Fee Charges For Sanction/Addition/Alterations: If a
person intends to erect or re-erect or make Master Plans
alterations in a building, he/she shall give notice Zonal Plans
in writing in the prescribed form (Form 1
Urban Extension
Appendix 'A' Bye-Law No.6.1) and such notice
Projects
shall be submitted in the proforma along with
Traffic &
requisite documents, fee and charges mentioned Transportation
therein.(Refer Annexure 'A').
Other Projects

Procedure during construction of Building Special Projects


: The owner/applicant who has been granted Policy Modifications
such building permit shall intimate the Authority
Building Guidelines
in writing before 7 days of starting of
construction work at site in the prescribed form VIOLATION IN
PROPERTIES
(Form III, Appendix 'B', Bye Law No.7.2.1). He
shall obtain an acknowledgement from the
Authority of this notice (Refer Annexure 'B').

Validity Period of Building Plans:


The building plans shall remain valid from date
of sanction as mentioned below:
For residential, Industrial & Commercial
(upto 4 stroreyed building.) - 2 years
For large complexes and multi stroreyed
buildings and institutional buildings. - 3
years
No building activity can be carried out
after the expiry of validity of such building
permit.

The building plans can be revalidated for a


period of one year at a time form the date of
expiry of validity of original permit.

Revalidation of Plans
The original sanctioned plan is required to be
submitted with a letter of request for
revalidation along with time extension letter
from the Lease Deptt. if necessary.
Plinth Level Permit : Ministry of Urban
Development and Poverty Alleviation, Govt. of
India, vide notification No.S-O1154(E) dated
21.11.2001 abolished C & D Certificates and
introduced intimation of completion of work up
to plinth level. Every owner/lessee, is required
to submit information of completion of work
upto plinth level in the prescribed form and such
notice shall be submitted in the proforma along
with requisite documents, fee and charges
mentioned therein. (Refer Annexure 'C').

Completion-cum-Occupancy Certificate :
No person shall occupy or allow any other
person to occupy any building or part of a
building for any purpose until such building or
part has been granted the occupancy certificate.
Every owner/ lessee is required to submit a
notice of Completion cum Occupancy Certificate
of the building in the prescribed form (Appendix B-
3) Bye Law No.7.5.2. and such notices shall be
submitted in the proforma along with the
requisite documents, fee and charges mentioned
therein.(Refer Annexure 'D').

https://dda.org.in/planning/how_to_apply.htm 1/2
10/1/2019 Planning - How to Apply
Provisional Occupancy Certificate and
Completion Certificate for Co-operative
Group Housing Societies, Govt.
Departments, Govt. Institutions,
Charitable Trusts and Wakf Board: No
person shall occupy or allow any other person to
occupy any building or part of a building for any
purpose until such building or part has been
granted the provisional occupancy certificate.
Every owner/ lessee is required to submit a
notice of Provisional Occupancy Certificate and
Completion Certificate of the building in the
prescribed form (Appendix B-3) Bye Law No.7.5.2.
and such notices shall be submitted in the
proforma along with the requisite documents,
fee and charges mentioned therein.(Refer
Annexure 'E').

Home | About Us | Planning | Housing | Land | Urban Heritage | Sports | Greens


Procedures | Notice | FAQ's | Sitemap | Feedback | Privacy Policy | Disclaimer | Terms & Conditions

Delhi Metro | Delhi Govt.| Indian Railways


This site is designed and developed by Intec Infocom Pvt. Ltd. Copyright @ 2006

https://dda.org.in/planning/how_to_apply.htm 2/2

Das könnte Ihnen auch gefallen