü ÃÖã¬ÖÖ¸ëüÖê µÖÖ ˆÃÖê Æü™ü֋ӐÖê…

54

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
14.1.3 Failing which, the Engineer-in-Charge may rectify or remove and re-
execute the work and/or remove and replace with others, the materials or
articles complained of, as the case may be, by other means at the risk
and expense of the Contractor.
14.1.4 In such case the Engineer-in-Charge may not accept the item of work at
the rates applicable under the contract but may accept such items at
reduced rates as the competent authority may consider reasonable
during the preparation of on account bills or final bill if the item is so
acceptable without detriment to the safety and utility of the item and
the structure or he may reject the work outright without any payment.
14.1.5 In case of repairs and maintenance works, splashes and droppings from
white washing, painting etc; shall be removed and surfaces cleaned
simultaneously with completion of these items of work in individual rooms,
quarters or premises, etc. where the work is done, without waiting for
completion of all other items of work in the Contract. In case the
Contractor fails to comply with the requirements of this clause, the
Engineer-in-Charge shall have the right to get the work done by other
means at the cost of the Contractor. Before taking such action however,
the Engineer-in-Charge shall give 3 days notice in writing to the Contractor.
15 INSURANCE
15.1 General Requirements for Insurances
15.1.1 The Contractor shall provide in the joint names of the Corporation and the
Contractor, insurance cover from the date of commencement of work to
the end of the Defects Liability Period. The Contractor is liable to take
Contractor’s all risk policy for the whole contract value. The insurance
amount shall also cover third party liability to the extent, if any as specified
in Schedule A. In addition to this the contractor shall also take Workmen
Compensation Policy for workmen.
15.1.2 Policies /certificates of insurance shall be delivered in original by the
Contractor to the Engineer-in-charge before the date of commencement
of work. In case of failure by the Contractor, no payment against the
running bill shall be released till the submission of the policies / certificates
of insurance. All such insurances shall provide for compensation to be
payable in the types and proportions for which these policies are intended.
15.1.3 The Contractor shall provide premium receipts to the Engineer-in-Charge
from time to time, as a proof that he has paid the necessary premiums
for keeping the policies alive till expiry of the Defects Liability Period.
15.1.4 The Contractor shall ensure that similar insurance policies are taken out
by his Sub-Contractors(if any) and shall be responsible for any claims or
losses to the Corporation resulting from their failure to obtain
adequate insurance protection in connection thereof. The Contractor
shall produce or cause to be produced by his Sub-Contractors (if any) as
the case may be, the relevant policy or policies and premium receipts as
and when required by the Engineer-in-Charge.
55

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
14.1.3 ‹êÃÖÖ ­Ö ÆüÖê­Öê ¯Ö¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ, •ÖîÃÖÖ ´ÖÖ´Ö»ÖÖ ÆüÖê, †­µÖ ÃÖÖ¬Ö­ÖÖë úß ÃÖÆüÖµÖŸÖÖ ÃÖê, ÃÖÓ×¾Ö¤ü֍úÖ¸ü
êú Ö“ÖÔ ¾Ö •ÖÖê×Ö´Ö ¯Ö¸ü, ˆÃÖ úÖµÖÔ úÖê šüߍú ú¸ü¾ÖÖ µÖÖ Æü™¾ÖüÖ Ã֍úŸÖê Æïü †Öî¸ü úÖµÖÔ úÖê ¯Öã­Ö:
×­Ö¯ÖÖפüŸÖ †Öî¸ü/†£Ö¾ÖÖ ×¿ÖúÖµÖŸÖ ¾ÖÖ»Öß ÃÖִ֐ÖÏß µÖÖ ¾ÖßÖã†Öë úÖê Æü™ü¾ÖÖ ú¸ü †­µÖ ÃÖִ֐ÖÏß µÖÖ
¾ÖßÖã†Öë úÖê »ÖÖ¾ÖÖ Ã֍úŸÖê Æïü…
14.1.4 ‹êÃÖê ´ÖÖ´Ö»ÖÖë ´Öë "†Öò­Ö ‹úÖˆÓ™ü ײֻÖ" µÖÖ †Ó×ŸÖ´Ö ×²Ö»Ö ŸÖîµÖÖ¸ü ú¸üŸÖê ÃÖ´ÖµÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ,
ÃÖÓ×¾Ö¤üÖ êú †¬Öß­Ö úÖµÖÔ úß »Ö֐Öæ ´Ö¤ü ¤ü¸ü úÖê þÖߍúÖ¸ü ­Ö ú¸ü ‡­Ö ´Ö¤üÖêÓ êú ×»Ö‹ ÃÖÖ´Ö ¯ÖÏÖ׬֍úÖ¸üß
«üÖ¸üÖ ˆ¯ÖµÖãŒŸÖ ´ÖÖ­Öß Ö‡Ô ú´ÖŸÖ¸ü ¤ü¸üÖêÓ úÖê, µÖפü ¾Öêü ´Ö¤ëü ÃÖÓ¸üÖÖ êú ×»Ö‹ ÖŸÖ¸üÖ ­Ö ÆüÖêÓ †Öî¸ü ´Ö¤ü ¾Ö
œüÖÓ“Öê úß ˆ¯ÖµÖÖêא֟ÖÖ ¤êüÖŸÖê Æãü‹ þÖߍúÖ¸ü ú¸ü Ã֍úŸÖë Æïü †£Ö¾ÖÖ ¾ÖÆü úÖµÖÔ úÖê ²ÖÖî¸ü ׍úÃÖß ³ÖãÖŸÖÖ­Ö
êú ¯ÖæÖÔºþ¯ÖêÖ ×­Ö¸üÃŸÖ ú¸ü Ã֍úŸÖê Æïü…
14.1.5 ´Ö¸ü´´ÖŸÖ ¾Ö †­Öã¸üÖÖ úÖµÖÖí ´Öë ¯ÖãŸÖÖ‡Ô ¾Ö ¸ÓüÖÖ‡Ô ú¸üŸÖê ÃÖ´ÖµÖ ±îú»Ö­Öê ¾Ö ×”û™üú­Öê ¾ÖÖ»Öê ¸ÓüÖ-¸üÖêÖ­Ö
†Öפü úÖê ú´Ö¸üÖ,ë Œ¾ÖÖ™Ôü¸üÖë ¾Ö ¯Ö׸üÃÖ¸üÖ,ë •ÖÆüÖÓ ¯Ö¸ü úÖµÖÔ ×úµÖÖ •ÖÖ ¸üÆüÖ ÆüÖê ¾ÖÆüÖÓ ÃÖê ´Ö¤ü¾ÖÖ¸ü úÖµÖÔ
ÃÖ´ÖÖ¯ŸÖ ú¸ü­Öê êú ÃÖÖ£Ö-ÃÖÖ£Ö Æüß ÃÖÓ×¾Ö¤üÖ êú †­µÖ úÖµÖÖí úÖê ÃÖ´ÖÖ¯ŸÖ ú¸ü­Öê ŸÖú ¯ÖÏŸÖ߁ÖÖ ×ú‹ ²ÖÖî¸ü
Æü™üÖµÖÖ •ÖÖ‹ÖÖ ¾Ö ÃÖŸÖÆü úÖê ÃÖÖ±ú ׍úµÖÖ •ÖÖ‹ÖÖ… µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ Ö›ü êú †­Öã¯ÖÖ»Ö­Ö ´Öë
†ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê µÖÆü úÖµÖÔ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“ÖÔ ¯Ö¸ü ׍úÃÖß †­µÖ ´ÖÖ¬µÖ´Ö
ÃÖê ú¸ü¾ÖÖ­Öê úÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ… ŸÖ£ÖÖ×¯Ö ‹êÃÖß úÖ¸Ôü¾ÖÖ‡Ô ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê 3 פü­ÖÖë úÖ ×»Ö×ÖŸÖ ­ÖÖê×™üÃÖ ¤ëüÖê…
15. ²Öß´ÖÖ
15.1 ²Öß´ÖÖë êú ×»Ö‹ ÃÖÖ´ÖÖ­µÖ †Ö¾Ö¿µÖúŸÖÖ‹Ó
15.1.1ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê ¾Ö ×­ÖÖ´Ö êú ÃÖÓµÖãŒŸÖ ­ÖÖ´Ö ¯Ö¸ü úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ÆüÖê­Öê úß ŸÖÖ¸üßÖ ÃÖê ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ
†¾Ö×¬Ö ŸÖú êú ×»Ö‹ ²Öß´ÖÖ ÃÖã¸üÖÖ ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ×»Ö‹ ÃÖÓ×¾Ö¤üÖ úß ãú»Ö
úß´ÖŸÖ êú ×»Ö‹ ÃÖ´ÖÃŸÖ •ÖÖê×Ö´Ö ¯ÖÖò×»ÖÃÖß »Öê­ÖÖ †×­Ö¾ÖÖµÖÔ Æîü… ‡ÃÖ ²Öß´ÖÖ ¸üÖ×¿Ö ´Öë וÖÃÖ ÃÖß´ÖÖ ŸÖú
†­ÖãÃÖæ“Öß ‹ ´Öë ×¾Ö×­ÖÙ¤ü™ü ÆüÖê ˆÃÖ ÃÖß´ÖÖ ŸÖú ŸÖßÃÖ¸êü ¯ÖÖ úß ²ÖÖ¬µÖŸÖÖ†Öë êú ×»Ö‹ ³Öß ÃÖã¸üÖÖ úß
•ÖÖ‹Öß… ‡Ã֍êú †×ŸÖ׸üÛŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †¯Ö­Öê úִ֐ÖÖ¸üÖë êú ×»Ö‹ úִ֐ÖÖ¸ü Öן֯ÖæÙŸÖ ¯ÖÖò×»ÖÃÖß
³Öß »Öê­Öß ÆüÖêÖß…
15.1.2 úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ²Öß´ÖÖ úß ¯ÖÖò×»ÖÃÖß/¯ÖÏ´Ö֝֯֡ÖÖêÓ úß ´Öæ»Ö ¯ÖÏןֵÖÖÓ ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ úÖê ¯ÖÏßÖãŸÖ ú¸ëüÖê… µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹êÃÖÖ ­ÖÆüà ú¸üŸÖê Æïü ŸÖÖê ¯ÖÖò×»ÖÃÖß/ ¯ÖÏ´ÖÖÖ¯Ö¡Ö •Ö´ÖÖ
׍ú‹ ²ÖÖî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ˆ­Öêú “ÖÖ»Öæ ײֻÖÖë êú ×¾Ö¹ý¨ü ׍úÃÖß ¯ÖύúÖ¸ü úÖ ³ÖãÖŸÖÖ­Ö ­ÖÆüà ׍úµÖÖ
•ÖÖ‹ÖÖ… µÖê ÃÖ³Öß ²Öß´Öê ˆÃÖ ¯ÖύúÖ¸ü †Öî¸ü †­Öã¯ÖÖŸÖ ´Öë Öן֯ÖæÙŸÖ úÖ ³ÖãÖŸÖÖ­Ö ú¸ëüÖê ו֭֍êú ×»Ö‹ µÖê
¯ÖÖò×»ÖÃÖß »Öß Ö‡Ô Æïü…
15.1.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡­Ö ¯ÖÖò×»Ö×ÃÖµÖÖë úÖê ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö ŸÖú “Ö»ÖÖŸÖê ¸üÆü­Öê êú ÃÖցµÖ þֺþ¯Ö
¯ÖÏß×´ÖµÖ´ÖÖë êú ³ÖãÖŸÖÖ­Ö úß ¸üÃÖߤÖêÓ úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ¯ÖÖÃÖ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü •Ö´ÖÖ ú¸ëüÖê…
15.1.4 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê ׍ú ˆ­Öêú ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë (µÖפü úÖê‡Ô ÆüÖê ŸÖÖê) «üÖ¸üÖ ³Öß ‡ÃÖß
¯ÖύúÖ¸ü úß ¯ÖÖò×»ÖÃÖß ú¸üÖ‡Ô Ö‡Ô Æïü †Öî¸ü ÃÖÓ²ÖÓ×¬ÖŸÖ ¯ÖµÖÖÔ¯ŸÖ ²Öß´ÖÖ ÃÖã¸üÖÖ êú †³ÖÖ¾Ö êú úÖ¸üÖ
×­ÖÖ´Ö ¯Ö¸ü ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ׍úÃÖß ¤üÖ¾Öê µÖÖ ­ÖãúÃÖÖ­Ö êú וִ´Öê¤üÖ¸ü ÆüÖëÖê… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ
´ÖÖӐÖê •ÖÖ­Öê ¯Ö¸ü †¯Ö­Öê ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë (µÖפü úÖê‡Ô ÆüÖê ŸÖÖê ) «üÖ¸üÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ²Öß´ÖÖ ¯ÖÖò×»ÖÃÖß †Öî¸ü
¯ÖÏß×´ÖµÖ´Ö úß ¸üÃÖߤüÖë úÖê ˆ¯Ö»Ö²¬Ö ú¸üÖ­Öê µÖÖ ú¸ü¾ÖÖ­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü וִ´Öê¤üÖ¸ü ÆüÖëÖê…

55

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
15.1.5 Alterations to the terms of insurance shall not be made without the
approval of the Engineer-in-charge.
15.1.6 Both parties shall comply with all conditions of the insurance policies.
15.1.7 All risks of loss of or damage to physical property and of personal injury and
death which arise during and in consequence of the execution of the
Contract shall be the responsibility of the Contractor. However this shall not
include excepted risks which are not covered under the above said
insurance policies. All consequential loss with reference to insurance claims
shall be borne by the contractor.
16 FORCE MAJEURE
16.1 Definition of Force Majeure
16.1.1 In this Clause, “Force Majeure” means an exceptional event or
circumstance:
a) Which is beyond a Party’s control,
b) Which such Party could not reasonably have provided against before
entering into the Contract,
c) Which, having arisen, such Party could not reasonably have avoided or
overcome, and
d) Which is not substantially attributable to the other Party.
Force Majeure may include, but is not limited to, exceptional events or
circumstances of the kind listed below, so long as conditions (a) to (d)
above are satisfied:
i. war, hostilities (whether war be declared or not), invasion, act of foreign
enemies,
ii. rebellion, terrorism, revolution, insurrection, military or usurped power, or
civil war,
iii. riot, commotion, disorder, strike or lockout by persons other than the
Contractor’s Personnel,
iv. munitions of war, explosive materials, ionising radiation or contamination
by radio-activity, except as may be attributable to the Contractor’s use of
such munitions, explosives, radiation or radio-activity, and
v. natural catastrophes such as earthquake, hurricane, typhoon, tsunami or
volcanic activity.
16.2 Consequence of Force Majeure
16.2.1 If the Contractor is prevented from performing its substantial obligations
under the Contract by Force Majeure, and suffers delay and/or incurs Cost
by reason of such Force Majeure, the Contractor may be eligible to
(a) An extension of time for any such delay, if completion is or will be delayed,
under Sub-Clause 7.6 [Extension of Time for Completion], and

56

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
15.1.5 ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú †­Öã´ÖÖê¤ü­Ö êú ²ÖÖî¸ü ²Öß´ÖÖ úß ¿ÖŸÖÖí ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úÖ ²Ö¤ü»ÖÖ¾Ö ­ÖÆüà ׍úµÖÖ
•ÖÖ‹ÖÖ…
15.1.6 ¤üÖê­ÖÖë ¯ÖÖ ²Öß´ÖÖ úß ÃÖ³Öß ¿ÖŸÖÖí úÖ †­Öã¯ÖÖ»Ö­Ö ú¸ëüÖê…
15.1.7 ¾ÖÖßÖ׾֍ú ÃÖÓ¯Ö×¢Ö úÖê ÆüÖê­Öê ¾ÖÖ»Öê ÃÖ³Öß •ÖÖê׏ִÖÖë µÖÖ ­ÖãúÃÖÖ­Ö †Öî¸ü ÃÖÓ×¾Ö¤üÖ êú ×­Ö¯ÖÖ¤ü­Ö êú ¤üÖî¸üÖ­Ö
†Öî¸ü ¯Ö׸üÖÖ´Öþֺþ¯Ö »ÖÖêÖÖë úÖê »ÖÖ­Öê ¾ÖÖ»Öß “ÖÖê™üÖë ¾Ö ´Ö韵Öã †Öפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ×•Ö´´Öê¤üÖ¸üß
ÆüÖêÖß… ŸÖ£ÖÖ×¯Ö •ÖÖêê ÃÖÓ³ÖÖ×¾ÖŸÖ •ÖÖê×Ö´Ö ˆ¯ÖµÖãÔŒŸÖ ²Öß´ÖÖ ¯ÖÖò×»ÖÃÖß úê ÃÖã¸üÖÖ ¤üÖµÖ¸êü ÃÖê ²ÖÖÆü¸ü ÆüÖ,ë ‡ÃÖ´Öë
¿ÖÖ×´Ö»Ö ­ÖÆüà Æïü… ²Öß´ÖÖ ¤üÖ¾ÖÖë ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ÃÖ³Öß ¯ÖύúÖ¸ü úß ¯Ö׸üÖÖ´Öß Ö×ŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯Öæ¸üß úß
•ÖÖ‹Öß…
16. †¯Ö׸üÆüÖµÖÔŸÖÖ‹Ó
16.1 †¯Ö׸üÆüÖµÖÔŸÖÖ úß ¯Ö׸ü³ÖÖÂÖÖ
16.1.1 ‡ÃÖ Ö›ü ´Öë "†¯Ö׸üÆüÖµÖÔŸÖÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ‹ú †¯Ö¾ÖÖ¤üþֺþ¯Ö ‘Ö™ü­ÖÖ µÖÖ ¯Ö׸üÛãÖ×ŸÖ ÃÖê Æîü •ÖÖê ;
‹) ׍úÃÖß ¯ÖÖ êú ×­ÖµÖÓ¡ÖÖ ÃÖê ¯Ö¸êü Æîü…
²Öß) וÖÃ֍úÖ ¯ÖÖ™üá «üÖ¸üÖ ÃÖÓ×¾Ö¤üÖ ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ŸÖÖٍúú ºþ¯Ö ÃÖê ¯ÖÏÖ¾Ö¬ÖÖ­Ö ­ÖÆüà ׍úµÖÖ •ÖÖ
Ã֍úŸÖÖ £ÖÖ…
ÃÖß) וÖÃÖê ‹êÃÖß ‘Ö™ü­ÖÖ ÆüÖê •ÖÖ­Öê êú ²ÖÖ¤ü ¯ÖÖ™üá «üÖ¸üÖ ŸÖÖٍúú ºþ¯Ö ÃÖê ²Ö“ÖÖµÖÖ ­ÖÆüßÓ •ÖÖ Ã֍úŸÖÖ
£ÖÖ µÖÖ ¤æü¸ü ­ÖÆüà ׍úµÖÖ •ÖÖ Ã֍úŸÖÖ £ÖÖ…
›üß) וÖÃ֍êú ×»Ö‹ ïÖ™üŸÖµÖÖ ×úÃÖß ¤æüÃÖ¸üß ¯ÖÖ™üá úÖê ¤üÖêÂÖß ­ÖÆüà ´ÖÖ­ÖÖ •ÖÖ Ã֍úŸÖÖ…
ˆ¯ÖµÖãÔŒŸÖ (‹) ÃÖê (›üß) ŸÖú úß ¿ÖŸÖí ¯Öæ¸üß ÆüÖê­Öê úß ÛãÖ×ŸÖ ´Öë †¯Ö׸üÆüÖµÖÔŸÖÖ ´Öë ×­Ö´­Ö×»Ö׏֟Ö
‘Ö™ü­ÖÖ†Öë µÖÖ ¯Ö׸üÛãÖןֵÖÖë úÖê ¿ÖÖ×´Ö»Ö ×úµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü ¯Ö¸ÓüŸÖã µÖÆü ´ÖÖ¡Ö ‡­Æüà ŸÖú ÃÖß×´ÖŸÖ ­ÖÆüà
Æîü :
i. µÖã¨ü, †ÖÎú´ÖÖ (µÖã¨ü ‘ÖÖê×ÂÖŸÖ ×úµÖÖ ÖµÖÖ ÆüÖê µÖÖ ­Ö ׍úµÖÖ ÖµÖÖ ÆüÖê), “ÖœÍüÖ‡Ô, ×¾Ö¤êü¿Öß
¿Ö¡Öã†Öë «üÖ¸üÖ ×úµÖÖ •ÖÖ­Öê ¾ÖÖ»ÖÖ éúŸµÖ…
ii. ×¾Ö¦üÖêÆü, †ÖŸÖӍú¾ÖÖ¤ü, ÎúÖÓןÖ, ×¾Ö‘Ö™ü­ÖúÖ¸üß úÖ¸Ôü¾ÖÖ‡Ô, ÃÖî׭֍ú µÖÖ ÃÖ¢ÖÖ Æü×£ÖµÖÖ­ÖÖ, µÖÖ
ÖéÆüµÖã¨ü…
iii. ¤ÓüÖÖ, ÃÖӁÖÖê³Ö, †¸ü֕֍úŸÖÖ, Æü›ÍüŸÖÖ»Ö µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úִ֐ÖÖ¸üÖë êú †»ÖÖ¾ÖÖ †­µÖ
»ÖÖêÖÖë «üÖ¸üÖ ŸÖÖ»Öê²ÖÓ¤üß…
iv. µÖã¨ü ÃÖִ֐ÖÏß, ×¾ÖñúÖê™üú ÃÖִ֐ÖÏß, †ÖµÖ­Öߍú¸üÖ ×¾Ö׍ú¸üÖ µÖÖ ¸êü×›üµÖÖê ÃÖ׍ÎúµÖŸÖÖ «üÖ¸üÖ
ÃÖÓ¤æüÂ֝Ö, ×ÃÖ¾ÖÖµÖ ŸÖ²Ö •Ö²Ö׍ú ‹êÃÖß µÖã¨ü ÃÖִ֐ÖÏß, ×¾ÖñúÖê™üú, ×¾Ö׍ú¸üÖ µÖÖ ¸êü×›üµÖÖê
ÃÖ׍ÎúµÖŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úÖ¸üÖ ÆüÖê…
v. ¯ÖÏ֍éúן֍ú †Ö¯Ö¤üÖ‹Ó •ÖîÃÖê ³ÖæÓú¯Ö, ŸÖæ±úÖ­Ö, “֍Îú¾ÖÖŸÖ, ÃÖã­ÖÖ´Öß µÖÖ •¾ÖÖ»ÖÖ´ÖãÖß
ÖןÖ×¾Ö׬ֵÖÖÓ…
16.2 †¯Ö׸üÆüÖµÖÔŸÖÖ êú ¯Ö׸üÖÖ´Ö
16.2.1 µÖפü †¯Ö׸üÆüÖµÖÔŸÖÖ êú úÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú †¬Öß­Ö †¯Ö­Öê ¯ÖÏ´ÖãÖ úÖµÖÖí êú
×­Ö¾ÖÔÆü­Ö ´Öë ²ÖÖ¬ÖÖ ¯ÖÓÆãü“ÖŸÖß Æîü †Öî¸ü ˆÃÖê ‹êÃÖß †¯Ö׸üÆüÖµÖÔŸÖÖ êú úÖ¸üÖ ×¾Ö»ÖÓ²Ö †Öî¸ü/†£Ö¾ÖÖ ¬Ö­Ö ¾µÖµÖ
ÆüÖêŸÖÖ Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­Ö´­Ö×»Ö×ÖŸÖ úÖ Æüú¤üÖ¸ü ´ÖÖ­ÖÖ •ÖÖ Ã֍úŸÖÖ Æîü :
(‹) µÖפü ˆ¯Ö-Ö›ü 7.6 (úÖµÖÔ¯ÖæÖÔŸÖÖ ÃÖ´ÖµÖ úÖ ×¾ÖßÖÖ¸ü) êú †¬Öß­Ö úÖµÖÔ¯ÖæÖÔŸÖÖ ×¾Ö»ÖÓ×²ÖŸÖ ÆüÖêŸÖß Æîü
µÖÖ ×¾Ö»ÖÓ×²ÖŸÖ ÆüÖê­Öê ¾ÖÖ»Öß ÆüÖê ŸÖÖê ‹êÃÖê ×¾Ö»ÖÓ²Ö êú ×»Ö‹ ÃÖ´ÖµÖ úÖ ×¾ÖßÖÖ¸ü †Öî¸ü

56

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(b) if the event or circumstance is of the kind described in sub-paragraphs (a)
to (d) of Sub-Clause 16.1 [Definition of Force Majeure] and, in the case of
sub-paragraphs (i) to (v), occurs in the Country, payment of any such costs
of rectifying or replacing the Works and/or Goods damaged or destructed
by Force Majeure, to the extent they are not indemnified through the
insurance policy referred to in Clause15 [Insurance].
16.2.2 The Contractor shall, as may be directed in writing by the Engineer-
in-Charge, remove from the Site any debris and so much of the
Works as shall have been damaged, taking to the Corporation's
store such Corporation's T&P, articles and/ or materials as may be
directed.
16.3 Duty to Minimise Delay
16.3.1 The Contractor shall, as may be directed in writing by the Engineer-
in-Charge, proceed with the erection and completion of the Works
under and in accordance with the provisions and conditions of the
Contract.
16.3.2 Each Party shall at all times use all reasonable endeavours to
minimise any delay in the executing of the Contract as a result of
Force Majeure. A Party shall give notice to the other Party when it
ceases to be affected by the Force Majeure.
17 CLAIMS, DISPUTES AND ARBITRATION
17.1 Contractor’s Claims
17.1.1 The Contractor may be granted extension of time and
compensation under the following delay events, for the portion of
delay attributable to Corporation :
(a) if the Contractor suffers delay as a result of failure by the Corporation to
give right or possession of site as per the sub-clause 2.1(Possession of site),
(b) if the Contractor suffers delay from executing the work due to error or
incorrect data furnished by the Engineer-in-charge, as per the clause 4.6
(Setting out the work)
(c) if there is a substantial delay in issue of drawings by the Corporation and
affects the progress of work.
(d) if there is a substantial delay in issue of material agreed as per the contract
to be supplied by Corporation and affects the progress of work
17.1.2 The contractor shall be eligible, based on reported and agreed delays
attributable to the corporation, to extension of time for the full delay
subject to the provisions of Sub-Clause 7.6 [Extension of Time for
Completion] and in addition for Compensation for the same period which
would be mutually agreed based on the initiation made by the Contractor
with proper supporting documents. The Contractor shall serve an notice for
claim within 90 days after the Contractor became aware, should have
become aware, of the event or circumstance, as stated under (a) to (d)
above. The settlement of the claims shall be made at the end of the
completion of contract.

57

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(²Öß) µÖפü ‘Ö™ü­ÖÖ µÖÖ ¯Ö׸ü׸ü£ÖןֵÖÖÓ ˆ¯Ö-Ö›ü 16.1 (†¯Ö׸üÆüÖµÖÔŸÖÖ úß ¯Ö׸ü³ÖÖÂÖÖ) êú ˆ¯Ö ¯Öî¸üÖ (‹) ÃÖê
(›üß) êú ¾ÖÖÔ­Ö êú ¯ÖύúÖ¸ü úß ÆüÖë †Öî¸ü ¤êü¿Ö ´Öë ˆ¯Ö ¯Öî¸ü֐ÖÏÖ±ú (i) ÃÖê (v) úß ÛãÖ×ŸÖ ÆüÖê ŸÖÖê úÖµÖÖí
úÖê ¤ãü¹ýÃŸÖ ú¸ü­Öê ¾Ö Ã£ÖÖ­ÖÖ¯Ö®Ö ú¸ü­Öê ´Öë †Ö­Öê ¾ÖÖ»Öê Ö“ÖÔ †Öî¸ü/µÖÖ †¯Ö׸üÆüÖµÖÔŸÖÖ êú úÖ¸üÖ
Öן֐ÖÏÃŸÖ µÖÖ ­Ö™ü ¾ÖßÖã†Öë úê ´Öæ»µÖ úÖ, וÖÃÖ ÃÖß´ÖÖ ŸÖú Ö›ü 15 (²Öß´ÖÖ) ´Öë ÃÖÓ¤üÙ³ÖŸÖ ²Öß´ÖÖ
¯ÖÖò×»ÖÃÖß «üÖ¸üÖ Öן֯ÖæŸÖÔ ­Ö ׍úµÖÖ •ÖÖ ¸üÆüÖ ÆüÖ,ê ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ‹ÖÖ…
16.2.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ×»Ö×ÖŸÖ ×­Ö¤ìü¿ÖÖ­ÖãÃÖÖ¸ü úÖµÖÔÃ£Ö»Ö ÃÖê ´Ö»Ö²ÖÖ Æü™ü֋ӐÖê †Öî¸ü úÖµÖÔ
úÖ Öן֐ÖÏÃŸÖ ³ÖÖÖ •ÖîÃÖê ׍ú ×­ÖÖ´Ö úß Öן֐ÖÏÃŸÖ ™üß‹›ü¯Öß, ¾ÖßÖã‹Ó †Öî¸ü/µÖÖ ÃÖִ֐ÖÏß úÖê
×­Ö¤ìü¿ÖÖ­ÖãÃÖÖ¸ü ×­ÖÖ´Ö êú ³ÖÓ›üÖ¸ü ŸÖú ¯ÖÓÆãü“Ö֋ӐÖê …
16.3 ­µÖæ­ÖŸÖ´Ö ×¾Ö»ÖÓ²Ö úÖ ¤üÖ×µÖŸ¾Ö
16.3.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ×»Ö×ÖŸÖ ×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü ÃÖÓ×¾Ö¤üÖ êú †¬Öß­Ö ¾Ö ‡Ã֍êú
¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë ¾Ö ¿ÖŸÖÖí êú †­Öãºþ¯Ö úÖµÖÔ úÖ Ã£ÖÖ¯Ö­Ö ¾Ö ¯ÖæÖÔ ú¸ëüÖê…
16.3.2 ÃÖ³Öß ¯ÖÖÖë úÖê ÃÖ¤îü¾Ö †¯Ö׸üÆüÖµÖÔ úÖ¸üÖÖë ÃÖê ÆüÖê­Öê ¾ÖÖ»Öê ×¾Ö»ÖÓ²Ö úÖê ­µÖæ­ÖŸÖ´Ö ú¸ü­Öê êú ×»Ö‹ ÃÖ³Öß
†Öîד֟µÖ¯ÖæÖÔ ¯ÖϵÖÖÃÖ ú¸ü­Öê ÆüÖëÖê… •Ö²Ö ׍úÃÖß ³Öß ¯ÖÖ ¯Ö¸ü †¯Ö׸üÆüÖµÖÔ úÖ¸üÖÖë úÖ ¯ÖϳÖÖ¾Ö ÖŸ´Ö ÆüÖê
•ÖÖ‹ ŸÖÖê ˆÃÖê †­µÖ ¯ÖÖ úÖê ÃÖæ×“ÖŸÖ ú¸ü­ÖÖ ÆüÖêÖÖ…
17. ¤üÖ¾ÖÖ, ×¾Ö¾ÖÖ¤ü †Öî¸ü ´ÖÖ¬µÖã֟ÖÖ
17.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ¤üÖ¾ÖÖ
17.1.1 ×­ÖÖ´Ö êú úÖ¸üÖ Æãü‡Ô ×­Ö´­Ö×»Ö×ÖŸÖ ×¾Ö»ÖӲ֍úÖ¸üß ‘Ö™ü­ÖÖ†Öë êú †Ö¬ÖÖ¸ü ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖ´ÖµÖ
úÖ ×¾ÖßÖÖ¸ü þÖߍéúŸÖ ׍úµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü ¾Ö Öן֯ÖæÙŸÖ úß •ÖÖ Ã֍úŸÖß Æîü…
(‹) µÖפü ×¾Ö»ÖÓ²Ö ˆ¯ÖÖ›ü 2.1(úÖµÖÔÃ£Ö»Ö úÖ ú²•ÖÖ) úê †­ÖãÃÖÖ¸ü ×­ÖÖ´Ö êú ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê
úÖµÖÔÃ£Ö»Ö úÖ †×¬ÖúÖ¸ü µÖÖ ú²•ÖÖ ¤êü­Öê ´Öë †ÃÖ±ú»Ö ¸üÆü­Öê êú úÖ¸üÖ ÆüÖêŸÖÖ Æîü…
(²Öß) µÖפü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ˆ¯ÖÖ›ü 4.6(úÖµÖÔ úÖ ¯ÖÏÖ¸Óü³Ö) úê †­ÖãÃÖÖ¸ü ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ Ö‹
†ÖӍú›ÍüÖë ´Öê ³Öæ»Ö µÖÖ Ö»ÖŸÖß êú úÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê úÖµÖÔ úÖ ×­Ö¯ÖÖ¤ü­Ö ú¸ü­Öê ´Öë ×¾Ö»ÖÓ²Ö ÆüÖêŸÖÖ
Æîü…
(ÃÖß) µÖפü ×­ÖÖ´Ö «üÖ¸üÖ ¸êüÖÖ×“Ö¡Ö ˆ¯Ö»Ö²¬Ö ú¸ü¾ÖÖ­Öê ´Öë ¯ÖµÖÖÔ¯ŸÖ ×¾Ö»ÖÓ²Ö ÆüÖêŸÖÖ Æîü †Öî¸ü úÖµÖÔ úß ¯ÖϐÖןÖ
¯ÖϳÖÖ×¾ÖŸÖ ÆüÖêŸÖß ÆüÖê…
(›üß) µÖפü ÃÖÓ×¾Ö¤üÖ êú †­ÖãÃÖÖ¸ü ÃÖÆü´ÖŸÖ úß Ö‡Ô ÃÖִ֐ÖÏß úÖê •ÖÖ¸üß ú¸ü­Öê ´Öë ×­ÖÖ´Ö «üÖ¸üÖ ×¾Ö»ÖÓ²Ö ×úµÖÖ
•ÖÖŸÖÖ Æîü †Öî¸ü ‡ÃÖÃÖê úÖµÖÔ úß ¯ÖϐÖ×ŸÖ ¯ÖϳÖÖ×¾ÖŸÖ ÆüÖêŸÖß ÆüÖê…
17.1.2 ׸ü¯ÖÖê™Ôü ׍ú‹ Ö‹ †Öî¸ü ÃÖÆü´ÖŸÖ ׍ú‹ Ö‹ ×­ÖÖ´Ö êú úÖ¸üÖ Æãü‹ ×¾Ö»ÖÓ²Ö êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯Öæ¸êü
×¾Ö»ÖÓ²Ö êú ÃÖ´ÖµÖ êú ×¾ÖßÖÖ¸ü úÖ ˆ¯ÖÖ›ü 7.6 (úÖµÖÔ¯ÖæÖÔŸÖÖ êú ×»Ö‹ ÃÖ´ÖµÖ ×¾ÖßÖÖ¸ü) êú
×¾ÖÂÖµÖÖ¬Öß­Ö Æüú¤üÖ¸ü ÆüÖêÖÖ †Öî¸ü ‡Ã֍êú ÃÖÖ£Ö Æüß ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖµÖÖÔ¯ŸÖ ¤üßÖÖ¾Öê•Öß ÃÖցµÖ ¯ÖÏßÖãŸÖ
׍ú‹ •ÖÖ­Öê ¯Ö¸ü ‡ÃÖ †¾Ö×¬Ö êú ×»Ö‹ ¤üÖê­ÖÖë ¯ÖÖÖë «üÖ¸üÖ †Ö¯ÖÃÖß ÃÖÆü´Ö×ŸÖ êú †Ö¬ÖÖ¸ü ¯Ö¸ü ŸÖµÖ
Öן֯ÖæÙŸÖ úÖ ³Öß Æüú¤üÖ¸ü ÆüÖêÖÖ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ˆ¯ÖµÖãÔŒŸÖ (‹) ÃÖê (›üß) ´Öë ¾ÖÙÖŸÖ ‘Ö™ü­ÖÖ†Öë µÖÖ
¯Ö׸üÛãÖןֵÖÖë êú ²ÖÖ¸êü ´Öë –ÖÖŸÖ ÆüÖê­Öê ¯Ö¸ü, וÖÃÖ ÃÖ´ÖµÖ ŸÖú –ÖÖŸÖ ÆüÖê •ÖÖ­ÖÖ “ÖÖ×Æü‹ £ÖÖ, êú ²ÖÖ¤ü ÃÖê
90 פü­ÖÖë êú ³Öߟָü †¯Ö­Öê ¤üÖ¾Öê úÖ ­ÖÖê×™üÃÖ ¤ëüÖê… ‡­Ö ¤üÖ¾ÖÖë úÖ ×­Ö¯Ö™üÖ­Ö ÃÖÓ×¾Ö¤üÖ úß ÃÖ´ÖÖÛ¯ŸÖ êú
ÃÖ´ÖµÖ ×úµÖÖ •ÖÖ‹ÖÖ…

57

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
17.1.3 If the Contractor fails to give notice of a claim within period of 90 days, the
Contractor shall not be eligible to additional payment, and the
Corporation shall be discharged from all liability in connection with the
claim. Otherwise, the following provisions of this Sub-Clause shall apply.
17.1.4 The Contractor shall keep such contemporary records as may be
necessary to substantiate any claim, either on the Site or at another
location acceptable to the Engineer. Without admitting the Corporation’s
liability, the Engineer-in-charge may, after receiving any notice under this
sub-clause, monitor the record-keeping and/or instruct the Contractor to
keep further contemporary records. The Contractor shall permit the
Engineer-in-charge to inspect all these records, and shall (if instructed)
submit copies to the Engineer-in-charge.
17.1.5 Within 15 days after the Contractor gives notice, or within such other
period as may be proposed by the Contractor and approved by the
Engineer-in-charge, the Contractor shall send to the Engineer-in-charge a
fully detailed claim which includes full supporting particulars of the basis of
the claim. If the event or circumstance giving rise to the claim has a
continuing effect:
(a) this claim shall be considered as interim;
(b) the Contractor shall send further interim claims at monthly intervals, giving
the accumulated delay and/or amount claimed, and such further
particulars as the Engineer-in-charge may reasonably require; and
(c) the Contractor shall send a final claim within 30 days after the end of the
effects resulting from the event or circumstance, or within such other
period as may be proposed by the Contractor and approved by the
Engineer-in-charge.
The Engineer-in-charge shall examine and accumulate all claims received
under this clause, for settlement of the claim immediately after the close of
the contract.
In case Contractor, at the end of the contract, has dispute over the claim
admitted by the Engineer-in-charge he may consider that the claim is
rejected by the Engineer and any of the Parties may refer it to the Dispute
Board in accordance with Sub-Clause 17.4 [Obtaining Dispute Resolution
Board’s Decision].
17.2 Dispute Resolution
17.2.1 Disputes if not resolved at the level of Engineer-in-charge, will be referred
to a committee appointed by the CMD, NPCIL, before the matter is
referred to Dispute Resolution Board.
17.3 Appointment of the Dispute Resolution Board
17.3.1 The present sub-clause 17.3 and the forth coming sub-clauses 17.4, 17.5,
17.6 and 17.7 relating to appointment of dispute resolution board,
obtaining Dispute resolution Board’s decision, amicable settlement, Failure
to comply to with Dispute resolution Board’s decision and expiry of Dispute
resolution board’s appointment shall not be applicable in respect of a
58

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
17.1.3 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü 90 פü­ÖÖë úß †¾Ö×¬Ö êú ³Öߟָü †¯Ö­Öê ¤üÖ¾Öê úÖ ­ÖÖê×™üÃÖ ¤êü­Öê ´Öë †ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü ŸÖÖê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ׍úÃÖß ³Öß ¯ÖύúÖ¸ü êú †×ŸÖ׸üŒŸÖ ³ÖãÖŸÖÖ­Ö úÖ Æüú¤üÖ¸ü ­ÖÆüà ÆüÖêÖÖ †Öî¸ü ×­ÖÖ´Ö ‡ÃÖ ¤üÖ¾Öê ÃÖê
ÃÖÓ²ÖÓ×¬ÖŸÖ ¯ÖÏŸµÖêú ²ÖÖ¬µÖŸÖÖ ÃÖê ´ÖãŒŸÖ ÆüÖêÖÖ… †­µÖ£ÖÖ ˆ¯ÖÖ›ü êú ×­Ö´­Ö×»Ö×ÖŸÖ ¯ÖÏÖ¾Ö¬ÖÖ­Ö »Ö֐Öæ ÆüÖê •Ö֋ӐÖê…
17.1.4 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¤üÖ¾Öê ¯Ö㏟ÖÖ ú¸ü­Öê êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖ³Öß ŸÖŸúÖ»Öß­Ö ×¸üúÖ›üÖí úÖê µÖÖ ŸÖÖê úÖµÖÔÃ£Ö»Ö ¯Ö¸ü
†£Ö¾ÖÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê þÖߍúÖµÖÔ Ã£ÖÖ­Ö ¯Ö¸ü ÃÖã¸ü×ÖŸÖ ¸üÖêÖÖ… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ, ×­ÖÖ´Ö úß ²ÖÖ¬µÖŸÖÖ
úÖê þÖߍúÖ¸ü ׍ú‹ ²ÖÖî¸ü ‡ÃÖ ˆ¯ÖÖ›ü êú †ÓŸÖÖÔŸÖ ×úÃÖß ­ÖÖê×™üÃÖ êú ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ¯Ö¸ü ‡­Ö ׸üúÖ›üÖí êú ¸üÖ-
¸üÖÖ¾Ö úÖ ´ÖÖò­Öß™ü¸ü­Ö ú¸ëüÖê †Öî¸ü/†£Ö¾ÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †Öî¸ü ³Öß ŸÖŸúÖ»Öß­Ö ×¸üúÖ›Ôü ¸üÖ­Öê êú ×­Ö¤ìü¿Ö
¤ëüÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ‡­Ö ÃÖ³Öß ×¸üúÖ›üÖí úê ×­Ö¸üßÖÖ úß †­Öã´Ö×ŸÖ ¤ëüÖê †Öî¸ü ‡­Öúß
¯ÖÏןֵÖÖÓ (µÖפü ×­Ö¤ìü¿Ö פü‹ •ÖÖ‹Ó) ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ¯ÖÏßÖãŸÖ ú¸ëüÖê…
17.1.5 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ­ÖÖê×™üÃÖ ×¤ü‹ •ÖÖ­Öê êú 15 פü­ÖÖë µÖÖ •ÖÖê ³Öß ÃÖ´ÖµÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖÏßÖÖ×¾ÖŸÖ †Öî¸ü
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ׍úµÖÖ •ÖÖ‹, êú ³Öߟָü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ‹ú ×¾ÖßÖéŸÖ
¤üÖ¾ÖÖ ³Öê•ÖëÖê וÖÃÖ´Öë ¤üÖ¾Öê êú †Ö¬ÖÖ¸ü úÖê ¯ÖæÖÔ ÃÖ´Ö£ÖÔ­Ö ¤êü­Öê ¾ÖÖ»Öê ÃÖ³Öß ×¾Ö¾Ö¸üÖ ÆüÖëÖê… µÖפü ¤üÖ¾ÖÖ ×ú‹
•ÖÖ­Öê ¾ÖÖ»Öß ‘Ö™ü­ÖÖ‹Ó µÖÖ ¯Ö׸üÛãÖןֵÖÖÓ †ÖÖê ³Öß •ÖÖ¸üß ¸üÆüŸÖß Æïü ŸÖÖê :
(‹) ‡ÃÖ ¤üÖ¾Öê úÖê †ÓŸÖ׸ü´Ö ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ;
(²Öß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü †Ö»Öê †ÓŸÖ׸ü´Ö ¤üÖ¾ÖÖë úÖê ‹ú-‹ú ´ÖÖÆü êú †ÓŸÖ¸üÖ»Ö ÃÖê ³Öê•ÖŸÖÖ ¸üÆêüÖÖ ×•ÖÃÖ´Öë ÃÖÓ×“ÖŸÖ ×¾Ö»ÖÓ²Ö
†Öî¸ü/†£Ö¾ÖÖ ¤üÖ¾ÖÖ úß Ö‡Ô ¬Ö­Ö¸üÖ×¿Ö †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ´ÖÖӐÖÖ ÖµÖÖ †­µÖ úÖê‡Ô †Öîד֟µÖ¯ÖæÖÔ
×¾Ö¾Ö¸üÖúפüµÖÖ •ÖÖ‹ÖÖ; †Öî¸ü
(ÃÖß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡­Ö ‘Ö™ü­ÖÖ†Öë µÖÖ ¯Ö׸üÛãÖןֵÖÖë úÖ ¯ÖϳÖÖ¾Ö ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê êú 30 פü­ÖÖë µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ
¯ÖÏßÖÖ×¾ÖŸÖ †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ‹êÃÖß ×úÃÖß †¾Ö×¬Ö êú ³Öߟָü ‹ú †Ó×ŸÖ´Ö ¤üÖ¾ÖÖ
¯ÖÏßÖãŸÖ ú¸ëüÖê…
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ‡ÃÖ Ö›ü êú †ÓŸÖÖÔŸÖ ¯ÖÏÖ¯ŸÖ ÃÖ³Öß ¤üÖ¾ÖÖë úÖ ÃÖÓ×¾Ö¤üÖ úß ÃÖ´ÖÖÛ¯ŸÖ êú ŸÖŸúÖ»Ö ²ÖÖ¤ü
×­Ö¯Ö™üÖ­Ö ú¸ü­Öê êú ×»Ö‹ ×­Ö¸üßÖÖ ú¸ëüÖê †Öî¸ü ˆ­Æëü ‹ú×¡ÖŸÖ ú¸ëüÖê…
µÖפü ÃÖÓ×¾Ö¤üÖ úß ÃÖ´ÖÖÛ¯ŸÖ êú ²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ Ã¾ÖߍúÖ¸ü ׍ú‹ Ö‹ ¤üÖ¾ÖÖë êú
ÃÖÓ²ÖÓ¬Ö ´Öë úÖê‡Ô ×¾Ö¾ÖÖ¤ü Æîü ŸÖÖê ¾ÖÆü ‡ÃÖ ¤üÖ¾Öê úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×­Ö¸üÃŸÖ ×úµÖÖ ÖµÖÖ ´ÖÖ­Ö Ã֍úŸÖê Æïü
†Öî¸ü ¤üÖê­ÖÖë ´Öë ÃÖê úÖê‡Ô ³Öß ¯ÖÖ ‡ÃÖê ˆ¯Ö Ö›ü 17.4 (×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úÖ ×­ÖÖÔµÖ ¯ÖÏÖ¯ŸÖ ú¸ü­ÖÖ) êú
†­ÖãÃÖÖ¸ü ×¾Ö¾ÖÖ¤ü ²ÖÖê›Ôü êú ¯ÖÖÃÖ ³Öê•Ö Ã֍úŸÖÖ Æîü…
17.2 ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö
17.2.1 µÖפü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ßָü ÃÖê ׍úÃÖß ×¾Ö¾ÖÖ¤ü úÖ ÃÖ´ÖÖ¬ÖÖ­Ö ­ÖÆüà ÆüÖêŸÖÖ Æîü ŸÖÖê ´ÖÖ´Ö»Öê úÖê ×¾Ö¾ÖÖ¤ü
ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü êú ¯ÖÖÃÖ ÃÖÓ¤üÙ³ÖŸÖ ×ú‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê †¬µÖÖ ‹¾ÖÓ ¯ÖϲÖÓ¬Ö ×­Ö¤êü¿Öú,
‹­Ö¯ÖßÃÖ߆ևԋ»Ö «üÖ¸üÖ ×­ÖµÖãŒŸÖ ‹ú ÃÖ×´Ö×ŸÖ êú ¯ÖÖÃÖ ³Öê•ÖÖ •ÖÖ‹ÖÖ…
17.3 ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úß ×­ÖµÖãÛŒŸÖ
17.3.1 µÖפü ÃÖÓ×¾Ö¤üÖ †¾ÖÖ›Ôü ׍ú‹ •ÖÖ­Öê êú ÃÖ´ÖµÖ ÃÖÓ×¾Ö¤üÖ úÖ ´Öæ»µÖ 100 ú¸üÖê›Íü ¹ý¯ÖµÖÖë ÃÖê ú´Ö ÆüÖê ŸÖÖê
×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úß ×­ÖµÖãÛŒŸÖ, ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úÖ ×­ÖÖÔµÖ ´ÖÖӐ֭ÖÖ, ÃÖÖîÆüÖ¤Ôü¯ÖæÖÔ
ÃÖ´Ö—ÖÖîŸÖÖ, ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü êú ׭֝ÖÔµÖ êú †­Öã¯ÖÖ»Ö­Ö ´Öë †ÃÖ±ú»Ö ¸üÆü­ÖÖ †Öî¸ü ×¾Ö¾ÖÖ¤ü
ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úß ÃÖ´ÖÖÛ¯ŸÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ µÖÆü ˆ¯Ö Ö›ü 17.3 †Öî¸ü †ÖÖê †Ö­Öê ¾ÖÖ»Öê ˆ¯Ö Ö›ü
17.4, 17.5, 17.6 ŸÖ£ÖÖ 17.7 »Ö֐Öæ ­ÖÆüà ÆüÖëÖê… ‡ÃÖ ÃÖÓ²ÖÓ¬Ö ´Öë µÖפü ׍úÃÖß ¯ÖύúÖ¸ü úÖ ÃÖÓ¤êüÆü ÆüÖê ŸÖÖê
ˆÃÖê ¤æü¸ü ú¸ü­Öê êú ×»Ö‹ ‘ÖÖê×ÂÖŸÖ ×úµÖÖ •ÖÖŸÖÖ Æîü ׍ú 100 ú¸üÖê›Íü ¹ý¯ÖµÖÖë ÃÖê †×¬Öú ´Öæ»µÖ ¾ÖÖ»Öß
ÃÖÓ×¾Ö¤üÖ†Öë êú ×»Ö‹ Ö›ü 17.3 ÃÖê »Öêú¸ü 17.7 »Ö֐Öæ ÆüÖëÖê… ˆ­Ö ´ÖÖ´Ö»ÖÖë ´Öë •ÖÆüÖÓ ÃÖÓ×¾Ö¤üÖ úÖ
58

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
contract having the total value of less than Rs. 100 Crores at the time of
award of contract. With a view to clarify the doubt, if any, it is declared
that clause 17.3 to 17.7 shall be applicable in respect of the contract
having value more than Rs. 100 Crores. In such cases, where the value of
the contract is less than Rs. 100 Crores, the disputes, differences shall be
settled and decided in accordance with clause 17.8 of this General
Conditions of Contract.
17.3.2 If a dispute (of any kind whatsoever) arises between the Parties in
connection with, or arising out of, the Contract or the execution of the
Works, including any dispute as to any certificate, determination,
instruction, opinion or valuation by the Engineer-in-charge, either Party
may refer the dispute in writing to the Dispute resolution board for its
decision, with copies to the other Party.
17.3.3 The Dispute Resolution Board (DRB) shall be established by signature of the
Dispute Resolution Board Agreement (“the Board Agreement”) which shall
be made effective from the same time as the signature of the Contract
Agreement.
17.3.4 The Board shall comprise three Members experienced in the type of work
involved and in the interpretation of document. One Member shall be
selected by each of the Corporation and the Contractor and approved
by the other.
17.3.5 The third Member shall be selected by the other two and approved by the
parties. The third Member shall serve as Chairman of the Board.
17.3.6 The terms of the remuneration of each of the three members, including the
remuneration of any expert whom the Dispute Resolution Board consults,
shall be mutually agreed upon by the Parties when agreeing the terms of
appointment of the member or such expert (as the case may be). Each
Party shall be responsible for paying one-half of this remuneration.
17.3.7 In the event of death, disability, or resignation of any Member, such
Member shall be replaced in the same manner as the Member being
replaced was selected. If for whatever other reason a Member shall fail or
be unable to serve, the Chairman (or failing the action of the Chairman
then either of other Members) shall inform the parties and such non- serving
Member shall be replaced in the same manner as the Member being
replaced was selected. Replacement shall be considered complete when
the new Member signs the Board Agreement. Throughout any
replacement process the Members not being replaced shall continue to
serve and the Board shall continue to function and its activities shall have
the same force and effects as if the vacancy had not occurred.
17.4 Obtaining Dispute Resolution Board’s Decision
17.4.1 The DRB shall be deemed to have received any reference on the
date when it is received by the chairman of the DRB.
17.4.2 Both Parties shall promptly make available to the DRB all such
additional information, further access to the Site, and appropriate
facilities, as the DRB may require for the purposes of making a
decision on such dispute. The DRB shall be deemed to be not acting
as arbitrator(s).
17.4.3 If the Dispute Resolution Board has given its decision as to a matter in
59

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
´Öæ»µÖ 100 ú¸üÖê›Íü ¹ý¯ÖµÖÖë ÃÖê ú´Ö Æîü, ×¾Ö¾ÖÖ¤ü, ׳֮֟ÖÖ†Öë úÖê ÃÖÓ×¾Ö¤üÖ úß ‡­Ö ÃÖÖ´ÖÖ­µÖ ¿ÖŸÖÖí êú Ö›ü 17.8 êú
†­Öãºþ¯Ö ׭֝ÖáŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
17.3.2 µÖפü ¯ÖÖÖë êú ²Öß“Ö, ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ׍úÃÖß ¯ÖÏ´Ö֝֯֡Ö, ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ, ×­Ö¤ìü¿Ö, ¸üÖµÖ µÖÖ ´Ö滵ÖÖӍú­Ö
ÃÖ×ÆüŸÖ ÃÖÓ×¾Ö¤üÖ úÖ µÖÖ úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö ÃÖÓ²ÖÓ¬Öß úÖê‡Ô ×¾Ö¾ÖÖ¤ü (“ÖÖÆêü ׍úÃÖß ³Öß ¯ÖύúÖ¸ü úÖ ÆüÖ)ê ÆüÖê ŸÖÖê ¤üÖê­ÖÖë
´ÖêÓ ÃÖê úÖê‡Ô ³Öß ¯ÖÖ ‡ÃÖ ×¾Ö¾ÖÖ¤ü úÖ ×­ÖÖÔµÖ ú¸üÖ­Öê êú ×»Ö‹ ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úÖê ×»Ö×ÖŸÖ ºþ¯Ö ´ÖêÓ
ÃÖæ“Ö­ÖÖ ¤êüú¸ü ÃÖÓ¤üÙ³ÖŸÖ ú¸ü Ã֍úŸÖÖ Æîü †Öî¸ü ‡Ã֍úß ¯ÖÏ×ŸÖ †­µÖ ¯ÖÖ úÖê ³Öß ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •ÖÖ‹Öß…
17.3.3 ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü (›ü߆ָü²Öß) úÖ Öšü­Ö ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü ú¸üÖ¸ ü("²ÖÖê›Ôü ú¸üÖ¸ü") ¯Ö¸ü ÆüßÖցָü
êú ÃÖÖ£Ö ×úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü µÖÆü ÃÖÓ×¾Ö¤üÖ ú¸üÖ¸ü ¯Ö¸ü ÆüßÖցָü ׍ú‹ •ÖÖ­Öê êú ÃÖÖ£Ö Æüß ¯ÖϳÖÖ¾Öß ÆüÖê •ÖÖ‹ÖÖ…
17.3.4 ²ÖÖê›Ôü ÃÖ´ÖÖ­Ö ¯ÖύúÖ¸ü êú úÖµÖÖí ¾Ö ¤üßÖÖ¾Öê•ÖÖë úê †£ÖԐÖÏÆüÖ ´Öë †­Öã³Ö¾Ö ¸üÖ­Öê ¾ÖÖ»Öê ŸÖß­Ö ÃÖ¤üõÖÖêÓ úÖ ÆüÖêÖÖ…
×­ÖÖ´Ö ¾Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ‹ú-‹ú ÃÖ¤üÃµÖ úÖ “ÖµÖ­Ö ‹ú-¤æüÃÖ¸êü êú †­Öã´ÖÖê¤ü­Ö ÃÖê ׍úµÖÖ •ÖÖ‹ÖÖ…
17.3.5 ŸÖßÃÖ¸êü ÃÖ¤üÃµÖ úÖ “ÖµÖ­Ö ‡­Ö ¤üÖê ÃÖ¤üõÖÖë «üÖ¸üÖ †Öî¸ü ˆÃ֍úÖ †­Öã´ÖÖê¤ü­Ö ‡­Ö ¯ÖÖÖë «üÖ¸üÖ ×úµÖÖ •ÖÖ‹ÖÖ…
ŸÖßÃÖ¸üÖ ÃÖ¤üÃµÖ ²ÖÖê›Ôü êú †¬µÖÖ êú ºþ¯Ö ´Öë úÖµÖÔ ú¸êüÖÖ…
17.3.6 ‡­Ö ŸÖß­ÖÖë ÃÖ¤üõÖÖë ´Öë ÃÖê ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü «üÖ¸üÖ ¯Ö¸üÖ´Ö¿ÖÔ êú ×»Ö‹ ²Öã»ÖÖ‹ Ö‹ ׍úÃÖß †­µÖ ×¾Ö¿ÖêÂÖ–Ö
ÃÖ×ÆüŸÖ ¯ÖÏŸµÖêú ÃÖ¤üÃµÖ úÖ ¯ÖÖ׸üÁÖ״֍ú ‹êÃÖê ÃÖ¤üõÖÖë µÖÖ ×¾Ö¿ÖêÂÖ–Ö (•ÖîÃÖÖ ³Öß ´ÖÖ´Ö»ÖÖ ÆüÖ)ê úß ×­ÖµÖãÛŒŸÖ úß
¿ÖŸÖÖí ¯Ö¸ü ÃÖÆü´Ö×ŸÖ ¤êüŸÖê ÃÖ´ÖµÖ Æüß ¯ÖÖÖë «üÖ¸üÖ †Ö¯ÖÃÖß ÃÖÆü´Ö×ŸÖ êú †Ö¬ÖÖ¸ü ¯Ö¸ü ŸÖµÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ¯ÖÏŸµÖêú
¯ÖÖ úÖê ‡ÃÖ ¯ÖÖ׸üÁÖ״֍ú úß †Ö¬Öß ¸üÖ×¿Ö úÖ ³ÖãÖŸÖÖ­Ö ú¸ü­ÖÖ ÆüÖêÖÖ…
17.3.7 ׍úÃÖß ÃÖ¤üÃµÖ úß ´Ö韵Öã, †¯ÖӐ֟ÖÖ µÖÖ ŸµÖÖÖ¯Ö¡Ö êú úÖ¸üÖ ˆÃÖ ÃÖ¤üÃµÖ êú ãÖÖ­ÖÖ¯Ö®Ö ÃÖ¤üÃµÖ úß ×­ÖµÖãÛŒŸÖ
ˆÃÖß ¯ÖύúÖ¸ü ÃÖê úß •ÖÖ‹Öß •ÖîÃÖê ˆÃÖ ÃÖ¤üÃµÖ úß ×­ÖµÖãÛŒŸÖ úß Ö‡Ô £Öß… µÖפü úÖê‡Ô ÃÖ¤üõÖ, “ÖÖÆêü ׍úÃÖß ³Öß
úÖ¸üÖ ÃÖê ÃÖê¾ÖÖ‹Ó ¤êü­Öê ´Öë †ÃÖ±ú»Ö µÖÖ †ÃÖ´Ö£ÖÔ ¸üÆüŸÖÖ Æîü ŸÖÖê †¬µÖÖ (†¬µÖÖ «üÖ¸üÖ ­Ö ׍ú‹ •ÖÖ­Öê ¯Ö¸ü ¤üÖê­ÖÖë
´Öë ÃÖê ׍úÃÖß ³Öß ÃÖ¤üÃµÖ «üÖ¸üÖ) ÃÖê¾ÖÖ‹Ó ­Ö ¯ÖϤüÖ­Ö ú¸ü­Öê ¾ÖÖ»Öê ‡ÃÖ ÃÖ¤üÃµÖ úß ¤üÖê­ÖÖë ¯ÖÖÖë úÖê ÃÖæ“Ö­ÖÖ ¤ëüÖê
†Öî¸ü ‡ÃÖ ÃÖ¤üÃµÖ êú ãÖÖ­ÖÖ¯Ö®Ö úÖ “ÖµÖ­Ö šüߍú ˆÃÖß ¯ÖύúÖ¸ü ÃÖê ׍úµÖÖ •ÖÖ‹ÖÖ ×•ÖÃÖ ¯ÖύúÖ¸ü ÃÖê ÃÖ¤üÃµÖ úÖ
“ÖµÖ­Ö ×úµÖÖ ÖµÖÖ £ÖÖ… ­Ö‹ ÃÖ¤üÃµÖ «üÖ¸üÖ ²ÖÖê›Ôü ú¸üÖ¸ü ¯Ö¸ü ÆüßÖցָ ׍ú‹ •ÖÖ­Öê êú ²ÖÖ¤ü ãÖÖ¯Ö®Ö ¯ÖÏ׍ÎúµÖÖ ¯ÖæÖÔ
´ÖÖ­Ö »Öß •ÖÖ‹Öß… ׍úÃÖß ³Öß ¯ÖύúÖ¸ü úß Ã£ÖÖ­ÖÖ¯Ö®Ö ¯ÖæÙŸÖ ¯ÖÏ׍ÎúµÖÖ êú ¤üÖî¸üÖ­Ö ×•ÖÃÖ ÃÖ¤üÃµÖ êú ãÖÖ­ÖÖ¯Ö®Ö úß
ü¯ÖÏ׍ÎúµÖÖ ¯ÖæÖÔ ­Ö Æãü‡Ô ÆüÖ,ê ¾ÖÆü ÃÖ¤üÃµÖ »ÖÖÖŸÖÖ¸ü ÃÖê¾ÖÖ ú¸üŸÖÖ ¸üÆêüÖÖ †Öî¸ü ²ÖÖê›Ôü ׍ÎúµÖÖ¿Öᯙ ¸üÆêüÖÖ ŸÖ£ÖÖ ‡Ã֍úß
úÖ¸Ôü¾ÖÖ‡µÖÖë ´Öë šüߍú ¾ÖÆüß ¿ÖÛŒŸÖ ¾Ö ¯ÖϳÖÖ¾Ö ¸üÆêüÖÖ ´ÖÖ­ÖÖë µÖÆü ׸üÛŒŸÖ Æãü‡Ô Æüß ­Ö ÆüÖê…
17.4 ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úÖ ×­ÖÖÔµÖ ¯ÖÏÖ¯ŸÖ ú¸ü­ÖÖ
17.4.1 וÖÃÖ ŸÖÖ¸üßÖ úÖê ›ü߆ָü²Öß êú †¬µÖÖ úÖê ׍úÃÖß ÃÖÓ¤üÙ³ÖŸÖ ´ÖÖ´Ö»Öê úß ¯ÖÏÖÛ¯ŸÖ ÆüÖê •ÖÖŸÖß Æîü, µÖÆü
´ÖÖ­Ö ×»ÖµÖÖ •ÖÖ‹ÖÖ ×ú µÖÆü ´ÖÖ´Ö»ÖÖ ˆÃÖß ŸÖÖ¸üßÖ úÖê ›ü߆ָü²Öß úÖê ¯ÖÏÖ¯ŸÖ ÆüÖê ÖµÖÖ Æîü…
17.4.2 ¤üÖê­ÖÖë ¯ÖÖ, ‹êÃÖê ×¾Ö¾ÖÖ¤üÖë ¯Ö¸ü ׭֝ÖÔµÖ ¤êü­Öê êú ×»Ö‹ ›ü߆ָü²Öß «üÖ¸üÖ ¾ÖÖÓ×”ûŸÖ ÃÖæ“Ö­ÖÖ‹Ó, úÖµÖÔÃ£Ö»Ö ´Öë
¯ÖϾÖê¿Ö †Öî¸ü †­µÖ µÖ£ÖÖµÖÖêµÖ ÃÖã×¾Ö¬ÖÖ‹Ó, µÖ£ÖÖ¿Öß‘ÖÐ ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê… ›ü߆ָü²Öß úÖê ´Ö¬µÖÃ£Ö (£ÖÖë)
êú ºþ¯Ö ´Öë úÖ´Ö ú¸ü­Öê ¾ÖÖ»ÖÖ ­ÖÆüà ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ…
17.4.3 µÖפü ›ü߆ָü²Öß ×úÃÖß ×¾Ö¾ÖÖפüŸÖ ´ÖÖ´Ö»Öê ´Öë ¤üÖê­ÖÖë ¯ÖÖÖë úÖê †¯Ö­ÖÖ ×­ÖÖÔµÖ ¤êü ¤êüŸÖÖ Æîü †Öî¸ü ׍úÃÖß ³Öß
¯ÖÖ «üÖ¸üÖ ›ü߆ָü²Öß úÖ ×­ÖÖÔµÖ ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú 30 פü­ÖÖë êú ³Öߟָü †¯Ö­Öß †ÃÖÓŸÖãÛ™ü úÖ úÖê‡Ô
­ÖÖê×™üÃÖ ­ÖÆüà פüµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ¾ÖÆü ׭֝ÖÔµÖ †Ó×ŸÖ´Ö ×­ÖÖÔµÖ ²Ö­Ö •ÖÖ‹ÖÖ †Öî¸ü ¤üÖê­ÖÖë ¯ÖÖÖë êú ×»Ö‹
²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…

59

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
dispute to both Parties, and no notice of dissatisfaction has been given by
either Party within 30 days after it received the DRB’s decision, then the
decision shall become final and binding upon both Parties.
17.4.4 Any dispute on which the Board has not issued a Recommendation within
45 days of its final hearing on the dispute, or regarding which the
Recommendation (s) are not accepted, may be referred in writing by
either party to arbitration in accordance with this Clause, by written notice
to the other party with copies to the the Board. Such notice shall state that
it is being made pursuant to this Clause and shall establish the entitlement
of the party giving it to commence arbitration provided that no such
arbitration may be commenced until such notice is given. Such reference
shall be made within 15 days of receipt of the Board’s recommendation (s),
or within 15 days of the day on which said period of 45 days expired, as the
case may be, failing which reference any recommendation (s) previously
rejected or not accepted shall be deemed accepted despite such
previous rejection or non-acceptance and shall be final and binding upon
the parties.
17.4.5 All Recommendations, which have become final and binding, shall be
implemented by the parties forthwith; such implementation shall include
any relevant action of the Engineer-in-charge.
17.4.6 Whether or not accepted or deemed accepted, all of the
Recommendations shall be admissible in any subsequent dispute resolution
procedure, including any arbitration or any litigation having any relation to
the dispute or disputes to which the Recommendation(s) relate.
17.4.7 Unless the Contract has already been repudiated or terminated, the
Contractor shall, in every case, continue to proceed with the Works with all
due diligence and the Contractor and the Corporation shall give effect
forthwith to every decision of the Engineer-in-charge unless and until the
same shall be revised, as hereinafter provided, in an arbitral award.
17.5 Amicable Settlement
17.5.1 Where notice of dissatisfaction has been given under Sub-Clause
17.4[Obtaining Dispute Resolution Board’s Decision] above, both
Parties shall attempt to settle the dispute amicably before the
commencement of arbitration. However, unless both Parties agree
otherwise, arbitration may be commenced on or after the 60th day
after the day on which a notice of dissatisfaction and intention to
commence arbitration was given, even if no attempt at amicable
settlement has been made.
17.6 Failure to Comply with Dispute Resolution Board’s Decision
17.6.1 In the event that a Party fails to comply with a final and binding DRB
decision, then the other Party may, without prejudice to any other
rights it may have, refer the failure itself to arbitration under sub-
clause 17.8 [Arbitration]. Sub-clause 17.4 [Obtaining Dispute
Resolution Board’s Decision] and sub-clause 17.5 [Amicable
Settlement] shall not apply to this reference.
60

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
17.4.4 †Ó×ŸÖ´Ö ÃÖã­Ö¾ÖÖ‡Ô êú 45 פü­ÖÖë êú ²ÖÖ¤ü ŸÖú ˆÃÖ ×¾Ö¾ÖÖ¤ü ¯Ö¸ü ²ÖÖê›Ôü «üÖ¸üÖ úÖê‡Ô ÃÖÓßÖã×ŸÖ ­Ö פü‹ •ÖÖ­Öê
µÖÖ ×•ÖÃ֍êú ²ÖÖ¸êü ´Öë ¤üß Ö‡Ô ÃÖÓßÖãןÖ(µÖÖÓ) þÖߍúÖ¸ü ­Ö ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ׍úÃÖß ×¾Ö¾ÖÖ¤ü úÖê, †­µÖ ¯ÖÖ
úÖê ×»Ö×ÖŸÖ ­ÖÖê×™üÃÖ †Öî¸ü ˆÃ֍úß ¯ÖÏ×ŸÖ ²ÖÖê›Ôü úÖê ¤êüŸÖê Æãü‹, ú‡ÃÖ Ö›ü êú †­ÖãÃÖÖ¸ü ´Ö¬µÖÃ£Ö úÖê
ÃÖÓ¤üÙ³ÖŸÖ ×úµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü… ‡ÃÖ ¯ÖύúÖ¸ü úß ­ÖÖê×™üÃÖ ´Öë ˆÛ»»Ö×ÖŸÖ ÆüÖêÖÖ ×ú µÖÆü ‡ÃÖ Ö›ü êú
†­ÖãÃÖÖ¸ü ׍úµÖÖ •ÖÖ ¸üÆüÖ Æîü †Öî¸ü µÖÆü ­ÖÖê×™üÃÖ ´ÖÖ¬µÖÃ£Ö úÖ¸Ôü¾ÖÖ‡Ô ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê úÖ ­ÖÖê×™üÃÖ ¤êü­Öê ¾ÖÖ»Öê
¯ÖÖ úß Æüú¤üÖ¸üß Ã£ÖÖ×¯ÖŸÖ ú¸êüÖß ¯Ö¸ÓüŸÖã •Ö²Ö ŸÖú µÖÆü ­ÖÖê×™üÃÖ ­Ö פüµÖÖ •ÖÖ‹ ‡ÃÖ ¯ÖύúÖ¸ü úß úÖê‡Ô
´Ö‘µÖÃ£Ö úÖ¸Ôü¾ÖÖ‡Ô ¯ÖÏÖ¸Óü³Ö ­ÖÆüà úß •ÖÖ‹Öß… ‡ÃÖ ¯ÖύúÖ¸ü úÖ ÃÖÓ¤ü³ÖÔ ²ÖÖê›Ôü úß ÃÖÓßÖã×ŸÖ (µÖÖÓ) ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê
êú 15 פü­ÖÖë êú ³Öߟָü †£Ö¾ÖÖ ˆŒŸÖ 45 פü­ÖÖë úß †¾Ö×¬Ö êú ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê êú ²ÖÖ¤ü ÃÖê 15 פü­ÖÖë êú
³Öߟָü, •ÖîÃÖÖ ³Öß ´ÖÖ´Ö»ÖÖ ÆüÖ,ê ׍úµÖÖ •ÖÖ‹ÖÖ… ‹êÃÖÖ ÃÖÓ¤ü³ÖÔ ­Ö ׍ú‹ •ÖÖ­Öê ¯Ö¸ü ‡ÃÖÃÖê ¯ÖÆü»Öê ×­Ö¸üÃŸÖ úß
Ö‡Ô µÖÖ Ã¾ÖߍúÖ¸ü ­Ö úß Ö‡Ô úÖê‡Ô ÃÖÓßÖãןÖ(µÖÖÓ) þÖߍúÖ¸ü ÃÖÓßÖã×ŸÖ ´ÖÖ­Ö »Öß •ÖÖ‹Öß ³Ö»Öê Æüß ‡ÃÖê
¯ÖÆü»Öê ×­Ö¸üÃŸÖ µÖÖ †Ã¾ÖߍéúŸÖ ´ÖÖ­ÖÖ ÖµÖÖ ÆüÖê †Öî¸ü µÖÆü ¤üÖê­ÖÖë ¯ÖÖÖë êú ×»Ö‹ †Ó×ŸÖ´Ö ¾Ö ²ÖÖ¬µÖúÖ¸üß
ÆüÖëÖß…
17.4.5 †Ó×ŸÖ´Ö ¾Ö ²ÖÖ¬µÖúÖ¸üß ²Ö­ÖßÓ ‹êÃÖß ÃÖ³Öß ÃÖÓßÖãןֵÖÖêÓ úÖê ¤üÖê­ÖÖë ¯ÖÖÖë «üÖ¸üÖ ŸÖŸúÖ»Ö »Ö֐Öæ ׍úµÖÖ •ÖÖ‹ÖÖ
; ‡ÃÖ †­Öã¯ÖÖ»Ö­Ö ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ úß •ÖÖ­Öê ¾ÖÖ»Öß ŸÖŸÃÖÓ²ÖÓ¬Öß úÖ¸Ôü¾ÖÖ‡Ô ³Öß ¿ÖÖ×´Ö»Ö Æîü…
17.4.6 “ÖÖÆêü þÖߍúÖ¸ µÖÖ Ã¾ÖߍúÖ¸ü ´ÖÖ­Öß Ö‡Ô µÖÖ ­Ö ´ÖÖ­Öß Ö‡Ô ÆüÖë, µÖêü ÃÖ³Öß ÃÖÓßÖãןֵÖÖÓ, ²ÖÖ¤ü êú ׍úÃÖß
´Ö¬µÖÃ£Ö úÖ¸Ôü¾ÖÖ‡Ô µÖÖ ‡ÃÖ ×¾Ö¾ÖÖ¤ü †£Ö¾ÖÖ ×•Ö­Ö ×¾Ö¾ÖÖ¤üÖë ÃÖê µÖÆü ÃÖÓßÖãןÖ(µÖÖÓ) ÃÖÓ²ÖÓ×¬ÖŸÖ ÆüÖê, ˆÃÖÃÖê
ÃÖÓ²ÖÓ×¬ÖŸÖ ×úÃÖß ¾ÖÖ¤üú¸üÖ ÃÖ×ÆüŸÖ ׍úÃÖß ³Öß ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ¯ÖÏ׍ÎúµÖÖ ´Öë ÖÏÖÊ ÆüÖëÖß… ü
17.4.7 •Ö²Ö ŸÖú ׍ú ׍úÃÖß ÃÖÓ×¾Ö¤üÖ úÖê ×­Ö¸ü֍éúŸÖ µÖÖ ×­Ö¸üÃŸÖ ­Ö ´ÖÖ­Ö ×»ÖµÖÖ ÖµÖÖ ÆüÖ,ê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖÏŸµÖêú
ÛãÖ×ŸÖ ´Öë ¯ÖæÖÔ ãú¿Ö»ÖŸÖÖ êú ÃÖÖ£Ö úÖµÖÔ ú¸ü­ÖÖ •ÖÖ¸üß ¸üÖêÖÖ †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ŸÖ£ÖÖ ×­ÖÖ´Ö ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ êú ¯ÖÏŸµÖêú ׭֝ÖÔµÖ, •Ö²Ö ŸÖú ׍ú ˆÃÖ´Öë †ÖÖê ´Ö¬µÖÃ£Ö †¾ÖÖ›Ôü ´Öë ²ÖŸÖÖ‹ Ö‹ úÖê‡Ô
ÃÖÓ¿ÖÖê¬Ö­Ö ­Ö ׍ú‹ •ÖÖ‹Ó, úÖê ŸÖŸúÖ»Ö ¯ÖϳÖÖ¾Öß ú¸êӐÖê…
17.5 ´Öî¡Ö߯ÖæÖÔ ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ
17.5.1 •Ö²Ö ˆ¯ÖµÖãÔŒŸÖ ˆ¯Ö-Ö›ü 17.4 (×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úÖ ×­ÖÖÔµÖ ¯ÖÏÖ¯ŸÖ ú¸ü­ÖÖ) êú †ÓŸÖÖÔŸÖ
†ÃÖÓŸÖãÛ™ü úß ­ÖÖê×™üÃÖ ×¤üµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ´Ö¬µÖã֟ÖÖ úÖ¸Ôü¾ÖÖ‡Ô ¯ÖÏÖ¸Óü³Ö ÆüÖê­Öê ÃÖê ¯ÖÆü»Öê ¤üÖê­ÖÖë ¯ÖÖ ×¾Ö¾ÖÖ¤ü
úÖê ´Öî¡Ö߯ÖæÖÔ œÓüÖ ÃÖê ÃÖã»Ö—ÖÖ­Öê úÖ ¯ÖϵÖÖÃÖ ú¸ëüÖê… ŸÖ£ÖÖׯÖ, •Ö²Ö ŸÖú ¤üÖê­ÖÖë ¯ÖÖ †­µÖ£ÖÖ ÃÖÆü´ÖŸÖ ­Ö
ÆüÖ,ë †ÃÖÓŸÖãÛ™ü †Öî¸ü ´Ö¬µÖã֟ÖÖ úÖ¸Ôü¾ÖÖ‡Ô úß ‡“”ûÖ úÖ ­ÖÖê×™üÃÖ ×¤ü‹ •ÖÖ­Öê úß ŸÖÖ¸üßÖ êú ²ÖÖ¤ü ¾ÖÖ»Öê
פü­Ö ÃÖê 60¾Öë פü­Ö µÖÖ ˆÃ֍êú ²ÖÖ¤ü ÃÖê ´Ö¬µÖã֟ÖÖ úÖ¸Ôü¾ÖÖ‡Ô ¯ÖÏÖ¸Óü³Ö úß •ÖÖ Ã֍úŸÖß Æîü ³Ö»Öê Æüß
´Öî¡Ö߯ÖæÖÔ ÃÖ´ÖÖ¬ÖÖ­Ö úÖ úÖê‡Ô ¯ÖϵÖÖÃÖ ­Ö ׍úµÖÖ ÖµÖÖ ÆüÖê…
17.6 ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü êú ׭֝ÖÔµÖ êú †­Öã¯ÖÖ»Ö­Ö ´Öë †ÃÖ±ú»Ö ¸üÆü­ÖÖ
17.6.1 µÖפü úÖê‡Ô ¯ÖÖ †Ó×ŸÖ´Ö ¾Ö ²ÖÖ¬µÖúÖ¸üß ›ü߆ָü²Öß ×­ÖÖÔµÖ êú †­Öã¯ÖÖ»Ö­Ö ´Öë †ÃÖ±ú»Ö ¸üÆüŸÖÖ Æîü ŸÖÖê
†­µÖ ¯ÖÖ †¯Ö­Öê †­µÖ ׍úÃÖß †×¬ÖúÖ¸ü êú ¯Öæ¾ÖÖԐÖÏÆü êú ²ÖÖî¸ü ‹êÃÖê †­Ö­Öã¯ÖÖ»Ö­Ö úÖê ˆ¯ÖÖ›ü
17.8(´Ö¬µÖã֟ÖÖ) êú †ÓŸÖÖÔŸÖ ´ÖÖ¬µÖÃ£Ö úÖê þֵÖÓ Æüß ÃÖÓ¤üÙ³ÖŸÖ ú¸ü Ã֍úŸÖÖ Æîü… ˆ¯ÖÖ›ü 17.4
(×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úÖ ×­ÖÖÔµÖ ¯ÖÏÖ¯ŸÖ ú¸ü­ÖÖ) †Öî¸ü ˆ¯ÖÖ›ü 17.5 (´Öî¡Ö߯ÖæÖÔ ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ) ü¯Ö¸ü
‹êÃÖê ÃÖÓ¤ü³ÖÔ »Ö֐Öæ ­ÖÆüà ÆÖêӐÖêÓ…

60

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
17.7 Expiry of Dispute Resolution Board’s Appointment
17.7.1 If a dispute arises between the Parties in connection with, or arising out
of, the Contract or the execution of the Works and there is no DRB in place,
whether by reason of the expiry of the DRB’s appointment or otherwise:
(a) Sub-Clause 17.4 [Obtaining Dispute Resolution Board’s Decision] and Sub-
Clause 17.5 [Amicable Settlement] shall not apply, and
(b) the dispute may be referred directly to arbitration under Sub-Clause
17.8 [Arbitration].
17.8 Arbitration
17.8.1 Any dispute not settled amicably and in respect of which the DRB’s
decision (if any) has not become final and binding shall be finally settled by
arbitration. Unless otherwise agreed by both Parties:
i) For contracts with foreign contractors:
a) International arbitration with proceedings administered by the international
arbitration institution appointed by the corporation, in accordance with the
rules of arbitration of the appointed institution;,
b) the place of arbitration shall be the city where the headquarters of the
appointed arbitration institution is located or such other place selected in
accordance with the applicable arbitration rules; and
c) the arbitration shall be conducted in the language for communications
defined in Sub-Clause 1.3 ; and
ii) For contracts with domestic contractors, arbitration with proceedings
conducted in accordance with the Indian Arbitration and Conciliation Act,
1996:
a) All questions and disputes relating to the meaning of the specifications,
designs, drawings and instructions herein before contained in this Contract or
as to the quality of the workmanship or materials used on the work or arising
out of the terms and conditions of the Contract whether during the
progress of the work or after the completion or abandonment thereof, at
the request of the aggrieved party in writing, shall be referred to the sole
arbitration of the person and appointed by the Chairman & Managing
Director, Nuclear Power Corporation of India Ltd, in respect of the contracts
entered for and on behalf of the Corporation, by any Officer / Authority of the
Corporation.
b) When it appears to the person that there exists an element of a settlement
which may be acceptable to the parties, he shall submit them to parties for
their observation. He may reformulate the terms of a possible settlement in the
light of their observations.
c) If the parties reach agreement of the dispute, they may draw up and sign a
written settlement agreement. They may request the person to draw up or
assist them in drawing up the settlement agreement.
d) If settlement agreement shall have the same status and effect as if it is an
arbitral award on agreed terms on the substance of the dispute rendered by
an arbitral tribunal under section 30 of the Act.

61

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
17.7 ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úß ×­ÖµÖãÛŒŸÖ úÖ ÃÖ´ÖÖ¯Ö­Ö
17.7.1µÖפü ¯ÖÖÖë êú ²Öß“Ö ÃÖÓ×¾Ö¤üÖ êú µÖÖ ÃÖÓ×¾Ö¤üÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ †£Ö¾ÖÖ úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö úÖê »Öêú¸ü ׍úÃÖß
¯ÖύúÖ¸ü úÖ ×¾Ö¾ÖÖ¤ü ÆüÖêŸÖÖ Æîü †Öî¸ü ›ü߆ָü²Öß úÖ ×­ÖµÖãÛŒŸÖúÖ»Ö ÃÖ´ÖÖ¯ŸÖ ÆüÖê •ÖÖ­Öê êú úÖ¸üÖ µÖÖ
†­µÖ£ÖÖ úÖê‡Ô ›ü߆ָü²Öß ÖךüŸÖ ­ÖÆüà Æîü ŸÖÖê
(‹) ˆ¯Ö-Ö›ü 17.4 (×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úÖ ×­ÖÖÔµÖ ¯ÖÏÖ¯ŸÖ ú¸ü­ÖÖ) †Öî¸ü ˆ¯Ö-Ö›ü 17.5
(´Öî¡Ö߯ÖæÖÔ ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ) »Ö֐Öæ ­ÖÆüà ÆüÖëÖê †Öî¸ü
(²Öß) ‡ÃÖ ×¾Ö¾ÖÖ¤ü úÖê ˆ¯Ö-Ö›ü 17.8 (´Ö¬µÖã֟ÖÖ) êú †ÓŸÖÖÔŸÖ ÃÖ߬Öê ´Ö¬µÖã֟ÖÖ êú ×»Ö‹ ÃÖÓ¤üÙ³ÖŸÖ
׍úµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü…
17.8 ´Ö¬µÖã֟ÖÖ
17.8.1 úÖê‡Ô ‹êÃÖÖ ×¾Ö¾ÖÖ¤ü וÖÃÖê ´Öî¡Ö߯ÖæÖÔ œÓüÖ ÃÖê ¯Ö׸ü×­Ö¬ÖÖÔ׸üŸÖ ­Ö ׍úµÖÖ •ÖÖ Ã֍êú †Öî¸ü וÖÃ֍êú ×»Ö‹
›ü߆ָü²Öß úÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ¾Ö ²ÖÖ¬µÖúÖ¸üß ­Ö Æãü†Ö ÆüÖ,ê úÖê, •Ö²Ö ŸÖú ¤üÖê­ÖÖë ¯ÖÖÖë «üÖ¸üÖ †­µÖ£ÖÖ
ÃÖÆü´Ö×ŸÖ ­Ö ÆüÖê, †Ó×ŸÖ´Ö ºþ¯Ö ÃÖê ´Ö¬µÖã֟ÖÖ «üÖ¸üÖ ÃÖã»Ö—ÖÖµÖÖ •ÖÖ‹ÖÖ :
i) ×¾Ö¤êü¿Öß ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú ÃÖÖ£Ö úß Ö‡Ô ÃÖÓ×¾Ö¤üÖ êú ×»Ö‹ :
‹) †ÓŸÖ¸ü¸üÖ™ÒüßµÖ ´Ö¬µÖã֟ÖÖ ×•ÖÃ֍úß ¯ÖÏ׍ÎúµÖÖ ×­ÖÖ´Ö «üÖ¸üÖ ×­ÖµÖãŒŸÖ †ÓŸÖ¸ü¸üÖ™ÒüßµÖ ´Ö¬µÖã֟ÖÖ ÃÖÓãÖÖ­Ö
«üÖ¸üÖ ×­ÖµÖãŒŸÖ ÃÖÓãÖÖ­Ö êú ´Ö¬µÖã֟ÖÖ ×­ÖµÖ´ÖÖë êú †­ÖãÃÖÖ¸ü úß •ÖÖ‹Öß ;
²Öß) ´Ö¬µÖã֟ÖÖ úÖ Ã£ÖÖ­Ö ¾ÖÆü ¿ÖÆü¸ü •ÖÆüÖÓ ×­ÖµÖãŒŸÖ ´Ö¬µÖã֟ÖÖ ÃÖÓãÖÖ­Ö úÖ ´Ö㏵ÖÖ»ÖµÖ ÆüÖê †£Ö¾ÖÖ úÖê‡Ô
‹êÃÖÖ Ã£ÖÖ­Ö •ÖÖê ´Ö¬µÖã֟ÖÖ êú »Ö֐Öæ ×­ÖµÖ´ÖÖë êú †­ÖãÃÖÖ¸ü “Öã­ÖÖ ÖµÖÖ ÆüÖê ; †Öî¸ü
ÃÖß) ´Ö¬µÖã֟ÖÖ úß úÖ¸Ôü¾ÖÖ‡Ô ˆ¯Ö-Ö›ü 1.3 ´Öë ¯Ö׸ü³ÖÖ×ÂÖŸÖ ³ÖÖÂÖÖ êú ´ÖÖ¬µÖ´Ö ÃÖê úß •ÖÖ‹Öß ; †Öî¸ü
ii) ³ÖÖ¸üŸÖßµÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú ÃÖÖ£Ö úß Ö‡Ô ÃÖÓ×¾Ö¤üÖ†Öë êú ×»Ö‹ ´Ö¬µÖã֟ÖÖ úß úÖ¸Ôü¾ÖÖ‡Ô ³ÖÖ¸üŸÖßµÖ
´Ö¬µÖã֟ÖÖ ¾Ö ÃÖ´Ö—ÖÖîŸÖÖ †×¬Ö×­ÖµÖ´Ö, 1996 êú †ÓŸÖÖÔŸÖ úß •ÖÖ‹Öß…
‹) ×­ÖÖ´Ö úß †Öê¸ü ÃÖê †Öî¸ü ×­ÖÖ´Ö êú ¾ÖÖßÖê ×­ÖÖ´Ö êú ׍úÃÖß †×¬ÖúÖ¸üß/¯ÖÏÖ׬֍úÖ¸üß «üÖ¸üÖ úß Ö‡Ô
ÃÖÓ×¾Ö¤üÖ†Öë êú ×»Ö‹ ÃÖÓ×¾Ö¤üÖ ´Öë ‡ÃÖÃÖê ¯ÖÆü»Öê ¾ÖÙÖŸÖ ×¾Ö×­Ö¤ìü¿ÖÖë, †×³Öú»¯ÖÖë, ¸êüÖÖד֡ÖÖë êú †£ÖÔ
†£Ö¾ÖÖ úÖµÖԍãú¿Ö»ÖŸÖÖ µÖÖ úÖµÖÔ êú ×»Ö‹ ¯ÖϵÖÖêÖ úß Ö‡Ô ÃÖִ֐ÖÏß úß ÖãÖ¾Ö¢ÖÖ µÖÖ ÃÖÓ×¾Ö¤üÖ êú ×­ÖµÖ´ÖÖë
¾Ö ¿ÖŸÖÖí ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ÃÖ³Öß ¯ÖÏ¿­ÖÖë ¾Ö ×¾Ö¾ÖÖ¤üÖë úÖê, “ÖÖÆêü ¾Öê úÖµÖÔ úß ¯ÖϐÖ×ŸÖ êú ¤üÖî¸üÖ­Ö ˆšëü µÖÖ µÖÖ
úÖµÖÔ ¯ÖæÖÔŸÖÖ †£Ö¾ÖÖ úÖµÖÔ ”ûÖê›Íü­Öê êú ¯Ö¿“ÖÖŸÖ ÃÖÖ´Ö­Öê †Ö‹Ó, ¯ÖϳÖÖ×¾ÖŸÖ ¯ÖÖ êú ×»Ö×ÖŸÖ †­Öã¸üÖê¬Ö ¯Ö¸ü
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü êú †¬µÖÖ ‹¾ÖÓ ¯ÖϲÖÓ¬Ö ×­Ö¤êü¿Öú «üÖ¸üÖ
×­ÖµÖãŒŸÖ ×ú‹ Ö‹ ¾µÖÛŒŸÖ úß ‹ú»Ö ´Ö¬µÖã֟ÖÖ úÖê ÃÖÓ¤üÙ³ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…
²Öß) ‹êÃÖê ¾µÖÛŒŸÖ úÖê •Ö²Ö µÖÆü ¯ÖÏŸÖßŸÖ ÆüÖêŸÖÖ ÆüÖêü ׍ú ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ úÖ úÖê‡Ô ŸÖŸ¾Ö ‹êÃÖÖ Æîü •ÖÖê ¤üÖê­ÖÖë ¯ÖÖÖë
úÖê þÖߍúÖµÖÔ ÆüÖê Ã֍úŸÖÖ Æîü ŸÖÖê ¾ÖÆü ˆÃÖê ¤üÖê­ÖÖë ¯ÖÖÖë úß ¸üÖµÖ •ÖÖ­Ö­Öê êú ×»Ö‹ ˆ­Öêú ÃÖ´ÖÖ ¯ÖÏßÖãŸÖ
ú¸êüÖÖ… ˆ­Öúß ¸üÖµÖ êú †­ÖãÃÖÖ¸ü ¾ÖÆü ‡ÃÖ ÃÖÓ³ÖÖ×¾ÖŸÖ ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ úß ¿ÖŸÖÖí ´Öë ¯Ö׸ü¾ÖŸÖÔ­Ö ú¸ü Ã֍úŸÖÖ
Æîü…
ÃÖß) µÖפü ¤üÖê­ÖÖë ¯ÖÖÖêÓ ×¾Ö¾ÖÖ¤ü ¯Ö¸ü ÃÖ´Ö—ÖÖîŸÖÖ ú¸ü »ÖêŸÖê Æïü ŸÖÖê ¾Öê ‹ú ×»Ö×ÖŸÖ ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ ÃÖ´Ö—ÖÖîŸÖÖ ŸÖîµÖÖ¸ü
ú¸ü ˆÃÖ ¯Ö¸ü ÆüßÖցָü ú¸ü Ã֍úŸÖê Æïü… ¾Öê ˆÃÖ ¾µÖÛŒŸÖ ÃÖê ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ ÃÖ´Ö—ÖÖîŸÖÖ ŸÖîµÖÖ¸ü ú¸ü­Öê µÖÖ
ŸÖîµÖÖ¸ü ú¸ü­Öê ´Öë ´Ö¤ü¤ü ú¸ü­Öê úÖ †­Öã¸üÖê¬Ö ú¸ü Ã֍úŸÖê Æïü…
›üß) ‡ÃÖ ¯Ö׸ü×­Ö¬ÖÖÔ׸üŸÖ ÃÖ´Ö—ÖÖîŸÖê úß ÛãÖ×ŸÖ ¾Ö ¯ÖϳÖÖ¾Ö šüߍú ¾ÖîÃÖÖ Æüß ÆüÖêÖÖ •ÖîÃÖê ׍ú µÖÆü ‡ÃÖ †×¬Ö×­ÖµÖ´Ö
êú †­Öã“”êû¤ü 30 êú †¬Öß­Ö ×úÃÖß ´Ö¬µÖã֟ÖÖ ×™Òü²µÖæ­Ö»Ö «üÖ¸üÖ ×¾Ö¾ÖÖ¤ü êú ŸÖ£µÖÖë êú †Ö¬ÖÖ¸ü ¯Ö¸ü
ÃÖÆü´ÖŸÖ úß Ö‡Ô ¿ÖŸÖÖí úÖü ´Ö¬µÖÃ£Ö †¾ÖÖ›Ôü ÆüÖê …
61

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
e) If a settlement does not appear possible, the person, after
consultation with the parties, will give a written declaration that
further efforts at Conciliation are no longer justified and the person
proceedings are terminated.
f) When Conciliation proceedings have become infructious or have
been terminated, the party, which initiated the Conciliation, shall
refer the disputes for Arbitration. The reference to Arbitration should
be made preferably within 30 days of the termination of Conciliation
Proceedings.
g) The Arbitration shall be conducted in accordance with the Indian
Arbitration and Conciliation Act, 1996. For Contracts costing upto Rs.
10 Crores, a Sole Arbitrator shall be appointed. For Contracts costing
over Rs. 10 Crores, a Committee of Arbitrators shall be appointed
composed of one Arbitrator to be by the Contractor, one to be by
the Owner and the third Arbitrator, who will act as a Chairman but
not as umpire, to be chosen jointly by the two nominees. The
decision of majority of Arbitrators shall be final and binding on both
parties.

62

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
‡Ô) µÖפü úÖê‡Ô ¯Ö׸ü×­Ö¬ÖÖÔ¸üÖ ÃÖÓ³Ö¾Ö ¯ÖÏŸÖßŸÖ ­ÖÆüßÓ ÆüÖêŸÖÖ Æîü ŸÖÖê ¤üÖê­ÖÖë ¯ÖÖÖë ÃÖê ¯Ö¸üÖ´Ö¿ÖÔ ú¸ü­Öê êú ²ÖÖ¤ü ¾ÖÆü
¾µÖÛŒŸÖ ×»Ö×ÖŸÖ ‘ÖÖêÂ֝ÖÖ ú¸êüÖÖ ×ú ÃÖ´Ö—ÖÖîŸÖê êú †Öî¸ü ¯ÖϵÖÖÃÖ †²Ö †Öîד֟µÖ¯ÖæÖÔ ­ÖÆüà Æïü †Öî¸ü
ˆÃ֍úß úÖ¸Ôü¾ÖÖ‡Ô ÃÖ´ÖÖ¯ŸÖ ÆüÖêŸÖß Æîü…
‹±ú) •Ö²Ö ÃÖ´Ö—ÖÖîŸÖÖ úÖµÖÔ¾ÖÖÆüß ×­Ö±ú»Ö ÆüÖê •ÖÖ‹ µÖÖ ÃÖ´ÖÖ¯ŸÖ ú¸ü ¤üß •ÖÖ‹ ŸÖÖê ¾ÖÆü ¯ÖÖ וÖÃÖ­Öê ÃÖ´Ö—ÖÖîŸÖê
úß ¿Öã¹ý†ÖŸÖ úß ÆüÖ,ê ‡ÃÖ ×¾Ö¾ÖÖ¤ü úÖê ´Ö¬µÖÃ£Ö êú ¯ÖÖÃÖ ÃÖÓ¤üÙ³ÖŸÖ ú¸êüÖÖ… ´Ö¬µÖÃ£Ö úÖê ÃÖÓ¤üÙ³ÖŸÖ
׍ú‹ •ÖÖ­Öê úß úÖµÖÔ¾ÖÖÆüß µÖ£ÖÖÃÖÓ³Ö¾Ö ÃÖ´Ö—ÖÖîŸÖÖ úÖµÖÔ¾ÖÖÆüß ÃÖ´ÖÖ¯ŸÖ ׍ú‹ •ÖÖ­Öê êú 30 פü­ÖÖë êú
³Öߟָü ú¸ü ¤üß •ÖÖ­Öß “ÖÖ×Æü‹…
•Öß) ´Ö¬µÖÃ£Ö úß úÖµÖÔ¾ÖÖÆüß ³ÖÖ¸üŸÖßµÖ ´Ö¬µÖÃ£Ö ¾Ö ÃÖ´Ö—ÖÖîŸÖÖ †×¬Ö×­ÖµÖ´Ö 1996 êú †­Öãºþ¯Ö úß •ÖÖ‹Öß…
10 ú¸üÖê›Íü ¹ý¯ÖµÖÖë ŸÖú úß ÃÖÓ×¾Ö¤üÖ†Öë êú ×»Ö‹ ‹ú ‹ú»Ö ´Ö¬µÖãµÖÖêêÓ ×­ÖµÖãŒŸÖ ×úµÖÖ •ÖÖ‹ÖÖ… 10
ú¸üÖê›Íü ÃÖê †×¬Öú ´Öæ»µÖ úß ×­Ö×¾Ö¤üÖ†Öë êú ×»Ö‹ ´Ö¬µÖãÖÖë úß ‹ú ÃÖ×´Ö×ŸÖ ×­ÖµÖãŒŸÖ úß •ÖÖ‹Öß
וÖÃÖ´Öë ‹ú ´Ö¬µÖÃ£Ö úß ×­ÖµÖãÛŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ, ‹ú úß ´ÖÖ׻֍ú «üÖ¸üÖ †Öî¸ü ŸÖßÃÖ¸êü ´Ö¬µÖãÖ
•ÖÖê ׍ú †¬µÖÖ úß ŸÖ¸üÆü ¯Ö¸ÓüŸÖã ׭֝ÖÖԵ֍ú úß ŸÖ¸üÆü ­ÖÆüà, úÖµÖÔ ú¸êüÖÖ, úÖ “ÖµÖ­Ö ÃÖÓµÖãŒŸÖ ºþ¯Ö ÃÖê
¤üÖê­ÖÖêÓ ­ÖÖ´ÖÖÓ׍úŸÖÖë «üÖ¸üÖ ×úµÖÖ •ÖÖ‹ÖÖ… ´Ö¬µÖãÖÖë êú ²ÖÆãü´ÖŸÖ úÖ ×­ÖÖÔµÖ ¤üÖê­ÖÖë ¯ÖÖÖë êú ×»Ö‹ †ÓןִÖ
¾Ö ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…

62

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
18 SCHEDULES
SCHEDULE ‘A’
Sr. Clause STIPULATION
No. Reference ITEM
No.
1 NIT 37.1 Applicability of Mega Power Project Concession Yes / No

2 1.1.1 Accepting Authority


3 2.1.3 Time by which possession of site will be given
4 4.14.1 Availability of Electricity Yes / No
5 4.14.1 The rate at which electricity will be charged Rs.______unit
6 4.19.2 Number of trees to be planted by the contractor ___Nos
7 4.22.1 Number of Apprentices to be trained by the ___Nos
contractor
8 4.23.2 Availability of Departmental water supply Yes / No
9 4.23.2 (i) Water charges Rs._____ Ltr

10 4.24.2 Land availability for contractor's colony Yes / No


11 5.6.3 Penalty, for not providing arrangements and Rs.____
facilities as per safety guidelines
12 5.6.4 Industrial Safety Training to be provided by Yes / No
Corporation
13 5.6.14 Minimum number of safety professionals to be ___Nos
employed by Contractor
14 5.6.15 Penalty, for not deploying the minimum number Rs.____ per
of safety professionals person
15 7.8.1 Applicability of the Incentive clause Yes / No
16 7.8.2 Maximum percentage of the contract value, ___%
which shall be paid as incentive.
17 7.9.3 Compensation for suspension (entire Rs___/ Day
work)beyond 30 days (per day rate )
18 9.1.1 Defect Liability Period
For the contracts other than maintenance 12 months
contracts mentioned below
For contracts such as housekeeping, annual __months
repairs, dismantling roads, horticulture, service
contracts etc.
19 9.1.6 Applicability of liability towards Latent defect Yes/no

20 11.3.4 Various Component expressed as a percentage


of contract value
Unskilled labour component (lu) __%
63

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
18. †­ÖãÃÖæדֵÖÖÓ
†­ÖãÃÖæ“Öß "‹"
Îú. Ö›ü ÃÖÓ¤ü³ÖÔ ´Ö¤ü †­Öã²ÖÓ¬Ö
ÃÖÓ ÃÖӏµÖÖ
1. ‹­Ö†Ö‡Ô™üß ´ÖêÖÖ¯ÖÖò¾Ö¸ü ¯Ö׸üµÖÖê•Ö­ÖÖ ×¸üµÖÖµÖŸÖÖêÓ úß ¯ÖϵÖÖꕵ֟ÖÖ ÆüÖÓ/­ÖÆüà
37.1
2. 1.1.1 þÖߍéú×ŸÖ ¯ÖÏÖ׬֍úÖ¸üß
3. 2.1.3 וÖÃÖ ÃÖ´ÖµÖ ŸÖú úÖµÖÔÃ£Ö»Ö úÖ ú²•ÖÖ ×¤üµÖÖ •ÖÖ‹ÖÖ
4. 4.14.1 ײֻ֕Öß úß ˆ¯Ö»Ö²¬ÖŸÖÖ ÆüÖÓ/­ÖÆüà
5. 4.14.1 ײֻ֕Öß ¯ÖϳÖÖ¸ü úß ¤ü¸ü ¹ý..........
‡úÖ‡Ô
6. 4.19.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¸üÖê¯Öê •ÖÖ­Öê ¾ÖÖ»Öê ¯Öê›ÍüÖêÓ úß ÃÖӏµÖÖ ....ÃÖӏµÖÖ
7. 4.22.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖÏ׿Ö×ÖŸÖ ×ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ¯ÖÏ׿ցÖã†Öë úß ÃÖӏµÖÖ .....ÃÖӏµÖÖ
8. 4.23.2 ×¾Ö³Ö֐ÖßµÖ •Ö»ÖÖ¯ÖæÙŸÖ úß ˆ¯Ö»Ö²¬ÖŸÖÖ ÆüÖÓ/­ÖÆüà
9. 4.23.2(i) •Ö»Ö ¯ÖϳÖÖ¸ü ¹ý.......»Öß™ü¸ü
10. 4.24.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß úÖò»ÖÖê­Öß êú ×»Ö‹ ³Öæ×´Ö úß ˆ¯Ö»Ö²¬ÖŸÖÖ ÆüÖÓ/­ÖÆüà
11. 5.6.3 ÃÖÓ¸üÖÖ ×¤ü¿ÖÖ×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü ¾µÖ¾ÖãÖÖ‹Ó ¾Ö ÃÖã×¾Ö¬ÖÖ‹Ó ˆ¯Ö»Ö²¬Ö ­Ö ¹ý..........
ú¸üÖ­Öê ¯Ö¸ü ¤ü›ü
12. 5.6.4 ×­ÖÖ´Ö «üÖ¸üÖ ˆ¯Ö»Ö²¬Ö ú¸üÖµÖÖ •ÖÖ­Öê ¾ÖÖ»Öß †ÖîªÖêא֍ú ÃÖÓ¸üÖÖ ¯ÖÏ×¿ÖÖÖ ÆüÖÓ/­ÖÆüà
13. 5.6.14 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­ÖµÖãŒŸÖ ×ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ­µÖæ­ÖŸÖ´Ö ÃÖÓ¸üÖÖ úÖٴ֍úÖë .....ÃÖӏµÖÖ
úß ÃÖӏµÖÖ
14. 5.6.15 ­µÖæ­ÖŸÖ´Ö ÃÖÓ¸üÖÖ úÖٴ֍úÖë úß ×­ÖµÖã׌ŸÖ ­Ö ú¸ü­Öê ¯Ö¸ü ¤ü›ü ¯ÖÏן־µÖÛŒŸÖ
¹ý......
15. 7.8.1 ¯ÖÏÖêŸÃÖÖÆü­Ö ¯ÖÏÖ¾Ö¬ÖÖ­Ö úß ¯ÖϵÖÖꕵ֟ÖÖ ÆüÖÓ/­ÖÆüà
16. 7.8.2 ¯ÖÏÖêŸÃÖÖÆü­Ö êú ºþ¯Ö ´Öë פüµÖÖ •ÖÖ­Öê ¾ÖÖ»ÖÖ ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ úÖ †×¬ÖúŸÖ´Ö -------%
¯ÖÏןֿ֟Ö
17. 7.9.3 30 פü­ÖÖë ÃÖê †×¬Öú †¾Ö×¬Ö êú ×­Ö»ÖÓ²Ö­Ö (ÃÖÓ¯ÖæÖÔ úÖµÖÔ)êú ×»Ö‹ úß ------¹ý. / פü­Ö
•ÖÖ­Öê ¾ÖÖ»Öß Öן֯ÖæÙŸÖ (¤îü׭֍ú †Ö¬ÖÖ¸ü ¯Ö¸ü)
18. 9.1.1 ¤üÖêÂÖ ²ÖÖ¬µÖŸÖÖ †¾Ö׬Ö
×­Ö´­Ö×»Ö×ÖŸÖ †­Öã¸üÖÖ ÃÖÓ×¾Ö¤üÖ†Öë ÃÖê ‡ŸÖ¸ü †­µÖ ÃÖÓ×¾Ö¤üÖ†Öë ÆêüŸÖã 12 ´ÖÆüß­Öê
ÖéÆü ÃÖ••ÖÖ, ¾ÖÖÙÂ֍ú ´Ö¸ü´´ÖŸÖ, ÃÖ›ÍüúÖë úß ŸÖã›ÍüÖ‡Ô, ²Ö֐־ÖÖ­Öß, ÃÖê¾ÖÖ ---´ÖÆüß­Öê
ÃÖÓ×¾Ö¤üÖ†Öë †Öפü úß ÃÖÓ×¾Ö¤üÖ†Öë êú ×»Ö‹
19. 9.1.6 †¯Öύú™ü ¤üÖêÂÖÖë êú ×»Ö‹ ²ÖÖ¬µÖŸÖÖ úß ¯ÖϵÖÖꕵ֟ÖÖ ÆüÖÓ/­ÖÆüà
20. 11.3.4 ÃÖÓ×¾Ö¤üÖ ´Öæ»µÖ êú ¯ÖÏ×ŸÖ¿ÖŸÖ êú ºþ¯Ö ´Öë ¾µÖŒŸÖ ׍ú‹ Ö‹ ×¾Ö×³Ö®Ö ‘Ö™üú
†ãú¿Ö»Ö ÁÖ״֍ú ‘Ö™üú (‹»Ö.µÖæ) ----%
63

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Sr. Clause STIPULATION
No. Reference ITEM
No.
Skilled labour component (ls) __%
Material component

______________(m) __%
______________(n) __%
______________(o) __%
______________(p) __%
All other materials (q) __%
P.O.L Component(d) __%
Nearest Petrol pump to be considered for petrol ADDRESS
prices (P.O.L)
21 12.1.4 The rate of interest to be charged for __%
mobilisation advance
22 12.2.1 Applicability to submit the bills and Yes / No
measurement in Computerised form
23 12.5.1 Interest for delayed payment __%
24 15.1.1 Amount of Third party liability to be covered in Rs_____
Insurance

64

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Îú. Ö›ü ÃÖÓ¤ü³ÖÔ ´Ö¤ü †­Öã²ÖÓ¬Ö
ÃÖÓ ÃÖӏµÖÖ
ãú¿Ö»Ö ÁÖ״֍ú ‘Ö™üú (‹»Ö.‹ÃÖ) ----%
ÃÖִ֐ÖÏß ‘Ö™üú
--------------- (‹´Ö) ----%
--------------- (‹­Ö) ----%
--------------- (†Öê) ----%
--------------- (¯Öß) ----%
†­µÖ ÃÖ³Öß ÃÖִ֐ÖÏß (ŒµÖæ) ----%
¯Öß.†Öê.‹»Ö ‘Ö™üú (›üß) ----%
¯Öê™ÒüÖê»Ö úß úß´ÖŸÖÖë úÖê ×­Ö¬ÖÖÔ׸üŸÖ ú¸ü­Öê êú ×»Ö‹ ׭֍ú™üŸÖ´Ö ¯Öê™ÒüÖê»Ö ¯ÖÓ¯Ö ¯ÖŸÖÖ
(¯Öß.†Öê.‹»Ö)
21 12.1.4 ÃÖӐÖÏÆüÖ †×ÖÏ´Ö ¯Ö¸ü »ÖÖÖµÖÖ •ÖÖ­Öê ¾ÖÖ»ÖÖ ²µÖÖ•Ö ----%
22 12.2.1 ú´¯µÖæ™ü¸üߍéúŸÖ ¯ÖÏÖºþ¯Ö ´Öë ײֻÖÖë ¾Ö ´ÖÖ¯Ö­ÖÖë úÖê •Ö´ÖÖ ú¸ü­Öê úß ÆüÖÓ/­ÖÆüà
¯ÖϵÖÖꕵ֟ÖÖ
23 12.5.1 ×¾Ö»ÖÓ×²ÖŸÖ ³ÖãÖŸÖÖ­Ö êú ×»Ö‹ ²µÖÖ•Ö ----%
24 15.1.1 ²Öß´Öë ´Öë ¿ÖÖ×´Ö»Ö úß •ÖÖ­Öê ¾ÖÖ»Öß ŸÖßÃÖ¸êü ¯ÖÖ úß ²ÖÖ¬µÖŸÖÖ úß ¸üÖ×¿Ö ¹ý.------------

64

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
SCHEDULE ‘B’

MATERIAL ISSUED TO THE CONTRACTOR

( The Engineer-in-Charge to indicate permissible wastage before issue of tender


duly approved by the Competent Authority)

Sl. Particulars Unit Rate at Maximum Maximum Qty.


No. which Invisible permissible to be
Material wastage wastage issued
will be (Non- (Returnable
(approx.)
issued Returnable) in case of
free issue)
% %*
1 2 3 4 5 6 7

* This percentage can vary as per the cutting plan approved by Engineer-in-
Charge

Signature of Issuing Officer: Signature of Contractor:

Date: ……………… Date : ………………….

65

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
†­ÖãÃÖæ“Öß "²Öß"
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê •ÖÖ¸üß úß •ÖÖ­Öê ¾ÖÖ»Öß ÃÖִ֐ÖÏß
(¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ×­Ö×¾Ö¤üÖ •ÖÖ¸üß ×ú‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê ÃÖÖ´Ö ¯ÖÏÖ׬֍úÖ¸üß «üÖ¸üÖ ×¾Ö׬־֟ÖË †­Öã´ÖÖêפüŸÖ †­Öã´Ö­µÖ
†­Öã¯ÖµÖÖêÖß ÆüÖê Ã֍ú­Öê ¾ÖÖ»Öß ÃÖִ֐ÖÏß úÖê ¤ü¿ÖÖԋӐÖê )
Îú´Ö ×¾Ö¾Ö¸üÖ ‡úÖ‡Ô ¾ÖÆü ¤ü¸ü וÖÃÖ ¯Ö¸ü †×¬ÖúŸÖ´Ö †¥ü¿µÖ †×¬ÖúŸÖ´Ö •ÖÖ¸üß úß
ÃÖÓ. ÃÖִ֐ÖÏß •ÖÖ¸üß úß †­Öã¯ÖµÖÖêÖß ÃÖִ֐ÖÏß †­Öã´Ö­µÖ úß •ÖÖ­Öê
•ÖÖ‹Öß (¾ÖÖ¯ÖÃÖß µÖÖêµÖ ­ÖÆüà) †­Öã¯ÖµÖÖêÖß ÃÖִ֐ÖÏß ¾ÖÖ»Öß ´ÖÖ¡ÖÖ
(¾ÖÖ¯ÖÃÖß µÖÖꐵÖ, µÖפü (»ÖÖ³ÖÖ)
×­Ö:¿Ö㻍ú •ÖÖ¸üß ÆüÖ)ê
% %*
1 2 3 4 5 6 7

------------------------------------------------------------------------------------------------
* µÖÆü ¯ÖÏ×ŸÖ¿ÖŸÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ úØ™üÖ µÖÖê•Ö­ÖÖ êú †­ÖãÃÖÖ¸ü ²Ö¤ü»Ö Ã֍úŸÖÖ Æîü…

•ÖÖ¸üß ú¸ü­Öê ¾ÖÖ»Öê †×¬ÖúÖ¸üß êú ÆüßÖցָü : ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÆüßÖցָü :


ŸÖÖ¸üßÖ : ---------------------------- ŸÖÖ¸üßÖ :--------------

65

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
SCHEDULE 'C'

TOOLS AND PLANT TO BE HIRED TO THE CONTRACTOR

Sr.no. Particulars Number Hire Frequency of Value Place Number


available charges Maintenance Per of Reqd.
per Unit per Unit Issue by the
working Contra
day ctor.
Rs.
1 2 3 4 5 6 7 8

Tools and Plants are not expected to be hired out to the Contractor. If,
however, any tools and plants are available at the time of performing the
work the same may be hired out at rates to be decided by the Engineer-In-
Charge. The Corporation reserves the right not to hire out any T&P and to
withdraw at any time such T&P hired out.

The Contractor shall ask the Engineer-In-Charge the value of tools & Plants for
which these have to be insured and carry out the insurance accordingly in
case insurance not available with NPCIL.

Signature of the Issuing Officer Signature of Contractor


Date.............. Date..............

FORMAT FOR ‘HINDRANCE REGISTER’

Sr.No Nature of Date Date Period of Overlap- Net Dated Dated Rem
hindrance of of hindrance ping exte sign sign arks
occur remov period if n- of of
ance al any sion Contr Engr.
act-or with
with name
name

66

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
†­ÖãÃÖæ“Öß "ÃÖß"
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍ú¸üÖ‹ ¯Ö¸ü פü‹ •ÖÖ­Öê ¾ÖÖ»Öê †Öî•ÖÖ¸ü ¾Ö ÃÖÓµÖÓ¡Ö
Îú´Ö ÃÖӏµÖÖ ×¾Ö¾Ö¸üÖ ˆ¯Ö»Ö²¬Ö ¯ÖÏ×ŸÖ ­ÖÖ ¯ÖÏ×ŸÖ †­Öã¸üÖÖ ¯ÖÏ×ŸÖ ­ÖÖ •ÖÖ¸üß ÃÖÓ×¾Ö¤ü֍úÖ¸ü
ÃÖӏµÖÖ úÖµÖÔ ×¤ü¾ÖÃÖ úß ´Öæ»µÖ ú¸ü­Öê «üÖ¸üÖ ¾ÖÖÓ×”ûŸÖ
׍ú¸üÖµÖÖ ¯ÖϳÖÖ¸ü †Ö¾Öé×¢Ö úÖ ­ÖÖÖë úß
¹ý. ãÖÖ­Ö ÃÖӏµÖÖ
1 2 3 4 5 6 7 8

ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †Öî•ÖÖ¸ü ¾Ö ÃÖÓµÖÓ¡Ö ×ú¸üÖ‹ ¯Ö¸ü פüµÖÖ •ÖÖ­ÖÖ †¯Öê×ÖŸÖ ­ÖÆüà Æîü… ŸÖ£ÖÖׯÖ, µÖפü, úÖµÖÔ ×­Ö¯ÖÖפüŸÖ ׍ú‹
•ÖÖŸÖê ÃÖ´ÖµÖ úÖê‡Ô †Öî•ÖÖ¸ü µÖÖ ÃÖÓµÖÓ¡Ö ˆ¯Ö»Ö²¬Ö Æîü ŸÖÖê ˆÃÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×­Ö¬ÖÖÔ׸üŸÖ úß Ö‡Ô ¤ü¸üÖë ¯Ö¸ü ׍ú¸üÖ‹
¯Ö¸ü פüµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü… ׍úÃÖß ³Öß ™üß ‹›ü ¯Öß úÖê ׍ú¸üÖ‹ ¯Ö¸ü ¤êü­Öê †Öî¸ü ׍ú¸üÖ‹ ¯Ö¸ü ¤üß Ö‡Ô ˆÃÖ ™üß ‹›ü ¯Öß úÖê
׍úÃÖß ³Öß ÃÖ´ÖµÖ ¾ÖÖ¯ÖÃÖ »Öê­Öê úÖ ×­ÖÖ´Ö úÖ †×¬ÖúÖ¸ü ÃÖã¸ü×ÖŸÖ Æîü…

ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖê ‡­Ö ™üß‹›ü¯Öß êú ×»Ö‹ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ²Öß´ÖÖ ´Öæ»µÖ ¯Öæ”ëûÖê †Öî¸ü µÖפü
‹­Ö¯ÖßÃÖ߆ևԋ»Ö ­Öê ˆ­ÖúÖ ²Öß´ÖÖ ­Ö ú¸üÖµÖÖ ÆüÖê ŸÖÖê, ŸÖ¤ü­ÖãÃÖÖ¸ü ²Öß´ÖÖ ú¸ü֋ӐÖê…

•ÖÖ¸üß ú¸ü­Öê ¾ÖÖ»Öê †×¬ÖúÖ¸üß êú ÆüßÖցָü : ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÆüßÖցָü :


ŸÖÖ¸üßÖ : ---------------------------- ŸÖÖ¸üßÖ :--------------
" ¯ÖÏןֲÖÖ¬ÖÖ ¸üוÖÙü¸ü úÖ ¯ÖÏÖºþ¯Ö"
Îú´Ö ¯ÖÏןֲÖÖ¬ÖÖ ‘Ö×™üŸÖ ÃÖ´ÖÖ¯ŸÖ ¯ÖÏןֲÖÖ¬ÖÖ †×ŸÖ“”ûÖ¤üß ãú»Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖϳÖÖ¸üß †³µÖãÛŒŸÖ
ÃÖӏµÖÖ úß ÆüÖê­Öê ÆüÖê­Öê ¸üÆü­Öê úß †¾Ö׬Ö, ÃÖ´ÖµÖ×¾ÖßÖÖ¸ü êú ŸÖÖ¸üßÖ †×³ÖµÖÓŸÖÖ
¯Öύéú×ŸÖ úß úß †¾Ö×¬Ö µÖפü úÖê‡Ô ¾Ö ­ÖÖ´Ö êú
ŸÖÖ¸üßÖ ŸÖÖ¸üßÖ ÆüÖê ŸÖÖê ÃÖ×ÆüŸÖ ŸÖÖ¸üߏÖ
ÆüßÖցָü ¾Ö ­ÖÖ´Ö
ÃÖ×ÆüŸÖ
ÆüßÖցָü

66

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
19. CONTRACTORS` LABOUR REGULATIONS AND FORMS

1. Definitions:

In these regulations, unless otherwise expressed or indicated, the following


words and expression shall have the meaning hereby assigned to them:

(a) "Workmen’ means any person employed by the contractor, directly or


indirectly through a sub-contractor, to do any skilled, semi-skilled or
unskilled manual, supervisory, technical or clerical work for hire or reward,
whether the terms of employment are expressed or implied but does not
include any person-
1. Who is employed mainly in managerial or administrative capacity; or
2. Who, being employed in supervisory capacity draws wages exceeding five
hundred rupees per mensem or exercise either by the nature of the duties
attached to the office or by reason of powers vested in him, functions
mainly of managerial nature;
3. Who is an out worker, that is to say, a person to whom any article or
materials are given out by or on behalf of the principal employer to be
made up, cleaned washed, altered, ornamental finished, repaired,
adopted or otherwise processed for sale for the purposes of the trade or
business of the principal employer and the process is to be carried out
either in the home of the out worker or in some other premises, not being
premises under the control and management of the principal employer.

(b) "Fair Wage" means wages, which shall include wages for weekly day of rest
and other allowances, whether for time or piece work, after taking into
consideration prevailing market rates for similar employments in the
neighborhood but shall not be less than the minimum rates of wages fixed
under The Minimum Wages Act.

(c) "Contractor" for the purpose of these regulations shall include an agent
or sub-contractor employing labour on the work taken on contract.

(d) "Inspecting Officer" means any Labour Enforcement Officer, or Assistant


Labour Commissioner of the Chief Labour Commissioner’s Organisation.

(e) "Form" means a form appended to these Regulations.

2. Notice of commencement: The Contractor shall, within SEVEN days of


commencement of the work, furnish in writing to the Inspecting Officer of
the area concerned the following information:

(a) Name and situation of the work


(b) Contractors` name and address
(c) Particulars of the Department for which the work is undertaken

67

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
19. šêüúÖ ÁÖ״֍ú ×¾Ö×­ÖµÖ´Ö ¾Ö ¯Öϯ֡Ö
1. ¯Ö׸ü³ÖÖÂÖÖ‹Ó :
‡­Ö ×¾Ö×­ÖµÖ´ÖÖë ´Öë •Ö²Ö ŸÖú ׍ú †­µÖ£ÖÖ ˆ¨éüŸÖ µÖÖ ¤ü¿ÖÖÔµÖÖ ­Ö •ÖÖ‹, ×­Ö´­Ö×»Ö×ÖŸÖ ¿Ö²¤ü ¾Ö †×³Ö¾µÖÛŒŸÖµÖÖÓ
‡Ã֍êú ²ÖÖ¤ü ˆ­Öêú †ÖÖê פü‹ Ö‹ †£ÖÔ úÖê ¾µÖŒŸÖ ú¸ëüÖß :
(‹) "úִ֐ÖÖ¸ü" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖÏŸµÖÖ ºþ¯Ö ÃÖê †£Ö¾ÖÖ †¯ÖÏŸµÖÖ ºþ¯Ö ÃÖê ˆ¯Ö
ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ´ÖÖ¬µÖ´Ö ÃÖê ãú¿Ö»Ö, †¬Öԍãú¿Ö»Ö µÖÖ †ãú¿Ö»Ö ¿ÖÖ¸üß׸üú, ¯ÖµÖÔ¾ÖêÖú, ŸÖú­Öߍúß
µÖÖ ×»Öׯ֍úßµÖ úÖµÖÔ ú¸ü­Öê êú ×»Ö‹ ׍ú¸üÖ‹ ¯Ö¸ü µÖÖ ¯ÖÖ׸üŸÖÖê×Â֍ú ¯Ö¸ü ×­ÖµÖãŒŸÖ ×ú‹ Ö‹ ׍úÃÖß ³Öß
¾µÖÛŒŸÖ ÃÖê Æîü, “ÖÖÆêü ×­ÖµÖãÛŒŸÖ úß ¿ÖŸÖí ¾ÖÙÖŸÖ ÆüÖë µÖÖ »Ö֐Öæ úß Ö‡Ô ÆüÖë ¯Ö¸ÓüŸÖã ‡ÃÖ´Öë ¾ÖÆü ¾µÖÛŒŸÖ
¿ÖÖ×´Ö»Ö ­ÖÆüà Æîü :-
1. •ÖÖê ´Ö㏵ֵ֟ÖÖ ¯ÖϲÖӬ֍úßµÖ µÖÖ ¯ÖÏ¿ÖÖÃÖ׭֍ú Ö´ÖŸÖÖ ´Öë ×­ÖµÖãŒŸÖ ×úµÖÖ ÖµÖÖ ÆüÖê ; µÖÖ
2. •ÖÖê ¯ÖµÖÔ¾ÖêÖú ÁÖêÖß ´Öë ×­ÖµÖãŒŸÖ ÆüÖê­Öê êú úÖ¸üÖ ¯ÖÖÓ“Ö ÃÖÖî ¹ý¯Ö‹ ¯ÖÏןִÖÖÆü ÃÖê †×¬Öú úÖ ¾ÖêŸÖ­Ö
¯ÖÏÖ¯ŸÖ ú¸ü ¸üÆüÖ ÆüÖê µÖÖ †¯Ö­Öê ¤üÖ×µÖŸ¾ÖÖë úß ¯Öύéú×ŸÖ êú úÖ¸üÖ ¯Ö¤ü ÃÖê ÃÖÓ²Ö¨ü †£Ö¾ÖÖ ˆÃÖê ¯ÖϤü¢Ö
¿ÖÛŒŸÖµÖÖë êú úÖ¸üÖ êú¾Ö»Ö ¯ÖϲÖӬ֍úßµÖ ¯Öύéú×ŸÖ êú úÖµÖÔ ú¸üŸÖÖ ÆüÖê…
3. •ÖÖê ²ÖÖÆü¸üß úִ֐ÖÖ¸ü ÆüÖ,ê †£ÖÖÔŸÖ ×•ÖÃÖê ´ÖãµÖ ×­ÖµÖÖꌟÖÖ «üÖ¸üÖ µÖÖ ˆÃ֍úß †Öê¸ü ÃÖê ÃÖÓ¾ÖÖ¸ü­Öê, ÃÖ±úÖ‡Ô
ú¸ü­Öê, ¬Öã»ÖÖ‡Ô ú¸ü­Öê, ¸ü¤ËüÖ²ê Ö¤ü»Ö ú¸ü­Öê, ÃÖ•ÖÖ­Öê, ´Ö¸ü´´ÖŸÖ ú¸ü­Öê, †¯Ö­ÖÖ­Öê µÖÖ †­µÖ£ÖÖ ¾µÖÖ¯ÖÖ¸ü µÖÖ
¾ÖÖםÖÛ•µÖú úÖ¸üÖÖë ÃÖê ײ֍Îúß ÆêüŸÖã ŸÖîµÖÖ¸ü ú¸ü­Öê êú ×»Ö‹ ׍úÃÖß ¾ÖßÖã µÖÖ ÃÖִ֐ÖÏß úÖê ˆÃ֍êú ‘Ö¸ü
´Öë µÖÖ ´ÖãµÖ ×­ÖµÖÖꌟÖÖ êú ×­ÖµÖÓ¡ÖÖ ¾Ö ¯ÖϲÖÓ¬Ö­Ö ÃÖê ²ÖÖÆü¸ü ׍úÃÖß †­µÖ ¯Ö׸üÃÖ¸ü ´Öë פüµÖÖ •ÖÖŸÖÖ Æîü…
(²Öß) "­µÖÖµÖ¯ÖæÖÔ ´Ö•Ö¤æü¸üß" ÃÖê ŸÖÖŸ¯ÖµÖÔ ÃÖ´ÖµÖ †£Ö¾ÖÖ ™ãüú›ÍüÖ úÖµÖÔ úß ÃÖÖ¯ŸÖÖ×Æüú ”ãû¼üß ¾Ö †­µÖ ³Ö¢Öê
¿ÖÖ×´Ö»Ö ú¸üŸÖê Æãü‹ ŸÖµÖ úß Ö‡Ô ˆÃÖ ´Ö•Ö¤æü¸üß ÃÖê Æîü •ÖÖê ÃÖ´ÖÖ­Ö ×­ÖµÖãÛŒŸÖ êú ×»Ö‹ †ÖÃÖ-¯ÖÖÃÖ “Ö»Ö
¸üÆüß ²ÖÖ•ÖÖ¸ü ¤ü¸ü ¯Ö¸ü ×¾Ö“ÖÖ¸ü ú¸üŸÖê Æãü‹ ¯Ö¸ÓüŸÖã ­µÖæ­ÖŸÖ´Ö ´Ö•Ö¤æü¸üß †×¬Ö×­ÖµÖ´Ö êú †¬Öß­Ö ×­ÖÛ¿“ÖŸÖ úß
Ö‡Ô ¤ü¸üÖë ÃÖê ú´Ö ­Ö ÆüÖê…
(ÃÖß) ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú ×»Ö‹ "ÃÖÓ×¾Ö¤ü֍úÖ¸ü" ÃÖê ŸÖÖŸ¯ÖµÖÔ ×úÃÖß ‹êÃÖê ‹•Öë™ü µÖÖ ˆ¯Ö-ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê Æî
•ÖÖê ÃÖÓ×¾Ö¤üÖ êú úÖµÖÔ êú ×»Ö‹ ´Ö•Ö¤æü¸üÖë úß ×­ÖµÖãÛŒŸÖ ú¸üŸÖÖ ÆüÖêü…
(›üß) "×­Ö¸üßÖÖ †×¬ÖúÖ¸üß" ÃÖê ŸÖÖŸ¯ÖµÖÔ ×úÃÖß ³Öß ÁÖ´Ö ¯ÖϾ֟ÖÔ­Ö †×¬ÖúÖ¸üß µÖÖ ¯ÖÏ´ÖãÖ ÁÖ´Ö †ÖµÖ㌟Ö
ÃÖӐ֚ü­Ö êú ÃÖÆüֵ֍ú ÁÖ´Ö †ÖµÖãŒŸÖ ÃÖê Æîü…
(‡Ô) "¯Öϯ֡Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú ÃÖÖ£Ö »ÖÖê Æãü‹ ¯ÖÏ¯Ö¡Ö ÃÖê Æîü…

2. ¯ÖÏÖ¸Óü³Ö úß ÃÖæ“Ö­ÖÖ : ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê úê ÃÖÖŸÖ ×¤ü­ÖÖë êú ³Öߟָü ÃÖÓ²ÖÓ×¬ÖŸÖ Öê¡Ö êú
×­Ö¸üßÖÖ †×¬ÖúÖ¸üß úÖê ×»Ö×ÖŸÖ ºþ¯Ö ÃÖê ×­Ö´­Ö×»Ö×ÖŸÖ úß ÃÖæ“Ö­ÖÖ ¤êüÖÖ :

(‹) úÖµÖÔ úÖ ­ÖÖ´Ö ¾Ö ¯ÖÏÛãÖןÖ


(²Öß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ­ÖÖ´Ö ¾Ö ¯ÖŸÖÖ
(ÃÖß) ˆÃÖ ×¾Ö³ÖÖÖ úÖ ­ÖÖ´Ö ×•ÖÃ֍úÖ úÖµÖÔ ×úµÖÖ •ÖÖ ¸üÆüÖ Æîü

67

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(d) Name and address of sub-contractors as and when they are appointed
(e) Commencement and probable duration of the work
(f) Number of workers employed and likely to be employed
(g) "Fair wages" for different categories of workers

3 (i) Number of hours of work which shall constitute a normal


working day:-
The number of hours which shall constitute a normal working day for
an adult shall be NINE hours. The working day of an adult worker shall be
so arranged that inclusive of intervals, if any, for rest, it shall not spread
over more than twelve hours on any day; when an adult worker is made
to work for more than NINE hours on any day or for more than FORTY EIGHT
hours in any week, he shall, in respect of overtime work, be paid wages at
double at ordinary rate of wages.
(ii) Weekly day of rest :

Every worker shall be given a weekly day of rest which shall be fixed and
notified at least TEN days in advance. A worker shall not be required or
allowed to work on the weekly rest day unless he has or will have a
substituted rest day, on one of the five day immediately before or after
the rest day. Provided that no substitution shall be made which will
result in the worker working for more than ten days consecutively
without a rest day for a whole day.

Where in accordance with the foregoing provisions a worker works on


the rest day and has been given a substituted rest day he shall be paid
wages for the work done on the weekly rest day at the overtime rate
of wages.
NOTE : The expression "ordinary rate of wages" means the fair wage the
worker is entitled to.
4. Display of notice regarding Wages, Weekly Day of Rest etc.,:

The Contractor shall, before he commences his work on Contract,


display and correctly maintain and continue to display and correctly
maintain in a clean and legible condition in conspicuous places on the
works, notice in English and in the local Indian Language spoken by
majority of workers, giving the rate of fair wages, the hours of work for
which such wages are payable, the weekly rest days workers are entitled
to and name and address of the Inspecting Officer. The Contractor shall
send a copy each of such notices to the Inspecting Officers.

5. Fixation of Wage Periods :


The Contractor shall fix wage periods in respect of which wages shall
be payable. No wage period shall normally exceed one week.

68

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(›üß) •Ö²Ö ú³Öß ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­ÖµÖãŒŸÖ ×úµÖÖ •ÖÖ‹ •ÖÖê ˆ­Öêú ­ÖÖ´Ö ¾Ö ¯ÖŸÖê
(‡Ô) úÖµÖÔ êú ¯ÖÏÖ¸Óü³Ö úß ŸÖÖ¸üßÖ ¾Ö ÃÖÓ³ÖÖ×¾ÖŸÖ †¾Ö׬Ö
(‹±ú) ×­ÖµÖãŒŸÖ ×ú‹ Ö‹ µÖÖ ÃÖÓ³ÖÖ×¾ÖŸÖ ×­ÖµÖãŒŸÖ ú´ÖÔ“ÖÖ׸üµÖÖë úß ÃÖӏµÖÖ
(•Öß) ×¾Ö×³Ö®Ö ÁÖêםֵÖÖë êú úִ֐ÖÖ¸üÖë úß "­µÖÖµÖ¯ÖæÖÔ" ´Ö•Ö¤æü¸üß…

3. (i) úÖµÖÔ êú ˆ­Ö ‘ÖÓ™üÖë úß ÃÖӏµÖÖ ×•Ö­ÆÓüê ‹ú ÃÖÖ´ÖÖ­µÖ úÖµÖÔ ×¤ü¾ÖÃÖ ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ :-
‹ú ¾ÖµÖÍú êú ×»Ö‹ ‹ú ÃÖÖ´ÖÖ­µÖ úÖµÖÔפü¾ÖÃÖ êú úÖµÖÔ‘ÖÓ™üÖë úß ÃÖӏµÖÖ ­ÖÖî ‘ÖÓ™êü ÆüÖêÖß… ‹ú
¾ÖµÖÍú úִ֐ÖÖ¸ü êú úÖµÖÔפü¾ÖÃÖ úÖê ‡ÃÖ ¯ÖύúÖ¸ü ¾µÖ¾ÖÛÃ£ÖŸÖ ×úµÖÖ •ÖÖ­ÖÖ “ÖÖ×Æü‹ ׍ú ×¾ÖÁÖÖ´Ö êú
×»Ö‹ µÖפü úÖê‡Ô ×¾Ö¸üÖ´Ö ÆüÖê ŸÖÖê ˆÃÖê ¿ÖÖ×´Ö»Ö ú¸üŸÖê Æãü‹ ‹ú פü­Ö ´Öë µÖÆü ãú»Ö ²ÖÖ¸üÆü ‘ÖÓ™üÖë ÃÖê
†×¬Öú ­Ö ÆüÖê ; •Ö²Ö ׍úÃÖß úִ֐ÖÖ¸ü úÖê ׍úÃÖß ‹ú פü­Ö ´Öë ­ÖÖî ‘ÖÓ™üÖë ÃÖê †×¬Öú µÖÖ ‹ú ÃÖ¯ŸÖÖÆü
´Öë †›ÍüŸÖÖ×»ÖÃÖ ‘ÖÓ™üÖë ÃÖê †×¬Öú ÃÖ´ÖµÖ êú ×»Ö‹ úÖ´Ö ¯Ö¸ü »ÖÖÖµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ˆÃÖê ‡ÃÖ
†×ŸÖ׸üŒŸÖ úÖ´Ö êú ×»Ö‹ ÃÖÖ´ÖÖ­µÖ ´Ö•Ö¤æü¸üß úß ¤ü¸ü ÃÖê ¤ãüÖã­Öß ¤ü¸ü ¯Ö¸ü ´Ö•Ö¤æü¸üß úÖ ³ÖãÖŸÖÖ­Ö ×úµÖÖ
•ÖÖ‹ÖÖ…
(ii) ÃÖ¯ŸÖÖ×ƍú ×¾ÖÁÖÖ´Ö úÖ ×¤ü­Ö :
¯ÖÏŸµÖêú úִ֐ÖÖ¸ü úÖê ÃÖ¯ŸÖÖÆü ´Öë ‹ú פü­Ö ×¾ÖÁÖÖ´Ö êú ×»Ö‹ פüµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖê ×­Ö¬ÖÖÔ׸üŸÖ ú¸ü ú´Ö
ÃÖê ú´Ö ¤üÃÖ ×¤ü­Ö ¯ÖÆü»Öê †×¬ÖÃÖæ×“ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ… ׍úÃÖß úִ֐ÖÖ¸ü úÖê ‡ÃÖ ×¾ÖÁÖÖ´Ö ¾ÖÖ»Öê פü­Ö
úÖ´Ö ú¸ü­Öê úß †Ö¾Ö¿µÖúŸÖÖ ­ÖÆüà ÆüÖêÖß †Öî¸ü •Ö²Ö ŸÖú ׍ú ˆÃÖê ¾ÖîúÛ»¯Öú ×¾ÖÁÖÖ´Ö ×¤ü¾ÖÃÖ ­Ö
פüµÖÖ •ÖÖ‹ µÖÖ ­Ö פüµÖÖ •ÖÖ­Öê ¾ÖÖ»ÖÖ ÆüÖ,ê ˆÃÖê úÖ´Ö ú¸ü­Öê úß †­Öã´Ö×ŸÖ ­ÖÆüßÓ ¤üß •ÖÖ‹Öß… ¯Ö¸ÓüŸÖã ‡ÃÖ
¯ÖύúÖ¸ü úß ¾ÖîúÛ»¯Öú ¾µÖ¾ÖãÖÖ ‹êÃÖß ­ÖÆüà ÆüÖêÖß ×ú úִ֐ÖÖ¸ü úÖê ²ÖÖî¸ü ׍úÃÖß ¯ÖæÖÔ ×¤ü¾ÖÃÖ
×¾ÖÁÖÖ´Ö êú »ÖÖÖŸÖÖ¸ü ¤üÃÖ ×¤ü­ÖÖë ÃÖê †×¬Öú úÖµÖÔ ú¸ü­ÖÖ ¯Ö›Íêü…
•Ö²Ö ú³Öß ¯Öæ¾ÖÖìŒŸÖ ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖêÓ êú †­ÖãÃÖÖ¸ü úÖê‡Ô úִ֐ÖÖ¸ü ×¾ÖÁÖÖ´Ö êú פü­Ö ´Öë úÖ´Ö ú¸üŸÖÖ Æîü †Öî¸ü
ˆÃ֍êú ²Ö¤ü»Öê ´Öë ˆÃÖê ‹ú פü­Ö úÖ ×¾ÖÁÖÖ´Ö ×¤üµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ˆÃÖê ÃÖÖ¯ŸÖÖ×Æüú ×¾ÖÁÖÖ´Ö ¾ÖÖ»Öê פü­Ö
êú úÖ´Ö êú ×»Ö‹ ÃÖ´ÖµÖÖê¯Ö׸ü ¤ü¸ü ÃÖê ´Ö•Ö¤æü¸üß úÖ ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ‹ÖÖ…

­ÖÖê™ü : †×³Ö¾µÖÛŒŸÖ " ´Ö•Ö¤æü¸üß úß ÃÖÖ´ÖÖ­µÖ ¤ü¸ü" ÃÖê ŸÖÖŸ¯ÖµÖÔ úִ֐ÖÖ¸ü úß Æüú¤üÖ¸üß ¾ÖÖ»Öß
­µÖÖµÖ¯ÖæÖÔ ´Ö•Ö¤æü¸üß ÃÖê Æîü…

4. ´Ö•Ö¤æü¸üß, ÃÖÖ¯ŸÖÖ×Æüú ”ãû¼üß †Öפü úß ÃÖæ“Ö­ÖÖ úÖ ¯ÖϤü¿ÖÔ­Ö :


ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ÃÖÓ×¾Ö¤üÖ úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê ÃÖê ¯ÖÆü»Öê úÖµÖÔÃ£Ö»Ö êú ´ÖÆüŸ¾Ö¯ÖæÖÔ Ã£ÖÖ­ÖÖë ¯Ö¸ü †ÓÖÏê•Öß ¾Ö
†×¬ÖúŸÖ¸ü ´Ö•Ö¤æü¸üÖë «üÖ¸üÖ ²ÖÖê»Öß •ÖÖ­Öê ¾ÖÖ»Öß Ã£ÖÖ­ÖßµÖ ³ÖÖ¸üŸÖßµÖ ³ÖÖÂÖÖ ´Öë þ֓”û ¾Ö ïÖ™ü ºþ¯Ö ÃÖê ¯ÖœÍêü •ÖÖ­Öê
µÖÖêµÖ ×»ÖÖÖ¾Ö™ü ´Öë ­µÖÖµÖ¯ÖæÖÔ ´Ö•Ö¤æü¸üß, úÖµÖÔ êú ‘ÖÓ™ê ו֭֍êú ×»Ö‹ ‡ÃÖ ´Ö•Ö¤æü¸üß úÖ ³ÖãÖŸÖÖ­Ö ×úµÖÖ
•ÖÖ‹ÖÖ, ´Ö•Ö¤æü¸üÖë úß ÃÖÖ¯ŸÖÖ×Æüú ”ãû¼üß ×•ÖÃ֍êú ×»Ö‹ ¾Öê ¯ÖÖ¡Ö Æïü †Öî¸ü ×­Ö¸üßÖÖ †×¬ÖúÖ¸üß úÖ ­ÖÖ´Ö ¾Ö ¯ÖŸÖÖ
†Öפü úß ÃÖæ“Ö­ÖÖ ¯ÖϤüÙ¿ÖŸÖ †Öî¸ü †ªŸÖ­Ö úß •ÖÖ‹Öß ŸÖ£ÖÖ »ÖÖÖŸÖÖ¸ü ¯ÖϤüÙ¿ÖŸÖ ¾Ö †ªŸÖ­Ö ¸üÖß •ÖÖ‹Öß…

5. ´Ö•Ö¤æü¸üß †¾Ö×¬Ö úÖ ×­Ö¬ÖÖÔ¸üÖ :


ÃÖÓ×¾Ö¤ü֍úÖ¸ü ³ÖãÖŸÖÖ­ÖµÖÖêµÖ ´Ö•Ö¤æü¸üß úß ³ÖãÖŸÖÖ­Ö †¾Ö×¬Ö ×­Ö¬ÖÖÔ׸üŸÖ ú¸êüÖÖ… ÃÖÖ´ÖÖ­µÖŸÖµÖÖ úÖê‡Ô ³Öß ³ÖãÖŸÖÖ­Ö
†¾Ö×¬Ö ‹ú ÃÖ¯ŸÖÖÆü ÃÖê †×¬Öú ­ÖÆüà ÆüÖêÖß…
68

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6. Payment of Wage:

(i) Wages due to every worker shall be paid to him direct. All wages
shall be paid in current coins or currency or in both.

(ii) Wages of every worker employed on the Contract shall be paid


where the wage period is one week, within THREE days from the end
of the Wage period; and in any other case before the expiry of the
7th day or 10th day from the end of the wage period according as
the number of workers does not exceed 1,000 or exceeds 1,000.

(iii) When employment of any worker is terminated by or on behalf of


the Contractor, the wages earned by him shall be paid before expiry
of the day succeeding the one on which his employment is
terminated.

(iv) Payment of wages shall be made at the work site on a working day
except when the work is completed before expiry of the wage
period, in which case final payment shall be made at the work site
within 48 hours of the last working day and during normal time.

NOTE : The term "working day" means a day on which the work on
which labour is employed, is in progress.

7. Register of Workmen :

A register of workmen shall be maintained in the Form appended to these


regulations and kept at the work site or as near to it as possible, and
relevant particulars of every workman shall be entered therein within
THREE days of his employment. (Ref. Appendix I)

8. Employment Card:

The Contractor shall issue an employment card in the Form appended


to these regulations to each worker on the day of work or entry into his
employment. If a worker already has any such card with him issued by
the previous employer, the contractor shall merely endorse that
Employment Card with relevant entries. On termination of employment the
Employment Card shall again be endorsed by the Contractor and
returned to the worker. (Appendix II)

9. Register of Wages etc. :

(i) A Register of Wages-Cum-Muster Roll in the Form appended to


these regulations shall be maintained and kept at the work site or
as near to it as possible.(Appendix III).

69

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6. ´Ö•Ö¤æü¸üß úÖ ³ÖãÖŸÖÖ­Ö :
(i) ¯ÖÏŸµÖêú ´Ö•Ö¤æü¸ü úÖê ˆÃ֍úß ¤êüµÖ ´Ö•Ö¤æü¸üß úÖ ³ÖãÖŸÖÖ­Ö ˆÃÖß ´Ö•Ö¤æü¸ü úÖê ÃÖ߬Öê ׍úµÖÖ •ÖÖ‹ÖÖ… ÃÖ³Öß
´Ö•Ö¤æü¸üß ŸÖŸÃÖ´ÖµÖ ¯ÖÏ“ÖÖ×»ÖŸÖ ×ÃÖŒúÖë µÖÖ ¹ý¯ÖµÖÖë µÖÖ ¤üÖê­ÖÖë ´Öë úß •ÖÖ‹Öß…
Í(ii) ÃÖÓ×¾Ö¤üÖ ¯Ö¸ü ×­ÖµÖãŒŸÖ ×ú‹ Ö‹ ÃÖ³Öß úִ֐ÖÖ¸üÖë úß ´Ö•Ö¤æü¸üß, µÖפü ¾ÖÆü ÃÖÖ¯ŸÖÖ×Æüú †¾Ö×¬Ö ¾ÖÖ»Öß
ÆüÖê ŸÖÖê ´Ö•Ö¤æü¸üß †¾Ö×¬Ö ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê êú ²ÖÖ¤ü ÃÖê ŸÖß­Ö ×¤ü­ÖÖë êú ³Öߟָü ³ÖãÖŸÖÖ­Ö úß •ÖÖ‹Öß… †­µÖ
ÃÖ³Öß ´ÖÖ´Ö»ÖÖë ´Öë ´Ö•Ö¤æü¸üÖë úß ÃÖӏµÖÖ 1000 ÃÖê ú´Ö µÖÖ 1000 ÃÖê †×¬Öú ÆüÖê­Öê ¯Ö¸ü ´Ö•Ö¤æü¸üß
†¾Ö×¬Ö ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê êú Îú´Ö¿Ö: 7¾Öë †Öî¸ü 10¾Öë פü­Ö ÃÖê ¯ÖÆü»Öê ³ÖãÖŸÖÖ­Ö úß •ÖÖ‹Öß…
(iii) •Ö²Ö ú³Öß ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ µÖÖ ˆÃ֍úß †Öê¸ü ÃÖê ׍úÃÖß úִ֐ÖÖ¸ü úÖ ×­ÖµÖÖê•Ö­Ö ÃÖ´ÖÖ¯ŸÖ ׍úµÖÖ
•ÖÖŸÖÖ Æîü ŸÖÖê ˆÃ֍êú «üÖ¸üÖ †Ù•ÖŸÖ ´Ö•Ö¤æü¸üß úÖ ³ÖãÖŸÖÖ­Ö ˆÃ֍úß ×­ÖµÖãÛŒŸÖ ÃÖ´ÖÖ¯ŸÖ úß •ÖÖ­Öê ¾ÖÖ»Öß
ŸÖÖ¸üßÖ ÃÖê ¯ÖÆü»Öê ¾ÖÖ»Öê פü­Ö ú¸ü פüµÖÖ •ÖÖ‹ÖÖ…
(iv) •Ö²Ö úÖµÖÔ úß ÃÖ´ÖÖÛ¯ŸÖ ´Ö•Ö¤æü¸üß †¾Ö×¬Ö ÃÖê ¯ÖÆü»Öê ÆüÖê •ÖÖ‹ ŸÖÖê ‹êÃÖê ´ÖÖ´Ö»ÖÖë ´Öë †Ó×ŸÖ´Ö ´Ö•Ö¤æü¸üß
³ÖãÖŸÖÖ­Ö †Ó×ŸÖ´Ö úÖµÖÔפü¾ÖÃÖ êú 48 ‘ÖÓ™üÖê êú ³Öߟָü ÃÖÖ´ÖÖ­µÖ úÖµÖÔÃÖ´ÖµÖ ´Öë úÖµÖÔÃ£Ö»Ö ¯Ö¸ü
úÖµÖÔפü¾ÖÃÖ ´Öë ׍ú‹ •ÖÖ­Öê êú †»ÖÖ¾ÖÖ ´Ö•Ö¤æü¸üß úÖ ³ÖãÖŸÖÖ­Ö úÖµÖÔ Ã£Ö»Ö ¯Ö¸ü úÖµÖÔ ×¤ü¾ÖÃÖ ´Öë Æüß
׍úµÖÖ •ÖÖ‹ÖÖ…
­ÖÖê™ü : †×³Ö¾µÖÛŒŸÖ "úÖµÖÔפü¾ÖÃÖ" ÃÖê ŸÖÖŸ¯ÖµÖÔ ˆÃÖ ×¤ü­Ö ÃÖê Æîü •Ö²Ö úÖµÖÔ êú ×»Ö‹ ×­ÖµÖÖê×•ÖŸÖ ´Ö•Ö¤æü¸ü ¾ÖÖ»ÖÖ
úÖµÖÔ ¯ÖϐÖ×ŸÖ ¯Ö¸ü ÆüÖê…
7. úִ֐ÖÖ¸üÖë úÖ ¸üוÖÙü¸ :
úִ֐ÖÖ¸üÖë êú ×»Ö‹ ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú ÃÖÖ£Ö »ÖÖ Æãü‹ ¯ÖÏÖºþ¯Ö êú †­ÖãÃÖÖ¸ü ‹ú ¸üוÖÙü¸ü ¯ÖÖê×ÂÖŸÖ
׍úµÖÖ •ÖÖ‹ÖÖ ¾Ö ‡ÃÖê úÖµÖÔÃ£Ö»Ö êú µÖ£ÖÖ ÃÖÓ³Ö¾Ö ×­Öú™üÃ£Ö Ã£ÖÖ­Ö ¯Ö¸ü ¸üÖÖ •ÖÖ‹ÖÖ ŸÖ£ÖÖ ¯ÖÏŸµÖêú
´Ö•Ö¤æü¸ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö¾Ö¸üÖ ˆÃ֍êú ×­ÖµÖÖê•Ö­Ö êú ŸÖß­Ö ×¤ü­ÖÖë êú ³Öߟָü ‡ÃÖ ¸üוÖÙü¸ü ´Öë ¤ü•ÖÔ ×úµÖÖ
•ÖÖ‹ÖÖ… (ÃÖÓ¤ü³ÖÔ ¯Ö׸ü׿Ö™ü I )
8. ú´ÖÔ“ÖÖ¸üß úÖ›Ôü :
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú ÃÖÖ£Ö »ÖÖê Æãü‹ ¯ÖÏÖºþ¯Ö êú †­ÖãÃÖÖ¸ü †¯Ö­Öê úִ֐ÖÖ¸üÖë úÖê ¯ÖÏŸµÖêú
úÖµÖÔ ×¤ü¾ÖÃÖ ¯Ö¸ü †£Ö¾ÖÖ ×­ÖµÖÖê×•ÖŸÖ ×ú‹ •ÖÖ­Öê êú ÃÖ´ÖµÖ ‹ú ×­ÖµÖÖê•Ö­Ö úÖ›Ôü •ÖÖ¸üß ú¸êüÖÖ… µÖפü
׍úÃÖß úִ֐ÖÖ¸ü úê ¯ÖÖÃÖ ˆÃ֍êú ׍úÃÖß ¯ÖÆü»Öê ×­ÖµÖÖꌟÖÖ úÖ ×¤üµÖÖ ÖµÖÖ úÖê‡Ô úÖ›Ôü ¯ÖÆü»Öê ÃÖê Æüß
´ÖÖî•Öæ¤ü ÆüÖê ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆÃÖ ×­ÖµÖÖê•Ö­Ö úÖ›Ôü ´Öë ´ÖÖ¡Ö ÃÖÓ²ÖÓ×¬ÖŸÖ ¯ÖÏ×¾ÖÛ™üµÖÖÓ ¯ÖéšüÖÓ׍úŸÖ ú¸ü ¤êüÖÖ…
×­ÖµÖÖê•Ö­Ö ÃÖ´ÖÖ¯ŸÖ ÆüÖê •ÖÖ­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ‡ÃÖ´Öë ¯Öã­Ö: ¯ÖéšüÖӍú­Ö ú¸ü ‡ÃÖê úִ֐ÖÖ¸ü úÖê
¾ÖÖ¯ÖÃÖ ú¸ü פüµÖÖ •ÖÖ‹ÖÖ… (¯Ö׸ü׿Ö™ü II)
9. ´Ö•Ö¤æü¸üß †Öפü úÖ ¸üוÖÙü¸ü :
(i) ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú ÃÖÖ£Ö »ÖÖê Æãü‹ ¯ÖÏÖºþ¯Ö êú †­ÖãÃÖÖ¸ü ‹ú ´Ö•Ö¤æü¸üß-ÃÖÆü-ˆ¯ÖÛãÖןÖ
¸üוÖÙü¸ü ¯ÖÖê×ÂÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü úÖµÖÔÃ£Ö»Ö êú µÖ£ÖÖ ÃÖÓ³Ö¾Ö ×­Öú™üÃ£Ö Ã£ÖÖ­Ö ¯Ö¸ü ¸üÖÖ
•ÖÖ‹ÖÖ…(¯Ö׸ü׿Ö™ü III)

69

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(ii) A wage slip in the Form appended to these regulations shall be
issued to every worker employed by the Contractor at least a day
prior to disbursement of wages. (Appendix IV).

10. Fines and deductions which may be made from Wages:

(i) Wages of a worker shall be paid to him without any deduction of


any kind except the following:
(a) fines;
(b) deductions for absence from duty; i.e. from the place of his
employment he is required to work. The amount of deduction shall
be in proportion to the period for which he was absent;
(c) deduction for damage to or loss of goods expressly entrusted to the
employed person for custody, or for loss of money which he is
required to account for, where such damage or loss is directly
attributable to his neglect or default;
(d) deductions for recovery of advances or for adjustment or
overpayment of wages, Advance granted shall be entered in a
register; and
(e) any other deduction which the Corporation may from time to time
allows.

(ii) No fines shall be imposed on any worker say in respect of such acts
and omissions on his part as has been approved by the Chief Labour
Commissioner.

(iii) No fine shall be imposed on a worker and no deductions for


damage or loss shall be made from his wages until the worker has
been given an opportunity of showing causes against such fines or
deductions.

(iv) The total amount of fines which may be imposed in any one wage
period on a worker shall not exceed an amount equal to three paise
in a rupee of the wages payable to him in respect of that wage
period.

(v) No fine imposed on a worker shall be recovered from him in


installments, or after expiry of sixty days from the date on which it
was imposed. Every fine shall be deemed to have been imposed
on the day of the act or omission in respect of which it was imposed.

(vi) The contractor shall maintain both in English & the local Indian
language a list, approved by the Chief Labour Commissioner,
clearly stating the acts and omissions for which penalty or fine may
be imposed on a workman and display it in a good condition in a
conspicuous place on the work site. (Appendix V)

70

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(ii) ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­ÖµÖÖê×•ÖŸÖ ×ú‹ Ö‹ ¯ÖÏŸµÖêú úִ֐ÖÖ¸ êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú
ÃÖÖ£Ö »ÖÖê Æãü‹ ¯ÖÏÖºþ¯Ö êú †­ÖãÃÖÖ¸,ü ´Ö•Ö¤æü¸üß ×¾ÖŸÖ¸üÖ ÃÖê ú´Ö ÃÖê ú´Ö ‹ú פü­Ö ¯ÖÆü»Ö ‹ú
´Ö•Ö¤æü¸üß ¯Ö“Öá •ÖÖ¸üß ú¸ëüÖê… (¯Ö׸ü׿Ö™ü IV)
10. ´Ö•Ö¤æü¸üß ÃÖê úÖ™êü •ÖÖ Ã֍ú­Öê µÖÖêµÖ ¤ü›ü ¾Ö ú™üÖîןֵÖÖÓ :
(i) ×ÃÖ¾ÖÖ‹ ×­Ö´­Ö×»Ö×ÖŸÖ êú, ‹ú úִ֐ÖÖ¸ü úß ´Ö•Ö¤æü¸üß ´Öë ÃÖê ׍úÃÖß ¯ÖύúÖ¸ü ú™üÖîŸÖß ×ú‹ ײ֭ÖÖ ˆÃÖê
³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ‹ÖÖ :
(‹) ¤ü›ü ;
(²Öß) úÖµÖÔ ÃÖê ; †£ÖÖÔŸÖ ×•ÖÃÖ Ã£ÖÖ­Ö ¯Ö¸ü úÖµÖÔ ú¸ü­Öê êú ×»Ö‹ ˆÃÖê ×­ÖµÖÖê×•ÖŸÖ ×úµÖÖ ÖµÖÖ Æîü,
¾ÖÆüÖÓ ÃÖê †­Öã¯ÖÛãÖ×ŸÖ ÆüÖê­Öê ¯Ö¸ü ú™üÖîŸÖß… ‹êÃÖß ú™üÖîŸÖß úß ¸üÖ×¿Ö ˆÃ֍úß †­Öã¯ÖÛãÖןÖ
†¾Ö×¬Ö êú ÃÖ´ÖÖ­Öã¯ÖÖŸÖ ´Öë ÆüÖêÖß…
(ÃÖß) ׍úÃÖß ú´ÖÔ“ÖÖ¸üß úÖê ×¾Ö¿ÖêÂÖ ºþ¯Ö ÃÖê ÃÖã¸ü×ÖŸÖ ¸üÖ­Öê êú ×»Ö‹ ¤üß Ö‡Ô ׍úÃÖß ¾ÖßÖ㠍êú
Öן֐ÖÏÃŸÖ ÆüÖê •ÖÖ­Öê †£Ö¾ÖÖ Öã´Ö ÆüÖê •ÖÖ­Öê ¯Ö¸ü, µÖÖ ˆÃ֍úß ×•Ö´´Öê¤üÖ¸üß ´Öê ¸üÖê Ö‹ ¬Ö­Ö ´Öë
Æãü‹ ­ÖãúÃÖÖ­Ö êú ×»Ö‹ úß •ÖÖ­Öê ¾ÖÖ»Öß ú™üÖîŸÖß, •Ö²Ö׍ú ‡ÃÖ ¯ÖύúÖ¸ü úß Ö×ŸÖ µÖÖ
­ÖãúÃÖÖ­Ö Ã¯Ö™ü ŸÖÖî¸ü ¯Ö¸ü ˆÃ֍úß »ÖÖ¯Ö¸ü¾ÖÖÆüß µÖÖ ³Öæ»Ö êú úÖ¸üÖ Æãü†Ö ÆüÖê…
(›üß) †×ÖÏ´Ö úß ¾ÖÃÖæ»Öß µÖÖ ´Ö•Ö¤æü¸üß êú ÃÖ´ÖÖµÖÖê•Ö­Ö †£Ö¾ÖÖ †×¬Öú ³ÖãÖŸÖÖ­Öü êú ×»Ö‹
ú™üÖîŸÖß, ´ÖÓ•Öæ¸ü ׍ú‹ Ö‹ †×ÖÏ´Ö úÖ ×¾Ö¾Ö¸üÖ ‹ú ¸üוÖÙü¸ü ´Öë ¤ü•ÖÔ ×úµÖÖ •ÖÖ­ÖÖ “ÖÖ×Æü‹
; †Öî¸ü
(‡Ô) ×­ÖÖ´Ö «üÖ¸üÖ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü †­Öã´ÖŸÖ úÖê‡Ô †­µÖ ú™üÖîŸÖß …

(ii) ´ÖãµÖ ÁÖ´Ö †ÖµÖãŒŸÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ׍úÃÖß éúŸµÖ µÖÖ “Öæú êú ×»Ö‹ ׍úÃÖß úִ֐ÖÖ¸ü ¯Ö¸ü úÖê‡Ô
¤ü›ü ­ÖÆüà »ÖÖÖµÖÖ •ÖÖ‹ÖÖ …
(iii) ׍úÃÖß úִ֐ÖÖ¸ü ¯Ö¸ü ׍úÃÖß Ö×ŸÖ µÖÖ ­ÖãúÃÖÖ­Ö êú ×»Ö‹ úÖê‡Ô ¤ü›ü µÖÖ ´Ö•Ö¤æü¸üß ÃÖê ú™üÖîŸÖß ŸÖ²Ö
ŸÖú †×¬Ö¸üÖê×¯ÖŸÖ ­ÖÆüà úß •ÖÖ Ã֍úŸÖß •Ö²Ö ŸÖú ׍ú ˆÃÖ úִ֐ÖÖ¸ü úÖê ‹êÃÖê ¤ü›ü µÖÖ ú™üÖîŸÖß êú
×¾Ö¹ý¨ü úÖ¸üÖ ²ÖŸÖÖ­Öê úÖ †¾ÖÃÖ¸ü ­Ö ¯ÖϤüÖ­Ö ×úµÖÖ ÖµÖÖ ÆüÖê…
(iv) ‹ú úִ֐ÖÖ¸ü ¯Ö¸ü ׍úÃÖß ‹ú ´Ö•Ö¤æü¸üß †¾Ö×¬Ö ´Öë ˆÃÖ ´Ö•Ö¤æü¸üß †¾Ö×¬Ö úß ¤êüµÖ ´Ö•Ö¤æü¸üß ´Öë ÃÖê
†×¬ÖúŸÖ´Ö ‹ú ¹ý¯Ö‹ ´Öë ŸÖß­Ö ¯ÖîÃÖê êú ²Ö¸üÖ²Ö¸ü ¸üÖ×¿Ö úÖ ãú»Ö ¤ü›ü Æüß †×¬Ö¸üÖê×¯ÖŸÖ ×úµÖÖ •ÖÖ
Ã֍úŸÖÖ Æî…
(v) ׍úÃÖß úִ֐ÖÖ¸ü ¯Ö¸ü »ÖÖÖ‹ Ö‹ ׍úÃÖß ¤ü›ü úÖê ˆÃÖÃÖê ׍ú¿ŸÖÖë ´Öê,Ó µÖÖ ¤ü›ü †×¬Ö¸üÖê¯ÖÖ úß
ŸÖÖ¸üßÖ êú ÃÖÖšü פü­ÖÖë êú ²ÖÖ¤ü ¾ÖÃÖæ»Ö ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖü… ¯ÖÏŸµÖêú ¤ü›ü úÖê ˆÃÖß ×¤ü­Ö ÃÖê »ÖÖÖµÖÖ
ÖµÖÖ ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ ×•ÖÃÖ ×¤ü­Ö ¤ü›ü »ÖÖÖ‹ •ÖÖ­Öê ¾ÖÖ»ÖÖ éúŸµÖ µÖÖ “Öæú úß Ö‡Ô ÆüÖê…
(vi) ÃÖÓ×¾Ö¤ü֍úÖ¸ü ´ÖãµÖ ÁÖ´Ö †ÖµÖãŒŸÖ «üÖ¸üÖ †­Öã´ÖÖêêפüŸÖ ¾Ö †ÓÖÏê•Öß †Öî¸ü ãÖÖ­ÖßµÖ ³ÖÖ¸üŸÖßµÖ ³ÖÖÂÖÖ ´Öë
ŸÖîµÖÖ¸ü úß Ö‡Ô ‹êÃÖß ÃÖæ“Öß ¸üÖëÖê וÖÃÖ´Öë ïÖ™üŸÖµÖÖ ˆ­Ö éúŸµÖÖë µÖÖ “ÖæúÖë úÖ ¾ÖÖÔ­Ö ÆüÖê ו֭֍êú
×»Ö‹ ‹ú úִ֐ÖÖ¸ü ¯Ö¸ü ¤ü›ü úÖ †×¬Ö¸üÖê¯ÖÖ ׍úµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü †Öî¸ü ‡ÃÖê úÖµÖÔÃ£Ö»Ö êú ׍úÃÖß
¯ÖÏ´ÖãÖ ãÖÖ­Ö ¯Ö¸ü »ÖÖÖµÖÖ •ÖÖ‹ÖÖ ¾Ö ‡ÃÖê ³Ö»Öß ¯ÖύúÖ¸ü ÃÖê ¯ÖϤüÙ¿ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…
(¯Ö׸ü׿Ö™ü v)

70

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(vii) The Contractor shall maintain a register of fines and the register of
deductions for damage or loss in the Forms appended to these
regulations which should be kept at the place of work.(Appendix VI
& VII).
11. Register of Accidents :
The Contractor shall maintain a register of accidents in such form as may
be convenient at the work place but the same shall include the following
particulars.
(a) Full particulars of the labourers who met with accident.
(b) Rate of Wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical Officer
(k) Claim required to be paid under Workmen’s Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
12. Preservation of Registers :
The Register of workmen and the Register of Wages-cum- Muster Roll
required to be maintained under these Regulations shall be preserved
for 3 years after the date on which the last entry is made therein.
13. Enforcement :
The Inspecting Officer shall either on his own motion or on a
complaint received by him carry out investigations, and send a report
to the Engineer-In-Charge specifying the amounts representing
Workers' dues and amount of penalty to be imposed on the
Contractor for breach of these Regulations, that have to be
recovered from the Contractor, indicating full details of the
recoveries proposed and the reasons therefore. It shall be obligatory
on the part of the Engineer-In-Charge on receipt of such a report to
deduct such amounts from payment due to the Contractor.
14. Disposal of amounts recovered from the Contractor :
The Engineer-In-Charge shall arrange payment to workers concerned
within FORTY FIVE days from receipt of a report from the Inspecting Officer
except in cases where the Contractor had made an appeal under
Regulation 16 of these Regulations. In cases where there is an appeal,
payment of workers dues would be arranged by the Engineer-In-Charge,
wherever such payments arise, within THIRTY days from the date of
receipt of the decision of the Regional Labour Commissioner (RLC).
71

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú ÃÖÖ£Ö »ÖÖê Æãü‹ ¯ÖÏÖºþ¯Ö êú †­ÖãÃÖÖ¸ü ‹ú ¤ü›ü ¸üוÖÙü¸ü ¾Ö Ö×ŸÖ µÖÖ ­ÖãúÃÖÖ­Ö
êú ×»Ö‹ ‹ú ú™üÖîŸÖß ¸üוÖÙü¸ü ŸÖîµÖÖ¸ü ú¸ëüÖê וÖÃÖê úÖµÖÔ-Ã£Ö»Ö ¯Ö¸ü ¸üÖÖ •ÖÖ­ÖÖ “ÖÖ×Æü‹… (¯Ö׸ü׿Ö™ü VI ¾Ö
VII)…
11. ¤ãü‘ÖÔ™ü­ÖÖ ¸üוÖÙü¸ü :
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔÃ£Ö»Ö úß ÃÖã×¾Ö¬ÖÖ êú †­ÖãÃÖÖ¸ü ˆ¯ÖµÖãŒŸÖ ¯ÖÏÖºþ¯Ö ´Öë ‹ú ¤ãü‘ÖÔ™ü­ÖÖ ¸üוÖÙü¸ü ¯ÖÖê×ÂÖŸÖ ú¸ëüÖê
¯Ö¸ÓüŸÖã ˆÃÖ´Öë ×­Ö´­Ö×»Ö×ÖŸÖ ×¾Ö¾Ö¸üÖ ÆüÖê­ÖÖ †Ö¾Ö¿µÖú Æïü :

(‹) ¤ãü‘ÖÔ™ü­Ö֐ÖÏÃŸÖ ÁÖ״֍ú úÖ ¯Öæ¸üÖ ×¾Ö¾Ö¸üÖ


(²Öß) ´Ö•Ö¤æü¸üß úß ¤ü¸ü
(ÃÖß) ػ֐Ö
(›üß) ˆ´ÖÏ
(‡Ô) ¤ãü‘ÖÔ™ü­ÖÖ úß ¯Öύéú×ŸÖ ¾Ö úÖ¸üÖ
(‹±ú) ¤ãü‘ÖÔ™ü­ÖÖ úÖ ÃÖ´ÖµÖ ¾Ö ŸÖÖ¸üߏÖ
(•Öß) †Ã¯ÖŸÖÖ»Ö ´Öë ³ÖŸÖá ú¸üÖ­Öê úß ŸÖÖ¸üßÖ ¾Ö ÃÖ´ÖµÖ
(‹“Ö) †Ã¯ÖŸÖÖ»Ö ÃÖê ”ãû¼üß ×¤ü‹ •ÖÖ­Öê úß ŸÖÖ¸üߏÖ
(†Ö‡Ô) ˆ¯Ö“ÖÖ¸ü úß †¾Ö×¬Ö ¾Ö ˆ¯Ö“ÖÖ¸ü úÖ ¯Ö׸üÖÖ´Ö
(•Öê) דÖ׍úŸÃÖÖ †×¬ÖúÖ¸üß «üÖ¸üÖ †­Öã´ÖÖ×­ÖŸÖ ¬Ö­ÖÖ•ÖÔ­Ö Ö´ÖŸÖÖ úß ú´Öß ¾Ö †¯ÖӐ֟ÖÖ úÖ ¯ÖÏןֿ֟Ö
(êú) úִ֐ÖÖ¸ü Öן֯ÖæÙŸÖ †×¬Ö×­ÖµÖ´Ö êú †ÓŸÖÖÔŸÖ ³ÖãÖŸÖÖ­Ö µÖÖêµÖ ¤üÖ¾ÖÖ
(‹»Ö) Öן֯ÖæÙŸÖ êú ³ÖãÖŸÖÖ­Ö úß ŸÖÖ¸üߏÖ
(‹´Ö) ³ÖãÖŸÖÖ­Ö úß Ö‡Ô ¸üÖ×¿Ö ¾Ö וÖÃÖ ¾µÖÛŒŸÖ úÖê ³ÖãÖŸÖÖ­Ö úß Ö‡Ô, ˆÃ֍úÖ ×¾Ö¾Ö¸üÖ
(‹­Ö) Öן֯ÖæÙŸÖ ×­Ö¬ÖÖÔ¸üÖ ú¸ü­Öê ¾ÖÖ»Öê ¯ÖÏÖ׬֍úÖ¸üß úÖ ­ÖÖ´Ö
(†Öê) †³µÖãÛŒŸÖµÖÖÓ
12. ¸üוÖÙü¸üÖë úÖ ¯Ö׸ü¸üÖÖ :
‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú †ÓŸÖÖÔŸÖ ¯ÖÖê×ÂÖŸÖ ×ú‹ •ÖÖ­Öê ¾ÖÖ»Öê úִ֐ÖÖ¸ü ¸üוÖÙü¸ü ¾Ö ´Ö•Ö¤æü¸üß-ÃÖÆü-ˆ¯ÖÛãÖןÖ
¸üוÖÙü¸üÖë úÖê ˆ­Ö´Öë úß Ö‡Ô †Ö׏ָüß ¯ÖÏ×¾ÖÛ™ü úß ŸÖÖ¸üßÖ ÃÖê ŸÖß­Ö ÃÖÖ»Ö ²ÖÖ¤ü ŸÖú ¯Ö׸ü¸ü×ÖŸÖ ×úµÖÖ
•ÖÖ‹ÖÖ…ü
13. ¯ÖϾ֟ÖÔ­Ö :
×­Ö¸üßÖÖ ¯ÖÏÖ׬֍úÖ¸üß µÖÖ ŸÖÖê þ֯ÖÏê¸üÖÖ ÃÖê †£Ö¾ÖÖ ×¿ÖúÖµÖŸÖ ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ¯Ö¸ü •ÖÖÓ“Ö ú¸ëüÖê †Öî¸ü ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ êú ¯ÖÖÃÖ †¯Ö­Öß ×¸ü¯ÖÖê™Ôü ³Öê•ÖëÖê וÖÃÖ´Öë úִ֐ÖÖ¸ü úÖê ¤êüµÖ ¸üÖ×¿Ö †Öî¸ü ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë úÖ
†­Öã¯ÖÖ»Ö­Ö ­Ö ú¸ü­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯Ö¸ü »ÖÖÖ‹ •ÖÖ­Öê ¾ÖÖ»Öê ¤ü›ü ¾Ö ¯ÖÏßÖÖ×¾ÖŸÖ ¾ÖÃÖæ»Öß †Öî¸ü ˆÃ֍êú
úÖ¸üÖÖë úÖ ¯Öæ¸üÖ ×¾Ö¾Ö¸üÖ ¤ü¿ÖÖÔµÖÖ •ÖÖ‹ÖÖ… ‹êÃÖß ×¸ü¯ÖÖê™Ôü ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú ²ÖÖ¤ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü
úÖê ¤êüµÖ ¸üÖ×¿Ö ´Öë ÃÖê ‡ÃÖ ¸üÖ×¿Ö úß ú™üÖîŸÖß ú¸ü­Öê êú ×»Ö‹ ²ÖÖ¬µÖ ÆüÖêӐÖê…
14. ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê ¾ÖÃÖæ»Ö úß Ö‡Ô ¸üÖ×¿Ö úÖ ×¾ÖŸÖ¸üÖ :
êú¾Ö»Ö ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú ×¾Ö×­ÖµÖ´Ö 16 êú †ÓŸÖÖÔŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ †¯Öᯙ ¤üÖµÖ¸ü ׍ú‹ Ö‹ ´ÖÖ´Ö»ÖÖë êú
†»ÖÖ¾ÖÖ ×­Ö¸üßÖÖ †×¬ÖúÖ¸üß ÃÖê ׸ü¯ÖÖê™Ôü ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú ¯ÖïŸÖÖ×»ÖÃÖ ×¤ü­ÖÖë ëú ³Öߟָü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ
ÃÖÓ²ÖÓ×¬ÖŸÖ úִ֐ÖÖ¸üÖë úÖê ³ÖãÖŸÖÖ­Ö ×ú‹ •ÖÖ­Öê úß ¾µÖ¾ÖãÖÖ ú¸ëüÖê… µÖפü úÖê‡Ô †¯Öᯙ ¤üÖµÖ¸ü Ö‡Ô ÆüÖê ŸÖÖê
Öê¡ÖßµÖ ÁÖ´Ö †ÖµÖãŒŸÖ (†Ö¸ü‹»ÖÃÖß) úÖ ×­ÖÖÔµÖ ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê úß ŸÖÖ¸üßÖ êú ŸÖßÃÖ ×¤ü­ÖÖë êú ³Öߟָü, •ÖÆüÖÓ úÆüà
‹êÃÖÖ ³ÖãÖŸÖÖ­Ö ×úµÖÖ •ÖÖ­ÖÖ ÆüÖê, ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ³ÖãÖŸÖÖ­Ö ú¸üÖ­Öê úß ¾µÖ¾ÖãÖÖ úß •ÖÖ‹Öß…
71

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
15. Welfare Fund :

All moneys that are recovered by the Engineer-In-Charge by way of


workers dues, which could not be disbursed to workers within the time limit
prescribed above, due to reasons such as whereabouts of workers not
being known, death of workers, etc. and also amounts recovered as
penalty, shall be credited to a Fund to be kept under the custody of the
Corporation for such benefit and welfare of workmen employed by
Contractors.

16. Appeal against decision of Inspecting Officer:

Any person aggrieved by a decision of the Inspecting Officer may appeal


against such decision to the Regional Labour Commissioner concerned
within THIRTY days from the date of the decision, forwarding simultaneously
a copy of his appeal to the Engineer-in-Charge. The decision of the
Regional Labour Commissioner shall be final and binding upon the
Contractor and the workmen.

17. Representation of parties:

(i) A workman shall be entitled to be represented in any investigation


or enquiry under these Regulations by an officer of a registered
trade union of which he is a member or by an officer of a Federation
of Trade Unions to which the said trade union is affiliated or where
the workman is not a member of any registered trade union, by an
official of a registered trade union, connected with, or by any
other workman employed in, the industry in which the worker is
employed.

(ii) A contractor shall be entitled to be represented in any investigation


enquiry under these Regulations by an officer of an association of
Contractors of which he is a member or by an officer of a
Federation associations of contractors to which the said
association is affiliated where the contractor is not a member of any
association of contractors, by an officer of association of employers,
connected with, or by any other employer engaged in, the industry
in which the contractor is engaged.

(iii) No party shall be entitled to be represented by a legal practitioner in


investigation or enquiry under these Regulations.

18. Inspection of Books and other Documents:


The Contractor shall allow inspection of the Registers and other
documents prescribed under these Regulations by Inspecting Officers and
the Engineer-in-charge or his authorised representative at any time and by
the worker or his agent on receipt of due notice at convenient time.

72

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
15. ×ÆüŸÖúÖ¸üß ×­Ö×¬Ö :
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ úִ֐ÖÖ¸üÖë úÖê ¤êüµÖ ¸üÖ×¿Ö êú ºþ¯Ö ´Öë ¾ÖÃÖæ»Ö úß Ö‡Ô ‹êÃÖß ÃÖ´¯ÖæÖÔ ¸üÖ×¿Ö ×•ÖÃÖê
ˆ¯ÖµÖãÔŒŸÖ ÃÖ´ÖµÖ ÃÖß´ÖÖ êú ³Öߟָü úִ֐ÖÖ¸üÖë úÖê ׍ú­Æüà úÖ¸üÖÖë •ÖîÃÖê úִ֐ÖÖ¸üÖë úÖ ¯ÖŸÖÖ-ךüúÖ­ÖÖ ­Ö
×´Ö»Ö­Öê, ´Ö韵Öã ÆüÖê •ÖÖ­Öê †Öפü êú úÖ¸üÖ ×¾ÖŸÖ׸üŸÖ ­ÖÆüà ׍úµÖÖ ÖµÖÖ ÆüÖê †Öî¸ü ¤ü›ü êú ºþ¯Ö ´Öë ¾ÖÃÖæ»Ö úß Ö‡Ô
¸üÖ×¿Ö úÖê ×­ÖÖ´Ö úê †×³Ö¸üÖÖ ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­ÖµÖÖê×ŸÖ úִ֐ÖÖ¸üÖë êú »ÖÖ³Ö ¾Ö ú»µÖÖÖ êú ×»Ö‹
²Ö­ÖÖ‡Ô Ö‡Ô ×­Ö×¬Ö ´Öë •Ö´ÖÖ ×úµÖÖ •ÖÖ‹ÖÖ…
16. ×­Ö¸üßÖÖ †×¬ÖúÖ¸üß êú ׭֝ÖÔµÖ êú ×¾Ö¹ý¨ü †¯Öᯙ :
×­Ö¸üßÖÖ †×¬ÖúÖ¸üß êú ׭֝ÖÔµÖ ÃÖê ¾µÖ×£ÖŸÖ úÖê‡Ô ³Öß ¾µÖÛŒŸÖ Öê¡ÖßµÖ ÁÖ´Ö †ÖµÖãŒŸÖ êú ¯ÖÖÃÖ ˆÃÖ ×­ÖÖÔµÖ úß
ŸÖÖ¸üßÖ ÃÖê ŸÖßÃÖ ×¤ü­ÖÖë êú ³Öߟָü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ‹ú ¯ÖÏ×ŸÖ †ÖÏÃÖÖ׸üŸÖ ú¸üŸÖê Æãü‹ ˆÃÖ ×­ÖÖÔµÖ êú
×¾Ö¹ý¨ü †¯Öᯙ ú¸ü Ã֍úŸÖÖ Æîü… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¾Ö úִ֐ÖÖ¸üÖë ¯Ö¸ü Öê¡ÖßµÖ ÁÖ´Ö †ÖµÖãŒŸÖ úÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ¾Ö
²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…
17. ¯ÖÖÖë úÖ ¯ÖÏןÖ×­Ö׬֟¾Ö :
(i) ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú †ÓŸÖÖÔŸÖ úß •ÖÖ­Öê ¾ÖÖ»Öß ×úÃÖß •ÖÖÓ“Ö µÖÖ ¯Öæ”û-ŸÖÖ”û ´Öë úִ֐ÖÖ¸ü, ׍úÃÖß ‹êÃÖß
™Òêü›ü µÖæ×­ÖµÖ­Ö ×•ÖÃ֍úÖ ¾ÖÆü ÃÖ¤üÃµÖ Æîü, êú †×¬ÖúÖ¸üß «üÖ¸üÖ, †£Ö¾ÖÖ ‹êÃÖß ™Òêü›ü µÖæ×­ÖµÖ­Ö, וÖÃÖ ™Òêü›ü
µÖæ×­ÖµÖ­ÖÖë êú ±êú›ü¸êü¿Ö­Ö êú ÃÖÖ£Ö ÃÖÓ²Ö¨ü ÆüÖ,ê ˆÃ֍êú †×¬ÖúÖ¸üß «Ö¸üÖ, †£Ö¾ÖÖ µÖפü úִ֐ÖÖ¸ü ׍úÃÖß
¯ÖÓ•ÖߍúŸÖ ™Òêü›ü µÖæ×­ÖµÖ­Ö úÖ ÃÖ¤üÃµÖ ­Ö ÆüÖê ŸÖÖê ׍úÃÖß ¯ÖÓ•ÖߍéúŸÖ ™Òêü›ü µÖæ×­ÖµÖ­Ö ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ †×¬ÖúÖ¸üß
«üÖ¸üÖ µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ וÖÃÖ ˆªÖêÖ ÃÖê ÃÖÓ²Ö¨ü Æîü, ˆÃ֍êú ׍úÃÖß ú´ÖÔ“ÖÖ¸üß «üÖ¸üÖ, ¯ÖÏןÖ×­Ö׬֟¾Ö ú¸üÖ­Öê
úÖ Æüú¤üÖ¸ü ÆüÖêÖÖ…
(ii) ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú †ÓŸÖÖÔŸÖ úß •ÖÖ­Öê ¾ÖÖ»Öß ×úÃÖß •ÖÖÓ“Ö µÖÖ ¯Öæ”û-ŸÖÖ”û ´Öë ÃÖÓ×¾Ö¤ü֍úÖ¸üü,
ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë úß ×úÃÖß ‹êÃÖß ‹ÃÖÖê×ÃÖ‹¿Ö­Ö וÖÃ֍úÖ ¾ÖÆü ÃÖ¤üÃµÖ Æîü, êú †×¬ÖúÖ¸üß «üÖ¸üÖ, †£Ö¾ÖÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë úß ‹ÃÖÖê×ÃÖ‹¿Ö­ÖÖêÓ úß ±êú›ü¸êü¿Ö­Ö וÖÃ֍êú ÃÖÖ£Ö ˆŒŸÖ ‹ÃÖÖê×ÃÖ‹¿Ö­Ö ÃÖÓ²Ö¨ü ÆüÖ,ê ˆÃ֍êú
†×¬ÖúÖ¸üß «Ö¸üÖ, †£Ö¾ÖÖ µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸üü ׍úÃÖß ¯ÖÓ•ÖߍúŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‹ÃÖÖê×ÃÖ‹¿Ö­Ö úÖ ÃÖ¤üõÖ
­Ö ÆüÖê ŸÖÖê ׍úÃÖß ×­ÖµÖÖꌟÖÖ ‹ÃÖÖê×ÃÖ‹¿Ö­Ö ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ †×¬ÖúÖ¸üß «üÖ¸üÖ µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ וÖÃÖ ˆªÖêÖ
ÃÖê ÃÖÓ²Ö¨ü Æîü, ˆÃ֍êú ׍úÃÖß †­µÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ×­ÖµÖÖꌟÖÖ «üÖ¸üÖ ¯ÖÏןÖ×­Ö׬֟¾Ö ú¸üÖ­Öê úÖ Æüú¤üÖ¸ü ÆüÖêÖÖ…
(iii) úÖê‡Ô ³Öß ¯ÖÖ ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú †ÓŸÖÖÔŸÖ úß •ÖÖ­Öê ¾ÖÖ»Öß •ÖÖÓ“Ö µÖÖ ¯Öæ”û-ŸÖÖ”û ´Öë ׍úÃÖß ¾Öúß»Ö
«üÖ¸üÖ ¯ÖÏןÖ×­Ö׬֟¾Ö ú¸üÖ­Öê úÖ Æüú¤üÖ¸ü ­ÖÆüà ÆüÖêÖÖ…

18. ²ÖÆüß ¾Ö †­µÖ ú֐֕ÖÖŸÖÖë úÖ ×­Ö¸üßÖÖ :


ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú †ÓŸÖÖÔŸÖ ×¾Ö×ÆüŸÖ ¸üוÖÙü¸üÖë ¾Ö †­µÖ ú֐֕ÖÖŸÖÖë úß ×­Ö¸üßÖÖ †×¬ÖúÖ¸üß
†Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ µÖÖ ˆ­Öêú †×¬ÖéúŸÖ ¯ÖÏןÖ×­Ö×¬Ö «üÖ¸üÖ ×úÃÖß ³Öß ÃÖ´ÖµÖ †Öî¸ü ˆ­Öêú ú´ÖÔ“ÖÖ¸üß µÖÖ
ˆ­Öêú ‹•Öë™ü «üÖ¸üÖ †Ö¾Ö¿µÖú ­ÖÖê×™üÃÖ ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ¯Ö¸ü ˆ¯ÖµÖãŒŸÖ ÃÖ´ÖµÖÖ­ÖãÃÖÖ¸ü •ÖÖÓ“Ö ×ú‹ •ÖÖ­Öê úß †­Öã´ÖןÖ
¤ëüÖê…

72
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
19. Interpretation, etc. :

On any question as to the application interpretation or effect of these


Regulations, the decision of the Chief Labour Commissioner or Deputy
Chief Labour Commissioner (Central) shall be final and binding.

20. Amendments

Central Government may from time to time, add to or amend these


Regulations and issue such directions as it may consider necessary for the
proper implementation of these Regulations or for the purpose of
removing any difficulty which may arise in the administration thereof.

73

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
19. ¾µÖ֏µÖÖ †Öפü :
»Ö֐Öæ ÆüÖê­Öê, ¾µÖ֏µÖÖ µÖÖ ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë úß ¯ÖϳÖÖ¾Ö¿Ö߻֟ÖÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ×úÃÖß ¯ÖύúÖ¸ü úß ¿ÖӍúÖ ÆüÖê­Öê ¯Ö¸ü
´ÖãµÖ ÁÖ´Ö †ÖµÖãŒŸÖ µÖÖ ˆ¯Ö ´ÖãµÖ ÁÖ´Ö †ÖµÖãŒŸÖ (ëú¦üßµÖ) úÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ¾Ö ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…
20. ÃÖÓ¿ÖÖê¬Ö­Ö :
ëú¦üßµÖ ÃÖ¸üúÖ¸ü µÖפü ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë êú ˆ×“ÖŸÖ †­Öã¯ÖÖ»Ö­Ö êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖ´Ö—Öê µÖÖ ‡­Öêú ¯ÖÏ¿ÖÖÃÖ­Ö
´Öë úÖê‡Ô úךü­ÖÖ‡Ô ˆŸ¯Ö®Ö ÆüÖê ŸÖÖê ˆÃÖê ¤æü¸ü ú¸ü­Öê êú ×»Ö‹ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ‡­Ö ×¾Ö×­ÖµÖ´ÖÖë ´Öë ÃÖÓµÖÖê•Ö­Ö µÖÖ
ÃÖÓ¿ÖÖê¬Ö­Ö ú¸ü Ã֍úŸÖß Æîü…

73

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Appendix – I

Register of workmen

(Regulation 7)

i) Name and address of the Contractor_________________________________________________________________

ii) Number and date of Contract________________________________________________________________________

iii) Name and address of the Department awarding the contract ________________________________________

iv) Nature of the Contract and location of the work _____________________________________________________

v) Duration of the Contract ____________________________________________________________________________

Sr. Name A Father Nature Permanent Present Date of Date of Signature Remarks
No and ge ’s/ of Home Address Commen termination or thumb
Surnam & Husba Employ Address of cement of or leaving impressio
e of the Se nd’s ment & Employee employm of n of the
workers x Name Designa (Vilage, Distt. ent employmen employee
tion Thana) t
1 2 3 4 5 6 7 8 9 10 11

74

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¯Ö׸ü׿Ö™ü -1
úִ֐ÖÖ¸ü ¸üוÖÙü¸ü
(×¾Ö×­ÖµÖ´Ö 7)
i) ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ­ÖÖ´Ö ¾Ö ¯ÖŸÖÖ------------------------------------------------------------------------
ii) ÃÖÓ×¾Ö¤üÖ úÖ Îú´ÖÖӍú ¾Ö ŸÖÖ¸üߏÖ----------------------------------------------------------------------
iii) ÃÖÓ×¾Ö¤üÖ †¾ÖÖ›Ôü ú¸ü­Öê ¾ÖÖ»Öê ×¾Ö³ÖÖÖ úÖ ­ÖÖ´Ö ¾Ö ¯ÖŸÖÖ--------------------------------------------------
iv) ÃÖÓ×¾Ö¤üÖ úß ¯Öύéú×ŸÖ ¾Ö úÖµÖÔ úß †¾ÖÛãÖןÖ----------------------------------------------------------
v) ÃÖÓ×¾Ö¤üÖ úß †¾Ö×¬Ö ------------------------------------------------------------------------------
Îú´ÖÖӍú úִ֐ÖÖ¸ü ˆ´ÖÏ ¾Ö ׯ֟ÖÖ/¯Ö×ŸÖ ×­ÖµÖÖê•Ö­Ö ú´ÖÔ“ÖÖ¸üß ¾ÖŸÖÔ´ÖÖ­Ö ÃÖê¾ÖÖ ÃÖê¾ÖÖ ÆüßÖցָü †³µÖãÛŒŸÖµÖÖÓ
úÖ ­ÖÖ´Ö Ø»ÖÖ úÖ ­ÖÖ´Ö úß úÖ ¯ÖŸÖÖ ¯ÖÏÖ¸Óü³Ö ÃÖ´ÖÖ¯ŸÖ †£Ö¾ÖÖ
¾Ö ¯Öύéú×ŸÖ Ã£ÖÖ‡Ô ú¸ü­Öê µÖÖ ú´ÖÔ“ÖÖ¸üß
ˆ¯Ö­ÖÖ´Ö ¾Ö †Ö¾ÖÖÃÖ úß ”ûÖê›Íü­Öê êú
¯Ö¤ü­ÖÖ´Ö ¯ÖŸÖÖ ŸÖÖ¸üßÖ úß †ÓÖæšêü
(ÖÖÓ¾Ö, ŸÖÖ¸üßÖ úÖ
וֻÖÖ, ×­Ö¿ÖÖ­Ö
£ÖÖ­ÖÖ)
1 2 3 4 5 6 7 8 9 10 11

74

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Appendix – 2
EMPLOYMENT CARD
(Regulation 8)

i) Name and Sex of the worker ________________________________________________________________________

ii) Father’s/Husband’s Name ___________________________________________________________________________

iii) Address ___________________________________________________________________________________________

iv) Age or Date of Birth ________________________________________________________________________________

v) Identification mark _________________________________________________________________________________

vi) Name and sex of the worker ________________________________________________________________________

Particulars of next of kin (Wife/Husband and Children, if any, or of dependent next of kin in case the worker
has no wife / husband or child)

Name ____________________________________________________________________________

Full Address of Dependent ________________________________________________________________________

(Specify, Village, Distt and State) ___________________________________________________________________

75

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¯Ö׸ü׿Ö™ü - 2
×­ÖµÖÖê•Ö­Ö úÖ›Ôü
(×¾Ö×­ÖµÖ´Ö 8)
i) úִ֐ÖÖ¸ü úÖ ­ÖÖ´Ö ¾Ö Ø»ÖÖ --------------------------------------------------------------------
ii) ׯ֟ÖÖ/¯Ö×ŸÖ úÖ ­ÖÖ´Ö--------------------------------------------------------------------
iii) ¯ÖŸÖÖ--------------------------------------------------------------------
iv) ˆ´ÖÏ µÖÖ •Ö­´ÖןÖ×£Ö--------------------------------------------------------------------
v) ¯ÖÆü“ÖÖ­Ö úÖ ×“ÖÅ­Ö--------------------------------------------------------------------
vi) úִ֐ÖÖ¸ü úÖ ­ÖÖ´Ö ¾Ö ػ֐Ö--------------------------------------------------------------------
ˆ¢Ö¸üÖ׬֍úÖ¸üß úÖ ×¾Ö¾Ö¸üÖ (¯ÖŸ­Öß/¯Ö×ŸÖ ¾Ö ²Ö““Öê, µÖפü úÖê‡Ô ÆüÖë, †£Ö¾ÖÖ µÖפü úִ֐ÖÖ¸ü êú ¯ÖןÖ/¯ÖŸ­Öß ­Ö ÆüÖë ŸÖÖê †Ö×ÁÖŸÖ ˆ¢Ö¸üÖ׬֍úÖ¸üß úÖ ×¾Ö¾Ö¸üÖ)

­ÖÖ´Ö ---------------------------------------------------

†Ö×ÁÖŸÖ úÖ ¯Öæ¸üÖ ¯ÖŸÖÖ--------------------------------------------------------------------

(ÖÖÓ¾Ö, וֻÖÖ ¾Ö ¿ÖÆü¸ü úÖ ×¾Ö¿ÖêÂÖ ºþ¯Ö ÃÖê ˆ»»ÖêÖ ú¸ëü…)--------------------------------------------------

75

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Sr Name and Particul Total Actual Leave Nature Wag Wage rate Total Rem Signature
N address of ars of period numb taken of work e with wage arks of the
o. employer locatio for er of (No. done peri particulars earned employer
(specify n of which days days by the od of unit in by the
weather a work the worke should worker case of worker
contractor site worker is d be piece work during
or a sub- and employe specifi the
Contractor) descrip d (from ed) period
tion of ……to shown
work ………..) under
done Col. 5
1 2 3 4 5 6 7 8 9 10 11 12

N.B. For a worker employed at one time piece work basis and at another on daily wages, relevant entries in
respect of each type of employment should be made separately.

76

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Îú´ÖÖӍ ×­ÖµÖÖꌟÖÖ úÖµÖÔÃ£Ö»Ö úß úִ֐ÖÖ¸ü úÖê ¾ÖÖßÖ׾֍ú ºþ¯Ö ÃÖê »Öß Ö‡Ô ”ãû¼üß úִ֐ÖÖ¸ü ´Ö•Ö¤æü¸üß †¾Ö×¬Ö ´Ö•Ö¤æü¸üß úß ¤ü¸ü úÖò»Ö´Ö 5 ´Öë †³µÖã ×­ÖµÖÖê•Öú
ú úÖ ­ÖÖ´Ö ¾Ö ÛãÖ×ŸÖ ¾Ö ׍ú‹ ×­ÖµÖÖê×•ÖŸÖ ×ú‹ ׍ú‹ Ö‹ úÖµÖÔ (פü­ÖÖë úß «üÖ¸üÖ ×ú‹ †Öî¸ü ±ãú™üú¸ü פüÖÖ‡Ô Ö‡Ô ÛŒŸÖ ü êú
¯ÖŸÖÖ Ö‹ úÖµÖÔ úÖ •ÖÖ­Öê úß ãú»Ö פü¾ÖÃÖÖë úß ãú»Ö ÃÖӏµÖÖ úÖ •ÖÖ­Öê ¾ÖÖ»Öê úÖµÖÔ êú ´ÖÖ´Ö»Öê †¾Ö×¬Ö êú ÆüßÖցָü
(éú¯ÖµÖÖ ×¾Ö¾Ö¸üÖ †¾Ö×¬Ö (- ÃÖӏµÖÖ ×¾Ö¿ÖêÂÖ ºþ¯Ö ÃÖê úÖµÖÔ úß ´Öë ¯ÖÏ×ŸÖ ‡úÖ‡Ô ¤üÖî¸üÖ­Ö †Ù•ÖŸÖ
ïÖ™ü ú¸ëü --ÃÖê----ŸÖú ) ˆ»»ÖêÖ ú¸ëü ) ¯Öύéú×ŸÖ ×¾Ö¾Ö¸üÖ ÃÖ×ÆüŸÖ ãú»Ö ´Ö•Ö¤æü¸üß
׍ú
ÃÖÓ×¾Ö¤ü֍úÖ¸ü
Æîü µÖÖ ˆ¯Ö
ÃÖÓ×¾Ö¤ü֍úÖ¸ü
)
1 2 3 4 5 6 7 8 9 10 11 12

¬µÖÖ­ÖµÖÖêµÖ : µÖפü ‹ú úִ֐ÖÖ¸ü úÖê ׍úÃÖß ÃÖ´ÖµÖ ±ãú™üú¸ü úÖµÖÔ †Ö¬ÖÖ¸ü ¯Ö¸ü †Öî¸ü ׍úÃÖß †­µÖ ÃÖ´ÖµÖ ¤îü׭֍ú ´Ö•Ö¤æü¸üß †Ö¬ÖÖ¸ü ¯Ö¸ü ¸üÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ¯ÖÏŸµÖêú
¯ÖύúÖ¸ü úß ×­ÖµÖãÛŒŸÖ êú ×»Ö‹ †»ÖÖ-†»ÖÖ ¯ÖÏ×¾ÖÛ™üµÖÖÓ úß •Ö֋ӐÖß…

76

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Appendix – 3

REGISTER OF WAGES - CUM - MUSTER ROLL


(Regulation 9)

i) Name & Address of the contractor _______________________________________________________________________

ii) Number and date of Contract __________________________________________________________________________

iii) Name and address of the Department awarding the Contract ___________________________________________

iv) Nature of the Contract and location of the work ________________________________________________________

v) Duration of the Contract _______________________________________________________________________________

vi) Wage Period _________________________________________________________________________________________

77

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¯Ö׸ü׿Ö™ü - 3

´Ö•Ö¤æü¸üß ü¸üוÖÙü¸-ÃÖÆü-ˆ¯ÖÛãÖ×ŸÖ ¯ÖÓ•Öß

(×¾Ö×­ÖµÖ´Ö 9)

i) ÃÖÓ×¾Ö¤ü֍úÖ¸üü úÖ ­ÖÖ´Ö ¾Ö ¯ÖŸÖÖ --------------------------------------------------------------------

ii) ÃÖÓ×¾Ö¤üÖ úÖ Îú´ÖÖӍú ¾Ö ŸÖÖ¸üßÖ ----------------------------------------------------------------

iii) ÃÖÓ×¾Ö¤üÖ †¾ÖÖ›Ôü ú¸ü­Öê ¾ÖÖ»Öê ×¾Ö³ÖÖÖ úÖ ­ÖÖ´Ö ¾Ö ¯ÖŸÖÖ --------------------------------------------

iv) ÃÖÓ×¾Ö¤üÖ úß ¯Öύéú×ŸÖ ¾Ö úÖµÖÔ úÖ Ã£ÖÖ­Ö ---------------------------------------------------------

v) ÃÖÓ×¾Ö¤üÖ úß †¾Ö×¬Ö --------------------------------------------------------------------

vi) ´Ö•Ö¤æü¸üß †¾Ö×¬Ö ----------------------------------------------------------------

77

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Fair Wages Overtime Deduction from
Wages Paid Worked wages
Payable

D.A. & other allowance


D.A. & other allowance
Designation/ Nature
Daily

impression of worker
Net Wages payable
Total wages paid

Signature / Thumb
Total Attendance

Other deductions
Over time wages

Date of Payment
atten

Damage or loss
Deduction for

Recovery of
Name Father danc

House Rent

Remarks
advances
No. of Hrs.
of work

earned
and ’s/ e (No.
No.

Basic

Basic

Date
units

Fine
Sex
Sr

Surname Husba of
of the nds Units
worker Name 1, 2, 3,
4, 5, 6,
7)
1 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18 19 20 21 22 23 24
5 6

Reasons to be recorded in Col. 24

78

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
1
Îú´ÖÖӍú

2
úִ֐ÖÖ¸ü úÖ ­ÖÖ´Ö ¾Ö ˆ¯Ö­ÖÖ´Ö

3
ׯ֟ÖÖ/¯Ö×ŸÖ úÖ ­ÖÖ´Ö

4
ػ֐Ö

5
¯Ö¤ü­ÖÖ´Ö/úÖµÖÔ úß ¯ÖύéúןÖ

6
ÖÏןÖפü­Ö ˆ¯ÖÛãÖ×ŸÖ (‡úÖ‡Ô ¾ÖÖ¸ü 1,2,3,4,5,6,7)

7
ãú»Ö ˆ¯ÖÛãÖןÖ

8
´Öæ»Ö ¾ÖêŸÖ­Ö
´Ö•Ö¤æü¸üß
­µÖÖµÖÖê×“ÖŸÖ ¤êüµÖ

9
´ÖÓÆüÖÖ‡Ô ³Ö¢ÖÖ ¾Ö †­µÖ ³Ö¢Öê

´Öæ»Ö ¾ÖêŸÖ­Ö
10
†¾Ö׬Ö
´Ö•Ö¤æü¸üß

úÖ¸üÖÖë úÖê úÖò»Ö´Ö Îú´ÖÖӍú 24 ´Öë ¤ü•ÖÔ ×úµÖÖ •ÖÖ‹…


´ÖÓÆüÖÖ‡Ô ³Ö¢ÖÖ ¾Ö †­µÖ ³Ö¢Öê
11

ŸÖÖ¸üߏÖ
12

ãú»Ö ‘ÖÓ™êü
13

†Ù•ÖŸÖ †×ŸÖ׸üŒŸÖ ÃÖ´ÖµÖ ´Ö•Ö¤æü¸üß


14
†×ŸÖ׸üŒŸÖ ÃÖ´ÖµÖ úÖµÖÔ

78
ãú»Ö ´Ö•Ö¤æü¸üß †¾Ö׬Ö
15

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¤ü›ü
16

­ÖãúÃÖÖ­Ö µÖÖ Ö×ŸÖ ¯ÖæÙŸÖ êú ×»Ö‹ ú™üÖîŸÖß


17

†Ö¾ÖÖÃÖ ×ú¸üÖµÖÖ
´Ö•Ö¤æü¸üß ÃÖê ú™üÖîŸÖß

úß ¾ÖÃÖæ»Öß
18 19 20

†­µÖ ú™üÖîןֵÖÖÓ
21

×­Ö¾Ö»Ö ¤êüµÖ ´Ö•Ö¤æü¸üß


22

³ÖãÖŸÖÖ­Ö úß ŸÖÖ¸üߏÖ

úִ֐ÖÖ¸ü êú ÆüßÖցָü /†ÓÖæšêü úÖ ×­Ö¿ÖÖ­Ö


23

†³µÖãÛŒŸÖµÖÖÓ
24
Appendix-4
WAGE SLIP

(Regulation 9)

i) Name of the Contractor ________________________________________________

ii) Place _________________________________________________________________

1. Name of the Workers with father`s/ :


husband`s name

2. Nature of Employment :

3. Wage period :

4. Rate of Wages Payable :

5. Total attendance/Unit of work done :

6. Date on which overtime worked :

7. Overtime Wages :

8. Gross Wages Payable :

9. Total Deductions (indicating :


nature of deductions)

10. Net Wages Payable :

Contractor’s Signature/ Employees` Signature/


Thumb Impression Thumb Impression

79

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¯Ö׸ü׿Ö™ü - 4

´Ö•Ö¤æü¸üß ¯Ö“Öá

(×¾Ö×­ÖµÖ´Ö 9)

i) ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ­ÖÖ´Ö-------------------------------------------------

ii) ãÖÖ­Ö ------------------------------------------------------------

1. úִ֐ÖÖ¸ü úÖ ­ÖÖ´Ö ¾Ö ׯ֟ÖÖ/¯Ö×ŸÖ úÖ ­ÖÖ´Ö :


2. ×­ÖµÖÖê•Ö­Ö úß ¯Öύéú×ŸÖ :
3. ´Ö•Ö¤æü¸üß †¾Ö×¬Ö :
4. ¤êüµÖ ´Ö•Ö¤æü¸üß úß ¤ü¸ü :
5. ãú»Ö ˆ¯ÖÛãÖןÖ/׍ú‹ Ö‹ úÖµÖÔ úß ‡úÖ‡Ô :
6. †×ŸÖ׸üŒŸÖ úÖµÖÔ úß ŸÖÖ¸üßÖ :
7. †×ŸÖ׸üŒŸÖ úÖµÖÔ ´Ö•Ö¤æü¸üß úß ¤ü¸ü :
8. Ã֍ú»Ö ¤êüµÖ ´Ö•Ö¤æü¸üß :
9. ãú»Ö ú™üÖîŸÖß(ú™üÖîŸÖß úß ¯Öύéú×ŸÖ ¤ü¿ÖÖÔ‹Ó) :
10. ¤êüµÖ ×­Ö¾Ö»Ö ´Ö•Ö¤æü¸üß :

ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÆüßÖցָü/†ÓÖæšêü úÖ ×­Ö¿ÖÖ­Ö ú´ÖÔ“ÖÖ¸üß êú ÆüßÖցָü/†ÓÖæšêü úÖ ×­Ö¿ÖÖ­Ö

79

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Appendix - 5

LIST OF ACTS AND OMISSIONS FOR WHICH FINES CAN BE IMPOSED

(REGULATION NO. 10 VI)

In accordance with rule 10 (vi) Contractor’s Labour Regulations to be displayed


prominently at the site of work both in English and local Language.

1. Willful insubordination or disobedience, whether alone or in combination with


other.

2. Theft, fraud or dishonesty in connection with the Contractors beside a business


or property of Corporation.

3. Taking or giving bribes or any illegal gratifications.

4. Habitual late attendance.

5. Drunkenness fighting, riotous or disorderly or indifferent behavior.

6. Habitual negligence.

7. Smoking near or around the area where combustible or other materials are
locked.

8. Habitual indiscipline.

9. Causing damage to work in the progress or to property of the Corporation or of


the Contractor.

10. Sleeping on duty.

11. Malingering or slowing down work .

12. Giving of false information regarding name, age father’s name etc.,

13. Habitual loss of wage cards supplied by the employers.

14. Unauthorized use of employer’s property for manufacturing or making of


unauthorised articles at the work place.

15. Bad workmanship in construction and maintenance by skilled workers which is


not approved by the Corporation and for which the contractors are compelled to
undertake rectifications.

80

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¯Ö׸ü׿Ö™ü - 5
¤ü›ü †×¬Ö¸üÖê¯ÖÖ µÖÖêµÖ úÖµÖÔ ¾Ö “ÖæúÖë úß ÃÖæ“Öß
(×¾Ö×­ÖµÖ´Ö ÃÖӏµÖÖ 10 VI)
×­ÖµÖ´Ö 10 (vi) êú †­ÖãÃÖÖ¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úִ֐ÖÖ¸ü ×¾Ö×­ÖµÖ´ÖÖë úÖê †ÓÖÏê•Öß ¾Ö ãÖÖ­ÖßµÖ ¤üÖê­ÖÖë ³ÖÖÂÖÖ†Öë ´Öë úÖµÖÔÃ£Ö»Ö êú
׍úÃÖß ¯ÖÏ´ÖãÖ ãÖÖ­Ö ¯Ö¸ü ¯ÖϤüÙ¿ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…
1. “ÖÖÆêü þֵÖÓ µÖÖ †­µÖ êú ÃÖÖ£Ö ×´Ö»Ö ú¸ü •ÖÖ­Ö²Öæ—Ö ú¸ü †¾Ö–ÖÖ µÖÖ †Ö–ÖÖ¯ÖÖ»Ö­Ö ­Ö ú¸ü­ÖÖ…
2. ×­ÖÖ´Ö úê ¾µÖÖ¯ÖÖ¸ü µÖÖ ÃÖ´¯Ö×¢Ö êú ÃÖÖ£Ö-ÃÖÖ£Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÃÖÓ²ÖÓ¬Ö ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úß “ÖÖê¸üß, ¬ÖÖêÖÖ µÖÖ
²ÖꇴÖÖ­Öß…
3. ‘ÖæÃÖ µÖÖ †­µÖ †¾Öî¬Ö ¯Ö׸üŸÖÖêÂÖÖ »Öê­ÖÖ µÖÖ ¤êü­ÖÖ…
4. †Ö¤üŸÖ­Ö ×¾Ö»ÖÓ²Ö ÃÖê ˆ¯ÖÛÃ£ÖŸÖ ÆüÖê­ÖÖ…
5. ¿Ö¸üÖ²Ö ¯Öß ú¸ü »Ö›ÍüÖ‡Ô, ¤ÓüÖ֍úÖ¸üß µÖÖ †´ÖµÖÖÔפüŸÖ µÖÖ †ÃÖÖ´ÖÖ­µÖ ¾µÖ¾ÖÆüÖ¸ü ú¸ü­ÖÖ…
6. †Ö¤üŸÖ­Ö »ÖÖ¯Ö¸ü¾ÖÖÆüß…
7. •¾Ö»Ö­Ö¿Öᯙ ¯Ö¤üÖ£ÖÖí µÖÖ †­µÖ ¾ÖßÖã†Öë êú ³ÖÓ›üÖ¸üÖ ãÖÖ­Ö êú ׭֍ú™ü µÖÖ †ÖÃÖ-¯ÖÖÃÖ ¬Öæ´ÖϯÖÖ­Ö ú¸ü­ÖÖ…
8. †Ö¤üŸÖ­Ö †­Öã¿ÖÖÃÖ­ÖÆüß­ÖŸÖÖ…
9. ×­ÖÖ´Ö µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ÃÖÓ¯Ö×¢Ö †£Ö¾ÖÖ úÖµÖÔ úß ¯ÖϐÖ×ŸÖ úÖê Ö×ŸÖ ¯ÖÓÆãü“ÖÖ­ÖÖ…
10. úÖµÖÔ êú ¤üÖî¸üÖ­Ö ÃÖÖê­ÖÖ…
11. ²Öß´ÖÖ¸üß úÖ ²ÖÆüÖ­ÖÖ ú¸ü­ÖÖ µÖÖ ¬Ö߸êü úÖµÖÔ ú¸ü­ÖÖ…
12. †¯Ö­Öê ­ÖÖ´Ö, ׯ֟ÖÖ êú ­ÖÖ´Ö, ˆ´ÖÏ †Öפü êú ²ÖÖ¸êü ´Öë Ö»ÖŸÖ ÃÖæ“Ö­ÖÖ‹Ó ¤êü­ÖÖ…
13. ×­ÖµÖÖê•Öú «üÖ¸üÖ †Ö¯ÖæŸÖÔ ´Ö•Ö¤æü¸üß úÖ›Ôü úÖê †Ö¤üŸÖ­Ö Öã´Ö ú¸ü­ÖÖ…
14. ×­ÖµÖÖê•Öú úß ÃÖÓ¯Ö×¢Ö úÖ †­Ö׬֍éúŸÖ ¯ÖϵÖÖêÖ ú¸ü úÖµÖÔ-Ã£Ö»Ö ¯Ö¸ü †­Ö׬֍éúŸÖ ºþ¯Ö ÃÖê ׍úÃÖß ¾ÖßÖ㠍úÖ ×­Ö´ÖÖԝÖ
ú¸ü­ÖÖ…
15. ×­Ö´ÖÖÔÖ ¾Ö †­Öã¸üÖÖ úÖµÖÖí ´Öë ׍úÃÖß ãú¿Ö»Ö ÁÖ״֍ú «üÖ¸üÖ ‹êÃÖß Ö¸üÖ²Ö úÖ¸üߐָüß ú¸ü­ÖÖ ×•ÖÃÖê ×­ÖÖ´Ö «üÖ¸üÖ
†­Öã´ÖÖêפüŸÖ ­Ö ׍úµÖÖ •ÖÖ‹ †Öî¸ü וÖÃ֍êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ´Ö¸ü´´ÖŸÖ úÖµÖÔ ú¸ü­Öê úÖê ×¾Ö¾Ö¿Ö ÆüÖê­ÖÖ ¯Ö›Íêü…

80

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
16. Making false complaints and/or misleading statements.

17. Engaging on trade within the premises of the establishments.

18. Any unauthorised divulgence of business affairs of the employees.

19. Collection or canvassing for the collection of any money within the premises of
an establishment unless authorised by the employer.

20. Holding meeting inside the premises without previous sanction of the employers.

21. Threatening or intimidating any workman or employer during the working hours
within the premises.

81

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
16. —Öæšüß ×¿ÖúÖµÖŸÖë ú¸ü­ÖÖ †Öî¸ü / †£Ö¾ÖÖ ³ÖÏִ֍ú ŸÖ£µÖ ¤êü­ÖÖ…
17. ãÖÖ¯Ö­ÖÖ êú ¯Ö׸üÃÖ¸ü ´Öë ׍úÃÖß úÖ¸üÖ²ê ÖÖ¸ü ´Öë ×»Ö¯ŸÖ ÆüÖê­ÖÖ…
18. ú´ÖÔ“ÖÖ׸üµÖÖë êú úÖµÖÔ-¾µÖÖ¯ÖÖ¸ü êú ²ÖÖ¸êü ´Öë †­Ö׬֍éúŸÖ ºþ¯Ö ÃÖê ÃÖæ“Ö­ÖÖ‹Ó ¤êü­ÖÖ…
19. ×­ÖµÖÖê•Öú êú ¯ÖÏÖ׬֍ú¸üÖ êú ²ÖÖî¸ü ãÖÖ¯Ö­ÖÖ êú ¯Ö׸üÃÖ¸ü ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úÖ ¸üÖ×¿Ö ÃÖӐÖÏÆüÖ †£Ö¾ÖÖ ¸üÖ×¿Ö ÃÖӐÖÏÆüÖ
êú ×»Ö‹ ¯ÖÏ“ÖÖ¸ü ú¸ü­ÖÖ…
20. ¯Ö׸üÃÖ¸ü êú ³Öߟָü ×­ÖµÖÖê•Öú úß ¯Öæ¾ÖÖÔ­Öã´Ö×ŸÖ êú ²ÖÖî¸ü ׍úÃÖß ¯ÖύúÖ¸ü úß ÃÖ³ÖÖ †ÖµÖÖê×•ÖŸÖ ú¸ü­ÖÖ…
21. ׍úÃÖß úִ֐ÖÖ¸ü µÖÖ ×­ÖµÖÖê•Öú úÖê ¯Ö׸üÃÖ¸ü êú ³Öߟָü úÖµÖÔפü¾ÖÃÖ ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úß ¬Ö´Öúß ¤êü­ÖÖ µÖÖ ˆúÃÖÖ­Öê
¾ÖÖ»Öß úÖ¸Ôü¾ÖÖ‡Ô ú¸ü­ÖÖ…

81

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Appendix –6

REGISTER OF FINES

Regulation No. 10 (vii)

Sr. Nam Father’s/ Sex Departm Nature Whether Rate of Date Date on Remar
No. e Husband’ ent and date workman wages and which ks
s Name offence showed offence amount fine
for fines cause against of fine realised
imposed fine or not, if so imposed
enter data
1 2 3 4 5 6 7 8 9 10 11

82

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¯Ö׸ü׿Ö™ü - 6

¤ü›ü ¸üוÖÙü¸ü

×¾Ö×­ÖµÖ´Ö ÃÖӏµÖÖ 10 (vii)


Îú´ÖÖӍú ­ÖÖ´Ö ×¯ÖŸÖÖ/¯Ö×ŸÖ Ø»ÖÖ ×¾Ö³ÖÖÖ †×¬Ö¸üÖê×¯ÖŸÖ ŒµÖÖ úִ֐ÖÖ¸ü ´Ö•Ö¤æü¸üß úß †×¬Ö¸üÖê×¯ÖŸÖ ¤ü›ü úß †³µÖãÛŒŸÖµÖÖÓ
úÖ ­ÖÖ´Ö ¤ü›ü êú úÖê †¯Ö¸üÖ¬Ö ¤ü¸ü ¤ü›ü úß ¾ÖÃÖæ»Öß úß
†¯Ö¸üÖ¬Ö úß êú ×¾Ö¹ý¨ü ¸üÖ×¿Ö ¾Ö ŸÖÖ¸üߏÖ
¯Öύéú×ŸÖ ¾Ö ¤ü›ü êú ŸÖÖ¸üߏÖ
ŸÖÖ¸üßÖ úÖ¸üÖ ²ÖŸÖÖ‹
Ö‹, µÖפü ÆüÖÓ
ŸÖÖê ÃÖÓ²ÖÓ׬֟Ö
×¾Ö¾Ö¸üÖ
¤ü¿ÖÖÔ‹Ó
1 2 3 4 5 6 7 8 9 10 11

82

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Appendix – 7

3. REGISTER OF DEDUCTIONS FOR DAMAGES OR LOSS CAUSED TO THE CORPORATION BY THE NEGLECT OR DEFAULT
OF THE EMPLOYED PERSONS.
Regulation No. 10 (vii)

Sr. Name Father’s / S Depar Damag Whether Date & Number of Date on which Remar
No. Husband’ e t-ment e or loss worker amount of installment total amount ks
s Name x caused showed deduction if any realized
with cause against imposed
date deduction, if
so enter date
1 2 3 4 5 6 7 8 9 10 11

83

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¯Ö׸ü׿Ö™ü - 7

3. ×­ÖµÖÖê×•ÖŸÖ ¾µÖÛŒŸÖµÖÖë úß »ÖÖ¯Ö¸ü¾ÖÖÆüß µÖÖ Ö»ÖŸÖß êú úÖ¸üÖ ×­ÖÖ´Ö úÖê Æãü‹ ­ÖãúÃÖÖ­Ö µÖÖ Ö×ŸÖ êú ×»Ö‹ úß •ÖÖ­Öê ¾ÖÖ»Öß ú™üÖîŸÖß úÖ ¸üוÖÙü¸ü

×¾Ö×­ÖµÖ´Ö ÃÖӏµÖÖ 10 (vii)


Îú´ÖÖӍú ­ÖÖ´Ö ×¯ÖŸÖÖ/¯Ö×ŸÖ Ø»ÖÖ ×¾Ö³ÖÖÖ ×úµÖÖ ÖµÖÖ ŒµÖÖ úִ֐ÖÖ¸ü †×¬Ö¸üÖê×¯ÖŸÖ ×ú¿ŸÖÖë úß ãú»Ö ¸üÖ×¿Ö úß †³µÖãÛŒŸÖ
úÖ ­ÖÖ´Ö ­ÖãúÃÖÖ­Ö µÖÖ úÖê ‡ÃÖ ú™üÖîŸÖß úß ÃÖӏµÖÖ µÖפü ¾ÖÃÖæ»Öß ¯Öæ¸üß µÖÖÓ
Ö×ŸÖ ¾Ö ú™üÖîŸÖß úÖ ŸÖÖ¸üßÖ ¾Ö úÖêê‡Ô ÆüÖê ŸÖÖê ÆüÖê­Öê úß
ˆÃ֍úß úÖ¸üÖ ¸üÖ×¿Ö ŸÖÖ¸üߏÖ
ŸÖÖ¸üßÖ ²ÖŸÖÖµÖÖ ÖµÖÖ,
µÖפü ÆüÖÓ ŸÖÖê
ˆÃ֍úß
ŸÖÖ¸üߏÖ
1 2 3 4 5 6 7 8 9 10 11

83

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
20. MODEL RULES FOR LABOUR WELFARE
1. Definitions:

(a) "Work Place" means a place at which, on an average, twenty or more workers
are employed.
(b) "Large work place" means a place at which, on an average 500 or more
workers are employed.
2. First Aid :

At every workplace, there shall be maintained in a readily accessible place


first aid appliances including an adequate supply of sterilized dressings and
sterilized cotton wool as prescribed in the Factory Rules of the State in which
the work is carried on. The appliances shall be kept in good order and in
large work-places, they shall be placed under the charge of a responsible
person who shall be readily available during working hours.

At large workplaces, where hospital facilities are not available within easy
distance of the works First Aid Posts shall be established and be run by
trained compounders.

Where large workplaces are remotely situated and far away from regular
hospitals, an indoor ward shall be provided with one bed for every 260
employees.

Where large workplaces are situated in cities, towns or in their suburbs and no
beds are considered necessary owing to proximity of city or town hospitals,
suitable transport shall be provided to facilitate removal of urgent cases to
these hospitals. At other workplaces, some conveyance facilities shall be
kept readily available to take injured person or person suddenly taken
seriously ill, to the nearest hospital.

At large workplaces these shall be provided and maintained an


ambulance room of the prescribed sizes, containing the prescribed
equipment and in the charge of such medical and nursing staff as may be
prescribed. For the purpose the relevant provisions of the Factory Rules of the
State Government of the area where the work is carried on may be taken as
the prescribed standard.

3. Accommodation for Labour :


The Contractor shall during the progress of the works provide, erect and
maintainnecessary temporary living accommodation and ancillary facilities for
labour at his own expense and to standards and scales as approved by the
Engineer-in-Charge.

84

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
20. ´Ö•Ö¤æü¸üÖë êú ú»µÖÖÖ êú ×»Ö‹ †Ö¤ü¿ÖÔ ×­ÖµÖ´Ö

1. ¯Ö׸ü³ÖÖÂÖÖ‹Ó :

(‹) "úÖµÖÔ Ã£Ö»Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ˆÃÖ Ã£ÖÖ­Ö ÃÖê Æîü •ÖÆüÖÓ ¯Ö¸ü †ÖîÃÖŸÖ­Ö ²ÖßÃÖ µÖÖ †×¬Öú ´Ö•Ö¤æü¸ü
×­ÖµÖÖê×•ÖŸÖ ÆüÖë…
(²Öß) "×¾Ö¿ÖÖ»Ö úÖµÖÔ Ã£Ö»Ö" ÃÖê ŸÖÖŸ¯ÖµÖÔ ˆÃÖ Ã£ÖÖ­Ö ÃÖê Æîü •ÖÆüÖÓ ¯Ö¸ü †ÖîÃÖŸÖ­Ö 500 µÖÖ †×¬Öú úִ֐ÖÖ¸ü
×­ÖµÖÖê×•ÖŸÖ ÆüÖë…

2. ¯ÖÏÖ£Ö״֍ú דÖ׍úŸÃÖÖ :

¯ÖÏŸµÖêú úÖµÖÔ Ã£Ö»Ö êú ŸÖŸúÖ»Ö ÃÖã»Ö³Ö ãÖÖ­Ö ¯Ö¸ü ¯ÖÏÖ£ÖÖ״֍ú דÖ׍úŸÃÖÖ ˆ¯Öú¸üÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê
וִ֭Öë úÖµÖÔ Ã£Ö»Ö êú ¸üÖ•µÖ ´Öë »Ö֐Öæ ±îúŒ™ü¸üß ×­ÖµÖ´ÖÖë ´Öë ׍ú‹ Ö‹ ¾ÖÖÔ­Ö êú †­ÖãÃÖÖ¸ü ¯ÖµÖÖÔ¯ŸÖ ´ÖÖ¡ÖÖ ´Öë
×¾ÖÃÖӍÎú×´ÖŸÖ ¯Ö×¼üµÖÖÓ ¾Ö ×¾ÖÃÖӍÎú×´ÖŸÖ ¹ý‡Ô úß †Ö¯ÖæŸÖÔ ¸üÖß •ÖÖ‹Öß… ‡­Ö ˆ¯Öú¸üÖÖë úÖê †“”ûß ÆüÖ»ÖŸÖ ´Öë ¸üÖÖ
•ÖÖ‹ÖÖ †Öî¸ü ×¾Ö¿ÖÖ»Ö úÖµÖÔ Ã£Ö»ÖÖë ¯Ö¸ü ‡­Æëü ׍úÃÖß ×•Ö´´Öê¤üÖ¸ü ¾µÖÛŒŸÖ úß ×­ÖÖ¸üÖ­Öß ´Öë ¸üÖÖ •ÖÖ‹ÖÖ… µÖÆü ¾µÖÛŒŸÖ
úÖµÖÔ ÃÖ´ÖµÖ êú ¤üÖî¸üÖ­Ö Æü¸ü ÃÖ´ÖµÖ ˆ¯Ö»Ö²¬Ö ¸üÆêüÖÖ…
×¾Ö¿ÖÖ»Ö úÖµÖÔ Ã£Ö»ÖÖë ¯Ö¸ü •ÖÆüÖÓ †Ã¯ÖŸÖÖ»Ö ÃÖã×¾Ö¬ÖÖ‹Ó úÖµÖÔ êú ÃÖã»Ö³Ö ׭֍ú™ü ˆ¯Ö»Ö²¬Ö ­Ö ÆüÖ,ë ¾ÖÆüÖÓ ¯Ö¸ü ¯ÖÏÖ£Ö״֍ú
þÖÖãµÖ “ÖÖî׍úµÖÖÓ Ã£ÖÖ×¯ÖŸÖ úß •Ö֋ӐÖß †Öî¸ü ‡­Æëü ¯ÖÏ׿Ö×ÖŸÖ ú´¯ÖÖˆÓ›ü¸üÖë «üÖ¸üÖ “Ö»ÖÖµÖÖ •ÖÖ‹ÖÖ…
µÖפü ×¾Ö¿ÖÖ»Ö úÖµÖÔÃ£Ö»Ö ¤æü¸ü-¤ü¸üÖ•Ö ÛÃ£ÖŸÖ ÆüÖë †Öî¸ü ×­ÖµÖ×´ÖŸÖ †Ã¯ÖŸÖÖ»ÖÖë ÃÖê ˆ­Öúß ¤æü¸üß †×¬Öú ÆüÖ,ê ŸÖÖê ¯ÖÏןÖ
260 ¾µÖÛŒŸÖµÖÖë ¯Ö¸ü ‹ú ײÖßָü ¾ÖÖ»ÖÖ ‡Ó›üÖê¸ü ¾ÖÖ›Ôü ˆ¯Ö»Ö²¬Ö ú¸üÖµÖÖ •ÖÖ‹ÖÖ…
•ÖÆüÖÓ úÆüà ×¾Ö¿ÖÖ»Ö úÖµÖÔÃ£Ö»Ö ¿ÖÆü¸ü, úòÖÖë µÖÖ ˆ­Öêú ˆ¯Ö­ÖÖ¸üÖë ´Öë ÛÃ£ÖŸÖ ÆüÖê †Öî¸ü ¿ÖÆü¸ü µÖÖ úòÖÖë êú
†Ã¯ÖŸÖÖ»Ö ­Ö•Ö¤üߍú ÆüÖê­Öê êú úÖ¸üÖ ‹êÃÖê ײÖßָüÖë úß †Ö¾Ö¿µÖúŸÖÖ ­Ö ´ÖÆüÃÖæÃÖ úß Ö‡Ô ÆüÖ,ê ¾ÖÆüÖÓ †Ö¯ÖÖŸÖË
´ÖÖ´Ö»ÖÖë úÖê ‡­Ö †Ã¯ÖŸÖÖ»ÖÖë ´Öë ŸÖŸúÖ»Ö †ÓŸÖ׸üŸÖ ú¸ü­Öê êú ×»Ö‹ ˆ¯ÖµÖãŒŸÖ ¯Ö׸ü¾ÖÆü­Ö úß ¾µÖ¾ÖãÖÖ úß •ÖÖ‹Öß…
†­µÖ úÖµÖÔãֻÖÖë ¯Ö¸ü ‘ÖÖµÖ»ÖÖë µÖÖ †“Ö֭֍ú ²Öß´ÖÖ¸ü ¯Ö›Íü Ö‹ ¾µÖÛŒŸÖÖêÓ úÖê ׭֍ú™üŸÖ´Ö †Ã¯ÖŸÖÖ»Ö ŸÖú »Öê •ÖÖ­Öê êú
×»Ö‹ ŸÖŸúÖ»Ö ÃÖã»Ö³Ö ÆüÖê Ã֍ú­Öê ¾ÖÖ»Öß ˆ¯ÖµÖãŒŸÖ ¯Ö׸ü¾ÖÆü­Ö ¾µÖ¾ÖãÖÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •ÖÖ‹Öß…
×¾Ö¿ÖÖ»Ö úÖµÖÔãֻÖÖë ¯Ö¸ü ×­Ö¬ÖÖÔ׸üŸÖ †ÖúÖ¸ü úÖ ‹ú ‹´²Öã»ÖëÃÖ úÖ ˆ¯Ö»Ö²¬Ö ú¸üÖµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ‡ÃÖê
†­Öã¸ü×ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖ´Öë ×­Ö¬ÖÖÔ׸üŸÖ ˆ¯Öú¸üÖ »ÖÖê ÆüÖëÖê †Öî¸ü ‡ÃÖê ×¾Ö×ÆüŸÖ דÖ׍úŸÃÖÖ ¾Ö ­ÖÚÃÖÖ Ã™üÖ±ú
«üÖ¸üÖ ÃÖÓ“ÖÖ×»ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ… ‡Ã֍êú ×»Ö‹ úÖµÖÔ Ã£Ö»Ö êú Öê¡Ö úß ¸üÖ•µÖ ÃÖ¸üúÖ¸ü êú ±îúŒ™ü¸üß ×­ÖµÖ´ÖÖë êú
ÃÖÓ²ÖÓ×¬ÖŸÖ ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖëÓ úÖê ×­Ö¬ÖÖÔ׸üŸÖ ´Ö֭֍ú ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ…

3. ÁÖ״֍úÖë úÖ †Ö¾ÖÖÃÖ :


úÖµÖÔ úß ¯ÖϐÖ×ŸÖ êú ¤üÖî¸üÖ­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü, †¯Ö­Öê ÁÖ״֍úÖë êú ×»Ö‹, ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ´Ö֭֍úÖë êú
†­ÖãÃÖÖ¸, þֵÖÓ êú Ö“ÖÔ ¯Ö¸ü †Ö¾Ö¿µÖú †Ã£ÖÖ‡Ô †Ö¾ÖÖÃÖ ¾Ö †Ö­ÖãÂÖÓא֍ú ÃÖã×¾Ö¬ÖÖ‹Ó ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê ¾Ö ‡­ÖúÖ
†­Öã¸üÖÖ ú¸ëüÖê…
84

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4. Drinking water :

In every workplace, there shall be provided and maintained at suitable


places easily accessible to labour, a sufficient supply of cold water fit for
drinking.

Where drinking water is obtained from an intermittent public water supply


each workplace shall be provided with storage where drinking water shall be
stored.

Every water supply storage shall be at a distance of not less than 15 meters
from any latrine drain or other source of pollution. Where water has to be
drawn from an existing well, which is within such proximity of latrine, drain
or any other source of pollution, the well shall be properly chlorinated
before water is drawn from it for drinking. All such wells shall be entirely
closed in and be provided with a trap door which shall be dust and water-
proof.

A reliable pump shall be fitted to each covered well, the trap door shall be
kept locked and opened only for cleaning or inspection which shall be done
at least once a month.

5. Washing and Bathing Places :

Adequate washing and bathing places shall be provided separately for man
women. Such places shall be kept in clean and drained condition.

6. Scale of Accommodation in Latrines and Urinals :

There shall be provided within the precincts of every workplace latrines and
urinals in an accessible place, and the accommodation, separately for
each of these, shall not be less than at the following scales:-

No. of Seats

(a) Where number of persons does not exceed 50 2

(b) Where number of persons exceeds 50 but does not exceed 100 3

(c) For additional persons per 100 or part thereof 3

In particular cases, the Engineer-in-Charge shall have the power to increase the
requirement, where necessary.

85

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4. ¯Öß­Öê úÖ ¯ÖÖ­Öß :
¯ÖÏŸµÖêú úÖµÖÔ Ã£Ö»Ö êú ׍úÃÖß ÃÖã»Ö³Ö †Ö¾ÖÖÖ´Ö­Ö Ã£ÖÖ­Ö ¯Ö¸ ÁÖ״֍úÖêÓ êú ×»Ö‹ ¯Öß­Öê µÖÖêµÖ ¯ÖµÖÖÔ¯ŸÖ ¿Öߟֻ•Ö»Ö úß
¾µÖ¾ÖãÖÖ úß •ÖÖ‹Öß ¾Ö ‡Ã֍úÖ †­Öã¸üÖÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
‹êÃÖê ¯ÖÏŸµÖêú úÖµÖÔÃ£Ö»Ö ¯Ö¸ü •ÖÆüÖÓ ¯Öß­Öê úÖ ¯ÖÖ­Öß ÃÖÖ¾ÖÔ•Ö׭֍ú •Ö»Ö ×¾ÖŸÖ¸üÖ ¯ÖϝÖÖ»Öß «üÖ¸üÖ †ÖÓŸÖ׸üú ºþ¯Ö ÃÖê ¯ÖÏÖ¯ŸÖ ׍úµÖÖ
•ÖÖŸÖÖ ÆüÖ,ê ¯Öß­Öê úÖ ¯ÖÖ­Öß ¸üÖ­Öê êú ×»Ö‹ ‹ú ³ÖÓ›üÖ¸Öü ™ïüú ˆ¯Ö»Ö²¬Ö ú¸üÖµÖÖ •ÖÖ‹ÖÖ…
¯ÖÏŸµÖêú •Ö»ÖÖ¯ÖæÙŸÖ ™ïüú ׍úÃÖß ¿ÖÖî“ÖÖ»ÖµÖ ×­ÖúÖÃÖß µÖÖ †­µÖ ׍úÃÖß ³Öß ¯ÖύúÖ¸ü êú ¯ÖϤæüÂÖÖ ÄÖÖêŸÖ ÃÖê ú´Ö ÃÖê ú´Ö 15
´Öß™ü¸ü ¤æü¸ü ÛÃ£ÖŸÖ ÆüÖêÖÖ… •ÖÆüÖÓ úÆüà ¯ÖÖ­Öß ×úÃÖß ¯ÖÆü»Öê ÃÖê ²Ö­Öê ‹êÃÖê ãú‹Ó ÃÖê ׭֍úÖ»ÖÖ •ÖÖ­ÖÖ ÆüÖê וÖÃÖÃÖê 15 ´Öß™ü¸ü úß
¤æü¸üß êú ³Öߟָü Æüß ¿ÖÖî“ÖÖ»ÖµÖ, ­ÖÖ»ÖÖ µÖÖ úÖê‡Ô †­µÖ ¯ÖϤæüÂÖÖ ÄÖÖêŸÖ ÛÃ£ÖŸÖ ÆüÖê, ¾ÖÆüÖÓ ¯Ö¸ü ãÓú‹ ÃÖê ¯Öß­Öê úÖ ¯ÖÖ­Öß ×­ÖúÖ»Ö­Öê
ÃÖê ¯ÖÆü»Öê ‡ÃÖ ¯ÖÖ­Öß úÖê ³Ö»Öß ¯ÖύúÖ¸ü ÃÖê Œ»ÖÖê¸üß­ÖߍéúŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ‹êÃÖê ÃÖ³Öß ãú†Öë úÖê ¯Öæ¸üß ŸÖ¸üÆü ÃÖê œüú ú¸ü ¸üÖÖ
•ÖÖ‹ÖÖ †Öî¸ü ‡ÃÖ´Öë ‹ú ¯ÖæÖÔºþ¯ÖêÖ ¬Öæ»Ö ¾Ö ¯ÖÖ­Öß ¸üÖê¬Öß ™Òîü¯Öü-›üÖê¸ü »ÖÖÖµÖÖ •ÖÖ‹ÖÖ…
¯ÖÏŸµÖêú œüêú Æãü‹ ãÓú‹ ´Öë ‹ú ×¾ÖÀ¾ÖÃÖ­ÖßµÖ ¯ÖÓ¯Ö ×±ú™ü ׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ™Òîü¯Ö-›üÖê¸ü ¯Ö¸ü ŸÖÖ»ÖÖ »ÖÖÖµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖ
¤ü¸ü¾ÖÖ•Öê úÖê êú¾Ö»Ö ÃÖ±úÖ‡Ô µÖÖ ×­Ö¸üßÖÖ êú ×»Ö‹ Æüß ÖÖê»ÖÖ •ÖÖ‹ÖÖ… ÃÖ±úÖ‡Ô ¾Ö ×­Ö¸üßÖÖ úÖµÖÔ ´ÖÖÆü ´Öë ú´Ö ÃÖê ú´Ö
‹ú ²ÖÖ¸ü †¾Ö¿µÖ ׍úµÖÖ •ÖÖ‹ÖÖ…

5. ­ÖÆüÖ­Öê †Öî¸ü ¬ÖÖê­Öê êú ãÖÖ­Ö :


¯ÖµÖÖÔ¯ŸÖ ÃÖӏµÖÖ ´Öë ´Ö×Æü»ÖÖ†Öë ¾Ö ¯Öã¹ýÂÖÖë êú ×»Ö‹ ¯Öé£Öú-¯Öé£Öú ­ÖÆüÖ­Öê ¾Ö ¬ÖÖê­Öê êú ãÖÖ­Ö ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê… ‡­Ö
ãÖÖ­ÖÖë úÖê ÃÖÖ±ú-ÃÖã£Ö¸üÖ ¸üÖÖ •ÖÖ‹ÖÖ ¾Ö •Ö»Ö-׭֍úÖÃÖß úß ¾µÖ¾ÖãÖÖ úß •ÖÖ‹Öß…

6. ¿ÖÖî“ÖÖ»ÖµÖÖêÓ ¾Ö ´Öæ¡ÖÖ»ÖµÖÖë ´Öë †Ö¾ÖÖÃÖ ´ÖÖ­Ö¤ü›ü :


¯ÖÏŸµÖêú úÖµÖÔÃ£Ö»Ö úß ¯ÖÏÃÖß´ÖÖ êú ³Öߟָü ´Ö×Æü»ÖÖ†Öë ¾Ö ¯Öã¹ýÂÖÖë êú ×»Ö‹ ¯Öé£Öú-¯Öé£Ö ú¿ÖÖî“ÖÖ»ÖµÖÖë ¾Ö ´Öæ¡ÖÖ»ÖµÖÖë úß
ÃÖãÖ´Ö ãÖÖ­ÖÖë ¯Ö¸ü ¾µÖ¾ÖãÖÖ úß •ÖÖ‹Öß †Öî¸ü ´Ö×Æü»ÖÖ†Öë ¾Ö ¯Öã¹ýÂÖÖë êú ¯Öé£Öú-¯Öé£Ö ‡­Ö ¿ÖÖî“ÖÖ»ÖµÖÖë ¾Ö ´Öæ¡ÖÖ»ÖµÖÖë ´Öë
†Ö¾ÖÖÃÖ úß ¾µÖ¾ÖãÖÖ ×­Ö´­Ö×»Ö×ÖŸÖ ´ÖÖ­Ö¤ü›üÖë ÃÖê ú´Ö ­ÖÆüà ÆüÖêÖß :-
ÃÖß™üÖë úß ÃÖӏµÖÖ
(‹) •Ö²Ö ¾µÖÛŒŸÖµÖÖë úß ÃÖӏµÖÖ 50 ÃÖê ú´Ö ÆüÖê 2
(²Öß) •Ö²Ö ¾µÖÛŒŸÖµÖÖë úß ÃÖӏµÖÖ 50 ÃÖê †×¬Öú ¯Ö¸ÓüŸÖã 100 ÃÖê ú´Ö ÆüÖê 3
(ÃÖß) ¯ÖÏŸµÖêú †×ŸÖ׸üŒŸÖ 100 ¾µÖÛŒŸÖµÖÖë µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ êú ×»Ö‹ 3

׍ú­Æüà ×¾Ö¿ÖêÂÖ ´ÖÖ´Ö»ÖÖë ´Öë µÖפü †Ö¾Ö¿µÖú ÆüÖê ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖß™üÖë úß ÃÖӏµÖÖ ²ÖœÍüÖ­Öê úÖ †×¬ÖúÖ¸ü
ÆüÖêÖÖ…

85

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7. Latrines and Urinals :
Except in workplaces provided with water flushed latrines connected with a
water-borne sewage system. All latrines shall be provided with receptacles
or dry-earth system which shall be cleaned at least four times daily and at
least twice during working hours and kept in a strictly sanitary condition.
Receptacles shall be tarred inside and outside at least once a year. If
women are employed, separate latrine and urinals screened from those for
men and marked in the vernacular in conspicuous letters "For Women
Only" shall be provided on the scale laid down in rule 6. Those for men shall
be similarly marked "For Men Only". A poster showing the figure of a man and
of a woman shall also be exhibited at the entrance to latrines for each sex.
There shall be adequate supply of water close to latrines and urinals.
8. Construction of Latrines:
Inside walls shall be constructed of masonry or some suitable heat
resisting nonabsorbent materials and shall be cement washed inside and
outside at least once a year. The dates of cement washing shall be noted in
a register maintained for the purpose and kept available for inspection.
Latrines shall have at least thatched roof.

9. Disposal of Excreta :
Unless otherwise arranged for by the local-sanitary authority, arrangements
for proper disposal of excreta by incineration at the workplace shall be made
by means of a suitable incinerator approved by the local medical health
and municipal or cantonment authorities. Alternatively excreta may be
disposed off by putting a layer of night soils at the Bottom of pucca tank
prepared for the purpose and covering it with a 15 cm layer of waste or
refuse and then covering it with a layer of earth for a fortnight(when it
will turn into manure).

The Contractor shall, at his own expense, carry out all instructions issued to
him by the Engineer-in-charge to effect proper disposal of soil and other
conservancy work in respect of Contractor`s work people or employees on
the Site. The Contractor shall be responsible for payment of any charges
which may be levied by municipal or cantonment authority for execution of
such work on his behalf.
10. Provision of shelters during rest :
At every work place there shall be provided free of cost, four suitable sheds,
two for meals and two others for rest, separately for use of men and women
Labour. Height of each shelter shall not be less than 3 meters from floor level
to lowest part of roof. Sheds shall be kept clean and the space provided
shall be on the basis of at least 0.5 sq.m. per head.

86

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7. ¿ÖÖî“ÖÖ»ÖµÖ ¾Ö ´Öæ¡ÖÖ»ÖµÖ :
×ÃÖ¾ÖÖ‹ ‹êÃÖê úÖµÖÔãֻÖÖë êú •ÖÆüÖÓ °»Ö¿Ö ¾ÖÖ»Öê ¿ÖÖî“ÖÖ»ÖµÖÖë úß ÃÖã×¾Ö¬ÖÖ ˆ¯Ö»Ö²¬Ö Æîü, ÃÖ³Öß ¿ÖÖî“ÖÖ»ÖµÖÖë ´Öë
׸üÃÖꯙêüú»ÃÖ µÖÖ ¿Öãú ÃÖŸÖÆü ¯ÖϝÖÖ»Öß »ÖÖÖ‡Ô •ÖÖ‹Öß… ‡­Æëü ¯ÖÏןÖפü­Ö ú´Ö ÃÖê ú´Ö “ÖÖ¸ü ²ÖÖ¸ü †Öî¸ü ¯ÖÏŸµÖêú
úÖµÖÔ ÃÖ´ÖµÖ ´Öë ú´Ö ÃÖê ú´Ö ¤üÖê ²ÖÖ¸ü ÃÖÖ±ú ׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ‡­Æëü ¯ÖæÖÔºþ¯ÖêÖ þ֓”û ÆüÖ»ÖŸÖ ´Öë ¸üÖÖ
•ÖÖ‹ÖÖ… ‡­Ö ׸üÃÖꯙüú»ÖÖë úÖê ¾ÖÂÖÔ ´Öë ú´Ö ÃÖê ú´Ö ‹ú ²ÖÖ¸ü †Ó¤ü¸ü ²ÖÖÆü¸ü ¯Öæ¸üß ŸÖ¸üÆü ÃÖê ŸÖÖ¸üúÖê»Ö ÃÖê ¯ÖÖêŸÖÖ
•ÖÖ‹ÖÖ… µÖפü ´Ö×Æü»ÖÖ†Öë úÖê ³Öß úÖ´Ö ¯Ö¸ü »ÖÖÖµÖÖ ÖµÖÖ ÆüÖê ŸÖÖê ˆ­Öêú ×»Ö‹ ¯Öã¹ýÂÖÖë êú ¿ÖÖî“ÖÖ»ÖµÖÖë ÃÖê ¯Öé£Öú
¿ÖÖî“ÖÖ»ÖµÖÖë ¾Ö ´Öæ¡ÖÖ»ÖµÖÖëê úß ¾µÖ¾ÖãÖÖ úß •ÖÖ‹Öß †Öî¸ü ‡­Æëü ãÖÖ­ÖßµÖ ³ÖÖÂÖÖ êú ïÖ™ü †Ö¸üÖë «üÖ¸üÖ
" êú¾Ö»Ö ´Ö×Æü»ÖÖ†Öë êú ×»Ö‹" דÖÛÅ­ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ… ‡­Öúß ÃÖӏµÖÖ ×­ÖµÖ´Ö 6 ´Öë ¾ÖÙÖŸÖ ´Ö֭֍úÖë êú
†­ÖãÃÖÖ¸ü ×­Ö¬ÖÖÔ׸üŸÖ úß •ÖÖ‹Öß… ‡ÃÖß ¯ÖύúÖ¸ü ¯Öã¹ýÂÖÖë êú ×»Ö‹ ²Ö­ÖÖ‹ Ö‹ ¿ÖÖî“ÖÖ»ÖµÖÖë ¾Ö ´Öæ¡ÖÖ»ÖµÖÖë ¯Ö¸ü "êú¾Ö»Ö
¯Öã¹ýÂÖÖë êú ×»Ö‹" †Ó׍úŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ¯ÖÏŸµÖêú ¾ÖÖÔ êú ¿ÖÖî“ÖÖ»ÖµÖÖë êú ¯ÖϾÖê¿Ö «üÖ¸ü ¯Ö¸ü ¯Öã¹ýÂÖ ¾Ö ´Ö×Æü»ÖÖ úÖ
×“Ö¡Ö ³Öß ²Ö­ÖÖµÖÖ •ÖÖ‹ÖÖ… ‡­Ö ¿ÖÖî“ÖÖ»ÖµÖÖë ¾Ö ´Öæ¡ÖÖ»ÖµÖÖë êú ­Ö•Ö¤üߍú ¯ÖµÖÖÔ¯ŸÖ ¯ÖÖ­Öß †Ö¯ÖæÙŸÖ úß ³Öß ¾µÖ¾ÖãÖÖ
úß •ÖÖ‹Öß…
8. ¿ÖÖî“ÖÖ»ÖµÖÖë úÖ ×­Ö´ÖÖÔÖ :
³Öߟָüß ¤üß¾ÖÖ¸üêÓ ‡Õ™ü-ÖÖ¸êü †£Ö¾ÖÖ ×úÃÖß ‰ú´ÖÖ¸üÖê¬Öß †­Ö†¾Ö¿ÖÖêÂÖß ¯Ö¤üÖ£ÖÔ úß ²Ö­ÖÖ‡Ô •Ö֋ӐÖß †Öî¸ü ‡Ã֍êú
³Öߟָüß ¾Ö ²ÖÖÆü¸üß †Öê¸ü ÃÖÖ»Ö ´Öë ú´Ö ÃÖê ú´Ö ‹ú ²ÖÖ¸ü ÃÖß´Öë™ü úß ¯ÖãŸÖÖ‡Ô úß •ÖÖ‹Öß… ÃÖß´Öë™ü úß ¯ÖãŸÖÖ‡Ô úß
ŸÖÖ¸üßÖ ‡ÃÖ úÖµÖÔ êú ×»Ö‹ ²Ö­ÖÖ‹ Ö‹ ¸üוÖÙü¸ü ´Öë ¤ü•ÖÔ úß •ÖÖ‹Öß †Öî¸ü µÖÆü ¸üוÖÙü¸ü ×­Ö¸üßÖÖ ÆêüŸÖã ŸÖîµÖÖ¸ü
¸üÖÖ •ÖÖ‹ÖÖ… ¿ÖÖî“ÖÖ»ÖµÖÖë úß ”ûŸÖ ú´Ö ÃÖê ú´Ö Ö¯Ö¸îü»Ö úß †¾Ö¿µÖ ÆüÖêÖß…
9. ´Ö»Ö úÖ ×­ÖßÖÖ¸üÖ :
•Ö²Ö ŸÖú ãÖÖ­ÖßµÖ ¯ÖÏÖ׬֍ú¸üÖ «üÖ¸üÖ †­µÖ£ÖÖ ¾µÖ¾ÖãÖÖ ­Ö úß Ö‡Ô ÆüÖê, úÖµÖÔÃ£Ö»Ö ÃÖê ´Ö»Ö †Öפü úÖê ãÖÖ­ÖßµÖ
דÖۍúŸÃÖÖ ‹¾ÖÓ Ã¾ÖÖãµÖ †Öî¸ü ´ÖÆüÖ¯ÖÖ׻֍úÖ µÖÖ ïú™üÖê­Ö´Öë™ü ¯ÖÏÖ׬֍úÖ׸üµÖÖë «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ˆ¯ÖµÖãŒŸÖ ¤üÖÆüú úß
ÃÖÆüÖµÖŸÖÖ ÃÖê ¤üÖÆü­Ö ¯ÖÏ׍ÎúµÖÖ «üÖ¸üÖ ×­ÖßÖÖ׸üŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ¾ÖîúÛ»¯Öú ¾µÖ¾ÖãÖÖ êú ºþ¯Ö ´Öë ‡ÃÖ úÖµÖÔ êú
×»Ö‹ ²Ö­ÖÖ‹ Ö‹ ¯ÖŒêú ™ïüú úß ÃÖŸÖÆü ¯Ö¸ü ד֍ú­Öß ×´Ö¼üß úß ¯ÖŸÖÔ »ÖÖ֍ú¸ü ‡Ã֍êú ‰ú¯Ö¸ü ú“Ö¸êü µÖÖ †¯Ö׿Ö™ü
úß 15 ÃÖê´Öß úß ¯ÖŸÖÔ »ÖÖÖ‡Ô •ÖÖ‹Öß… ‡Ã֍êú ‰ú¯Ö¸ü ×´Ö¼üß úß ¯ÖŸÖÔ “ÖœÍü֍ú¸ü ‡ÃÖê 15 פü­ÖÖë êú ×»Ö‹ ”ûÖê›Íü פüµÖÖ
•ÖÖ‹ÖÖ (‡ŸÖ­Öê ÃÖ´ÖµÖ ´Öë µÖÆü ÖÖ¤ü ´Öë ¯Ö׸ü¾ÖÙŸÖŸÖ ÆüÖê •ÖÖ‹ÖÖ)…
‡ÃÖ ×´Ö¼üß êú ˆ×“ÖŸÖ ×­ÖßÖÖ¸üÖ †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úÖµÖÔ ´Öë »ÖÖê »ÖÖêÖÖë ¾Ö úÖµÖÔÃ£Ö»Ö êú ú´ÖÔ“ÖÖ׸üµÖÖë êú
ÃÖÓ²ÖÓ¬Ö ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×¤ü‹ Ö‹ ¯Ö׸ü¸üÖÖ ÃÖÓ²ÖÓ¬Öß ×­Ö¤ìü¿ÖÖë úÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê Ö“ÖÔ ¯Ö¸ü
†­Öã¯ÖÖ»Ö­Ö ú¸ëüÖê… ˆ­Öúß †Öê¸ü ÃÖê ‡ÃÖ úÖµÖÔ úÖê ׍ú‹ •ÖÖ­Öê êú ×»Ö‹ ´ÖÆüÖ¯ÖÖ׻֍úÖ µÖÖ ïú™üÖê­Ö´Öë™ü
¯ÖÏÖ׬֍úÖ׸üµÖÖë «üÖ¸üÖ ×úÃÖß ¯ÖύúÖ¸ü úÖ ¿Ö㻍ú »ÖÖÖ‹ •ÖÖ­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆÃ֍êú ³ÖãÖŸÖÖ­Ö êú וִ´Öê¤üÖ¸ü ÆüÖëÖê…
10. ×¾ÖÁÖÖ´Ö êú ¤üÖî¸üÖ­Ö †Ö¸üÖ´Ö ú¸ü­Öê êú ×»Ö‹ ²ÖÃÖê¸üÖ :
¯ÖÏŸµÖêú úÖµÖÔÃ£Ö»Ö ¯Ö¸ü “ÖÖ¸ü ˆ¯ÖµÖãŒŸÖ ¿Öê›ü ×­Ö:¿Ö㻍ú ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê… ¯Öã¹ýÂÖ ¾Ö ´Ö×Æü»ÖÖ ÁÖ״֍úÖêÓ ×»Ö‹
†»ÖÖ-†»ÖÖ ‡­Ö ¿Öê›üÖë ´Öë ÃÖê ¤üÖê ¿Öê›ü ÖÖ­ÖÖ ÖÖ­Öê êú ×»Ö‹ ¾Ö ¤üÖê †Ö¸üÖ´Ö ú¸ü­Öê êú ×»Ö‹ ÆüÖëÖê… ‡­Ö ¿Öê›üÖë úß
”ûŸÖÖë úÖ ÃÖ²ÖÃÖê ×­Ö“Ö»ÖÖ ×ÃÖ¸üÖ ±ú¿ÖÔ ÃÖê ú´Ö ÃÖê ú´Ö 3 ´Öß™ü¸ü ‰Óú“ÖÖ ÆüÖêÖÖ… ‡­Ö ¿Öê›üÖë ´Öë Æü´Öê¿ÖÖ ÃÖÖ±ú-ÃÖ±úÖ‡Ô
¸üÖß •ÖÖ‹Öß †Öî¸ü ‡­Ö ¿Öê›üÖë êú †ÖúÖ¸ü úÖ †Ö¬ÖÖ¸ü ¯ÖÏ×ŸÖ ¾µÖÛŒŸÖ ú´Ö ÃÖê ú´Ö 0.5 ¾ÖÖÔ ´Öß™ü¸ü Öê¡Ö êú
×ÆüÃÖÖ²Ö ÃÖê ÆüÖêÖÖ…

86

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
11. Crèches :

At a place at which 20 or more women workers are ordinarily employed,


there shall be provided at least one hut for use of children under the age of
6 years belonging to such women, Huts shall not be constructed to a
standard lower than that of thatched roof, mud floor and wall with wooden
plants spread over mud floor and covered with matting.
Huts shall provided with suitable and sufficient openings for light and
ventilation. There shall be adequate provision of sweepers to keep the
places clean. There shall be two dais in attendance. Sanitary utensils shall
be provided to the satisfaction of local medical health and municipal or
cantonment authorities. Use of huts shall be restricted to children their
attendance and mothers of children.
Where the number of women workers is more than 25 but less than 50, the
Contractor shall provide at least one hut and one dai to look after children of
women workers.
Size of creche (s) shall vary according to the number of women workers
employed.
Creche (s) shall be properly maintained and necessary equipment like
toys etc., provided.
12. Canteen :

A cooked food canteen on a moderate scale shall be provided for the


benefit of workers wherever it is considered necessary.
13. Planning :

Setting and erection of the above mentioned structures shall be approved


by the Engineer-in-Charge, and the whole of such temporary
accommodation shall at all times during the progress of the works be kept
tidy and in a clean and sanitary condition to the satisfaction of the Engineer-
in-Charge and at the Contractor`s expenses. The Contractor shall conform
generally to sanitary requirements of local medical, health and municipal or
cantonment authorities and at all times adopt such precautions as may
be necessary to prevent soil pollution of the Site.

On completion of the Works the whole of such temporary structures shall


be cleared away, all rubbish burnt, excreta or other disposal pits or
trenches filled in and effectively sealed off and the whole of site left clean
and tidy to the entire satisfaction of the Engineer-in-Charge and at the
Contractor`s expenses.

87

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
11. ׿ֿÖãÖéÆü :
×•Ö­Ö Ã£Ö»ÖÖë ¯Ö¸ü ÃÖÖ´ÖÖ­µÖŸÖµÖÖ 20 µÖÖ †×¬Öú ´Ö×Æü»ÖÖ úִ֐ÖÖ¸ü ×­ÖµÖÖê×•ÖŸÖ ¸üÆüŸÖß ÆüÖë ¾ÖÆüÖÓ ¯Ö¸ü ‡­Ö ´Ö×Æü»ÖÖ†Öë
êú 6 ¾ÖÂÖÔ ÃÖê ú´Ö †ÖµÖ㠍êú ׿ֿÖã†Öë úê ˆ¯ÖµÖÖêÖ êú ×»Ö‹ ú´Ö ÃÖê ú´Ö ‹ú —ÖÖê¯Ö›Íüß ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •ÖÖ‹Öß…
‡ÃÖ —ÖÖê¯Ö›Íüß úÖ ×­Ö´ÖÖÔÖ Ö¯Ö¸îü»Ö úß ”ûŸÖ, ×´Ö¼üß úß ±ú¿ÖÔ †Öî¸ü ‡ÃÖ ±ú¿ÖÔ ¯Ö¸ü »Öú’Íß êú ¯Ö™ü¸üê †Öî¸ü ¯Ö™ü¸üÖë êú
‰ú¯Ö¸ü “Ö™üÖ‡Ô ÃÖê ú´Ö ßָü úÖ ­ÖÆüà ÆüÖêÖÖ…
‡ÃÖ —ÖÖê¯Ö›Íüß ´Öë Æü¾ÖÖ †Öî¸ü ¸üÖê¿Ö­Öß úÖ ˆ¯ÖµÖãŒŸÖ ¾Ö ¯ÖµÖÖÔ¯ŸÖ ¯ÖϲÖÓ¬Ö ×úµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖ Ã£ÖÖ­Ö úÖê ÃÖÖ±ú-ÃÖã£Ö¸üÖ
¸üÖ­Öê êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ ÃÖӏµÖÖ ´Öë ÃÖ±úÖ‡Ô ú´Öá »ÖÖÖ‹ •Ö֋ӐÖê… µÖÆüÖÓ ¯Ö¸ü ¤üÖê ¤üÖ‡µÖÖÓ ÆüÖëÖß… ãÖÖ­ÖßµÖ ×“Ö׍úŸÃÖÖ
¾Ö ´ÖÆüÖ¯ÖÖ׻֍úÖ µÖÖ ïú™üÖê­Ö´Öë™ü ¯ÖÏÖ׬֍úÖ׸üµÖÖë úÖê ÃÖÓŸÖÖêÂ֭֕֍ú ¯ÖÏŸÖßŸÖ ÆüÖê­Öê µÖÖêµÖ Ã¾Ö“”û ²Ö¸üŸÖ­Ö ˆ¯Ö»Ö²¬Ö
ú¸üÖ‹ •Ö֋ӐÖê… ‡ÃÖ —ÖÖê¯Ö›Íüß úÖ ˆ¯ÖµÖÖêÖ ׿ֿÖã†Öë, ˆ­Öêú ¯Ö׸ü“Öֵ֍úÖë ¾Ö ×¿Ö¿Öã†Öë úß ´ÖÖŸÖÖ†Öë êú ×»Ö‹ Æüß
ÃÖß×´ÖŸÖ ÆüÖêÖÖ…
•ÖÆüÖÓ úÆüà ´Ö×Æü»ÖÖ ú´ÖÔ“ÖÖ׸üµÖÖë úß ÃÖӏµÖÖ 25 ÃÖê †×¬Öú ¯Ö¸ÓüŸÖã 50 ÃÖê ú´Ö ÆüÖê ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ´Ö×Æü»ÖÖ
úִ֐ÖÖ¸üÖë êú ׿ֿÖã†Öë úß ¤êüÖ³ÖÖ»Ö êú ×»Ö‹ ú´Ö ÃÖê ú´Ö ‹ú —ÖÖê¯Ö›Íüß ¾Ö ‹ú ¤üÖ‡Ô úß ¾µÖ¾ÖãÖÖ ú¸ëüÖê…
׿ֿÖãÖéÆü(ÖéÆüÖ)ë úÖ †ÖúÖ¸ü ×­ÖµÖÖê×•ÖŸÖ úß Ö‡Ô ´Ö×Æü»ÖÖ úִ֐ÖÖ¸üÖë úß ÃÖӏµÖÖ úê †­ÖãÃÖÖ¸ü ¯Ö׸ü¾ÖÙŸÖŸÖ ÆüÖê
•ÖÖ‹ÖÖ…
׿ֿÖãÖéÆü(ÖéÆüÖ)ë úÖê ³Ö»Öß ¯ÖύúÖ¸ü †­Öã¸ü×ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ ¾Ö †Ö¾Ö¿µÖú ˆ¯Öú¸üÖ •ÖîÃÖê ׏ֻÖÖî­Öê †Öפü
ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê…

12. ïú™üß­Ö :
•ÖÆüÖÓ úÆüà †Ö¾Ö¿µÖúŸÖÖ ¯ÖÏŸÖßŸÖ ÆüÖê, úִ֐ÖÖ¸üÖë êú »ÖÖ³ÖÖ£ÖÔ ‹ú †Ã£ÖÖ‡Ô ŸÖîµÖÖ¸ü ³ÖÖê•Ö­Ö ïú™üß­Ö ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô
•ÖÖ‹Öß…

13. †ÖµÖÖê•Ö­ÖÖ :
ˆ¯ÖµÖãÔŒŸÖ ¾ÖÙÖŸÖ ×­Ö´ÖÖԝÖÖë úß Ã£ÖÖ¯Ö­ÖÖ ¾Ö ŸÖîµÖÖ¸ü ú¸ü­Öê êú ×»Ö‹ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ †­Öã´ÖÖê¤ü­Ö ×»ÖµÖÖ
•ÖÖ‹ÖÖ †Öî¸ü úÖµÖÔ úß ¯ÖϐÖ×ŸÖ êú ¤üÖî¸üÖ­Ö ‹êÃÖê ÃÖ³Öß †Ã£ÖÖ‡Ô †Ö¾ÖÖÃÖÖë úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“ÖÔ ¯Ö¸ü ŸÖîµÖÖ¸ü
׍úµÖÖ •ÖÖ‹ÖÖ ¾Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ÃÖÓŸÖãÛ™ü êú ßָü ŸÖú ÃÖÖ±ú ¾Ö þ֓”û ÖÓ¤üÖß ¸ü×ÆüŸÖ ¸üÖÖ •ÖÖ‹ÖÖ…
ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÖ´ÖÖ­µÖŸÖµÖÖ Ã£ÖÖ­ÖßµÖ ×“Ö׍úŸÃÖÖ, þÖÖãµÖ ¾Ö ´ÖÆüÖ¯ÖÖ׻֍úÖ µÖÖ ïú™üÖê­Ö´Öë™ü ¯ÖÏÖ׬֍úÖ׸üµÖÖë úß
†×­Ö¾ÖÖµÖÔŸÖÖ†Öë úÖ †­Öã¯ÖÖ»Ö­Ö ú¸ëüÖê †Öî¸ü úÖµÖÔÃ£Ö»Ö úß ³Öæ×´Ö úÖê ׍úÃÖß ³Öß ¯ÖύúÖ¸ü êú ¯ÖϤæüÂÖÖ ÃÖê ²Ö“ÖÖ­Öê
êú ×»Ö‹ Æü´Öê¿ÖÖ †Ö¾Ö¿µÖú ÃÖÖ¾Ö¬ÖÖ×­ÖµÖÖÓ ²Ö¸üŸÖëÖê…
úÖµÖÔ ¯ÖæÖÔ ÆüÖê •ÖÖ­Öê êú ¯Ö¿“ÖÖŸÖ, ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“Öì ¯Ö¸ü ‹êÃÖê ÃÖ³Öß †Ã£ÖÖ‡Ô ×­Ö´Ö֝ÖÖí úÖê Æü™üÖµÖÖ •ÖÖ‹ÖÖ,
ÃÖ³Öß •Ö»ÖÖ‡Ô Ö‡Ô ÖÓ¤üÖß, ´Ö»Ö †Öפü, †­µÖ ×­ÖßÖÖ¸üÖ ÖùüÖë µÖÖ ÖÖ‡µÖÖë úÖê ³Ö¸üÖ •ÖÖ‹ÖÖ ¾Ö ˆ×“ÖŸÖ ¯ÖύúÖ¸ü ÃÖê
²ÖÓ¤ü ׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ¯Öæ¸êü úÖµÖÔÃ£Ö»Ö úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ÃÖÓŸÖãÛ™ü êú ßָü ŸÖú ÃÖÖ±ú ¾Ö þ֓”û
ÆüÖ»ÖŸÖ ´Öë »ÖÖµÖÖ •ÖÖ‹ÖÖ…

87

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
14. Anti-malarial precautions :

The Contractor shall, at his own expense, conform to all anti-malarial


instructions given to him by the Engineer-in-Charge, including filling up any
borrow pits which may have been dug by him.

15. Enforcement :

The Inspecting Officer mentioned in the Contractors Labour Regulations or


any other officer nominated in his behalf by the Engineer-in-Charge shall
report to the Engineer-in-Charge all cases of failure on the part of the
Contractor and or his sub-contractors to comply with the provisions of these
Rules either wholly or in part and the Engineer-in-Charge shall impose such
fines and other penalties as are prescribed in the conditions.

16. Interpretations etc. :

On any question as to the application, interpretation or effect of these


Rules, the decision of the Chief Labour Commissioner or Deputy Chief Labour
Commissioner(Central) shall be final and binding.

17. Amendments :

Government may, from time to time add to or amend these Rules and
issue such directions as it may consider necessary for the proper
implementation of these Rules or for the purpose of removing any difficulty
which may arise in the administration thereof.

88

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
14. ´Ö»Öê׸üµÖÖ ¸üÖê¬Öß ÃÖÖ¾Ö¬ÖÖ×­ÖµÖÖÓ :
ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê Ö“Öì ¯Ö¸ü, ˆ­Öêú «üÖ¸üÖ ÖÖê¤êü Ö‹ †Ã£ÖÖ‡Ô ÖùüÖë úÖê ³Ö¸ü­Öê ÃÖ×ÆüŸÖ ´Ö»Öê׸üµÖÖ úß ¸üÖêú£ÖÖ´Ö êú
ÃÖÓ²ÖÓ¬Ö ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ×¤ü‹ •ÖÖ­Öê ¾ÖÖ»Öê ÃÖ´ÖÃŸÖ ×­Ö¤ìü¿ÖÖë úÖê ¯Öæ¸üÖ ú¸ëüÖê…

15. ¯ÖϾ֟ÖÔ­Ö :
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úִ֐ÖÖ¸ü ×¾Ö×­ÖµÖ´ÖÖë ´Öë ×¾Ö×­ÖÙ¤ü™ü ×­Ö¸üßÖÖ †×¬ÖúÖ¸üß †£Ö¾ÖÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß †Öê¸ü ÃÖê
­ÖÖ×´ÖŸÖ úÖê‡Ô †­µÖ †×¬ÖúÖ¸üß, ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖÖ ˆ­Öêú ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë «üÖ¸üÖ ‡­Ö ×­ÖµÖ´ÖÖë êú ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë úÖ
¯ÖæÖÔºþ¯ÖêÖ µÖÖ ˆ­Öêú ׍úÃÖß ³ÖÖÖ úÖ †­Öã¯ÖÖ»Ö­Ö ú¸ü­Öê ´Öë †ÃÖ±ú»Ö ¸üÆü­Öê úß ×¸ü¯ÖÖê™Ôü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê
¤ëüÖê †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ŸÖ¤ü­ÖãÃÖÖ¸ü ‡­Ö ¿ÖŸÖÖí ´Öë ¾ÖÙÖŸÖ •Öã´ÖÖÔ­ÖÖ ¾Ö ¤ü›ü úÖ †×¬Ö¸üÖê¯ÖÖ ú¸ëüÖê…
16. ¾µÖ֏µÖÖ :
‡­Ö ×­ÖµÖ´ÖÖë êú »Ö֐Öæ ÆüÖê­Öê, ¾µÖ֏µÖÖ µÖÖ ¯ÖϳÖÖ¾Ö êú ²ÖÖ¸êü ´Öë úÖê‡Ô ¿ÖӍúÖ ÆüÖê­Öê ¯Ö¸ü ´ÖãµÖ ÁÖ´Ö †ÖµÖãŒŸÖ µÖÖ ˆ¯Ö
´ÖãµÖ ÁÖ´Ö †ÖµÖãŒŸÖ (ëú¦üßµÖ) úÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ¾Ö ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…

17. ÃÖÓ¿ÖÖê¬Ö­Ö
ÃÖ¸üúÖ¸ü ‡­Ö ×­ÖµÖ´ÖÖë úÖ ˆ×“ÖŸÖ †­Öã¯ÖÖ»Ö­Ö †£Ö¾ÖÖ ‡­Öêú ¯ÖÏ¿ÖÖÃÖ­Ö ´Öë †Ö­Öê ¾ÖÖ»Öß ×ú­Æüà úךü­ÖÖ‡µÖÖë úÖê ¤æü¸ü
ú¸ü­Öê êú ¯ÖϵÖÖê•Ö­Ö úß †Ö¾Ö¿µÖúŸÖÖ ÃÖ´Ö—Ö­Öê ¯Ö¸ü ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ‡­Ö ×­ÖµÖ´ÖÖë ´Öë ãú”û •ÖÖê›Íü Ã֍úŸÖß Æîü
†£Ö¾ÖÖ ÃÖÓ¿ÖÖê¬Ö­Ö ú¸ü Ã֍úŸÖß Æîü…

88

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
21. AERB Safety Guide
S. NO. CONTENTS
TITLE
1. INTRODUCTION
2. GENERAL SAFETY PROVISIONS
3. TRAFFIC
4. SAFE MEANS OF ACCESS
5. EXCAVATION, TRENCHING & EARTH REMOVAL
6. CONCRETING
7. DEMOLITION
8. PERSONAL PROTECTIVE EQUIPMENT

9. PAINTING
10. LIFTING MACHINES & TACKLES
11. WELDING AND GAS CUTTING
12. GRINDING
13. ELECTRICITY
14. HOUSE KEEPING
15. FIRE SAFETY
16. SAFETY WORK PERMIT

17. WORK IN RADIATION AREA


18. WORK IN AROUND WATER BODIES
19. MEDICAL FACILITIES
20. SAFETY OFFICER & SAFETY CO-ORDINATION
21. REPORTING OF ACCIDENT
22. PUBLIC PROTECTION
23. OTHER STATUTORY PROVISIONS
ANNEXURE: GUIDELINES AND GENERAL PROCEDURES FOR SUPPLY AND USE OF
ELECTRICITY AT SITE
FORMS: 1. FORM FOR COMPLETION CERTIFICATE
2. APPLICATION FOR SERVICE CONNECTION BY CONTRACTOR

89

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
21. ¯Ö¸ü´Ö֝Öã ‰ú•ÖÖÔ ×­ÖµÖִ֍ú ¯Ö׸üÂÖ¤ü ÃÖÓ¸üÖÖ ×¤ü¤üٿ֍úÖ
Îú´Ö ÃÖӏµÖÖ ×¾ÖÂÖµÖ ¿ÖßÂÖԍú
1. ¯ÖÏßÖÖ¾Ö­ÖÖ
2. ÃÖÖ´ÖÖ­µÖ ÃÖÓ¸üÖÖ ¯ÖÏÖ¾Ö¬ÖÖ­Ö
3. µÖÖŸÖÖµÖÖŸÖ
4. ¯ÖϾÖê¿Ö êú ÃÖã¸ü×ÖŸÖ ´Ö֐ÖÔ
5. Öã¤üÖ‡Ô, ÖÖ‡Ô ²Ö­ÖÖ­ÖÖ ¾Ö ×´Ö¼üß Æü™üÖ­ÖÖ
6. ÓúÎúß™ü úß œü»ÖÖ‡Ô
7. ŸÖÖê›Íü-±úÖê›üÍ
8. ¾µÖÛŒŸÖÖŸÖ ÃÖã¸üÖÖ ˆ¯Öú¸üÖ
9. ¸ÓüÖÖ‡Ô
10. ×»ÖÜ°™üÖ ´Ö¿Öß­Öê ¾Ö ™îüú»Ö
11. ¾ÖêÜ»›üÖ ¾Ö ÖîÃÖ úØ™üÖ
12. בÖÃÖÖ‡Ô
13. ײֻ֕Öß
14. ÖéÆü ÃÖ••ÖÖ
15. †Û­Ö ÃÖÓ¸üÖÖ
16. ÃÖÓ¸üÖÖ úÖµÖÔ ¯Ö¸ü×´Ö™ü
17. ×¾Ö׍ú¸üÖ Öê¡Ö ´Öë úÖµÖÔ
18. •Ö»ÖßµÖ Öê¡ÖÖê ´Öë ¾Ö ˆÃ֍êú †ÖÃÖ-¯ÖÖÃÖ úÖµÖÔ
19. דÖ׍úŸÃÖÖ ÃÖã×¾Ö¬ÖÖ‹Ó
20. ÃÖÓ¸üÖÖ †×¬ÖúÖ¸üß/ÃÖÓ¸üÖÖ ÃÖ´Ö­¾ÖµÖú
21. ¤ãü‘ÖÔ™ü­ÖÖ úß ×¸ü¯ÖÖêÚ™üÖ
22. •Ö­ÖŸÖÖ úß ÃÖã¸üÖÖ
23. †­µÖ ÃÖÓ¾Öî¬ÖÖ׭֍ú ¯ÖÏÖ¾Ö¬ÖÖ­Ö
¯Ö׸ü׿ÖÛ™ü : úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ײֻ֕Öß úß †Ö¯ÖæÙŸÖ ¾Ö ˆ¯ÖµÖÖêÖ êú ×»Ö‹ פü¿ÖÖ×­Ö¤ìü¿Ö ¾Ö ÃÖÖ´ÖÖ­µÖ ×¾Ö׬ֵÖÖÓ
¯Öϯ֡Ö: 1.úÖµÖÔ¯ÖæÖÔŸÖÖ
¯ÖÏ´ÖÖÖ¯Ö¡Ö úÖ ¯Öϯ֡Ö
2. ײֻ֕Öß ÃÖê¾ÖÖ ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×¤üµÖÖ •ÖÖ­Öê ¾ÖÖ»ÖÖ †Ö¾Öê¤ü­Ö

89

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
1. INTRODUCTION
Many of the works of Department of Atomic Energy at its various sites are
executed by the Contractors. During these works, contractors personnel are
likely to be exposed to different types of hazards. Similarly, unsafe acts of
contractors personnel may generate hazards for Departmental staff and / or
workmen of other contractors working at the site. Such unsafe acts may also
pose danger to the existing installations and even to members of public. This
guide is prepared to facilitate safe working during execution of contract
works. It is hoped that units of DAE may issue this guide as a part of contract
documents while awarding contracts.
2. GENERAL SAFETY PROVISIONS
2.1 The Contractor shall take all safety precautions during the execution of
awarded work and shall maintain and leave the site safe at all times. At the
end of each working day and at all times when the work is temporarily
suspended, he shall ensure that all materials, equipment and facilities will not
cause damage to existing property, personal injury or interfere with the other
works of the Project or Station. The Contractor shall comply with all
applicable provisions of the safety regulations, clean up programme and
other measures that are in force at the site.
2.2 The Contractor shall provide and maintain all lights, guards, fencing, warning
signs, caution boards and other safety measures and provide for vigilance as
and where necessary or as required by the Engineer-in-charge or by any duly
constituted authority for the protection of workers or for the safety of others.
The caution boards shall also have appropriate symbols.
2.3 Adequate lighting facilities such as flood lights, hand lights and area lighting
shall be provided by the Contractor at the site of work, storage area of
materials and equipment and temporary access roads within his working
area. The contractor shall obtain written approval of the Engineer-in-charge
to the lighting scheme and place of tapping prior to its installation.
2.4 The Contractor shall plan his operation so as to avoid interference with the
other Departmental works, other contractors or sub-contractors at the site. In
case of any interference, necessary co-ordination shall be sought by the
contractor from the Department for safe and smooth working.
2.5 The Contractor and his sub-contractor, if any, shall comply with the
instructions given by the Safety Engineer or his authorised nominee regarding
safety precautions, protective measures, house keeping requirements, etc.
The Safety Engineer with due intimation to Engineer-In-charge shall have the
right to stop the work of the contractor, if in his opinion proceeding with the
work will lead to an unsafe and dangerous condition. Engineer-in-charge
shall get the unsafe conditions removed or provide protective equipment at
the contractors cost. The contractor can employ his own Safety Engineer or
nominate one of his officers for liaison with Departmental Safety Engineer, for
ensuring compliance of all safety rules.

90

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
1. ³Öæ״֍úÖ ü
¯Ö¸ü´Ö֝Öã ‰ú•ÖÖÔ ×¾Ö³ÖÖÖ úê ×¾Ö×³Ö®Ö Ã£Ö»ÖÖë êú †­Öêú úÖµÖÖí úÖ ×­Ö¯ÖÖ¤ü­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë «üÖ¸üÖ ×úµÖÖ •ÖÖŸÖÖ Æîü…
‡­Ö úÖµÖÖí êú ¤üÖî¸üÖ­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úִ֐ÖÖ¸üÖë úÖ ÃÖÖ´Ö­ÖÖ ×¾Ö×³Ö®Ö ¯ÖύúÖ¸ü êú ÖŸÖ¸üÖë ÃÖê ÆüÖê­Öê úß ÃÖÓ³ÖÖ¾Ö­ÖÖ
¸üÆüŸÖß Æîü… ‡ÃÖß ¯ÖύúÖ¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úִ֐ÖÖ¸üÖë «üÖ¸üÖ †ÃÖã¸ü×ÖŸÖ éúŸµÖÖë ÃÖê ×¾Ö³Ö֐ÖßµÖ ú´ÖÔ“ÖÖ׸üµÖÖë †Öî¸ü /
úÖµÖÔÃ£Ö»Ö ¯Ö¸ü úÖ´Ö ú¸ü ¸üÆêü †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú úִ֐ÖÖ¸üÖë úÖê ÖŸÖ¸üÖ ˆŸ¯Ö®Ö ÆüÖê Ã֍úŸÖÖ Æîü… ‹êÃÖê
†ÃÖã¸ü×ÖŸÖ éúŸµÖÖë ÃÖê ´ÖÖî•Öæ¤üÖ ‡´ÖÖ¸üŸÖÖë †Öî¸ü µÖÆüÖÓ ŸÖú ׍ú †Ö´Ö •Ö­ÖŸÖÖ úÖê ³Öß ÖŸÖ¸üÖ ÆüÖê Ã֍úŸÖÖ Æîü… ‡ÃÖ
פü¤üٿ֍úÖ úÖê ÃÖÓ×¾Ö¤üÖ úÖµÖÖí êú ×­Ö¯ÖÖ¤ü­Ö êú ¤üÖî¸üÖ­Ö ÃÖã¸ü×ÖŸÖ úÖµÖÔ¯ÖϝÖÖ»Öß †¯Ö­ÖÖ­Öê êú ×»Ö‹ ŸÖîµÖÖ¸ü ׍úµÖÖ
ÖµÖÖ Æîü… †Ö¿ÖÖ úß •ÖÖŸÖß Æîü ׍ú ¯Ö¸ü´Ö֝Öã ‰ú•ÖÖÔ ×¾Ö³ÖÖÖ úß ‡úÖ‡µÖÖÓ ÃÖÓ×¾Ö¤üÖ †¾ÖÖ›Ôü ú¸üŸÖê ÃÖ´ÖµÖ ‡­Ö
פü¿ÖÖ×­Ö¤ìü¿ÖÖë úÖê ÃÖÓ×¾Ö¤üÖ ¤üßÖÖ¾Öê•ÖÖë úê ‹ú ³ÖÖÖ êú ºþ¯Ö ´Öë •ÖÖ¸üß ú¸ëüÖß…
2. ÃÖÖ´ÖÖ­µÖ ÃÖÓ¸üÖÖ ¯ÖÏÖ¾Ö¬ÖÖ­Ö
2.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¾ÖÖ›Ôü ׍ú‹ Ö‹ úÖµÖÔ êú ×­Ö¯ÖÖ¤ü­Ö êú ¤üÖî¸üÖ­Ö ÃÖ³Öß ÃÖÓ¸üÖÖ ÃÖÖ¾Ö¬ÖÖ×­ÖµÖÖÓ †¯Ö­Ö֋ӐÖê †Öî¸ü
úÖµÖÔÃ£Ö»Ö úÖê ÃÖ¤îü¾Ö ÃÖã¸ü×ÖŸÖ ¤ü¿ÖÖ ´Öë ²Ö­ÖÖ‹ ¸üÖëÖê ¾Ö ”ûÖê›ÍëüÖê… ¯ÖÏŸµÖêú úÖµÖÔפü¾ÖÃÖ êú ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê ¯Ö¸ü ¾Ö
úÖµÖÔ úÖê †Ã£ÖÖ‡Ô ºþ¯Ö ÃÖê »ÖÓ×²ÖŸÖ ×ú‹ •ÖÖ­Öê ¯Ö¸ü ¾Öê ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê ׍ú ÃÖ³Öß ÃÖִ֐ÖÏß, ˆ¯Öú¸Ö ¾Ö
ÃÖã×¾Ö¬ÖÖ‹Ó ´ÖÖî•Öæ¤üÖ ÃÖÓ¯Ö×¢Ö úÖê Ö×ŸÖ ­Ö ¯ÖÆãÓü“ÖÖ‹Ó, ׍úÃÖß ¾µÖÛŒŸÖ úÖê “ÖÖê™ü ­Ö »ÖÖê µÖÖ ¯Ö׸üµÖÖê•Ö­ÖÖ †£Ö¾ÖÖ ëú¦ü
êú †­µÖ úÖµÖÖí ´Öë úÖê‡Ô ²ÖÖ¬ÖÖ ­Ö †Ö‹ … ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÓ¸üÖÖ ×¾Ö×­ÖµÖ´ÖÖë êú ÃÖ´ÖÃŸÖ »Ö֐Öæ ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë, ÃÖ±úÖ‡Ô
úÖµÖԍÎú´Ö ¾Ö úÖµÖÔÃ£Ö»Ö ¯Ö¸ü »Ö֐Öæ †­µÖ ˆ¯ÖÖµÖÖë úÖ †­Öã¯ÖÖ»Ö­Ö ú¸ëüÖê…
2.2 ÃÖÓ×¾Ö¤ü֍úÖ¸,ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ µÖÖ ×¾Ö׬־֟ÖË ×­ÖµÖãŒŸÖ ×úÃÖß †­µÖ ¯ÖÏÖ׬֍úÖ¸üß «üÖ¸üÖ úִ֐ÖÖ¸üÖë úß ÃÖã¸üÖÖ µÖÖ
†­µÖ »ÖÖêÖÖë úß ÃÖã¸üÖÖ êú ×»Ö‹ ¾ÖÖÓ×”ûŸÖ ÃÖ³Öß »ÖÖ‡™ëü, ÖÖ›Ôü, ²ÖÖ›Íü, “ÖêŸÖÖ¾Ö­Öß ²ÖÖê›Ôü, ÃÖÖ¾Ö¬ÖÖ­Öß ²ÖÖê›Ôü ŸÖ£ÖÖ
µÖ£ÖÖÃÖ´ÖµÖ µÖ£ÖÖ†Ö¾Ö¿µÖú Ã֟֍ÔúŸÖÖ êú ×»Ö‹ †Ö¾Ö¿µÖú †­µÖ ÃÖã¸üÖÖ ˆ¯ÖÖµÖ ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê… “ÖêŸÖÖ¾Ö­Öß
²ÖÖê›Ôü ´Öë ˆ¯ÖµÖãŒŸÖ ¯ÖÏŸÖߍú דÖÅ­Ö ³Öß ²Ö­Öë ÆüÖëÖê…
2.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ †Ó¤ü¸ü úÖµÖÔÃ£Ö»Ö ¯Ö¸ü, ÃÖִ֐ÖÏß ¾Ö ˆ¯Öú¸üÖ ³ÖÓ›üÖ¸üÖ Öê¡Ö ´Öë ¾Ö †¯Ö­Öê úÖµÖԁÖê¡Ö ´Öë •ÖÖ­Öê
¾ÖÖ»Öß †Ã£ÖÖ‡Ô ÃÖ›ÍüúÖë ¯Ö¸ü ¯ÖµÖÖÔ¯ŸÖ ¸üÖê¿Ö­Öß ÃÖã×¾Ö¬ÖÖ‹Ó •ÖîÃÖê °»Ö›ü »ÖÖ‡™ëü, Æïü›ü »ÖÖ‡™ëü, ¾Ö †ÖÃÖ-¯ÖÖÃÖ êú Öê¡Ö êú
×»Ö‹ »ÖÖ‡™üÖë †Öפü úß ¾µÖ¾ÖãÖÖ úß •ÖÖ‹Öß… ‡­Ö »ÖÖ‡™üÖë úÖê »ÖÖÖ­Öê ÃÖê ¯ÖÆü»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öß »ÖևؙüÖ
µÖÖê•Ö­ÖÖ ¾Ö ŸÖÖ¸üÖë úÖê •ÖÖê›üÍ­Öê êú ãÖÖ­ÖÖë êú ²ÖÖ¸êü ´Öë ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖê ¯Öæ¾ÖÔ ×»Ö×ÖŸÖ †­Öã´ÖÖê¤ü­Ö ¯ÖÏÖ¯ŸÖ ú¸ëüÖê…
2.4 ÃÖÓ×¾Ö¤üúÖ¸ü †¯Ö­Öê úÖµÖÖí úß µÖÖê•Ö­ÖÖ ‡ÃÖ ¯ÖύúÖ¸ü ²Ö­Ö֋ӐÖê ׍ú ‡ÃÖÃÖê †­µÖ ×¾Ö³Ö֐ÖßµÖ úÖµÖÖí ´Öë, úÖµÖÔÃ£Ö»Ö ¯Ö¸ü
úÖµÖÔ¸üŸÖ †­µÖ ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë µÖÖ ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸üÖë êú úÖµÖÖí ´Öë ¾µÖ¾Ö¬ÖÖ­Ö ­Ö ¯Ö›Íêü… µÖפü úÖê‡Ô ‹êÃÖÖ ¾µÖ¾Ö¬ÖÖ­Ö
ÆüÖêŸÖÖ Æîü ŸÖÖê ÃÖã¸ü×ÖŸÖ ¾Ö ÃÖãÖ´Ö œÓüÖ ÃÖê úÖµÖÔ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×¾Ö³ÖÖÖ ÃÖê ˆ×“ÖŸÖ ÃÖ´Ö­¾ÖµÖ ú¸üÖ­Öê
úß ´ÖÖÓÖ ú¸ëüÖê…
2.5 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †Öî¸ü µÖפü ˆ­Öêú úÖê‡Ô ˆ¯Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÆüÖë ŸÖÖê, ¾Öê ÃÖÓ¸üÖÖ †×³ÖµÖÓŸÖÖ †£Ö¾ÖÖ ˆ­Öêú ¯ÖÏÖ׬֍éúŸÖ
­ÖÖ×´ÖŸÖ «üÖ¸üÖ ÃÖÓ¸üÖÖ ÃÖÖ¾Ö¬ÖÖ×­ÖµÖÖë, ²Ö“ÖÖ¾Ö êú ˆ¯ÖÖµÖÖë, ÆüÖˆÃÖ úßØ¯ÖÖ †Ö¾Ö¿µÖúŸÖÖ†Öë †Öפü êú ÃÖÓ²ÖÓ¬Ö ´Öë פü‹
Ö‹ ×­Ö¤ìü¿ÖÖêÓ úÖ †­Öã¯ÖÖ»Ö­Ö ú¸ëüÖê… ÃÖÓ¸üÖÖ †×³ÖµÖÓŸÖÖ úß ¸üÖµÖ ´Öë µÖפü úÖµÖÔ úß ¯ÖϐÖ×ŸÖ êú úÖ¸üÖ †ÃÖã¸üׁ֟Ö
¾Ö ÖŸÖ¸ü­Ö֍ú ÛãÖןֵÖÖÓ ˆŸ¯Ö®Ö ÆüÖê •ÖÖ­Öê úÖ †Ó¤êü¿ÖÖ ÆüÖê ŸÖÖê ˆ­Æëü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê µÖ£ÖÖµÖÖêµÖ ÃÖæ×“ÖŸÖ ú¸üŸÖê
Æãü‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úÖµÖÔ úÖê ¸üÖêú­Öê úÖ †×¬ÖúÖ¸ü ÆüÖêÖÖ… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ü ‹êÃÖß †ÃÖã¸ü×ÖŸÖ ¤ü¿ÖÖ†Öë úÖê
üÆü™ü¾Ö֋ӐÖê †£Ö¾ÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“ÖÔ ¯Ö¸ ¾Ö“ÖÖ¾Ö êú ˆ¯Öú¸üÖ ˆ¯Ö»Ö²¬Ö ú¸ü¾Ö֋ӐÖê… ÃÖ³Öß ÃÖÓ¸üÖÖ ×­ÖµÖ´ÖÖë úÖ
†­Öã¯ÖÖ»Ö­Ö ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­Öê ÆêüŸÖã ×¾Ö³Ö֐ÖßµÖ ÃÖÓ¸üÖÖ †×³ÖµÖÓŸÖÖ êú ÃÖÖ£Ö ÃÖ´Ö­¾ÖµÖ ú¸ü­Öê êú
90

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Contractor shall ensure that, all his workmen are aware about the nature of risk
involved in their work and have adequate training for carrying out their work safely.

2.6 The Contractor shall be held responsible for non-compliance of any of the
safety measures and delays, implications, injuries, fatalities and
compensation arising out of such situations or incidents.

3. TRAFFIC

3.1 The Contractor shall conduct his operations so as to interfere as little as


possible, with the use of existing roads at or near locations where the work is
being performed.

3.2 When interference to traffic is inevitable, notice of such interference shall be


given to the Engineer-in-charge well in advance (at least 48 hours) with the
details of start of the work and time required, storage of materials, and details
of the proposed methods of providing the required facilities for safe and
continuous use of roads and obtain his clearance.

3.3 The Contractor shall, at his own expense, make such approved temporary
provisions as are required to maintain at least one lane of traffic by bridging
the excavation, providing ramps over surface obstructions or providing
suitable temporary bye-pass around the obstructions. The Contractor shall
exercise full care to ensure that no damage is caused by him or his workmen,
during the operation, to the existing water supply, sewage, power or
telecommunication lines or any other service or works. The Contractor shall
be required to provide and erect before construction, substantial barricades,
guard-rails and warning signs. He shall furnish, place and maintain adequate
warning lights, signals, etc., as required by Engineer-in-charge.

4. SAFE MEANS OF ACCESS

4.1 Adequate and safe means of access and exit shall be provided for all work
places, at all elevations. Using of scaffolding members (avoiding a ladder)
for approach to high elevations shall not be permitted.
4.2 Suitable scaffolds shall be provided for workmen for all works that cannot
safely be done from the ground, or from solid construction except such short
duration work as can be done safely from ladders. Ladder shall be of rigid
construction having sufficient strength for the intended loads and made
either of good quality wood or metal and all ladders shall be maintained
well for safe working condition. An extra mazdoor shall be engaged for
holding the ladder, if ladder is not securely fixed. If the ladder is used for c
arrying materials as well, suitable foot holds and hand holds shall be provided
on the ladder. The ladder shall be given an inclination not steeper

91

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­ÖÖ ÃÖÓ¸üÖÖ †×¬ÖúÖ¸üß ×­ÖµÖÖê×•ÖŸÖ ú¸ü Ã֍úŸÖê Æïü µÖÖ †¯Ö­Öê †×¬ÖúÖ׸üµÖÖë ´Öë ÃÖê ׍úÃÖß
‹ú úÖê ÃÖÓ¸üÖÖ †×¬ÖúÖ¸üß êú ºþ¯Ö ´Öë ­ÖÖ×´ÖŸÖ ú¸ü Ã֍úŸÖê ÆïüÓ… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê ׍ú ˆ­Öêú ÃÖ³Öß
úִ֐ÖÖ¸üÖë úÖê ‡ÃÖ úÖµÖÔ ´Öë ´ÖÖî•Öæ¤ü ÖŸÖ¸üÖë êú ²ÖÖ¸êü ´Öë ³Ö»Öß ³ÖÖÓ×ŸÖ •Ö֭֍úÖ¸üß ÆüÖê †Öî¸ü ˆ­Æëü †¯Ö­Öê úÖµÖÖí úÖê
ÃÖã¸ü×ÖŸÖ œÓüÖ ÃÖê ú¸ü­Öê êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ ¯ÖÏ×¿ÖÖÖ ×¤üµÖÖ ÖµÖÖ ÆüÖê…
2.6 ÃÖÓ¸üÖÖ ˆ¯ÖÖµÖÖë úÖ †­Öã¯ÖÖ»Ö­Ö ­Ö ú¸ü­Öê ŸÖ£ÖÖ ×úÃÖß ×¾Ö»ÖÓ²Ö, ¯ÖϳÖÖ¾Ö, “ÖÖê™ü, ÆüŸÖÖÆüŸÖ †Öפü êú ×»Ö‹ †Öî¸ü ‹êÃÖß
¯Ö׸üÛãÖןֵÖÖë µÖÖ ‘Ö™ü­ÖÖ†Öë êú úÖ¸üÖ ¤êüµÖ Öן֯ÖæÙŸÖ êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê וִ´Öê¤üÖ¸ü ´ÖÖ­ÖÖ •ÖÖ‹ÖÖ…
3. µÖÖŸÖÖµÖÖŸÖ :
3.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê úÖµÖÖí úÖê ‡ÃÖ ¯ÖύúÖ¸ü ú¸ëüÖê ׍ú ˆÃÖÃÖê úÖµÖÔ ×­Ö¯ÖÖ¤ü­Ö Öê¡Ö ´Öë µÖÖ ˆÃ֍êú †ÖÃÖ-¯ÖÖÃÖ
ÛÃ£ÖŸÖ ´ÖÖî•Öæ¤üÖ ÃÖ›ÍüúÖë êú ˆ¯ÖµÖÖêÖ ´Öë µÖ£ÖÖÃÖÓ³Ö¾Ö ­µÖæ­ÖŸÖ´Ö ¾µÖ¾Ö¬ÖÖ­Ö ÆüÖê…
3.2 •Ö²Ö µÖÖŸÖÖµÖÖŸÖ ´Öë ¾µÖ¾Ö¬ÖÖ­Ö úÖê ™üÖ»Ö­ÖÖ ÃÖÓ³Ö¾Ö ­Ö ¸üÆêü ŸÖÖê ‹êÃÖê ¾µÖ¾Ö¬ÖÖ­Ö êú ×»Ö‹ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ÃÖæ“Ö­ÖÖ
¤üß •ÖÖ‹Öß (ú´Ö ÃÖê ú´Ö 48 ‘ÖÓ™êü ¯ÖÆü»Öê) †Öî¸ü ‡ÃÖ ÃÖæ“Ö­ÖÖ ´Öë úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ׍ú‹ •ÖÖ­Öê úÖ ÃÖ´ÖµÖ †Öî¸ü úÖµÖÔ
¯Öæ¸üÖ ÆüÖê­Öê ´Öë »ÖÖ­Öê ¾ÖÖ»Öê ÃÖ´ÖµÖ úÖ ×¾Ö¾Ö¸üÖ, ÃÖִ֐ÖÏß úÖ ³ÖÓ›üÖ¸üÖ ¾Ö ÃÖ›ÍüúÖë êú ÃÖã¸ü×ÖŸÖ ¾Ö ÃÖŸÖŸÖ ˆ¯ÖµÖÖêÖ
úê ×»Ö‹ †Ö¾Ö¿µÖú ÃÖã×¾Ö¬ÖÖ‹Ó ˆ¯Ö»Ö²¬Ö ú¸üÖ­Öê êú ×»Ö‹ ¯ÖÏßÖÖ×¾ÖŸÖ ×¾Ö×¬Ö úÖ ¾ÖÖÔ­Ö ×úµÖÖ •ÖÖ‹ÖÖ ŸÖ£ÖÖ
ˆ­Öúß †­Öã´Ö×ŸÖ »Öß •ÖÖ‹Öß…
3.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê Ö“ÖÔ ¯Ö¸ü ‹êÃÖê †­Öã´ÖÖêפüŸÖ †Ã£ÖÖ‡Ô ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë êú ×»Ö‹ †Ö¾Ö¿µÖú, Öã¤üÖ‡Ô êú ‰ú¯Ö¸ü ¯Öã»Ö
úÖ ×­Ö´ÖÖÔÖ ú¸ü, ²ÖÖ¬ÖÖ ¾ÖÖ»Öê ŸÖ»Ö êú ‰ú¯Ö¸ü ¸îü´¯Ö ²Ö­Ö֍ú¸ü µÖÖ ²ÖÖ¬ÖÖ êú “ÖÖ¸üÖë ŸÖ¸ü±ú ˆ¯ÖµÖãŒŸÖ †Ã£ÖÖ‡Ô ²ÖÖ‡Ô
¯ÖÖÃÖ ˆ¯Ö»Ö²¬Ö ú¸ü֍ú¸,ü ú´Ö ÃÖê ú´Ö ‹ú »Öê­Ö µÖÖŸÖÖµÖÖŸÖ úÖ ´Ö֐ÖÔ ²Ö­Ö֋ӐÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü, ‡ÃÖ úÖµÖÔ úß
¯ÖϐÖ×ŸÖ êú ¤üÖî¸üÖ­Ö ¯Öæ¸üß ŸÖ¸üÆü ÃÖê ÃÖÖ¾Ö¬ÖÖ­Öß ²Ö¸üŸÖŸÖê Æãü‹ ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê ׍ú ˆ­Öêú µÖÖ ˆ­Öêú úִ֐ÖÖ¸üÖë «üÖ¸üÖ
´ÖÖî•Öæ¤üÖ •Ö»ÖÖ¯ÖæÙŸÖ, •Ö»Ö׭֍úÖÃÖß, ײֻ֕Öß µÖÖ ™êü»Öß±úÖê­Ö êú ŸÖÖ¸üÖë úÖê µÖÖ †­µÖ ׍úÃÖß ÃÖê¾ÖÖ†Öë µÖÖ úÖµÖÖì úÖê
úÖê‡Ô Ö×ŸÖ ­Ö ¯ÖÆãÓü“Öê… ×­Ö´ÖÖÔÖ úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖµÖÖÔ¯ŸÖ ²Öî¸üߍêúØ›üüÖ, ÖÖ›Ôü¸êü»Ö ¾Ö
“ÖêŸÖÖ¾Ö­Öß ²ÖÖê›Ôü »ÖÖ֋ӐÖê… ¾Öê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß †Ö¾Ö¿µÖúŸÖÖ êú †­ÖãÃÖÖ¸ü ¯ÖµÖÖÔ¯ŸÖ ÃÖӏµÖÖ ´Öë “ÖêŸÖÖ¾Ö­Öß
»ÖÖ‡™ëü, ×ÃÖÖ­Ö»Ö †Öפü ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê ¾Ö ˆ­Æëü †­Öã¸ü×ÖŸÖ ú¸ëüÖê…
4. ¯ÖÓÆãü“Ö­Öê úÖ ÃÖã¸ü×ÖŸÖ ´Ö֐ÖÔ
4.1 ÃÖ´ÖÃŸÖ úÖµÖÔãֻÖÖë ¾Ö ˆÓ“ÖÖ‡µÖÖë ¯Ö¸ü ¯ÖÆãÓü“Ö­Öê ¾Ö ¾ÖÆüÖÓ ÃÖê ²ÖÖÆü¸ü ׭֍ú»Ö­Öê êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ ¾Ö ÃÖã¸ü×ÖŸÖ ¸üÖßÖê
ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê… ‰Óú“Öß •ÖÖÆüÖë ¯Ö¸ü ¯ÖÓÆãü“Ö­Öê êú ×»Ö‹ ¯ÖÖ›ÍüÍ úß ²ÖÛ»»ÖµÖÖë úê (ÃÖßœÍüß úÖ ¯ÖϵÖÖêÖ ú¸ü­Öê úß
²Ö•ÖÖ‹) ¯ÖϵÖÖêÖ úß †­Öã´Ö×ŸÖ ­ÖÆüà ¤üß •ÖÖ‹Öß…
4.2 ×ÃÖ¾ÖÖ‹ ú´Ö ÃÖ´ÖµÖ êú ‹êÃÖê úÖµÖÖí êú ו֭Æëü ÃÖßœÍüß ¯Ö¸ü “ÖœÍüú¸ü ׍úµÖÖ •ÖÖ Ã֍êú, ÃÖ³Öß ‹êÃÖê úÖµÖÖí êú ו֭Æëü
•Ö´Öß­Ö ÃÖê µÖÖ šüÖêÃÖ ×­Ö´ÖÖÔÖ ÃÖê ú¸ü­ÖÖ ÃÖÓ³Ö¾Ö ­Ö ÆüÖê, úִ֐ÖÖ¸üÖë êú ×»Ö‹ ˆ¯ÖµÖãŒŸÖ ¯ÖÖ›Íü úß ¾µÖ¾ÖãÖÖ úß
•ÖÖ‹Öß… ‡Û“”ûŸÖ ³ÖÖ¸ü ¾ÖÆü­Ö ú¸ü­Öê úß Ö´ÖŸÖÖ ¾ÖÖ»Öß †“”ûß ÖãÖ¾Ö¢ÖÖ ¾ÖÖ»Öß »Öú›Íüß µÖÖ ¬ÖÖŸÖ㠍úß ²Ö­Öß
úšüÖê¸ü ÃÖßלÍüµÖÖêÓ úÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ‡­Æëü ÃÖã¸ü×ÖŸÖ úÖµÖÔ¤ü¿ÖÖ ´Öë ²Ö­ÖÖ‹ ¸üÖ­Öê êú ×»Ö‹ †­Öã¸üׁ֟Ö
׍úµÖÖ •ÖÖ‹ÖÖ… µÖפü ÃÖßœÍüß úÖê ´Ö•Ö²ÖæŸÖß ÃÖê ²ÖÖÓ¬ÖÖ ­Ö ÖµÖÖ ÆüÖê ŸÖÖê ÃÖßœÍüß ¯Öú›Íü­Öê êú ×»Ö‹ ‹ú †×ŸÖ׸üŒŸÖ
´Ö•Ö¤æü¸ü ¸üÖÖ •ÖÖ‹ÖÖ… µÖפü ÃÖßœÍüß úÖ ¯ÖϵÖÖêÖ ÃÖִ֐ÖÏß »Öê •ÖÖ­Öê êú ×»Ö‹ ³Öß ×úµÖÖ •ÖÖ­ÖÖ ÆüÖê ŸÖÖê ÃÖßœÍüß ¯Ö¸ü ÆüÖ£Ö
¾Ö ¯ÖÖÓ¾Ö ¸üÖ­Öê êú ×»Ö‹ ˆ¯ÖµÖãŒŸÖ Ã£ÖÖ­Ö ²Ö­ÖÖ‹ •Ö֋ӐÖê… ÃÖßœÍüß úÖ †×¬ÖúŸÖ´Ö —ÖãúÖ¾Ö 4 ´Öë 1 êú †Ö¬ÖÖ¸ü ¯Ö¸ü
ÆüÖêÖÖ (1 Öî×ŸÖ•Ö ¾Ö 4 ‰ú¬¾ÖÔ ) … ÆüÖ£ÖÖë ´Öë ÃÖÖ´ÖÖ­Ö ¯Öú›Íü ú¸ü “ÖœÍü­Öê êú ×»Ö‹ ÃÖßœÍüß úÖ ¯ÖϵÖÖêÖ ­ÖÆüà ׍úµÖÖ
•ÖÖ‹ÖÖ… ÃÖßœÍüß ¯Ö¸ü “ÖœÍüŸÖê ÃÖ´ÖµÖ ¤üÖê­ÖÖë ÆüÖ£Ö ´ÖãŒŸÖ ÆüÖêӐÖê…
91

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
than 1 in 4 (1 horizontal and 4 vertical). Ladders shall not be used for climbing
carrying materials in hands. While climbing, both the hands shall be free.
4.3 Scaffolding or staging more than 3.5 m above the ground or floor, swung or
suspended from an overhead support or erected with stationary support shall
have a standard guard rail properly attached, bolted, braced or otherwise
secured at least 1.0m high above the floor or platform of such scaffolding or
staging. The guard rail shall extend along the entire exposed length of the
scaffolding with only such opening, as may be necessary for the delivery of
materials. Standard railing shall have posts not more than 2m apart and an
intermediate rail halfway between the floor or platform of the scaffolding
and the top rail. Such scaffolding or staging shall be so fastened as to
prevent it from swaying from the building or structure. Scaffolding and ladder
shall conform to relevant IS Specification (IS 3696-1966). Timber / Bamboo
scaffolding shall not be used.
4.4 Working platforms of scaffolds shall have toe boards at least 15 cm in height
to prevent materials from falling down.
4.5 A sketch of the scaffolding proposed to be used shall be prepared and
approval of the Engineer-in-charge obtained prior to start of erection of
scaffolding. All scaffolds shall be examined by Engineer-in-charge, before
use.
4.6 Working platform, gangways and stairways shall be so constructed that they
shall not sag unduly or unequally and if the height of the platform or
gangway or stairway is more than 3.5m above ground level or floor level,
they shall be closely boarded, shall have adequate width for easy movement
of persons and materials and shall be suitably guarded as described in 3.3
above.
4.7 The planks used for working platform shall not project beyond the end
supports to a distance exceeding four times the thickness of the planks used.
The planks shall be rigidly tied at both ends to prevent sliding and slippage.
The thickness of the planks shall be adequate to take load of men and
materials and shall not collapse.
4.8 Every opening in the floor of a building or in a working platform shall be
provided with suitable means to prevent fall of persons or materials by
providing suitable fencing or railing, the minimum height of which shall be 1.0
m, along with 15 cm high sheet obstruction at floor level along the railing.
4.9 Safe means of access shall be provided to all working platforms and other
elevated working places. Every ladder shall be securely fixed. No single
portable ladder shall be over 9m in length. For ladders upto 3m in length the
width between side rails in the ladder shall in no case be less than 300 mm.
For longer ladders this width shall be increased by at least 20mm for each
additional meter of length. Step spacing shall be uniform and shall not
exceed 300 mm.

92

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.3 •Ö´Öß­Ö úß ÃÖŸÖÆü ÃÖê 3.5 ´Öß™ü¸ü ÃÖê †×¬Öú ‰Óú“Öê —Öæ»Öê úß ŸÖ¸üÆü µÖÖ ‰ú¯Ö¸ü ׍úÃÖß “Öß•Ö úê ÃÖÆüÖ¸êü »Ö™üúÖ‹ Ö‹
µÖÖ Ûãָü ÃÖÆüÖ¸êü êú ÃÖÖ£Ö ŸÖîµÖÖ¸ü ׍ú‹ Ö‹ ¯ÖÖ›Íü µÖÖ ´Ö“ÖÖ­Ö êú “ÖÖ¸üÖë ŸÖ¸ü±ú ŸÖ»Ö µÖÖ ¯»Öê™ü±úÖ´ÖÔ ÃÖê ú´Ö ÃÖê ú´Ö
1.0 ´Öß™ü¸ü ‰Óú“Öß ´Ö֭֍ú ÖÖ›Ôü¸êü»Ö »ÖÖÖ‡Ô •ÖÖ‹Öß ×•ÖÃÖê ³Ö»Öß ¯ÖύúÖ¸ü ÃÖê ²ÖÖÓ¬ÖÖ, ²ÖÖê»™ü ׍úµÖÖ, •ÖÖê›ÍüÖ µÖÖ
†­µÖ£ÖÖ ãú”û †­µÖ ŸÖ¸üߍúê ÃÖê ´Ö•Ö²ÖæŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ… µÖÆü ÖÖ›Ôü¸êü»Ö ÃÖִ֐ÖÏß úß †Ö¯ÖæÙŸÖ ú¸ü­Öê ¾ÖÖ»Öê ãÖÖ­ÖÖë
êú †»ÖÖ¾ÖÖ ¯ÖÖ›Íü úß ¯Öæ¸üß »ÖÓ²ÖÖ‡Ô ŸÖú ±îú»Öß ÆüÖêÖß… ´Ö֭֍ú ¸êüØ»ÖÖ ´Öë »ÖÖê Æãü‹ Ö´³ÖÖêÓ êú ²Öß“Ö 2 ´Öß™ü¸ü ÃÖê
†×¬Öú úß ¤æü¸üß ­ÖÆüà ÆüÖêÖß †Öî¸ü ¯ÖÖ›Íü êú ŸÖ»Ö ¾Ö ¸êüØ»ÖÖ êú ÃÖ²ÖÃÖê ‰ú¯Ö¸üß ×ÆüÃÃÖê êú ²Öß“Ö ´Öë ‹ú †Öî¸ü ¯Ö™ü¸üß
›üÖ»Öß •ÖÖ‹Öß… ‡ÃÖ ¯ÖÖ›Íü µÖÖ ´Ö“ÖÖ­Ö úÖê ‡ÃÖ ¯ÖύúÖ¸ü ²ÖÖÓ¬ÖÖ •ÖÖ‹ÖÖ ×ú µÖÆü ³Ö¾Ö­Ö µÖÖ œüÖÓ“Öê ÃÖê ×Æü»Ö ­Ö Ã֍êú…
¯ÖÖ›Íü ¾Ö ÃÖßœÍüß ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö×­Ö¤ìü¿ÖÖë (†Ö‡Ô‹ÃÖ 3696-1966) êú †­ÖãÃÖÖ¸ü ÆüÖêÖß… »Öú›Íüß/²ÖÖÓÃÖ êú ¯ÖÖ›ÍüÖê úÖ
¯ÖϵÖÖêÖ ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ…
4.4 ׍úÃÖß ÃÖִ֐ÖÏß úÖê אָü­Öê ÃÖê ¸üÖêú­Öê êú ×»Ö‹ ¯ÖÖ›ÍüÖë êú úÖµÖÔ ¯»Öê™ü±úÖ´ÖÖì ¯Ö¸ü ú´Ö ÃÖê ú´Ö 15 ÃÖê´Öß ‰Óú“Öê
™üÖ²ê ÖÖê›Ôü »ÖÖÖ‹ •Ö֋ӐÖê …
4.5 ¯ÖÖ›üÍÖêÓ úÖê »ÖÖÖ­Öê ÃÖê ¯ÖÆü»Öê, ˆ¯ÖµÖÖêÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ¯ÖÖ›Íü úÖ ‹ú Íêú“Ö ŸÖîµÖÖ¸ü ú¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖê
†­Öã´ÖÖêפüŸÖ ú¸üÖµÖÖ •ÖÖ‹ÖÖ… ¯ÖϵÖÖêÖ ׍ú‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ÃÖ³Öß ¯ÖÖ›ÍüÖë úß •ÖÖÓ“Ö úß
•ÖÖ‹Öß…
4.6 úÖµÖÔ ¯»Öê™ü±úÖ´ÖÔ, ¸üÖßÖê †Öî¸ü ÃÖßœÍüß ¾ÖÖ»Öê ¸üÖßÖÖë úÖ ‡ÃÖ ¯ÖύúÖ¸ü ×­Ö´ÖÖÔÖ ×úµÖÖ •ÖÖ­ÖÖ “ÖÖ×Æü‹ ׍ú ¾Öê
†­ÖÖ¾Ö¿µÖú ºþ¯Ö ÃÖê ­Ö ×Æü»Öë µÖÖ †ÃÖÓŸÖã×»ÖŸÖ ­Ö ÆüÖë †Öî¸ü µÖפü ¯»Öê™ü±úÖ´ÖÔ µÖÖ ¸üÖßÖê µÖÖ ÃÖßœÍüß ¾ÖÖ»Öê ¸üÖßÖê úß
ˆÓ“ÖÖ‡Ô ³Öæ×´Ö ŸÖ»Ö ÃÖê 3.5 ´Öß™ü¸ü ‰Óú“Öß ÆüÖê ŸÖÖê ˆ­Ö ¯Ö¸ü ²ÖÆãüŸÖ ׭֍ú™ü ÃÖê “ÖœÍüÖ •ÖÖ­ÖÖ “ÖÖ×Æü‹ †Öî¸ü ˆ­Ö ¯Ö¸ü
†Ö¤ü×´ÖµÖÖë µÖÖ ÃÖִ֐ÖÏß êú †Ö¾ÖÖÖ´Ö­Ö êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ “ÖÖî›ÍüÖ‡Ô ÆüÖê­Öß “ÖÖ×Æü‹ †Öî¸ü ˆ­Æëü ˆ¯ÖµÖãÔŒŸÖ 3.3 êú
†­ÖãÃÖÖ¸ü ˆ¯ÖµÖãŒŸÖ ŸÖ¸üߍêú ÃÖê ÖÖ›Ôü ׍úµÖÖ •ÖÖ­ÖÖ “ÖÖ×Æü‹…
4.7 úÖµÖÔ ¯»Öê™ü±úÖ´ÖÔ êú ‰ú¯Ö¸ü ײ֔ûÖ‹ Ö‹ ¯Ö™ü¸üê †ÖÖ¸üß ÃÖÆüÖ¸êü ÃÖê ²ÖÖÆü¸ü ­ÖÆüà ׭֍úÖ»Öê •Ö֋ӐÖê… µÖÆü †¯Ö­Öß ´ÖÖê™üÖ‡Ô
êú “ÖÖ¸ü Öã­Öê ÃÖê †×¬Öú ²ÖÖÆü¸ü ­ÖÆüà ÆüÖêӐÖê… ×úÃÖß ¯ÖύúÖ¸ü úß ×±úÃÖ»Ö­Ö µÖÖ ×ÖÃ֍ú­Ö úÖê ¸üÖêú­Öê êú ×»Ö‹ ‡­Ö
¯Ö™ü¸üÖë úÖê ¤üÖê­ÖÖë ×ÃÖ¸üÖë ¯Ö¸ü ´Ö•Ö²ÖæŸÖß ÃÖê ²ÖÖÓ¬ÖÖ •ÖÖ‹ÖÖ… ¯Ö™ü¸üÖë úß ´ÖÖê™üÖ‡Ô †Ö¤ü×´ÖµÖÖë ¾Ö ÃÖִ֐ÖÏß úÖ ¾Ö•Ö­Ö ˆšüÖ­Öê
´Öë ÃÖÖ´Ö †Öî¸ü ­Ö ™æü™ü­Öê ¾ÖÖ»Öß ¸üÖß •ÖÖ‹Öß…
4.8 ׍úÃÖß ³Öß ³Ö¾Ö­Ö µÖÖ úÖµÖÔ ¯»Öê™ü±úÖ´ÖÔ êú ¯ÖÏŸµÖêú Öã»Öê ×ÆüÃÃÖê úÖê ˆ¯ÖµÖãŒŸÖ ²ÖÖ›Íü µÖÖ ¸êüØ»ÖÖ »ÖÖ֍ú¸ü ÃÖã¸üׁ֟Ö
׍úµÖÖ •ÖÖ‹ÖÖ ŸÖÖ׍ú »ÖÖêÖÖë µÖÖ ÃÖִ֐ÖÏß úÖê אָü­Öê ÃÖê ²Ö“ÖÖµÖÖ •ÖÖ Ã֍êú… ‡ÃÖ ²ÖÖ›Íü µÖÖ ¸êüØ»ÖÖ úß ˆÓ“ÖÖ‡Ô ú´Ö
ÃÖê ú´Ö 1.0 ´Öß™ü¸ü ¾Ö ¸êüØ»ÖÖ êú ÃÖŸÖÆü ŸÖ»Ö êú ÃÖÖ£Ö ú´Ö ÃÖê ú´Ö 15 ÃÖê´Öß ‰Óú“Öß ¿Öß™ úß ²ÖÖ¬ÖÖü »ÖÖÖ‡Ô
•ÖÖ‹Öß…
4.9 ÃÖ³Öß úÖµÖÔ ¯»Öê™ü±úÖ´ÖÖí ¾Ö ‰Óú“ÖÖ‡Ô ¾ÖÖ»Öê úÖµÖÔãÖÖ­ÖÖë ¯Ö¸ü ¯ÖϾÖê¿Ö úÖ ÃÖã¸ü×ÖŸÖ ŸÖ¸üߍúÖ ˆ¯Ö»Ö²¬Ö ú¸üÖµÖÖ •ÖÖ‹ÖÖ…
ÃÖ³Öß ÃÖßלÍüµÖÖë úÖê ´Ö•Ö²ÖæŸÖß ÃÖê ²ÖÖÓ¬ÖÖ •ÖÖ‹ÖÖ… 9 ´Öß™ü¸ü ÃÖê †×¬Öú »ÖÓ²Öß úÖê‡Ô ³Öß †êú»Öß †Ã£ÖÖ‡Ô ÃÖßœÍüß
¯ÖϵÖÖêÖ ­ÖÆüà úß •ÖÖ‹Öß… 3 ´Öß™ü¸ü ŸÖú »ÖÓ²Öß ÃÖßלÍüµÖÖë úß ×ú­ÖÖ¸êü ¾ÖÖ»Öß ¯Ö×¼üµÖÖë êú ²Öß“Ö “ÖÖî›ÍüÖ‡Ô 300 ×´Ö´Öß
ÃÖê ú´Ö ­ÖÆüà ÆüÖêÖß… ‡ÃÖÃÖê »ÖÓ²Öß ÃÖßלÍüµÖÖë êú ×»Ö‹ µÖÆü “ÖÖî›ÍüÖ‡Ô ¯ÖÏ×ŸÖ ´Öß™ü¸ü 20 ×´Ö´Öß êú ×ÆüÃÖÖ²Ö ÃÖê ²ÖœÍüÖ‡Ô
•ÖÖ‹Öß… ¯ÖÖµÖ¤üÖ­ÖÖë êú ²Öß“Ö úÖ †ÓŸÖ¸üÖ»Ö ‹ú ÃÖ´ÖÖ­Ö ¸üÖÖ •ÖÖ‹ÖÖ †Öî¸ü µÖÆü 300 ×´Ö´Öß ÃÖê †×¬Öú ­ÖÆüà
ÆüÖêÖÖ…

92

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4.10 Adequate precautions shall be taken to prevent danger from electrical lines
and equipment. No scaffolding, ladder, working platform, gangway runs,
etc. shall exist within 3 meters of any uninsulated electric wire. Whenever
electric power and lighting cables are required to run through (pass on) the
scaffolding or electrical equipments are used, such scaffolding structures
shall have minimum two earth connections with earth continuity conforming
to IS code of practice.

5. EXCAVATION, TRENCHING AND EARTH REMOVAL

5.1 All trenches 1.2 m or more in depth shall at all times be supplied with at least
one ladder for each spacing of 30m in length or fraction thereof. Ladder
shall be extended from bottom of the trench to at least 1 m above the
surface of the ground.

5.2 The sides of the trench which are 1.2 m or more in depth shall be stepped
back to give suitable slope (angle of repose) or securely held by timber
bracing, so as to avoid the danger of sides from collapsing. The excavated
material shall not be placed within 1.5 m of the edges of the trench or half of
the depth of the trench, whichever is more. Cutting shall be done from top
to bottom. Under no circumstances mining or under-cutting shall be done.

5.3 The Contractor shall ensure the stability and safety of the excavation,
adjacent structures, services and the works.

5.4 Open excavations shall be fenced off by suitable railing and warning signals
installed at night at well lit places so as to prevent persons slipping or falling
into the excavations.

5.5 All blasting operations shall be carried out on the basis of procedures
approved by Inspector of Explosives. All works in this connection shall be
carried out as per IS Code of Practice. Barricades, warning signals, etc. shall
be placed on the roads / open area. Prior approval of such operation shall
be obtained from Safety Engineer / Engineer-In-Charge of works.

5.6 a. For removal of earth from an earth mound, a written permission shall
be obtained from the Engineer-in-charge of the work and the
Engineer-in-Charge of the earth mound.
b. As far as practical, earth shall be removed mechanically.
c. Wherever manual removal of earth is involved, earth shall be removed
from the top by maintaining the proper slope equal to the angle of
repose of the earth.

93

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
ú4.10 ˆ¯Öú¸üÖÖë êú ‰ú¯Ö¸ü ÃÖê •ÖÖ ¸üÆüß ×²Ö•Ö»Öß úß »ÖÖ‡­ÖÖë ¾Ö ˆ¯Öú¸üÖÖë êú ÖŸÖ¸êü ÃÖê ²Ö“ÖÖ¾Ö êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ
ÃÖÖ¾Ö¬ÖÖ­Öß ²Ö¸üŸÖß •ÖÖ­Öß “ÖÖ×Æü‹… úÖê‡Ô ³Öß ¯ÖÖ›Íü, ÃÖßœÍüß, úÖµÖÔ ¯»Öê™ü±úÖ´ÖÔ, ÃÖßœÍüߤüÖ¸ü ¸üÖßÖê ײֻ֕Öß êú ­ÖӐÖê ŸÖÖ¸üÖë
êú 3 ´Öß™ü¸ü ¤æü¸üß êú ³Öߟָü ­ÖÆüà ÆüÖëÖê… •Ö²Ö ú³Öß ×²Ö•Ö»Öß êú ŸÖÖ¸üÖë úÖê ¯ÖÖ›Íü êú ‰ú¯Ö¸ü ÃÖê Öã•ÖÖ¸ü­Öê úß •Öºþ¸üŸÖ
¯Ö›Íêü †£Ö¾ÖÖ ×²Ö•Ö»Öß êú ˆ¯Öú¸üÖÖë úÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹, ‡­Ö ¯ÖÖ›ÍüÖë ¯Ö¸ü ú´Ö ÃÖê ú´Ö ¤üÖê †Ú£ÖÖ ú­Öꌿ֭Ö
»ÖÖÖ‹ •Ö֋ӐÖê ו֭֍úß †Ú£ÖÖ ¯ÖϾÖÖÆüŸÖÖ †Ö‡Ô‹ÃÖ úÖê›ü êú †­ÖãÃÖÖ¸ü ÆüÖêÖß…
5. Öã¤üÖ‡Ô, ÖÖ‡Ô ²Ö­ÖÖ­ÖÖ ¾Ö ×´Ö¼üß Æü™üÖ­ÖÖ
5.1 1.2 ´Öß™ü¸ü ÃÖê ÖÆü¸üß ÃÖ³Öß ÖÖ‡µÖÖë êú ×»Ö‹ ¯ÖÏ×ŸÖ 30 ´Öß™ü¸ü µÖÖ ˆÃ֍êú ³ÖÖÖ úß »ÖÓ²ÖÖ‡Ô êú †ÓŸÖ¸üÖ»Ö êú ×»Ö‹ ú´Ö
ÃÖê ú´Ö ‹ú ÃÖßœÍüß »ÖÖÖ‡Ô •ÖÖ‹Öß… µÖÆü ÃÖßלÍüµÖÖÓ ÖÖ‡Ô êú ¬Ö¸üÖŸÖ»Ö ÃÖê »Öêú¸ü ³Öæ×´ÖŸÖ»Ö ¯Ö¸ü ú´Ö ÃÖê ú´Ö 1 ´Öß™ü¸ü
‰ú¯Ö¸ü ŸÖú ÆüÖëÖß…
5.2 1.2 ´Öß™ü¸ü ÃÖê ÖÆü¸üß ÖÖ‡µÖÖë úß ¤üß¾ÖÖ¸üÖë úÖê ¯Öß”êû úß †Öê¸ü ú™üÖ¾Ö¤üÖ¸ü ŸÖ¸üߍêú ÃÖê ²Ö­ÖÖµÖÖ •ÖÖ‹ÖÖ µÖÖ ˆÃ֍êú ÃÖÖ£Ö
»Öú›Íüß êú ÃÖÆüÖ¸êü »ÖÖÖ‹ •Ö֋ӐÖê ŸÖÖ׍ú ‡­Ö ¤üß¾ÖÖ¸üÖë êú ¬ÖÓÃÖ­Öê êú ÖŸÖ¸êü úÖê ¤æü¸ü ׍úµÖÖ •ÖÖ Ã֍êú… Öã¤üÖ‡Ô ÃÖê
׭֍úÖ»Öß Ö‡Ô ÃÖִ֐ÖÏß úÖê ÖÖ‡Ô úê ׍ú­ÖÖ¸üÖë êú 1.5 ´Öß™ü¸ü †£Ö¾ÖÖ ÖÖ‡Ô úß ÖÆü¸üÖ‡Ô úß †Ö¬Öß ¤æü¸üß, ‡­Ö´Öë ÃÖê •ÖÖê
³Öß †×¬Öú ÆüÖ,ê ÃÖê ¤æü¸ü ¸üÖÖ •ÖÖ‹ÖÖ… Öã¤üÖ‡Ô ‰ú¯Ö¸ü ÃÖê ­Öß“Öê úß †Öê¸ü úß •ÖÖ‹Öß… ׍úÃÖß ³Öß ¤ü¿ÖÖ ´Öë ×¾ÖñúÖê™ü µÖÖ
³Öߟָüß úØ™üÖ ­ÖÆüà úß •ÖÖ‹Öß…
5.3 ÃÖÓ×¾Ö¤ü֍úÖ¸ü Öã¤üÖ‡Ô, ׭֍ú™üÃ£Ö ³Ö¾Ö­ÖÖë, ÃÖê¾ÖÖ†Öë ¾Ö úÖµÖÖí úê ãÖÖ×µÖŸ¾Ö ¾Ö ÃÖã¸üÖÖ úÖê ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê…
5.4 »ÖÖêÖÖë úÖê Öã»Öß Æãü‡Ô Öã¤üÖ‡µÖÖë ´Öë ×±úÃÖ»Ö­Öê µÖÖ ×Ö¸ü­Öê ÃÖê ²Ö“ÖÖ­Öê êú ×»Ö‹ Öã»Öß Öã¤üÖ‡µÖÖë êú “ÖÖ¸üÖë ŸÖ¸ü±ú ˆ¯ÖµÖ㌟Ö
¸êüØ»ÖÖ úß ²ÖÖ›Íü »ÖÖÖ‡Ô •ÖÖ‹Öß †Öî¸ü ¸üÖ×¡Ö êú ÃÖ´ÖµÖ ¯ÖµÖÖÔ¯ŸÖ ¸üÖê¿Ö­Öß ¾ÖÖ»Öê ãÖÖ­ÖÖë ¯Ö¸ü “ÖêŸÖÖ¾Ö­Öß ×ÃÖÖ­Ö»Ö »ÖÖÖ‹
•Ö֋ӐÖê…
5.5 ×¾ÖñúÖê™ü úß ÃÖ³Öß ¯ÖÏ׍ÎúµÖÖ†Öë úÖê ×¾ÖñúÖê™ü ×­Ö¸ü߁֍ú «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ¯ÖÏ׍ÎúµÖÖ†Öë êú †Ö¬ÖÖ¸ü ¯Ö¸ü Æüß ×úµÖÖ
•ÖÖ‹ÖÖ… ‡ÃÖÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ÃÖ³Öß úÖµÖÔ ³ÖÖ¸üŸÖßµÖ ´Ö֭֍ú úÖê›ü ´Öë ×­Ö¬ÖÖÔ׸üŸÖ ŸÖ¸üߍúÖë êú †­ÖãÃÖÖ¸ü Æüß ×ú‹ •Ö֋ӐÖê…
ÃÖ›ÍüúÖë/Öã»Öê ãÖÖ­ÖÖë ¯Ö¸ü ²Öî¸üߍêú™, “ÖêŸÖÖ¾Ö­Öß ×ÃÖÖ­Ö»Ö †Öפü »ÖÖÖ‹ •Ö֋ӐÖê… ‡ÃÖ ¯ÖύúÖ¸ü êú úÖµÖÖí êú ×»Ö‹ ÃÖÓ¸üÖÖ
†×¬ÖúÖ¸üß/úÖµÖÔ êú ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ ¯Öæ¾ÖÔ †­Öã´ÖÖê¤ü­Ö ×»ÖµÖÖ •ÖÖ­ÖÖ †Ö¾Ö¿µÖú Æîü…
5.6 ‹. ×´Ö¼üß êú ™üß»ÖÖë ÃÖê ×´Ö¼üß Æü™üÖ­Öê êú ×»Ö‹ úÖµÖÔ êú ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ¾Ö ×´Ö¼üß êú ™üß»Öê êú ¯ÖϳÖÖ¸üß
†×³ÖµÖÓŸÖÖ ÃÖê ×»Ö×ÖŸÖ †­Öã´Ö×ŸÖ ¯ÖÏÖ¯ŸÖ úß •ÖÖ‹Öß…
Í ²Öß. •ÖÆüÖÓ ŸÖú ÃÖÓ³Ö¾Ö ÆüÖê ×´Ö¼üß úÖê µÖÖÓס֍ú ÃÖÖ¬Ö­ÖÖë «üÖ¸üÖ Æüß Æü™üÖµÖÖ •ÖÖ‹ÖÖ…
ÃÖß. •ÖÆüÖÓ úÆüà ×´Ö¼üß úÖê ÁÖ´Ö¿ÖÛŒŸÖ «üÖ¸üÖ Æü™üÖµÖÖ •ÖÖ­ÖÖ ÆüÖ,ê ×´Ö¼üß úÖê ™üß»Öê êú ‰ú¯Ö¸üß ×ÃÖ¸êü úß ŸÖ¸ü±ú ÃÖê
×´Ö¼üß úß œü»ÖÖ­Ö úÖê µÖ£ÖÖ¾ÖŸÖ ²Ö­ÖÖ‹ ¸üÖŸÖê Æãü‹ Æü™üÖµÖÖ •ÖÖ‹ÖÖ…

93

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
d. Such work shall be constantly supervised by the contractor’s responsible
person and frequently inspected by the departmental representative to
ensure that no under-cutting is done.

6. CONCRETING

Shuttering and supporting structures shall be of adequate strength and


approved by Engineer-in-charge . This shall be ensured before concrete is
poured. The procedure approved by Engineer-in-charge shall be followed
for mixing, transporting and pouring of concrete.

7. DEMOLITION

Before any demolition work is commenced and also during the progress of
the work :

a. All roads and open area adjacent to the work site shall either be closed or
suitably protected. Appropriate warning signs shall be displayed for
cautioning approaching persons.

b. Before demolition operations begin, the Contractor shall ensure that the
power on all electric service lines is shut off and the lines cut or disconnected
at or outside the demolition site. If it is necessary to maintain electric power
during demolition operation, the required service lines shall be adequately
protected against damage. Persons handling heavy materials / equipments
shall wear safety shoes.

c. No floor, roof or other part of the building shall be overloaded with debris or
materials as to render it unsafe.

d. Entries to the demolition area shall be restricted to authorised persons only.

8. PERSONAL PROTECTIVE EQUIPMENT

All necessary personal protective equipment as considered necessary by the


Engineer-in-Charge shall be kept available by contractor for the use of the
persons employed on the site and maintained in a condition suitable for
immediate use. Also the contractor shall take adequate steps to ensure
proper use of equipment by those concerned. The personal protective
equipments are to be provided by the contractor.

a. All persons employed at the construction site shall use safety helmets. For
other types of works, persons working in that area shall also use safety
helmets, if advised by Safety Engineer / Engineer-in-charge.

94

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
›üß. ‹êÃÖê úÖµÖÔ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú וִ´Öê¤üÖ¸ü ¾µÖÛŒŸÖ êú ¯ÖµÖÔ¾ÖêÖÖ ´Öë ´Öë ׍ú‹ •Ö֋ӐÖê †Öî¸ü ×¾Ö³Ö֐ÖßµÖ ¯ÖÏןÖ×­Ö×¬Ö «üÖ¸üÖ
‡­Ö úÖµÖÖí úÖ ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ×­Ö¸üßÖÖ ×úµÖÖ •ÖÖ‹ÖÖ ŸÖÖ׍ú ÃÖã×­ÖÛ¿“ÖŸÖ ×úµÖÖ •ÖÖ Ã֍êú ׍ú ­Öß“Öê úß
ŸÖ¸ü±ú ÃÖê úÖê‡Ô ú™üÖ‡Ô ­Ö úß •ÖÖ‹…
6. ÓúÎúß™ü úß œü»ÖÖ‡Ô
¿Ö™üظüÖ ¾Ö ÃÖÆüÖ¸üÖ ¤êü­Öê ¾ÖÖ»Öê œüÖÓ“ÖÖêÓ úÖê ¯ÖµÖÖÔ¯ŸÖ ´Ö•Ö²ÖæŸÖ ²Ö­ÖÖµÖÖ •ÖÖ­ÖÖ “ÖÖ×Æü‹ †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖê
†­Öã´ÖÖêפüŸÖ ú¸üÖµÖÖ •ÖÖ‹ÖÖ… µÖÆü úÖµÖÔ ÓúÎúß™ü úß œü»ÖÖ‡Ô ¯ÖÏÖ¸Óü³Ö ÃÖê ¯ÖÆü»Öê Æüß ÃÖã×­ÖÛ¿“ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…
ÓúÎúß™ü úß ×´ÖÜŒÃ֐Ö, ¯Ö׸ü¾ÖÆü­Ö ¾Ö œü»ÖÖ‡Ô êú ×»Ö‹ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ¯ÖÏ׍ÎúµÖÖ †¯Ö­ÖÖ‡Ô
•ÖÖ‹Öß…
7. ŸÖÖê›Íü-±úÖê›üÍ
ŸÖÖê›Íü-±úÖê›üÍ ÃÖÓ²ÖÓ¬Öß úÖê‡Ô ³Öß úÖµÖÔ ¿Öãºþ ú¸ü­Öê ÃÖê ¯ÖÆü»Öê †Öî¸ü ‹êÃÖê úÖµÖÖí úß ¯ÖϐÖ×ŸÖ êú ¤üÖî¸üÖ­Ö ³Öß :
‹. úÖµÖÔ Ã£Ö»Ö êú †ÖÃÖ-¯ÖÖÃÖ úß ÃÖ³Öß ÃÖ›Íüëú ¾Ö Öã»Öê Öê¡Ö úÖê ²ÖÓ¤ü ú¸ü פüµÖÖ •ÖÖ‹ÖÖ µÖÖ ˆ¯ÖµÖãŒŸÖ ×¾Ö×¬Ö ÃÖê
ÃÖã¸ü×ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ… ˆÃÖ Öê¡Ö úß ŸÖ¸ü±ú †Ö­Öê ¾ÖÖ»Öê ¾µÖÛŒŸÖµÖÖë úÖê ÃÖÖ¾Ö¬ÖÖ­Ö ú¸ü­Öê êú ×»Ö‹ ˆ×“ÖŸÖ
“ÖêŸÖÖ¾Ö­Öß ²ÖÖê›Ôü »ÖÖÖ‹ •Ö֋ӐÖê…
²Öß. ŸÖÖê›Íü-±úÖê›Íü úß úÖ¸Ôü¾ÖÖ‡Ô ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖêê ׍ú ÃÖ³Öß ×²Ö•Ö»Öß êú ŸÖÖ¸üÖë úß
ײֻ֕Öß †Ö¯ÖæÙŸÖ ²ÖÓ¤ü ú¸ü ¤üß Ö‡Ô ÆüÖê †Öî¸ü ŸÖÖê›Íü-±úÖê›Íü Ã£Ö»Ö ¯Ö¸ü µÖÖ ˆÃ֍êú ²ÖÖÆü¸ü úß ÃÖ³Öß »ÖÖ‡­ÖÖë úÖê úÖ™ü
פüµÖÖ ÖµÖÖ ÆüÖê †£Ö¾ÖÖ †Ö¯ÖæÙŸÖ ¸üÖêú ¤üß Ö‡Ô ÆüÖê…
ÃÖß. ׍úÃÖß ³Öß ±ú¿ÖÔ, ”ûŸÖ µÖÖ ³Ö¾Ö­Ö êú †­µÖ ×ÆüÃÃÖÖë ¯Ö¸ü ´Ö»Ö²Öê µÖÖ ÃÖִ֐ÖÏß úß ‡ŸÖ­Öß ´ÖÖ¡ÖÖ ­ÖÆüà »ÖÖ¤üß •ÖÖ‹Öß ×ú
¾ÖÆü †ÃÖã¸ü×ÖŸÖ ÆüÖê •ÖÖ‹…
›üß. ŸÖÖê›Íü-±úÖê›Íü Öê¡Ö ´Öë êú¾Ö»Ö †×¬ÖéúŸÖ ¾µÖÛŒŸÖµÖÖë êú ¯ÖϾÖê¿Ö úß Æüß †­Öã´Ö×ŸÖ ÆüÖêÖß…
8. ¾µÖÛŒŸÖÖŸÖ ÃÖã¸üÖÖ ˆ¯Öú¸üÖ
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¸üÖµÖ êú †­ÖãÃÖÖ¸ü úÖµÖÔÃ£Ö»Ö ¯Ö¸ü »ÖÖÖ‹ Ö‹ ÃÖ³Öß ¾µÖÛŒŸÖµÖÖë êú ¯ÖϵÖÖêÖ êú ×»Ö‹
†Ö¾Ö¿µÖú ¾µÖÛŒŸÖÖŸÖ ÃÖã¸üÖÖ ˆ¯Öú¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê ¾Ö ˆ­Æëü ŸÖŸúÖ»Ö ¯ÖϵÖÖêÖ
׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öß ÆüÖ»ÖŸÖ ´Öë ²Ö­ÖÖ‹ ¸üÖÖ •ÖÖ‹ÖÖ… ÃÖÖ£Ö Æüß ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÓ²ÖÓ×¬ÖŸÖ ¾µÖÛŒŸÖµÖÖë «üÖ¸üÖ ˆ­Öêú ˆ×“ÖŸÖ
¯ÖϵÖÖêÖ úÖê ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­Öê úê ×»Ö‹ ³Öß ¯ÖµÖÖÔ¯ŸÖ ú¤ü´Ö ˆšü֋ӐÖê… ¾µÖÛŒŸÖÖŸÖ ÃÖã¸üÖÖ ˆ¯Öú¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü
«üÖ¸üÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê…
‹. ×­Ö´ÖÖÔÖ úÖµÖÔãֻÖÖë ¯Ö¸ü ×­ÖµÖÖê×•ÖŸÖ ×ú‹ Ö‹ ÃÖ³Öß ¾µÖÛŒŸÖ ÃÖÓ¸üÖÖ Æêü»´Öê™ü ¯ÖÆü­ÖëÖê… µÖפü ÃÖÓ¸üÖÖ †×³ÖµÖÓŸÖÖ µÖÖ
¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úß ¸üÖµÖ Æîü ŸÖÖê ‡ÃÖ Öê¡Ö ´Öë †­µÖ ¯ÖύúÖ¸ü êú úÖµÖÖí ´Öë »ÖÖê ¾µÖÛŒŸÖ ³Öß ÃÖÓ¸üÖÖ Æêü»´Öê™ü
¯ÖÆü­ÖëÖê…

94

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
b. Workers employed on mixing asphaltic materials, cement and lime mortars shall
use protective goggles, protective foot wear and hand gloves. Use of proper
respirators shall be an advantage.

c. Persons engaged in welding and gas-cutting works shall use suitable welding
face shields. Persons who assist the welders shall use suitable goggles.
Protective goggles shall be worn while chipping and grinding.

d. Stone breakers shall use protective goggles. They shall be seated at sufficiently
safe intervals of distance.

e. Persons engaged in or assisting in shot blasting operations and cleaning the


blasting chamber shall use suitable gauntlets, overalls, dust-proof goggles, boots
and protective hood supplied with fresh air at the minimum rate of 9m3/hr.

f. All persons working at heights more than 4.5 m above ground or floor and
exposed to risk of falling down, shall use safety belts, unless otherwise protected
by cages, guard railings, etc. In places where the use of safety belts is
impractical, suitable net of adequate strength fastened to substantial supports
shall be employed.

g. All powered two-wheeler motorcycle and scooter drivers and their pillion riders
shall wear crash helmets inside the Project / Plant sites.

h. When workers are employed in sewers and inside manholes which are in use, the
contractor shall ensure that the manholes are opened and are adequately
ventilated at least for an hour. After it has been well-ventilated, the atmosphere
inside the space shall be checked for the presence of any toxic gas or oxygen
deficiency and recorded in the register before the workers are allowed to get
into the manholes. The manholes opened shall be cordoned off with suitable
railing and provided with warning signals or caution boards to prevent
accidents. There shall be proper illumination in the night.

9. PAINTING

9.1 The Contractor shall not employ women on the work of painting with
products containing lead in any form. Only men above the age of 18 years
shall be employed on the work with lead paint. The following precautions
shall be taken during the work.

 Supplied air respirators shall be provided for use by the workers when
paint is applied in the form of spray, or a surface having lead paint is dry
rubbed or scraped.

95

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
²Öß. ‹îñîú×™ú ÃÖִ֐ÖÏß, ÃÖß´Öë™ü ¾Ö “Öæ­ÖÖ-¸üÖÖ †Öפü ×´Ö»ÖÖ­Öê úÖ úÖ´Ö ú¸ü­Öê ¾ÖÖ»Öê úִ֐ÖÖ¸ü ÃÖã¸üÖÖ “Ö¿´Öë, ÃÖã¸üÖÖ ²Öæ™ü
¾Ö ¤üßÖÖ­Öê ¯ÖÆü­ÖëÖê… ˆ×“ÖŸÖ À¾ÖÃÖ­Ö ˆ¯Öú¸üÖÖë úÖ ¯ÖϵÖÖêÖ †Öî¸ü ³Öß ²ÖêÆüŸÖ¸ü ¸üÆêüÖÖ…
ÃÖß. ¾ÖêÜ»›üÖ ¾Ö ÖîÃÖ úØ™üÖ úÖ úÖ´Ö ú¸ü­Öê ¾ÖÖ»Öê »ÖÖêÖÖë úÖê ˆ×“ÖŸÖ ¾ÖêÜ»›üÖ ±êúÃÖ ¿Öß»›üÖë úÖ ¯ÖϵÖÖêÖ ú¸ü­ÖÖ ÆüÖêÖÖ…
¾Öê»›ü¸üÖêÓ êú ÃÖÆüֵ֍ú ˆ×“ÖŸÖ ¯ÖύúÖ¸ü êú “Ö¿´ÖÖë úÖ ¯ÖϵÖÖêÖ ú¸ëüÖê… ×“ÖØ¯ÖÖ ¾Ö ÖÏÖ‡ÓØ›üÖ ú¸üŸÖê ÃÖ´ÖµÖ ÃÖã¸üÖÖ “Ö¿´ÖÖë
úÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
›üß. ¯ÖŸ£Ö¸ü ŸÖÖê›Íü­Öê ¾ÖÖ»Öê ˆ×“ÖŸÖ ¯ÖύúÖ¸ü êú “Ö¿´ÖÖë úÖ ¯ÖϵÖÖêÖ ú¸ëüÖê… ˆ­Æëü ‹ú ¤æüÃÖ¸êü ÃÖê ¯ÖµÖÖÔ¯ŸÖ ÃÖã¸ü×ÖŸÖ ¤æü¸üß ¯Ö¸ü ²ÖîšüÖµÖÖ
•ÖÖ‹ÖÖ…
‡Ô. ¿ÖÖò™ü ²»ÖÖÜÙüÖ †Öî¸ü ²»ÖÖÜÙüÖ “Öî´²Ö¸ü úß ÃÖ±úÖ‡Ô úê úÖ´ÖÖë ¯Ö¸ü »ÖÖÖ‹ Ö‹ ¾µÖÛŒŸÖ ˆ¯ÖµÖãŒŸÖ ³ÖÖ¸üß ¤üßÖÖ­Öê,
†Öê¾Ö¸ü†Öò»Ö, ¬Öæ»Ö´ÖãŒŸÖ “Ö¿´Öê, ²Öæ™ü †Öî¸ü ú´Ö ÃÖê ú´Ö 9 ‘Ö­Ö´Öß™ü¸ü/‘ÖÓ™êü úß ¤ü¸ü ÃÖê ¿Öã¨ü Æü¾ÖÖ úß †Ö¯ÖæÙŸÖ ×ú‹
•ÖÖ­Öê ¾ÖÖ»Öê ÃÖã¸üÖÖ Æãü›ÖêÓ úÖ ˆ¯ÖµÖÖêÖ ú¸ëüÖê…
‹±ú.•Ö´Öß­Ö ÃÖê µÖÖ ±ú¿ÖÔ ÃÖê 4.5 ´Öß™ü¸ü ÃÖê †×¬Öú ˆÓ“ÖÖ‡Ô ¯Ö¸ü úÖ´Ö ú¸ü­Öê ¾ÖÖ»Öê ‹êÃÖê ÃÖ³Öß »ÖÖêÖ ו֭֍êú אָü­Öê úÖ ›ü¸ü
ÆüÖ,ê úÖê µÖפü دָ֕êü, ÖÖ›Ôü ¸êü»ÖÖë †Öפü úß ÃÖã×¾Ö¬ÖÖ ˆ¯Ö»Ö²¬Ö ­Ö ÆüÖê ŸÖÖê ÃÖã¸üÖÖ ¯Öê™üß ²ÖÖÓ¬Ö­Öß ÆüÖêÖß… ‹êÃÖê ãÖÖ­ÖÖë ¯Ö¸ü
•ÖÆüÖÓ ÃÖã¸üÖÖ ¯Öê™üß ²ÖÖÓ¬Ö­ÖÖ ¾µÖ¾ÖÆüÖ׸üú ºþ¯Ö ÃÖê ÃÖÓ³Ö¾Ö ­Ö ÆüÖ,ê ¾ÖÆüÖÓ ´Ö•Ö²ÖæŸÖ ÃÖÆüÖ¸üÖë êú ÃÖÖ£Ö ¯ÖµÖÖÔ¯ŸÖ ŸÖ֍úŸÖ ¾ÖÖ»ÖÖ
•ÖÖ»Ö ²ÖÖÓ¬ÖÖ •ÖÖ‹ÖÖ…
•Öß. ¯Ö׸üµÖÖê•Ö­ÖÖ/ÃÖÓµÖÓ¡ÖÃ£Ö»Ö êú ³Öߟָü ÃÖ³Öß ¿ÖÛŒŸÖ“ÖÖ×»ÖŸÖ ¤ãü¯Ö×ÆüµÖÖ ´ÖÖê™ü¸ü ÃÖև׍ú»ÖÖë ¾Ö Ãæú™ü¸üÖë êú “Öֻ֍úÖë ¾Ö ˆ­Öêú
¯Öß”êû ²Öîšü­Öê ¾ÖÖ»ÖÖêÓ úÖê Îîú¿Ö Æêü»Ö´Öê™ü ¯ÖÆü­Ö­ÖÖ ÆüÖêÖÖ…
‹“Ö.•Ö²Ö úִ֐ÖÖ¸üÖë úÖê “ÖÖ»Öæ ÃÖß¾Öê•Ö µÖÖ ´Öê­ÖÆüÖê»Ö êú ³Öߟָü úÖ´Ö ú¸ü­ÖÖ ÆüÖê ŸÖÖê ÃÖÓ×¾Ö¤üúÖ¸ü ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê ׍ú ˆ­Ö
´Öê­ÖÆüÖê»ÖÖë úÖê Öã»ÖÖ ¸üÖÖ •ÖÖ‹ †Öî¸ü ˆ­Ö´Öë ú´Ö ÃÖê ú´Ö ‹ú ‘ÖÓ™êü êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ Æü¾ÖÖ úÖ ¯ÖϾÖê¿Ö ú¸üÖµÖÖ •ÖÖ‹…
‡­Ö´Öë ¯ÖµÖÖÔ¯ŸÖ Æü¾ÖÖ úÖ ¯ÖϾÖê¿Ö ú¸üÖ­Öê êú ²ÖÖ¤ü úִ֐ÖÖ¸ü úÖê ´Öê­ÖÆüÖê»Ö êú ³Öߟָü •ÖÖ­Öê úß †­Öã´Ö×ŸÖ ¤êü­Öê ÃÖê ¯ÖÆü»Öê
³Öߟָüß ¾ÖÖŸÖÖ¾Ö¸üÖ ´Öë ×¾ÖÂÖî»Öß ÖîÃÖÖë úß ˆ¯ÖÛãÖ×ŸÖ úß µÖÖ †ÖòŒÃÖß•Ö­Ö úß ú´Öß úß •ÖÖÓ“Ö úß •ÖÖ‹Öß †Öî¸ü ‡ÃÖê
¸üוÖÙü¸ü ´Öë ¤ü•ÖÔ ×úµÖÖ •ÖÖ‹ÖÖ… ׍úÃÖß ÃÖÓ³ÖÖ×¾ÖŸÖ ¤ãü‘ÖÔ™ü­ÖÖ ÃÖê ²Ö“Ö­Öê êú ×»Ö‹ ‡­Ö Öã»Öê ´Öê­ÖÆüÖê»ÖÖë êú “ÖÖ¸üÖë ŸÖ¸ü±ú
ˆ×“ÖŸÖ ¸êüØ»ÖÖ »ÖÖ֍ú¸ü ¯ÖϾÖêÂÖ ×­ÖÂÖê¬Ö ׍úµÖÖ •ÖÖ‹ÖÖ ¾Ö “ÖêŸÖÖ¾Ö­Öß ×ÃÖÖ­Ö»Ö †Öî¸ü “ÖêŸÖÖ¾Ö­Öß ²ÖÖê›Ôü »ÖÖÖ‹ •Ö֋ӐÖê…
¸üÖ×¡Ö ´Öë µÖÆüÖÓ ¯ÖµÖÖÔ¯ŸÖ ¸üÖê¿Ö­Öß úß ¾µÖ¾ÖãÖÖ úß •ÖÖ‹Öß…
9. ¸ÓüÖÖ‡Ô
9.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ´Ö×Æü»ÖÖ†ÖêÓ úÖê ׍úÃÖß ³Öß ¯ÖύúÖ¸ü êú ¿Öß¿ÖÖ µÖãŒŸÖ ˆŸ¯ÖÖ¤üÖë ÃÖê ¸ÓüÖÖ‡Ô ¾ÖÖ»Öê úÖ´ÖÖë ´Öë ­ÖÆüà »ÖÖ֋ӐÖê…
¿Öß¿ÖÖµÖãŒŸÖ ¯Öë™ü ÃÖê ¸ÓüÖÖ‡Ô êú úÖ´ÖÖë êú ×»Ö‹ êú¾Ö»Ö 18 ¾ÖÂÖÔ ÃÖê †×¬Öú ˆ´ÖÏ êú ¯Öã¹ýÂÖÖë úÖê Æüß »ÖÖÖµÖÖ •ÖÖ‹ÖÖ…
‡ÃÖ úÖµÖÔ êú ¤üÖî¸üÖ­Ö ×­Ö´­Ö×»Ö×ÖŸÖ ÃÖÖ¾Ö¬ÖÖ×­ÖµÖÖÓ ²Ö¸üŸÖß •Ö֋ӐÖß…
 •Ö²Ö ú³Öß Ã¯ÖÏê ¯ÖëØ™üÖ úß •ÖÖ‹ µÖÖ »Öê›ü ¯Öë™ü ¾ÖÖ»Öß ÃÖŸÖÆüÖë úÖê ÃÖæÖÖ ¸üÖ›ÍüÖ µÖÖ Öã¸ü“ÖÖ •ÖÖ­ÖÖ ÆüÖê ŸÖÖê úִ֐ÖÖ¸üÖêÓ êú
¯ÖϵÖÖêÖ êú ×»Ö‹ †Ö¯ÖæŸÖÔ Æü¾ÖÖ À¾ÖÖÓÃÖ ˆ¯Öú¸üÖ ˆ¯Ö»Ö²¬Ö ú¸üÖµÖÖ •ÖÖ‹ÖÖ…

95

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
 Overalls shall be supplied by the Contractors to the workmen and
adequate facilities shall be provided to enable the painters to wash at
the cessation of work.

 All painting jobs, especially those in which lead paints are used shall be
kept under industrial hygiene surveillance.

9.2 Smoking, open flames or sources of ignition shall not be allowed in places
where paints and other flammable substances are stored, mixed or used. A
caution board, with the instruction written in national / regional language,
“SMOKING - STRICTLY PROHIBITED” shall be displayed in the vicinity where
painting is in progress or where paints are stored. Symbols shall also be used
for caution boards.

Suitable fire extinguishers / sand buckets shall be kept available at places


where flammable paints are stored, handled or used.

When painting work is done in a closed room or in a confined space,


adequate ventilation shall be provided. If adequate ventilation cannot be
provided, workers shall wear suitable respirators.

9.3 Epoxy resins and their formulations used for painting shall not be allowed to
come in contact with the skin. The workers shall use plastic gloves and / or
suitable barrier creams.

Adequate ventilation shall be provided especially when working with hot


resin mixes.

Increased personal hygiene shall be practiced to control inadvertent


contact with the resin and eliminate its effects.

Workers shall thoroughly wash hands and feet before leaving the work. Work
clothes shall be changed and laundered frequently.

10. LIFTING MACHINES AND TACKES

10.1 Use of lifting machines and tackles, including their attachments, anchorage
and supports shall conform to the following standards or conditions.

a. Lifting machines and tackles shall be of good mechanical construction,


sound material and adequate strength and free from any defects and shall
be kept in good repair and in good working order.

Every rope used in hoisting or lowering materials or as a means of suspension


shall be of good quality and adequate strength and free from any defect.
96

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
 ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ †Öê¾Ö¸ü†Öò»Ö ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê †Öî¸ü úÖ´Ö ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê êú ²ÖÖ¤ü ¯Öë™ü¸üÖë úÖê ÆüÖ£Ö-´ÖãÓÆü
¬ÖÖê­Öê êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ ÃÖã×¾Ö¬ÖÖ‹Ó ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •Ö֋ӐÖß…
 ÃÖ³Öß ¯ÖëØ™üÖ êú úÖ´ÖÖë úÖê , ×¾Ö¿ÖêÂÖŸÖ: ¿Öß¿ÖÖ µÖãŒŸÖ ¯Öë™üÖë úÖê †ÖîªÖêא֍ú þÖÖãµÖ þ֓”ûŸÖÖ úß ×­ÖÖ¸üÖ­Öß ´Öë
¸üÖÖ •ÖÖ‹ÖÖ…
9.2 •ÖÆüÖÓ ¯Öë™ü ¾Ö †­µÖ •¾Ö»Ö­Ö¿Öᯙ ¯Ö¤üÖ£ÖÔ ¸üÖê •ÖÖŸÖê ÆüÖë, ×´Ö»ÖÖ‹ •ÖÖŸÖê ÆüÖë µÖÖ ¯ÖϵÖÖêÖ ׍ú‹ ÆüÖë ‹êÃÖê ãÖÖ­ÖÖë ¯Ö¸
¬Öæ´ÖϯÖÖ­Ö, »ÖÖî¤üÖ¸ü †ÖÖ µÖÖ Ø“ÖÖÖ¸üß êú ÄÖÖêŸÖ úß †­Öã´Ö×ŸÖ ­ÖÆüà ¤üß •ÖÖ‹Öß… •ÖÆüÖÓ ÓúÆüß ¯ÖëØ™üÖ úÖ úÖµÖÔ “Ö»Ö
¸üÆüÖ ÆüÖê µÖÖ ¯Öë™ü úÖ ³ÖÓ›üÖ¸ü ÆüÖê ¾ÖÆüÖÓ ¸üÖ™ÒüßµÖ/Öê¡ÖßµÖ ³ÖÖÂÖÖ ´Öë " ¬Öæ´ÖϯÖÖ­Ö ×­ÖÂÖê¬Ö" úÖ ²ÖÖê›Ôü »ÖÖÖµÖÖ •ÖÖ‹ÖÖ…
“ÖêŸÖÖ¾Ö­Öß ²ÖÖê›Ôü ¯Ö¸ü ¯ÖÏŸÖߍú דÖÅ­ÖÖë úÖ ³Öß ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
•¾Ö»Ö­Ö¿Öᯙ ¯Öë™ü êú ³ÖÓ›üÖ¸üÖ, ˆ¯ÖµÖÖêÖ µÖÖ ¯ÖϵÖÖêÖ êú ÃÖ³Öß Ã£ÖÖ­ÖÖë ¯Ö¸ü ˆ¯ÖµÖãŒŸÖ †Û­Ö¿Ö´Ö­Ö ˆ¯Öú¸üÖ/²ÖÖ»Öæ
úß ²ÖÖÛ»™üµÖÖÓ †Öפü ¸üÖß •Ö֋ӐÖß…
•Ö²Ö ú³Öß ²ÖÓ¤ü ú´Ö¸üÖë µÖÖ ŸÖÓÖ •ÖÖÆüÖë ¯Ö¸ü ¯ÖëØ™üÖ úÖ úÖ´Ö ×úµÖÖ •ÖÖ­ÖÖ ÆüÖê ŸÖÖê ¾ÖÆüÖÓ ¯Ö¸ü ¯ÖµÖÖÔ¯ŸÖ Æü¾ÖÖ †Öפü úß
¾µÖ¾ÖãÖÖ úß •ÖÖ­Öß “ÖÖ×Æü‹… µÖפü ¯ÖµÖÖÔ¯ŸÖ Æü¾ÖÖ úß ¾µÖ¾ÖãÖÖ ×úµÖÖ •ÖÖ­ÖÖ ÃÖÓ³Ö¾Ö ­Ö ÆüÖê ŸÖÖê úִ֐ÖÖ¸ ˆ¯ÖµÖ㌟Ö
À¾ÖÖÓÃÖ ˆ¯Öú¸üÖ ¯ÖÆü­ÖêӐÖê…
9.3 ¯ÖëØ™üÖ êú ×»Ö‹ ¯ÖϵÖÖêÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ‹¯ÖÖòŒÃÖß ¸êü×•Ö­Ö ¾Ö ˆ­Öêú ±úÖ´ÖæÔ»Öê¿Ö­ÖÖêÓ úÖê Ÿ¾Ö“ÖÖ êú ÃÖӯ֍Ôú ´Öë ­ÖÆüà
†Ö­Öê פüµÖÖ •ÖÖ‹ÖÖ… úִ֐ÖÖ¸ü ¯»ÖÖÛÙüú êú ¤üßÖÖ­Öê †£Ö¾ÖÖ/†Öî¸ü ˆ¯ÖµÖãŒŸÖ ¸üÖê¬Öß Îúß´ÖÖë úÖ ¯ÖϵÖÖêÖ ú¸ëüÖê…
•Ö²Ö ú³Öß Ö´ÖÔ ¸êü×ÃÖ­Ö ×´ÖŒÃÖ êú ÃÖÖ£Ö úÖ´Ö ×úµÖÖ •ÖÖ ¸üÆüÖ ÆüÖê ŸÖÖê ¯ÖµÖÖÔ¯ŸÖ Æü¾ÖÖ †Ö¾ÖÖÖ´Ö­Ö úß ¾µÖ¾ÖãÖÖ úß
•ÖÖ‹Öß…ü
†­ÖÖ¾Ö¿µÖú ºþ¯Ö ÃÖê ¸êü×ÃÖ­Ö êú ÃÖӯ֍Ôú ´Öë †Ö­Öê ¾Ö ‡Ã֍êú ¯ÖϳÖÖ¾ÖÖë úÖê ×­ÖµÖÓ×¡ÖŸÖ ú¸ü­Öê êú ×»Ö‹ ¾µÖÛŒŸÖÖŸÖ
ÃÖÖ±ú-ÃÖ±úÖ‡Ô ¯Ö¸ü †×¬Öú ¬µÖÖ­Ö ×¤üµÖÖ •ÖÖ‹ÖÖ…
úִ֐ÖÖ¸ü úÖ´Ö ÃÖê •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê †¯Ö­Öê ÆüÖ£Ö-¯ÖÖÓ¾ÖÖë úÖê ³Ö»Öß ¯ÖύúÖ¸ü ÃÖê ÃÖÖ±ú ú¸ëüÖê… úÖ´Ö êú ÃÖ´ÖµÖ ¯Ö¸ü
¯ÖÆü­Öê Ö‹ ú¯Ö›ÍüÖë úÖê ²Ö¤ü»ÖÖ •ÖÖ‹ÖÖ †Öî¸ü ÃÖ´ÖµÖ-ÃÖ´ÖµÖ ¯Ö¸ü ¬Öã»Ö¾ÖÖµÖÖ •ÖÖ‹ÖÖ…
10. ×»ÖÜ°™üÖ ´Ö¿Öß­Öê ¾Ö ™îüú»Ö
10.1 †™îü“Ö´Öë™üÖ,ë ‹îӍú¸ü ¾Ö ÃÖ¯ÖÖê™Ôü ÃÖ×ÆüŸÖ ×»ÖÜ°™üÖ ´Ö¿Öß­ÖÖë ¾Ö ™îüú»ÖÖë úÖ ˆ¯ÖµÖÖêÖ ×­Ö´­Ö×»Ö×ÖŸÖ ´ÖÖ­Ö¤ü›üÖë µÖÖ
¿ÖŸÖÖí êú †­ÖãÃÖÖ¸ü ׍úµÖÖ •ÖÖ‹ÖÖ…
‹. ×»ÖÜ°™üÖ ´Ö¿Öß­Öë ¾Ö ™îüú»Ö ²ÖלÍüµÖÖ µÖÖÓס֍úß ÃÖê ×­ÖÙ´ÖŸÖ, ÁÖêš ÃÖִ֐ÖÏß ¾Ö ¯ÖµÖÖÔ¯ŸÖ ´Ö•Ö²ÖæŸÖß ¾ÖÖ»Öß †Öî¸ü
¤üÖêÂÖ¸ü×ÆüŸÖ ÆüÖêӐÖß… ‡­Öúß ²ÖלÍüµÖÖ ´Ö¸ü´´ÖŸÖ úß •ÖÖ‹Öß ¾Ö ‡­Æëü ²ÖêÆüŸÖ¸ü “ÖÖ»Öæ ÆüÖ»ÖŸÖ ´Öë ¸üÖÖ •ÖÖ‹ÖÖ…
ÃÖִ֐ÖÏß úÖê Öà“Ö­Öê µÖÖ ­Öß“Öê ˆŸÖÖ¸ü­Öê ¾ÖÖ»Öß µÖÖ »Ö™üúÖ­Öê êú ×»Ö‹ ¯ÖϵÖÖêÖ úß •ÖÖ­Öê ¾ÖÖ»Öß ÃÖ³Öß ¸üÛÃÃÖµÖÖÓ
†“”ûß ÖãÖ¾Ö¢ÖÖ ¾Ö ¯ÖµÖÖÔ¯ŸÖ ´Ö•Ö²ÖæŸÖß ¾ÖÖ»Öß ŸÖ£ÖÖ ÃÖ³Öß ¯ÖύúÖ¸ü êú ¤üÖêÂÖÖë ÃÖê ´ÖãŒŸÖ ÆüÖëÖß…

96

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
b. Every crane operator or lifting appliance operator shall be properly qualified.
No person under the age of 21 years shall be in charge of any hoisting
machine or give signal to operator of such machine.

c. In case of every lifting machine (and of every chain, ring, hook, shackle,
swivel and pulley block used in hoisting or as means of suspension) the safe
working load shall be ascertained and clearly marked. In case of a lifting
machine having a variable safe working load, each safe working load and
the conditions under which it is applicable, shall be clearly indicated. No
part of any machine or any gear referred to above in this paragraph shall be
loaded beyond the safe working load except for the purpose of testing. This
shall be approved by the Safety Engineer.

d. In case of departmental machines, the safe working load shall be notified by


the Engineer-in-charge. As regards Contractor’s machines, the contractor
shall notify the safe working load of the machine to the Engineer-in-charge
whenever he brings any machinery to site of work and get it verified by the
Engineer-in-charge, supported by a valid test certificate by the competent
person.

e. Thorough inspection and load testing of lifting machines and tackles shall be
done by a competent person at least once every 12 months and records of
such inspection and testing shall be maintained.

10.2 Motors, gearing transmission, couplings, belts, chain drives and other moving
parts of hoisting appliances shall be provided with adequate safeguards.
Hoisting appliances shall be provided with such means as will reduce to the
minimum the risk of any part of a suspended load becoming accidentally
displaced or lowered.

11. WELDING AND GAS CUTTING


11.1 Welding and gas cutting operations shall be done only by qualified and
authorised persons and as per IS Specification and Code of Practice.

11.2 Welding and gas cutting shall not be carried out in places where flammable
or combustible materials are kept and where there is danger of explosion
due to presence of gaseous mixtures.

11.3 Welding and gas cutting equipment including hoses and cables shall be
maintained in good condition.

11.4 Barriers shall be erected to protect other persons from harmful rays from the
work. When welding or gas cutting is done in elevated positions, precautions
shall be taken to prevent sparks or hot metal falling on persons or flammable
materials.
97

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
²Öß. ¯ÖÏŸµÖêú Îêú­Ö ¯ÖÏ“Öֻ֍ú ¾Ö ×»ÖÜ°™üÖ ˆ¯Öú¸üÖ ¯ÖÏ“Öֻ֍ú ˆ×“ÖŸÖ µÖÖꐵ֟ÖÖ ¯ÖÏÖ¯ŸÖ ÆüÖëÖê… 21 ¾ÖÂÖÔ ÃÖê ú´Ö ˆ´ÖÏ úÖ
úÖê‡Ô ³Öß ¾µÖÛŒŸÖ ׍úÃÖß ‰ú¯Ö¸ü Öà“Ö­Öê ¾ÖÖ»Öß ´Ö¿Öß­Ö µÖÖ ‹êÃÖß ´Ö¿Öß­ÖÖë êú ¯ÖÏ“ÖÖ»Ö­Ö ×ÃÖÖ­Ö»Ö ¤êü­Öê êú úÖ´Ö ¯Ö¸ü
­ÖÆüà »ÖÖÖµÖÖ •ÖÖ‹ÖÖ…
ÃÖß. ¯ÖÏŸµÖêú ×»ÖÜ°™üÖ ´Ö¿Öß­Ö (†Öî¸ü ¯ÖÏŸµÖêú “Öê­Ö, ظüÖ, Æãüú, ¿Öîú»Ö, þÖÖ‡Ô¾Ö»Ö †Öî¸ü ‰ú¯Ö¸ü ˆšüÖ­Öê µÖÖ »Ö™üúÖ­Öê êú
×»Ö‹ ¯ÖϵÖÖêÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ¯Öã»Öß ²»ÖÖòú) êú ´ÖÖ´Ö»Öê ´Öë ÃÖã¸ü×ÖŸÖ ³ÖÖ¸ü ¾ÖÆü­Ö Ö´ÖŸÖÖ ×­ÖÛ¿“ÖŸÖ úß •ÖÖ‹Öß
†Öî¸ü ‡ÃÖê ïÖ™ü ºþ¯Ö ÃÖê †Ó׍úŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ… úÖê‡Ô ‹êÃÖß ×»ÖÜ°™üÖ ´Ö¿Öß­Ö ×•ÖÃ֍úß ÃÖã¸ü×ÖŸÖ ³ÖÖ¸ü ¾ÖÆü­Ö
Ö´ÖŸÖÖ ¯Ö׸ü¾ÖÙŸÖŸÖ ÆüÖêŸÖß ÆüÖê, êú ´ÖÖ´Ö»Öê ´Öë ¯ÖÏŸµÖêú ÃÖã¸ü×ÖŸÖ ³ÖÖ¸ü ¾ÖÆü­Ö Ö´ÖŸÖÖ †Öî¸ü ¾Öê ¤ü¿ÖÖ‹Ó ×•Ö­Ö´Öë µÖÆü
Ö´ÖŸÖÖ »Ö֐Öæ ÆüÖêŸÖß ÆüÖê, úÖê ïÖ™ü ºþ¯Ö ÃÖê ¯ÖϤüÙ¿ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖ ¯Öî¸ü֐ÖÏÖ±ú ´Öë ‰ú¯Ö¸ü ¾ÖÙÖŸÖ ×úÃÖß
´Ö¿Öß­Ö µÖÖ †Öî•ÖÖ¸üÖêÓ êú ׍úÃÖß ³ÖÖÖ ¯Ö¸ü ¯Ö¸üßÖÖ êú †»ÖÖ¾ÖÖ ×úÃÖß ³Öß ÃÖ´ÖµÖ ¯Ö¸ü ÃÖã¸ü×ÖŸÖ ³ÖÖ¸ü ¾ÖÆü­Ö Ö´ÖŸÖÖ
ÃÖê †×¬Öú ³ÖÖ¸ü ­ÖÆüà »ÖÖ¤üÖ •ÖÖ‹ÖÖ… µÖÆü ÃÖÓ¸üÖÖ †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ ú¸üÖµÖÖ •ÖÖ‹ÖÖ…
›üß. ×¾Ö³Ö֐ÖßµÖ ´Ö¿Öß­ÖÖë êú ´ÖÖ´Ö»Öê ´Öë ÃÖã¸ü×ÖŸÖ ³ÖÖ¸ü¾ÖÆü­Ö Ö´ÖŸÖÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †×¬ÖÃÖæ×“ÖŸÖ úß •ÖÖ‹Öß…
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ´Ö¿Öß­ÖÖë êú ´ÖÖ´Ö»Öê ´Öë, ‡­Ö ´Ö¿Öß­ÖÖë úÖê úÖµÖÔÃ£Ö»Ö ¯Ö¸ü »ÖÖ‹ •ÖÖ­Öê êú ÃÖ´ÖµÖ ¾Öê ‡­Öúß
ÃÖã¸ü×ÖŸÖ ³ÖÖ¸ü¾ÖÆü­Ö Ö´ÖŸÖÖ †×¬ÖÃÖæ×“ÖŸÖ ú¸ëüÖê †Öî¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖê ‡Ã֍úß ¯ÖãÛ™ü ú¸ü֋ӐÖê ŸÖ£ÖÖ ‡ÃÖ êú
ÃÖ´Ö£ÖÔ­Ö-ÃÖցµÖþֺþ¯Ö ÃÖÖ´Ö ¾µÖÛŒŸÖ úÖ ¾Öî¬Ö •ÖÖÓ“Ö ¯ÖÏ´ÖÖÖ¯Ö¡Ö ³Öß ¯ÖÏßÖãŸÖ ú¸ëüÖê…
‡Ô. ¯ÖÏŸµÖêú 12 ´ÖÆüß­Öê ´Öë ú´Ö ÃÖê ú´Ö ‹ú ²ÖÖ¸ü ׍úÃÖß ÃÖÖ´Ö ¾µÖÛŒŸÖ «üÖ¸üÖ ×»ÖÜ°™üÖ ´Ö¿Öß­ÖÖë ¾Ö ™îüú»ÖÖë úÖ ÖÆü­Ö
×­Ö¸üßÖÖ ¾Ö ³ÖÖ¸ü¾ÖÆü­Ö Ö´ÖŸÖÖ ¯Ö¸üßÖÖ ú¸üÖµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ‡ÃÖ ×­Ö¸üßÖÖ ¾Ö ¯Ö¸üßÖÖ úÖ ×¸üúÖ›Ôü †­Öã¸üׁ֟Ö
׍úµÖÖ •ÖÖ‹ÖÖ…
10.2 ³ÖÖ¸ü ˆšüÖ­Öê-ˆŸÖÖ¸ü­Öê ¾ÖÖ»Öê ˆ¯Öú¸üÖÖë úß ´ÖÖê™ü¸üÖ,ë אֵÖظüÖ ™ÒüÖÓÃÖ×´Ö¿Ö­Ö, ú¯Öػ֐Ö, ²Öê»™üÖ,ë “Öê­Ö ›ÒüÖ‡¾ÖÖë ¾Ö †­µÖ
“Ö»Ö ×ÆüÃÃÖÖë ´ÖêÓ ¯ÖµÖÖÔ¯ŸÖ ÃÖã¸üÖÖ ÃÖÖ¾Ö¬ÖÖ×­ÖµÖÖÓ ¯ÖϵÖãŒŸÖ úß •Ö֋ӐÖß… ³ÖÖ¸ü ˆšüÖ­Öê-ˆŸÖÖ¸ü­Öê ¾ÖÖ»Öê ˆ¯Öú¸üÖÖë ´Öë ‹êÃÖß
¾µÖ¾ÖãÖÖ‹Ó úß •Ö֋ӐÖß ×•ÖÃÖÃÖê ׍úÃÖß »Ö™üúÖ‹ Ö‹ ³ÖÖ¸ü µÖÖ ˆÃ֍úê ׍úÃÖß ³ÖÖÖ êú ¤ãü‘ÖÔ™ü­ÖÖ¾Ö¿Ö †¯Ö­Öê ãÖÖ­Ö
ÃÖê Æü™ü­Öê µÖÖ ­Öß“Öê †Ö •ÖÖ­Öê •ÖîÃÖê •ÖÖê׏ִÖÖë úÖê ­µÖæ­ÖŸÖ´Ö ׍úµÖÖ •ÖÖ Ã֍êú…
11. ¾ÖêÜ»›üÖ ¾Ö ÖîÃÖ úØ™üÖ
11.1 ¾ÖêÜ»›üÖ ¾Ö ÖîÃÖ úØ™üÖ êú úÖ´ÖÖë úÖê êú¾Ö»Ö ¯ÖÏ׿Ö×ÖŸÖ ¾Ö ¯ÖÏÖ׬֍éúŸÖ ¾µÖÛŒŸÖµÖÖêÓ «üÖ¸üÖ Æüß ×úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü
µÖÆü ³ÖÖ¸üŸÖßµÖ ´Ö֭֍ú ×¾Ö×­Ö¤ì¿Ö ¾Ö úÖê›ü †Öò±ú ¯ÖÏîÛŒ™üÃÖ êú †­ÖãÃÖÖ¸ü ׍úµÖÖ •ÖÖ‹ÖÖ…
11.2 ‹êÃÖê ãÖÖ­Ö •ÖÆüÖÓ •¾Ö»Ö­Ö¿Öᯙ ¾Ö ¤üÖÆüú ¯Ö¤üÖ£ÖÔ ¸üÖê ÆüÖë µÖÖ •ÖÆüÖÓ ÖîÃÖßµÖ ×´ÖÁ֝ÖÖë úß ˆ¯ÖÛãÖ×ŸÖ êú úÖ¸üÖ
×¾ÖñúÖê™ü ÆüÖê­Öê úÖ ³ÖµÖ ÆüÖê, ¾ÖÆüÖÓ ¾ÖêÜ»›üÖ ¾Ö ÖîÃÖ úØ™üÖ úÖ úÖµÖÔ ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ…
11.3 ÆüÖê•ÖÖë ¾Ö êúײֻÖÖë ÃÖ×ÆüŸÖ ¾ÖêÜ»›üÖ ¾Ö ÖîÃÖ úØ™üÖ ˆ¯Öú¸üÖÖë úÖê ÃÖ¤îü¾Ö †“”ûßü ÆüÖ»ÖŸÖ ´Öë ²Ö­ÖÖ‹ ¸üÖÖ •ÖÖ‹ÖÖ…
11.4 ‡­Ö úÖµÖÖí úß ÆüÖ׭֍úÖ¸üú ׍ú¸üÖÖë ÃÖê †­µÖ ¾µÖÛŒŸÖµÖÖë úÖê ²Ö“ÖÖ­Öê êú ×»Ö‹ ²Öî׸üµÖ¸ü »ÖÖÖ‹ •Ö֋ӐÖê… •Ö²Ö ú³Öß
‹êÃÖê úÖµÖÖí úÖê ‰Óú“Öê ãÖÖ­ÖÖë ¯Ö¸ü ׍úµÖÖ •ÖÖ­ÖÖ ÆüÖê, ؓ֐ÖÖ׸üµÖÖë ¾Ö Ö´ÖÔ ¬ÖÖŸÖã†Öë úÖê ­Öß“Öê Ö›Íêü ¾µÖÛŒŸÖµÖÖë ¾Ö
•¾Ö»Ö­Ö¿Öᯙ ¯Ö¤üÖ£ÖÖí ¯Ö¸ü אָü­Öê ÃÖê ²Ö“ÖÖ­Öê êú ×»Ö‹ ÃÖÖ¾Ö¬ÖÖ­Öß ²Ö¸üŸÖß •ÖÖ‹Öß…

97

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
11.5 Suitable type of protective clothing consisting of fire resistant gauntlet gloves,
leggings, boots and aprons shall be provided to workers as protection from
heat and hot metal splashes. Welding shields with filter glasses of appropriate
shade shall be worn as face protection.

11.6 Adequate ventilation shall be provided while welding in confined space or


while brazing, cutting or welding zinc, brass, bronze, galvanised or lead
coated materials.

11.7 Welding and gas cutting shall not be done on drums, barrels, tanks or other
containers unless they have been emptied, cleaned thoroughly and it is
made certain that no flammable material is present.

11.8 Fire extinguisher shall be available near the location of welding operations.
Fire Safety Permit shall be obtained for working at vulnerable areas and
operating areas before flame cutting/welding is taken up.

11.9 For electric (Arc) welding the following additional safety precautions shall be
taken:

i) When electrical welding is undertaken near pipe lines carrying flammables,


such pipe lines shall not be used as part of earth conductor but a separate
earth conductor shall be connected to the machine directly from the job.

ii) Personnel contact with the electrode or other live parts of electric welding
equipment shall be avoided.

iii) Extreme caution shall be exercised to prevent accidental contact of


electrodes with ground.

iv) The welding cables shall not be allowed to get entangled with power cables.
It shall be ensured that the cables are not damaged by movement of
materials.

12. GRINDING
12.1 All portable grinders shall be used only with their wheel guards in position to
reduce the danger from flying fragments should the wheel break during the
use.

12.2 Grinding wheels of specified diameter only shall be used on a grinder -


portable or pedestal - in order not to exceed the prescribed peripheral
speed.

12.3 Goggles shall be used during grinding operation.

98

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
11.5 ‰ú´ÖÖ †Öî¸ü Ö´ÖÔ ¬ÖÖŸÖ㠍êú ”ûà™üÖë ÃÖêê ²Ö“ÖÖ­Öê êú ×»Ö‹ úִ֐ÖÖ¸üÖë úÖê ˆ¯ÖµÖãŒŸÖ ¯ÖύúÖ¸ü êú ²Ö“ÖÖ¾Ö ¾ÖÃ¡Ö •ÖîÃÖê
¯ÖÏןָüÖê¬Öú ³ÖÖ¸üß ¤üßÖÖ­Öê, ¯ÖÖÓ¾Ö¸üÖú, ²Öæ™ü ¾Ö ‹ê¯ÖÏ­Ö †Öפü ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê… “ÖêÆü¸êü úê ²Ö“ÖÖ¾Ö êú ×»Ö‹
ˆ¯ÖµÖãŒŸÖ ¿Öê›ü ¾ÖÖ»Öê ×±ú»™ü¸ü »ÖÖÃÖ µÖãŒŸÖ ¾ÖêÜ»›üÖ ¿Öß»›üÖë úÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
11.6 ÃÖӍú¸êü ãÖÖ­ÖÖë ´Öë úÖµÖÔ µÖÖ ²ÖÎêؕ֐Ö, úØ™üÖ µÖÖ •ÖßÖÖ, ¯ÖߟֻÖ, ŸÖÖÓ²ÖÖ, ÖÖê­ÖÖ‡•›ü †£Ö¾ÖÖ ÃÖßÃÖê úß ¯ÖŸÖÔ “ÖœüÍß
¬ÖÖŸÖã†Öë úß ¾ÖêÜ»›üÖ ú¸üŸÖê ÃÖ´ÖµÖ ¯ÖµÖÖÔ¯ŸÖ Æü¾ÖÖ êú †Ö¾ÖÖÖ´Ö­Ö úß ¾µÖ¾ÖãÖÖ úß •ÖÖ‹Öß…
11.7 ›Òü´ÖÖë, ²Öî¸ü»ÖÖë, ™ïüúÖê †£Ö¾ÖÖ †­µÖ Óú™êü­Ö¸üÖêÓ ¯Ö¸ü, •Ö²Ö ŸÖú ׍ú ˆ­Æëü ¯Öæ¸üß ŸÖ¸üÆü ÃÖê ÖÖ»Öß, ÃÖÖ±ú ú¸ü ˆ­Ö´Öê
׍úÃÖß ¯ÖύúÖ¸ü úÖ •¾Ö»Ö­Ö¿Öᯙ ¯Ö¤üÖ£ÖÔ ­Ö ÆüÖê­ÖÖ ÃÖã×­ÖÛ¿“ÖŸÖ ­Ö ú¸ü ×»ÖüµÖÖ ÖµÖÖ ÆüÖê, ¾ÖêÜ»›üÖ †Öî¸ü ÖîÃÖ úØ™üÖ
­ÖÆüà úß •ÖÖ‹Öß…
11.8 ¾ÖêÜ»›üÖ êú úÖ´Ö ú¸ü­Öê êú ãÖÖ­Ö ¯Ö¸ü †Û­Ö¿Öִ֍ú ˆ¯Öú¸üÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê… †ÖÖ ÃÖÓ³ÖÖ×¾ÖŸÖ Öê¡ÖÖë
†Öî¸ü ¯ÖÏ“ÖÖ»Ö­Ö Öê¡ÖÖë ´Öë °»Öê´Ö úØ™üÖ/¾ÖêÜ»›üÖ úÖ úÖ´Ö ú¸ü­Öê ÃÖê ¯ÖÆü»Öê †Û­Ö ÃÖÓ¸üÖÖ ¯Ö¸ü×´Ö™ü ¯ÖÏÖ¯ŸÖ ׍ú‹
•Ö֋ӐÖê…
11.9 ‡»ÖêÛŒ™Òüú(†ÖÔú) ¾ÖêÜ»›üÖ ú¸ü­Öê êú ×»Ö‹ ×­Ö´­Ö×»Ö×ÖŸÖ †×ŸÖ׸üŒŸÖ ÃÖÓ¸üÖÖ ÃÖÖ¾Ö¬ÖÖ×­ÖµÖÖÓ ²Ö¸üŸÖß •Ö֋ӐÖß :
i) •Ö²Ö ׍úÃÖß •¾Ö»Ö­Ö¿Öᯙ ¯Ö¤üÖ£ÖÔ úÖê »Öê •ÖÖ­Öê ¾ÖÖ»Öß ¯ÖÖ‡¯Ö»ÖÖ‡­Ö êú ¯ÖÖÃÖ ¾ÖêÜ»›üÖ úÖ úÖ´Ö ×úµÖÖ •ÖÖ­ÖÖ ÆüÖê ŸÖÖê
ˆÃÖ ¯ÖÖ‡¯Ö»ÖÖ‡­Ö úÖê †£ÖÔ ÃÖã“Öֻ֍ú êú ºþ¯Ö ´Öë ¯ÖϵÖÖêÖ ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ… ‡Ã֍êú ²Ö•ÖÖ‹ ÃÖ߬Öê ´Ö¿Öß­Ö ÃÖê Æüß
‹ú †»ÖÖ †£ÖÔ ÃÖã“Öֻ֍ú •ÖÖê›ÍüÖ •ÖÖ‹ÖÖ…
ii) ‡»ÖꌙÒüÖê›ü µÖÖ ‡»ÖêÛŒ™Òüú ¾ÖêÜ»›üÖ ˆ¯Öú¸üÖÖë êú †­µÖ ³Ö֐ÖÖë êú ÃÖÖ£Ö ÃÖ߬Öê ¾µÖÛŒŸÖÖŸÖ ÃÖӯ֍Ôú ÃÖê ²Ö“ÖÖ
•ÖÖ‹ÖÖ…
iii) ¤ãü‘ÖÔ™ü­ÖÖ¾Ö¿Ö ‡»ÖꌙÒüÖê›ü êú •Ö´Öß­Ö êú ÃÖӯ֍Ôú ´Öë †Ö­Öê úÖê ²Ö“ÖÖ­Öê êú ×»Ö‹ †×¬ÖúŸÖ´Ö ÃÖÖ¾Ö¬ÖÖ­Öß ²Ö¸üŸÖß •ÖÖ‹Öß…
iv) ¾ÖêÜ»›üÖ êúײֻÖÖë úÖê ײֻ֕Öß úß êúײֻÖÖë ´Öë ˆ»Ö—Ö­Öê ÃÖê ²Ö“ÖÖµÖÖ •ÖÖ‹ÖÖ… ÃÖã×­ÖÛ¿“ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ ×ú
ÃÖִ֐ÖÏß êú †Ö¾ÖÖÖ´Ö­Ö êú úÖ¸üÖ êúײֻÖë Öן֐ÖÏÃŸÖ ­Ö ÆüÖë…
12. בÖÃÖÖ‡Ô
12.1 ¯ÖϵÖÖêÖ êú ¤üÖî¸üÖ­Ö ˆ”û»Ö ú¸ü אָü­Öê ¾ÖÖ»Öê ™ãüú›ÍüÖë êú úÖ¸üÖ ¾Æüᯙ ²ÖÎêú ±êú»Ö ÆüÖê •ÖÖ­Öê úß ÛãÖ×ŸÖ ÃÖê ˆŸ¯Ö®Ö
ÆüÖê­Öê ¾ÖÖ»Öê ÖŸÖ¸êü úÖê ú´Ö ú¸ü­Öê ¾ÖÖ»Öê ¾Æüᯙ ÖÖ›üÖí úÖ µÖ£ÖÖãÖÖ­Ö ÆüÖê­ÖÖ ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­Öê êú ²ÖÖ¤ü Æüß ×úÃÖß
¯ÖÖê™ìü²Ö»Ö ÖÏÖ‡Ó›ü¸üÖë úÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
12.2 ×­Ö¬ÖÖÔ׸üŸÖ “֍ÎúßµÖ Ö×ŸÖ ÃÖê †×¬Öú Ö×ŸÖ úÖê ¸üÖêú­Öê êú ×»Ö‹ ¯ÖÖê™ìü²Ö»Ö µÖÖ ¯Öê›êüÛÙÒüµÖ»Ö ÖÏÖ‡Ó›ü¸üÖë ÆêüŸÖ㠍êú¾Ö»Ö
×¾Ö×­ÖÙ¤ü™ü ¾µÖÖÃÖ ¾ÖÖ»Öê ÖÏÖ‡ÓØ›üÖ ¯Ö×ÆüµÖÖë úÖ Æüß ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
12.3 בÖÃÖÖ‡Ô úÖ úÖ´Ö ú¸üŸÖê ÃÖ´ÖµÖ “Ö¿´ÖÖë úÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ…

98

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
13. ELECTRICITY
Guidelines for providing temporary power supply at the site and general
safety procedures for using electricity are given in the enclosed Annexure.

14. HOUSEKEEPING

14.1 The Contractor shall at all times keep his work spot, site office and
surroundings clean and tidy from rubbish, scrap, surplus materials and
unwanted tools and equipment.

14.2 Welding and other electrical cables shall be so routed as to allow safe traffic
by all concerned.

14.3 No materials on any of the sites of work shall be so stacked or placed as to


cause danger or inconvenience to any person or the public. The Engineer-In-
Charge may require the Contractor to remove any materials which are
considered to be of danger or cause inconvenience to the public. If
necessary, the Engineer-In-Charge may cause them to be removed at the
Contractor’s cost.

14.4 At the completion of the work, the Contractor shall have removed from the
work premises all scaffoldings, surplus materials, rubbish and all huts and
sanitary arrangements used/installed for his workmen on the site.

14.5 The Engineer-In-Charge has the right to stop work if the Contractor fails to
improve upon the housekeeping after having been notified.

15. FIRE SAFETY

All necessary precautions shall be taken to prevent outbreak of fires at the


construction site. Adequate provisions shall be made to extinguish fires
should they still break out.
a) Quantifies of combustible materials like timber, bamboos, coal, paints, etc.,
shall be the minimum required in order to avoid unnecessary accumulation
of combustibles at site.

b) Containers of paints, thinners and allied materials shall be stored in a separate


room which shall be well ventilated and free from excessive heat, sparks,
flame ventilated and free from excessive heat, sparks, flame or direct rays of
the sun. The containers of paint shall be kept covered or properly fitted with
lid and shall not be kept open except while using.

c) Fire extinguishers as approved by the Engineer-In-Charge shall be located at the


construction site at appropriate places.

99

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
13. ײֻ֕Öß
úÖµÖÔÃ£Ö»Ö ¯Ö¸ü †Ã£ÖÖ‡Ô ×¾ÖªãŸÖ†Ö¯ÖæÙŸÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ­Öê ÃÖÓ²ÖÓ¬Öß ×¤ü¿ÖÖ×­Ö¤ìü¿Ö ¾Ö ײֻ֕Öß êú ¯ÖϵÖÖêÖ ÃÖÓ²ÖÓ¬Öß
¯ÖÏ׍ÎúµÖÖ‹Ó ÃÖӻ֐­Ö ¯Ö׸ü׿Ö™ü ´Öë ¤üß Ö‡Ô Æïü…
14. ÖéÆü ÃÖ••ÖÖ
14.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê úÖµÖÔãֻÖ, Ã£Ö»Ö úÖµÖÖÔ»ÖµÖ, ¾Ö †ÖÃÖ-¯ÖÖÃÖ êú Öê¡Ö úÖê ±úÖ»ÖŸÖæ ÃÖÖ´ÖÖ­Ö, ú“Ö¸êü,
†×ŸÖ׸üŒŸÖ ÃÖִ֐ÖÏß ŸÖ£ÖÖ †­ÖÖ¾Ö¿µÖú †Öî•ÖÖ¸üÖë ¾Ö ˆ¯Öú¸üÖÖë ÃÖê ´ÖãŒŸÖ ¾Ö ÃÖÖ±ú-ÃÖã£Ö¸üÖ ¸üÖëÖê…
14.2 ¾ÖêÜ»›üÖ ¾Ö †­µÖ ŸÖÖ¸üÖë úÖê ‡ÃÖ ¯ÖύúÖ¸ü ײ֔ûÖµÖÖ •ÖÖ‹ÖÖ ×ú ˆ­Öêú úÖ¸üÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ¾µÖÛŒŸÖµÖÖë úÖ †Ö¾Ö֐ִ֭Ö
ÃÖã¸ü×ÖŸÖ ¸üÆêü…
14.3 úÖµÖÔ êú ׍úÃÖß ³Öß Ã£Ö»Ö ¯Ö¸ü ‹êÃÖß úÖê‡Ô ³Öß ÃÖִ֐ÖÏß ‡ÃÖ ¯ÖύúÖ¸ü ‹ú×¡ÖŸÖ ­ÖÆüà úß •ÖÖ‹Öß ×ú ˆÃÖÃÖê ׍úÃÖß
¾µÖÛŒŸÖ µÖÖ †Ö´Ö •Ö­ÖŸÖÖ úÖê ÖŸÖ¸üÖ µÖÖ †ÃÖã×¾Ö¬ÖÖ ÆüÖê… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê †Ö´Ö •Ö­ÖŸÖÖ êú
×»Ö‹ ÖŸÖ¸ü­Ö֍ú µÖÖ †ÃÖã×¾Ö¬Ö֭֕֍ú ÃÖ´Ö—Öß •ÖÖ­Öê ¾ÖÖ»Öß ×úÃÖß ³Öß ÃÖִ֐ÖÏß úÖê Æü™üÖ­Öê êú ×»Ö‹ †Ö¤êü¿Ö ¤êü
Ã֍úŸÖê Æïü… µÖפü †Ö¾Ö¿µÖúŸÖÖ ¯Ö›Íêü ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ‹êÃÖß ÃÖִ֐ÖÏß úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú Ö“ÖÔ ¯Ö¸ü Æü™ü¾ÖÖ ³Öß
Ã֍úŸÖê Æïü…
14.4 úÖµÖÔ ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê êú ¯Ö¿“ÖÖŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔ Ã£Ö»Ö ¯Ö׸üÃÖ¸ü ÃÖê ÃÖ³Öß ¯ÖÖ›Íü, †×ŸÖ׸üŒŸÖ ÃÖִ֐ÖÏß, ±úÖ»ÖŸÖæ
ÃÖÖ´ÖÖ­Ö, †Öî¸ü ˆ­Öêú ú´ÖÔ“ÖÖ׸üµÖÖë êú ¯ÖϵÖÖêÖ êú ×»Ö‹/ãÖÖ×¯ÖŸÖ ÃÖ³Öß ú““Öê ´ÖúÖ­Ö ¾Ö ¿ÖÖî“ÖÖ»ÖµÖÖë †Öפü úß
¾µÖ¾ÖãÖÖ úÖê Æü™ü¾Ö֋ӐÖê…
14.5 µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü †×¬ÖÃÖæ×“ÖŸÖ ×ú‹ •ÖÖ­Öê êú ²ÖÖ¤ü ³Öß ÖéÆü ÃÖ••ÖÖ ÃÖÓ²ÖÓ¬Öß úÖµÖÖí ´Öë ÃÖã¬ÖÖ¸ü ú¸ü­Öê ´Öë †ÃÖ±ú»Ö
¸üÆüŸÖÖ Æîü ŸÖÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê úÖµÖÔ ¹ýú¾ÖÖ­Öê úÖ †×¬ÖúÖ¸ü Æîü…
15. †Û­Ö ÃÖÓ¸üÖÖ
×­Ö´ÖÖÔÖ Ã£Ö»Ö ¯Ö¸ü †ÖÖ »ÖÖ­Öê ÃÖê ¸üÖêú­Öê êú ×»Ö‹ ÃÖ³Öß ÃÖÖ¾Ö¬ÖÖ×­ÖµÖÖÓ †¯Ö­ÖÖ‡Õ •Ö֋ӐÖß… †Ö¸ü ×±ú¸ü ³Öß †ÖÖ
»ÖÖ •ÖÖŸÖß Æîü ŸÖÖê ˆÃÖ ¯Ö¸ü úÖ²Öæ ¯ÖÖ­Öê êú ×»Ö‹ ¯ÖµÖÖÔ¯ŸÖ ÃÖÖ¬Ö­Ö ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê…
‹) úÖµÖÔÃ£Ö»Ö ¯Ö¸ü •¾Ö»Ö­Ö¿Öᯙ ÃÖִ֐ÖÏß úÖê †­ÖÖ¾Ö¿µÖú ºþ¯Ö ÃÖê ‹ú×¡ÖŸÖ ÆüÖê­Öê ÃÖê ¸üÖêú­Öê êú ×»Ö‹ •¾Ö»Ö­Ö¿Öß»Ö
ÃÖִ֐ÖÏß •ÖîÃÖê »Öú›Íüß, ²ÖÖÓÃÖ, úÖêµÖ»ÖÖ, ¯Öë™ü †Öפü úÖê ­µÖæ­ÖŸÖ´Ö †Ö¾Ö¿µÖú ´ÖÖ¡ÖÖ ´Öë ¸üÖÖ •ÖÖ‹ÖÖ…
²Öß) ¯Öë™ü, ×£Ö­Ö¸ü ¾Ö ŸÖŸÃÖÓ²ÖÓ¬Öß ÃÖִ֐ÖÏß êú ×›ü²²ÖÖë úÖê ‹ú ¯Öé£Öú Æü¾ÖÖ¤üÖ¸ü úÖ ´Öë ¸üÖÖ •ÖÖ‹ÖÖ †Öîê¸ü ‡ÃÖê †ŸµÖ׬֍ú
Ö´Öá, ؓ֐ÖÖ¸üß, »Ö¯Ö™üÖë µÖÖ ÃÖæµÖÔ úß ÃÖ߬Öß ×ú¸üÖÖë ÃÖê ²Ö“ÖÖµÖÖ •ÖÖ‹ÖÖ… ¯Öë™ü êú ×›ü²²ÖÖë úÖê œüú ú¸ü µÖÖ ˆ×“ÖŸÖ
¯ÖύúÖ¸ü ÃÖê œüŒú­Ö »ÖÖ֍ú¸ü ¸üÖÖ •ÖÖ‹ÖÖ †Öî¸ü ‡­Æëü ¯ÖϵÖÖêÖ ú¸üŸÖê ÃÖ´ÖµÖ êú †»ÖÖ¾ÖÖ Öã»ÖÖ ­ÖÆüà ¸üÖÖ •ÖÖ‹ÖÖ…
ÃÖß) ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ †Û­Ö¿Öִ֍ú ˆ¯Öú¸üÖÖë úÖê ×­Ö´ÖÖÔÖ Ã£Ö»Ö ´Öë ˆ×“ÖŸÖ Ã£ÖÖ­ÖÖë ¯Ö¸ü »ÖÖÖµÖÖ
•ÖÖ‹ÖÖ…

99

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
d) Adequate number of contract workmen shall be given education and
training in fire fighting and extinguishing methods.

16. SAFETY WORK PERMIT

16.1 In order to ensure safety of work for hazardous operation (such as entry into
confined spaces, welding/cutting on equipment/pipes where explosion
hazard is present, works on high voltage and main medium voltage lines,
blasting etc.) special Safety Work Permits (SWP) shall be raised. The SWP’s
shall also to be obtained for any other work as recommended by Safety
Engineer.

16.2 The Contractor shall strictly ensure all the safety conditions and requirements
stipulated in the Safety Work Permit. The decision of the Safety Engineer shall
be final in this regard.

17. WORK IN RADIATION AREA

The Contractor shall follow the stipulated procedure regarding work in the radiation
area and other works related with radiography.

18. WORK IN AND AROUND WATER BODIES

When the work is done near any place where there is risk of drowning, all
necessary rescue equipment such as life buoys and life jackets shall be
provided and kept ready for use and all necessary steps taken for prompt
rescue of any person in danger and adequate provision shall be made for
prompt first-aid treatment of all injuries likely to be sustained during the course
of the work. Persons who do not know swimming shall not be engaged alone
for any work where risk of drowning exists. Sufficient number of life buoys or
life jackets shall be provided.

19. MEDICAL FACILITIES


19.1 The Contractor shall arrange adequate facilities for medical aid and
treatment for his staff and workers engaged on the work site including the
first-aid facilities if they are not available at the project site.

19.2 First-aid appliances including sterilized dressing, cotton wool and antiseptic
cream shall be made available at a readily accessible places at every work
site. These shall be maintained in good order under the charge of a
responsible person.
19.3 At large work places where hospital facilities are not available within easy
reach of the works, first-aid posts shall be established and be manned by a
trained compounder. An ambulance shall be available during the entire
period of work for attending to injury cases.

100

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
›üß) ¯ÖµÖÖÔ¯ŸÖ ÃÖӏµÖÖ ´Öë ÃÖÓ×¾Ö¤üúÖ¸ü êú úִ֐ÖÖ¸üÖë úÖê †Û­Ö¿Ö´Ö­Ö ¾Ö †Û­Ö¿Öִ֍ú ˆ¯Öú¸üÖÖë úÖ ¯ÖÏ×¿ÖÖÖ ×¤üµÖÖ
•ÖÖ‹ÖÖ…
16. ÃÖÓ¸üÖÖ úÖµÖÔ ¯Ö¸ü×´Ö™ü
16.1 ÖŸÖ¸ü­Ö֍ú ¯ÖÏ“ÖÖ»Ö­Ö úÖµÖÖí êú ×»Ö‹ (•ÖîÃÖê ‹úÖÓŸÖ êú ãÖÖ­Ö ´Öë ¯ÖϾÖê¿Ö, ×¾ÖñúÖê™ü ÆüÖê­Öê êú ÖŸÖ¸êü ¾ÖÖ»Öê ãÖÖ­ÖÖë ´Öë
¾ÖêÜ»›üÖ/úØ™üÖ, ˆ““Ö Ö´ÖŸÖÖ ¾ÖÖê»™êü•Ö ¾Ö ¯ÖÏ´ÖãÖ ´Ö¬µÖ´Ö Ö´ÖŸÖÖ ¾ÖÖê»™êü•Ö ¾ÖÖ»Öß ×¾ÖªãŸÖ »ÖÖ‡­ÖÖë ¯Ö¸ü úÖµÖÔ,
²»ÖÖÜÙüÖ †Öפü ) ×¾Ö¿ÖêÂÖ ÃÖÓ¸üÖÖ úÖµÖÔ ¯Ö¸ü×´Ö™ü (‹ÃÖ ›ü²»µÖæ ¯Öß) •ÖÖ¸üß ×úµÖÖ •ÖÖ‹ÖÖ… ÃÖÓ¸üÖÖ †×³ÖµÖÓŸÖÖ úß
ÃÖÓßÖã×ŸÖ êú †­ÖãÃÖÖ¸ü †­µÖ úÖµÖÖí êú ×»Ö‹ ³Öß ‹ÃÖ ›ü²»µÖæ ¯Öß •ÖÖ¸üß ×ú‹ •Ö֋ӐÖê…
16.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÓ¸üÖÖ úÖµÖÔ ¯Ö¸ü×´Ö™ü ´Öë ¾ÖÙÖŸÖ ÃÖ´ÖÃŸÖ ÃÖÓ¸üÖÖ ¿ÖŸÖÖí ¾Ö †Ö¾Ö¿µÖúŸÖÖ†Öë úÖ †­Öã¯ÖÖ»Ö­Ö
ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê… ‡ÃÖ ÃÖÓ²ÖÓ¬Ö ´Öë ÃÖÓ¸üÖÖ †×³ÖµÖÓŸÖÖ úÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ¾Ö ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…
17. ×¾Ö׍ú¸üÖ Öê¡Ö ´Öë úÖµÖÔ
×¾Ö׍ú¸üÖ Öê¡Ö ´Öë ¾Ö ¸êü×›üµÖÖêÖÏÖ±úß ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ †­µÖ úÖµÖÖí êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­Ö¬ÖÖÔ׸üŸÖ ¯ÖÏ׍ÎúµÖÖ úÖ
†­Öã¯ÖÖ»Ö­Ö ú¸ëüÖê…

18. •Ö»ÖßµÖ Öê¡ÖÖê ´Öë ¾Ö ˆÃ֍êú †ÖÃÖ-¯ÖÖÃÖ úÖµÖÔ


•Ö²Ö ú³Öß ›æü²Ö­Öê úê ÖŸÖ¸üê ¾ÖÖ»Öß •ÖÖÆüÖêÓ ¯Ö¸ü úÖµÖÔ ×úµÖÖ •ÖÖ­ÖÖ ÆüÖê ŸÖÖê ²Ö“ÖÖ¾Ö êú ÃÖ³Öß †Ö¾Ö¿µÖú ˆ¯Öú¸üÖ
•ÖîÃÖê »ÖÖ‡±ú ²¾ÖÖµÖ ¾Ö »ÖÖ‡±ú •Öîêú™ü †Öפü ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •Ö֋ӐÖß †Öî¸ü ÃÖ¤îü¾Ö ˆ¯ÖµÖÖêÖ êú ×»Ö‹ ŸÖîµÖÖ¸ü ¸üÖß
•Ö֋ӐÖß ŸÖ£ÖÖ ÖŸÖ¸êü ´Öë ±ÓúÃÖê ׍úÃÖß ³Öß ¾µÖÛŒŸÖ úÖê ŸÖŸúÖ»Ö ²Ö“ÖÖ­Öê êú ×»Ö‹ †Ö¾Ö¿µÖú ÃÖ³Öß ¯ÖϲÖÓ¬Ö ×ú‹
•Ö֋ӐÖê ¾Ö úÖµÖÔ êú ¤üÖî¸üÖ­Ö ÃÖ³Öß ÃÖÓ³ÖÖ×¾ÖŸÖ “ÖÖê™üÖë †Öפü êú ˆ¯Ö“ÖÖ¸ü êú ×»Ö‹ ŸÖŸúÖ»Ö ¯ÖÏÖ£Ö״֍ú דÖ׍úŸÃÖÖ
ˆ¯Ö»Ö²¬Ö ú¸üÖ­Öê êú ÃÖ³Öß ¯ÖϲÖÓ¬Ö ×ú‹ •Ö֋ӐÖê… ŸÖî¸ü­ÖÖ ­Ö •ÖÖ­Ö­Öê ¾ÖÖ»Öê »ÖÖêÖÖë úÖê ›æü²Ö­Öê êú ÖŸÖ¸êü ¾ÖÖ»Öê ׍úÃÖß
³Öß úÖ´Ö ´Öë †êú»Öê ­ÖÆüà »ÖÖÖµÖÖ •ÖÖ‹ÖÖ… ¯ÖµÖÖÔ¯ŸÖ ÃÖӏµÖÖ ´Öë »ÖÖ‡±ú •Öîêú™ü ¾Ö »ÖÖ‡±ú ²¾ÖÖµÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‹
•Ö֋ӐÖê…
19. דÖ׍úŸÃÖÖ ÃÖã×¾Ö¬ÖÖ‹Ó
19.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ×­ÖµÖÖê×•ÖŸÖ ×ú‹ Ö‹ †¯Ö­Öê ÃÖ³Öß ú´ÖÔ“ÖÖ׸üµÖÖë ¾Ö úִ֐ÖÖ¸üÖë êú ×»Ö‹ ¯ÖÏÖ£Ö״֍ú
דÖ׍úŸÃÖÖ ÃÖã×¾Ö¬ÖÖ, µÖפü ¾ÖÆü ¯Ö׸üµÖÖê•Ö­ÖÖ Ã£Ö»Ö ¯Ö¸ü ˆ¯Ö»Ö²¬Ö ­Ö ÆüÖê ŸÖÖê, ÃÖ×ÆüŸÖ ¯ÖµÖÖÔ¯ŸÖ דÖ׍úŸÃÖÖ ÃÖÆüÖµÖŸÖÖ ¾Ö
ˆ¯Ö“ÖÖ¸ü úß ¾µÖ¾ÖãÖÖ ú¸ëüÖê…
19.2 ¯ÖÏŸµÖêú úÖµÖÔÃ£Ö»Ö êú ÃÖãÖ´µÖ ãÖÖ­Ö ¯Ö¸ü úß™ü֝Öã ´ÖãŒŸÖ ¯Ö¼üß, ¹ý‡Ô ¾Ö ‹Ó™üßÃÖêÛ¯™üú ´Ö»ÖÆü´Ö ÃÖ×ÆüŸÖ ¯ÖÏÖ£Ö״֍ú
ˆ¯Ö“ÖÖ¸ü ˆ¯Öú¸üÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê… ‡­Æëü ׍úÃÖß ×•Ö´´Öê¤üÖ¸ü ¾µÖÛŒŸÖ úß ×­ÖÖ¸üÖ­Öß ´Öë †“”ûß ÆüÖ»ÖŸÖ ´Öë
¸üÖÖ •ÖÖ‹ÖÖ…
19.3 ×¾Ö¿ÖÖ»Ö úÖµÖÔãֻÖÖë ¯Ö¸ü •ÖÆüÖÓ úÖµÖÔ êú †ÖÃÖ-¯ÖÖÃÖ †Ã¯ÖŸÖÖ»Ö ÃÖã×¾Ö¬ÖÖ ÃÖã»Ö³Ö ­Ö ÆüÖ,ê ¯ÖÏÖ£Ö״֍ú ˆ¯Ö“ÖÖ¸ü
“ÖÖî׍úµÖÖÓ Ã£ÖÖ×¯ÖŸÖ úß •Ö֋ӐÖß †Öî¸ü ‡­Æëü ¯ÖÏ׿Ö×ÖŸÖ Óú¯ÖÖˆÓ›ü¸üÖë «üÖ¸üÖ ÃÖÓ“ÖÖ×»ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ… ¤ãü‘ÖÔ™ü­ÖÖ êú
´ÖÖ´Ö»ÖÖë úÖê ¤êüÖ­Öê êú ×»Ö‹ úÖµÖÔ úß ¯Öæ¸üß †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö ‹ú ‹´²Öã»ÖëÃÖ ˆ¯Ö»Ö²¬Ö ¸üÖß •ÖÖ‹Öß…

100

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
20. SAFETY OFFICER / SAFETY COORDINATOR
The Contractor shall have a Safety Officer or a supervisor to be designated as
a Safety Coordinator in order to specifically look into the implementation of
different safety requirements of the contract work. The person thus
designated will in general co-ordinate with the Engineer-In-Charge on
matters of safety and in particular ensure that the Safety Guide is complied
with fully. His name shall be displayed on the Notice Board at a prominent
place at the work site.
21. REPORTING OF ACCIDENT
21.1 All accidents leading to property damage and/or personnel injuries shall be
reported to the Engineer-In-Charge immediately who shall inform SARCOP to
be followed up with detailed accident reports in prescribed form.

21.2 Contractor shall also submit a monthly statement of accidents to Engineer-In-


Charge by 4th of every month showing details of accident, nature of injury
including disability, days lost, treatment required, etc. and the extent of
property damage.
22. PUBLIC PROTECTION
The Contractor shall make all necessary provisions to protect the public. He
shall be bound to bear the expenses for defense of every action or other
proceedings at law that may be brought by any person for injury sustained
owing to neglect of any precaution required to be taken to protect the
public. He shall pay any damage and cost which may be awarded in any
such suit, action or proceedings to any such person, or the amount which
may be fixed as a compromise by any such person.
23. OTHER STATUTORY PROVISIONS
Notwithstanding the above clauses from 1 to 21 there is nothing in these to
exempt the Contractor from the provisions of any other Act or Rules in force
in the Republic of India. In particular, all operations involving the transport,
handling, storage and use of explosives shall be as per the standing
instructions and conform with the Indian Explosives Act, 1884 and the
Explosives Rules, 1983. Handling, transport, storage and use of compressed
gas cylinders and pressure vessels shall conform with the Gas Cylinder Rules,
1981 and Static and Mobile Pressure Vessels (Unfired) Rules, 1981. In addition,
the Indian Electricity Act, 1910 and Indian Electricity Rules, 1956, the Atomic
Energy Act, 1962, the Radiation Protection Rules, 1971, Radiation Protection
Manual of Nuclear Facilities and the Atomic Energy (Factories) Rules, 1988
and various Rules and Act related to mining shall also be strictly complied
with.

101

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
20. ÃÖÓ¸üÖÖ †×¬ÖúÖ¸üß/ÃÖÓ¸üÖÖ ÃÖ´Ö­¾ÖµÖú
ÃÖÓ×¾Ö¤üÖ úÖµÖÔ úß ÃÖÓ¸üÖÖ ÃÖÓ²ÖÓ¬Öß ×¾Ö×³Ö®Ö †Ö¾Ö¿µÖúŸÖÖ†Öë êú ×¾Ö¿ÖêÂÖ ºþ¯Ö ÃÖê †­Öã¯ÖÖ»Ö­Ö êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü
‹ú ÃÖÓ¸üÖÖ †×¬ÖúÖ¸üß µÖÖ ‹ú ¯ÖµÖÔ¾ÖêÖú וÖÃÖê ÃÖÓ¸üÖÖ ÃÖ´Ö­¾ÖµÖú êú ºþ¯Ö ´Öë ¯Ö¤ü­ÖÖ×´ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ,
¸üÖëÖê… µÖÆü ¯Ö¤ü­ÖÖ×´ÖŸÖ ¾µÖÛŒŸÖ ÃÖÖ´ÖÖ­µÖŸÖµÖÖ ÃÖÓ¸üÖÖ ÃÖÓ²ÖÓ¬Öß ´ÖÖ´Ö»ÖÖë ¯Ö¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ÃÖÖ£Ö ÃÖ´Ö­¾ÖµÖ
ãÖÖ×¯ÖŸÖ ú¸ëüÖê †Öî¸ü ×¾Ö¿ÖêÂÖŸÖµÖÖ ÃÖÓ¸üÖÖ ×¤ü¤üٿ֍úÖ úÖ ¯ÖæÖÔºþ¯ÖêÖ †­Öã¯ÖÖ»Ö­Ö ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê… ˆ­ÖúÖ
­ÖÖ´Ö úÖµÖÔÃ£Ö»Ö êú ׍úÃÖß ¯ÖÏ´ÖãÖ ãÖÖ­Ö ¯Ö¸ »ÖÖê ÃÖæ“Ö­ÖÖ ¯Ö¼ü ´Öë ¯ÖϤüÙ¿ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…

21. ¤ãü‘ÖÔ™ü­ÖÖ úß ×¸ü¯ÖÖêÚ™üÖ


21.1 ÃÖÓ¯Ö×¢Ö úÖê ÆüÖê­Öê ¾ÖÖ»Öê ÃÖ³Öß ­ÖãúÃÖÖ­Ö †Öî¸ü/†£Ö¾ÖÖ ¾µÖÛŒŸÖµÖÖë êú ÃÖÖ£Ö ÆüÖê­Öê ¾ÖÖ»Öß ÃÖ³Öß ¤ãü‘ÖÔ™ü­ÖÖ†Öë úß
ÃÖæ“Ö­ÖÖ ŸÖŸúÖ»Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ¤üß •ÖÖ‹Öß… ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÖ¸üúÖê¯Ö (SARCOP) úÖê ‡Ã֍úß
ÃÖæ“Ö­ÖÖ ¤ëüÖê ¾Ö ‡Ã֍êú ²ÖÖ¤ü ×­Ö¬ÖÖÔ׸üŸÖ ¯ÖÏ¯Ö¡Ö ´Öë ×¾ÖßÖéŸÖ ¤ãü‘ÖÔ™ü­ÖÖ ×¸ü¯ÖÖê™Ôü ¯ÖÏê×ÂÖŸÖ ú¸ëüÖê…
21.2 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖÏŸµÖêú ´ÖÖÆü úß 4£Öß ŸÖÖ¸üßÖ úÖê ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê ´ÖÖ×Ã֍ú ¤ãü¬ÖÔ™ü­ÖÖ ×¾Ö¾Ö¸üÖ ¤ëüÖê וÖÃÖ´Öë
¤ãü‘ÖÔ™ü­ÖÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ÃÖ³Öß ×¾Ö¾Ö¸üÖ •ÖîÃÖê †¯ÖӐ֟ÖÖ ÃÖ×ÆüŸÖ “ÖÖê™ü úß ¯ÖύéúןÖ, פü­ÖÖë úÖ ­ÖãúÃÖÖ­Ö, †Ö¾Ö¿µÖú
ˆ¯Ö“ÖÖ¸ü, †Öפü ¾Ö ÃÖÓ¯Ö×¢Ö úÖê Æãü‡Ô Ö×ŸÖ úß ÃÖß´ÖÖ ×¤ü‹ •Ö֋ӐÖê…
22. •Ö­ÖŸÖÖ úß ÃÖã¸üÖÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü †Ö´Ö •Ö­ÖŸÖÖ úß ÃÖã¸üÖÖ êú ×»Ö‹ ÃÖ³Öß †Ö¾Ö¿µÖú ¯ÖÏÖ¾Ö¬ÖÖ­Ö ú¸ëüÖê… ¾Öê †Ö´Ö •Ö­ÖŸÖÖ úß ÃÖã¸üÖÖ
êú ×»Ö‹ †Ö¾Ö¿µÖú ¯ÖϲÖÓ¬Ö ­Ö ú¸ü­Öê êú úÖ¸üÖ ׍úÃÖß ¾µÖÛŒŸÖ êú ÃÖÖ£Ö Æãü‡Ô ¤ãü‘ÖÔ™ü­ÖÖ êú ×»Ö‹ ²Ö“ÖÖ¾Ö ÃÖÓ²ÖÓ¬Öß
ÃÖ³Öß úÖ¸Ôü¾ÖÖ‡µÖÖë ŸÖ£ÖÖ ¤üÖµÖ¸ü ÆüÖê­Öê ¾ÖÖ»Öê ׍úÃÖß ³Öß ´Öãú¤ü´Öë ´Öë †¯Ö­Öê ²Ö“ÖÖ¾Ö êú ×»Ö‹ ÆüÖê­Öê ¾ÖÖ»Öê Ö“ÖÔ úÖê
¾ÖÆü­Ö ú¸ü­Öê ÆêüŸÖã ²ÖÖ¬µÖ ÆüÖëÖê… ¾Öê ‹êÃÖê ׍úÃÖß ¾µÖÛŒŸÖ úÖê ‹êÃÖê ´Öãú¤ü´Öë ´Öë †¾ÖÖ›Ôü ׍ú‹ Ö‹ ׍úÃÖß Öן֯ÖæÙŸÖ µÖÖ
´Öæ»µÖ úÖ †£Ö¾ÖÖ ‹êÃÖê ¾µÖÛŒŸÖ êú ÃÖÖ£Ö ×ú‹ Ö‹ ÃÖ´Ö—ÖÖîŸÖê ´Öë ×­Ö¬ÖÖÔ׸üŸÖ úß Ö‡Ô ¸üÖ×¿Ö ³ÖãÖŸÖÖ­Ö ú¸ëüÖê…
23. †­µÖ ÃÖÓ¾Öî¬ÖÖ׭֍ú ¯ÖÏÖ¾Ö¬ÖÖ­Ö
ˆ¯ÖµÖãÔŒŸÖ †­Öã“”êû¤ü 1 ÃÖê 21 ´Öë ׍úÃÖß ²ÖÖŸÖ êú ÆüÖêŸÖê Æãü‹ ³Öß ‡­Ö´Öë ‹êÃÖÖ ãú”û ³Öß ­ÖÆüà Æî •ÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê
³ÖÖ¸üŸÖ êú ÖÖŸÖÓ¡Ö êú »Ö֐Öæ ׍úÃÖß †×¬Ö×­ÖµÖ´Ö µÖÖ ×­ÖµÖ´Ö êú ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë ÃÖê ”æû™ü פü»ÖÖŸÖÖ ÆüÖê… ×¾Ö¿ÖêÂÖŸÖ:
×¾ÖñúÖê™üúÖë êú ¯Ö׸ü¾ÖÆü­Ö, Æïü›üػ֐Ö, ³ÖÓ›üÖ¸üÖ ¾Ö ˆ¯ÖµÖÖêÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ úÖµÖÖí úÖê ãÖÖ‡Ô ×­Ö¤ìü¿ÖÖë êú †­ÖãÃÖÖ¸ü ¾Ö
³ÖÖ¸üŸÖßµÖ ×¾ÖñúÖê™üú †×¬Ö×­ÖµÖ´Ö, 1884 †Öî¸ü ×¾ÖñúÖê™üú ×­ÖµÖ´ÖÖ¾Ö»Öß 1983 êú †­Öãºþ¯Ö ׍úµÖÖ •ÖÖ‹ÖÖ…
ÃÖ³Öß ¤üÖ×²ÖŸÖ ÖîÃÖ ×ÃÖ»Öë›ü¸üÖë ¾Ö ¤üÖ²Ö ¾ÖêÃÖ»ÖÖë úß Æïü›üػ֐Ö, ¯Ö׸ü¾ÖÆü­Ö, ³ÖÓ›üÖ¸üÖ ¾Ö ¯ÖϵÖÖêÖ ÖîÃÖ ×ÃÖ»Öë›ü¸ü
×­ÖµÖ´ÖÖ¾Ö»Öß 1981 ¾Ö Ûãָü †Öî¸ü “Ö»Ö ¯ÖÏê¿Ö¸ü ¾ÖêÃÖ»ÃÖ (†­Ö±úÖµÖ›Ôü) ×­ÖµÖ´Ö, 1981 úß ¯ÖãÛ™ü ú¸üŸÖê Æãü‹
׍úµÖÖ •ÖÖ‹ÖÖ… ‡Ã֍êú †×ŸÖ׸üŒŸÖ, ³ÖÖ¸üŸÖßµÖ ×¾ÖªãŸÖ †×¬Ö×­ÖµÖ´Ö, 1910 ¾Ö ³ÖÖ¸üŸÖßµÖ ×¾ÖªãŸÖ ×­ÖµÖ´ÖÖ¾Ö»Öß
1956, ¯Ö¸ü´Ö֝Öã ‰ú•ÖÖÔ †×¬Ö×­ÖµÖ´Ö, 1962, ×¾Ö׍ú¸üÖ ²Ö“ÖÖ¾Ö ×­ÖµÖ´ÖÖ¾Ö»Öß, 1971, ­µÖæÛŒ»ÖµÖ¸ü ÃÖã×¾Ö¬ÖÖ†Öë
úÖ ×¾Ö׍ú¸üÖ ²Ö“ÖÖ¾Ö ´Öî­Öã†»Ö †Öî¸ü ¯Ö¸ü´Ö֝Öã ‰ú•ÖÖÔ (±îúŒ™ü¸üß) ×­ÖµÖ´ÖÖ¾Ö»Öß, 1988 ¾Ö Ö­Ö­Ö ÃÖê ÃÖÓ²ÖÓ׬֟Ö
×¾Ö×³Ö®Ö ×­ÖµÖ´ÖÖë ¾Ö †×¬Ö×­ÖµÖ´ÖÖë úÖ ³Öß ú›ÍüÖ‡Ô ÃÖê †­Öã¯ÖÖ»Ö­Ö ×úµÖÖ •ÖÖ‹ÖÖ…

101

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
ANNEXURE

GUIDELINES AND GENERAL PROCEDURES FOR


SUPPLY AND USE OF ELECTRICITY AT SITE

1. GENERAL

Following safety requirements shall be complied with before the Contractor uses
the power supply.

1.1 The Contractor shall submit a list of licensed electrical staff to be posted at
site.

1.2 It shall be the responsibility of the Contractor to provide and maintain


complete installation on the load side of the supply point with regard to the
safety requirements at site. All cabling and installation shall comply with the
appropriate statutory requirements given below and shall be subject to
approval of the Departmental Engineer-In-Charge/Electrical Engineer.
a) Indian Electricity Act, 1910
b) Electricity (Supply) Act, 1948
c) Indian Electricity Rules, 1956
d) National Electric Code, 1985
e) Other relevant rules of Local Bodies and Electricity Boards
After installation of the electrical power wiring works by the Contractor, form
of completion certificate as per IS 732 (Form SGCW - 1) shall be submitted by
the Contractor duly signed by the authorised valid licensed electrical
Contractor and/or supervisor along with one copy of the Contractor’s license
and/or competency certificate of supervisor issued by the Electricity
Board/Government Electricity Organisations as per the enclosure.
The power supply shall be regulated as per the terms and conditions of the
supply of the respective Electricity Boards.
1.3 (a) For purposes of electrical load and power planning by the electrical
section, the contractor shall furnish along with the tender, the estimated load
requirement of electric power for the execution of the contract works in terms
of maximum Kilo Watt or KVA demand during various periods/months of the
contract period along with the details of the construction electrical
equipment/machinery with their individual load details and
location/locations of power supply required for availing temporary electric
power supply in the standard proforma enclosed (Form SGCW - 2)

102

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¯Ö׸ü׿Ö™ü
úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖ ¾Ö ˆ¯ÖµÖÖêÖ ÆêüŸÖã פü¿ÖÖ×­Ö¤ìü¿Ö ¾Ö ÃÖÖ´ÖÖ­µÖ ¯ÖÏ׍ÎúµÖÖ‹Ó

1. ÃÖÖ´ÖÖ­µÖ

ײֻ֕Öß †Ö¯ÖæÙŸÖ úÖ ˆ¯ÖµÖÖêÖ ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­Ö´­Ö×»Ö×ÖŸÖ ÃÖÓ¸üÖÖ †Ö¾Ö¿µÖúŸÖÖ‹Ó ¯Öæ¸üß úß •Ö֋ӐÖß…
1.1 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÓµÖÓ¡Ö Ã£Ö»Ö ¯Ö¸ü ×­ÖµÖãŒŸÖ ×ú‹ Ö‹ ×¾ÖªãŸÖ »ÖÖ‡ÃÖëÃÖ¬ÖÖ¸üú ÙüÖ±ú úß ‹ú ÃÖæ“Öß ¯ÖÏßÖãŸÖ ú¸ëüÖê…
1.2 †Ö¯ÖæÙŸÖ ¯¾ÖÖ‡Ó™ü êú »ÖÖê›ü ¾ÖÖ»Öß ŸÖ¸ü±ú úß ÃÖÓ¸üÖÖ †Ö¾Ö¿µÖúŸÖÖ†Öë úÖê ¯Öæ¸üÖ ú¸ü­Öê ÃÖê ÃÖÓ²Öê×¬ÖŸÖ ÃÖÓ¯ÖæÖÔ Ã£ÖÖ¯Ö­ÖÖ
¾Ö †­Öã¸üÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ×•Ö´´Öê¤üÖ¸üß ÆüÖêÖß… êúײֻÖÖë úÖ ×²Ö”ûÖ­ÖÖ ¾Ö ãÖÖ¯Ö­Ö ­Öß“Öê ¤üß Ö‡Ô ÃÖÖÓ×¾Ö׬֍ú
†Ö¾Ö¿µÖúŸÖÖ†Öë úÖê ¯Öæ¸üÖ ú¸ü­Öê ¾ÖÖ»ÖÖ ÆüÖêÖÖ †Öî¸ü ×¾Ö³Ö֐ÖßµÖ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ/×¾ÖªãŸÖ †×³ÖµÖÓŸÖÖ êú
†­Öã´ÖÖê¤ü­Ö êú ×¾ÖÂÖµÖÖ¬Öß­Ö ÆüÖêÖÖ…
‹) ³ÖÖ¸üŸÖßµÖ ×¾ÖªãŸÖ †×¬Ö×­ÖµÖ´Ö, 1910
²Öß) ×¾ÖªãŸÖ (†Ö¯ÖæÙŸÖ) †×¬Ö×­ÖµÖ´Ö, 1948
ÃÖß) ³ÖÖ¸üŸÖßµÖ ×¾ÖªãŸÖ ×­ÖµÖ´Ö, 1956
›üß) ¸üÖ™ÒüßµÖ ×¾ÖªãŸÖ úÖê›ü, 1985
‡Ô) ãÖÖ­ÖßµÖ ×­ÖúÖµÖÖë ¾Ö ×²Ö•Ö»Öß ²ÖÖê›üÖí êú †­µÖ »Ö֐Öæ ×­ÖµÖ´Ö
†¯Ö­ÖÖ ×²Ö•Ö»Öß úß ¾ÖÖµÖظüÖ úÖµÖÔ ÃÖ´ÖÖ¯ŸÖ ú¸ü­Öê êú ²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖÏÖ׬֍éúŸÖ ¾Öî¬Ö »ÖÖ‡ÃÖëÃÖ¬ÖÖ¸üß
ÃÖÓ×¾Ö¤ü֍úÖ¸ü †Öî¸ü/†£Ö¾ÖÖ ¯ÖµÖÔ¾ÖêÖú ÃÖê ×¾Ö׬־֟ÖË ÆüßÖցָü ú¸üÖµÖÖ Æãü†Ö †Ö‡‹ÃÖ 732 (¯Öϯ֡Ö
‹ÃÖ•ÖßÃÖß›ü²»µÖæ-1) úÖ ¯ÖÏ¯Ö¡Ö †Öî¸ü ˆÃ֍êú ÃÖÖ£Ö ´Öë ÃÖӻ֐­Öú êú †­Öãºþ¯Ö ײֻ֕Öß ²ÖÖê›Ô/ÃÖ¸üúÖ¸üß ×¾ÖªãŸÖ
ÃÖӐ֚ü­Ö «üÖ¸üÖ •ÖÖ¸üß üÃÖÓ×¾Ö¤ü֍úÖ¸ü êú »ÖÖ‡ÃÖëÃÖ †Öî¸ü/†£Ö¾ÖÖ ¯ÖµÖÔ¾ÖêÖÖ Ãցִ֟ÖÖ úÖ ¯ÖÏ´ÖÖÖ¯Ö¡Ö ¯ÖÏßÖãŸÖ ú¸ëüÖê…
×¾ÖªãŸÖ úß †Ö¯ÖæÙŸÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ×²Ö•Ö»Öß ²ÖÖê›Ôü úê ×­ÖµÖ´Ö ¾Ö ¿ÖŸÖÖí êú †­ÖãÃÖÖ¸ü ×¾Ö×­ÖµÖ×´ÖŸÖ úß •ÖÖ‹Öß…
1.3(‹) ×¾ÖªãŸÖ †­Öã³ÖÖÖ «üÖ¸üÖ ×²Ö•Ö»Öß »ÖÖê›ü †Öî¸ü ¯ÖÖò¾Ö¸ü úß †ÖµÖÖê•Ö­ÖÖ ú¸ü­Öê êú ×»Ö‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú
×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ ÃÖÓ×¾Ö¤üÖ úß ×¾Ö×³Ö®Ö †¾Ö׬ֵÖÖë/´Ö×Æü­ÖÖë ´Öë †×¬ÖúŸÖ´Ö †Ö¾Ö¿µÖú ײֻ֕Öß úß ´ÖÖ¡ÖÖ úÖê
׍ú»ÖÖê¾ÖÖ™ü µÖÖ êú¾Öß‹ ‡úÖ‡Ô ´Öë ×­Ö×¾Ö¤üÖ ¯ÖÏ¯Ö¡Ö êú ÃÖÖ£Ö Æüß ¯ÖÏßÖãŸÖ ú¸ëüÖê †Öî¸ü ‡Ã֍êú ÃÖÖ£Ö Æüß ×­Ö´ÖÖÔÖ úÖµÖÖí
êú ×»Ö‹ †Ö¾Ö¿µÖú ײֻ֕Öß êú ˆ¯Öú¸üÖÖë/´Ö¿Öß­ÖÖë êú ˆ­Öêú »ÖÖê›ü ×¾Ö¾Ö¸üÖÖë ÃÖ×ÆüŸÖ ¾Ö †Ã£ÖÖ‡Ô ×¾ÖªãŸÖ
†Ö¯ÖæÙŸÖ ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ×»Ö‹ ¯ÖÖò¾Ö¸ ¯¾ÖÖ‡Ó™ü êú ü ãÖÖ­Ö/ãÖÖ­ÖÖë úÖ ³Öß ×¾Ö¾Ö¸üÖ ×­Ö¬ÖÖÔ׸üŸÖ ÃÖӻ֐­Ö ¯ÖÏ¯Ö¡Ö ´Öë
(¯ÖÏ¯Ö¡Ö ‹ÃÖ•ÖßÃÖß›ü²»µÖæ-2) ¯ÖÏßÖãŸÖ ú¸ëüÖê…

102

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(b) The electric power supply will be generally made available at one point in
the works site of the contractor by the department.
(c) Where distribution boards are located at different places the Contractor shall
submit schematic drawing indicating all details like size of wires, over head or
cable feeders, earthing, etc. The position and location of all equipment and
switches shall be given.

1.4 The Contractor shall make his own arrangements for main earth electrode
and tapping thereof. The existing earth points available at site can be used
at the discretion of the Departmental Electrical Engineer with prior permission.
Method of earthing, installation and earth testing results shall conform to
relevant I.S. specifications (IS-3043).

1.5 All three phase equipment shall be provided with double earthing. All light
fixtures and portable equipment shall be effectively earthed to main
earthing.
1.6 All earth terminals shall be visible. No gas pipes and water pipes shall be
used for earth connection. Natural conductor shall not be treated as earth
wire.
1.7 The Contractor shall not connect any additional load without prior permission
of Departmental Electrical Engineer. For obtaining additional power
required, test reports of the tests mentioned in (d) of Form SGCW - 1 shall be
submitted.
1.8 Joints in earthing conductors shall be avoided. Loop earthing of equipment
shall not be allowed. However tappings from an earth bus may be done.
1.9 The entire installation shall be subjected to the following tests before
energisation of installation including portable equipment :
a) Insulation resistance test
b) Polarity test of switches
c) Earth continuity test
d) Earth electrode resistance
The test procedures and their results shall conform to relevant IS
specifications. The Contractor shall submit a test report for his complete
installation every 2 months or after rectifying any fault section in the specimen
test report. One such test report for the complete installation shall be
submitted before onset of monsoon.

103

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(²Öß) ÃÖÖ´ÖÖ­µÖŸÖµÖÖ ×¾Ö³ÖÖÖ «üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úÖµÖÔÃ£Ö»Ö êú ‹ú ãÖÖ­Ö ¯Ö¸ü ײֻ֕Öß úß †Ö¯ÖæÙŸÖ úß •ÖÖ‹Öß…
(ÃÖß) •ÖÆüÖÓ úÆüà ×¾ÖªãŸÖ ×¾ÖŸÖ¸üÖ ²ÖÖê›Ôü ×¾Ö×³Ö®Ö Ã£ÖÖ­ÖÖë ¯Ö¸ü †¾ÖÛÃ£ÖŸÖ ÆüÖë ¾ÖÆüÖÓ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖæÖÔ ×¾Ö¾Ö¸üÖ •ÖîÃÖê ŸÖÖ¸ü êú
†ÖúÖ¸ü, †Öê¾Ö¸ü Æêü›ü êú×²Ö»Ö µÖÖ êú×²Ö»Ö ±úß›ü¸, †Ú£ÖÖü †Öפü úÖ µÖÖê•Ö­ÖÖ²Ö¨ü †Ö¸êüÖ ¯ÖÏßÖËãŸÖ ú¸ëüÖê… ÃÖ³Öß
ˆ¯Öú¸üÖÖë ¾Ö Ûþ֓ÖÖë úß †¾ÖÛãÖ×ŸÖ úß ³Öß •Ö֭֍úÖ¸üß ¤üß •ÖÖ‹Öß…
1.4 ´ÖãµÖ †£ÖÔ ‡»ÖꌙÒüÖê›ü ¾Ö ˆÃ֍êú ‰ú¯Ö¸ü »ÖÖÖ‹ •ÖÖ­Öê ¾ÖÖ»Öê ÃÖ´ÖÃŸÖ ÃÖÖ´ÖÖ­Ö úß ¾µÖ¾ÖãÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê þֵÖÓ
Æüß ú¸ü­Öß ÆüÖêÖß… úÖµÖÔÃ£Ö»Ö ¯Ö¸ü ˆ¯Ö»Ö²¬Ö †Ú£ÖÖ ¯¾ÖÖ‡Ó™ü úÖ ˆ¯ÖµÖÖêÖ ×¾Ö³Ö֐ÖßµÖ ×¾ÖªãŸÖ †×³ÖµÖÓŸÖÖ úß ¯Öæ¾ÖÔ
†­Öã´Ö×ŸÖ ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ²ÖÖ¤ü ׍úµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü… †Ú£ÖÖ, ãÖÖ¯Ö­Ö ¾Ö †£ÖÔ ¯Ö¸üßÖÖ ¯Ö׸üÖÖ´Ö ÃÖÓ²ÖÓ׬֟Ö
³ÖÖ¸üŸÖßµÖ ´Ö֭֍ú (†Ö‡Ô‹ÃÖ) êú ×¾Ö×­Ö¤ìü¿ÖÖë (†Ö‡Ô‹ÃÖ-3043) êú †­ÖãÃÖÖ¸ü ÆüÖëÖê…
1.5 ÃÖ³Öß ŸÖß­Ö ±êúÃÖ ¾ÖÖ»Öê ˆ¯Öú¸üÖÖë ´Öë ¤ãüÖã­Öß †Ú£ÖÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‡Ô •ÖÖ‹Öß… ÃÖ³Öß »ÖÖ‡™ü ˆ¯Öú¸üÖ ¾Ö Æü»êú
ˆ¯Öú¸üÖÖë úÖê ´Öê­Ö †Ú£ÖÖ êú ÃÖÖ£Ö ´Ö•Ö²ÖæŸÖß ÃÖê †£ÖÔ ×úµÖÖ •ÖÖ‹ÖÖ…
1.6 ÃÖ³Öß †£ÖÔ ™üÙ´Ö­Ö»Ö ¥ü¿µÖ´ÖÖ­Ö ÆüÖëÖê… †£ÖÔ ÃÖÓ²ÖÓ¬Ö êú ×»Ö‹ ׍úÃÖß ÖîÃÖ µÖÖ ¯ÖÖ­Öß êú ¯ÖÖ‡¯Ö úÖ ‡ÃŸÖê´ÖÖ»Ö ­ÖÆüà
׍úµÖÖ •ÖÖ‹ÖÖ… †Ö¾Öê¿Ö¸ü×ÆüŸÖ ÃÖã“Öֻ֍úÖë úÖê †£ÖÔ¾ÖÖµÖ¸ü úß ŸÖ¸üÆü ¯ÖϵÖÖêÖ ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ…
1.7 ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×¾Ö³Ö֐ÖßµÖ ×¾ÖªãŸÖ †×³ÖµÖÓŸÖÖ úß ¯Öæ¾ÖÖÔ­Öã´Ö×ŸÖ êú ²ÖÖî¸ü úÖê‡Ô †×ŸÖ׸üŒŸÖ »ÖÖê›ü ­ÖÆüà »ÖÖ֋ӐÖê…
†Ö¾Ö¿µÖú †×ŸÖ׸üŒŸÖ ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖ êú ×»Ö‹ ‹ÃÖ•ÖßÃÖß›ü²»µÖæ-1 ¯ÖÏ¯Ö¡Ö êú úÖò»Ö´Ö (›üß) ´Öë ¾ÖÙ¾ÖŸÖ •ÖÖÓ“Ö úß
•ÖÖÓ“Ö ×¸ü¯ÖÖê™Ôü ¯ÖÏßÖãŸÖ úß •ÖÖ‹Öß…
1.8 †Ú£ÖÖ ÃÖã“Öֻ֍úÖë ´Öë •ÖÖê›Íü »ÖÖÖ­Öê ÃÖê ²Ö“ÖÖ •ÖÖ‹ÖÖ… »Öæ¯Ö †Ú£ÖÖ úß †­Öã´Ö×ŸÖ ­ÖÆüà ¤üß •ÖÖ‹Öß… ŸÖ£ÖÖ×¯Ö ×úÃÖß
†£ÖÔ ÃÖê ™îüØ¯ÖÖ úß •ÖÖ Ã֍úŸÖß Æîü…
1.9 Æü»êú ˆ¯Öú¸üÖÖë ÃÖ×ÆüŸÖ ÃÖÓ¯ÖæÖÔ Ã£ÖÖ¯Ö­Ö ´Öë ×¾ÖªãŸÖ ¯ÖϾÖÖ×ÆüŸÖ ׍ú‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê µÖÆü ×­Ö´­Ö×»Ö×ÖŸÖ ¯Ö¸ü߁֝ÖÖë êú
×¾ÖÂÖµÖÖ¬Öß­Ö ÆüÖêÖÖ :
‹) ‡ÓÃÖã»Öê¿Ö­Ö ¯ÖÏןָüÖê¬Öú ¯Ö¸ü߁֝Ö
²Öß) Ûþ֓ÖÖë úÖ ¯ÖÖê»Öî׸ü™üß ¯Ö¸ü߁֝Ö
ÃÖß) †£ÖÔ ¯ÖϾÖÖÆüŸÖÖ ¯Ö¸ü߁֝Ö
›üß) †£ÖÔ ‡»ÖꌙÒüÖê›ü ¯ÖÏןָüÖê¬Ö ¯Ö¸ü߁֝Ö
¯Ö¸üßÖÖ úß ×¾Ö×¬Ö ¾Ö ˆ­Öêú ¯Ö׸üÖÖ´Ö ÃÖÓ²ÖÓ×¬ÖŸÖ ³ÖÖ¸üŸÖßµÖ ´Ö֭֍ú ×¾Ö×­Ö¤ìü¿ÖÖë úß ¯ÖãÛ™ü ú¸ü­Öê ¾ÖÖ»Öê
ÆüÖëÖê… ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¯ÖÏŸµÖêú 2 ´ÖÖÆü ´Öë †£Ö¾ÖÖ ­Ö´Öæ­ÖÖ ¯Ö¸üßÖÖ ´Öë ¯ÖÏÖ¯ŸÖ ׍úÃÖß ¤üÖêÂÖ êú ×­Ö¾ÖÖ¸üÖ êú ²ÖÖ¤ü ÃÖÓ¯ÖæÖÔ
ãÖÖ¯Ö­Ö úß •ÖÖÓ“Ö ×¸ü¯ÖÖê™Ôü ¯ÖÏßÖãŸÖ ú¸ëüÖê… ÃÖÓ¯ÖæÖÔ Ã£ÖÖ¯Ö­Ö úß ‹êÃÖß Æüß ‹ú •ÖÖÓ“Ö ×¸ü¯ÖÖê™Ôü ´ÖÖ­ÖÃÖæ­Ö ÃÖ¡Ö êú ¯ÖÏÖ¸Óü³Ö
ÆüÖê­Öê ÃÖê ¯ÖÆü»Öê ¯ÖÏßÖãŸÖ úß •ÖÖ‹Öß…

103

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
2. The following are provided for general guidance of the Contractor and shall
be read a specific requirement, in addition to complying with Indian
Electricity Act, Indian Electricity Rules and IS specifications.

2.1 INSTALLATION
a) Only persons having valid wireman’s license/competency certificate shall be
employed for carrying out electrical work and repair of electrical equipment,
installation and maintenance at site. The job shall be supervised by a
qualified licensed supervisor.

b) Electrical equipment and installations shall be installed and maintained as to


prevent danger from contract with live conductors and to prevent fires
originating from electrical causes like short circuits, overheating, etc.
Installation shall not cause any hindrance to movement of men and
materials.

c) Materials for all electrical equipment shall be selected with regard to working
voltage, load and working environment. Such equipment shall conform to
the relevant standards.

d) The minimum clearance to be maintained for all overhead lines along roads
and across roads shall be as per the statutory requirements as listed in Clause
1.2 of the Annexure.

e) Grounding conductor of wring system shall be of copper or other corrosion-


resistant material. An extra grounding connection shall be made in
appliances/equipment where chances of electric shock is high.

f) Electric fuses and/or circuit breakers installed in equipment circuits for short
circuit protection shall be of proper rating. It is also recommended that high
rupturing capacity (HRC) fuses be used in all circuits. For load of 5 KW or
more earth leakage circuit breaker shall be provided in the circuits.
g) Wherever cables or wires are laid on poles, a guard wire of adequate size shall
be run along the cables/wires and earthed effectively. Metallic poles as a
general rules, shall be avoided and if used shall be earthed individually.
Anticlimbing guards and danger notices shall be provided on poles. Each
equipment shall have individual isolating switches.

104

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
2. ×­Ö´­Ö×»Ö×ÖŸÖ úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖÖ´ÖÖ­µÖ פü¿ÖÖ×­Ö¤ìü¿Ö ¤êü­Öê êú ×»Ö‹ ˆ¯Ö»Ö²¬Ö ú¸üÖµÖÖ •ÖÖ ¸üÆüÖ Æîü †Öî¸ü ‡­Æëü
³ÖÖ¸üŸÖßµÖ ×¾ÖªãŸÖ †×¬Ö×­ÖµÖ´Ö, ³ÖÖ¸üŸÖßµÖ ×¾ÖªãŸÖ ×­ÖµÖ´ÖÖë †Öî¸ü ³ÖÖ¸üŸÖßµÖ ´Ö֭֍ú ×¾Ö×­Ö¤ìü¿ÖÖë êú †­Öã¯ÖÖ»Ö­Ö êú
ÃÖÖ£Ö-ÃÖÖ£Ö ‹ú ×¾Ö׿Ö™ü †Ö¾Ö¿µÖúŸÖÖ êú ºþ¯Ö ´Öë ¯ÖœÍüÖ •ÖÖ‹ÖÖ…
2.1 ãÖÖ¯Ö­Ö
‹) ײֻ֕Öß êú ˆ¯Öú¸üÖÖë, úÖµÖÔÃ£Ö»Ö ´Öë ײֻ֕Öß êú úÖµÖÖí êú ãÖÖ¯Ö­Ö ¾Ö †­Öã¸üÖÖ úÖµÖÔ †Öפü êú ×»Ö‹ êú¾Ö»Ö
¾ÖÖµÖ¸ü´Öî­Ö »ÖÖ‡ÃÖëÃÖ¬ÖÖ¸üúÖë/Ãցִ֟ÖÖ ¯ÖÏ´Ö֝֯֡֬ÖÖ¸üúÖë ÃÖê Æüß úÖ´Ö ú¸üÖµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖ úÖµÖÔ úÖ ¯ÖµÖÔ¾ÖêÖÖ
µÖÖꐵ֟ÖÖ¬ÖÖ¸üß »ÖÖ‡ÃÖëÃÖß ¯ÖµÖÔ¾ÖêÖúÖë ÃÖê ú¸üÖµÖÖ •ÖÖ‹ÖÖ…
²Öß) ײֻ֕Öß êú ˆ¯Öú¸üÖÖë ¾Ö Ã£ÖÖ¯Ö­ÖÖ†Öë úÖ Ã£ÖÖ¯Ö­Ö ¾Ö †­Öã¸üÖÖ ‡ÃÖ ¯ÖύúÖ¸ü ׍úµÖÖ •ÖÖ‹ÖÖ ×ú ¬ÖÖ¸üÖ ¯ÖϾÖÖ×ÆüŸÖ
ÃÖã“Öֻ֍úÖë êú ”æû­Öê êú ÖŸÖ¸üÖë †Öî¸ü ײֻ֕Öß êú úÖ¸üÖÖë •ÖîÃÖê ¿ÖÖò™Ôü ÃÖٍú™ü †×¬Öú Ö´Öá †Öפü êú úÖ¸üÖ
»ÖÖ­Öê ¾ÖÖ»Öß †ÖÖ ÃÖê ²Ö“ÖÖ¾Ö ÆüÖê… ‡­Öêú ãÖÖ¯Ö­Ö êú úÖ¸üÖ »ÖÖêÖÖë ¾Ö ÃÖÖ´ÖÖ­Ö úÖ †Ö¾ÖÖÖ´Ö­Ö ²ÖÖ×¬ÖŸÖ ­ÖÆüà
׍úµÖÖ •ÖÖ‹ÖÖ…
ÃÖß) ÃÖ³Öß ×²Ö•Ö»Öß “ÖÖ×»ÖŸÖ ˆ¯Öú¸üÖÖë úß ÃÖִ֐ÖÏß ˆ­Öêú ¾ÖÖê»™êü•Ö ¯ÖϵÖÖêÖ, »ÖÖê›ü ¾Ö úÖµÖÔ êú ´ÖÖÆüÖî»Ö êú †Ö¬ÖÖ¸ü
¯Ö¸ü “Öã­Öß •ÖÖ­Öß “ÖÖ×Æü‹… µÖê ˆ¯Öú¸üÖ úÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ´Ö֭֍úÖêÓ êú †­Öãºþ¯Ö ÆüÖëÖê…
›üß) ÃÖ›ÍüúÖë êú ÃÖÖ£Ö-ÃÖÖ£Ö “Ö»Ö­Öê ¾ÖÖ»Öê ¾Ö ÃÖ›Íüú êú †Ö¸ü-¯ÖÖ¸ü Öã•Ö¸ü­Öê ¾ÖÖ»Öê ÃÖ³Öß †Öê¾Ö¸üÆêü›ü ŸÖÖ¸üÖë úß ­µÖæ­ÖŸÖ´Ö
ÛŒ»ÖµÖ¸ëüÃÖ ¯Ö׸ü׿Ö™ü êú †­Öã“”êû¤ü 1.2 ´Öë ¤üß Ö‡Ô ÃÖÖÓ×¾Ö׬֍ú †Ö¾Ö¿µÖúŸÖÖ êú †­ÖãÃÖÖ¸ü ¸üÖß •ÖÖ‹Öß…
‡Ô) ¾ÖÖµÖظüÖ ¯ÖϝÖÖ»Öß êú ÖÏÖˆÓØ›üÖ ÃÖã“Öֻ֍ú ŸÖÖÓ²Öê µÖÖ †­µÖ •ÖӐָüÖê¬Öß ¬ÖÖŸÖ㠍êú ²Ö­Öê ÆüÖêӐÖê… —Ö™üêú »ÖÖ­Öê úß
†×¬Öú ÃÖÓ³ÖÖ¾Ö­ÖÖ ¾ÖÖ»Öê ˆ¯Öú¸üÖÖë ´Öë ‹ú †×ŸÖ׸üŒŸÖ ÖÏÖˆÓØ›üÖ ú­ÖêŒ¿Ö­Ö ×úµÖÖ •ÖÖ‹ÖÖ…
‹±ú) ײֻ֕Öß êú °µÖæ•ÖÌ/ˆ¯Öú¸üÖÖë ´Öë ¿ÖÖò™Ôü ÃÖٍú™ü ¸üÖêú­Öê êú ×»Ö‹ »ÖÖÖ‹ Ö‹ ÃÖٍú™ü ²ÖÎêú¸ü ˆ×“ÖŸÖ ¸êüØ™üÖ êú ÆüÖê­Öê
“ÖÖ×Æü‹… ÃÖ³Öß ÃÖٍú™üÖë ´Öë ˆ““Ö ¸ü¯“ÖظüÖ Ö´ÖŸÖÖ (‹“Ö†Ö¸üÃÖß) ¾ÖÖ»Öê °µÖæ•ÖÖë úê ˆ¯ÖµÖÖêÖ úß ³Öß ÃÖÓßÖã×ŸÖ úß
•ÖÖŸÖß Æîü… 5 ׍ú»ÖÖê¾ÖÖ™ü µÖÖ †×¬Öú »ÖÖê›ü êú ÃÖٍú™üÖë êú ×»Ö‹ †£ÖÔ »Öߍêú•Ö ÃÖٍú™ü ²ÖÎêú¸ü »ÖÖÖ‹ •Ö֋ӐÖê…
•Öß) •ÖÆüÖÓ úÆüàÓ êú×²Ö»Ö µÖÖ ŸÖÖ¸üÖë úÖê Ö´³ÖÖë ¯Ö¸ü »ÖÖÖµÖÖ •ÖÖŸÖÖ Æîü, êúײֻÖÖë/ŸÖÖ¸üÖë êú ÃÖÖ£Ö-ÃÖÖ£Ö ˆ×“ÖŸÖ †ÖúÖ¸ü úÖ
‹ú ÖÖ›Ôü ¾ÖÖµÖ¸ü ³Öß »ÖÖÖµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ‡ÃÖê ¯ÖϳÖÖ¾Öß œÓüÖ ÃÖê †£ÖÔ ×úµÖÖ •ÖÖ‹ÖÖ… ‹ú ÃÖÖ´ÖÖ­µÖ ×­ÖµÖ´Ö êú
ºþ¯Ö ´Öë ¬ÖÖŸÖ㠍êú Ö´³ÖÖë úÖ ¯ÖϵÖÖêÖ ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü µÖפü ‡­ÖúÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ¯ÖÏŸµÖêú
Ö´³Öê úÖê †»ÖÖ-†»ÖÖ †£ÖÔ ×úµÖÖ •ÖÖ‹ÖÖ… Ö´³ÖÖë ¯Ö¸ü “ÖœÍü­ÖÖ ¸üÖêú­Öê ¾ÖÖ»Öê ÖÖ›Ôü ¾Ö ÖŸÖ¸êü úß “ÖêŸÖÖ¾Ö­Öß
¾ÖÖ»Öê ²ÖÖê›Ôü »ÖÖÖ‹ •Ö֋ӐÖê… ¯ÖÏŸµÖêú ˆ¯Öú¸üÖ úÖ ¾µÖÛŒŸÖÖŸÖ †Ö‡ÃÖÖê»Öê¿Ö­Ö ÛÃ¾Ö“Ö ÆüÖêÖÖ…

104

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
h) Wires and cables shall be properly supported and an approved method of
fixing shall be adopted. Loose hanging of wires & cables shall be avoided.
Lighting and power circuits shall be kept distinct and separate.

i) Reinforcement rods or any metallic part of structure shall not be used for
supporting wires and cables, fixtures, equipment, earthing, etc.

j) All cables and wires shall be adequately protected mechanically against


damages. In case the cable is required to be laid under ground, it shall be
adequately protected by covering the same with bricks, plain cement concrete
(PCC) tile or any other approved means.

k) All armoured cables shall be properly terminated by using suitable cable glands.
Multi-stranded conductor cables shall be connected by using cable
lugs/sockets. Cable lugs shall preferably be crimped. They shall be of proper size
and shall correspond to the current rating and size of the cable. Twisted
connections will not be allowed.

l) All cable glands, amouring and sheathing of electric cables, metal circuits and
their fittings, metallic fittings and other non-current carrying parts of electrical
equipment and apparatus shall be effectively grounded.

m) All the Distribution Boards, switch fuse units, bus bar chambers, ducts, cubicles,
etc. shall have MS enclosures and shall be dust, vermin and water proof. The
Distribution Boards, switches, etc., shall be so fixed that they shall be easily
accessible. Changes shall be done only after the approval of the Departmental
Electrical Engineer.

n) The Contractor shall provide proper enclosures/covers of approved size and


shape for protection of all the switch board, equipment, etc. against rain.
Exposed live parts of all electrical circuits & equipment shall be enclosed
permanently. Crane trolley wires and other conductors which cannot be
completely insulated shall be placed such that they are inaccessible under
normal working conditions.

o) Iron clad industrial type plug outlets are preferred for additional safety.

105

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
‹“Ö) ŸÖÖ¸üÖë †Öî¸ü êúײֻÖÖë úÖê ˆ×“ÖŸÖ ¯ÖύúÖ¸ü ÃÖê ÃÖÆüÖ¸üÖ ×¤üµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ‡­Æëü »ÖÖÖ­Öê êú ×»Ö‹ †­Öã´ÖÖêפüŸÖ ×¾Ö׬Ö
úÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ… Öã»Öê »Ö™üúŸÖê Æãü‹ ŸÖÖ¸ »ÖÖÖ­Öê ÃÖê ²Ö“ÖÖ •ÖÖ‹ÖÖ… ¸üÖê¿Ö­Öß †Öî¸ü ¯ÖÖò¾Ö¸ü êú ¯Ö׸ü¯Ö£Ö
†»ÖÖ-†»ÖÖ ¾Ö ‹ú ¤æüÃÖ¸êü ÃÖê ¤æü¸ü ÆüÖëÖê…
†Ö‡Ô) ׍úÃÖß œüÖÓ“Öê úß ¯ÖϲÖ×»ÖŸÖ ¸üÖ›üÖë µÖÖ †­µÖ ¬ÖÖŸÖ㠍úê ³Ö֐ÖÖë úÖê êú×²Ö»Ö †Öî¸ü ŸÖÖ¸üÖ,ë ÃÖÖ´ÖÖ­ÖÖë, ˆ¯Öú¸üÖÖë, †Ú£ÖÖ
êú ÃÖÆüÖ¸êü êú ×»Ö‹ ¯ÖϵÖÖêÖ ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ…
•Öê) ÃÖ³Öß êú×²Ö»Ö ¾Ö ŸÖÖ¸ÖêÓ úÖ Ö×ŸÖ êú ×¾Ö¹ý¨ü µÖÖÓס֍ú œÓüÖ ÃÖê ²Ö“ÖÖ¾Ö ×úµÖÖ •ÖÖ‹ÖÖ… µÖפü êúײֻÖÖë úÖê •Ö´Öß­Ö
êú ­Öß“Öê ײ֔ûÖ­ÖÖ ÆüÖê ŸÖÖê ‡­Æëü ‡Õ™üÖê, ÃÖÖ¤üÖ ÃÖß´Öë™ü ÓúÎúß™ü(¯ÖßÃÖßÃÖß) êú ™üÖ‡»ÖÖë µÖÖ †­µÖ ׍úÃÖß †­Öã´ÖÖêפüŸÖ
ŸÖ¸üߍêú ÃÖê œüúÖ •ÖÖ‹ÖÖ…
êú) ÃÖ³Öß †Ö¸ü´ÖÔ›ü êúײֻÖÖë êú †Ó×ŸÖ´Ö ×ÃÖ¸üÖë úÖê ˆ×“ÖŸÖ êú×²Ö»Ö »Öï›üÖë úÖ ¯ÖϵÖÖêÖ ú¸üŸÖê Æãü‹ šüߍú ŸÖ¸üÆü ÃÖê ÖŸ´Ö
׍úµÖÖ •ÖÖ‹ÖÖ… ²ÖÆãü»Ö ×ÃÖ¸üÖë ¾ÖÖ»Öß ÃÖã“Öֻ֍ú êúײֻÖÖë úÖê êú×²Ö»Ö »ÖÃÖ/ÃÖÖòêú™ü úÖ ¯ÖϵÖÖêÖ ú¸üŸÖê Æãü‹ •ÖÖê›ÍüÖ
•ÖÖ‹ÖÖ… êú×²Ö»Ö »ÖÃÖ úÖê ´ÖÖê›Íü­ÖÖ ²ÖêÆüŸÖ¸ü ÆüÖêÖÖ… ¾Öê ˆ×“ÖŸÖ †ÖúÖ¸ü êú ÆüÖëÖê †Öî¸ü êú×²Ö»Ö úß ¾ÖŸÖÔ´ÖÖ­Ö ¸êüØ™üÖ
¾Ö †ÖúÖ¸ü êú ÆüÖëÖê… ´Öã›Íêü Æãü‹ •ÖÖê›Íü þÖߍúÖµÖÔ ­ÖÆüà ÆüÖëÖê…
‹»Ö) ÃÖ³Öß êú×²Ö»Ö »Öï›ü, •ÖÖê›ê Æãü‹ µÖÖ œüêú Æãü‹ Íüײֻ֕Öß êúײֻÖÖë, ¬ÖÖŸÖã ¯Ö׸ü¯Ö£ÖÖë ¾Ö ˆ­Öúß ×±úØ™üÖ, ¬ÖÖŸÖã ×±úØ™üÖ
¾Ö ײֻ֕Öß êú ˆ¯Öú¸üÖÖë ¾Ö ˆ¯ÖÍú¸üÖë êú †­µÖ ×¾ÖªãŸÖ ¯ÖϾÖÖÆü ×¾ÖÆüß­Ö ³Ö֐ÖÖë úÖê ¯ÖϳÖÖ¾Öß œÓüÖ ÃÖê •Ö´Öß­Ö ÃÖê
•ÖÖê›ÍüÖ •ÖÖ‹ÖÖ…
‹´Ö) ‡­Öêú ÃÖ³Öß ×¾ÖŸÖ¸üÖ ²ÖÖê›Ôü, ÛÃ¾Ö“Ö °µÖæ•Ö ‡úÖ‡µÖÖÓ, ²ÖÃÖ ²ÖÖ¸ü “Öî´²Ö¸ü, ­Ö׻֍úÖ‹Ó, ŒµÖæײÖ׍ú»ÃÖ †Öפü ´ÖÖ‡»›ü
Ùüᯙ êú ³Öߟָü ÆüÖëÖê †Öî¸ü µÖÆü ¬Öæ»Ö, ”ûÖê™êü-´ÖÖê™êü •Öß¾Ö-•ÖÓŸÖã†Öë ¾Ö ¯ÖÖ­Öß ¸üÖê¬Öß ÆüÖëÖê… ×¾ÖŸÖ¸üÖ ²ÖÖê›üÖ,í Ûþ֓ÖÖë
†Öפü úÖê ‡ÃÖ ¯ÖύúÖ¸ü »ÖÖÖµÖÖ •ÖÖ‹ÖÖ ×ú ˆ­Ö ŸÖú †ÖÃÖÖ­Öß ÃÖê ¯ÖÓÆãü“ÖÖ •ÖÖ Ã֍êú… ‡­Ö´Öë ׍úÃÖß ¯ÖύúÖ¸ü úÖ
¯Ö׸ü¾ÖŸÖÔ­Ö êú¾Ö»Ö ×¾Ö³Ö֐ÖßµÖ ×¾ÖªãŸÖ †×³ÖµÖÓŸÖÖ úê †­Öã´ÖÖê¤ü­Ö ÃÖê Æüß ×úµÖÖ •ÖÖ‹ÖÖ…
‹­Ö) ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖ³Öß ÛÃ¾Ö“Ö ²ÖÖê›üÖ,í ˆ¯Öú¸üÖÖë †Öפü úÖê ²ÖÖ׸ü¿Ö ÃÖê ²Ö“ÖÖ­Öê êú ×»Ö‹ †­Öã´ÖÖêפüŸÖ †ÖúÖ¸ü ¾Ö
¯ÖύúÖ¸ü úê ˆ×“ÖŸÖ ‡­ÖŒ»ÖÖê•Ö¸ü/ú¾Ö¸ü ˆ¯Ö»Ö²‘Ö ú¸ü֋ӐÖê… ÃÖ³Öß ×¾ÖªŸÖã ¯Ö׸ü¯Ö£ÖÖë ¾Ö ˆ¯Öú¸üÖÖë êú ×¾ÖªãŸÖ¬ÖÖ¸üÖ
¯ÖϾÖÖ×ÆüŸÖ ³Ö֐ÖÖë úÖê ãÖÖ‡Ô ºþ¯Ö ÃÖê ²ÖÓ¤ü ú¸ü ú¸ü ¸üÖÖ •ÖÖ‹ÖÖ… Îêú­Ö ™ÒüÖò»Öß êú ŸÖÖ¸üÖë ¾Ö ÃÖã“Öֻ֍úÖë, ו֭Æëü
¯ÖæÖÔŸÖµÖÖ ¯Öé£Öú ÛãÖ×ŸÖ ´Öë ­Ö ¸üÖÖ •ÖÖ Ã֍úŸÖÖ ÆüÖ,ê úÖê ‡ÃÖ ¯ÖύúÖ¸ü »ÖÖÖµÖÖ •ÖÖ‹ÖÖ ×ú ¾Öê ÃÖÖ´ÖÖ­µÖ
úÖµÖÔ¤ü¿ÖÖ†Öë ´Öë ¯ÖÆÓüã“Ö ÃÖê ²ÖÖÆü¸ü ÆüÖë…
†Öê) »ÖÖêÆêü ÃÖê œüêú Æãü‹ †ÖîªÖêא֍ú ˆ¯ÖµÖÖêÖ ¾ÖÖ»Öê ¯»ÖÖÖë úÖ ˆ¯ÖµÖÖêÖ ²ÖêÆüŸÖ¸ü ¸üÆêüÖÖ…

105

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
p) Open type Distribution Boards shall be placed only in dry and ventilated rooms;
they shall not be placed in the vicinity of storage batteries or otherwise exposed
to chemical fumes.
q) Isolating switches shall be provided close to equipment for easy disconnection
of electrical equipment or conductors from the source of supply when repair or
maintenance work has to be done on them.
r) In front of distribution boards a clear space of 90 cm shall be maintained in order
to have easy access during an emergency.
s) Adequate working space shall be provided around electrical equipment which
require adjustment or examination during operation.
t) As far as possible electrical switches shall be excluded from a place where there
is danger of explosion. All electrical equipment such as motors, switches and
lighting fittings installed in work room where there is possibility of explosion hazard
shall be explosion proof.
u) All connections to lighting fixtures, starters or other power supplies shall be
provided with PVC insulated, PVC sheathed twin/three/four core wires to have
better mechanical protection for preventing possible damage to equipment or
injury to personnel. Taped joints shall not be allowed and the connections may
be made in looping system. Electric starter of motors, switches shall not be
mounted on wooden boards. Only sheet steel mounting or iron frame work shall
be used.
v) All the lighting fixtures and lamp holders shall be of good quality and in good
condition. Badly repaired or broken holders, etc. shall not be used.
w) Only PVC insulated and PVC sheathed wires or armoured PVC insulated and
sheathed cables shall be used for external power supply connections of
temporary nature. Whether proof rubber wires shall not be used for any
temporary power supply connections. Taped joints in the wires shall not be
used.
x) The bulbs/lamps used for illumination and testing purpose shall have cover or
guard to protect them from accidental breakages. Only 24 V supply system
shall be used for hand lamps etc. while working inside metallic tanks or
conducting vessels.

106

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¯Öß) Öã»Öê ¯ÖύúÖ¸ü êú ×¾ÖŸÖ¸üÖ ²ÖÖê›üÖí úÖê êú¾Ö»Ö ¿Öãú †Öî¸ü Æü¾ÖÖ¤üÖ¸ü ú´Ö¸üÖë ´Öë Æüß »ÖÖÖµÖÖ •ÖÖ‹ÖÖ; ˆ­Æëü ²Öî™ü¸üß
³ÖÓ›üÖ¸üÖë êú †ÖÃÖ-¯ÖÖÃÖ ­ÖÆüà »ÖÖÖµÖÖ •ÖÖ‹ÖÖ †£Ö¾ÖÖ ˆ­Æëü ¸üÖÃÖÖµÖ׭֍ú ¾ÖÖ¯ÖÖë êú ˆ¤ü˳ÖÖÃÖ­Ö Öê¡Ö ´Öë ­ÖÆüà ¸üÖÖ
•ÖÖ‹ÖÖ…
ŒµÖæ) †Ö‡ÃÖÖê»Öê¿Ö­Ö Ûþ֓ÖÖë úÖê ˆ¯Öú¸üÖÖë µÖÖ ÃÖã“Öֻ֍úÖêÓ êú µÖ£ÖÖ׭֍ú™ü »ÖÖÖµÖÖ •ÖÖ‹ÖÖ ŸÖÖ׍ú •Ö²Ö ú³Öß ˆ­ÖúÖ
´Ö¸ü´´ÖŸÖ µÖÖ †­Öã¸üÖÖ úÖµÖÔ ú¸ü­ÖÖ ÆüÖê ˆ­Æêü ¿Öß‘ÖПÖÖ ÃÖê ÃÖÓ²ÖÓ¬Ö ×¾Ö“”êûפüŸÖ ׍úµÖÖ •ÖÖ Ã֍êú…
†Ö¸ü) ×¾ÖŸÖ¸üÖ ²ÖÖê›üÖí êú ÃÖÖ´Ö­Ö 90 ÃÖê´Öß úÖ ×­Ö¸üÖ¯Ö¤ü ãÖÖ­Ö ”ûÖê›ÍüÖ •ÖÖ‹ÖÖ ŸÖÖ׍ú †Ö¯ÖÖŸÖ ÛÃ£ÖŸÖ ´Öë ˆ­Ö ŸÖú
†ÖÃÖÖ­Öß ÃÖê ¯ÖÓÆãü“ÖÖ •ÖÖ Ã֍êú…
‹ÃÖ) ‹êÃÖê ×¾ÖªãŸÖ ˆ¯Öú¸üÖ ו֭֍êú ¯ÖÏ“ÖÖ»Ö­Ö êú ¤üÖî¸üÖ­Ö ¯Ö¸üßÖÖ µÖÖ ÃÖ´ÖÖµÖÖê•Ö­Ö úß †Ö¾Ö¿µÖúŸÖÖ ¯Ö›ÍüŸÖß ÆüÖ,ê êú
“ÖÖ¸üÖë ŸÖ¸±ú ¯ÖµÖÖÔ¯ŸÖ úÖµÖÔãÖÖ­Ö ˆ¯Ö»Ö²¬Ö ú¸üÖµÖÖ •ÖÖ‹ÖÖ…
™üß) •ÖÆüÖÓ ŸÖú ÃÖÓ³Ö¾Ö ÆüÖê ×¾ÖñúÖê™ü êú ÖŸÖ¸êü ¾ÖÖ»Öê ãÖÖ­ÖÖë ¯Ö¸ü ײֻ֕Öß êú Ûþ֓ÖÖë úÖê ­ÖÆüà »ÖÖÖµÖÖ •ÖÖ‹ÖÖ…
×¾ÖñúÖê™ü úß ÃÖÓ³ÖÖ¾Ö­ÖÖ ¾ÖÖ»Öê úÖµÖԍúÖ ´Öë »ÖÖÖ‹ Ö‹ ÃÖ³Öß ×¾ÖªãŸÖ ˆ¯Öú¸üÖ •ÖîÃÖê ´ÖÖê™ü¸ëü, ÛÃ¾Ö“Ö ¾Ö ¸üÖê¿Ö­Öß
úß ×±úØ™üÃÖ †Öפü ×¾ÖñúÖê™ü¸üÖê¬Öß ÆüÖëÖß…
µÖæ) ˆ¯Öú¸üÖÖë úÖê ÃÖÓ³ÖÖ×¾ÖŸÖ ÖŸÖ¸êü µÖÖ »ÖÖêÖÖë úÖê “ÖÖê™ü »ÖÖ­Öê †Öפü ÃÖê ²Ö“ÖÖ­Öê êú ×»Ö‹ ²ÖêÆüŸÖ¸ü µÖÖÓ×9 ú ÃÖã¸üÖÖ
¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ×»Ö‹ ¸üÖê¿Ö­Öß êú ÃÖ³Öß ‡ÓŸÖ•ÖÖ´ÖÖë, ÙüÖÔ™ü¸üÖë ¾Ö †­µÖ ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖµÖÖë úÖê ¯Öß¾ÖßÃÖß ¯Öé£ÖŒú¸üÖ,
¯Öß¾ÖßÃÖß ÃÖê œüêú Æãü‹ ¤üÖê/ŸÖß­Ö/“ÖÖ¸ü úÖê¸ü ŸÖÖ¸ü ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ •Ö֋ӐÖê… ™îü¯Ö ׍ú‹ Ö‹ •ÖÖê›ÍüÖë úß †­Öã´Ö×ŸÖ ­ÖÆüà
¤üß •ÖÖ‹Öß †Öî¸ü •ÖÖê›üÍÖêÓ úÖê »ÖæØ¯ÖÖ ×¾Ö×¬Ö ÃÖê »ÖÖÖµÖÖ •ÖÖ‹ÖÖ… ´ÖÖê™ü¸üÖë êú ×¾ÖªãŸÖ “ÖÖ×»ÖŸÖ Ã™üÖÔ™ü¸ü, Ûþ֓ÖÖë úÖê
»Öú›Íüß êú ²ÖÖê›üÖí ¯Ö¸ü ­ÖÆüà »ÖÖÖµÖÖ •ÖÖ‹ÖÖ… êú¾Ö»Ö »ÖÖêÆêü úß ´ÖÖˆÓØ™üÖ µÖÖ »ÖÖêÆêü êú ±Ïêú´ÖÖë úÖ Æüß ¯ÖϵÖÖêÖ ׍úµÖÖ
•Ö‹ÖÖ…
¾Öß) ¸üÖê¿Ö­Öß êú ÃÖ³Öß ‡ÓŸÖ•ÖÖ´Ö ¾Ö »Öï¯Ö ÆüÖê»›ü¸ü ˆ““Ö ÖãÖ¾Ö¢ÖÖ ¾ÖÖ»Öê ÆüÖëÖê †Öî¸ü †“”ûß ÆüÖ»ÖŸÖ ´Öë ÆüÖëÖê… ™æü™êü Æãü‹ µÖÖ
Ö¸üÖ²Ö ŸÖ¸üߍúê ÃÖê ´Ö¸ü´´ÖŸÖ ׍ú‹ Ö‹ ÆüÖê»›ü¸üÖë †Öפü úÖ ¯ÖϵÖÖêÖ ­ÖÆüßÓ ×úµÖÖ •ÖÖ‹ÖÖ…
›ü²»µÖæ) †Ã£ÖÖ‡Ô ¯Öύéú×ŸÖ úß ²ÖÖÆü¸üß ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖ •ÖÖê›Íü­Öê êú ×»Ö‹ êú¾Ö»Ö ¯Öß¾ÖßÃÖß ¯Öé£ÖŒú¸üÖ ¾ÖÖ»Öß †Öî¸ü ¯Öß¾ÖßÃÖß
ÃÖê œüêú µÖÖ †Ö¸ü´ÖÔ›ü ¯Öß¾ÖßÃÖß ¯Öé£ÖŒú¸üÖ ¾Ö œüêú êúײֻÖÖë úÖ Æüß ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ… •Ö»Ö ¸üÖê¬Öß ¸ü²Ö¸ü êú
ŸÖÖ¸ü ׍úÃÖß ³Öß †Ã£ÖÖ‡Ô ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖ ú­Öꌿ֭ÖÖë êú ×»Ö‹ ¯ÖϵÖÖêÖ ­ÖÆüà ׍ú‹ •Ö֋ӐÖê… ŸÖÖ¸üÖë ´Öë ™îü¯Ö ׍ú‹ Æãü‹
•ÖÖê›ÍüÖë úÖ ¯ÖϵÖÖêÖ ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ…
‹ŒÃÖ) ¸üÖê¿Ö­Öß ¾Ö ¯Ö¸üßÖÖ êú ×»Ö‹ ¯ÖϵÖÖêÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê »Öï¯ÖÖë/²Ö»²ÖÖë êú ‰ú¯Ö¸ü ú¾Ö¸ü µÖÖ ÖÖ›Ôü »ÖÖÖ‹ •Ö֋ӐÖê ŸÖÖ׍ú
¤ãü‘ÖÔ™ü­ÖÖ¾Ö¿Ö ‡­Öêú ™æü™ü­Öê úÖê ¸üÖêúÖ •ÖÖ Ã֍êú… ¬ÖÖŸÖ㠍êú ²Ö­Öê ™ïüúÖê µÖÖ Óú›üÜŒ™üÖ ¾ÖêÃÖ»ÖÖë ´Öë Æïü›ü »Öï¯ÖÖë †Öפü êú
×»Ö‹ êú¾Ö»Ö 24 ¾ÖÖê»™ü ¾ÖÖ»Öß †Ö¯ÖæÙŸÖ úÖ Æüß ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ…

106

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
y) After installation of new electric system and or other extensive alterations to
existing installations, thorough inspection shall be made by Departmental
Electrical Engineer before the new system or new extension is put in use.

z) Contractor shall ensure that power factor for their loads shall be maintained at
0.85. In case the power factor falls below 0.85, necessary capacitor units shall
be provided by the contractor.

2.2 OPERATION & MAINTENANCE


a) All persons who work with electrical installation/equipment shall be aware of the
electrical hazards, use of protective devices and safe operational procedures.
They shall be given training in fire fighting, first aid and artificial resuscitation
techniques.

b) The supervisor shall instruct the workers in the proper procedure, specify and
enforce the use of necessary protective equipment such as adequately
insulated pliers, screw drivers, fuse pullers, testing lamps and similar hand tools.
Only wooden ladders shall be used to reach the heights in electrical work.

c) No material or earth work shall be allowed to be dumped below or in the vicinity


of the bare overhead line conductors.

d) Separate work permits shall be issued for individual group leaders working on the
same system which shall be returned after the completion of the work to Safety
Supervisor and no system shall be energised without the clearance of Safety
Supervisor.

e) Before any maintenance work is commenced on electrical


installations/equipment, the circuits shall be de-energised and ascertained to be
dead by positive test with an approved voltage testing device. Switches shall
be tagged or the fuse holders withdrawn before starting the work. Adequate
precautions shall be taken in two important aspects viz.

i) That there shall be no danger from any adjacent live parts and

ii) That there shall be no changes of re-energisation of the equipments on


which the persons are working.

107

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¾ÖÖ‡Ô) ׍úÃÖß ­Ö‡Ô ×¾ÖªãŸÖ ¯ÖϝÖÖ»Öß êú »ÖÖÖ‹ •ÖÖ­Öê †Öî¸ü †£Ö¾ÖÖ ¾ÖŸÖÔ´ÖÖ­Ö Ã£ÖÖ¯Ö­ÖÖ†Öë ´Öë †­µÖ ÖÆü­Ö ¯Ö׸ü¾ÖŸÖÔ­Ö ×ú‹
•ÖÖ­Öê êú ²ÖÖ¤ü ­Ö‡Ô ¯ÖϝÖÖ»Öß µÖÖ ­Ö‹ ×¾ÖßÖÖ¸ü úÖê ˆ¯ÖµÖÖêÖ ´Öë »ÖÖ‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê ‡­ÖúÖ ×¾Ö³Ö֐ÖßµÖ ×¾ÖªãŸÖ
†×³ÖµÖÓŸÖÖ «üÖ¸üÖ ¯Ö¸üßÖÖ ×úµÖÖ •ÖÖ‹ÖÖ…
•Öê›ü) ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ëüÖê ׍ú ˆ­Öêú »ÖÖê›ü úÖ ¯ÖÖò¾Ö¸ü ±îúŒ™ü¸ü 0.85 ²Ö­ÖÖ ¸üÆêü… µÖפü ¯ÖÖò¾Ö¸ü ±îúŒ™ü¸ü 0.85
ÃÖê ú´Ö ÆüÖêŸÖÖ Æîü ŸÖÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ †Ö¾Ö¿µÖú îú¯Öê×ÃÖ™ü¸ü ‡úÖ‡Ô †Öפü úß ¾µÖ¾ÖãÖÖ ú¸üÖ‡Ô •ÖÖ‹Öß…
2.2 ¯ÖÏ“ÖÖ»Ö­Ö ¾Ö †­Öã¸üÖÖ
‹) ×¾ÖªãŸÖ ãÖÖ¯Ö­ÖÖë/ˆ¯Öú¸üÖÖë ¯Ö¸ü úÖ´Ö ú¸ü­Öê ¾ÖÖ»Öê »ÖÖêÖÖë úÖê ײֻ֕Öß êú ÖŸÖ¸üÖ,ë ²Ö“ÖÖ¾Ö µÖãÛŒŸÖµÖÖë êú ¯ÖϵÖÖêÖ ¾Ö
ÃÖã¸ü×ÖŸÖ ¯ÖÏ“ÖÖ»Ö­Ö ×¾Ö׬ֵÖÖë êú ²ÖÖ¸êü ´Öë •Ö֭֍úÖ¸üß ÆüÖê­Öß “ÖÖ×Æü‹… ˆ­Æëü †Û­Ö¿Ö´Ö­Ö, ¯ÖÏÖ£Ö״֍ú ˆ¯Ö“ÖÖ¸ü ¾Ö
éú×¡Ö´Ö À¾ÖÖÓÃÖ ˆ¯Ö“ÖÖ¸ü ŸÖú­ÖߍúÖë úÖ ¯ÖÏ×¿ÖÖÖ ×¤üµÖÖ •ÖÖ‹ÖÖ…
²Öß) ¯ÖµÖÔ¾ÖêÖú †¯Ö­Öê úִ֐ÖÖ¸üÖë úÖê ˆ×“ÖŸÖ ¯ÖÏ׍ÎúµÖÖ êú ²ÖÖ¸êü ´Öë ×­Ö¤ìü¿Ö ¤ëüÖê, †Ö¾Ö¿µÖú ²Ö“ÖÖ¾Ö ˆ¯Öú¸üÖÖë •ÖîÃÖê
¯ÖµÖÖÔ¯ŸÖ ãú“Öֻ֍úŸÖÖ µÖãŒŸÖ ¯»ÖÖµÖ¸ü, ¯Öë“֍úÃÖ, °µÖæ•Ö ¯Öã»Ö¸ü, •ÖÖÓ“Ö »Öï¯Ö ¾Ö ‡ÃÖß ¯ÖύúÖ¸ü êú †­µÖ †Öî•ÖÖ¸üÖë úÖê
×¾Ö×­ÖÙ¤ü™ü ú¸ëüÖê ¾Ö ˆ­ÖúÖ ¯ÖϵÖÖêÖ †×­Ö¾ÖÖµÖÔ ú¸ëüÖê… ‰Óú“ÖÖ‡Ô ¾ÖÖ»Öê ײֻ֕Öß êú úÖ´ÖÖë úÖê ú¸ü­Öê êú ×»Ö‹
êú¾Ö»Ö »Öú›Íüß úß ÃÖßœÍüß úÖ Æüß ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
ÃÖß) Öã»Öß †Öê¾Ö¸üÆêü›ü »ÖÖ‡­Ö ÃÖã“Öֻ֍úÖë êú ­Öß“Öê µÖÖ ˆÃ֍êú †ÖÃÖ¯ÖÖÃÖ ×úÃÖß ¯ÖύúÖ¸ü úß ÃÖִ֐ÖÏß µÖÖ ×´Ö¼üß †Öפü
•Ö´ÖÖ ­ÖÆüà ú¸ü­Öê ¤üß •ÖÖ‹Öß…
›üß) ‹ú Æüß ¯ÖϝÖÖ»Öß ¯Ö¸ü úÖ´Ö ú¸ü­Öê ¾ÖÖ»Öê ¯ÖÏŸµÖêú ÖÏã¯Ö »Öß›ü¸ü êú ×»Ö‹ ¯Öé£Öú úÖµÖÔ ¯Ö¸ü×´Ö™ü •ÖÖ¸üß ×úµÖÖ •ÖÖ‹ÖÖ
†Öî¸ü úÖµÖÔ ÃÖ´ÖÖ¯ŸÖ ÆüÖê •ÖÖ­Öê êú ¯Ö¿“ÖÖŸÖ ‡ÃÖê ÃÖÓ¸üÖÖ ¯ÖµÖÔ¾ÖêÖú úÖê ¾ÖÖ¯ÖÃÖ ×úµÖÖ •ÖÖ‹ÖÖ ŸÖ£ÖÖ ÃÖÓ¸üÖÖ
¯ÖµÖÔ¾ÖêÖú úß †­Öã´Ö×ŸÖ êú ²ÖÖî¸ü ׍úÃÖß ³Öß ¯ÖϝÖÖ»Öß ´Öë ×¾ÖªãŸÖ¬ÖÖ¸üÖ ¯ÖϾÖÖ×ÆüŸÖ ­ÖÆüà úß •ÖÖ‹Öß…
‡Ô) ׍úÃÖß ³Öß ×¾ÖªãŸÖ ãÖÖ¯Ö­Ö/ˆ¯Öú¸üÖ ¯Ö¸ü ׍úÃÖß ³Öß ¯ÖύúÖ¸ü úÖ †­Öã¸üÖÖ úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ׍ú‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê ˆÃÖ
¯Ö׸ü¯Ö£Ö ´Öë ×¾ÖªãŸÖ¬ÖÖ¸üÖ ¯ÖϾÖÖÆü ¸üÖêúÖ •ÖÖ‹ÖÖ †Öî¸ü †­Öã´ÖÖêפüŸÖ ¾ÖÖê»™êü•Ö ¯Ö¸üßÖÖ µÖãÛŒŸÖ «üÖ¸üÖ Ã֍úÖ¸üÖŸ´Öú
¯Ö¸üßÖÖ ÃÖã×­ÖÛ¿“ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ… úÖµÖÔ ¯ÖÏÖ¸Óü³Ö ׍ú‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê Ûþ֓ÖÖë ´Öë ¯Ö“ÖßÔ »Ö™üúÖ‡Ô •Ö֋ӐÖß µÖÖ
°µÖæ•Ö ÆüÖê»›ü¸ü ׭֍úÖ»Ö ×»Ö‹ •Ö֋ӐÖê… ¤üÖê ´ÖÆüŸ¾Ö¯ÖæÖÔ Ø²Ö¤ãü†Öë êú ¯ÖÏ×ŸÖ ×¾Ö¿ÖêÂÖ ÃÖÖ¾Ö¬ÖÖ­Öß ²Ö¸üŸÖß •ÖÖ‹Öß :
i) ׍úÃÖß ­Ö•Ö¤üߍúß ×¾ÖªãŸÖ ¯ÖϾÖÖ×ÆüŸÖ ³ÖÖÖ ÃÖê úÖê‡Ô ÖŸÖ¸üÖ ­Ö ÆüÖê †Öî¸ü
ii) »ÖÖêÖÖë êú úÖ´Ö ú¸üŸÖê ÃÖ´ÖµÖ ˆ¯Öú¸üÖ ´Öë ×¾ÖªãŸÖ¬ÖÖ¸üÖ ¯ÖϾÖÖÆü úß ÛãÖ×ŸÖ ´Öë úÖê‡Ô ¯Ö׸ü¾ÖŸÖÔ­Ö ­Ö ÆüÖê…

107

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
f) While working on or near a circuit, whenever possible the use of one hand may
be practiced even though the circuit is supposed to be dead. The other hand
may preferably be kept in pocket.
g) When it is necessary to touch electrical equipment (for example when checking
for overload of motors) back of the hand may be used. Thus, if accidental
shock were to cause muscular contractions, one would not ‘freeze’ to the
conductor.

h) Operation of electrical equipment shall be avoided when standing on wet floor


or when hands are wet.

i) Before blown fuses are replaced, the circuit shall be locked out and an
investigation shall be made for the cause of the short circuit or overload.

j) When two persons are working within reach of each other, they shall never work
on different phases of the supply.

k) When structural repairs, modification or painting work are to be undertaken,


appropriate measures shall be taken for the protection of persons whose work
may bring them into the proximity of live equipment/circuit.

l) It shall be ensured that the insulation and wire size of extension cords are
adequate for the voltage and current to be carried.

m) While tapping electricity from the socket, plug top must be used. It shall be
ensured that no extension boards are over loaded while tapping. Only standard
three pin plugs shall be used for tapping electricity. Broken sockets/plugs shall
be replaced immediately with good ones. Only joint free cables shall be used
for connecting equipment/apparatus.

n) Floors shall be kept free from trailing electrical cables to avoid tripping hazard.

o) Power supply to all the machines and lighting fixture shall be switched off when
not in use.

p) Temporary electrical connections shall be removed as soon as the stipulated


work is over. After completion of the works, the Contractor shall dismantle the
distribution boards and the other facilities he may have erected.

q) Unauthorised tapping of power by others from distribution boards under the


control of the contractor shall be prohibited at all circumstances.

r) No flammable materials shall be stored in any working area near the switch
boards.

s) Safety work permits shall be used for switching off the main feeder and
equipment by the contractor.

108

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
‹±ú) ׍úÃÖß ¯Ö׸ü¯Ö£Ö ¯Ö¸ü µÖÖ ‡Ã֍êú ­Ö•Ö¤üߍú úÖµÖÔ ú¸üŸÖê ÃÖ´ÖµÖ, µÖ£ÖÖ ÃÖÓ³Ö¾Ö ‹ú ÆüÖ£Ö úê ¯ÖϵÖÖêÖ úß †Ö¤üŸÖ ›üÖ»Öß
•ÖÖ‹ ³Ö»Öê Æüß ¯Ö׸ü¯Ö£Ö ´ÖêÓ ×¾ÖªãŸÖ¬ÖÖ¸üÖ ¯ÖϾÖÖÆü ­Ö ÆüÖê… ¤æüÃÖ¸üê ÆüÖ£Ö úÖê •Öê²Ö ´Öë ›üÖ»Öê ¸üÖÖ •ÖÖ Ã֍úŸÖÖ Æîü…
•Öß) •Ö²Ö ú³Öß ×úÃÖß ×¾ÖªãŸÖ ˆ¯Öú¸üÖ úÖê ïֿÖÔ ú¸ü­ÖÖ †×­Ö¾ÖÖµÖÔ ÆüÖê •ÖÖ‹ (•ÖîÃÖê ׍ú ´ÖÖê™ü¸ü úß †Öê¾Ö¸ü»ÖÖêØ›üÖ
úß •ÖÖÓ“Ö ú¸üŸÖê ÃÖ´ÖµÖ) ŸÖÖê ÆüÖ£Ö êú ׯ֔û»Öê ³ÖÖÖ úÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü… ‡ÃÖ ¯ÖύúÖ¸ü µÖפü
¤ãü‘ÖÔ™ü­ÖÖ¾Ö¿Ö »ÖÖê ײֻ֕Öß êú —Ö™üêú ÃÖê ´ÖÖÓÃÖ¯Öê׿ֵÖÖë ´Öë úÖê‡Ô ×Ã֍ãú›Íü­Ö †ÖŸÖß Æîü ŸÖÖê ¾ÖÆü ¾µÖÛŒŸÖ ÃÖã“Öֻ֍ú ÃÖê
ד֯֍ú ­ÖÆüà Ã֍êúÖÖ…
‹“Ö) Öß»Öê ±ú¿ÖÔ ¯Ö¸ü Ö›Íêü ÆüÖêú¸ü µÖÖ Öß»Öê ÆüÖ£ÖÖë ÃÖê ×¾ÖªãŸÖ ˆ¯Öú¸üÖÖë úÖ ¯ÖÏ“ÖÖ»Ö­Ö ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ…
†Ö‡Ô) ±ãÓúêú °µÖæ•ÖÖë úÖê ¾ÖÖ¯ÖÃÖ »ÖÖÖ­Öê ÃÖê ¯ÖÆü»Öê ˆÃÖ ¯Ö׸ü¯Ö£Ö úÖê »ÖÖòú ׍úµÖÖ •ÖÖ‹ÖÖ †Öî¸ü ¿ÖÖò™Ôü ÃÖٍú™ü µÖÖ
†Öê¾Ö¸ü»ÖÖê›ü êú úÖ¸üÖÖë úß •ÖÖÓ“Ö úß •ÖÖ‹Öß…
•Öê) •Ö²Ö ¤üÖê ¾µÖÛŒŸÖ ‹ú-¤æüÃÖ¸êü êú †ŸµÖÓŸÖ ÃÖ´Öß¯Ö úÖµÖÔ ú¸ü ¸üÆêü ÆüÖë ŸÖÖê ¾Öê ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖ êú ׳֮Ö-×³Ö®Ö ±êúÃÖÖë ¯Ö¸ü
ú³Öß ³Öß úÖ´Ö ­ÖÆüà ú¸ëüÖê…
êú) •Ö²Ö ú³Öß œüÖÓ“ÖÖÖŸÖ ´Ö¸ü´´ÖŸÖ, ¯Ö׸ü¾ÖŸÖÔ­Ö µÖÖ ¯ÖëØ™üÖ úÖµÖÔ ×úµÖÖ •ÖÖ­ÖÖ ŸÖÖê ×¾ÖªãŸÖ ¯ÖϾÖÖ×ÆüŸÖ ¯Ö׸ü¯Ö£ÖÖë/ˆ¯Öú¸üÖÖë
êú ÃÖ´Öß¯Ö úÖµÖÔ ú¸ü­Öê ¾ÖÖ»Öê ¾µÖÛŒŸÖµÖÖë úê ²Ö“ÖÖ¾Ö êú ×»Ö‹ ˆ×“ÖŸÖ ú¤ü´Ö ˆšüÖ‹ •Ö֋ӐÖê…
‹»Ö) ‹ŒÃÖ™ëü¿Ö­Ö úÖê›Ôü ´Öë ¯ÖϾÖÖ×ÆüŸÖ ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ¾ÖÖê»™êü•Ö †Öî¸ü ×¾ÖªãŸÖ¬ÖÖ¸üÖ êú †­ÖãÃÖÖ¸ü Æüß ŸÖÖ¸ü úÖ †ÖúÖ¸ü ¾Ö
‡ÓÃÖã»Öê¿Ö­Ö ÆüÖê­ÖÖ ÃÖã×­ÖÛ¿“ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…
‹´Ö) ׍úÃÖß ÃÖÖòêú™ü ÃÖê ײֻ֕Öß »ÖêŸÖê ÃÖ´ÖµÖ ¯»ÖÖ™üÖò¯Ö úÖ †¾Ö¿µÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ™îüØ¯ÖÖ ú¸üŸÖê ÃÖ´ÖµÖ
ÃÖã×­ÖÛ¿“ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ ×ú ‹ŒÃÖ™ëü¿Ö­Ö ²ÖÖê›Ôü ¯Ö¸ü †Öê¾Ö¸ü»ÖÖêØ›üÖ ­Ö ÆüÖê… ×²Ö•Ö»Öß úß ™îüØ¯ÖÖ ú¸üŸÖê ÃÖ´ÖµÖ
êú¾Ö»Ö ŸÖß­Ö ×¯Ö­ÖÖë ¾ÖÖ»Öê ´Ö֭֍ú ¯»ÖÖÖë úÖ Æüß ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ™æü™êü Æãü‹ ÃÖÖòêú™üÖ/ë ¯»ÖÖÖë úê ãÖÖ­Ö ¯Ö¸ü
ŸÖŸúÖ»Ö Æüß ­Ö‹ ÃÖÖòêú™ü/¯»ÖÖ »ÖÖÖ‹ •ÖÖ‹Öë… ˆ¯Öú¸üÖÖë/ˆ¯ÖÍú¸üÖë úÖê •ÖÖê›ÍüŸÖê ÃÖ´ÖµÖ êú¾Ö»Ö •ÖÖê›Íü´Ö㌟Ö
êúײֻÖÖë úÖ Æüß ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
‹­Ö) ¯ÖÖÓ¾Ö ¯Ö›Íü •ÖÖ­Öê êú ÖŸÖ¸êü ÃÖê ²Ö“Ö­Öê êú ×»Ö‹ ±ú¿ÖÔ ¯Ö¸ü ׍úÃÖß ¯ÖύúÖ¸ü úß êúײֻÖë ­ÖÆüà ±îú»ÖÖ‡Ô •Ö֋ӐÖß…
†Öê) •Ö²Ö ¯ÖϵÖÖêÖ ­Ö ׍úµÖÖ •ÖÖ‹ ŸÖÖê ÃÖ³Öß ´Ö¿Öß­ÖÖë ¾Ö ¸üÖê¿Ö­Öß ˆ¯Öú¸üÖÖë úß ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖ ²ÖÓ¤ü ¸üÖß •ÖÖ‹Öß…
¯Öß) ×¾Ö¿ÖêÂÖ ¯ÖύúÖ¸ü êú úÖµÖÖí úê ¯Öæ¸üÖ ÆüÖêŸÖê Æüß †Ã£ÖÖ‡Ô ×¾ÖªãŸÖ ú­ÖêŒ¿Ö­Ö Æü™üÖ ×»Ö‹ •Ö֋ӐÖê… úÖµÖÔ ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê êú
²ÖÖ¤ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü »ÖÖÖ‹ Ö‹ ×¾ÖŸÖ¸üÖ ²ÖÖê›Ôü ¾Ö †­µÖ ÃÖã×¾Ö¬ÖÖ†Öë úÖê Æü™üÖ »ÖëÖê…
ŒµÖæ) ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ×­ÖµÖÓ¡ÖÖ ¾ÖÖ»Öê ×¾ÖŸÖ¸üÖ ²ÖÖê›üÖí ÃÖê †­µÖ »ÖÖêÖÖë «üÖ¸üÖ †­Ö׬֍éúŸÖ ײֻ֕Öß ™îüØ¯ÖÖ ¯ÖÏŸµÖêú
¯Ö׸üÛãÖ×ŸÖ ´Öë ¾ÖÙ•ÖŸÖ Æîü…
†Ö¸ü) ÛÃ¾Ö“Ö ²ÖÖê›üÖí êú ÃÖ´Öß¯Ö ×úÃÖß ³Öß úÖµÖԁÖê¡Ö ´Öë ׍úÃÖß ³Öß ¯ÖύúÖ¸ü êú •¾Ö»Ö­Ö¿Öᯙ ¯Ö¤üÖ£ÖÖí úÖ ³ÖÓ›üÖ¸üÖ ­ÖÆüà
׍úµÖÖ •ÖÖ‹ÖÖ…
‹ÃÖ) ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ´Öê­Ö ±úß›ü¸ü ¾Ö ˆ¯Öú¸üÖÖë úß ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖ ²ÖÓ¤ü ú¸ü­Öê êú ×»Ö‹ ÃÖÓ¸üÖÖ úÖµÖÔ ¯Ö¸ü×´Ö™ü úÖ
¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ…

108

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
t) “MAN ON LINE” “DO NOT SWITCH ON” “DANGER” or “CAUTION” board as
applicable shall be used during maintenance works on the electrical
equipment.

2.3 PORTABLE ELECTRICAL EQUIPMENT

a) Portable electrical equipment shall be regularly examined, tested and


maintained to ensure that the equipment and its leads are in good order.
Register shall be maintained for inspection recording the testing dates and
results of the equipments.

b) All portable appliances shall be provided with three core cable and three pin
plug. The third pin of the plug shall invariably be earthed. It shall be ensured
that the metal part of the equipment shall be effectively earthed.

c) All connections to portable equipment or machines from the


panel/distribution board/extension board shall be taken using 3 core double
insulated PVC flexible copper wire in one length. No joints shall be allowed in
this flexible wire. In case single length of wire is not sufficient for a particular
location then the supply can be tapped by providing another extension
board comprising of switch and socket.

d) Flexible cables for portable lamps, tools and apparatus shall be regularly
examined, tested periodically and maintained to ensure safety.

109

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
™üß) ×¾ÖªãŸÖ ˆ¯Öú¸üÖÖë ¯Ö¸ü ´Ö¸ü´´ÖŸÖ úÖµÖÔ ú¸üŸÖê ÃÖ´ÖµÖ µÖ£ÖÖ ˆ¯ÖµÖãŒŸÖ "»ÖÖ‡­Ö ¯Ö¸ü »ÖÖêÖ úÖµÖÔ ú¸ü ¸üÆêü Æïü", "Ûþ֓Ö
úÖê †Öò­Ö ­Ö ú¸ëü", "ÖŸÖ¸üÖ", µÖÖ "“ÖêŸÖÖ¾Ö­Öß" ²ÖÖê›üÖí úÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
2.3 Æü»êú ×¾ÖªãŸÖ ˆ¯Öú¸üÖ
‹) Æü»êú ˆ¯Öú¸üÖÖë ¾Ö ˆ­Öêú ŸÖÖ¸üÖë úß ²ÖêÆüŸÖ¸ü ÛãÖ×ŸÖ ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­Öê êú ×»Ö‹ ˆ­ÖúÖ ×­ÖµÖ×´ÖŸÖ †ÓŸÖ¸üÖ»Ö ¯Ö¸ü
¯Ö¸ü߁֝Ö, •ÖÖÓ“Ö ¾Ö †­Öã¸üÖÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ˆ¯Öú¸üÖÖë êú ×­Ö¸üßÖÖ úÖ ‹ú ¸üוÖÙü¸ü ¸üÖÖ •ÖÖ‹ÖÖ ×•ÖÃÖ´Öë
•ÖÖÓ“Ö úß ŸÖÖ¸üߏÖê ˆ¯Öú¸üÖ úÖ ¯Ö׸üÖÖ´Ö ¤ü•ÖÔ ÆüÖëÖê…
²Öß) ÃÖ³Öß Æü»êú ˆ¯Öú¸üÖÖë ´Öë ŸÖß­Ö úÖê¸ü ¾ÖÖ»ÖÖ êú×²Ö»Ö ¾Ö ŸÖß­Ö ×¯Ö­Ö ¾ÖÖ»Öê ¯»ÖÖÖë úÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ¯»ÖÖ
úß ŸÖßÃÖ¸üß ×¯Ö­Ö úÖê ×­ÖÛ¿“ÖŸÖ ºþ¯Ö ÃÖê †£ÖÔ ×úµÖÖ •ÖÖ‹ÖÖ… ˆ¯Öú¸üÖ êú ¬ÖÖŸÖã ¾ÖÖ»Öê ×ÆüÃÃÖê úÖê †£ÖÔ ÃÖê
•ÖÖê›Íü­ÖÖ ÃÖã×­ÖÛ¿“ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…
ÃÖß) Æü»êú ˆ¯Öú¸üÖÖë µÖÖ ´Ö¿Öß­ÖÖë ´Öë ¯Öî­Öê»Ö/×¾ÖŸÖ¸üÖ ²ÖÖê›Ôü/‹ŒÃÖ™ëü¿Ö­Ö ²ÖÖê›Ôü ÃÖê ¤üß •ÖÖ­Öê ¾ÖÖ»Öß ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖ êú
×»Ö‹ 3 úÖê¸ü ¤üÖêÆü¸êü ¯Öß¾ÖßÃÖß ‡ÓÃÖã»Öê¿Ö­Ö ¾ÖÖ»Öê »ÖÖê“Ö¤üÖ¸ü •ÖÖê›Íü¸ü×ÆüŸÖ ŸÖÖ¸ü úÖ ¯ÖϵÖÖêÖ ׍úµÖÖ •ÖÖ‹ÖÖ… ‡ÃÖ
»ÖÖê“Ö¤üÖ¸ü ŸÖÖ¸ü ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úÖ •ÖÖê›Íü ›üÖ»Ö­Öê úß †­Öã´Ö×ŸÖ ­ÖÆüà ÆüÖêÖß… µÖפü ׍úÃÖß ×¾Ö¿ÖêÂÖ Ã£ÖÖ­Ö ¯Ö¸ü ŸÖÖ¸ü
úß ‹ú »ÖÓ²ÖÖ‡Ô ¯ÖµÖÖÔ¯ŸÖ ­Ö ÆüÖê ŸÖÖê ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖ êú ×»Ö‹ ÛÃ¾Ö“Ö ¾Ö ÃÖÖòêú™ü µÖãŒŸÖ ¤æüÃÖ¸êü ‹ŒÃÖ™ëü¿Ö­Ö ²ÖÖê›Ôü ÃÖê
¯ÖÏÖ¯ŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
›üß) ÃÖã¸üÖÖ ÃÖã×­ÖÛ¿“ÖŸÖ ú¸ü­Öê êú ˆ§êü¿µÖ ÃÖê Æü»êú »Öï¯ÖÖë ¾Ö ˆ¯Öú¸üÖÖë êú »ÖÖê“Ö¤üÖ¸ü êúײֻÖÖë úÖ ×­ÖµÖ×´ÖŸÖ ¯Ö¸ü߁֝Ö
׍úµÖÖ •ÖÖ‹ÖÖ, ×­ÖÛ¿“ÖŸÖ ÃÖ´ÖµÖ ¯Ö¸ü •ÖÖÓ“Ö úß •ÖÖ‹Öß ¾Ö ˆ­ÖúÖ †­Öã¸üÖÖ ׍úµÖÖ •ÖÖ‹ÖÖ…

109

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
FORM NO.SGCW - 1
FORM FOR COMPLETION CERTIFICATE
(Prescribed under Cl. 1.2 of Annexure)

I/We certify tht the installation detailed below has been installed by me/us
and tested and that to the best of my/our knowledge and belief, it complies
with Indian Electricity Rules, 1956 as well as IS:732-1963 code of practice for
Electrical Wiring Installations. (System voltage not exceeding 650 Volts
(Revised).

Electrical installation at …………………………………………………………………….

Voltage and system of supply ……………………………………………………………...

a) Particulars of work Number Total Type of system


load of wiring
--------- ------ -------------------
i) Light points
ii) Fan points
iii) Plug points (3 pin)
iv) Motors

b) If the work involves installation of overhead lines and/or underground cable


__________________________________________________________________

c) Earthing

Description of earthing electrode, size of earth wire and number of electrodes


provided :

d) Test results

1. Insulation resistance for the whole installation :


i) Between conductors
ii) Between each conductor and earth

2. Resistance of earthing electrode or earthing system.

3. Maximum earthing resistance of installation ___________________________

Signature of Supervisor Signature of Contractor

Name and address of Supervisor Name and address of Contractor


110

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¯ÖÏ¯Ö¡Ö ÃÖӏµÖÖ ‹ÃÖ•ÖßÃÖß›ü²»µÖæ - 1
úÖµÖÔ¯ÖæÖÔŸÖÖ ¯ÖÏ´ÖÖÖ¯Ö¡Ö úÖ ¯Öϯ֡Ö
(†­Öã“”êû¤ü 1.2 êú †ÓŸÖÖÔŸÖ ¾Öٝ֟Ö)
´Öï/Æü´Ö ¯ÖÏ´ÖÖ×ÖŸÖ ú¸üŸÖê Æïü ׍ú †¬ÖÖê×»Ö×ÖŸÖ Ã£ÖÖ¯Ö­Ö úÖµÖÔ ´Öê¸/êü Æü´ÖÖ¸êü «üÖ¸üÖ ×úµÖÖ ÖµÖÖ Æîü
†Öî¸ü ´Öê¸üß/Æü´ÖÖ¸üß ¯ÖæÖÔ •Ö֭֍úÖ¸üß ¾Ö ×¾ÖÀ¾ÖÖÃÖ úê †­ÖãÃÖÖ¸ü µÖÆü úÖµÖÔ ³ÖÖ¸üŸÖßµÖ ×¾ÖªãŸÖ
×­ÖµÖ´ÖÖ¾Ö»Öß, 1956 ŸÖ£ÖÖ ÃÖÖ£Ö Æüß ×²Ö•Ö»Öß ¾ÖÖµÖظüÖ ãÖÖ¯Ö­Ö ¯ÖÏ׍ÎúµÖÖ êú úÖê›ü †Ö‡Ô‹ÃÖ:
732-1963 êú ×­ÖµÖ´ÖÖë úÖ ¯ÖÖ»Ö­Ö ú¸üŸÖÖ Æîü… (¯ÖϝÖÖ»Öß ¾ÖÖê»™êü•Ö 650 ¾ÖÖê»™ü ÃÖê †×¬Öú ­ÖÆüà
(ÃÖÓ¿ÖÖê׬֟Ö)
×¾ÖªãŸÖ ÃÖÓ²ÖÓ¬Öß Ã£ÖÖ¯Ö­Ö úÖ Ã£ÖÖ­Ö ----------------------------------------------
†Ö¯ÖæÙŸÖ úÖ ¾ÖÖê»™êü•Ö ¾Ö ¯ÖϝÖÖ»Öß ------------------------------------------------
‹) úÖµÖÔ úÖ ×¾Ö¾Ö¸üÖ ÃÖӏµÖÖ ãú»Ö »ÖÖê›ü ¾ÖÖµÖظüÖ ¯ÖϝÖÖ»Öß úÖ ¯ÖύúÖ¸ü
------ ------- --------------
I) ײֻ֕Öß êú ¯¾ÖÖ‡Ó™ü
II) ¯ÖӏÖÖë êú ¯¾ÖÖ‡Ó™ü
III) ¯»ÖÖ êú ¯¾ÖÖ‡Ó™ü (3 ×¯Ö­Ö ¾ÖÖ»Öê)
IV) ´ÖÖê™ü¸ü
²Öß) ŒµÖÖ úÖµÖÔ ´Öë †Öê¾Ö¸üÆêü›ü »ÖÖ‡­ÖÖë †Öî¸ü / µÖÖ ³Öæ×´ÖÖŸÖ êúײֻÖÖë úê ײ֔ûÖ­Öê úÖ úÖµÖÔ
¿ÖÖ×´Ö»Ö £ÖÖ
-----------------------------------------------------------------------------------
ÃÖß) †Ú£ÖÖ
†Ú£ÖÖ ‡»ÖꌙÒüÖê›ü úÖ ×¾Ö¾Ö¸üÖ, †£ÖÔ ¾ÖÖµÖ¸ü úÖ ­ÖÖ¯Ö ŸÖ£ÖÖ ˆ¯Ö»Ö²¬Ö ú¸üÖ‹ Ö‹
‡»ÖꌙÒüÖê›üÖë úß ÃÖӏµÖÖ :
›üß) ¯Ö¸üßÖÖ úÖ ¯Ö׸üÖÖ´Ö
1. ÃÖÓ¯ÖæÖÔ Ã£ÖÖ¯Ö­ÖÖ úÖ ‡ÓÃÖã»Öê¿Ö­Ö ¸üוÖÙëüÃÖ
I) ÃÖã“Öֻ֍úÖë êú ²Öß“Ö ´Öë
II) ³Öæ×´Ö ÃÖã“Öֻ֍ú ¾Ö ³Öæ×´Ö êú ²Öß“Ö ´Öë
2) †Ú£ÖÖ ¯ÖϝÖÖ»Öß êú †Ú£ÖÖ ‡»ÖꌙÒüÖê›ü úÖ ¯ÖÏןָüÖê¬Ö
3) ãÖÖ¯Ö­ÖÖ úÖ †×¬ÖúŸÖ´Ö †Ú£ÖÖ ¯ÖÏןָüÖê¬Ö
¯ÖµÖÔ¾ÖêÖú êú ÆüßÖցָü ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÆüßÖցָü
¯ÖµÖÔ¾ÖêÖú úÖ ­ÖÖ´Ö ŸÖ£ÖÖ ¯ÖŸÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ­ÖÖ´Ö ŸÖ£ÖÖ ¯ÖŸÖÖ
110

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
FORM NO.SGCW - 2

‘A’ APPLICATION FOR SERVICE CONNECTION BY CONTRACTOR


(Prescribed under Cl. 1.3 of Annexure)
(To be filled in triplicate)

1. Name and Address of Contractor :

2. Reference to Tender & Work Order :

3. Completion period :

4. Connected load details (please attach details :


in a separate sheet)

5. Max. demand anticipated :

6. Nature of service connection required :


(whether single or three phase)

7. Place where service required :

a) Works :
b) Colony :
8. If supply of electricity is free or chargeable :
(Please enclose extract of conditions from
the tender)

9. Details of meter provided :

a) If meter required from the Department, :


whether SD is paid

b) Details of SD (Security Deposit) :

c) Whether meter is tested or not, if tested, :


attach test report, if not, details of testing
fee deposited

10. Name of Supervisor/Electrician in charge :


of installation and maintenance

11. Electrical license No. of person mentioned :


Against Col. 10

111

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
¯ÖÏ¯Ö¡Ö ÃÖӏµÖÖ ‹ÃÖ•ÖßÃÖß›ü²»µÖæ-2
"‹" ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ÃÖê¾ÖÖ ú­ÖêŒ¿Ö­Ö êú ×»Ö‹ †Ö¾Öê¤ü­Ö
(¯Ö׸ü׿Ö™ü êú úÖò»Ö´Ö 1.3 êú †¬Öß­Ö ×¾Ö×ÆüŸÖ)
(ŸÖß­Ö ¯ÖÏןֵÖÖë ´Öë ³Ö¸üÖ •ÖÖ‹)
1. ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ­ÖÖ´Ö ¾Ö ¯ÖŸÖÖ :
2. ×­Ö×¾Ö¤üÖ ¾Ö úÖµÖÔ †Ö¤êü¿Ö úÖ ÃÖÓ¤ü³ÖÔ :
3. úÖµÖÔ¯ÖæÖÔŸÖÖ †¾Ö×¬Ö :
4. •ÖÖê›Íêü Ö‹ »ÖÖê›ü úÖ ×¾Ö¾Ö¸üÖ (éú¯ÖµÖÖ ×¾Ö¾Ö¸üÖ †»ÖÖ ¿Öß™ü ´Öë ­ÖŸ£Öß ú¸ëü) :
5. †×¬ÖúŸÖ´Ö †­Öã´ÖÖ×­ÖŸÖ ´ÖÖÓÓÖ :
6. †Ö¾Ö¿µÖú ÃÖê¾ÖÖ ú­ÖêŒ¿Ö­Ö úß ¯Öύéú×ŸÖ :
(‹ú ±êúÃÖ ¾ÖÖ»Öß µÖÖ ŸÖß­Ö ±êúÃÖ ¾ÖÖ»Öß)
7. ãÖÖ­Ö •ÖÆüÖÓ ÃÖê¾ÖÖ úß †Ö¾Ö¿µÖúŸÖÖ Æîü :
‹) úÖµÖÔ :
²Öß) úÖò»ÖÖê­Öß :
8. ×¾ÖªãŸÖ úß †Ö¯ÖæÙŸÖ ×­Ö:¿Ö㻍ú µÖÖ ¯ÖϳÖÖ¸ü ¾ÖÖ»Öß Æîü :
(éú¯ÖµÖÖ ×­Ö×¾Ö¤üÖ úß ¿ÖŸÖÖí êú †Ó¿Ö ­ÖŸ£Öß ú¸ëü)
9. »ÖÖÖ‹ Ö‹ ´Öß™ü¸ü úÖ ×¾Ö¾Ö¸üÖ :
‹) µÖפü ×¾Ö³ÖÖÖ úÖ ´Öß™ü¸ü »ÖÖ­ÖÖ ÆüÖ,ê ŸÖÖê ŒµÖÖ ¯ÖÏןֳÖæ •Ö´ÖÖ úÖ ³ÖãÖŸÖÖ­Ö :
׍úµÖÖ ÖµÖÖ Æîü…
²Öß) ¯ÖÏןֳÖæ •Ö´ÖÖ úÖ ×¾Ö¾Ö¸üÖ :
ÃÖß) ´Öß™ü¸ü úß •ÖÖÓ“Ö úß Ö‡Ô Æîü µÖÖ ­ÖÆüà, µÖפü •ÖÖÓ“Ö úß Ö‡Ô Æîü ŸÖÖê •ÖÖÓ“Ö ×¸ü¯ÖÖê™Ôü :
­ÖŸ£Öß ú¸ëü, µÖפü ­ÖÆüà ŸÖÖê •Ö´ÖÖ ×ú‹ Ö‹ •ÖÖÓ“Ö ¿Ö㻍ú úÖ ×¾Ö¾Ö¸üÖ ¤ëü…
10. ãÖÖ¯Ö­Ö ¾Ö †­Öã¸üÖÖ êú ¯ÖµÖÔ¾ÖêÖú/‡»ÖêÛŒ™Òü×¿ÖµÖ­Ö úÖ ­ÖÖ´Ö :
11. úÖò»Ö´Ö 10 ´Öë ׻֏Öê Ö‹ ¾µÖÛŒŸÖ úß ‡»ÖêÛŒ™Òüú»Ö »ÖÖ‡ÃÖëÃÖ ÃÖӏµÖÖ :

111

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
12. Electrical safety appliances available :
for use

13. Fire extinguishers available for use :

14. First Aid facility/box available for use, :


if any.

(Signature of the Contractor)

Date : Name :

112

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
12. ˆ¯ÖµÖÖêÖ êú ×»Ö‹ ˆ¯Ö»Ö²¬Ö ×¾ÖªãŸÖ ÃÖÓ¸üÖÖ ˆ¯Öú¸üÖ :
13. ˆ¯ÖµÖÖêÖ êú ×»Ö‹ ˆ¯Ö»Ö²¬Ö †Û­Ö¿Ö´Ö­Ö ˆ¯Öú¸üÖ :
14. ˆ¯ÖµÖÖêÖ êú ×»Ö‹ ˆ¯Ö»Ö²¬Ö ¯ÖÏÖ£Ö״֍ú ˆ¯Ö“ÖÖ¸ü ÃÖã×¾Ö¬ÖÖ/¯Öê™üß

(ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÆüßÖցָü)


ŸÖÖ¸üßÖ : ­ÖÖ´Ö :

112

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
‘B’ CERTIFICATE BY THE CONTRACTOR
Certified that my/our installations have been carried out in accordance with
I.E. Rules and that I/we have employed competent persons to handle the
installations.

I/We am/are agreeable to the bills, in respect of this service connections


being raised on the basis the connected load furnished above, in case the actual
consumption falls below the one stipulated by the tender conditions.

(Signature of the Contractor)

Name :

Address :
Date :

…………………………………………………………………………………………………………

‘C’ CERTIFICATE BY THE CONTRACT CONTROL ENGINEER

Verified the particulars and forwarded to the Engineer-In-Charge.

(Signature of Contract Control Engineer)

Name :

Section : Civil/Electrical/Mechanical

…………………………………………………………………………………………………………

‘D’ CERTIFICATE BY THE ENGINEER-IN-CHARGE

Certified that the particulars furnished by the Contractor are true to the best
of my knowledge and belief and that I have satisfied myself as to the safe
conditions of electrical installations for which the service connection is applied for.

Signature :
Name :
Date: Designation with Section :

113

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
"²Öß" ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ ¯ÖÏ´Ö֝֯֡Ö
¯ÖÏ´ÖÖ×ÖŸÖ ×úµÖÖ •ÖÖŸÖÖ Æîü ׍ú ´Öê¸êü/Æü´ÖÖ¸êü ãÖÖ¯Ö­Ö ÃÖÓ²ÖÓ×¬ÖŸÖ ×­ÖµÖ´ÖÖë êú †­ÖãÃÖÖ¸ü ׍ú‹ Ö‹ Æïü †Öî¸ü ´Öï­Öê/Æü´Ö­Öê ‡­Ö
ãÖÖ¯Ö­ÖÖë êú ÃÖÓ“ÖÖ»Ö­Ö êú ×»Ö‹ ÃÖÖ´Ö ¾µÖÛŒŸÖµÖÖë úÖê ×­ÖµÖãŒŸÖ ×úµÖÖ Æîü…

´Öï/Æü´Ö ˆ¯ÖµÖãÔŒŸÖ פü‹ Ö‹ ×¾Ö¾Ö¸üÖ êú †­ÖãÃÖÖ¸ü ÃÖÙ¾ÖÃÖ ú­ÖêŒ¿Ö­Ö ÆêüŸÖã •ÖÖê›Íêü Ö‹ »ÖÖê›ü êú ×»Ö‹ µÖפü ¾ÖÖßÖ׾֍ú
ˆ¯ÖµÖÖêÖ ×­Ö×¾Ö¤üÖ úß ¿ÖŸÖÖí ÃÖê ú´Ö ÆüÖêŸÖÖ Æîü ŸÖÖê ²Ö­Ö­Öê ¾ÖÖ»Öê ײֻÖÖêÓ êú ³ÖãÖŸÖÖ­Ö êú ×»Ö‹ ÃÖÆü´ÖŸÖ Æïü…

(ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÆüßÖցָü)


ŸÖÖ¸üßÖ : ­ÖÖ´Ö :
¯ÖŸÖÖ :
--------------------------------------------------------------------------------------------
"ÃÖß" ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­ÖµÖÓ×¡ÖŸÖ †×³ÖµÖÓŸÖÖ úÖ ¯ÖÏ´Ö֝֯֡Ö
×¾Ö¾Ö¸üÖ úß •ÖÖÓ“Ö úß Ö‡Ô ¾Ö ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖê †ÖÏê×ÂÖŸÖ ×úµÖÖ ÖµÖÖ…

(ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­ÖµÖÓ×¡ÖŸÖ †×³ÖµÖÓŸÖÖ êú ÆüßÖցָü)


­ÖÖ´Ö :
†­Öã³ÖÖÖ : ×ÃÖ×¾Ö»Ö/‡»ÖêÛŒ™Òüú»Ö/´Öîêú׭֍ú»Ö
--------------------------------------------------------------------------------------------
"›üß" ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ úÖ ¯ÖÏ´Ö֝֯֡Ö
¯ÖÏ´ÖÖ×ÖŸÖ ×úµÖÖ •ÖÖŸÖÖ Æîü ׍ú ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×¤ü‹ Ö‹ ×¾Ö¾Ö¸üÖ ´Öê¸üß ¯ÖæÖÔ •Ö֭֍úÖ¸üß ¾Ö ×¾ÖÀ¾ÖÖÃÖ êú †­ÖãÃÖÖ¸ü ÃÖŸµÖ Æîü
†Öî¸ü ´Öî­Öê †Ö¾ÖêפüŸÖ ÃÖê¾ÖÖ ú­Öꌿ֭ÖÖë êú ×¾ÖªãŸÖ ãÖÖ¯Ö­ÖÖë úß ÃÖã¸ü×ÖŸÖ ¤ü¿ÖÖ êú ¯ÖÏ×ŸÖ Ã¾ÖµÖÓ úÖê †ÖÀ¾ÖÃŸÖ ú¸ü ×»ÖµÖÖ Æîü…
ÆüßÖցָü :
­ÖÖ´Ö :
¯Ö¤ü­ÖÖ´Ö ¾Ö †­Öã³ÖÖÖ :
פü­ÖÖӍú:
--------------------------------------------------------------------------------------------
113

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
‘E’ CERTIFICATE BY THE SAFETY ENGINEER

Certified that I have inspected the electrical installations referred herein and
after satisfying myself about the safe conditions of the installation, I hereby
recommend that the service connection be given to the Contractor.

Signature of the Safety Engineer

Date : Name :

…………………………………………………………………………………………………………

‘F’ AUTHORISATION BY THE ELECTRICAL ENGINEER

Service connection may be/may not be given for the reasons noted hereunder :

Signature of Electrical Engineer :

Name :

Date: Designation :

…………………………………………………………………………………………………………

114

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
"‡Ô" ÃÖÓ¸üÖÖ †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ¯ÖÏ´Ö֝֯֡Ö
¯ÖÏ´ÖÖ×ÖŸÖ ×úµÖÖ •ÖÖŸÖÖ Æîü ׍ú µÖÆüÖÓ ¯Ö¸ü ÃÖÓ¤üÙ³ÖŸÖ ×¾ÖªãŸÖ ãÖÖ¯Ö­ÖÖ†Öë úß ´Öî­Öê •ÖÖÓ“Ö úß Æîü †Öî¸ü ˆ­Öúß ÃÖã¸ü×ÖŸÖ ¤ü¿ÖÖ êú
²ÖÖ¸êü ´Öë ´Öï ÃÖÓŸÖã™ü ÆæÑü… ´Öï ‹ŸÖ¤Ëü«üÖ¸üÖ ÃÖÓßÖãŸÖ ú¸üŸÖÖ ÆæÑü ׍ú ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ×¾ÖªãŸÖ ÃÖê¾ÖÖ úÖ ú­ÖêŒ¿Ö­Ö ¤êü פüµÖÖ •ÖÖ‹…

ÃÖÓ¸üÖÖ †×³ÖµÖÓŸÖÖ êú ÆüßÖցָü


­ÖÖ´Ö :
פü­ÖÖӍú:
--------------------------------------------------------------------------------------------
"‹±ú" ×¾ÖªãŸÖ †×³ÖµÖÓŸÖÖ «üÖ¸üÖ ¯ÖÏÖ׬֍ú¸üÖ
ÃÖê¾ÖÖ ú­ÖêŒ¿Ö­Ö ×¤üµÖÖ •ÖÖ Ã֍úŸÖÖ Æîü/×­Ö´­Ö×»Ö×ÖŸÖ úÖ¸üÖÖë úß ¾Ö•ÖÆü ÃÖê ­ÖÆüà פüµÖÖ •ÖÖ Ã֍úŸÖÖ :

×¾ÖªãŸÖ †×³ÖµÖÓŸÖÖ êú ÆüßÖցָü :


­ÖÖ´Ö :
פü­ÖÖӍú: ¯Ö¤ü­ÖÖ´Ö :
--------------------------------------------------------------------------------------------

114

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
‘G’ REPORT OF COMPLIANCE

Service connection is given by me on

a) Meter Nos. : 1.

2.

3.

b) Initial readings : 1.

2.

3.

c) Locations : 1.

2.

3.

d) Meter sealings :

Signature of Electrical Engineer


(Metering and Billing)

Name :

Date : Designation :

Note:

1st copy to Contract Control Engineer } After all the formalities are
completed
} and Report of Compliance in (G)
are
2nd copy to Safety Engineer } filled up by the electrical Engineer
after
} power supply is given.
3rd copy to Electrical Engineer }

115

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
"•Öß" †­Öã¯ÖÖ»Ö­Ö úß ×¸ü¯ÖÖê™Ôü
´Öï­Öê פü­ÖÖӍú --------úÖê ÃÖê¾ÖÖ ú­ÖêŒ¿Ö­Ö ×¤üµÖÖ…
‹) ´Öß™ü¸ü ÃÖӏµÖÖ‹Ó 1.
2.
3.

²Öß) ¯ÖÏÖ¸Óü׳֍ú ¸üßØ›üÖ 1.


2.
3.

ÃÖß †¾ÖÛãÖ×ŸÖ 1.
2.
3.

›üß) ´Öß™ü¸ü ´ÖãÆü¸üߍú¸üÖ

¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ êú ÆüßÖցָü


(´Öß™ü׸ӐÖü ¾Ö ײÖػ֐Ö)
­ÖÖ´Ö :
פü­ÖÖӍú: ¯Ö¤ü­ÖÖ´Ö :

­ÖÖê™ü:
ÃÖ³Öß †Öî¯Ö“ÖÖ׸üúŸÖÖ†Öë úÖê ¯Öæ¸üÖ ú¸ü­Öê êú ²ÖÖ¤ü
¯ÖÆü»Öß ¯ÖÏ×ŸÖ ÃÖÓ×¾Ö¤üÖ ×­ÖµÖÓ¡ÖÖ †×³ÖµÖÓŸÖ úÖê †Öî¸ü ×¾ÖªãŸÖ †Ö¯ÖæÙŸÖ ×¤ü‹ •ÖÖ­Öê êú ²ÖÖ¤ü ×¾ÖªãŸÖ
¤æüÃÖ¸üß ¯ÖÏ×ŸÖ ÃÖÓ¸üÖÖ †×³ÖµÖÓŸÖÖ úÖê †×³ÖµÖÓŸÖÖ «üÖ¸üÖ†­Öã¯ÖÖ»Ö­Ö ×¸ü¯ÖÖê™Ôü (•Öß) •Ö´ÖÖ ×ú‹
ŸÖßÃÖ¸üß ¯ÖÏ×ŸÖ ×¾ÖªãŸÖ †×³ÖµÖÓŸÖÖ úÖê •ÖÖ­Öê êú ²ÖÖ¤ü…

--------------------------------------------------------------------------------------------

115

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
22. TENDER FORMS
TENDER

To,
Nuclear Power Corporation of India Ltd.,
(Hereinafter referred to as the Corporation)

I/We have read and examined the following documents relating to ______________

________________________________________________________________________________

(Name of the Works)

(a) Notice Inviting tender.

(b) Schedules A, B & C

(c) Technical Specifications

(d) Drawings

(e) General Conditions of Contract including Contractors Labour Regulations, Model


Rules for Labour Welfare and Safety guide appended to these conditions
together with the amendments thereto Nos. 1 to ..... if any.

(f) Special Conditions of contracts

(g) Schedule of quantities and Rates (referred to in the General Conditions of


Contract as Schedule of Rates) together with Amendment Nos. 1 to ..... if any.

I/We hereby tender for execution of the works referred to in the aforesaid
documents upon the terms and conditions contained or referred to therein and in
accordance in all respects with the specifications, designs, drawings and other
relevant details at the rates contained in Schedule of Quantities and Rates and
within the period(s) of completion as stipulated in NIT.

In consideration of I/We being invited to tender. I/We agree to keep the tender
open for acceptance for ....... days from the due date of submission thereof and
not to make any modifications in its terms and conditions which are not
acceptable to the Corporation.

116

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
22. ×­Ö×¾Ö¤üÖ ¯Öϯ֡Ö
×­Ö×¾Ö¤üÖ

ÃÖê¾ÖÖ ´Öë,

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü


(‡ÃÖê †ÖÖê úÖò¸ü¯ÖÖê¸êü¿Ö­Ö úÆüÖ ÖµÖÖ Æîü)

´Öî­Öê/Æü´Ö­Öê ------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------(úÖµÖÔ úÖ ­ÖÖ´Ö)
ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ×­Ö´­Ö×»Ö×ÖŸÖ ¤üßÖÖ¾Öê•ÖÖë úÖê ¯ÖœÍü ×»ÖµÖÖ Æîü ¾Ö ˆ­Öúß •ÖÖÓ“Ö ú¸ü »Öß Æîü…

(‹) ×­Ö×¾Ö¤üÖ †Ö´ÖÓ¡ÖÖ ÃÖæ“Ö­ÖÖ


(²Öß) †­ÖãÃÖæ“Öß ‹, ²Öß, ¾Ö ÃÖß
(ÃÖß) ŸÖú­Öߍúß ×¾Ö×­Ö¤ìü¿Ö
(›üß) ¸êüÖÖד֡Ö
(‡Ô) ‡­Ö ¿ÖŸÖÖí êú ÃÖÖ£Ö ÃÖӻ֐­Ö ÃÖÓ×¾Ö¤üÖ ÁÖ״֍ú ×¾Ö×­ÖµÖ´ÖÖê, ÁÖ״֍ú ú»µÖÖÖ êú ×»Ö‹ †Ö¤ü¿ÖÔ ×­ÖµÖ´Ö †Öî¸ü ÃÖÓ¸üÖÖ
פü¤üٿ֍úÖ ¾Ö ˆ­Öêú ÃÖÓ¿ÖÖê¬Ö­ÖÖë Îú´ÖÖӍú 1 ÃÖê ------ŸÖú, µÖפü úÖê‡Ô ÆüÖ,ê ÃÖ×ÆüŸÖ ÃÖÓ×¾Ö¤üÖ úß ÃÖÖ´ÖÖ­µÖ ¿ÖŸÖí
(‹±ú) ÃÖÓ×¾Ö¤üÖ úß ×¾Ö¿ÖêÂÖ ¿ÖŸÖí
(•Öß) ÃÖÓ¿ÖÖê¬Ö­ÖÖë Îú´ÖÖӍú 1 ÃÖê ------ŸÖú, µÖפü úÖê‡Ô ÆüÖê, ÃÖ×ÆüŸÖ ´ÖÖ¡ÖÖ ¾Ö ¤ü¸ü úß †­ÖãÃÖæ“Öß (ÃÖÓ×¾Ö¤üÖ úß ÃÖÖ´ÖÖ­µÖ
¿ÖŸÖÖí ´Öë ¤ü¸ü úß †­ÖãÃÖæ“Öß êú ºþ¯Ö ´Öë ÃÖÓ¤üÙ³ÖŸÖ)

´Öï/Æü´Ö ‹ŸÖ¤Ëü«üÖ¸üÖ ˆ¯ÖµÖãÔŒŸÖ ¤üßÖÖ¾Öê•ÖÖë ´Öë ÃÖÓ¤üÙ³ÖŸÖ úÖµÖÔ êú ×»Ö‹ ˆ­Ö´Öë ¿ÖÖ×´Ö»Ö µÖÖ ÃÖÓ¤üÙ³ÖŸÖ ×­ÖµÖ´Ö ¾Ö ¿ÖŸÖÖí ¯Ö¸ü †Öî¸ü
ˆ­Ö´Öë ¾ÖÙÖŸÖ ×¾Ö×­Ö¤ìü¿ÖÖë, †×³Öú»¯Ö­ÖÖ, ¸êüÖÖד֡ÖÖë ¾Ö ´ÖÖ¡ÖÖ †Öî¸ü ¤ü¸ü †­ÖãÃÖæ“Öß ´Öë ×­Ö×ÆüŸÖ ÃÖ³Öß ¤ü¸üÖë êú †­Öãºþ¯Ö †Öî¸ü
×­Ö×¾Ö¤üÖ †Ö´ÖÓ¡ÖÖ ÃÖæ“Ö­ÖÖ ´Öë ˆÛ»»Ö×ÖŸÖ ¯ÖæÖÔŸÖÖ úß †¾Ö׬Ö(µÖÖë) ´Öë ×­Ö¯ÖÖ¤ü­Ö êú ×»Ö‹ ×­Ö×¾Ö¤üÖ ú¸üŸÖÖ ÆæÓü/ú¸üŸÖê Æïü …

×­Ö×¾Ö¤üÖ êú †Ö´ÖÓ¡ÖÖ êú ×»Ö‹ ´Öã—Öê/Æü´ÖÖ¸êü ­ÖÖ´Ö ¯Ö¸ü ×¾Ö“ÖÖ¸ü ׍ú‹ •ÖÖ­Öê ¯Ö¸ü ´Öï/Æü´Ö ×­Ö×¾Ö¤üÖ úÖê þÖߍúÖ¸ü ׍ú‹ •ÖÖ­Öê ÆêüŸÖã
‡Ã֍úê •Ö´ÖÖ ×ú‹ •ÖÖ­Öê úê ×»Ö‹ ×­Ö¬ÖÖÔ׸üŸÖ ŸÖÖ¸üßÖ ÃÖê --------פü­ÖÖë êú ×»Ö‹ Öã»Öß ¸üÖ­Öê †Öî¸ü ‡Ã֍êú ×­ÖµÖ´Ö ¾Ö ¿ÖŸÖÖí
´Öë ×­ÖÖ´Ö úÖê †Ã¾ÖߍúÖµÖÔ úÖê‡Ô ÃÖÓ¿ÖÖê¬Ö­Ö ­Ö ú¸ü­Öê ¯Ö¸ü ÃÖÆü´ÖŸÖ ÆæÓü/Æïü…

116

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
A sum of Rs ...... is hereby forwarded in Demand Draft payable at ........./Deposit
at Call Receipt of any scheduled commercial bank as Bid Security. If I/We fail to
keep the tender open as aforesaid or make any modifications in the terms and
conditions of the tender which are not acceptable to the Corporation, I/We
agree that the Corporation shall without prejudice to any other right or remedy,
be at liberty to forfeit the said bid security absolutely. Should this tender be
accepted, I/We hereby agree to abide by and fulfill all the terms, conditions and
provisions of the aforesaid documents.

If, After the tender is accepted, I/We fail to commence the execution of the works
as provided in the conditions, I/we agree that the Corporation shall without
prejudice to any other right or remedy be at liberty forfeit the said bid security
absolutely.

Signature of the capacity of ___________________________________________


Duly authorised to sign the tender on behalf of the
(In block Capitals)____________________________________________________
______________________________________________________________________
Dated _______________________________________
Postal Address _______________________________________________________
Telegraph Address ____________________________________________________
Telephone No./Fax/Telex No __________________________________________
Seal of the Company/Firm
Witness ___________________________
Date_______________________________
Address ___________________________

117

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
²ÖÖê»Öß ¯ÖÏןֳÖæ êú ºþ¯Ö ´Öë ¹ý.------- úÖ ------------¯Ö¸ü ¤êüµÖ ×›ü´ÖÖÓ›ü ›ÒüÖò°™ü/׍úÃÖß †­ÖãÃÖæ×“ÖŸÖ ²Öïú úß ×›ü´ÖÖÓ›ü ‹ê™ü
úÖò»Ö ׸üÃÖ߯™ü •Ö´ÖÖ úÖê ‹ŸÖ¤Ëü«üÖ¸üÖ †ÖÏê×ÂÖŸÖ ×úµÖÖ •ÖÖŸÖÖ Æîü… µÖפü ´Öï/Æü´Ö ˆ¯ÖµÖãÔŒŸÖ †¾Ö×¬Ö êú ×»Ö‹ ×­Ö×¾Ö¤üÖ úÖê Öã»ÖÖ
¸üÖ­Öê ´Öë †ÃÖ´Ö£ÖÔ ¸üÆüŸÖÖ ÆæÓü/¸üÆüŸÖê Æïü µÖÖ ×­Ö×¾Ö¤üÖ êú ×­ÖµÖ´Ö ¾Ö ¿ÖŸÖÖí ´Öë ×­ÖÖ´Ö úÖê †Ã¾ÖߍúÖµÖÔ úÖê‡Ô ÃÖÓ¿ÖÖê¬Ö­Ö ú¸üŸÖÖ
ÆæÓü/ú¸üŸÖê Æïü ŸÖÖê ׍úÃÖß †×¬ÖúÖ¸ü µÖÖ ˆ¯Ö“ÖÖ¸üß ˆ¯ÖÖµÖ êú ¯Öæ¾ÖÖԐÖÏÆü êú ²ÖÖî¸ü ×­ÖÖ´Ö «üÖ¸üÖ ˆŒŸÖ ²ÖÖê»Öß ¯ÖÏןֳÖæ úÖê ¯ÖæÖÔŸÖµÖÖ
•Ö²ŸÖ ׍ú‹ •ÖÖ­Öê úê ×»Ö‹ þ֟ÖÓ¡Ö ÆüÖê­Öê ¯Ö¸ü ´Öï/Æü´Ö ÃÖÆü´ÖŸÖ ÆæÓü/Æïü… µÖפü µÖÆü ×­Ö×¾Ö¤üÖ Ã¾ÖߍúÖ¸ü ú¸ü »Öß •ÖÖŸÖß Æîü ŸÖÖê
´Öï/Æü´Ö ‹ŸÖ¤Ëü«üÖ¸üÖ ˆ¯ÖµÖãÔŒŸÖ ¤üßÖÖ¾Öê•ÖÖë úß ÃÖ´ÖÃŸÖ ¿ÖŸÖÖí, ×­Ö²ÖÓ¬Ö­ÖÖë ¾Ö ¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë êú ¯ÖæÖÔŸÖµÖÖ ¯ÖÖ»Ö­Ö ¾Ö ¯Öæ¸üÖ ú¸ü­Öê êú
×»Ö‹ ÃÖÆü´ÖŸÖ ÆæÓü/Æïü…
µÖפü, ×­Ö×¾Ö¤üÖ Ã¾ÖߍúÖ¸ü ú¸ü ×»Ö‹ •ÖÖ­Öê êú ²ÖÖ¤ü ´Öï/Æü´Ö ‡Ã֍úß ¿ÖŸÖÖí êú †­ÖãÃÖÖ¸ü úÖµÖÔ úÖ ×­Ö¯ÖÖ¤ü­Ö ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê ´Öë
†ÃÖ±ú»Ö ¸üÆüŸÖê Æïü ŸÖÖê ׍úÃÖß †×¬ÖúÖ¸ü µÖÖ ˆ¯Ö“ÖÖ¸üß ˆ¯ÖÖµÖ êú ¯Öæ¾ÖÖԐÖÏÆü êú ²ÖÖî¸ü ×­ÖÖ´Ö «üÖ¸üÖ ˆŒŸÖ ÃÖÓ¯ÖæÖÔ ²ÖÖê»Öß ¯ÖÏןֳÖæ
úÖê ¯ÖæÖÔŸÖµÖÖ •Ö²ŸÖ ׍ú‹ •ÖÖ­Öê úê ×»Ö‹ þ֟ÖÓ¡Ö ÆüÖê­Öê ¯Ö¸ü ´Öï/Æü´Ö ÃÖÆü´ÖŸÖ ÆæÓü/Æïü…

---------------------------------------------------------------(ïÖ™ü †Ö¸üÖê ´Öë ׻֏Öë) úß †Öê¸ü


ÃÖê ×¾Ö׬־֟ÖË ¯ÖÏÖ׬֍éúŸÖ
úß Ö´ÖŸÖÖ ´Öë ÆüßÖցָü ------------------------------
פü­ÖÖӍú--------------------------------------------
›ü֍ú úÖ ¯ÖŸÖÖ--------------------------------------
™êü»ÖߐÖÏÖ±ú úÖ ¯ÖŸÖÖ----------------------------------
™êü»Öß±úÖê­Ö ÃÖӏµÖÖ/±îúŒÃÖ/™êü»ÖêŒÃÖ ÃÖӏµÖÖ----------------
Óú¯Ö­Öß/±ú´ÖÔ úß ´ÖãÆü¸ü

ÃÖցÖß-------------------------------------------
ŸÖÖ¸üߏÖ------------------------------------------
¯ÖŸÖÖ--------------------------------------------

117

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
23. FORMS OF DIFFERENT DEEDS

1. PROFORMA BANK GUARANTEE IN LIEU OF BID SECURITY

(On Non Judicial Stamp paper to be stamped in accordance


with stamp act, the stamp paper to be in name of
Executing Bank)

Ref.............. Date................

Bank Guarantee No........

To NUCLEAR POWER CORPORATION OF INDIA LTD

____________________________________________________

____________________________________________________

____________________________________________________

Dear Sir,

In accordance with your Notice Inviting Tender for _______________under your


tender No__________ dated ________________ M/s _______________________
(hereinafter called the Tenderer) with following directors on their Board of
Directors/Partners of
the firm.

1________________________ 2________________________
3________________________ 4________________________
5________________________ 6________________________
7________________________ 8________________________
9________________________ 10________________________

Wish to participate in the said tender for the following:

1______________________________________________________________________________
2______________________________________________________________________________
3______________________________________________________________________________
118

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
23. ×¾Ö×³Ö®Ö ×¾Ö»ÖêÖÖë êú ¯Öϯ֡Ö
1. ²ÖÖê»Öß ¯ÖÏןֳÖæ êú ²Ö¤ü»Öê ´Öë ¤üß •ÖÖ­Öê ¾ÖÖ»Öß ²Öïú ÖÖ¸Óü™üß úÖ ¯ÖÏÖºþ¯Ö
(­µÖÖ׵֍úêŸÖ¸ü ÙüÖ´¯Ö ¯Öê¯Ö¸ü ¯Ö¸ü ÙüÖ´¯Ö †×¬Ö×­ÖµÖ´Ö êú †­Öãºþ¯Ö ´ÖãÆü¸ü »ÖÖÖ‡Ô •ÖÖ‹, µÖÆü ÙüÖ´¯Ö ¯Öê¯Ö¸ü ×­Ö¯ÖÖפüŸÖ
ú¸ü­Öê ¾ÖÖ»Öê ²Öïú êú ­ÖÖ´Ö ¯Ö¸ü ÆüÖêÖÖ…)
ÃÖÓ¤ü³ÖÔ---------------- פü­ÖÖӍú-------------------
²Öïú ÖÖ¸Óü™üß ÃÖӏµÖÖ-----------------
ÃÖê¾ÖÖ ´Öë ­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü
---------------------------------------------
---------------------------------------------
--------------------------------------------
ׯÖ쵅 ´ÖÆüÖê¤üµÖ,
×­Ö×¾Ö¤üÖ Îú´ÖÖӍú----------------------פü­ÖÖӍú-----------------úß ×­Ö×¾Ö¤üÖ êú †¬Öß­Ö----------------------
--úÖµÖÔ êú ×»Ö‹ †Ö¯Öúß ×­Ö×¾Ö¤üÖ †Ö´ÖÓ¡ÖÖ ÃÖæ“Ö­ÖÖ êú †­Öãºþ¯Ö ´ÖêÃÖÃÖÔ----------------------------------------
---------(‡­Æëü †ÖÖê "×­Ö×¾Ö¤ü֍úŸÖÖÔ" úÆüÖ ÖµÖÖ Æîü) ו֭֍úß ±ú´ÖÔ ´Öë ×­Ö´­Ö×»Ö×ÖŸÖ ×­Ö¤êü¿Öú ´ÖÓ›ü»Ö êú
×­Ö¤êü¿ÖúÖÖ/³Ö֐ÖߤüÖ¸ü Æïü,
1Ë----------------------------------------2.------------------------------------------------
3.---------------------------------------4.------------------------------------------------
5.---------------------------------------6.------------------------------------------------
7.---------------------------------------8.------------------------------------------------
9.---------------------------------------10.-----------------------------------------------
×­Ö´­Ö×»Ö×ÖŸÖ êú ×»Ö‹ ˆŒŸÖ ×­Ö×¾Ö¤üÖ ´Öë ³ÖÖÖ »Öê­ÖÖ “ÖÖÆüŸÖê Æïü:
1.------------------------------------------------------------------------------------------
2.------------------------------------------------------------------------------------------
3.------------------------------------------------------------------------------------------

118

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Whereas it is a condition in the tender documents that the tenderer has to
deposit Bid Security with respect to the tender, with Nuclear Power Corporation
of India Ltd (hereinafter referred to as "Corporation") amounting to Rs........ or
alternatively the tenderer is required to submit "Bank Guarantee" from a
nationalised bank irrevocable and operative till 28 days after the validity of the
offer. (i.e. 120 days from the date of opening of tender), for the like amount
which amount is likely to be forfeited on the happening of contingencies
mentioned in the tender documents. And whereas the tenderer desires to secure
exemption from deposit of Bid Security and has offered to furnish a Bank
Guarantee for a sum of Rs....... to the Corporation for the purpose of securing
exemption from the deposit of Bid Security.
1. NOW THEREFORE, we the ...................... Bank, a body corporate constituted
under the Banking Companies (Acquisition and Transfer of undertakings) Act
1969 and having a branch office at............ (hereinafter referred to as the Bank")
do hereby undertake and agree to pay on demand in writing by the
Corporation, the amount of Rs.......(Rupees............) to the Nuclear Power
Corporation of India Ltd without any demur, reservation or recourse.
2. We, the aforesaid Bank, further agree that the Corporation shall be the sole
judge of and as to whether the tenderer has committed any breach or breaches
of any of the terms and conditions of the tender and the extent of loss,
damage, costs, charges and expenses caused to or suffered by or that may be
caused to or suffered by the Corporation on account thereof the extent of the
bid security required to be deposited by the Tenderer in respect of the said
Tender document and the decision of the Corporation that the Tenderer has
committed such breach or breaches and as to the amount or amounts of loss,
damage, costs, charges and expenses caused to or suffered by or that may be
caused to or suffered by the Corporation shall be final and binding on us.
3. We, the said Bank further agree that the Guarantee herein contained shall
remain in full force and effect until it is released by the Corporation and change in
the constitution, liquidation or dissolution of the Tenderer, shall not discharge
our liability guaranteed herein.
4. It is further declared that it shall not be necessary for the Corporation to
proceed against the Contractor before proceeding against the Bank and the
Guarantee herein contained shall be enforceable against the Bank
notwithstanding any security which the Corporation may have obtained or shall
obtain from the Contractor at the time when proceedings are taken against the
Bank for whatever amount may be outstanding or unrealised under the
Guarantee.
5. The right of the Corporation to recover the said amount of Rs...........(Rupees
......................) from us in manner aforesaid will not be affected or suspended by
reason of the fact that any dispute or disputes have been raised by the said
M/s................... (Tenderer) and/or that any dispute or disputes are pending
before any authority, officer, tribunal or arbitrator(s) etc.

119

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
•Ö²Ö׍ú ×­Ö×¾Ö¤üÖ ¯ÖÏ¯Ö¡Ö ´Öë µÖÆ ü¿ÖŸÖÔ Æîü ׍ú ×­Ö×¾Ö¤ü֍úŸÖÖÔ úÖê ‡ÃÖ ×­Ö×¾Ö¤üÖ êú ÃÖÓ²ÖÓ¬Ö ´Öë ­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö
†Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü (וÖÃÖê †ÖÖê "úÖ¸ü¯ÖÖê¸êü¿Ö­Ö" úÆüÖ ÖµÖÖ Æîü) êú ¯ÖÖÃÖ ¹ý.---------------¸üÖ×¿Ö úß ²ÖÖê»Öß
¯ÖÏןֳÖæ •Ö´ÖÖ ú¸üÖ­Öß ÆüÖêÖß µÖÖ ×¾Öú»¯Ö êú ºþ¯Ö ´Öë ׍úÃÖß ¸üÖ™Òüߵ֍éúŸÖ ²Öïú úß †¯ÖÏןÖÆüßÖÖÓŸÖ¸üÖßµÖ ¾Ö ¯ÖÏßÖÖ¾Ö êú 28
פü­ÖÖë êú ²ÖÖ¤ü ŸÖú êú ×»Ö‹ (†£ÖÖÔŸÖ ×­Ö×¾Ö¤üÖ ÖÖê»Öê •ÖÖ­Öê úß ŸÖÖ¸üßÖ êú 120 פü­Ö ²ÖÖ¤ü ŸÖú) ¯ÖϳÖÖ¾Öß ‡ŸÖ­Öß Æüß
¸üÖ׿Ö, וÖÃ֍úê ׍ú ×­Ö×¾Ö¤üÖ ¤üßÖÖ¾Öê•Ö ´Öë ¾ÖÙÖŸÖ †Ö¯Ö¤üÖ†Öë êú ‘Ö×™üŸÖ ÆüÖê­Öê ¯Ö¸ü •Ö²ŸÖ ׍ú‹ •ÖÖ­Öê úß ÃÖÓ³ÖÖ¾Ö­ÖÖ Æîü, úß
"²Öïú ÖÖ¸Óü™üß" ¯ÖÏßÖãŸÖ ú¸ü­Öß ÆüÖêÖß… †Öî¸ü •Ö²Ö׍ú ×­Ö×¾Ö¤ü֍úŸÖÖÔ ²ÖÖê»Öß ¯ÖÏןֳÖæ •Ö´ÖÖ ú¸üÖ­Öê ÃÖê ”æû™ü ¯ÖÏÖ¯ŸÖ ú¸ü­Öê úÖ
‡“”ãûú Æîü †Öî¸ü ˆÃÖ­Öê ²ÖÖê»Öß ¯ÖÏןֳÖæ •Ö´ÖÖ ú¸ü­Öê ÃÖê ”æû™ü ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ˆ§êü¿µÖ ÃÖê ×­ÖÖ´Ö úÖê ¹ý.------------¸üÖ׿Ö
úß ²Öïú ÖÖ¸Óü™üß ¯ÖÏßÖãŸÖ ú¸ü­Öê úÖ ¯ÖÏßÖÖ¾Ö ×úµÖÖ Æîü…
1. †ŸÖ: †²Ö, Æü´Ö ---------------------------²Öïú •ÖÖê׍ú ²Öï؍úÖ Óú¯Ö­Öß (ˆ¯ÖÎú´ÖÖë úÖ †×¬ÖÖÏÆüÖ ¾Ö
†ÓŸÖ¸üÖ) ‹êŒ™ 1969 êú †¬Öß­Ö ÖךüŸÖ ‹ú ׭֍úÖµÖ ×­ÖÖ´Ö Æïü †Öî¸ü ו֭֍úÖ -----------------ãÖÖ­Ö ¯Ö¸ü ¿Ö֏ÖÖ
úÖµÖÖÔ»ÖµÖ (וÖÃÖê †ÖÖê "²Öïú" êú ºþ¯Ö ´Öë ÃÖÓ¤üÙ³ÖŸÖ ×úµÖÖ ÖµÖÖ Æîü) Æîü, ‹ŸÖ¤Ëü«üÖ¸üÖ ×­ÖÖ´Ö êú ×»Ö×ÖŸÖ ºþ¯Ö ÃÖê ´ÖÖӐÖê •ÖÖ­Öê
¯Ö¸ü ­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü úÖê ²ÖÖî¸ü †Ö¯Ö×¢Ö, †Ö¸üÖÖ †£Ö¾ÖÖ †¾Ö»ÖÓ²Ö­Ö êú ¹ý.----
---------(------------------------¹ý¯Ö‹ ´ÖÖ¡Ö)ü úß ¸üÖ×¿Ö úÖ ³ÖãÖŸÖÖ­Ö ú¸ü­Öê úß ÃÖÆü´Ö×ŸÖ ¤êüŸÖê Æïü…
2. Æü´Ö, ˆ¯ÖµÖãÔŒŸÖ ²Öïú ‡ÃÖ ¯Ö¸ü ³Öß ÃÖÆü´ÖŸÖ Æïü ׍ú ×­Ö×¾Ö¤ü֍úŸÖÖÔ «üÖ¸üÖ ×­Ö×¾Ö¤üÖ úß ¿ÖŸÖÖí ¾Ö ×­Ö²ÖÓ¬Ö­ÖÖë êú ˆ»»ÖÓ‘Ö­Ö
µÖÖ ˆ»»ÖÓ‘Ö­ÖÖëü úÖê ׍ú‹ •ÖÖ­Öê µÖÖ ­Ö ׍ú‹ •ÖÖ­Öê êú ×»Ö‹ †Öî¸ü ˆŒŸÖ ×­Ö×¾Ö¤üÖ ¤üßÖÖ¾Öê•Ö êú ÃÖÓ²ÖÓ¬Ö ´Öë •Ö´ÖÖ úß •ÖÖü­Öê
µÖÖêµÖ ²ÖÖê»Öß ¯ÖÏןֳÖæ úß ÃÖß´ÖÖ ŸÖú ˆÃ֍úß ¾Ö•ÖÆü ÃÖê µÖÖ ˆÃ֍êú úÖ¸üÖ ÆüÖê­Öê ¾ÖÖ»Öê †£Ö¾ÖÖ ˆÃ֍úß ¾Ö•ÖÆü ÃÖê µÖÖ ˆÃ֍êú
úÖ¸üÖ ÆüÖê­Öê ¾ÖÖ»Öê ÆüÖê Ã֍ú­Öê ¾ÖÖ»Öê ×­ÖÖ´Ö êú ­ÖãúÃÖÖ­Ö, ÖןÖ, úß´ÖŸÖ, ¯ÖϳÖÖ¸ü ŸÖ£ÖÖ ¾µÖµÖ úß ÃÖß´ÖÖ êú ×»Ö‹, ׭֐ִÖ
‹ú´ÖÖ¡Ö ×­ÖÖÖԵ֍ú ÆüÖêÖÖ †Öî¸ü ×­Ö×¾Ö¤ü֍úŸÖÖÔ «üÖ¸üÖ ‡­Ö ˆ»»ÖÓ‘Ö­Ö µÖÖ ˆ»»ÖÓ‘Ö­ÖÖë úÖê ׍ú‹ •ÖÖ­Öê †Öî¸ü ‡Ã֍úß ¾Ö•ÖÆü ÃÖê µÖÖ
‡Ã֍êú úÖ¸üÖ ×­ÖÖ´Ö úÖê ÆüÖê­Öê ¾ÖÖ»Öê †£Ö¾ÖÖ ‡Ã֍úß ¾Ö•ÖÆü ÃÖê µÖÖ ‡Ã֍êú úÖ¸üÖ ÆüÖê Ã֍ú­Öê ¾ÖÖ»Öê ­ÖãúÃÖÖ­Ö, ÖןÖ,
úß´ÖŸÖ, ¯ÖϳÖÖ¸ü ŸÖ£ÖÖ ¾µÖµÖ úß ¸üÖ×¿Ö µÖÖ ¸üÖ׿ֵÖÖêÓ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ×­ÖÖ´Ö úÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ¾Ö Æü´Ö ¯Ö¸ü ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…
3. Æü´Ö, ˆŒŸÖ ²Öïú ‡ÃÖ ¯Ö¸ü ³Öß ÃÖÆü´ÖŸÖ Æïü ׍ú ‹ŸÖ¤Ëü«üÖ¸üÖ ¤üß Ö‡Ô ÖÖ¸Óü™üß ×­ÖÖ´Ö «üÖ¸üÖ ×­Ö´ÖãÔŒŸÖ ׍ú‹ •ÖÖ­Öê ŸÖú ¯ÖæÖÔ
²Ö»Ö¿Öᯙ ¾Ö ¯ÖϳÖÖ¾Öß ¸üÆêüÖß †Öî¸ü ×­Ö×¾Ö¤ü֍úŸÖÖÔ êú ÃÖÓ×¾Ö¬ÖÖ­Ö ´Öë ¯Ö׸ü¾ÖŸÖÔ­Ö, ¯Ö׸üÃÖ´ÖÖ¯Ö­Ö µÖÖ ×¾Ö‘Ö™ü­Ö Æü´Öë ‹ŸÖ¤Ëü«üÖ¸üÖ ¤üß
Ö‡Ô ÖÖ¸Óü™üß êú Æü´ÖÖ¸üê ¤üÖ×µÖŸ¾Ö ÃÖê ˆ­´ÖÖê×“ÖŸÖ ­ÖÆüà ú¸êüÖÖ…
4. †ÖÖê µÖÆü ³Öß ‘ÖÖê×ÂÖŸÖ ×úµÖÖ •ÖÖŸÖÖ Æîü ׍ú ×­ÖÖ´Ö êú ×»Ö‹ ²Öïú êú ×¾Ö¹ý¨ü úÖ¸Ôü¾ÖÖ‡Ô ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê ÃÖê ¯ÖÆü»Öê
ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ×¾Ö¹ý¨ü úÖ¸Ôü¾ÖÖ‡Ô ¯ÖÏÖ¸Óü³Ö ú¸ü­ÖÖ †Ö¾Ö¿µÖú ­ÖÆüà ÆüÖêÖÖ †Öî¸ü ‹ŸÖ¤Ëü«üÖ¸üÖ ¤üß Ö‡Ô ÖÖ¸Óü™üß ²Öïú êú ×¾Ö¹ý¨ü
²Ö»Ö¿Öᯙ ¸üÆêüÖß ³Ö»Öê Æüß ‡ÃÖ ÖÖ¸Óü™üß êú †¬Öß­Ö ×úÃÖß ³Öß ²ÖúÖµÖÖ µÖÖ †¯ÖÏÖ¯µÖ ¸üÖ×¿Ö êú ×»Ö‹ ×­ÖÖ´Ö «üÖ¸üÖ ²Öïú êú
×¾Ö¹ý¨ü úÖ¸Ôü¾ÖÖ‡Ô ×ú‹ •ÖÖ­Öê êú ÃÖ´ÖµÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê ×­ÖÖ´Ö ­Öê úÖê‡Ô ¯ÖÏןֳÖæ »Öê ×»ÖµÖÖ ÆüÖê µÖÖ »Öê­Öê ¾ÖÖ»ÖÖ ÆüÖê…
5. ˆŒŸÖ ¹ý.--------(------------¹ý¯Ö‹ ´ÖÖ¡Ö) úß ¸üÖ×¿Ö úÖê ˆ¯ÖµÖãÔŒŸÖ ¸üß×ŸÖ ÃÖê Æü´ÖÃÖê ¾ÖÃÖæ»Ö ú¸ü­Öê úÖ ×­ÖÖ´Ö
úÖ †×¬ÖúÖ¸ü ‡ÃÖ ŸÖ£µÖ ׍ ˆŒŸÖ ´ÖêÃÖÃÖÔ------------------(×­Ö×¾Ö¤ü֍úŸÖÖÔ) «üÖ¸üÖ úÖê‡Ô ×¾Ö¾ÖÖ¤ü ˆšüÖ‹ Ö‹ Æîü/Æïü
†Öî¸ü/†£Ö¾ÖÖ úÖê‡Ô ×¾Ö¾ÖÖ¤ü ׍úÃÖß ¯ÖÏÖ׬֍ú¸üÖ, †×¬ÖúÖ¸üß, †×¬Öú¸üÖ µÖÖ ´Ö¬µÖÃ£Ö (£ÖÖë) †Öפü êú ¯ÖÖÃÖ »ÖÓ×²ÖŸÖ Æîü/Æïü,
êú úÖ¸üÖÖë ÃÖê ¯ÖϳÖÖ×¾ÖŸÖ µÖÖ »ÖÓ×²ÖŸÖ ­ÖÆüà ÆüÖêÖÖ…

119

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6. Notwithstanding anything stated above, our liability under this guarantee
shall be restricted to Rs........(Rupees....... ....)and our guarantee shall
remain in force upto.......... and unless a demand or claim under the
guarantee is made on us in writing within three months after the aforesaid
date i.e. on or before the .......... all your rights under the guarantee shall
be forfeited and we shall be relieved and discharged from all liabilities
thereunder.

Date......................

place....................

(Signature)___________________________________________
(Printed Name)_______________________________________

(Designation)_________________________________________

(Bank's Common seal_________________________________

(Authorisation No.)___________________________________

In the presence of:

Witness

1)_______________________

2)_______________________

Accepted

(Signature of the Officer)


For and on behalf of the
Nuclear Power Corporation
of India Ltd.

120

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
6. ˆ¯ÖµÖãÔŒŸÖ ŸÖ£µÖÖë ´Öë ׍úÃÖß ²ÖÖŸÖ êú ÆüÖêŸÖê Æãü‹ ³Öß ‡ÃÖ ÖÖ¸Óü™üß êú †ÓŸÖÖÔŸÖ Æü´ÖÖ¸êü ¤üÖ×µÖŸ¾Ö ¹ý. ----------(------
---------¹ý¯Ö‹ ´ÖÖ¡Ö) ŸÖú ¯ÖÏןֲÖÓ×¬ÖŸÖ ÆüÖëÖê †Öî¸ü Æü´ÖÖ¸üß ÖÖ¸Óü™üß ×¤ü­ÖÖӍú----------- ŸÖú ²Ö»Ö¿Öᯙ ¸üÆêüÖß †Öî¸ü •Ö²Ö
ŸÖú ׍ú ‡ÃÖ ÖÖ¸Óü™üß êú †ÓŸÖÖÔŸÖ ˆ¯ÖµÖãÔŒŸÖ ŸÖÖ¸üßÖ †£ÖÖÔŸÖ ×¤ü­ÖÖӍú----------ŸÖú µÖÖ ‡ÃÖÃÖê ¯ÖÆü»Öê ŸÖß­Ö ´ÖÖÆü úß
†¾Ö×¬Ö ´Öë ×»Ö×ÖŸÖ ºþ¯Ö ´Öë Æü´ÖÃÖê úÖê‡Ô ´ÖÖÓÖ µÖÖ ¤üÖ¾ÖÖ ­ÖÆüà ׍úµÖÖ •ÖÖŸÖÖ, ‡ÃÖ ÖÖ¸Óü™üß êú †ÓŸÖÖÔŸÖ †Ö¯Öêú ÃÖ³Öß
†×¬ÖúÖ¸ü ÃÖ´ÖÖ¯ŸÖ ÆüÖê •Ö֋ӐÖê †Öî¸ü Æü´Ö ‡Ã֍êú †¬Öß­Ö ÃÖ³Öß ¤üÖ×µÖŸ¾ÖÖë ÃÖê ´ÖãŒŸÖ ¾Ö ˆ­´ÖÖê×“ÖŸÖ ÆüÖëÖê…
פü­ÖÖӍú--------------
ãÖÖ­Ö---------------
(ÆüßÖցָü)---------------------------------------
(”ûÖ¯ÖÖ ÖµÖÖ ­ÖÖ´Ö)---------------------------------

(¯Ö¤ü­ÖÖ´Ö)----------------------------------------

(²Öïú úß †Ö´Ö ´ÖãÆü¸ü)------------------------------

(¯ÖÏÖ׬֍ú¸üÖ ÃÖӏµÖÖ)-------------------------------
úß ˆ¯ÖÛÃ£ÖŸÖ ´Öë :
ÃÖցÖߐ֝Ö
1)-------------------------
2)-------------------------

þÖߍúÖ¸ü ׍úµÖÖ ÖµÖÖ

(†×¬ÖúÖ¸üß êú ÆüßÖցָü)


éúŸÖê ‹¾ÖÓ ¾ÖÖßÖê
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö
†Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü

120

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
2. PROFORMA OF BANK GUARANTEE IN LIEU OF SECURITY DEPOSIT
(Performance Guarantee / Retention money)
IN INDIVIDUAL CONTRACT
(ON NON JUDICIAL STAMP PAPER)

To

Nuclear Power Corporation of India Ltd.

_________________________________________

________________________________________

In consideration of the Nuclear Power Corporation of India Ltd.....................


Atomic Power Project) having its registered Office at
........................................ (hereinafter called the "Corporation" which expression shall
unless repugnant to the subject or context include its administrators,
successors and assigns) having agreed under the terms and conditions of the
Award Letter bearing No......... dated...... issued by the Corporation, which
has been unequivocally accepted by the Contractor
M/s...*...................................................... work of........................(hereinafter called the
said Contract) to accept a Deed of Guarantee as herein provided for
Rs.......(Rupees..........................only) from a Scheduled commercial bank in lieu of
the ………………….. (performance guarantee to be submitted by the Contractor
/retention money deducted from the Contractor's bills) for the due fulfillment by
the said Contractor of the terms and conditions contained in the said Contract.

1. We, the ........ Bank (hereinafter referred to as "the said Bank" and having our
registered office at....... do hereby undertake and agree to indemnify and keep
indemnified the Corporation from time to time to the extent of
Rs..........(Rupees ................Only) against any loss or damage, costs, charges and
expenses caused to or suffered by or that may be caused to or suffered by the
Corporation by reason of any breach or breaches by the said Contractor of any
of the terms and conditions contained in the said Contract and to
unconditionally pay the amount claimed by the Corporation on demand and
without demur to the extent aforesaid.

2. We.................... Bank, further agree that the Corporation shall be the


sole judge of and as to whether the said Contractor has committed any breach
or breaches of any of the terms and conditions of the said Contract and the
extent of loss, damage, costs, charges and expenses caused to or suffered by or
that may be caused to or suffered by the Corporation on account thereof and
the decision of the corporation that the said Contractor has committed such
breach or

*Refer note at the end of the proforma.


121

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
2. ¯ÖÏןֳÖæ •Ö´ÖÖ êú ãÖÖ­Ö ¯Ö¸ü ¤üß •ÖÖ­Öê ¾ÖÖ»Öß ²Öïú ÖÖ¸Óü™üß úÖ ¯ÖÏÖºþ¯Ö
(úÖµÖÔ×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üß/¯ÖÏן֬ÖÖ¸üÖ ¸üÖ׿Ö)
¾µÖÛŒŸÖÖŸÖ ÃÖÓ×¾Ö¤üÖ ´Öë
(­µÖÖ׵֍êúŸÖ¸ü ÙüÖ´¯Ö ¯Öê¯Ö¸ü ¯Ö¸ü)

ÃÖê¾ÖÖ ´Öë,
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü
----------------------------------------------
---------------------------------------------
µÖÆü ×¾Ö“ÖÖ¸ü ú¸üŸÖê Æãü‹ ׍ú ­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü -------------¯Ö¸ü´Ö֝Öã ײֻ֕Öß‘Ö¸ü)
ו֭֍úÖ ¯ÖÓ•ÖߍéúŸÖ úÖµÖÖÔ»ÖµÖ-------------------------------------------¯Ö¸ü ÛÃ£ÖŸÖ Æîü (וÖÃÖê †ÖÖê "׭֐ִÖ"
úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ †×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú ×¾ÖÂÖµÖ µÖÖ ÃÖÓ¤ü³ÖÔ êú ×¾Ö¹ý¨ü ­Ö ÆüÖ,ê ‡Ã֍úê ¯ÖÏ¿ÖÖÃ֍úÖÖ,
ˆ¢Ö¸üÖ׬֍úÖ¸üß ¾Ö ÃÖ´Ö­Öã¤êü¿Öß ¿ÖÖ×´Ö»Ö Æïü), ­Öê ×­ÖÖ´Ö «üÖ¸üÖ •ÖÖ¸üß †Ó׍úŸÖ ÃÖӏµÖÖ--------פü­ÖÖӍú-------------êú
†¾ÖÖ›Ôü ¯Ö¡Ö úß ¿ÖŸÖÖí ¾Ö ×­Ö²ÖÓ¬Ö­ÖÖë êú †¬Öß­Ö ×•ÖÃÖê -----------------úÖµÖÔ êú ÃÖÓ×¾Ö¤ü֍úÖ¸ü ´ÖêÃÖÃÖÔ *--------------
--------------(ו֭Æëü †ÖÖê ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÆüÖ ÖµÖÖ Æîü) «üÖ¸üÖ ×­ÖÙ¾Ö¾ÖÖפüŸÖ ºþ¯Ö ÃÖê þÖߍúÖ¸ü ׍úµÖÖ ÖµÖÖ Æîü,
ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ ´Öë ˆÛ»»Ö×ÖŸÖ ¿ÖŸÖÖí ¾Ö ×­Ö²ÖÓ¬Ö­ÖÖë úÖê ×¾Ö׬־֟ÖË ¯Öæ¸üÖ ú¸ü­Öê êú ×»Ö‹ •Ö´ÖÖ úß •ÖÖ­Öê
¾ÖÖ»Öß ÖÖ¸Óü™üß (úÖµÖÔ×­Ö¯ÖÖ¤ü­Ö ÖÖ¸Óü™üß/ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ײֻÖÖë ´Öë ÃÖê ú™üÖîŸÖß úß •ÖÖ­Öê ¾ÖÖ»Öß ¯ÖÏן֬ÖÖ¸üÖ ¸üÖ׿Ö) êú ²Ö¤ü»Öê
´Öë ׍úÃÖß †­ÖãÃÖæ×“ÖŸÖ ¾ÖÖםÖÛ•µÖú ²Öïú êú µÖÆüÖÓ ¯Ö¸ü פü‹ Ö‹ ¹ý.------(-------------------¹ý¯Ö‹ ´ÖÖ¡Ö) êú ÖÖ¸Óü™üß
×¾Ö»ÖêÖ úÖê þÖߍúÖ¸ü ú¸ü­Öê êú ×»Ö‹ ÃÖÆü´Ö×ŸÖ ¤üß Æîü…
1. Æü´Ö-------------------------²Öïú (וÖÃÖê †ÖÖê "ˆŒŸÖ ²Öïú" êú ºþ¯Ö ´Öë ÃÖÓ¤üÙ³ÖŸÖ ×úµÖÖ ÖµÖÖ Æîü) †Öî¸ü
Æü´ÖÖ¸üÖ ¯ÖÓ•ÖߍéúŸÖ úÖµÖÖÔ»ÖµÖ -------------¯Ö¸ü ÛÃ£ÖŸÖ Æîü, ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ ´Öë ˆÛ»»Ö×ÖŸÖ ¿ÖŸÖÖí ¾Ö
×­Ö²ÖÓ¬Ö­ÖÖë êú ˆ»»ÖÓ‘Ö­Ö µÖÖ ˆ»»ÖÓ‘Ö­ÖÖë êú úÖ¸üÖ ×­ÖÖ´Ö úÖê Æãü‹ µÖÖ ×ú‹ Ö‹ †£Ö¾ÖÖ ³Ö×¾Ö嵅 ´Öë ÆüÖê Ã֍ú­Öê µÖÖ ×ú‹ •ÖÖ
Ã֍ú­Öê ¾ÖÖ»Öê ­ÖãúÃÖÖ­Ö, ÖןÖ, úß´ÖŸÖ, ¯ÖϳÖÖ¸ü ŸÖ£ÖÖ ¾µÖµÖ êú ×»Ö‹ ×­ÖÖ´Ö úÖê וÖÃÖ ÃÖ´ÖµÖ ³Öß †Ö¾Ö¿µÖúŸÖÖ ÆüÖ,ê ¹ý.----
------(-----------------------¹ý¯Ö‹ ´ÖÖ¡Ö) ŸÖú úß ÃÖß´ÖÖ ŸÖú úßê Öן֯ÖæÙŸÖ †Öî¸ ÃÖŸÖŸÖË Öן֯ÖæÙŸÖü êú ×»Ö‹ ŸÖ£ÖÖ
×­ÖÖ´Ö «üÖ¸üÖ ¤üÖ¾ÖÖ µÖÖ ´ÖÖÓÖ úß Ö‡Ô ˆ¯ÖµÖãÔŒŸÖ ÃÖß´ÖÖ ŸÖú úß ¸üÖ×¿Ö úÖê ²ÖÖî¸ü ׍úÃÖß †Ö¯Ö×¢Ö êú ¾Ö ײ֭ÖÖ¿ÖŸÖÔ ³ÖãÖŸÖÖ­Ö
ú¸ü­Öê úÖ ‹ŸÖ¤Ëü«üÖ¸üÖ ¾Ö“Ö­Ö ¤êüŸÖê Æïü ¾Ö ÃÖÆü´Ö×ŸÖ ¤êüŸÖê ÆïüÓ…
2. Æü´Ö, ----------------- ²Öïú ‡ÃÖ ¯Ö¸ü ³Öß ÃÖÆü´ÖŸÖ Æïü ׍ú ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ úß ×úÃÖß
¿ÖŸÖÖí ¾Ö ×­Ö²ÖÓ¬Ö­ÖÖë êú ˆ»»ÖÓ‘Ö­Ö µÖÖ ˆ»»ÖÓ‘Ö­ÖÖëü úÖê ׍ú‹ •ÖÖ­Öê µÖÖ ­Ö ׍ú‹ •ÖÖ­Öê êú ×»Ö‹ †Öî¸ü ˆÃ֍úß ¾Ö•ÖÆü ÃÖê Æãü‹
†£Ö¾ÖÖ ×ú‹ Ö‹ µÖÖ ˆÃ֍êú úÖ¸üÖ ³Ö×¾Ö嵅 ´Öë ÆüÖê Ã֍ú­Öê ¾ÖÖ»Öê µÖÖ ×ú‹ •ÖÖ Ã֍ú­Öê ¾ÖÖ»Öê ×­ÖÖ´Ö êú ­ÖãúÃÖÖ­Ö, ÖןÖ,
úß´ÖŸÖ, ¯ÖϳÖÖ¸ü ŸÖ£ÖÖ ¾µÖµÖ êú ×»Ö‹, ×­ÖÖ´Ö ‹ú´ÖÖ¡Ö ×­ÖÖÖԵ֍ú ÆüÖêÖÖ †Öî¸ü ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×ú‹ Ö‹ ‡­Ö
ˆ»»ÖÓ‘Ö­Ö µÖÖ ˆ»»ÖÓ‘Ö­ÖÖë †Öî¸ü ‡Ã֍úß ¾Ö•ÖÆü ÃÖê ×­ÖÖ´Ö úÖê ÆüÖê­Öê ¾ÖÖ»Öê µÖÖ ×ú‹ •ÖÖ­Öê ¾ÖÖ»Öê †£Ö¾ÖÖ ³Ö×¾Ö嵅 ´Öë ÆüÖê Ã֍ú­Öê
¾ÖÖ»Öê µÖÖ ×ú‹ •ÖÖ Ã֍ú­Öê ¾ÖÖ»Öê ­ÖãúÃÖÖ­Ö, ÖןÖ, úß´ÖŸÖ, ¯ÖϳÖÖ¸ü ŸÖ£ÖÖ ¾µÖµÖ úß ¸üÖ×¿Ö µÖÖ ¸üÖ׿ֵÖÖêÓ úÖ ×­ÖÖ´Ö úÖ ×­ÖÖÔµÖ
†Ó×ŸÖ´Ö ¾Ö Æü´Ö ¯Ö¸ü ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…
* ¯ÖÏÖºþ¯Ö êú †ÓŸÖ ´Öë ¤üß Ö‡Ô ×™ü¯¯ÖÖß úÖ ÃÖÓ¤ü³ÖÔ »Öë

121

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
breaches and as to the amount or amounts of loss, damage, costs charges
and expenses caused to or suffered by or that may be caused to or suffered by
the Corporation from time to time shall be final and binding on us.

3. We, the said Bank further agree that the Guarantee herein contained shall
remain in full force and effect during the period that would be taken for the
performance of the said Contract and till all the dues of the Corporation
under the said Contract or by virtue of any of the terms and conditions
governing the said Contract have been fully paid and its claims satisfied or
discharged and till the owner certifies that the terms and conditions of the said
Contract have been fully and properly carried out by the said Contractor
and accordingly discharges this Guarantee subject, however, that the
Corporation shall have no claim under the Guarantee after 90 (Ninety) days
from the date of expiry of the Defects Liability Period as provided in the said
Contract, i.e. ...........(date) or from the date of cancellation of the said
contract as the case may be, unless a notice of the claim under this Guarantee
has been served on the Bank before the expiry of the said period in which case
the same shall be enforceable against the Bank notwithstanding the
fact, that the same is enforced after the expiry of the said period.
4. The Corporation shall have the fullest liberty without affecting in any way
the liability of the Bank under this Guarantee or Indemnity, from time to time, to
vary any of the terms and conditions of the said Contract or to extend time of
performance by the said Contractor or to postpone for any time from time to
time any of the powers exercisable by it against the said Contractor and either
to enforce or forbear from enforcing any of the terms and conditions governing
the said Contract or securities available to the Corporation and the said bank
shall not be released from its liability under these presents by any exercise by
the Corporation of the liberty with reference to the matters aforesaid or by
reason of time being given to the said Contractor or any other forbearance
act or omission on the part of the Corporation or any indulgence by the
Corporation to the said Contractor or any other matter or thing whatsoever
which under the law relating to sureties would, but for this provision, have the
effect of so releasing the Bank from its such liability.
5. It shall not be necessary for the Corporation to proceed against the
Contractor before proceeding against the Bank and the Guarantee herein
contained shall be enforceable against the Bank, notwithstanding any security
which the Corporation may have obtained or obtain from the Contractor shall
at the time when proceedings are taken against the Bank hereunder, be
outstanding or unrealised.
6. We, the said Bank, lastly undertake not to revoke this Guarantee during its
currency except with the previous consent of the Corporation in writing and
agree that any change in the Constitution of the said Contractor or the said
Bank shall not discharge our liability hereunder. If any further extension of
this

122

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
3. Æü´Ö, ˆŒŸÖ ²Öïú ‡ÃÖ ¯Ö¸ü ³Öß ÃÖÆü´ÖŸÖ Æïü ׍ú µÖÆüÖÓ ¯Ö¸ü ¤üß Ö‡Ô ÖÖ¸Óü™üß ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ êú ×­Ö¯ÖÖ¤ü­Ö ÆêüŸÖã ×»Ö‹ Ö‹
ÃÖ´ÖµÖ †Öî¸ü ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ µÖÖ ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ úÖê ¿ÖÖ×ÃÖŸÖ ú¸ü­Öê ¾ÖÖ»Öê ׍úÃÖß ×­Ö²ÖÓ¬Ö­ÖÖë ¾Ö ¿ÖŸÖÖí êú †ÓŸÖÖÔŸÖ
×­ÖÖ´Ö úÖê ÃÖ³Öß ¤êüµÖ úÖ ¯ÖæÖÔ ºþ¯Ö ÃÖê ³ÖãÖŸÖÖ­Ö ×ú‹ •ÖÖ­Öê ŸÖú †Öî¸ü ‡Ã֍êú ¤üÖ¾ÖÖë úß ÃÖÓŸÖãÛ™ü µÖÖ ˆ­´ÖÖê“Ö­Ö
ŸÖú †£Ö¾ÖÖ ´ÖÖ׻֍ú êú µÖÆü ¯ÖÏ´ÖÖ×ÖŸÖ ×ú‹ •ÖÖ­Öê ŸÖú ׍ú ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ êú ÃÖ´ÖÃŸÖ ×­Ö²ÖÓ¬Ö­ÖÖë ¾Ö ¿ÖŸÖÖíÓ úÖ
ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ¯ÖæÖÔºþ¯ÖêÖ ¾Ö ˆ×“ÖŸÖ œÓüÖ ÃÖê ¯ÖÖ»Ö­Ö ×úµÖÖ ÖµÖÖ Æîü †Öî¸ü ŸÖ¤ü­ÖãÃÖÖ¸ü µÖÆü ÖÖ¸Óü™üß ×¾ÖÂÖµÖ
´ÖãŒŸÖ ÆüÖêŸÖÖ Æîü, ¯ÖæÖÔŸÖµÖÖ ²Ö»Ö¿Öᯙ ¾Ö ¯ÖϳÖÖ¾Öß ¸üÆêüÖÖ, ŸÖ£ÖÖ×¯Ö µÖÆü ׍ú, ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ ´Öë ˆÛ»»Ö×ÖŸÖ ¤üÖêÂÖ
²ÖÖ¬µÖŸÖÖ †¾Ö×¬Ö êú ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê ¾ÖÖ»Öß ŸÖÖ¸üßÖ êú 90(­Ö²²Öê) פü­ÖÖë êú ¯Ö¿“ÖÖŸÖ •ÖÖê ׍ú ------------
(ŸÖÖ¸üߏÖ) Æîü, †£Ö¾ÖÖ ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ êú ×­Ö¸üÃŸÖ ×ú‹ •ÖÖ­Öê úß ŸÖÖ¸üߏÖ, •ÖîÃÖÖ ³Öß ´ÖÖ´Ö»ÖÖ ÆüÖ,ê êú ²ÖÖ¤ü ׭֐ִÖ
úÖ úÖê‡Ô ¤üÖ¾ÖÖ ŸÖ²Ö ŸÖú ­ÖÆüà ÆüÖêÖÖ •Ö²Ö ŸÖú ׍ú ×­ÖÖ´Ö «üÖ¸üÖ ˆŒŸÖ †¾Ö×¬Ö úß ÃÖ´ÖÖÛ¯ŸÖ ÃÖê ¯ÖÆü»Öê ‡ÃÖ ÖÖ¸Óü™üß
êú †¬Öß­Ö ²Öïú úÖê ¤üÖ¾Öê úÖ ­ÖÖê×™üÃÖ ­Ö ¤êü פüµÖÖ ÖµÖÖ ÆüÖê †Öî¸ü ‹êÃÖê ´ÖÖ´Ö»Öê ´Öë ‡ÃÖê ˆŒŸÖ †¾Ö×¬Ö úß ÃÖ´ÖÖÛ¯ŸÖ
êú ²ÖÖ¤ü ¯ÖϳÖÖ¾Öß ×ú‹ •ÖÖ­Öê êú ŸÖ£µÖ êú ²ÖÖ¾Ö•Öæ¤ü µÖÆü ¯ÖϳÖÖ¾Ö µÖÖêµÖ ¸üÆêüÖÖ…
4. ‡ÃÖ ÖÖ¸Óü™üß µÖÖ Öן֯ÖæÙŸÖ êú †¬Öß­Ö ²Öïú êú ¤üÖ×µÖŸ¾Ö ¯Ö¸ü ²ÖÖî¸ü úÖê‡Ô ¯ÖϳÖÖ¾Ö ›üÖ»Öê ÃÖ´ÖµÖ ¯Ö›Íü­Öê ¯Ö¸ü ×­ÖÖ´Ö úÖê
ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ êú ׍úÃÖß ¿ÖŸÖÔ µÖÖ ×­Ö²ÖÓ¬Ö­Ö ÃÖê ×¾Ö“Ö×»ÖŸÖ ÆüÖê­Öê µÖÖ ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú úÖµÖÔ×­Ö¯ÖÖ¤ü­Ö êú ÃÖ´ÖµÖ
úÖê ²ÖœÍüÖ­Öê µÖÖ ×úÃÖß ³Öß ÃÖ´ÖµÖ ˆÃ֍êú ÃÖ´ÖµÖ úÖê †ÖÖê ú¸ü­Öê úß ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ×¾Ö¹ý¨ü ׍úÃÖß ¯ÖϵÖÖꕵÖ
¿ÖÛŒŸÖµÖÖë êú ¯ÖϵÖÖêÖ úß †Öî¸ü ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ úÖê ¿ÖÖ×ÃÖŸÖ ú¸ü­Öê ¾ÖÖ»Öß ×úÃÖß ¿ÖŸÖÖí ¾Ö ×­Ö²ÖÓ¬Ö­ÖÖë úÖê †£Ö¾ÖÖ
×­ÖÖ´Ö êú ¯ÖÖÃÖ ˆ¯Ö»Ö²¬Ö ¯ÖÏןֳÖæןֵÖÖë úÖê µÖÖ ŸÖÖê ¯ÖϾÖé¢Ö ú¸ü­Öê µÖÖ ¯ÖÏ×¾Ö¸üŸÖ ú¸ü­Öê úß ÃÖ´¯ÖæÖÔ Ã¾ÖŸÖÓ¡ÖŸÖÖ ÆüÖêÖß
†Öî¸ü ×­ÖÖ´Ö «üÖ¸üÖ Ã¾ÖŸÖÓ¡ÖŸÖÖ êú ˆ¯ÖµÖãÔŒŸÖ ÃÖÓ¤üÙ³ÖŸÖ ´ÖÖ´Ö»ÖÖë ´Öë ÃÖê ׍úÃÖß úÖ ³Öß ¯ÖϵÖÖêÖ ׍ú‹ •ÖÖ­Öê êú úÖ¸üÖ
µÖÖ ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖ´ÖµÖ ×¤ü‹ •ÖÖ­Öê êú úÖ¸üÖ †£Ö¾ÖÖ ×­ÖÖ´Ö «üÖ¸üÖ †­µÖ ׍úÃÖß ¯ÖÏ×¾Ö¸üŸÖ úÖµÖÔ µÖÖ
³Öæ»Ö-“Öæú µÖÖ ×­ÖÖ´Ö «üÖ¸üÖ ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê פü‹ Ö‹ ׍úÃÖß †­ÖãÖÏÆü êú úÖ¸üÖ µÖÖ úÖ­Öæ­Ö êú †¬Öß­Ö
¯ÖÏןֳÖæןֵÖÖë ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ †­µÖ ׍úÃÖß ´ÖÖ´Ö»Öê µÖÖ ²ÖÖŸÖ ×•ÖÃÖÃÖê ‡ÃÖ ¯ÖÏÖ¾Ö¬ÖÖ­Ö êú ­Ö ÆüÖê­Öê ¯Ö¸ü ²Öïú úÖê ‡ÃÖ
¯ÖύúÖ¸ü †¯Ö­Öê ¤üÖ×µÖŸ¾ÖÖë ÃÖê ´ÖãŒŸÖ ú¸ü­Öê ¯Ö¸ü ¯ÖϳÖÖ¾Ö ¯Ö›ÍüŸÖÖ ÆüÖ,ê êú úÖ¸üÖ ˆŒŸÖ ²Öïú †¯Ö­Öê ¤üÖ×µÖŸ¾Ö ÃÖê ´Ö㌟Ö
­ÖÆüà ÆüÖêÖÖ…
5. ×­ÖÖ´Ö êú ×»Ö‹ ²Öïú êú ×¾Ö¹ý¨ü úÖ¸Ôü¾ÖÖ‡Ô ¯ÖÏÖ¸Óü³Ö ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ×¾Ö¹ý¨ü úÖ¸Ôü¾ÖÖ‡Ô ú¸ü­ÖÖ
†Ö¾Ö¿µÖú ­ÖÆüà ÆüÖêÖÖ †Öî¸ü µÖÆüÖÓ ¯Ö¸ü ˆÛ»»Ö×ÖŸÖ ÖÖ¸Óü™üß ²Öïú êú ×¾Ö¹ý¨ü ¯ÖϳÖÖ¾Öß ú¸ü­Öê µÖÖêµÖ ÆüÖêÖß ³Ö»Öê Æüß
‡ÃÖ ²Öïú êú ×¾Ö¹ý¨ü úÖ¸Ôü¾ÖÖ‡Ô ú¸üŸÖê ÃÖ´ÖµÖ ×­ÖÖ´Ö «üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê ¯ÖÏÖ¯ŸÖ úß Ö‡Ô µÖÖ ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ¾ÖÖ»Öß
¯ÖÏןֳÖæןֵÖÖÓ ²ÖúÖµÖÖ µÖÖ †¯ÖÏÖ¯µÖ ÆüÖë…
6. Æü´Ö, ˆŒŸÖ ²Öïú †ÓŸÖ ´Öë ¾Ö“Ö­Ö ¤êüŸÖê Æïü ׍ú ‡ÃÖ ÖÖ¸Óü™üß úê ¯ÖϾÖé¢Ö ¸üÆü­Öê êú ¤üÖî¸üÖ­Ö ×­ÖÖ´Ö úß ×»Ö×ÖŸÖ ¯Öæ¾ÖÔ
ÃÖÆü´Ö×ŸÖ êú †»ÖÖ¾ÖÖ ‡ÃÖ ÖÖ¸Óü™üß úÖê ¯ÖÏןÖÃÖÓÇüŸÖ ­ÖÆüà ú¸ëüÖê †Öî¸ü ÃÖÆü´Ö×ŸÖ ¤êüŸÖê Æïü ׍ú ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖÖ
ˆŒŸÖ ²Öïú êú ÃÖÓ×¾Ö¬ÖÖ­Ö ´Öë ׍úÃÖß ¯ÖύúÖ¸ü úÖ ¯Ö׸ü¾ÖŸÖÔ­Ö ×ú‹ •ÖÖ­Öê ¯Ö¸ü ‡ÃÖ´Öë פü‹ Ö‹ ¤üÖ×µÖŸ¾ÖÖë ÃÖê ˆ­´ÖÖêד֟Ö
­ÖÆüà ÆüÖêӐÖê…

122

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Guarantee is required the same shall be extended to such required periods
on receiving instructions from M/s.......................on whose behalf this guarantee
is issued.

In the presence of For and on behalf of (the Bank)

WITNESS
1.________________ Signature ___________________________________

2.________________ Name & Designation ____________________________

_________________________________________________

Authorisation No:_________________________________

Date and Place:___________________________________

Bank's Seal ______________________________________

Accepted

(Signature of the Officer)


For and on behalf of the
(Nuclear Power Corporation of India Ltd)

123

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
µÖפü ‡ÃÖ ÖÖ¸Óü™üß úÖê †Öî¸ü †ÖÖê ²ÖœÍüÖ­ÖÖ ÆüÖê ŸÖÖê ´ÖêÃÖÃÖÔ--------------------, ו֭֍úß †Öê¸ü ÃÖê ‡ÃÖ ÖÖ¸Óü™üß úÖê •ÖÖ¸üß
׍úµÖÖ ÖµÖÖ Æîü, ÃÖê ×­Ö¤êü¿Ö ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ¯Ö¸ü ‡ÃÖê †Ö¾Ö¿µÖú †¾Ö×¬Ö êú ×»Ö‹ ²ÖœÍüÖµÖÖ •ÖÖ‹ÖÖ…

úß ˆ¯ÖÛãÖ×ŸÖ ´Öë éúŸÖê ‹¾ÖÓ ¾ÖÖßÖê (²Öïú úÖ ­ÖÖ´Ö)


ÃÖցÖß
1.---------------------- ÆüßÖցָü -------------------------------------------------
2.--------------------- ­ÖÖ´Ö ¾Ö ¯Ö¤ü­ÖÖ´Ö--------------------------------------------
---------------------------------------------------------
¯ÖÏÖ׬֍ú¸üÖ ÃÖӏµÖÖ : ---------------------------------------
פü­ÖÖӍú ¾Ö ãÖÖ­Ö : ----------------------------------------
²Öïú úß ´ÖãÆü¸ü --------------------------------------------

þÖߍúÖ¸ü ׍úµÖÖ ÖµÖÖ

(†×¬ÖúÖ¸üß êú ÆüßÖցָü)


éúŸÖê ‹¾ÖÓ ¾ÖÖßÖê
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö
†Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü

123

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
NOTES

*For Proprietary Concerns

Shri _______________________________________ son of__________________ resident of


_____________________________________carrying on business under the name and
style of _________ at_____________(herein after called " the said Contractor" which
expression shall unless the context requires otherwise include his heirs, executors,
administrators and legal representatives.

*For Partnership Concerns

M/s. _____________________ a partnership firm with its office


___________________(hereinafter called " the said Contractor" which expression shall
unless the context requires otherwise include their heirs, executors, administrators
and legal representative); the names of their partners being

(i) Shri _________________S/o.______________________________

(ii) Shri ________________ S/o._______________________________

*For Companies

M/s................ a company registered under the Companies Act, 1956 and


having its registered office at .........in the State of ............ ...(hereinafter called "the
said Contractor" which expression shall unless the context requires otherwise
include its administrators, successors and assigns).

124

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
×™ü¯¯ÖםֵÖÖÓ

* þÖÖ×´ÖŸ¾Ö ¾ÖÖ»Öê ¯ÖÏןÖšüÖ­ÖÖë êú ×»Ö‹

ÁÖß-----------------------------------------¯Öã¡Ö ÁÖß -----------------------------------×­Ö¾ÖÖÃÖß ------


--------------------------------------------‡ÃÖ ­ÖÖ´Ö êú †¬Öß­Ö ¾Ö -------------------¸üß×ŸÖ ÃÖê ---------
------------ãÖÖ­Ö ¯Ö¸ü ¾µÖÖ¯ÖÖ¸ü “Ö»ÖÖ ¸üÆêü Æïü… ( ‡­Æëü ‡Ã֍êú †ÖÖê "ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü" úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ
†×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú ÃÖÓ¤ü³ÖÔ êú †­ÖãÃÖÖ¸ü †­µÖ£ÖÖ †¯Öê×ÖŸÖ ­Ö ÆüÖê ˆ­Öêú ¾ÖÖ׸üÃÖ, ×­Ö¯ÖÖ¤üú, ¯ÖÏ¿ÖÖÃ֍ú ¾Ö
×¾Ö׬֍ú ¯ÖÏןÖ×­Ö×¬Ö ¿ÖÖ×´Ö»Ö Æïü…)

* ³Ö֐ÖߤüÖ¸üß ¾ÖÖ»Öê ¯ÖÏןÖšüÖ­ÖÖë êú ×»Ö‹

´ÖêÃÖÃÖÔ -------------------------------------------------------‹ú ³Ö֐ÖߤüÖ¸üß ±ú´ÖÔ Æîü †Öî¸ü ‡Ã֍úÖ úÖµÖÖÔ»ÖµÖ


------------------------------ÛÃ£ÖŸÖ Æîü (‡­Æëü ‡Ã֍êú †ÖÖê "ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü" úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ
†×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú ÃÖÓ¤ü³ÖÔ êú †­ÖãÃÖÖ¸ü †­µÖ£ÖÖ †¯Öê×ÖŸÖ ­Ö ÆüÖê ˆ­Öêú ¾ÖÖ׸üÃÖ, ×­Ö¯ÖÖ¤üú, ¯ÖÏ¿ÖÖÃ֍ú ¾Ö
×¾Ö׬֍ú ¯ÖÏןÖ×­Ö×¬Ö ¿ÖÖ×´Ö»Ö Æïü) ; ˆ­Öêú ³Ö֐ÖߤüÖ¸üÖë êú ­ÖÖ´Ö ‡ÃÖ ¯ÖύúÖ¸ü Æïü

(i) ÁÖß -------------------------------¯Öã¡Ö ÁÖß-----------------------------------------


(ii) ÁÖß -------------------------------¯Öã¡Ö ÁÖß-----------------------------------------

* ú´¯Ö×­ÖµÖÖë êú ×»Ö‹


´ÖêÃÖÃÖÔ--------------------------ú´¯Ö­Öß †×¬Ö×­ÖµÖ´Ö 1956 êú †¬Öß­Ö ¯ÖÓ•ÖߍéúŸÖ ‹ú ú´¯Ö­Öß Æîü †Öî¸ü ‡Ã֍úÖ
¯ÖÓ•ÖߍéúŸÖ úÖµÖÖÔ»ÖµÖ ---------------------¯ÖϤêü¿Ö ´Öë --------------------ãÖÖ­Ö ¯Ö¸ü ÛÃ£ÖŸÖ Æîü… (‡­Æëü ‡Ã֍êú †ÖÖê
"ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü" úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ †×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú ÃÖÓ¤ü³ÖÔ êú †­ÖãÃÖÖ¸ü †­µÖ£ÖÖ †¯Öê×ÖŸÖ ­Ö ÆüÖê
ˆ­Öêú ¯ÖÏ¿ÖÖÃ֍ú, ˆ¢Ö¸üÖ׬֍úÖ¸üß ¾Ö ÃÖ´Ö­Öã¤êü¿Öß ¿ÖÖ×´Ö»Ö Æïü)

124

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
3 PROFORMA OF BANK GUARANTEE TO SECURE A LUMPSUM ADVANCE

(On Non-Judicial Stamp Paper of Appropriate Value)

To
Nuclear Power Corporation of India Ltd.
.........................
.........................

In consideration of the Nuclear Power Corporation of India Ltd. (...................


Atomic Power Project) having its registered Office at
................................... (hereinafter called "the Owner" which expression shall
unless repugnant to the subject or context include its successors and assigns)
having agreed under the terms and conditions of Award Letter No. ...........
dated ........ issued by Owner which has been unequivocally accepted by
.*...............……...in connection with the work of ".……..................................."
Tender No.................. (hereinafter called "the said Contract") to make at the
request of the Contractor a lumpsum advance of Rs. ..... (Rupees.....................
only) for utilizing it for the purpose of the Contract on his furnishing a guarantee
acceptable to the Owner. We,.....................................................Bank
incorporated under .......................and having one of our branches at
............................................ (hereinafter referred to as " the said Bank") do
hereby guarantee the due recovery by the Owner of this said advance with
interest thereon as provided according to the terms and conditions of the
Contract. If the said Contractor fails to utilize the said advance for the purpose
of the Contract and/ or the said advance together with interest thereon as
aforesaid is not fully recovered by the Owner, We, ......... Bank hereby
unconditionally and irrevocably undertake to pay to the Owner on demand
and without demur to the extent of the said sum of Rs.........
(Rupees.......................only) on any claim made by the Owner on us for the loss or
damage caused to or suffered by the Owner by reason of the Owner not being
able to recover in full the said sum of Rs........... (Rupees................only) with
interest as aforesaid.

2. We,.................... Bank, further agree that the Owner shall be the sole
judge of and as to whether the said Contractor has not utilized the said
advance or any part thereof for the purpose of the contract and the
extent of loss or damage caused to or suffered by the Owner on account of
the said advance together with interest not being recovered in
full and the decision of the Owner that the said Contractor has not
utilized the said advance or
*Refer note at the end of the proforma
any part thereof for the purpose of the Contract and as to the amount or
amounts of loss or damage caused to or suffered by the Owner shall be final
and binding on us.

125

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
3. ‹ú´Öã¿ŸÖ †×ÖÏ´Ö ¯ÖÏÖ¯ŸÖ ú¸ü­Öê êú ×»Ö‹ ²Öïú ÖÖ¸Óü™üß ¯ÖÏÖºþ¯Ö
(ˆ×“ÖŸÖ ´Öæ»µÖ êú ­µÖÖ׵֍êúŸÖ¸ü ÙüÖ´¯Ö ¯Öê¯Ö¸ü ¯Ö¸ü)

ÃÖê¾ÖÖ ´Öë,
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü
----------------------------------------------
---------------------------------------------

µÖÆü ×¾Ö“ÖÖ¸ü ú¸üŸÖê Æãü‹ ׍ú ­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü -------------¯Ö¸ü´Ö֝Öã
ײֻ֕Öß‘Ö¸ü) ו֭֍úÖ ¯ÖÓ•ÖߍéúŸÖ úÖµÖÖÔ»ÖµÖ-------------------------------------------¯Ö¸ü ÛÃ£ÖŸÖ Æîü (וÖÃÖê
†ÖÖê "´ÖÖ׻֍ú" úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ †×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú ×¾ÖÂÖµÖ µÖÖ ÃÖÓ¤ü³ÖÔ êú ×¾Ö¹ý¨ü ­Ö ÆüÖ,ê ‡Ã֍úê,
ˆ¢Ö¸üÖ׬֍úÖ¸üß ¾Ö ÃÖ´Ö­Öã¤êü¿Öß ¿ÖÖ×´Ö»Ö Æïü), ­Öê ´ÖÖ׻֍ú «üÖ¸üÖ •ÖÖ¸üß ÃÖӏµÖÖ--------פü­ÖÖӍú-------------êú †¾ÖÖ›Ôü
¯Ö¡Ö úß ¿ÖŸÖÖí ¾Ö ×­Ö²ÖÓ¬Ö­ÖÖë êú †¬Öß­Ö ×•ÖÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü ´ÖêÃÖÃÖÔ *---------------------------- «üÖ¸üÖ (ו֭Æëü
†ÖÖê ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÆüÖ ÖµÖÖ Æîü)"-----------------"ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ úÖµÖÔ ×­Ö×¾Ö¤üÖ ÃÖӏµÖÖ------------- úÖê
×­ÖÙ¾Ö¾ÖÖפüŸÖ ºþ¯Ö ÃÖê þÖߍúÖ¸ü ׍úµÖÖ ÖµÖÖ Æîü, úÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú †­Öã¸üÖê¬Ö ¯Ö¸ü ÃÖÓ×¾Ö¤üÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ úÖµÖÖí ´Öë
ˆ¯ÖµÖÖêÖ ú¸ü­Öê êú ×»Ö‹ ´ÖÖ׻֍ú úÖê þÖߍúÖµÖÔ ÖÖ¸Óü™üß ¯ÖÏßÖãŸÖ ú¸ü­Öê ¯Ö¸ü ¹ý.-----------(-------------------
¹ý¯Ö‹ ´ÖÖ¡Ö) úÖ ‹ú´Öã¿ŸÖ †×ÖÏ´Ö ¤êü­Öê ¯Ö¸ü ÃÖÆü´ÖŸÖ ÆüÖê ÖµÖÖ Æîü…
Æü´Ö,----------------------------²Öïú וÖÃ֍úÖ Öšü­Ö ---------------------------êú †¬Öß­Ö ×úµÖÖ ÖµÖÖ
Æîü †Öî¸ü Æü´ÖÖ¸üß ¿Ö֏ÖÖ‹Ó--------------------------------------¯Ö¸ü ÛÃ£ÖŸÖ Æïü (וÖÃÖê †ÖÖê "ˆŒŸÖ ²Öïú" úÆüÖ
ÖµÖÖ Æîü) ´ÖÖ׻֍ú «üÖ¸üÖ ˆŒŸÖ ¤êüµÖ †×ÖÏ´Ö ¾Ö ÃÖÓ×¾Ö¤üÖ úß ¿ÖŸÖÖí ¾Ö ×­Ö²ÖÓ¬Ö­ÖÖë ´Öë ˆ»»Ö×ÖŸÖ ˆÃ֍êú ²µÖÖ•Ö úÖê ¾ÖÃÖæ»Ö
׍ú‹ •ÖÖ­Öê úß ‹ŸÖ¤Ëü«üÖ¸üÖ ÖÖ¸Óü™üß ¤êüŸÖê Æïü… µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆŒŸÖ †×ÖÏ´Ö úÖê ÃÖÓ×¾Ö¤üÖ êú ˆ§êü¿µÖÖë êú ×»Ö‹ ˆ¯ÖµÖÖêÖ
ú¸ü­Öê ´Öë †ÃÖ´Ö£ÖÔ ¸üÆüŸÖÖ Æîü †Öî¸ü/†£Ö¾ÖÖ ´ÖÖ׻֍ú «üÖ¸üÖ ²µÖÖ•Ö ÃÖ×ÆüŸÖ ˆŒŸÖ †×ÖÏ´Ö úß ˆ¯ÖµÖãÔŒŸÖ êú †­ÖãÃÖÖ¸ü ¯Öæ¸üß
¾ÖÃÖæ»Öß ­ÖÆüà ÆüÖê ¯ÖÖŸÖß Æîü ŸÖÖê Æü´Ö, -----------------²Öïú ´ÖÖ׻֍ú «üÖ¸üÖ ˆŒŸÖ ¹ý.-----------(--------------
-----¹ý¯Ö‹ ´ÖÖ¡Ö) úß ¸üÖ×¿Ö úß ¯Öæ¸üß ¾ÖÃÖæ»Öß ­Ö ú¸ü ¯ÖÖ­Öê êú úÖ¸üÖ ˆšüÖ‹ Ö‹ ׍úÃÖß ­ÖãúÃÖÖ­Ö µÖÖ Ö×ŸÖ êú
úÖ¸üÖ ´ÖÖ׻֍ú «üÖ¸üÖ Æü´ÖÖ¸êü ‰ú¯Ö¸ü ׍ú‹ Ö‹ ׍úÃÖß ¤üÖ¾Öê êú ±ú»Öþֺþ¯Ö ˆŒŸÖ ¹ý.-----------(---------------
----¹ý¯Ö‹ ´ÖÖ¡Ö) ŸÖú úß ¸üÖ×¿Ö úÖê ˆÃ֍êú ˆ¯ÖµÖãÔŒŸÖ ²µÖÖ•Ö ÃÖ×ÆüŸÖ ´ÖÖ׻֍ú úß ´ÖÖÓÖ ¯Ö¸ü †Öî¸ü ²ÖÖî¸ü ׍úÃÖß
†Ö¯Ö×¢Ö êú ³ÖãÖŸÖÖ­Ö ú¸ü­Öê úÖ ×²Ö­ÖÖ¿ÖŸÖÔ ¾Ö †¯ÖÏןÖÆüßÖÖÓŸÖ¸üÖßµÖ ¾Ö“Ö­Ö ¤êüŸÖê Æïü…
2. Æü´Ö,----------------------------²Öïú, ÃÖÆü´ÖŸÖ Æïü ׍ú ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆŒŸÖ †×ÖÏ´Ö µÖÖ ˆÃ֍êú ׍úÃÖß
³ÖÖÖ úÖê ÃÖÓ×¾Ö¤üÖ êú ˆ§êü¿µÖ ÃÖê ˆ¯ÖµÖÖêÖ ׍ú‹ •ÖÖ­Öê †£Ö¾ÖÖ ­Ö ׍ú‹ •ÖÖ­Öê êú ×»Ö‹ †Öî¸ü ²µÖÖ•Ö ÃÖ×ÆüŸÖ ˆŒŸÖ †×ÖÏ´Ö
úÖê ¯ÖæÖÔºþ¯ÖêÖ ¾ÖÃÖæ»Ö ­Ö ׍ú‹ •ÖÖ­Öê êú úÖ¸üÖ ´ÖÖ׻֍ú úÖê Æãü‹ µÖÖ ×ú‹ Ö‹ ­ÖãúÃÖÖ­Ö µÖÖ Ö×ŸÖ úß ÃÖß´ÖÖ êú
ÃÖÓ²ÖÓ¬Ö ´Öë ´ÖÖ׻֍ú ‹ú´ÖÖ¡Ö ×­ÖÖÖԵ֍ú ÆüÖêÖÖ †Öî¸ü ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆŒŸÖ †×ÖÏ´Ö µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ úÖ
ÃÖÓ×¾Ö¤üÖ êú úÖµÖÔ êú ×»Ö‹ ˆ¯ÖµÖÖêÖ ­Ö ú¸ü­Öê µÖÖ ´ÖÖ׻֍ú úÖê Æãü‹ µÖÖ ×ú‹ Ö‹ ­ÖãúÃÖÖ­Ö µÖÖ Ö×ŸÖ úß ¸üÖ×¿Ö µÖÖ
¸üÖ׿ֵÖÖë êú ×»Ö‹ ´ÖÖ׻֍ú «üÖ¸üÖ ×»ÖµÖÖ ÖµÖÖ ×­ÖÖÔµÖ †Ó×ŸÖ´Ö ¾Ö Æü´ÖÖ¸êü ‰ú¯Ö¸ü ²ÖÖ¬µÖúÖ¸üß ÆüÖêÖÖ…
* ¯ÖÏÖºþ¯Ö êú †ÓŸÖ ´Öë ¤üß Ö‡Ô ×™ü¯¯ÖÖß úÖ ÃÖÓ¤ü³ÖÔ »Öë…
125

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
3. We, the said Bank further agree that the Guarantee herein contained shall
remain in full force and effect during the period that would be taken for the
performance of the said Contract and till all the said advance with interest
has been fully recovered and its claims satisfied or discharged and till Owner
certifies that the said advance with interest has been fully recovered from the
said Contractor, and accordingly shall have no claim under this guarantee
after 30 (thirty) days from the date of satisfactory completion of the said
Contract ( as per the mutually agreed work schedule) i.e. upto and inclusive
of ........(date) unless a notice of the claim under this Guarantee has been
served on the Bank before the expiry of the said period i.e...................
(date) in which case the same shall be enforceable against the Bank
notwithstanding the fact, that the same is enforced after the expiry of the said
period.

4. The Owner shall have the fullest liberty without effecting in any way the liability
of the Bank under this Guarantee or Indemnity, from time to time, to vary any
of the terms and conditions of the said Contract or the advance or to extend
time of performance by the said Contractor or to postpone for any time from
time to time any of the powers exercisable by it against the said Contractor
and either to enforce or forbear from enforcing any of the terms and
conditions governing the said contract or the advance available to the owner
and this said bank shall not be released from its liability under these presents
by any exercise by the Owner of the liberty with reference to the matters
aforesaid or by reasons of time being given to the said Contractor or any
other forbearance act or omission on the part of the Owner or any indulgence
by the Owner to the said Contractor on of any other matter or thing whatsoever
which under the law relating to sureties would, but for this provision, have the
effect of so releasing the Bank from its such liability.

5. It shall not be necessary for the Owner to proceed against the Contractor
before proceeding against the Bank and the Guarantee herein contained
shall be enforceable against the Bank notwithstanding any security, which the
Owner may have obtained or obtain from the Contractor shall at the time
when proceedings are taken against the Bank hereunder, be outstanding
or unrealised.

6. We, the said Bank, lastly undertake not to revoke this Guarantee during its
currency except with the previous consent of the Owner in writing and agree
that any change in the Constitution of the said Contractor or the said Bank
shall not discharge our liability hereunder.

If any further extension of this Guarantee is required the same shall be


extended to such required periods on receiving instructions from
M/s........................................ on whose behalf this Guarantee is issued.

126

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
3. Æü´Ö, ˆŒŸÖ ²Öïú ‡ÃÖ ¯Ö¸ü ³Öß ÃÖÆü´ÖŸÖ Æïü ׍ú µÖÆüÖÓ ¯Ö¸ü ¤üß •ÖÖ­Öê ¾ÖÖ»Öß ÖÖ¸Óü™üß ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ êú ×­Ö¯ÖÖ¤ü­Ö ÆêüŸÖã »Öß
•ÖÖ­Öê ¾ÖÖ»Öß †¾Ö×¬Ö ŸÖú †Öî¸ü ²µÖÖ•Ö ÃÖ×ÆüŸÖ ˆŒŸÖ †×ÖÏ´Ö êú ¯ÖæÖÔºþ¯ÖêÖ ¾ÖÃÖæ»Ö ׍ú‹ •ÖÖ­Öê ¾Ö ‡Ã֍êú ¤üÖ¾ÖÖë úß
ÃÖÓŸÖãÛ™ü µÖÖ ˆ­´ÖÖê“Ö­Ö †Öî¸ü ´ÖÖ׻֍ú êú µÖÆü ¯ÖÏ´ÖÖ×ÖŸÖ ú¸ü­Öê ׍ú ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê ˆŒŸÖ †×ÖÏ´Ö úß ²µÖÖ•Ö
ÃÖ×ÆüŸÖ ¾ÖÃÖæ»Öß úß •ÖÖ “Öãúß Æîü, ŸÖú ¯ÖæÖÔ ²Ö»Ö¿Öᯙ ¾Ö ¯ÖϳÖÖ¾Öß ¸üÆêüÖß, †Öî¸ü ŸÖ¤ü­ÖãÃÖÖ¸ü ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ úÖê
ÃÖÓŸÖÖêÂ֭֕֍ú œÓüÖ ÃÖê ¯ÖæÖÔ ú¸ü­Öê êú 30 (ŸÖßÃÖ) פü­ÖÖë êú ²ÖÖ¤ü (†Ö¯ÖÃÖß ²ÖÖŸÖ“ÖßŸÖ ÃÖê ŸÖµÖ úß Ö‡Ô ÃÖ´ÖµÖ-†­ÖãÃÖæ“Öß
úê †­ÖãÃÖÖ¸ü) †£ÖÖÔŸÖ -------(ŸÖÖ¸üߏÖ) úÖê ¿ÖÖ×´Ö»Ö ú¸üŸÖê Æãü‹ ‡ÃÖ ŸÖÖ¸üßÖ ŸÖú êú ²ÖÖ¤ü ‡ÃÖ ÖÖ¸Óü™üß êú †¬Öß­Ö
úÖê‡Ô ¤üÖ¾ÖÖ ŸÖ²Ö ŸÖú ­ÖÆüà ²Ö­ÖêÖÖ •Ö²Ö ŸÖú ׍ú ‡ÃÖ ÖÖ¸Óü™üß êú †¬Öß­Ö ˆŒŸÖ †¾Ö×¬Ö †£ÖÖÔŸÖ ------(ŸÖÖ¸üߏÖ) êú
ÃÖ´ÖÖ¯ŸÖ ÆüÖê­Öê ÃÖê ¯ÖÆü»Öê ²Öïú úÖê ¤üÖ¾Öê úß ­ÖÖê×™üÃÖ ­Ö ¤êü ¤üß Ö‡Ô ÆüÖê †Öî¸ü ‹êÃÖê ´ÖÖ´Ö»Öê ´Öë µÖÆü ˆŒŸÖ †¾Ö×¬Ö êú ÃÖ´ÖÖ¯ŸÖ
ÆüÖê­Öê êú ²ÖÖ¤ü ¯ÖϳÖÖ¾Öß ×ú‹ •ÖÖ­Öê êú ŸÖ£µÖ êú ²ÖÖ¾Ö•Öæ¤ü ²Öïú êú ×¾Ö¹ý¨ü ¯ÖϳÖÖ¾Öß ¸üÆêüÖß…
4. ‡ÃÖ ÖÖ¸Óü™üß µÖÖ Öן֯ÖæÙŸÖ êú †ÓŸÖÖÔŸÖ ²Öïú êú ¤üÖ×µÖŸ¾Ö úÖê ׍úÃÖß ³Öß ºþ¯Ö ´Öë ¯ÖϳÖÖ×¾ÖŸÖ ×ú‹ ²ÖÖî¸ü ´ÖÖ׻֍ú úÖê
ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ úß ¿ÖŸÖÖí ¾Ö ×­Ö²ÖÓ¬Ö­ÖÖë ´Öë ÃÖ´ÖµÖ ÃÖ´ÖµÖ ¯Ö¸ü ¯Ö׸ü¾ÖÔŸÖ­Ö ú¸ü­Öê †£Ö¾ÖÖ †×ÖÏ´Ö †£Ö¾ÖÖ ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü
êú úÖµÖÔ×­Ö¯ÖÖ¤ü­Ö †¾Ö×¬Ö úÖê ú´Ö ú¸ü­Öê µÖÖ ×¾ÖßÖÖ¸ü ú¸ü­Öê µÖÖ ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ×¾Ö¹ý¨ü ¯ÖϵÖÖêÖ úß •ÖÖ
Ã֍ú­Öê¾ÖÖ»Öß ¯ÖϤü¢Ö ¿ÖÛŒŸÖµÖÖë «üÖ¸üÖ ÃÖ´ÖµÖ úÖê ׍úÃÖß ³Öß ÃÖ´ÖµÖ êú ×»Ö‹ †ÖÖê ²ÖœÍüÖ­Öê †Öî¸ü ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ úÖê
¿ÖÖ×ÃÖŸÖ ú¸ü­Öê ¾ÖÖ»Öß ×úÃÖß ¿ÖŸÖÖí ¾Ö ×­Ö²ÖÓ¬Ö­ÖÖë úÖê ²Ö»Ö¿Öᯙ µÖÖ ¯ÖÏ×¾Ö¸üŸÖ ú¸ü­Öê µÖÖ ´ÖÖ׻֍ú êú ¯ÖÖÃÖ ˆ¯Ö»Ö²¬Ö
†×ÖÏ´Ö êú ×»Ö‹ ÃÖ´¯ÖæÖÔ Ã¾ÖŸÖÓ¡ÖŸÖÖ ÆüÖêÖß †Öî¸ü µÖÆü ˆŒŸÖ ²Öïú, ´ÖÖ׻֍ú «üÖ¸üÖ ‡­Ö ¿ÖÛŒŸÖµÖÖë êú ¯ÖϵÖÖêÖ êú úÖ¸üÖ
ˆ¯ÖµÖãÔŒŸÖ ´ÖÖ´Ö»ÖÖë êú µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ÃÖ´ÖµÖ ×¤ü‹ •ÖÖ­Öê êú µÖÖ ´ÖÖ׻֍ú êú ׍úÃÖß ¯ÖÏ×¾Ö¸üŸÖ éúŸµÖ µÖÖ ³Öæ»Ö êú
úÖ¸üÖ µÖÖ ´ÖÖ׻֍ú «üÖ¸üÖ ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ׍úÃÖß ´ÖÖ´Ö»ÖÖë µÖÖ ²ÖÖŸÖ †Öפü êú ×»Ö‹ פü‹ Ö‹ ׍úÃÖß †­ÖãÖÏÆü
וÖÃ֍êú úÖ¸üÖ ‡ÃÖ ¯ÖÏÖ¾Ö¬ÖÖ­Ö êú ­Ö ÆüÖê­Öê ¯Ö¸ü ¯ÖÏןֳÖæןֵÖÖë ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ úÖ­Öæ­Ö êú †¬Öß­Ö ²Öïú úÖê ‡ÃÖ ¤üÖ×µÖŸ¾Ö ÃÖê
´ÖãŒŸÖ ×ú‹ •ÖÖ­Öê ¯Ö¸ü ¯ÖϳÖÖ¾Ö ¯Ö›ÍüŸÖÖ, êú úÖ¸üÖ †¯Ö­Öê ¤üÖ×µÖŸ¾ÖÖë ÃÖê ´ÖãŒŸÖ ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ…
5. ´ÖÖ׻֍ú êú ×»Ö‹ ²Öïú êú ×¾Ö¹ý¨ü úÖ¸Ôü¾ÖÖ‡Ô ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ×¾Ö¹ý¨ü úÖ¸Ôü¾ÖÖ‡Ô ú¸ü­ÖÖ †Ö¾Ö¿µÖú
­ÖÆüà ÆüÖêÖÖ †Öî¸ü ´ÖÖ׻֍ú «üÖ¸üÖ ‡ÃÖ ˆ¯ÖµÖãÔŒŸÖ ²Öïú êú ×¾Ö¹ý¨ü úÖ¸Ôü¾ÖÖ‡Ô ×ú‹ •ÖÖ­Öê êú ÃÖ´ÖµÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖê »Öß Ö‡Ô
µÖÖ »Öß •ÖÖ­Öê ¾ÖÖ»Öß ×úÃÖß ¯ÖÏןֳÖæ×ŸÖ “ÖÖÆêü ²ÖúÖµÖÖ ÆüÖê †£Ö¾ÖÖ †¯ÖÏÖ¯µÖ, êú ÆüÖêŸÖê Æãü‹ ³Öß µÖÆüÖÓ ¯Ö¸ü ˆÛ»»Ö׏֟Ö
ÖÖ¸Óü™üß ²Ö»Ö¿Öᯙ ¸üÆêüÖß…
6. Æü´Ö, ˆŒŸÖ ²Öïú †ÓŸÖ ´Öë ‡ÃÖ ÖÖ¸Óü™üß úÖê ‡Ã֍úß ¯ÖϾÖé¢Ö ¸üÆü­Öê êú ¤üÖî¸üÖ­Ö ´ÖÖ׻֍ú úß ×»Ö×ÖŸÖ ¯Öæ¾ÖÔ †­Öã´Ö×ŸÖ êú ²ÖÖî¸ü
×­Ö¸üÃŸÖ ­Ö ú¸ü­Öê úÖ ¾Ö“Ö­Ö ¤êüŸÖê Æïü †Öî¸ü ÃÖÆü´Ö×ŸÖ ¤êüŸÖê Æïü ׍ú ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú µÖÖ ˆŒŸÖ ²Öïú êú ÃÖÓ×¾Ö¬ÖÖ­Ö ´Öë
׍úÃÖß ¯ÖύúÖ¸ü êú ¯Ö׸ü¾ÖŸÖÔ­Ö µÖÆüÖÓ ¯Ö¸ פü‹ Ö‹ Æü´ÖÖ¸êü ¤üÖ×µÖŸ¾ÖÖë úÖê ˆ­´ÖÖê×“ÖŸÖ ­ÖÆüà ú¸êüÖÖ…
µÖפü ‡ÃÖ ÖÖ¸Óü™üß úÖê †ÖÖê ×¾ÖßÖÖ׸üŸÖ ׍ú‹ •ÖÖ­Öê úß †Ö¾Ö¿µÖúŸÖÖ ÆüÖê ŸÖÖê ´ÖêÃÖÃÖÔ-----------------ו֭֍úß †Öê¸ü
ÃÖê µÖÆü ÖÖ¸Óü™üß •ÖÖ¸üß úß •ÖÖ ¸üÆüß Æî,ü ÃÖê ×­Ö¤ìü¿Ö ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê ¯Ö¸ü †Ö¾Ö¿µÖú †¾Ö×¬Ö êú ×»Ö‹ ‡ÃÖê ²ÖœÍüÖ ×¤üµÖÖ •ÖÖ‹ÖÖ…

126

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Notwithstanding anything contained herein before our liability under this
Guarantee is restricted to Rs,......... (Rupees ..............Only) together with interest.
Our undertaking shall commence from the date of execution and shall remain in
force upto ..........

Dated this ………................day of......………...20…

In presence of For and on behalf of (the Bank)

WITNESS

1________________________ Signature _________________________________

2________________________ Name & Designation_______________________

Authorisation No___________________________

Seal of the Bank___________________________

Accepted

(Signature of the Officer)


For and On behalf of the
Nuclear Power Corporation of India Ltd.,

127

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
‡ÃÖ ÖÖ¸Óü™üß êú †ÓŸÖÖÔŸÖ Æü´ÖÖ¸êü ¤üÖ×µÖŸ¾ÖÖë ÃÖê ¯ÖÆü»Öê ׍úÃÖß ²ÖÖŸÖ êú ÆüÖêŸÖê Æãü‹ ³Öß µÖÆü ²µÖÖ•Ö ÃÖ×ÆüŸÖ ¹ý--------------(---
-----------------------------------¹ý¯Ö‹ ´ÖÖ¡Ö ) ŸÖú êú ×»Ö‹ ¯ÖÏןֲÖÓ×¬ÖŸÖ Æîü… Æü´ÖÖ¸üÖ ¾Ö“Ö­Ö ‡Ã֍êú ×­Ö¯ÖÖ¤ü­Ö úß
ŸÖÖ¸üßÖ ÃÖê ¯ÖÏÖ¸Óü³Ö ÆüÖêÖÖ †Öî¸ü -----------ŸÖú ²Ö»Ö¿Öᯙ ¸üÆêüÖÖ…
¾ÖÂÖÔ 200--êú ---¾Öë פü­Ö úß -----------ŸÖÖ¸üßÖ úÖê
úß ˆ¯ÖÛãÖ×ŸÖ ´Öë éúŸÖê ‹¾ÖÓ ¾ÖÖßÖê (²Öïú úÖ ­ÖÖ´Ö)
ÃÖցÖߐ֝Ö
1.------------------- ÆüßÖցָü-------------------------------------
2.------------------ ­ÖÖ´Ö ¾Ö ¯Ö¤ü­ÖÖ´Ö-------------------------------
¯ÖÏÖ׬֍ú¸üÖ ÃÖӏµÖÖ-----------------------------
²Öïú úß ´ÖãÆü¸ü-------------------------

þÖߍúÖ¸ü ׍úµÖÖ ÖµÖÖ

(†×¬ÖúÖ¸üß êú ÆüßÖցָü)


éúŸÖê ‹¾ÖÓ ¾ÖÖßÖê
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü

127

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
NOTES

*For Proprietary Concerns

Shri ………………..................... son of..……………………….............. resident of


....................................carrying on business under the name and Style of...........at...
........(herein after called " the said Contractor" which expression shall unless the
context requires otherwise include his heirs, executors, administrators and legal
representatives).

*For Partnership Concerns


M/s..................……………………………………... a partnership firm with its
office.........................(hereinafter called " the said Contractor" which expression
shall unless the context requires otherwise include their heirs, executors,
administrators and legal representative); the names of their partners being

(i) Shri ...........……………………………………….....S/o........……….......................

(i) Shri ...........……………………………………….....S/o........……….......................

*For Companies

M/s. ________________ a company under the Companies Act, 1956 and having its
registered office at______________ in the State of_________________(hereinafter
called "the said Contractor" which expression shall unless the context
requires otherwise include its administrators, successors and assigns).

128

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
×™ü¯¯ÖםֵÖÖÓ

* þÖÖ×´ÖŸ¾Ö ¾ÖÖ»Öê ¯ÖÏןÖšüÖ­ÖÖë êú ×»Ö‹

ÁÖß-----------------------------------------¯Öã¡Ö ÁÖß -----------------------------------×­Ö¾ÖÖÃÖß ------


--------------------------------------------‡ÃÖ ­ÖÖ´Ö êú †¬Öß­Ö ¾Ö -------------------¸üß×ŸÖ ÃÖê ---------
------------ãÖÖ­Ö ¯Ö¸ü ¾µÖÖ¯ÖÖ¸ü “Ö»ÖÖ ¸üÆêü Æïü… ( ‡­Æëü ‡Ã֍êú †ÖÖê "ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü" úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ
†×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú ÃÖÓ¤ü³ÖÔ êú †­ÖãÃÖÖ¸ü †­µÖ£ÖÖ †¯Öê×ÖŸÖ ­Ö ÆüÖê ˆ­Öêú ¾ÖÖ׸üÃÖ, ×­Ö¯ÖÖ¤üú, ¯ÖÏ¿ÖÖÃ֍ú ¾Ö
×¾Ö׬֍ú ¯ÖÏןÖ×­Ö×¬Ö ¿ÖÖ×´Ö»Ö Æïü…)

* ³Ö֐ÖߤüÖ¸üß ¾ÖÖ»Öê ¯ÖÏןÖšüÖ­ÖÖë êú ×»Ö‹

´ÖêÃÖÃÖÔ -------------------------------------------------------‹ú ³Ö֐ÖߤüÖ¸üß ±ú´ÖÔ Æîü †Öî¸ü ‡Ã֍úÖ úÖµÖÖÔ»ÖµÖ


------------------------------ÛÃ£ÖŸÖ Æîü (‡­Æëü ‡Ã֍êú †ÖÖê "ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü" úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ
†×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú ÃÖÓ¤ü³ÖÔ êú †­ÖãÃÖÖ¸ü †­µÖ£ÖÖ †¯Öê×ÖŸÖ ­Ö ÆüÖê ˆ­Öêú ¾ÖÖ׸üÃÖ, ×­Ö¯ÖÖ¤üú, ¯ÖÏ¿ÖÖÃ֍ú ¾Ö
×¾Ö׬֍ú ¯ÖÏןÖ×­Ö×¬Ö ¿ÖÖ×´Ö»Ö Æïü) ; ˆ­Öêú ³Ö֐ÖߤüÖ¸üÖë êú ­ÖÖ´Ö ‡ÃÖ ¯ÖύúÖ¸ü Æïü

(i) ÁÖß -------------------------------¯Öã¡Ö ÁÖß----------------------------------------


(ii) ÁÖß -------------------------------¯Öã¡Ö ÁÖß-----------------------------------------

* ú´¯Ö×­ÖµÖÖë êú ×»Ö‹


´ÖêÃÖÃÖÔ--------------------------ú´¯Ö­Öß †×¬Ö×­ÖµÖ´Ö 1956 êú †¬Öß­Ö ¯ÖÓ•ÖߍéúŸÖ ‹ú ú´¯Ö­Öß Æîü †Öî¸ü ‡Ã֍úÖ
¯ÖÓ•ÖߍéúŸÖ úÖµÖÖÔ»ÖµÖ ---------------------¯ÖϤêü¿Ö ´Öë --------------------ãÖÖ­Ö ¯Ö¸ü ÛÃ£ÖŸÖ Æîü… (‡­Æëü ‡Ã֍êú †ÖÖê
"ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü" úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ †×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú ÃÖÓ¤ü³ÖÔ êú †­ÖãÃÖÖ¸ü †­µÖ£ÖÖ †¯Öê×ÖŸÖ ­Ö ÆüÖê
ˆ­Öêú ¯ÖÏ¿ÖÖÃ֍ú, ˆ¢Ö¸üÖ׬֍úÖ¸üß ¾Ö ÃÖ´Ö­Öã¤êü¿Öß ¿ÖÖ×´Ö»Ö Æïü)

128

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4. FORM OF HYPOTHECATION DEED

(ON NON-JUDICIAL STAMP PAPER ON APPROPRIATE VALUE)

THE INDENTURE made this .................day of .........20....................... BETWEEN ............


of the one part (herein after called `Contractor') and Nuclear Power
Corporation of India Ltd. (........... Atomic Power Project/ Station) hereinafter
called " the Corporation" which expression shall unless the context requires
otherwise include his successors and assigns of the other part:

WHEREAS under sub-clause12.1 of the General Conditions of Contract relating to


the terms and conditions of its Award letter No....................dated .............which
have been unequivocally accepted by the Contractor, the Contractor has applied
to the Corporation for a loan of Rs.............. (Rupees)
...............................................Only) for plant and equipment described in the
Schedule here to specifically acquired by the Contractor for the works and
brought to site.

AND WHEREAS one of the conditions on which the said loan of Rs........./- granted
by the Corporation to the Contractor is that the Contractor shall hypothecate the
plant and equipment described in the Schedule hereto in favour of the
Corporation as security for the due repayment of the said loan.

AND WHEREAS the Contractor has represented that he is the Owner of the plant
and equipment described in the Schedule hereto and the same is free from
encumbrances.

NOW THIS INDENTURE WITNESSTH THAT in pursuance of the said agreement and in
consideration of the premises the Contractor doth hereby hypothecate, assign
and transfer to the Corporation the Plant and equipment described in the
Schedule hereto the intent that the same shall remain and form security for
repayment to the Corporation of the said loan of Rs........... together with the interest
thereon at ........ % per annum.

1. The Contractor hereby agrees, declares and convenants with the


Corporation as follows:-

(a) The Contractor shall repay to the Corporation the said loan of
Rs........(Rupees....................... Only) together with interest thereon as aforesaid by
and agrees that the said loan be recovered by the Corporation by making
deductions in the manner provided in sub-clause12.1 of the General Conditions
of Contract and other conditions of the Award letter from the claims made by
the Contractor against the Corporation of "on account payment".

129

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
4. ²ÖӬ֍ú ×¾Ö»ÖêÖ úÖ ¯ÖÏÖºþ¯Ö
(ˆ×“ÖŸÖ ´Öæ»µÖ êú ­µÖÖ׵֍êúŸÖ¸ü ÙüÖ´¯Ö ¯Öê¯Ö¸ü ¯Ö¸ü)

†Ö•Ö ¾ÖÂÖÔ 20---êú -----פü­Ö úß -------ŸÖÖ¸üßÖ úÖê --------------- ¯ÖÖ úê ºþ¯Ö ´Öë ‹ú ³ÖÖÖ (וÖÃÖê †ÖÖê
"ÃÖÓ×¾Ö¤ü֍úÖ¸ü" úÆüÖ ÖµÖÖ Æîü) †Öî¸ü ¤æüÃÖ¸êü ³ÖÖÖ êú ºþ¯Ö ´Öë ­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü (----
--------¯Ö¸ü´Ö֝Öã ¯Ö׸üµÖÖê•Ö­ÖÖ/ײֻ֕Öß‘Ö¸ü) וÖÃÖê †ÖÖê "׭֐ִÖ" úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ †×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú
×¾ÖÂÖµÖ µÖÖ ÃÖÓ¤ü³ÖÔ êú ×¾Ö¹ý¨ü ­Ö ÆüÖ,ê ‡Ã֍úê, ˆ¢Ö¸üÖ׬֍úÖ¸üß ¾Ö ÃÖ´Ö­Öã¤êü¿Öß ¿ÖÖ×´Ö»Ö Æïü, êú ´Ö¬µÖ µÖÆü †­Öã²ÖÓ¬Ö ×úµÖÖ ÖµÖÖ :
•Ö²Ö׍ú ‡ÃÖ †¾ÖÖ›Ôü ¯Ö¡ÖÖӍú-----------------------פü­ÖÖӍú---------------êú ÃÖÓ×¾Ö¤üÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ÃÖÖ´ÖÖ­µÖ ¿ÖŸÖÖí
êú ˆ¯Ö Ö›ü 12.1 êú †¬Öß­Ö ¿ÖŸÖÖí ¾Ö ×­Ö²ÖÓ¬Ö­ÖÖë ו֭Æëü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­ÖÙ¾Ö¾ÖÖפüŸÖ ºþ¯Ö ÃÖê þÖߍúÖ¸ü ú¸ü ×»ÖµÖÖ
ÖµÖÖ Æîü, ÃÖÓ×¾Ö¤ü֍úÖ¸ü ­Öê ×­ÖÖ´Ö úÖê µÖÆüÖÓ †­ÖãÃÖæ“Öß ´Öë ¾ÖÙÖŸÖ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ ו֭Æëü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ‡ÃÖ úÖµÖÔ êú
×»Ö‹ ×¾Ö¿ÖêÂÖ ºþ¯Ö ¯ÖÏÖ¯ŸÖ ׍úµÖÖ ¾Ö úÖµÖÔÃ£Ö»Ö ¯Ö¸ü »ÖÖµÖÖ ÖµÖÖ Æîüê, êú ×»Ö‹ ¹ý. -------------------(-----------¹ý¯Ö‹
´ÖÖ¡Ö ) êú ŠúÖ êú ×»Ö‹ †Ö¾Öê¤ü­Ö ׍úüµÖÖ Æîü…
†Öî¸ü •Ö²Ö׍ú ×­ÖÖ´Ö «üÖ¸üÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ´ÖÓ•Öæ¸ü ׍ú‹ Ö‹ ˆŒŸÖ ¹ý.----------/- êú ŠúÖ úß ¿ÖŸÖÖí ´Öë ÃÖê ‹ú ¿ÖŸÖÔ
µÖÆü Æîü ׍ú ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆŒŸÖ ŠúÖ úß ¤êüµÖ ¾ÖÖ¯ÖÃÖß úß ¯ÖÏןֳÖæ×ŸÖ êú ºþ¯Ö ´Öë ‡ÃÖ †­ÖãÃÖæ“Öß ´Öë ¾ÖÙÖŸÖ ÃÖÓµÖÓ¡Ö ¾Ö
ˆ¯Öú¸üÖ úÖê ×­ÖÖ´Ö êú ¯ÖÖ ´Öë ²ÖӬ֍ú ¸üÖêÖÖ…
†Öî¸ü •Ö²Ö׍ú ÃÖÓ×¾Ö¤ü֍úÖ¸ü ­Öê †³µÖÖ¾Öê¤ü­Ö ׍úµÖÖ Æîü ׍ú ¾ÖÆü ‡ÃÖ †­ÖãÃÖæ“Öß ´Öë ¾ÖÙÖŸÖ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ úÖ ´ÖÖ׻֍ú Æîü
†Öî¸ü µÖÆü †×¬Ö³ÖÖ¸ü ÃÖê ´ÖãŒŸÖ Æîü…
†²Ö µÖÆü †­Öã²ÖÓ¬Ö ÃÖցÖß Æîü ׍ú ˆŒŸÖ ú¸üÖ¸ü êú †­ÖãÃÖ¸üÖ †Öî¸ü †Ö¬ÖÖ¸üÖÓ›ü ¯Ö¸ü ×¾Ö“ÖÖ¸ü ú¸üŸÖê Æãü‹ ÃÖÓ×¾Ö¤ü֍úÖ¸ü
‹ŸÖ¤Ëü«üÖ¸üÖ ×­ÖÖ´Ö úÖê ‡ÃÖ †­ÖãÃÖæ“Öß ´Öë ¾ÖÙÖŸÖ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ ‡ÃÖ †Ö¿ÖµÖ êú ÃÖÖ£Ö ²ÖӬ֍ú, ÃÖ´Ö­Öã¤êü×¿ÖŸÖ ¾Ö
†ÓŸÖ׸üŸÖ ú¸üŸÖÖ Æîü ׍ú µÖÆü ˆŒŸÖ ¹ý.----------/- ŠúÖ ¾Ö ˆÃ֍êú -----% ¾ÖÖÙÂ֍ú úß ¤ü¸ü ÃÖê ²µÖÖ•Ö êú ³ÖãÖŸÖÖ­Ö êú
×»Ö‹ ¯ÖÏןֳÖæ×ŸÖ êú ºþ¯Ö ´Öë ²Ö­ÖÖ ¸üÆêüÖÖ…
1. ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­ÖÖ´Ö êú ÃÖÖ£Ö ×­Ö´­Ö×»Ö×ÖŸÖ ú¸üÖ¸ü, ¾Ö“Ö­Ö ¾Ö ÃÖÓµÖÖê•Ö­Ö ú¸üŸÖÖ Æîü :-
(‹) ÃÖÓ×¾Ö¤ü֍úÖ¸ü ×­ÖÖ´Ö úÖê ˆŒŸÖ ¹ý.----------(---------¹ý¯Ö‹ ´ÖÖ¡Ö ) úÖ ŠúÖ ¾Ö ˆÃ֍úÖ ²µÖÖ•Ö ˆ¯ÖµÖãÔŒŸÖ †­ÖãÃÖÖ¸ü
¾ÖÖ¯ÖÃÖ ú¸êüÖÖ †Öî¸ü ‡ÃÖ ŠúÖ úÖê ×­ÖÖ´Ö «üÖ¸üÖ ÃÖÓ×¾Ö¤üÖ úß ÃÖÖ´ÖÖ­µÖ ¿ÖŸÖÖí êú ˆ¯Ö-Ö›ü 12.1 ¾Ö †¾ÖÖ›Ôü ¯Ö¡Ö úß ¿ÖŸÖÖí
´Öë ¾ÖÙÖŸÖ ¸üß×ŸÖ êú †­ÖãÃÖÖ¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­ÖÖ´Ö êú ×¾Ö¹ý¨ü ׍ú‹ Ö‹ "†Öò­Ö ‹úÖˆÓ™ ³ÖãÖŸÖÖ­Ö" êú ¤üÖ¾ÖÖë ´Öë ÃÖê
ú™üÖîŸÖß ×ú‹ •ÖÖ­Öê êú ×»Ö‹ ú¸üÖ¸ü ú¸üŸÖÖ Æîü…

129

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(b) The Contractor has paid in full the purchase price of the Plant & Equipment
described in the Schedule hereto and each and every one of them and that
the same are the absolute property of the Contractor and that the same have
not been sold, pledged, mortgaged or transferred or in any way dealt with
by the Contractor.

(c) So long as any amount remains payable to the Corporation by the


Contractor in respect of the said loan of Rs.__________ the Contractor shall not
sell, pledge, hypothecate, transfer, part with or in any way deal with the
Plant and Equipment described in the Schedule hereto.

(d) If the said loan of Rs.___________shall not be repaid by the Contractor or


recovered in the manner described above by the said ..........day of ..... due to
any reasons whatsoever or the said Contract has been determined earlier or
cancelled or if the Contractor shall sell, pledge, mortgage, transfer, part
with or in any way deal with the said plant and equipment or any part
thereof or the Contractor or any of the partners is adjudged insolvent or
the Contractor is to be would up or makes any composition or
arrangement with its creditors or the Contractor shall commit breach of any of
the terms and conditions or convenants as herein contained or if any of the
said plant and equipment or if any other property whatsoever belonging to
the Contractor has been sold or attached for a period of not less than 21 days
in execution of the decree of any court for payment of money, the whole of
the said loan of Rs....... or such part thereof as may remained unpaid or
unrecovered together with interest thereon shall forthwith become due and
payable.
(e) The Corporation may on the happening of any of the events mentioned in the
preceding clause (d) or in the event of the said loan or any part thereof
becoming due and payable and has not been paid or recovered or cannot
be recovered as provided in the said conditions, seize and take possession of
the said plant and equipment (and either remain in possession thereof
without removing the same or else may remove the same) and sell the said
plant and equipment or any of them either by public auction or private
contract and may out of the sale proceeds retain the balance of the said
loan and interest thereon remaining unpaid and unrecovered and all costs,
charges and expenses and payments incurred or made in maintaining,
defending or protecting the rights of the Corporation hereunder and shall
pay over the surplus, if any, to the Contractor.
(f) The Contractor shall at all times during the continuance of the security
and at the expense of the Contractor insure and keep insured
and plant and equipment described in the Schedule hereto for the
value thereof in the joint names of the Contractor and the Corporation with
an insurance company to be approved by the Engineer-in-charge against
the risk of loss or damage from whatever cause arising other than the
Excepted
130

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(²Öß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü ­Öê ‡ÃÖ †­ÖãÃÖæ“Öß ´Öë ¾ÖÙÖŸÖ †Öî¸ü ˆ­Ö´Öë ÃÖê ¯ÖÏŸµÖêú ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ úß Ö¸üߤü úß ¯Öæ¸üß úß´ÖŸÖ
†¤üÖ ú¸ü ¤üß Æîü †Öî¸ü µÖÆü ¯ÖæÖÔºþ¯ÖêÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ÃÖÓ¯Ö×¢Ö Æïü †Öî¸ü µÖÆü ׍ú ‡ÃÖê ²Öê“ÖÖ, אָü¾Öß, ¸êüÆü­Ö µÖÖ
†ÓŸÖ׸üŸÖ ­ÖÆüà ׍úµÖÖ ÖµÖÖ Æîü †£Ö¾ÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×úÃÖß ³Öß ºþ¯Ö ´Öë »Öê­Ö-¤êü­Ö ­ÖÆüà ׍úµÖÖ ÖµÖÖ Æîü…
(ÃÖß) •Ö²Ö ŸÖú ׍ú ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ×­ÖÖ´Ö úÖê ¤êüµÖ ˆŒŸÖ ¹ý.----------´Öë ÃÖê úÖê‡Ô ŠúÖ ²ÖúÖµÖÖ ¸üÆüŸÖÖ Æîü ŸÖ²Ö
ŸÖú ÃÖÓ×¾Ö¤ü֍úÖ¸ü ‡ÃÖ †­ÖãÃÖæ“Öß ´Öë ¾ÖÙÖŸÖ ÃÖÓµÖÓ¡Ö µÖÖ ˆ¯Öú¸üÖ úÖê ²Öê“Ö­ÖÖ, ¸êüÆü­Ö, ²ÖӬ֍ú, †ÓŸÖ¸üÖ, †»ÖÖ µÖÖ
׍úÃÖß ³Öß ºþ¯Ö ´Öë »Öê­Ö-¤êü­Ö ­ÖÆüà ú¸êüÖÖ…
(›üß) µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆŒŸÖ ¹ý.----------úÖ ¾ÖÖ¯ÖÃÖ ³ÖãÖŸÖÖ­Ö µÖÖ ¾ÖÃÖæ»Öß ×úÃÖß ³Öß úÖ¸üÖ ÃÖê ˆ¯ÖµÖãÔŒŸÖ
¸üß×ŸÖ ÃÖê ˆŒŸÖ ----------úê ˆŒŸÖ פü­Ö ŸÖú ­ÖÆüà ׍úµÖÖ •ÖÖ‹ÖÖ µÖÖ ˆŒŸÖ ÃÖÓ×¾Ö¤üÖ úÖê ÃÖ´ÖµÖ ÃÖê ¯ÖÆü»Öê Æüß
¯Ö׸ü×­Ö¬ÖÖÔ׸üŸÖ ú¸ü­Öê µÖÖ ×­Ö¸üÃŸÖ ú¸ü­Öê ¯Ö¸ü µÖÖ µÖפü ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ˆ¯ÖµÖãÔŒŸÖ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ µÖÖ ˆÃ֍êú
׍úÃÖß ³ÖÖÖ úÖê ²Öê“Ö­Öê, ¸êüÆü­Ö, ²ÖӬ֍ú, †ÓŸÖ¸üÖ, †»ÖÖ µÖÖ ×úÃÖß ³Öß ºþ¯Ö ´Öë »Öê­Ö-¤êü­Ö ú¸ü­Öê ¯Ö¸ü µÖÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü †£Ö¾ÖÖ ˆÃ֍êú ׍úÃÖß ³Ö֐ÖߤüÖ¸ü êú ¤üß¾ÖÖ×»ÖµÖÖ ‘ÖÖê×ÂÖŸÖ ×ú‹ •ÖÖ­Öê ¯Ö¸ü µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖ †¯Ö­Öê
ŠúÖ¤üÖŸÖÖ†Öë êú ÃÖÖ£Ö úÖê‡Ô ÃÖ´Ö—ÖÖîŸÖÖ µÖÖ ú¸üÖ¸ü µÖÖ ¾µÖ¾ÖãÖÖ ú¸ü­Öê ¯Ö¸ü µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü «Ö¸üÖ µÖÆüÖÓ ¯Ö¸ü ¾Öٝ֟Ö
×­Ö²ÖÓ¬Ö­ÖÖë ¾Ö ¿ÖŸÖÖí µÖÖ ÃÖ»ÖÖÆüÖë úÖ ˆ»»ÖÓ‘Ö­Ö ×ú‹ •ÖÖ­Öê ¯Ö¸ü †£Ö¾ÖÖ ˆŒŸÖ ÃÖÓµÖÓ¡Ö †Öî¸ü ˆ¯Öú¸üÖ µÖÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß †­µÖ úÖê‡Ô ³Öß ÃÖÓ¯Ö×¢Ö úê ²Öê“Öê •ÖÖ­Öê µÖÖ ¬Ö­Ö êú ³ÖãÖŸÖÖ­Ö êú ×»Ö‹ ׍úÃÖß ­µÖÖµÖÖ»ÖµÖ úß
×›üÎúß êú ×­Ö¯ÖÖ¤ü­Ö êú †Ö¬ÖÖ¸ü ¯Ö¸ü 21 פü­Ö ÃÖê †×¬Öú ÃÖ´ÖµÖ êú ×»Ö‹ ãúÔú ׍ú‹ •ÖÖ­Öê ¯Ö¸ü, ˆŒŸÖ ¹ý.------
----úÖ ŠúÖ µÖÖ ˆÃ֍úÖ ³ÖãÖŸÖÖ­Ö µÖÖ ¾ÖÃÖæ»Ö ­Ö ׍úµÖÖ ÖµÖÖ úÖê‡Ô ¿ÖêÂÖ ³ÖÖÖ ¾Ö ˆÃ֍úÖ ²µÖÖ•Ö ŸÖŸúÖ»Ö ¯ÖϳÖÖ¾Ö
ÃÖê ¤êüµÖ ¾Ö ³ÖãÖŸÖÖ­ÖµÖÖêµÖ ÆüÖê •ÖÖ‹ÖÖ…
(‡Ô) ˆ¯ÖµÖãÔŒŸÖ Ö›ü(›üß) ´Öë ¾ÖÙÖŸÖ ×úÃÖß ³Öß ‘Ö™ü­ÖÖ êú ÆüÖê­Öê ¯Ö¸ü µÖÖ ˆŒŸÖ ŠúÖ †£Ö¾ÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ êú
¤êüµÖ ¾Ö ³ÖãÖŸÖÖ­ÖµÖÖêµÖ ÆüÖê •ÖÖ­Öê †Öî¸ü ³ÖãÖŸÖÖ­Ö µÖÖ ¾ÖÃÖæ»Ö ­Ö ׍ú‹ •ÖÖ­Öê µÖÖ ˆŒŸÖ ¿ÖŸÖÖí êú †­ÖãÃÖÖ¸ü ¾ÖÃÖæ»Ö ­Ö
׍ú‹ •ÖÖ Ã֍ú­Öê ¯Ö¸ü ×­ÖÖ´Ö ˆŒŸÖ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ úÖê •Ö²ŸÖ ú¸ü Ã֍úŸÖÖ Æîü ¾Ö ˆÃ֍úÖ ú²•ÖÖ »Öê Ã֍úŸÖÖ Æîü
(†Öî¸ü ˆÃ֍úÖ ú²•ÖÖ »Öê­Öê êú ²ÖÖ¤ü ˆ­Æëü ˆÃÖß Ã£ÖÖ­Ö ¯Ö¸ü ¸üÖ Ã֍úŸÖÖ Æîü µÖÖ ¾ÖÆüÖÓ ÃÖê Æü™üÖ Ã֍úŸÖÖ Æîü) †Öî¸ü ˆŒŸÖ
ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ úÖê †Ö´Ö ­Öß»ÖÖ´Öß µÖÖ ×­Ö•Öß ÃÖÓ×¾Ö¤üÖ êú ´ÖÖ¬µÖ´Ö ÃÖê ²Öê“Ö Ã֍úŸÖÖ Æîü †Öî¸ü ‹êÃÖß ×²ÖÎúß ÃÖê
¯ÖÏÖ¯ŸÖ ¸üú´Ö ´Öë ÃÖê ˆŒŸÖ ŠúÖ ¾Ö ˆÃ֍êú ²µÖÖ•Ö úß ¤êüµÖ ¾Ö Öî¸ü ¾ÖÃÖæ»ÖßµÖÖêµÖ ¿ÖêÂÖ ¸üú´Ö †Öî¸ü µÖÆüÖÓ ¯Ö¸ü
ˆÛ»»Ö×ÖŸÖ ×­ÖÖ´Ö êú †×¬ÖúÖ¸üÖë úÖê †­Öã¸ü×ÖŸÖ ú¸ü­Öê, ²Ö“ÖÖ¾Ö ú¸ü­Öê µÖÖ ÃÖã¸ü×ÖŸÖ ¸üÖ­Öê ´Öë Ö“ÖÔ ×ú‹ Ö‹ µÖÖ
»ÖÖÖ‹ Ö‹ ÃÖ´ÖÃŸÖ Ö“ÖÔ, ¯ÖϳÖÖ¸ü ¾Ö ¾µÖµÖ úÖê †¯Ö­Öê ¯ÖÖÃÖ ¸üÖ Ã֍úŸÖÖ Æîü †Öî¸ü ‡Ã֍êú ²ÖÖ¤ü µÖפü úÖê‡Ô
†×ŸÖ׸üŒŸÖ ¸üú´Ö ²Ö“ÖŸÖß Æîü ŸÖÖê ˆÃÖê ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¤êü Ã֍úŸÖÖ Æîü…
(‹±ú) ¯ÖÏןֳÖæ êú ¯ÖϳÖÖ¾Öß ¸üÆü­Öê êú ¤üÖî¸üÖ­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê Ö“Öì ¯Ö¸ü µÖÆüÖÓ †­ÖãÃÖæ“Öß ´Öë ¾ÖÙÖŸÖ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ
êú ×»Ö‹ ˆ­Öêú ´Öæ»µÖ úÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¾Ö ×­ÖÖ´Ö êú ÃÖÓµÖãŒŸÖ ­ÖÖ´Ö ¯Ö¸ü ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ «üÖ¸üÖ †­Öã´ÖÖêפüŸÖ
׍úÃÖß ²Öß´ÖÖ ú´¯Ö­Öß ÃÖê ²Öß´ÖÖ êú †ÓŸÖÖÔŸÖ ­Ö †Ö­Öê ¾ÖÖ»Öê •ÖÖê׏ִÖÖë êú †»ÖÖ¾ÖÖ ÃÖ´ÖÃŸÖ ­ÖãúÃÖÖ­Ö ¾Ö Ö×ŸÖ êú
•ÖÖê×Ö´Ö úÖ Æü¸ü ÃÖ´ÖµÖ ²Öß´ÖÖ ¸üÖëÖê… ¯ÖÏןֳÖæ êú ¯ÖϳÖÖ¾Öß ¸üÆü­Öê êú ¤üÖî¸üÖ­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü µÖÆü ²Öß´ÖÖ ¯ÖϾÖé¢Ö ¸üÖ­Öê êú
×»Ö‹ †Ö¾Ö¿µÖú ÃÖ³Öß ¯ÖÏß×´ÖµÖ´ÖÖë ¾Ö ¬Ö­Ö¸üÖ×¿Ö úÖ ³ÖãÖŸÖÖ­Ö ú¸ëüÖê †Öî¸ü ²Öß´ÖÖ ¯ÖÖò×»ÖÃÖß ¾Ö ¯ÖÏß×´ÖµÖ´Ö ³ÖãÖŸÖÖ­Ö
úß ¸üÃÖߤüÖë úß ´Öæ»Ö ¯ÖÏןֵÖÖÓ ¯ÖϳÖÖ¸üß

130

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
Risks not covered under the insurance. During the continuance of the
security the Contractor shall pay all premia and sums of money necessary for
keeping such insurance on foot and the insurance policy and receipts in
original for premia paid shall be deposited with the Engineer-in-charge. The
Contractor shall assign all his rights, title and interest in the policy to the
Corporation.

(g) The Contractor shall not permit or suffer the said plant and equipment or
any part thereof to be destroyed or damaged or used or to be used or
to deteriorate in a greater degree than it would deteriorate by
reasonable wear and tear thereof in the performance of the Contract.

(h) In the event of any damage or loss happening to the said plant and
equipment or any part thereof from whatever cause other than the
Excepted Risk [not covered under insurance] the Contractor shall forthwith
have the same repaired or replaced as the case may be or arrange for
payment of the entire amount recovered or to be recovered from the
insurance company to the Corporation towards the payment of the said
loan of Rs............

2 Upon repayment or recovery in full of the amount secured on account of


this hypothecation deed the said plant and equipment secured
hereunder shall stand released from hypothecation but this is without
prejudice to the right of the Corporation under any other conditions of the
Contract.

131

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
†×³ÖµÖÓŸÖÖ êú ¯ÖÖÃÖ •Ö´ÖÖ úß •Ö֋ӐÖß… ÃÖÓ×¾Ö¤ü֍úÖ¸ü †¯Ö­Öê ÃÖ³Öß †×¬ÖúÖ¸üÖ,êÓ Æüú ¾Ö ¯ÖÖò×»ÖÃÖß êú †ÓŸÖÖÔŸÖ ×ÆüŸÖÖë
úÖê ×­ÖÖ´Ö úÖê ÃÖ´Ö­Öã¤êü×¿ÖŸÖ ú¸ëüÖê…
(•Öß) ÃÖÓ×¾Ö¤ü֍úÖ¸ü ˆŒŸÖ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ êú ­Ö™ü ÆüÖê­Öê µÖÖ Öן֐ÖÏÃŸÖ ÆüÖê­Öê µÖÖ ˆ¯ÖµÖÖêÖ ÆüÖê­Öêê
µÖÖ †ÖÖê ˆ¯ÖµÖÖêÖ ׍ú‹ •ÖÖ­Öê µÖÖ ÃÖÓ×¾Ö¤üÖ êú ×­Ö¯ÖÖ¤ü­Ö êú úÖ¸üÖ ÆüÖê­Öê ¾ÖÖ»Öß ÃÖÖ´ÖÖ­µÖ Ö×ŸÖ ÃÖê †×¬Öú ßָü
ŸÖú úß ÖןÖü ­ÖÆüà ÆüÖê­Öê ¤ëüÖê…
(‹“Ö) ˆŒŸÖ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ µÖÖ ˆÃ֍êú ׍úÃÖß ³ÖÖÖ úÖê †¯Ö¾ÖÖפüŸÖ •ÖÖê×Ö´Ö (²Öß´ÖÖ êú †ÓŸÖÖÔŸÖ ­Ö †Ö­Öê ¾ÖÖ»Öê)
êú †»ÖÖ¾ÖÖ ×úÃÖß ³Öß úÖ¸üÖ ÃÖê ׍úÃÖß ³Öß ¯ÖύúÖ¸ü úß Ö×ŸÖ µÖÖ ­ÖãúÃÖÖ­Ö ÆüÖê­Öê ¯Ö¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü ŸÖŸúÖ»Ö
‡Ã֍úß ´Ö¸ü´´ÖŸÖ µÖÖ ÃÖÖ´ÖÖ­Ö ²Ö¤ü»Öß, •ÖîÃÖÖ ³Öß ´ÖÖ´Ö»ÖÖ ÆüÖê ú¸ü¾Ö֋ӐÖê µÖÖ ²Öß´ÖÖ ú´¯Ö­Öß ÃÖê ¾ÖÃÖæ»Ö úß Ö‡Ô µÖÖ
¾ÖÃÖæ»Ö úß •ÖÖ­Öê ¾ÖÖ»Öß ÃÖÓ¯ÖæÖÔ ¸üÖ×¿Ö úÖê ˆŒŸÖ ¹ý.---------êú ŠúÖ úß †¤üֵ֐Öß êú ×»Ö‹ ×­ÖÖ´Ö úÖê
³ÖãÖŸÖÖ­Ö ú¸üÖ­Öê úß ¾µÖ¾ÖãÖÖ ú¸ëüÖê…
2. ‡ÃÖ ²ÖӬ֍ú ×¾Ö»ÖêÖ êú †ÓŸÖÖÔŸÖ ¯ÖÏןֳÖæ úß Ö‡Ô ¸üÖ×¿Ö úê ¯Öã­ÖÔ³ÖãÖŸÖÖ­Ö µÖÖ ¾ÖÃÖæ»Öß ÆüÖê •ÖÖ­Öê ¯Ö¸ü µÖÆüÖÓ ‡Ã֍êú «üÖ¸üÖ
¯ÖÏןֳÖæ ׍ú‹ Ö‹ ˆŒŸÖ ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ ²ÖÓ¬Ö­Ö ÃÖê ´ÖãŒŸÖ ´ÖÖ­Öê •Ö֋ӐÖê ¯Ö¸ÓüŸÖã µÖÆü ‡ÃÖ ÃÖÓ×¾Ö¤üÖ úß ×úÃÖß †­µÖ
¿ÖŸÖÖí êú †¬Öß­Ö ×­ÖÖ´Ö êú †×¬ÖúÖ¸üÖë êú ¯Öæ¾ÖÖԐÖÏÆü êú ²ÖÖî¸ü ÆüÖêÖÖ…

131

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
SCHEDULE ABOVE REFERRED TO

Sr. Particulars of Nos. Purchase price/ Total price Advance(75%


No. Plant and considered of Col.5)
Equipment reasonable by
Engineer-in-Charge

1 2 3 4 5 6

IN WITNESS WHEREOF the parties hereto have executed these presents on the
day and your first above written

Signed and delivered Signed by Shri ___________________


by the within named ............ (Name and Designation)
Nuclear Power Corporation of India Ltd.,
(__________Atomic Power Project)

in the presence of :

(1)__________________________ (1)______________________________
(2)__________________________ (2)______________________________

132

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
‰ú¯Ö¸ü ÃÖÓ¤üÙ³ÖŸÖ †­ÖãÃÖæ“Öß
Îú´Ö ÃÖÓµÖÓ¡Ö ¾Ö ˆ¯Öú¸üÖ ´Ö¤üÖë úß Ö¸üߤü úß´ÖŸÖ/ ¯ÖϳÖÖ¸üß †×³ÖµÖÓŸÖÖ ãú»Ö †×ÖÏ´Ö
ÃÖӏµÖÖ úÖ ×¾Ö¾Ö¸üÖ ÃÖӏµÖÖ «üÖ¸üÖ ˆ×“ÖŸÖ ´ÖÖ­Öß Ö‡Ô úß´ÖŸÖ (úÖ»Ö´Ö ÃÖÓ.
5 úÖ
75%)
1. 2. 3. 4. 5. 6.

µÖÆüÖÓ ¯Ö¸ü ˆ¨éüŸÖ ¯ÖÖÖë «üÖ¸üÖ ÃÖցµÖþֺþ¯Ö ‡­Öúß ˆ¯ÖÛÃ£ÖŸÖ ´Öë †Ö•Ö ‡ÃÖÃÖê ¯ÖÆü»Öê ‰ú¯Ö¸ü ׻֏Öê Æãü‹ ºþ¯Ö ´Öë ×­Ö¯ÖÖפüŸÖ
׍úµÖÖ ÖµÖÖ…

----------------------êú ­ÖÖ´Ö «üÖ¸üÖ ÁÖß ----------------------«üÖ¸üÖ ÆüßÖցÖ׸üŸÖ


ÆüßÖցÖ׸üŸÖ ¾Ö ÃÖã¯Öã¤Ôü (­ÖÖ´Ö ¾Ö ¯Ö¤ü­ÖÖ´Ö)
­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖò¾Ö¸ü úÖò¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü
(---------------¯Ö¸ü´Ö֝Öã ײֻ֕Öß ¯Ö׸üµÖÖê•Ö­ÖÖ)

úß ˆ¯ÖÛãÖ×ŸÖ ´Öë :

(1)--------------------------------- (1)---------------------------------
(2)--------------------------------- (2)---------------------------------

132

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
*NOTES

*For Proprietary Concerns

Shri __________________________________ son of__________________ resident of


________________________________________carrying on business under the name and
Style of __________ at _________ (hereinafter called " the said Contractor" which
expression shall unless the context requires otherwise include his heirs, executors,
administrators and legal representatives.

*For Partnership Concerns

M/s. _____________________ a partnership firm with its office _____________________


(hereinafter called " the said Contractor" which expression shall unless the
context requires otherwise include their heirs, executors, administrators and legal
representative); the names of their partners being

(i) Shri _________________S/o.______________________________

(ii) Shri ________________ S/o._______________________________

*For Companies

M/s................ a company registered under the Companies Act, 1956 and having its
registered office at ............... in the State of ............... (hereinafter called "the said
Contractor" which said Contractor" which expression shall unless the context
requires otherwise include its administrators, successors and assigns).

133

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
×™ü¯¯ÖםֵÖÖÓ

* þÖÖ×´ÖŸ¾Ö ¾ÖÖ»Öê ¯ÖÏןÖšüÖ­ÖÖë êú ×»Ö‹

ÁÖß-----------------------------------------¯Öã¡Ö ÁÖß -----------------------------------×­Ö¾ÖÖÃÖß ------


--------------------------------------------‡ÃÖ ­ÖÖ´Ö êú †¬Öß­Ö ¾Ö -------------------¸üß×ŸÖ ÃÖê ---------
------------ãÖÖ­Ö ¯Ö¸ü ¾µÖÖ¯ÖÖ¸ü “Ö»ÖÖ ¸üÆêü Æïü… ( ‡­Æëü ‡Ã֍êú †ÖÖê "ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü" úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ
†×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú ÃÖÓ¤ü³ÖÔ êú †­ÖãÃÖÖ¸ü †­µÖ£ÖÖ †¯Öê×ÖŸÖ ­Ö ÆüÖê ˆ­Öêú ¾ÖÖ׸üÃÖ, ×­Ö¯ÖÖ¤üú, ¯ÖÏ¿ÖÖÃ֍ú ¾Ö
×¾Ö׬֍ú ¯ÖÏןÖ×­Ö×¬Ö ¿ÖÖ×´Ö»Ö Æïü…)

* ³Ö֐ÖߤüÖ¸üß ¾ÖÖ»Öê ¯ÖÏןÖšüÖ­ÖÖë êú ×»Ö‹

´ÖêÃÖÃÖÔ -------------------------------------------------------‹ú ³Ö֐ÖߤüÖ¸üß ±ú´ÖÔ Æîü †Öî¸ü ‡Ã֍úÖ úÖµÖÖÔ»ÖµÖ


------------------------------ÛÃ£ÖŸÖ Æîü (‡­Æëü ‡Ã֍êú †ÖÖê "ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü" úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ
†×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú ÃÖÓ¤ü³ÖÔ êú †­ÖãÃÖÖ¸ü †­µÖ£ÖÖ †¯Öê×ÖŸÖ ­Ö ÆüÖê ˆ­Öêú ¾ÖÖ׸üÃÖ, ×­Ö¯ÖÖ¤üú, ¯ÖÏ¿ÖÖÃ֍ú ¾Ö
×¾Ö׬֍ú ¯ÖÏןÖ×­Ö×¬Ö ¿ÖÖ×´Ö»Ö Æïü) ; ˆ­Öêú ³Ö֐ÖߤüÖ¸üÖë êú ­ÖÖ´Ö ‡ÃÖ ¯ÖύúÖ¸ü Æïü

(i) ÁÖß -------------------------------¯Öã¡Ö ÁÖß----------------------------------------


(ii) ÁÖß ------------------------------- ¯Öã¡Ö ÁÖß-----------------------------------------

* ú´¯Ö×­ÖµÖÖë êú ×»Ö‹


´ÖêÃÖÃÖÔ--------------------------ú´¯Ö­Öß †×¬Ö×­ÖµÖ´Ö 1956 êú †¬Öß­Ö ¯ÖÓ•ÖߍéúŸÖ ‹ú ú´¯Ö­Öß Æîü †Öî¸ü ‡Ã֍úÖ
¯ÖÓ•ÖߍéúŸÖ úÖµÖÖÔ»ÖµÖ ---------------------¯ÖϤêü¿Ö ´Öë --------------------ãÖÖ­Ö ¯Ö¸ü ÛÃ£ÖŸÖ Æîü… (‡­Æëü ‡Ã֍êú †ÖÖê
"ˆŒŸÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü" úÆüÖ ÖµÖÖ Æîü †Öî¸ü ‡ÃÖ †×³Ö¾µÖÛŒŸÖ ´Öë •Ö²Ö ŸÖú ׍ú ÃÖÓ¤ü³ÖÔ êú †­ÖãÃÖÖ¸ü †­µÖ£ÖÖ †¯Öê×ÖŸÖ ­Ö ÆüÖê
ˆ­Öêú ¯ÖÏ¿ÖÖÃ֍ú, ˆ¢Ö¸üÖ׬֍úÖ¸üß ¾Ö ÃÖ´Ö­Öã¤êü¿Öß ¿ÖÖ×´Ö»Ö Æïü)

133

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
24 DISPUTES RESOLUTION BOARD AGREEMENT

THIS AGREEMENT, made and entered into this ...……........................……………. Day of


…………..20 .............…. Between ….......…….....…….. (“the Corporation”) and
.................................................................................................................
.............................................................................................................. (“the Contractor”),
and the Disputes resolution Board (“the Board”) consisting of three Board Members, (1)
……………………………………………………………………………………… (2)
……………………………………………………………………………………… (3)
……………………………………………………………………………………………

WITNESSETH, that
WHEREAS, the Corporation and the Contractor have contracted for the construction
of the
……………………………………………………………………………………………… .
……………………………………………………………………………………………… .
(Project name) ………………………………………………………………………… (the
“Contract”) and WHEREAS, the contract provides for the establishment and
operation of the Board NOW THEREFORE, the parties hereto agree as follows :

1. The parties agree to the establishment and operation of the Board in


accordance with this Board Agreement.

2. Except for providing the services required hereunder, the Board Members
should not give any advice to either party concerning conduct of the Works.

The Board Members :

(a) shall have no financial interest in any party to the contract, or a financial interest
in the contract, except for payment for services on the Board.

(b) shall have had no previous employment by, or financial ties to, any party to the
contract, except for fee based consulting services on other projects, all of which
must be disclosed prior to appointment to the Board.

134

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
24. ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü ú¸üÖ¸ü
†Ö•Ö 20--------------------------¾ÖÂÖÔ êú -----------´ÖÖÆü êú -----------פü­Ö ------------("׭֐ִÖ")
†Öî¸ü--------------------------------------("ÃÖÓ×¾Ö¤ü֍úÖ¸ü") êú ²Öß“Ö µÖÆü ú¸üÖ¸ü ׍úµÖÖ ÖµÖÖ †Öî¸ü ‡ÃÖ´Öë
¿ÖÖ×´Ö»Ö Æãü‹ ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü ("²ÖÖê›Ôü") וÖÃÖ´Öë ŸÖß­Ö ÃÖ¤üÃµÖ (1)---------------------------------------
--------------------------------------------------(2)----------------------------------------------
------------------------------------------(3)------------------------------------------------------
----------------------------------------------- Æïü, ÃÖցÖß Æîü ׍ú,
•Ö²Ö׍ú, ‡ÃÖ ×­ÖÖ´Ö †Öî¸ü ‡ÃÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ­Öê -------------------------------------------------------------
---------------------------------------------------------------------------------------------------
------------------------------------------(¯Ö׸üµÖÖê•Ö­ÖÖ úÖ ­ÖÖ´Ö) êú ×­Ö´ÖÖÔÖ êú ×»Ö‹ --------------------
---------------------------------------(ÃÖÓ×¾Ö¤üÖ úÖ ­ÖÖ´Ö) ÃÖÓ×¾Ö¤üÖ úß Æîü †Öî¸ü •Ö²Ö׍ú, ‡ÃÖ ÃÖÓ×¾Ö¤üÖ ´Öë ²ÖÖê›Ôü úß
ãÖÖ¯Ö­ÖÖ ¾Ö ¯ÖÏ“ÖÖ»Ö­Ö úÖ ¯ÖÏÖ¾Ö¬ÖÖ­Ö Æîü, †ŸÖ: †²Ö, ‡Ã֍êú ¤üÖê­ÖÖë ¯ÖÖ ×­Ö´­Ö×»Ö×ÖŸÖ êú †­ÖãÃÖÖ¸ü ÃÖÆü´ÖŸÖ Æïü :
1. ¤üÖê­ÖÖë ¯ÖÖ ‡ÃÖ ²ÖÖê›Ôü ú¸üÖ¸ü êú †­Öãºþ¯Ö ²ÖÖê›Ôü êú Öšü­Ö ¾Ö ¯ÖÏ“ÖÖ»Ö­Ö êú ×»Ö‹ ÃÖÆü´Ö×ŸÖ ¤êüŸÖê Æïü…
2. êú¾Ö»Ö µÖÆüÖÓ ¯Ö¸ü ˆÛ»»Ö×ÖŸÖ ÃÖê¾ÖÖ‹Ó ¯ÖϤüÖ­Ö ú¸ü­Öê êú †»ÖÖ¾ÖÖ ²ÖÖê›Ôü êú ÃÖ¤üõÖÖë «üÖ¸üÖ ×úÃÖß ³Öß ¯ÖÖ úÖê úÖµÖÖí úß
¯ÖÏ“ÖÖ»Ö­Ö ¸üß×ŸÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ×úÃÖß ¯ÖύúÖ¸ü úß ÃÖ»ÖÖÆü ­ÖÆüà ¤üß •ÖÖ­Öß “ÖÖ×Æü‹…
²ÖÖê›Ôü êú ÃÖ¤üÃµÖÖÖ :
(‹) ²ÖÖê›Ôü «üÖ¸üÖ ¯ÖϤü¢Ö ÃÖê¾ÖÖ†Öë êú ×»Ö‹ ³ÖãÖŸÖÖ­Ö êú †»ÖÖ¾ÖÖ, ÃÖÓ×¾Ö¤üÖ êú ׍úÃÖß ¯ÖÖ êú ÃÖÖ£Ö †£Ö¾ÖÖ ÃÖÓ×¾Ö¤üÖ ´Öë
úÖê‡Ô ×¾Ö¢ÖßµÖ ×ÆüŸÖ ­ÖÆüà ¸üÖëÖê…
(²Öß) †­µÖ ¯Ö׸üµÖÖê•Ö­ÖÖ†Öë ´Öë ¿Ö㻍ú †Ö¬ÖÖ׸üŸÖ ÃÖê¾ÖÖ‹Ó ˆ¯Ö»Ö²¬Ö ú¸üÖ­Öê ¾ÖÖ»Öê ²ÖÖê›Ôü, ×•Ö­Ö ÃÖ³Öß êú ²ÖÖ¸êü ´Öë ‡ÃÖ ²ÖÖê›Ôü
´Öë ×­ÖµÖãÛŒŸÖ ÃÖê ¯Öæ¾ÖÔ †×­Ö¾ÖÖµÖÔ ºþ¯Ö ÃÖê ÃÖæ“Ö­ÖÖ ¤üß •ÖÖ­Öß ÆüÖêÖß, êú †»ÖÖ¾ÖÖ ÃÖÓ×¾Ö¤üÖ êú ׍úÃÖß ¯ÖÖ êú ¯Öæ¾ÖÔ
ú´ÖÔ“ÖÖ¸üß, †£Ö¾ÖÖ ×¾Ö¢ÖßµÖ ÃÖӯ֍Ôú ´Öë, µÖÖ úÖê‡Ô ×¾Ö¢ÖßµÖ »ÖÖ³Ö ¯ÖÏÖ¯ŸÖúŸÖÖÔ ­ÖÆüà ÆüÖëÖê…

134

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(c) shall have disclosed in writing to the parties prior to signature of this
Agreement any and all recent or close professional or personal or
personal relationships with any director, officer, or employee of any party to
the contract, and any and all prior involvement in the project to which the
contract relates;
(d) shall not, while a Board Member, be employed whether as a consultant or
otherwise by either party to the contract, except as a Board Member.
(e) shall not, while a Board Member, engage in discussion or make any
agreement with any party to the contract, regarding employment whether
as a consultant or otherwise either after the contract is completed or after
services as a Board Member is completed;

(f) shall be and remain impartial and independent of the parties and shall
disclose
in writing to the Corporation, the Contractor, and one another any fact or
circumstances which might be such to cause either the Corporation or the
Contractor to question the continued existence of the impartiality and
independence required of Board Members.
3. Except for its participation in the Board’s activities as provided in the
contract and in this Agreement none of the Employer, the Contractor, the
Nodal Officer or his nominee, and one another any fact or circumstances
which might be such to cause either the Employer or the Contractor to
question the continued existence of the impartiality and independence
required of Board Members.
4. The Contractor shall :
a) furnish to each Board Members one copy of all documents which the
Board may request including contract documents, progress reports,
variation orders, and other documents, pertinent to the performance of the
Contract.
b) in co-operation with the Employer, co-ordinate the Site visits of the Board,
including conference facilities, and secretarial and copying services.
5. The Board shall serve throughout the operation of the contract. It shall
begin operation following execution of this Agreement, and shall
terminate its activities after issuance of the taking over Certificate and
the Board’s issuance of its Recommendations on all disputes referred to it.
6. Board Member, shall not assign or subcontract any of their work under
this Agreement.

135

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(ÃÖß) ‡ÃÖ ú¸üÖ¸ü ¯Ö¸ü ÆüßÖցָü ú¸ü­Öê ÃÖê ¯ÖÆü»Öê ¤üÖê­ÖÖë ¯ÖÖÖë úÖê ÃÖÓ×¾Ö¤üÖ êú ׍úÃÖß ¯ÖÖ êú ×­Ö¤êü¿Öú, †×¬ÖúÖ¸üß
µÖÖ ú´ÖÔ“ÖÖ¸üß êú ÃÖÖ£Ö †¯Ö­Öê ÆüÖ»Ö êú µÖÖ ÃÖ´ÖÖ¯ŸÖ ÆüÖê “Öãêú µÖפü úÖê‡Ô ÃÖÓ²ÖÓ¬Ö ÆüÖë ŸÖÖê ˆ­Öêú ²ÖÖ¸êü ´Öë †Öî¸ü
‡ÃÖ ÃÖÓ×¾Ö¤üÖ ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ×úÃÖß ¯Ö׸üµÖÖê•Ö­ÖÖ ÃÖê †¯Ö­Öê ¯ÖÆü»Öê êú ÃÖÓ²ÖÓ¬ÖÖë êú ²ÖÖ¸êü ´Öë ×»Ö×ÖŸÖ ºþ¯Ö ÃÖê
•Ö֭֍úÖ¸üß ¤ëüÖê ;
(›üß) ²ÖÖê›Ôü êú ÃÖ¤üÃµÖ ¸üÆüŸÖê Æãü‹, ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú ׍úÃÖß ¯ÖÖ êú ÃÖÖ£Ö ²ÖÖê›Ôü êú ÃÖ¤üÃµÖ êú †»ÖÖ¾ÖÖ ¯Ö¸üÖ´Ö¿ÖÔ¤üÖŸÖÖ
µÖÖ ×úÃÖß †­µÖ ºþ¯Ö ´Öë ×­ÖµÖãŒŸÖ ­ÖÆüà ÆüÖëÖê…
(‡Ô) ²ÖÖê›Ôü êú ÃÖ¤üÃµÖ ¸üÆüŸÖê Æãü‹, ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú ¯ÖæÖÔ ÆüÖê­Öê †£Ö¾ÖÖ ²ÖÖê›Ôü úê ÃÖ¤üÃµÖ êú ºþ¯Ö ´Öë ÃÖê¾ÖÖ‹Ó ¯ÖæÖÔ ÆüÖê
•ÖÖ­Öê êú ¯Ö¿“ÖÖŸÖ ‡ÃÖ ÃÖÓ×¾Ö¤üÖ êú ׍úÃÖß ¯ÖÖ êú ÃÖÖ£Ö ‹ú ¯Ö¸üÖ´Ö¿ÖÔ¤üÖŸÖÖ êú ºþ¯Ö ´Öë †£Ö¾ÖÖ †­µÖ ׍úÃÖß
ºþ¯Ö ´Öë ×­ÖµÖãÛŒŸÖ êú ÃÖÓ²ÖÓ¬Ö ´Öë ׍úÃÖß ¯ÖύúÖ¸ü êú ×¾Ö“ÖÖ¸ü-×¾Ö´Ö¿ÖÔ ´Öë ³ÖÖÖ ­ÖÆüà »ÖëÖê †Öî¸ü ­Ö Æüß úÖê‡Ô ú¸üÖ¸ü
ú¸ëüÖê…
(‹±ú) ¤üÖê­ÖÖë ¯ÖÖÖë êú ÃÖÖ£Ö ×­ÖÂ¯ÖÖ ¾Ö þ֟ÖÓ¡Ö ¸üÆëüÖê ¾Ö ²Ö­Öê ¸üÆëüÖê ŸÖ£ÖÖ ²ÖÖê›Ôü êú ÃÖ¤üõÖÖë «üÖ¸üÖ ×­ÖÖ´Ö †£Ö¾ÖÖ
ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ÃÖÖ£Ö †Ö¾Ö¿µÖú ×­Ö¯ց֟ÖÖ ¾Ö þ֟ÖÓ¡ÖŸÖÖ ²Ö­ÖÖ‹ ¸üÖ­Öê ¯Ö¸ü ÃÖ¾ÖÖ»Ö ˆšüÖ Ã֍ú­Öê ¾ÖÖ»Öê
׍úÃÖß ŸÖ£µÖ µÖÖ ¯Ö׸üÛãÖןֵÖÖë êú ²ÖÖ¸êü ´Öë ×­ÖÖ´Ö úÖê, ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê ¾Ö ‹ú-¤æüÃÖ¸êü úÖê ×»Ö×ÖŸÖ ºþ¯Ö ´Öë
•Ö֭֍úÖ¸üß ¤ëüÖê…
3. êú¾Ö»Ö ÃÖÓ×¾Ö¤üÖ ´Öë †Öî¸ü ‡ÃÖ ú¸üÖ¸ü ´Öë ¾ÖÙÖŸÖ ²ÖÖê›Ôü úß ÖןÖ×¾Ö׬ֵÖÖë ´Öë ³ÖÖÖ »Öê­Öê êú †»ÖÖ¾ÖÖ †»ÖÖ¾ÖÖ
×­ÖµÖÖꌟÖÖ, ÃÖÓ×¾Ö¤ü֍úÖ¸ü, ­ÖÖê›ü»Ö †×¬ÖúÖ¸üß µÖÖ ˆÃ֍êú ­ÖÖ×´ÖŸÖß †Öî¸ü ‹ú-¤æüÃÖ¸êü ÃÖ×ÆüŸÖ ‹êÃÖê úÖê‡Ô ŸÖ£µÖ µÖÖ
¯Ö׸üÛãÖןֵÖÖÓ ­ÖÆüà ²Ö­Ö֋ӐÖê וÖÃ֍êú úÖ¸üÖ ×­ÖµÖÖꌟÖÖ µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ²ÖÖê›Ôü êú ÃÖ¤üõÖÖë úß ×­Ö¯ց֟ÖÖ
†Öî¸ü þ֟ÖÓ¡ÖŸÖÖ ¯Ö¸ü ¯ÖÏ¿­Ö ˆšüÖ Ã֍ëú…
4. ÃÖÓ×¾Ö¤ü֍úÖ¸ü :
(‹) ÃÖÓ×¾Ö¤üÖ êú ×­Ö¯ÖÖ¤ü­Ö ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ÃÖÓ×¾Ö¤üÖ ú֐֕ÖÖŸÖÖë, ¯ÖϐÖ×ŸÖ ×¸ü¯ÖÖê™üÖ,í ×¾Ö“Ö»Ö­Ö †Ö¤êü¿ÖÖë †Öî¸ü †­µÖ
¤üßÖÖ¾Öê•ÖÖë ÃÖ×ÆüŸÖ ÃÖ´ÖÃŸÖ ú֐֕ÖÖŸÖÖë úß ‹ú ¯ÖÏ×ŸÖ ²ÖÖê›Ôü êú ¯ÖÏŸµÖêú ÃÖ¤üÃµÖ úÖê ˆ¯Ö»Ö²¬Ö ú¸ü֋ӐÖê…
(²Öß) ×­ÖµÖÖꌟÖÖ úê ÃÖÖ£Ö ÃÖÆüµÖÖêÖ ú¸üŸÖê Æãü‹ ²ÖÖê›Ôü êú ×»Ö‹ ´Öӡ֝ÖÖ ÃÖã×¾Ö¬ÖÖ†Öë ¾Ö ÃÖד־ÖßµÖ †Öî¸ü
¯ÖÏןÖ×»Öׯ֍ú¸üÖ ÃÖê¾ÖÖ†Öë ÃÖ×ÆüŸÖ ÃÖÓµÖÓ¡Ö ³ÖÏ´ÖÖ êú ×»Ö‹ ÃÖ´Ö­¾ÖµÖ ãÖÖ×¯ÖŸÖ ú¸ëüÖê…
5. ²ÖÖê›Ôü úß ÃÖê¾ÖÖ‹Ó ÃÖÓ×¾Ö¤üÖ ¯ÖÏ“ÖÖ»Ö­Ö úß ¯Öæ¸üß †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö •ÖÖ¸üß ¸üÆëüÖß… µÖÆü ‡ÃÖ ú¸üÖ¸ü êú ¯ÖÏ“ÖÖ»Ö­Ö
êú ÃÖÖ£Ö ¯ÖÏÖ¸Óü³Ö ÆüÖëÖß †Öî¸ü ÃÖã¯Öã¤ÔüÖß ¯ÖÏÖÛ¯ŸÖ ¯ÖÏ´ÖÖÖ ¯Ö¡Ö •ÖÖ¸üß ×ú‹ •ÖÖ­Öê ¾Ö ²ÖÖê›Ôü úÖê ÃÖÓ¤üÙ³ÖŸÖ ÃÖ´ÖßÖ
×¾Ö¾ÖÖ¤üÖë ¯Ö¸ü ²ÖÖê›Ôü úß ÃÖÓßÖãןֵÖÖë êú •ÖÖ¸üß ×ú‹ •ÖÖ­Öê êú ²ÖÖ¤ü †¯Ö­Öß ÖןÖ×¾Ö׬ֵÖÖÓ ÃÖ´ÖÖ¯ŸÖ ú¸êüÖÖ…
6. ²ÖÖê›Ôü êú ÃÖ¤üÃµÖ ‡ÃÖ ú¸üÖ¸ü êú †¬Öß­Ö ˆ­Æëü ÃÖÖï¯Öê Ö‹ úÖµÖÖí úÖê ׍úÃÖß †­µÖ úÖê µÖÖ ˆ¯ÖÃÖÓ×¾Ö¤üÖ ¯Ö¸ü ­ÖÆüà
¤ëüÖê…

135

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7. The Board Members are independent and not employees or agents of
either theEmployer or the Contractor.

8. The Board Members are absolved of any personal or professional


liability arising from the activities and the Recommendations of the Board.

9. Fees and expenses of the Board Member[s] shall be agreed to and


shared equally by the Employer and the Contractor. If the Board requires
special services, such as accounting, data research, and the like, both
parties must agree and the costs shall be shared by them as mutually
agreed.

10. Board Site visits :


a) The Board shall visit the Site and meet with representatives of the
Employer and the Contractor and at regular intervals, at times of critical
construction events, and at the written request of either party. The timing
of Site visit, failing agreement shall be fixed by the Board.

b) Site meetings shall consist of an informal discussion of the status of the


construction of the works followed by an inspection of the works, both
attended by personnel from the Employer, the Contractor .

c) If requested by either party or the Board, the Employer will prepare


minutes of the meetings and circulate them for comments of the
parties.

11. Procedure for disputes referred to the Board :


a) If either party objects to any action or inaction of the other party, the
objecting party may file a written Notice of Dispute to the other party
stating that it is given pursuant to relevant clause and stating clearly
and in detail the basis of the dispute.
b) The party receiving the Notice of Dispute will consider it and respond in
writing within 7 days after receipt.
c) This response shall be final and conclusive on the subject, unless a
written appeal to the response is filed with the responding party within 7
days of receiving the response. Both parties are encouraged to pursue
the matter further to attempt to settle the dispute. When it appears
that the dispute cannot be resolved without the assistance of the
Board either party may refer the dispute to the Board by written Request
for Recommendation to the Board, and the other party stating that it is
made pursuant to relevant Clause.
136

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
7. ²ÖÖê›Ôü êú ÃÖ¤üÃµÖ Ã¾ÖŸÖÓ¡Ö Æïü †Öî¸ü ×­ÖµÖÖꌟÖÖ µÖÖ ÃÖÓ×¾Ö¤ü֍úÖ¸ü ´Öë ÃÖê ׍úÃÖß êú ú´ÖÔ“ÖÖ¸üß µÖÖ ‹•Öë™ü ­ÖÆüà Æïü…
8. ²ÖÖê›Ôü êú ÃÖ¤üÃµÖ ²ÖÖê›Ôü úß ÖןÖ×¾Ö׬ֵÖÖë µÖÖ ÃÖÓßÖãןֵÖÖë êú úÖ¸üÖ ˆŸ¯Ö®Ö ÆüÖê­Öê ¾ÖÖ»Öß ×úÃÖß ¾µÖÛŒŸÖÖŸÖ
†£Ö¾ÖÖ ¾µÖÖ¾ÖÃÖÖ׵֍ú ²ÖÖ¬µÖŸÖÖ†ÖêÓ ÃÖê ´ÖãŒŸÖ Æïü…
9. ²ÖÖê›Ôü êú ÃÖ¤üõÖ(µÖÖë) úÖ ¿Ö㻍ú ¾Ö Ö“ÖÔ ×­ÖµÖÖꌟÖÖ ¾Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü «üÖ¸üÖ ²Ö¸üÖ²Ö¸ü-²Ö¸üÖ²Ö¸ü þÖߍúÖ¸ü ¾Ö ¾ÖÆü­Ö
׍úµÖÖ •ÖÖ‹ÖÖ… µÖפü ²ÖÖê›Ôü úÖê ×¾Ö¿ÖêÂÖ ÃÖê¾ÖÖ†Öë •ÖîÃÖê »ÖêÖÖ, †ÖӍú›ÍüÖ ¿ÖÖê¬Ö †Öî¸ü ‡ÃÖß ¯ÖύúÖ¸ü úß †­µÖ
ÃÖê¾ÖÖ†Öë úß †Ö¾Ö¿µÖúŸÖÖ ÆüÖêŸÖß Æîü ŸÖÖê ¤üÖê­ÖÖë ¯ÖÖÖêÓ úÖê †×­Ö¾ÖÖµÖÔ ºþ¯Ö ÃÖê ‡ÃÖê ´ÖÖ­Ö­ÖÖ ÆüÖêÖÖ †Öî¸ü ‡ÃÖ ¯Ö¸ü
ÆüÖê­Öê ¾ÖÖ»Öê Ö“ÖÔ úÖê ¤üÖê­ÖÖë ¯ÖÖÖë úß †Ö¯ÖÃÖß ÃÖÆü´Ö×ŸÖ êú †Ö¬ÖÖ¸ü ¯Ö¸ü ²ÖÖÓ™üÖ •ÖÖ‹ÖÖ…
10. ²ÖÖê›Ôü úÖ úÖµÖÔÃ£Ö»Ö ³ÖÏ´ÖÖ :
(‹) ²ÖÖê›Ôü ×­ÖµÖ×´ÖŸÖ †ÓŸÖ¸üÖ»Ö ¯Ö¸ü úÖµÖÔÃ£Ö»Ö úÖ ³ÖÏ´ÖÖ ú¸êüÖÖ †Öî¸ü ´ÖÆüŸ¾Ö¯ÖæÖÔ ×­Ö´ÖÖԝ֍úÖµÖÖí êú ÃÖ´ÖµÖ ü†Öî¸
׍úÃÖß ¯ÖÖ «üÖ¸üÖ ×»Ö×ÖŸÖ †­Öã¸üÖê¬Ö ׍ú‹ •ÖÖ­Öê ¯Ö¸üü ×­ÖµÖÖꌟÖÖ ¾Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¯ÖÏןÖ×­Ö׬ֵÖÖë ÃÖê ×´Ö»ÖêÖÖ …
ÃÖÆü´Ö×ŸÖ ­Ö ²Ö­Ö ¯ÖÖ­Öê ¯Ö¸ü úÖµÖÔÃ£Ö»Ö ³ÖÏ´ÖÖ úÖ ÃÖ´ÖµÖ ²ÖÖê›Ôü «üÖ¸üÖ ŸÖµÖ ׍úµÖÖ •ÖÖ‹ÖÖ…
(²Öß) úÖµÖÔÃ£Ö»Ö úß ²ÖîšüúÖë ´Öë úÖµÖÔ úê ×­Ö´ÖÖÔÖ úß ÛãÖ×ŸÖ êú ²ÖÖ¸êü ´Öë †­ÖÖî¯Ö“ÖÖ׸üú ×¾Ö“ÖÖ¸ü- ×¾Ö´Ö¿ÖÔ ×úµÖÖ
•ÖÖ‹ÖÖ †Öî¸ü ˆÃ֍êú ²ÖÖ¤ü úÖµÖÔ úÖ ×­Ö¸üßÖÖ ×úµÖÖ •ÖÖ‹ÖÖ… ‡­Ö ¤üÖê­ÖÖë ´Öë ×­ÖµÖÖꌟÖÖ ¾Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú
ú´ÖÔ“ÖÖ¸üß ˆ¯ÖÛÃ£ÖŸÖ ¸üÆëüÖê…
(ÃÖß) µÖפü ׍úÃÖß ¯ÖÖ µÖÖ ²ÖÖê›Ôü «üÖ¸üÖ †­Öã¸üÖê¬Ö ׍úµÖÖ •ÖÖŸÖÖ Æîü ŸÖÖê ×­ÖµÖÖꌟÖÖ ²Öîšüú úÖ úÖµÖÔ¾Öé¢Ö ŸÖîµÖÖ¸ü ú¸êüÖÖ
†Öî¸ü ‡ÃÖê ¯ÖÖÖë êú ¯ÖÖÃÖ ˆ­Öúß ×™ü¯¯ÖÖß êú ×»Ö‹ ¯Ö׸ü“ÖÖ×»ÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…
11. ×¾Ö¾ÖÖ¤üÖë úÖê ²ÖÖê›Ôü êú ¯ÖÖÃÖ ÃÖÓ¤üÙ³ÖŸÖ ú¸ü­Öê úß ¯ÖÏ׍ÎúµÖÖ :
(‹) µÖפü úÖê‡Ô ¯ÖÖ †­µÖ ¯ÖÖ «üÖ¸üÖ ×úÃÖß úÖ¸Ôü¾ÖÖ‡Ô úÖê ú¸ü­Öê µÖÖ ­Ö ú¸ü­Öê ¯Ö¸ü †Ö¯Ö×¢Ö ˆšüÖŸÖÖ Æîü ŸÖÖê †Ö¯Ö×¢Ö
ˆšüÖ­Öê ¾ÖÖ»ÖÖ ¯ÖÖ ‡ÃÖ ×¾Ö¾ÖÖ¤ü úß ­ÖÖê×™üÃÖ ¤æüÃÖ¸êü ¯ÖÖ úÖê ¤êüÖÖ ×•ÖÃÖ´Öë ¾ÖÆü ­ÖÖê×™üÃÖ ×¤ü‹ •ÖÖ­Öê ´Öë
†­Öãú¸üÖ ׍ú‹ Ö‹ ÃÖÓ²ÖÓ×¬ÖŸÖ Ö›ü úÖ ˆ»»ÖêÖ †Öî¸ü ×¾Ö¾ÖÖ¤ü êú †Ö¬ÖÖ¸ü úÖ Ã¯Ö™ü ¾Ö ×¾ÖßÖéŸÖ ×¾Ö¾Ö¸üÖ
¤êüÖÖ…
(²Öß) ×¾Ö¾ÖÖ¤ü úß ­ÖÖê×™üÃÖ ¯ÖÏÖ¯ŸÖ ú¸ü­Öê ¾ÖÖ»ÖÖ ¯ÖÖ ‡ÃÖ ¯Ö¸ü ×¾Ö“ÖÖ¸ü ú¸êüÖÖ †Öî¸ü ‡Ã֍úß ¯ÖÏÖÛ¯ŸÖ êú 7 פü­ÖÖë êú
³Öߟָü ˆ¢Ö¸ü ¤êüÖÖ…
(ÃÖß) µÖÆü ˆ¢Ö¸ü •Ö²Ö ŸÖú ׍ú ˆ¢Ö¸ü ¯ÖÏÖ¯ŸÖ ÆüÖê­Öê êú 7 פü­ÖÖë êú ³Öߟָü ˆ¢Ö¸ü ¤êü­Öê ¾ÖÖ»Öê ¯ÖÖ êú ×¾Ö¹ý¨ü ×»Ö׏֟Ö
†¯Öᯙ ­Ö ú¸ü ¤üß •ÖÖ‹, †Ó×ŸÖ´Ö ¾Ö ׭֝ÖÖԵ֍ú ÆüÖêÖÖ… ×¾Ö¾ÖÖ¤ü úÖê ÃÖã»Ö—ÖÖ­Öê êú ×»Ö‹ ¤üÖê­ÖÖë ¯ÖÖÖë úÖê
´ÖÖ´Ö»Öê úÖ †­ÖãÃÖ¸üÖ ú¸ü­Öê êú ×»Ö‹ ¯ÖÏÖêŸÃÖÖ×ÆüŸÖ ׍úµÖÖ •ÖÖ‹ÖÖ… •Ö²Ö ‹êÃÖÖ ¯ÖÏŸÖßŸÖ ÆüÖê­Öê »ÖÖê ׍ú ‡ÃÖ
×¾Ö¾ÖÖ¤ü úÖê ²ÖÖê›Ôü úß ÃÖÆüÖµÖŸÖÖ êú ²ÖÖî¸ü ÃÖã»Ö—ÖÖµÖÖ ­ÖÆüà •ÖÖ Ã֍êúÖÖ, úÖê‡Ô ³Öß ¯ÖÖ ‡ÃÖ ×¾Ö¾ÖÖ¤ü ¯Ö¸ü ²ÖÖê›Ôü úß
ÃÖÓßÖã×ŸÖ êú ×»Ö‹ ³Öê•Ö­Öê úÖ ×»Ö×ÖŸÖ †­Öã¸üÖê¬Ö ú¸üŸÖê Æãü‹ ²ÖÖê›Ôü êú ¯ÖÖÃÖ ÃÖÓ¤üÙ³ÖŸÖ ú¸ü Ã֍úŸÖÖ Æîü, ¾Ö †­µÖ
¯ÖÖ êú ¯ÖÖÃÖ µÖÆü ²ÖŸÖÖŸÖê Æãü‹ ׍ú µÖÆü ÃÖÓ²ÖÓ×¬ÖŸÖ Ö›ü êú †­ÖãÃÖ¸üÖ ´Öë Æïü, ³Öê•Ö Ã֍úŸÖÖ Æîü…

136

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
d) The Request for recommendation shall state clearly and in full detail the
specific ssues of the dispute to be considered by the Board.

e) When a dispute is referred to the Board, and the Board is satisfied that the
dispute requires the Board’s assistance, the Board shall decide when to
conduct a hearing on the dispute. The Board may request that written
documentation and arguments from both parties be submitted to each
Board Members before the hearing begins. The parties shall submit insofar as
possible agreed statements of the relevant facts.
f) During the hearing, the Contractor and the Employer, shall each have
ample opportunity to be heard and to offer evidence. The Board’s
Recommendations for resolution of the dispute will be given in writing, to
the Employer and the Contractor as soon as possible, and in any event not
more than 28 days after the Board’s final hearing on the dispute.
12. Conduct of Hearings:

a) Normally hearing will be conducted at the Site, but any location that would
be more convenient and still provide all required facilities and access to
necessary documentation may be utilised by the Board. Private sessions of
the Board may be held at any location convenient to the Board.
b) The Employer and the Contractor shall have representatives at all hearings.
c) During the hearings, no Board Member shall express any opinion concerning
the merit of any facet of the case.
d) After the hearing are concluded, the Board shall meet privately to formulate
its
Recommendations. All Board deliberations shall be conducted in private,
with all individual views kept strictly confidential. The Board’s
r ecommendations, together with an explanation of its reasoning shall be
submitted in writing to both parties. The Recommendations shall be based
on the pertinent contract provisions, applicable laws and regulations, and the
facts and circumstances involved in the dispute.
The Board shall make every effort to reach a unanimous Recommendation.
If this proves impossible, the majority shall decide, and the dessenting
member any prepare a written minority report for submission to both parties.
13. If during the contract period, the Corporation and the Contractor are of
the opinion that the Dispute Resolution Board is not performing its functions
properly, the Corporation and the Contractor may together disband the
Disputes Resolution Board. In such an event, the disputes shall referred to
Arbitration straightaway.

137

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
(›üß) ÃÖÓßÖã×ŸÖ êú †­Öã¸üÖê¬Ö ´Öë ²ÖÖê›Ôü «üÖ¸üÖ ×¾Ö“ÖÖ¸ü ׍ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ×¾Ö¾ÖÖ¤ü êú ×¾Ö¿ÖêÂÖ ´Öã§êü úÖ Ã¯Ö™ü ¾Ö ×¾ÖßÖéŸÖ
×¾Ö¾Ö¸üÖ פüµÖÖ •ÖÖ‹ÖÖ…
(‡Ô) •Ö²Ö ׍úÃÖß ×¾Ö¾ÖÖ¤ü úÖê ²ÖÖê›Ôü úÖê ÃÖÓ¤üÙ³ÖŸÖ ×úµÖÖ •ÖÖŸÖÖ Æîü †Öî¸ü ²ÖÖê›Ôü ‡ÃÖ ²ÖÖŸÖ ÃÖê ÃÖÓŸÖã™ü ÆüÖê •ÖÖŸÖÖ Æîü ׍ú
‡ÃÖ ×¾Ö¾ÖÖ¤ü êú ×»Ö‹ ²ÖÖê›Ôü úß ÃÖÆüÖµÖŸÖÖ †Ö¾Ö¿µÖú Æîü ŸÖÖê ²ÖÖê›Ôü ׭֝ÖÔµÖ ú¸êüÖÖ ×ú ‡ÃÖ ×¾Ö¾ÖÖ¤ü úß
ÃÖã­Ö¾ÖÖ‡Ô ú²Ö úß •ÖÖ‹… ÃÖã­Ö¾ÖÖ‡Ô ¯ÖÏÖ¸Óü³Ö ׍ú‹ •ÖÖ­Öê ÃÖê ¯ÖÆü»Öê ²ÖÖê›Ôü ¤üÖê­ÖÖë ¯ÖÖÖë ÃÖê ×»Ö×ÖŸÖ ¤üßÖÖ¾Öê•ÖÖë
†Öî¸ü ²ÖÆüÃÖ úÖê ¯ÖÏŸµÖêú ²ÖÖê›Ôü ÃÖ¤üÃµÖ êú ¯ÖÖÃÖ ¯ÖÏßÖãŸÖ ú¸ü­Öê úÖ †­Öã¸üÖê¬Ö ú¸ü Ã֍úŸÖÖ Æîü… ¤üÖê­ÖÖë ¯ÖÖ •ÖÆüÖÓ
ŸÖú ÃÖÓ³Ö¾Ö ÆüÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ŸÖ£µÖÖë êú ÃÖÆü´ÖŸÖ ú£Ö­ÖÖë úÖê ¯ÖÏßÖãŸÖ ú¸ëüÖê…
(‹±ú) ÃÖã­Ö¾ÖÖ‡Ô êú ¤üÖî¸üÖ­Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü ¾Ö ×­ÖµÖÖꌟÖÖ ¤üÖê­ÖÖë úÖê ÃÖã­Öê •ÖÖ­Öê †Öî¸ü ÃÖցµÖ ¯ÖÏßÖãŸÖ ú¸ü­Öê êú ³Ö¸ü¯Öæ¸ü
†¾ÖÃÖ¸ü פü‹ •Ö֋ӐÖê… ×¾Ö¾ÖÖ¤ü êú ÃÖ´ÖÖ¬ÖÖ­Ö êú ×»Ö‹ ²ÖÖê›Ôü úß ÃÖÓßÖãןֵÖÖÓ ×­ÖµÖÖꌟÖÖ ¾Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü úÖê
×»Ö×ÖŸÖ ºþ¯Ö ´Öë µÖ£ÖÖÃÖÓ³Ö¾Ö ¿Ö߬ÖÐÖןֿÖß‘ÖÐ †Öî¸ü ׍úÃÖß ³Öß ¤ü¿ÖÖ ´Öë ×¾Ö¾ÖÖ¤ü ¯Ö¸ü ²ÖÖê›Ôü úß †Ó×ŸÖ´Ö ÃÖã­Ö¾ÖÖ‡Ô
êú 28 פü­ÖÖë êú ³Öߟָü ¤üß •Ö֋ӐÖß…
12. ÃÖã­Ö¾ÖÖ‡Ô úÖ ÃÖÓ“ÖÖ»Ö­Ö :
(‹) ÃÖÖ´ÖÖ­µÖŸÖµÖÖ ÃÖã­Ö¾ÖÖ‡Ô úÖµÖÔ Ã£Ö»Ö ¯Ö¸ü ÃÖÓ“ÖÖ×»ÖŸÖ úß •ÖÖ‹Öß, ¯Ö¸ÓüŸÖã ²ÖÖê›Ôü, ÃÖã×¾Ö¬ÖÖ úß ¥üÛ™ü ÃÖê ²ÖêÆüŸÖ¸ü ¾Ö
ÃÖ³Öß †Ö¾Ö¿µÖú ÃÖã×¾Ö¬ÖÖ‹Ó †Öî¸ü †Ö¾Ö¿µÖú ú֐֕ÖÖŸÖÖë úß ÃÖã»Ö³ÖŸÖÖ ˆ¯Ö»Ö²¬Ö ÆüÖê Ã֍ú­Öê ¾ÖÖ»Öê ׍úÃÖß
³Öß †­µÖ ãÖÖ­Ö úÖ ˆ¯ÖµÖÖêÖ ú¸ü Ã֍úŸÖÖ Æîü… ²ÖÖê›Ôü êú ¾µÖÛŒŸÖÖŸÖ ÃÖ¡ÖÖë êú †ÖµÖÖê•Ö­Ö úê ×»Ö‹ ²ÖÖê›Ôü
†¯Ö­Öê ×»Ö‹ ÃÖãÖ´Ö ׍úÃÖß ³Öß Ã£ÖÖ­Ö úÖ ¯ÖϵÖÖêÖ ú¸ü Ã֍úŸÖÖ Æîü…
(²Öß) ÃÖ³Öß ÃÖã­Ö¾ÖÖ‡µÖÖë êú ¤üÖî¸üÖ­Ö ×­ÖµÖÖꌟÖÖ ¾Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü êú ¯ÖÏןÖ×­Ö×¬Ö ˆ¯ÖÛÃ£ÖŸÖ ¸üÆëüÖê…
(ÃÖß) ÃÖã­Ö¾ÖÖ‡Ô êú ¤üÖî¸üÖ­Ö ²ÖÖê›Ôü úÖ úÖê‡Ô ³Öß ÃÖ¤üÃµÖ ´ÖÖ´Ö»Öê úê ׍úÃÖß ³Öß ¯ÖÆü»Öæ êú ÖãÖ¤üÖêÂÖ êú ÃÖÓ²ÖÓ¬Ö ´ÖêÓ †¯Ö­Öê
×¾Ö“ÖÖ¸ü ¾µÖŒŸÖ ­ÖÆüà ú¸êüÖÖ…
(›üß) ÃÖã­Ö¾ÖÖ‡Ô ¯Öæ¸üß ÆüÖê •ÖÖ­Öê êú ²ÖÖ¤ü ÃÖÓßÖãןֵÖÖë úÖê †Ó×ŸÖ´Ö ºþ¯Ö ¤êü­Öê êú ×»Ö‹ ²ÖÖê›Ô ¾µÖÛŒŸÖÖŸÖ ºþ¯Ö ÃÖê ²Öîšüú
ú¸êüÖÖ… ²ÖÖê›Ôü «üÖ¸üÖ ×ú‹ •ÖÖ­Öê ¾ÖÖ»Öê ÃÖ³Öß ×¾Ö“ÖÖ¸ü×¾Ö´Ö¿ÖÔ ×­Ö•Öß ŸÖÖî¸ü ¯Ö¸ü ׍ú‹ •Ö֋ӐÖê וÖÃÖ´Öë ¾µÖŒŸÖ
ÃÖ´ÖÃŸÖ ¾µÖÛŒŸÖÖŸÖ ×¾Ö“ÖÖ¸üÖë úÖê ×­ÖŸÖÖÓŸÖ ÖÖê¯Ö­ÖßµÖ ¸üÖÖ •ÖÖ‹ÖÖ… ²ÖÖê›Ôü úß ÃÖÓßÖãןֵÖÖÓ ¾Ö ˆ­Öêú úÖ¸üÖÖë
úß ¾µÖ֏µÖÖ ¤üÖê­ÖÖë ¯ÖÖÖë úÖê ×»Ö×ÖŸÖ ºþ¯Ö ´Öë ¯ÖÏßÖãŸÖ úß •ÖÖ‹Öß… µÖÆü ÃÖÓßÖãןֵÖÖÓ ÃÖÓ×¾Ö¤üÖ êú »Ö֐Öæ
¯ÖÏÖ¾Ö¬ÖÖ­ÖÖë, ¯ÖϵÖÖê•µÖ ×¾Ö×¬Ö ¾Ö ×¾Ö×­ÖµÖ´ÖÖë †Öî¸ü ×¾Ö¾ÖÖ¤ü ´Öë ¿ÖÖ×´Ö»Ö ŸÖ£µÖÖë ¾Ö ¯Ö׸üÛãÖןֵÖÖë ¯Ö¸ü †Ö¬ÖÖ׸üŸÖ
ÆüÖëÖß…
²ÖÖê›Ôü ÃÖ¾ÖÔÃÖ´´ÖŸÖ ÃÖÓßÖã×ŸÖ ¯Ö¸ü ¯ÖÓÆãü“Ö­Öê úÖ Æü¸üÃÖÓ³Ö¾Ö ¯ÖϵÖÖÃÖ ú¸êüÖÖ… µÖפü µÖÆü †ÃÖÓ³Ö¾Ö ×ÃÖ¨ü ÆüÖêŸÖÖ Æîü ŸÖÖê
²ÖÆãü´ÖŸÖ úÖ ±îúÃÖ»ÖÖ ×­ÖÖÖԵ֍ú ÆüÖêÖÖ †Öî¸ü µÖפü úÖê‡Ô ÃÖ¤üÃµÖ †ÃÖÆü´ÖŸÖ Æîü ŸÖÖê ¾ÖÆü ÃÖ¤üÃµÖ ¤üÖê­ÖÖë ¯ÖÖÖë úÖê
¯ÖÏßÖãŸÖ ú¸ü­Öê ÆêüŸÖã ‹ú ×»Ö×ÖŸÖ †»¯Ö´ÖŸÖ ׸ü¯ÖÖê™Ôü ŸÖîµÖÖ¸ü ú¸êüÖÖ…
13. µÖפü ÃÖÓ×¾Ö¤üÖ †¾Ö×¬Ö êú ¤üÖî¸üÖ­Ö ×­ÖÖ´Ö †Öî¸ü ÃÖÓ×¾Ö¤ü֍úÖ¸ü úß ¸üÖµÖ ÆüÖêŸÖß Æîü ׍ú ×¾Ö¾ÖÖ¤ü ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü
†¯Ö­Öê úŸÖÔ¾µÖÖë úÖ ˆ×“ÖŸÖ ¯ÖύúÖ¸ü ÃÖê ×­Ö¾ÖÔÆü­Ö ­ÖÆüà ú¸ü ¸üÆüÖ Æîü ŸÖÖê ×­ÖÖ´Ö ¾Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü ״ֻ֍ú¸ü ×¾Ö¾ÖÖ¤ü
ÃÖ´ÖÖ¬ÖÖ­Ö ²ÖÖê›Ôü úÖê ³ÖÓÖ ú¸ü Ã֍úŸÖê Æïü… ‹êÃÖß ÛãÖ×ŸÖ ´Öë ×¾Ö¾ÖÖ¤üÖë úÖê ÃÖ߬Öê †Ö²Öá™Òêü™ü¸ü êú ¯ÖÖÃÖ ÃÖÓ¤üÙ³ÖŸÖ
׍úµÖÖ •ÖÖ‹ÖÖ…

137

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
The Corporation and the Contractor shall jointly sign a notice specifying that the
Board shall stand disbanded with effect from the date specified in the notice.
The notice shall be posted by a registered letter with AD or delivery of the
letter, even if he refuses to do so.

138

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)
×­ÖÖ´Ö ¾Ö ÃÖÓ×¾Ö¤ü֍úÖ¸ü ÃÖÓµÖãŒŸÖ ºþ¯Ö ÃÖê ‹ú ­ÖÖê×™üÃÖ ¯Ö¸ü ÆüßÖցָü ú¸ëüÖê וÖÃÖ´Öë ­ÖÖê×™üÃÖ ´Öë ×¾Ö×­ÖÙ¤ü™ü ŸÖÖ¸üßÖ ÃÖê
²ÖÖê›Ôü úÖê ³ÖÓÖ ×ú‹ •ÖÖ­Öê úÖ ×¾Ö×­Ö¤ìü¿Ö ÆüÖêÖÖ… ‡ÃÖ ­ÖÖê×™üÃÖ úÖê, ³Ö»Öê Æüß ¾Öê ‹êÃÖÖ ú¸ü­Öê ÃÖê ‡ÓúÖ¸ü ú¸ëü,
¯ÖÖ¾ÖŸÖßµÖãŒŸÖ µÖÖ ¯Ö¡Ö-ÃÖã¯Öã¤ÔüÖß ¾ÖÖ»Öß ¸üוÖÙü›Ôü ›ü֍ú ÃÖê ¯ÖÏê×ÂÖŸÖ ×úµÖÖ •ÖÖ‹ÖÖ…

138

­µÖæÛŒ»ÖµÖ¸ü ¯ÖÖ¾Ö¸ü úÖ¸ü¯ÖÖê¸êü¿Ö­Ö †Öò±ú ‡Ó×›üµÖÖ ×»Ö×´Ö™êü›ü NUCLEAR POWER CORPORATION OF INDIA LIMITED (NPCIL)