VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
COSTO DIRECTO 118,460.67 51,263.55 43.27 67,197.12 56.73 118,460.67 100.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE
SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
1 OBRAS EXTERIORES 187,176.71 184,215.67 98.42 2,961.04 1.58 187,176.71 100.00 0.00 0.00
2 AULAS Y ESCALERA 594,974.69 539,396.45 90.66 55,578.24 9.34 594,974.69 100.00 0.00 0.00
3 AUDIDTORIO Y CENTRO COMPUTO 373,086.38 332,412.59 89.10 40,673.80 10.90 373,086.38 100.00 0.00 0.00
4 AMB ADMINISTRATIVOS 174,076.58 148,731.00 85.44 25,345.58 14.56 174,076.58 100.00 0.00 0.00
5 COCINA COMEDOR 184,909.43 151,059.46 81.69 33,849.97 18.31 184,909.43 100.00 0.00 0.00
6 SS.HH. N IÑOS Y NIÑAS 102,692.82 78,070.90 76.02 24,621.92 23.98 102,692.82 100.00 0.00 0.00
7 SS.HH. ADMINISTRCION 53,554.99 0.00 0.00 0.00 0.00 0.00 0.00 53,554.99 100.00
8 PATIO FORMACION 118,460.67 51,263.55 43.27 67,197.12 56.73 118,460.67 100.00 0.00 0.00
9 LOSA DEPORTIVA 251,048.94 126,400.65 50.35 124,648.29 49.65 251,048.94 100.00 0.00 0.00
10 CISTERNA TANQUE ALTO 51,134.12 45,021.36 88.05 6,112.76 11.95 51,134.12 100.00 0.00 0.00
11 CERCO PERIMENTRICO 150,796.85 150,796.85 100.00 0.00 0.00 150,796.85 100.00 0.00 0.00
12 PUERTA DE INGRESO 7,931.69 5,957.99 75.12 1,973.70 24.88 7,931.69 100.00 0.00 0.00
13 MOB, MA, CAPACITC Y FLET 113,259.13 21,150.00 18.67 14,100.00 12.45 35,250.00 31.12 78,009.13 68.88
COSTO DIRECTO 2,363,103.00 1,834,476.47 77.63 397,001.22 16.80 2,231,477.68 94.43 131,625.32 5.57
GASTOS GENERALES 5% 118,154.86 91,723.82 19,850.06 111,573.88 6,580.98
UTILIDAD 5% 118,154.85 91,723.82 19,850.06 111,573.88 6,580.97
SUB TOTAL 2,599,412.71 2,017,924.11 436,701.34 2,454,625.44 144,787.27
IGV 18% 467,894.29 363,226.33 78,606.24 441,832.57 26,061.72
PRESUPUESTO BASE 3,067,307.00 2,381,150.44 77.63 515,307.58 16.80 2,896,458.01 94.43 170,848.99 5.57
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONT ADELANT MATERIAL : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: : CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
01 OBRAS EXTERIORES
01.01 OBRAS DE EXPLANACION
01.01.01 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO M2 1,226.53 6.95 8,524.38 1,165.20 8,098.16 95.00 61.33 426.22 5.00 1,226.53 8,524.38 100.00 0.00 0.00 0.00
01.01.01.01 EXCAVACION MASIVA A MAQUINA DURANTE EL PROCESO m2 613.27 9.20 5,642.08 582.61 5,359.98 95.00 30.66 282.10 5.00 613.27 5,642.08 100.00 0.00 0.00 0.00
01.01.01.02 ELIMINACION MATERIAL EXCEDENTE m2 766.58 6.56 5,028.76 728.22 4,777.14 95.00 38.36 251.63 5.00 766.58 5,028.76 100.00 0.00 0.00 0.00
01.02 OBRAS DE SANEAMIENTO 0.00 0.00
01.02.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO M2 1,708.14 5.03 8,591.94 1,708.14 8,591.94 100.00 0.00 0.00 0.00 1,708.14 8,591.94 100.00 0.00 0.00 0.00
01.02.02 RED DE DISTRIBUCION TUBERIA DE D=3/4"PVC SAP M 75.15 4.85 364.48 75.15 364.48 100.00 0.00 0.00 0.00 75.15 364.48 100.00 0.00 0.00 0.00
01.02.03 RED DE DISTRIBUCION TUBERIA DE D=1" PVC SAP ML 79.03 10.62 839.30 79.03 839.30 100.00 0.00 0.00 0.00 79.03 839.30 100.00 0.00 0.00 0.00
01.02.04 RED DE DERIVACION PVC SAL PARA DESAGUE DE 6" ML 3,202.97 16.56 53,041.18 3,202.97 53,041.18 100.00 0.00 0.00 0.00 3,202.97 53,041.18 100.00 0.00 0.00 0.00
01.02.05 RED DE DERIVACION PVC SAL PARA DESAGUE DE 8" ML 59.12 8.71 514.94 59.12 514.94 100.00 0.00 0.00 0.00 59.12 514.94 100.00 0.00 0.00 0.00
01.02.06 EXCAVACION DE ZANJAS PARA TUBERIAS DE DESAGUE M3 1,110.29 7.61 8,449.31 1,110.29 8,449.31 100.00 0.00 0.00 0.00 1,110.29 8,449.31 100.00 0.00 0.00 0.00
01.02.07 RELLENO COMP. ZANJA TERR. NORMAL "C" -P/TUB.4"-6" AGU M 3,416.27 20.67 70,614.30 3,416.27 70,614.30 100.00 0.00 0.00 0.00 3,416.27 70,614.30 100.00 0.00 0.00 0.00
01.02.08 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 939.47 7.92 7,440.60 939.47 7,440.60 100.00 0.00 0.00 0.00 939.47 7,440.60 100.00 0.00 0.00 0.00
01.02.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" PZA 6.00 434.38 2,606.28 6.00 2,606.28 100.00 0.00 0.00 0.00 6.00 2,606.28 100.00 0.00 0.00 0.00
01.02.10 TEE PVC SAP 1 " PZA 3.00 8.21 24.63 3.00 24.63 100.00 0.00 0.00 0.00 3.00 24.63 100.00 0.00 0.00 0.00
01.02.11 REDUCCION PVC SAP DE 1" A 3/4" P/AGUA PZA 2.00 10.71 21.42 2.00 21.42 100.00 0.00 0.00 0.00 2.00 21.42 100.00 0.00 0.00 0.00
01.02.12 YEEE DE P. V. C. SAL SP, RAMAL CON REDUCCION DE 8" - 6" UND 2.00 12.50 25.00 2.00 25.00 100.00 0.00 0.00 0.00 2.00 25.00 100.00 0.00 0.00 0.00
01.02.13 YEE PVC SAL DE 6" PZA 11.00 7.17 78.87 11.00 78.87 100.00 0.00 0.00 0.00 11.00 78.87 100.00 0.00 0.00 0.00
01.02.14 CODO PVC SAL DE 6" X 45° PZA 9.00 15.77 141.93 9.00 141.93 100.00 0.00 0.00 0.00 9.00 141.93 100.00 0.00 0.00 0.00
01.02.15 GRIFO PARA RIEGO PZA 9.00 40.40 363.60 9.00 363.60 100.00 0.00 0.00 0.00 9.00 363.60 100.00 0.00 0.00 0.00
01.02.16 VALVULA CHECK DE 1" UND 2.00 55.56 111.12 2.00 111.12 100.00 0.00 0.00 0.00 2.00 111.12 100.00 0.00 0.00 0.00
01.02.17 CAJA PARA MEDIDOR DE AGUA PZA 1.00 161.00 161.00 1.00 161.00 100.00 0.00 0.00 0.00 1.00 161.00 100.00 0.00 0.00 0.00
O1.03 OBRAS ELECTRICAS 0.00 0.00
01.03.01 EXCAVACION M3 36.03 20.60 742.22 36.03 742.22 100.00 0.00 0.00 0.00 36.03 742.22 100.00 0.00 0.00 0.00
01.03.02 RELLENO COMP. ZANJA TERR. NORMAL "C" -P/TUB.4"-6" AGU M 138.59 20.67 2,864.66 138.59 2,864.66 100.00 0.00 0.00 0.00 138.59 2,864.66 100.00 0.00 0.00 0.00
01.03.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 38.11 7.92 301.83 38.11 301.83 100.00 0.00 0.00 0.00 38.11 301.83 100.00 0.00 0.00 0.00
01.03.04 TUBERIAS PVC SAP (ELECTRICAS) DE=1 1/2" M 138.59 9.62 1,333.24 138.59 1,333.24 100.00 0.00 0.00 0.00 138.59 1,333.24 100.00 0.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONT ADELANT MATERIAL : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: : CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
01.03.05 CABLE ELECTRICO NYY 2 X 4 MM2 M 138.59 7.98 1,105.95 138.59 1,105.95 100.00 0.00 0.00 0.00 138.59 1,105.95 100.00 0.00 0.00 0.00
01.03.06 POZO A TIERRA UND 1.00 779.45 779.45 0.00 0.00 0.00 1.00 779.45 100.00 1.00 779.45 100.00 0.00 0.00 0.00
01.03.07 TABLERO GENERAL UND 1.00 114.00 114.00 0.00 0.00 0.00 1.00 114.00 100.00 1.00 114.00 100.00 0.00 0.00 0.00
O1.04 OBRAS DE CIRCULACION (VEREDAS) 0.00 0.00
01.04.01 TRAZO Y REPLANTEO M2 688.86 2.24 1,543.05 688.86 1,543.05 100.00 0.00 0.00 0.00 688.86 1,543.05 100.00 0.00 0.00 0.00
01.04.02 EXCAVACION M3 34.44 20.60 709.46 34.44 709.46 100.00 0.00 0.00 0.00 34.44 709.46 100.00 0.00 0.00 0.00
01.04.03 ELIMINACION MATERIAL EXCEDENTE M3 43.05 6.56 282.41 43.05 282.41 100.00 0.00 0.00 0.00 43.05 282.41 100.00 0.00 0.00 0.00
01.04.04 NIVELACION DE TERRENO M2 688.86 2.00 1,377.72 688.86 1,377.72 100.00 0.00 0.00 0.00 688.86 1,377.72 100.00 0.00 0.00 0.00
01.04.05 ENCOFRADO Y DESENCOFRADO M2 32.40 46.95 1,521.18 32.40 1,521.18 100.00 0.00 0.00 0.00 32.40 1,521.18 100.00 0.00 0.00 0.00
01.04.06 VEREDA DE CONCRETO F' C=175 KG/CM2 M2 68.89 11.74 808.77 68.89 808.77 100.00 0.00 0.00 0.00 68.89 808.77 100.00 0.00 0.00 0.00
01.04.07 JUNTAS ASFALTICAS M 105.39 10.51 1,107.65 0.00 0.00 0.00 105.39 1,107.65 100.00 105.39 1,107.65 100.00 0.00 0.00 0.00
COSTO DIRECTO 187,176.71 184,215.67 98.42 2,961.04 1.58 187,176.71 100.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONT ADELANT MATERIAL : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: : CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
02 CONSTRUCCION DE 06 AULAS
02.01 TRABAJOS PRELIMINARES
02.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M UND 1.00 400.00 400.00 1.00 400.00 100.00 0.00 0.00 0.00 1.00 400.00 100.00 0.00 0.00 0.00
02.01.02 LIMPIEZA DE TERRENO MANUAL M2 287.96 0.66 190.05 287.96 190.05 100.00 0.00 0.00 0.00 287.96 190.05 100.00 0.00 0.00 0.00
02.01.03 TRAZO Y REPLANTEO M2 287.96 2.24 645.03 287.96 645.03 100.00 0.00 0.00 0.00 287.96 645.03 100.00 0.00 0.00 0.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 287.96 2.55 734.30 287.96 734.30 100.00 0.00 0.00 0.00 287.96 734.30 100.00 0.00 0.00 0.00
02.02.02 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUND M3 182.26 24.36 4,439.85 182.26 4,439.85 100.00 0.00 0.00 0.00 182.26 4,439.85 100.00 0.00 0.00 0.00
02.02.03 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NO M3 44.64 13.13 586.12 44.64 586.12 100.00 0.00 0.00 0.00 44.64 586.12 100.00 0.00 0.00 0.00
02.02.04 RELLENO CON MATERIAL PROPIO M3 69.37 16.65 1,155.01 69.37 1,155.01 100.00 0.00 0.00 0.00 69.37 1,155.01 100.00 0.00 0.00 0.00
02.02.05 ELIMINACION MATERIAL EXCEDENTE M3 196.91 6.56 1,291.73 196.91 1,291.73 100.00 0.00 0.00 0.00 196.91 1,291.73 100.00 0.00 0.00 0.00
02.03 CONCRETO SIMPLE
02.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 87.21 89.39 7,795.70 87.21 7,795.70 100.00 0.00 0.00 0.00 87.21 7,795.70 100.00 0.00 0.00 0.00
02.03.02 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMI M3 39.39 170.48 6,715.21 39.39 6,715.21 100.00 0.00 0.00 0.00 39.39 6,715.21 100.00 0.00 0.00 0.00
02.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 M2 39.07 24.75 966.98 39.07 966.98 100.00 0.00 0.00 0.00 39.07 966.98 100.00 0.00 0.00 0.00
02.03.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. AN M3 10.80 225.77 2,438.32 10.80 2,438.32 100.00 0.00 0.00 0.00 10.80 2,438.32 100.00 0.00 0.00 0.00
02.04 CONCRETO ARMADO
02.04.01 ZAPATAS
02.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 86.33 335.04 28,924.00 86.33 28,924.00 100.00 0.00 0.00 0.00 86.33 28,924.00 100.00 0.00 0.00 0.00
02.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 2,190.61 4.68 10,252.05 2,190.61 10,252.05 100.00 0.00 0.00 0.00 2,190.61 10,252.05 100.00 0.00 0.00 0.00
02.04.02 COLUMNAS
02.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 66.07 413.53 27,321.93 66.07 27,321.93 100.00 0.00 0.00 0.00 66.07 27,321.93 100.00 0.00 0.00 0.00
02.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 446.49 41.04 18,323.95 446.49 18,323.95 100.00 0.00 0.00 0.00 446.49 18,323.95 100.00 0.00 0.00 0.00
02.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 9,894.95 4.44 43,933.58 9,894.95 43,933.58 100.00 0.00 0.00 0.00 9,894.95 43,933.58 100.00 0.00 0.00 0.00
02.04.03 VIGAS
02.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 63.03 344.40 21,707.53 63.03 21,707.53 100.00 0.00 0.00 0.00 63.03 21,707.53 100.00 0.00 0.00 0.00
02.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 487.12 39.23 19,109.72 487.12 19,109.72 100.00 0.00 0.00 0.00 487.12 19,109.72 100.00 0.00 0.00 0.00
02.04.03.03 ACERO GRADO 60 EN VIGAS KG 11,910.79 4.32 51,454.61 11,910.79 51,454.61 100.00 0.00 0.00 0.00 11,910.79 51,454.61 100.00 0.00 0.00 0.00
02.04.04 LOSAS ALIGERADAS
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONT ADELANT MATERIAL : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: : CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
COSTO DIRECTO 373,086.38 332,412.59 89.10 40,673.80 10.90 373,086.38 100.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Arq° ROLANDO PONCE CORDOVA SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO
(S/.)
P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
COSTO DIRECTO 174,076.58 148,731.00 85.44 25,345.58 14.56 174,076.58 100.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO
(S/.)
P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
COSTO DIRECTO 184,909.43 151,059.46 81.69 33,849.97 18.31 184,909.43 100.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: : CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
COSTO DIRECTO 102,692.82 78,070.90 76.02 24,621.92 23.98 102,692.82 100.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
COSTO DIRECTO 53,554.99 0.00 0.00 0.00 0.00 0.00 0.00 53,554.99 100.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
COSTO DIRECTO 118,460.67 51,263.55 43.27 67,197.12 56.73 118,460.67 100.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
COSTO DIRECTO 251,048.94 126,400.65 50.35 124,648.29 49.65 251,048.94 100.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
COSTO DIRECTO 51,134.12 45,021.36 88.05 6,112.76 11.95 51,134.12 100.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
11 CERCO PERIMETRICO
11.01 TRABAJOS PRELIMINARES
11.01.01 DEMOLICION DE MUROS DE ADOBE M3 197.40 6.56 1,294.94 197.40 1,294.94 100.00 0.00 0.00 197.40 1,294.94 100.00 0.00 0.00 0.00
11.01.02 ELIMINACION DE DESMONTE, PROV. POR DEMOLICION M3 197.40 22.08 4,358.59 197.40 4,358.59 100.00 0.00 0.00 197.40 4,358.59 100.00 0.00 0.00 0.00
11.01.03 TRAZO Y REPLANTEO M2 173.55 2.24 388.75 173.55 388.75 100.00 0.00 0.00 173.55 388.75 100.00 0.00 0.00 0.00
11.02 MOVIMIENTO DE TIERRAS
11.02.01 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUNDIDAD M3 90.16 24.36 2,196.30 90.16 2,196.30 100.00 0.00 0.00 90.16 2,196.30 100.00 0.00 0.00 0.00
11.02.02 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NORMAL M3 198.36 13.13 2,604.47 198.36 2,604.47 100.00 0.00 0.00 198.36 2,604.47 100.00 0.00 0.00 0.00
11.02.03 RELLENO CON MATERIAL PROPIO M3 123.08 16.65 2,049.28 123.08 2,049.28 100.00 0.00 0.00 123.08 2,049.28 100.00 0.00 0.00 0.00
11.02.04 ELIMINACION MATERIAL EXCEDENTE M3 165.44 6.56 1,085.29 165.44 1,085.29 100.00 0.00 0.00 165.44 1,085.29 100.00 0.00 0.00 0.00
11.03 CONCRETO SIMPLE
11.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 56.35 89.39 5,037.13 56.35 5,037.13 100.00 0.00 0.00 56.35 5,037.13 100.00 0.00 0.00 0.00
11.03.02 CONCRETO F'C = 175 KG/CM2. PARA ZAPATAS M3 78.89 326.74 25,776.52 78.89 25,776.52 100.00 0.00 0.00 78.89 25,776.52 100.00 0.00 0.00 0.00
11.03.03 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMIGON) M3 146.16 170.48 24,917.36 146.16 24,917.36 100.00 0.00 0.00 146.16 24,917.36 100.00 0.00 0.00 0.00
11.03.04 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT M2 278.40 24.75 6,890.40 278.40 6,890.40 100.00 0.00 0.00 278.40 6,890.40 100.00 0.00 0.00 0.00
11.03.05 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. ANCHO=0 M3 20.88 225.77 4,714.08 20.88 4,714.08 100.00 0.00 0.00 20.88 4,714.08 100.00 0.00 0.00 0.00
11.04 CONCRETO ARMADO
11.04.01 COLUMNAS
11.04.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 12.08 413.53 4,995.44 12.08 4,995.44 100.00 0.00 0.00 12.08 4,995.44 100.00 0.00 0.00 0.00
11.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 257.06 41.04 10,549.74 257.06 10,549.74 100.00 0.00 0.00 257.06 10,549.74 100.00 0.00 0.00 0.00
11.04.01.03 ACERO GRADO 60 EN COLUMNAS KG 2,512.55 4.44 11,155.72 2,512.55 11,155.72 100.00 0.00 0.00 2,512.55 11,155.72 100.00 0.00 0.00 0.00
11.04.02 VIGAS
11.04.02.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 17.40 344.40 5,992.56 17.40 5,992.56 100.00 0.00 0.00 17.40 5,992.56 100.00 0.00 0.00 0.00
11.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 174.00 39.23 6,826.02 174.00 6,826.02 100.00 0.00 0.00 174.00 6,826.02 100.00 0.00 0.00 0.00
11.04.02.03 ACERO GRADO 60 EN VIGAS KG 2,404.33 4.32 10,386.71 2,404.33 10,386.71 100.00 0.00 0.00 2,404.33 10,386.71 100.00 0.00 0.00 0.00
11.05 ALBAÑELERIA
11.05.01 MURO DE LADRILLO CORRIENTE CARAVISTA DE ARCILLA TIPO SOGAM2 46.42 122.92 5,705.95 46.42 5,705.95 100.00 0.00 0.00 46.42 5,705.95 100.00 0.00 0.00 0.00
11.06 REVOQUES, ENLUCIDOS Y MOLDURAS
11.06.01 TARRAJEO EN SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA M2 257.60 17.97 4,629.07 257.60 4,629.07 100.00 0.00 0.00 257.60 4,629.07 100.00 0.00 0.00 0.00
11.06.02 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMENTO - M2 174.00 21.15 3,680.10 174.00 3,680.10 100.00 0.00 0.00 174.00 3,680.10 100.00 0.00 0.00 0.00
COSTO DIRECTO 150,796.85 150,796.85 100.00 0.00 0.00 150,796.85 100.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
12 PUERTA DE INGRESO
12.01 TRABAJOS PRELIMINARES
12.01.01 TRAZO Y REPLANTEO M2 2.89 2.24 6.47 2.89 6.47 100.00 0.00 0.00 0.00 2.89 6.47 100.00 0.00 0.00 0.00
12.02 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUND M3 7.91 24.36 192.69 7.91 192.69 100.00 0.00 0.00 0.00 7.91 192.69 100.00 0.00 0.00 0.00
12.02.02 RELLENO CON MATERIAL PROPIO M3 3.94 16.65 65.60 3.94 65.60 100.00 0.00 0.00 0.00 3.94 65.60 100.00 0.00 0.00 0.00
12.02.03 ELIMINACION MATERIAL EXCEDENTE M3 4.97 6.56 32.60 4.97 32.60 100.00 0.00 0.00 0.00 4.97 32.60 100.00 0.00 0.00 0.00
12.03 CONCRETO SIMPLE
12.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 5.95 89.39 531.87 5.95 531.87 100.00 0.00 0.00 0.00 5.95 531.87 100.00 0.00 0.00 0.00
12.04 CONCRETO ARMADO
12.04.01 ZAPATAS
12.04.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 2.98 335.04 998.42 2.98 998.42 100.00 0.00 0.00 0.00 2.98 998.42 100.00 0.00 0.00 0.00
12.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 52.71 4.68 246.68 52.71 246.68 100.00 0.00 0.00 0.00 52.71 246.68 100.00 0.00 0.00 0.00
12.04.02 COLUMNAS
12.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 0.84 413.53 347.37 0.84 347.37 100.00 0.00 0.00 0.00 0.84 347.37 100.00 0.00 0.00 0.00
12.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 12.31 41.04 505.20 12.31 505.20 100.00 0.00 0.00 0.00 12.31 505.20 100.00 0.00 0.00 0.00
12.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 135.40 4.44 601.18 135.40 601.18 100.00 0.00 0.00 0.00 135.40 601.18 100.00 0.00 0.00 0.00
12.04.03 VIGAS
12.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 0.78 344.40 268.63 0.78 268.63 100.00 0.00 0.00 0.00 0.78 268.63 100.00 0.00 0.00 0.00
12.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 7.97 39.23 312.66 7.97 312.66 100.00 0.00 0.00 0.00 7.97 312.66 100.00 0.00 0.00 0.00
12.04.03.03 ACERO GRADO 60 EN VIGAS KG 91.81 4.32 396.62 91.81 396.62 100.00 0.00 0.00 0.00 91.81 396.62 100.00 0.00 0.00 0.00
12.05 REVOQUES, ENLUCIDOS Y MOLDURAS
12.05.01 TARRAJEO EN SUPERFICIE DE COLUMNAS CON CEMENTO - M2 12.31 17.97 221.21 0.00 0.00 0.00 12.31 221.21 100.00 12.31 221.21 100.00 0.00 0.00 0.00
12.05.02 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMEN M2 7.97 21.15 168.57 0.00 0.00 0.00 7.97 168.57 100.00 7.97 168.57 100.00 0.00 0.00 0.00
12.05.03 VESTIDURA DE DERRAMES EN PUERTAS , VENTANAS Y VANO M 14.75 7.68 113.28 0.00 0.00 0.00 14.75 113.28 100.00 14.75 113.28 100.00 0.00 0.00 0.00
12.06 CARPINTERIA METALICA
12.06.01 PUERTA DE INGRESO PERSONAL M2 11.00 220.00 2,420.00 6.60 1,452.00 60.00 4.40 968.00 40.00 11.00 2,420.00 100.00 0.00 0.00 0.00
12.07 CERRAJERIA
12.07.01 CERRADURA DE TRES GOLPES PZA 2.00 103.38 206.76 0.00 0.00 0.00 2.00 206.76 100.00 2.00 206.76 100.00 0.00 0.00 0.00
12.07.02 CANDADO INCLUYENDO ALDABAS UND 2.00 25.00 50.00 0.00 0.00 0.00 2.00 50.00 100.00 2.00 50.00 100.00 0.00 0.00 0.00
COSTO DIRECTO 7,931.69 5,957.99 75.12 1,973.70 24.88 7,931.69 100.00 0.00 0.00
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
13 MOBILIARIO
13.01 MOBILIARIO ESCOLAR G LB 1.00 68,009.13 68,009.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 68,009.13 100.00
14 MITIGACION AMBIENTAL
14.01 MITIGACION AMBIENTAL GLB 1.00 7,500.00 7,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 7,500.00 100.00
15 CAPACITACION TECNICO PEDAGOGICO
15.01 CAPACITACION GLB 1.00 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,500.00 100.00
16 FLETE TERRESTRE
16.01 FLETE TERRESTRE GLB 1.00 35,250.00 35,250.00 0.60 21,150.00 60.00 0.40 14,100.00 40.00 1.00 35,250.00 100.00 0.00 0.00 0.00
COSTO DIRECTO 113,259.13 21,150.00 18.67 14,100.00 12.45 35,250.00 31.12 78,009.13 68.88
306,730.70 259,941.27
ADELANTO DIRECTO
10.00% 10.00%
VAL MES PARTIDA
VALORIZACIÓN N° 01 Julio - 2017 Global 763,187.58 76,318.76 183,622.51
VALORIZACIÓN N° 02 Agosto - 2017 Global 604,623.40 60,462.34 123,160.17
VALORIZACIÓN N° 03 Sept - 2017 Global 389,911.91 38,991.19 84,168.98
VALORIZACIÓN N° 04 Oct - 2018 Global 260,201.21 26,020.12 58,148.86
VALORIZACIÓN N° 05 Nov - 2017 Global 436,701.34 58,148.86 -
613,461.40 519,882.54
ADELANTO DIRECTO
20.00% 20.00%
VAL MES PARTIDA
VALORIZACIÓN N° 01 julio-17 GLOBAL 0.00 0.00 519,882.54
VALORIZACIÓN N° 02 agosto-17 GLOBAL 604,623.40 120,924.68 398,957.86
VALORIZACIÓN N° 03 septiembre-17 GLOBAL 389,911.91 77,982.38 320,975.48
VALORIZACIÓN N° 04 octubre-17 GLOBAL 260,201.21 52,040.24 268,935.24
VALORIZACIÓN N° 05 noviembre-17 GLOBAL 436,701.34 268,935.24 -
"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS
ALTAMIRANO EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS
OBRA : HUAMAN - AYACUICHO"
CONTRATISTA : CONSORCIO NUEVA ESPERANZA
SUPERVISOR : ING. SAMUEL AYALA TINEO
RESIDENTE DE OBRA : ING. GABRIEL ALFONSO GUZMAN MANRIQUE
FECHA VALOR REFERENCIAL :
MONTO CONTRACTUAL : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONTO CONTRACTUAL : S/. 3,067,307.00 (SIN IGV)
ADELANTO DIRECTO 10% : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV)
ADELANTO DE MATERIALES 20% : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
A: VALORIZACION CONTRACTUAL
01.- COSTO DIRECTO O.P. 2,599,412.71 2,017,924.11 436,701.34 2,454,625.44 94.43% 144,787.27
SUB TOTAL (A) 2,599,412.71 2,017,924.11 436,701.34 2,454,625.44 144,787.27
AVANCE FISICO DE OBRA PRINCIPAL 77.63% 16.80% 94.43% 5.57%
B: VALORIZACION ADICIONAL
0.00
SUB TOTAL (B) 0.00 0.00 0.00 0.00 0.00
AVANCE FISICO DE ADICIONAL DE OBRA 0.00% 0.00% 0.00%
C: REAJUSTES
D: AMORTIZACIONES
E: RETENCIONES
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE
SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
1 OBRAS EXTERIORES 187,176.71 184,215.67 98.42 2,961.04 1.58 187,176.71 100.00 0.00 0.00
2 AULAS Y ESCALERA 594,974.69 539,396.45 90.66 55,578.24 9.34 594,974.69 100.00 0.00 0.00
3 AUDIDTORIO Y CENTRO COMPUTO 373,086.38 332,412.59 89.10 40,673.80 10.90 373,086.38 100.00 0.00 0.00
4 AMB ADMINISTRATIVOS 174,076.58 148,731.00 85.44 25,345.58 14.56 174,076.58 100.00 0.00 0.00
5 COCINA COMEDOR 184,909.43 151,059.46 81.69 33,849.97 18.31 184,909.43 100.00 0.00 0.00
6 SS.HH. N IÑOS Y NIÑAS 102,692.82 78,070.90 76.02 24,621.92 23.98 102,692.82 100.00 0.00 0.00
7 SS.HH. ADMINISTRCION 53,554.99 0.00 0.00 0.00 0.00 0.00 0.00 53,554.99 100.00
8 PATIO FORMACION 118,460.67 51,263.55 43.27 67,197.12 56.73 118,460.67 100.00 0.00 0.00
9 LOSA DEPORTIVA 251,048.94 126,400.65 50.35 124,648.29 49.65 251,048.94 100.00 0.00 0.00
10 CISTERNA TANQUE ALTO 51,134.12 45,021.36 88.05 6,112.76 11.95 51,134.12 100.00 0.00 0.00
11 CERCO PERIMENTRICO 150,796.85 150,796.85 100.00 0.00 0.00 150,796.85 100.00 0.00 0.00
12 PUERTA DE INGRESO 7,931.69 5,957.99 75.12 1,973.70 24.88 7,931.69 100.00 0.00 0.00
13 MOB, MA, CAPACITC Y FLET 113,259.13 21,150.00 18.67 14,100.00 12.45 35,250.00 31.12 78,009.13 68.88
COSTO DIRECTO 2,363,103.00 1,834,476.47 77.63 397,001.22 16.80 2,231,477.68 94.43 131,625.32 5.57
GASTOS GENERALES 5% 118,154.86 91,723.82 19,850.06 111,573.88 6,580.98
UTILIDAD 5% 118,154.85 91,723.82 19,850.06 111,573.88 6,580.97
SUB TOTAL 2,599,412.71 2,017,924.11 436,701.34 2,454,625.44 144,787.27
IGV 18% 467,894.29 363,226.33 78,606.24 441,832.57 26,061.72
PRESUPUESTO BASE 3,067,307.00 2,381,150.44 77.63 515,307.58 16.80 2,896,458.01 94.43 170,848.99 5.57
02 CONSTRUCCION DE 06 AULAS
02.01 TRABAJOS PRELIMINARES
02.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M UND 1.00 400.00 400.00 100% 1.00 400.00 400.00 100%
02.01.02 LIMPIEZA DE TERRENO MANUAL M2 287.96 0.66 190.05 100% 287.96 0.66 190.05 100%
02.01.03 TRAZO Y REPLANTEO M2 287.96 2.24 645.03 100% 287.96 2.24 645.03 100%
02.02 MOVIMIENTO DE TIERRAS
02.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 287.96 2.55 734.30 100% 287.96 2.55 734.30 100%
02.02.02 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUNDIDAD M3 182.26 24.36 4,439.85 100% 182.26 24.36 4,439.85 100%
02.02.03 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NORMAL M3 44.64 13.13 586.12 100% 44.64 13.13 586.12 100%
02.02.04 RELLENO CON MATERIAL PROPIO M3 69.37 16.65 1,155.01 100% 69.37 16.65 1,155.01 100%
02.02.05 ELIMINACION MATERIAL EXCEDENTE M3 196.91 6.56 1,291.73 100% 196.91 6.56 1,291.73 100%
02.03 CONCRETO SIMPLE
02.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 87.21 89.39 7,795.70 100% 87.21 89.39 7,795.70 100%
02.03.02 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMIGON) M3 39.39 170.48 6,715.21 100% 39.39 170.48 6,715.21 100%
02.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT M2 39.07 24.75 966.98 100% 39.07 24.75 966.98 100%
02.03.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. ANCHO=0.25 MT M3 10.80 225.77 2,438.32 100% 10.80 225.77 2,438.32 100%
02.04 CONCRETO ARMADO
02.04.01 ZAPATAS
02.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 86.33 335.04 28,924.00 100% 86.33 335.04 28,924.00 100%
02.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 2,190.61 4.68 10,252.05 100% 2,190.61 4.68 10,252.05 100%
02.04.02 COLUMNAS
02.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 66.07 413.53 27,321.93 100% 66.07 413.53 27,321.93 100%
02.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 446.49 41.04 18,323.95 100% 446.49 41.04 18,323.95 100%
02.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 9,894.95 4.44 43,933.58 100% 9,894.95 4.44 43,933.58 100%
02.04.03 VIGAS
02.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 63.03 344.40 21,707.53 100% 63.03 344.40 21,707.53 100%
02.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 487.12 39.23 19,109.72 100% 487.12 39.23 19,109.72 100%
02.04.03.03 ACERO GRADO 60 EN VIGAS KG 11,910.79 4.32 51,454.61 100% 11,910.79 4.32 51,454.61 100%
02.04.05 ESCALERAS
02.04.05.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 M3 5.18 390.47 2,022.63 100% 5.18 390.47 2,022.63 100%
02.04.05.02 ENCOFRADO Y DESENCOFRADO M2 27.18 46.95 1,276.10 100% 27.18 46.95 1,276.10 100%
02.04.05.03 ACERO GRADO 60 KG 294.83 5.14 1,515.43 100% 294.83 5.14 1,515.43 100%
02.05 ALBAÑELERIA
02.05.01 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO - ARENA M2 285.33 61.67 17,596.30 100% 285.33 61.67 17,596.30 100%
02.05.02 MURO SOGA LADRILLO CORRIENTE CON CEMENTO - ARENA M2 41.13 54.67 2,248.58 100% 41.13 54.67 2,248.58 100%
02.06 COBERTURA
02.06.01 COBERTURA DE TEJA ANDINA TIPO ETERNIT M2 288.35 35.13 10,129.74 100% 288.35 35.13 10,129.74 100%
02.06.02 CUMBRERA CON TEJA ANDINA TIPO ETERNIT ML 27.90 83.06 2,317.37 100% 27.90 83.06 2,317.37 100%
02.07 REVOQUES, ENLUCIDOS Y MOLDURAS
Valorización 05 Aulas y Escaler 42de75
02.07.01 TARRAJEO EN INTERIORES Y EXTERIORES MESCLA 1:5 E=1.5CM M2 582.12 26.36 15,344.68 100% 582.12 26.36 15,344.68 100%
02.07.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA M2 446.49 17.97 8,023.43 100% 446.49 17.97 8,023.43 100%
02.07.03 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMENTO - ARENA M2 487.12 21.15 10,302.59 100% 487.12 21.15 10,302.59 100%
02.07.04 VESTIDURA DE DERRAMES CON MEZCLA 1:5 (CEMENTO - ARENA) ML 215.00 7.46 1,603.90 100% 215.00 7.46 1,603.90 100%
02.07.05 TARRAJEO EN CIELORRASO CON C:A - 1:5 E=1.5 CM M2 1,046.25 43.68 45,700.20 100% 1,046.25 43.68 45,700.20 100%
02.07.06 TARRAJEO EN FONDO DE ESCALERA CON CEMENTO - ARENA M2 27.18 16.18 439.77 100% 27.18 16.18 439.77 100%
02.07.07 BRUÑAS ML 546.21 1.68 917.63 100% 546.21 1.68 917.63 100%
02.08 CIELORRASOS
02.08.01 CIELORRASOS SUSPENDIDO CON BALDOSAS M2 154.55 32.17 4,971.87 100% 154.55 32.17 4,971.87 100%
02.08.02 FRISOS CON BALDOSAS M2 154.55 26.77 4,137.30 100% 154.55 26.77 4,137.30 100%
02.08.03 PERFIL METALICO T/"L" 2"X1"X1/16" PARA BALDOSAS M 515.17 5.19 2,673.73 100% 515.17 5.19 2,673.73 100%
02.08.04 TEE DE SUSPENSIÓN ALAMBRE GALVANISADO N° 14 + 6 VUELTAS DE ENTORCHADO PZA 107.00 30.54 3,267.78 100% 107.00 30.54 3,267.78 100%
02.09 PISOS Y PAVIMENTOS
02.09.01 NIVELACION Y COMPACTACION DE PISO M2 287.96 2.00 575.92 100% 287.96 2.00 575.92 100%
02.09.02 FALSO PISO DE 4" DE CONCRETO DE 1:10 M2 152.34 13.66 2,080.96 100% 152.34 13.66 2,080.96 100%
02.09.03 CONTRAPISO DE 40 MM M2 304.68 24.75 7,540.83 100% 304.68 24.75 7,540.83 100%
02.09.04 PISO DE CERAMICO ANTIDESLIZANTE 20 X 20 CM. S/PIEDRA VERDE PALMA M2 304.68 62.98 19,188.75 100% 304.68 62.98 19,188.75 100%
02.09.05 REVESTIMIENTO GRADAS C/MORTERO 1:4 X 2CM. PULIDO 1:2 X 1CM M 11.10 27.62 306.58 100% 11.10 27.62 306.58 100%
02.09.06 ENCOFRADO Y DESENCOFRADO M2 7.09 46.95 332.88 100% 7.09 46.95 332.88 100%
02.09.07 VEREDA DE CONCRETO DE 4" M2 9.44 53.27 502.87 100% 9.44 53.27 502.87 100%
02.09.08 JUNTAS ASFALTICAS M 35.10 10.51 368.90 100% 35.10 10.51 368.90 100%
02.10 ZOCALOS Y CONTRAZOCALOS
02.10.01 CONTRAZOCALO DE CERAMICO DE H=10CM M 228.80 28.63 6,550.54 100% 228.80 28.63 6,550.54 100%
02.10.02 CONTRAZOCALO CEMENTO S/COLOREAR H =20 CM M 228.80 6.79 1,553.55 100% 228.80 6.79 1,553.55 100%
02.11 CARPINTERIA DE MADERA
02.11.01 PUERTAS APANELADAS DE MADERA TORNILLO M2 47.75 236.25 11,280.94 100% 47.75 236.25 11,280.94 100%
02.12 CARPINTERIA METALICA
02.12.01 VENTANA DE FIERRO C/ PERFIL DE 1" X 1/8" + HOJA BAST. "L"3/4" M2 102.11 153.79 15,703.50 100% 102.11 153.79 15,703.50 100%
02.12.02 BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2" - PARANTE 1" X 1M. ALT. M 28.73 67.88 1,950.19 100% 28.73 67.88 1,950.19 100%
02.13 CERRAJERIA
02.13.01 BISAGRA CAPUCHINA 3" X 3" PZA 78.00 11.72 914.16 100% 78.00 11.72 914.16 100%
02.13.02 CERRADURA DE TRES GOLPES PZA 9.00 103.38 930.42 100% 9.00 103.38 930.42 100%
02.13.03 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 9.00 17.63 158.67 100% 9.00 17.63 158.67 100%
02.14 VIDRIOS, CRISTALES Y SIMILARES
02.14.01 VIDRIO SEMI DOBLE. PROVISION Y COLOCACION EN VENTANAS FIERRO P2 1,154.01 7.01 8,089.61 100% 1,154.01 7.01 8,089.61 100%
02.15 PINTURA
02.15.01 PINTURA EN EXTERIORES INTERIORES C/LATEX SUPERMATE M2 1,515.73 8.81 13,353.58 100% 1,515.73 8.81 13,353.58 100%
02.15.02 PINTADO DE CIELO RASO C/LATEX M2 1,046.25 9.30 9,730.13 100% 1,046.25 9.30 9,730.13 100%
02.15.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA M2 47.75 12.68 605.47 100% 47.75 12.68 605.47 100%
02.15.04 PINTADO DE VENTANAS METALICAS (2 MANOS ANTIC. + 2 ESMALTE) M2 107.25 4.53 485.84 100% 107.25 4.53 485.84 100%
02.16 VARIOS
02.16.01 JUNTA DE COSTRUCCION CON TEKVOPORT M 18.66 2.43 45.34 100% 18.66 2.43 45.34 100%
02.16.02 TAPAJUNTA METALICA 4 X 3/16" M 34.72 34.00 1,180.48 100% 34.72 34.00 1,180.48 100%
02.16.03 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA A LA COMPRESION) UND 10.00 45.00 450.00 100% 10.00 45.00 450.00 100%
02.16.04 LIMPIEZA GENERAL M2 287.96 1.31 377.23 100% 287.96 1.31 377.23 100%
02.17 SISTEMA DE AGUA DE LLLUVIA
02.17.01 CANALETA DE CALAMINAS GALVANIZADAS M 61.00 50.23 3,064.03 100% 61.00 50.23 3,064.03 100%
02.17.02 TUBERIA PARA AGUAS PLUVIALES PVC SAL 3" M 13.56 13.54 183.60 100% 13.56 13.54 183.60 100%
02.17.03 CODO 90° PVC SAP 3" UND 2.00 12.43 24.86 100% 2.00 12.43 24.86 100%
Valorización 05 Aulas y Escaler 43de75
02.17.04 ABRAZADERA DE 1" DE PLANCHA METALICA CON TUERCAS Y ARANDELAS U ND 30.00 6.48 194.40 100% 30.00 6.48 194.40 100%
02.18 INSTALACIONES ELECTRICAS
02.18.01 SALIDA DE CENTROS DE LUZ PTO 31.00 24.64 763.84 100% 31.00 24.64 763.84 100%
02.18.02 SALIDA DE PARED PARA BRAQUETES PTO 8.00 12.46 99.68 100% 8.00 12.46 99.68 100%
02.18.03 SALIDA PARA INTERRUPTOR PTO 15.00 24.26 363.90 100% 15.00 24.26 363.90 100%
02.18.04 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC PTO 24.00 96.20 2,308.80 100% 24.00 96.20 2,308.80 100%
02.18.05 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA UND 2.00 489.00 978.00 100% 2.00 489.00 978.00 100%
02.18.06 FLOURECENTE RECTO 2 40 WATT INCLUENDO EQUIPO Y PANTALLA EQP 31.00 45.06 1,396.86 100% 31.00 45.06 1,396.86 100%
02.18.07 BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 100W UND 8.00 48.31 386.48 100% 8.00 48.31 386.48 100%
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
PROGRAMADO EJECUTADO
ITM DESCRIPCION
P. UNITARIO P. UNITARIO
UND METRADO P. PARCIAL (S/.) METRADO P. PARCIAL (S/.)
(S/.) (S/.)
% %
04 CONSTRUCCION DE AMBIENTES ADMINISTRATIVOS
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL M2 130.56 0.66 86.17 100% 130.56 0.66 86.17 100%
04.01.02 TRAZO Y REPLANTEO M2 130.56 2.24 292.45 100% 130.56 2.24 292.45 100%
04.02 MOVIMIENTO DE TIERRAS
04.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 130.56 2.55 332.93 100% 130.56 2.55 332.93 100%
04.02.02 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUNDIDAD M3 133.77 24.36 3,258.64 100% 133.77 24.36 3258.64 100%
04.02.03 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NORMAL M3 18.93 13.13 248.55 100% 18.93 13.13 248.55 100%
04.02.04 RELLENO CON MATERIAL PROPIO M3 54.33 16.65 904.59 100% 54.33 16.65 904.59 100%
04.02.05 ELIMINACION MATERIAL EXCEDENTE M3 122.93 6.56 806.42 100% 122.93 6.56 806.42 100%
04.03 CONCRETO SIMPLE
04.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 63.70 89.39 5,694.14 100% 63.70 89.39 5694.14 100%
04.03.02 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMIGON) M3 14.70 170.48 2,506.06 100% 14.70 170.48 2506.06 100%
04.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT M2 15.68 24.75 388.08 100% 15.68 24.75 388.08 100%
04.03.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. ANCHO=0.25 M3 11.76 225.77 2,655.06 100% 11.76 225.77 2655.06 100%
04.04 CONCRETO ARMADO
04.04.01 ZAPATAS
04.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 31.85 335.04 10,671.02 100% 31.85 335.04 10671.02 100%
04.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 2,842.68 4.68 13,303.74 100% 2,842.68 4.68 13303.74 100%
04.04.02 COLUMNAS
04.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 5.22 413.53 2,158.63 100% 5.22 413.53 2158.63 100%
04.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 60.90 41.04 2,499.34 100% 60.90 41.04 2499.34 100%
04.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 1,028.20 4.44 4,565.21 100% 1,028.20 4.44 4565.21 100%
04.04.03 VIGAS
04.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 16.73 344.40 5,761.81 100% 16.73 344.40 5761.81 100%
04.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 142.96 39.23 5,608.32 100% 142.96 39.23 5608.32 100%
04.04.03.03 ACERO GRADO 60 EN VIGAS KG 3,033.65 4.32 13,105.37 100% 3,033.65 4.32 13105.37 100%
04.04.04 LOSAS ALIGERADAS
04.04.04.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 20.82 336.54 7,006.76 100% 20.82 336.54 7006.76 100%
04.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 229.67 43.46 9,981.46 100% 229.67 43.46 9981.46 100%
Valorizacióm N° 05 Administración 48de75
04.04.04.03 ACERO GRADO 60 EN LOSAS ALIGERADAS KG 602.47 4.36 2,626.77 100% 602.47 4.36 2626.77 100%
04.04.04.04 LADRILLO HUECO DE ARCILLA 25 X 30 X 30 CM. PARA TECHO ALIGERADO UND 1,087.56 1.83 1,990.23 100% 1,087.56 1.83 1990.23 100%
04.05 ALBAÑELERIA
04.05.01 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO - ARENA M2 88.79 61.67 5,475.68 100% 88.79 61.67 5475.68 100%
04.06 COBERTURA
04.06.01 COBERTURA DE TEJA ANDINA TIPO ETERNIT M2 130.56 35.13 4,586.57 100% 130.56 35.13 4586.57 100%
04.06.02 CUMBRERA CON TEJA ANDINA TIPO ETERNIT ML 13.70 83.06 1,137.92 100% 13.70 83.06 1137.92 100%
04.07 REVOQUES, ENLUCIDOS Y MOLDURAS
04.07.01 TARRAJEO EN INTERIORES Y EXTERIORES MESCLA 1:5 E=1.5CM M2 88.79 26.36 2,340.50 100% 88.79 26.36 2340.50 100%
04.07.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA M2 60.90 17.97 1,094.37 100% 60.90 17.97 1094.37 100%
04.07.03 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMENTO - AREN M2 142.96 21.15 3,023.60 100% 142.96 21.15 3023.60 100%
04.07.04 VESTIDURA DE DERRAMES CON MEZCLA 1:5 (CEMENTO - ARENA) ML 68.58 7.46 511.61 100% 68.58 7.46 511.61 100%
04.07.05 TARRAJEO EN CIELORRASO CON C:A - 1:5 E=1.5 CM M2 229.67 43.68 10,031.99 100% 229.67 43.68 10031.99 100%
04.07.06 BRUÑAS ML 215.22 1.68 361.57 100% 215.22 1.68 361.57 100%
04.08 CIELORRASOS
04.08.01 CIELORRASO SUSPENDIDO CON BALDOSAS M2 130.56 32.17 4,200.12 100% 130.56 32.17 4200.12 100%
04.08.02 FRISOS CON BALDOSAS M2 39.17 26.77 1,048.58 100% 39.17 26.77 1048.58 100%
04.08.03 PERFIL METALICO T/"L" 2"X1"X1/16" PARA BALDOSAS M 435.20 5.19 2,258.69 100% 435.20 5.19 2258.69 100%
04.08.04 TEE DE SUSPENSIÓN ALAMBRE GALVANISADO N° 14 + 6 VUELTAS DE PZA 91.00 30.54 2,779.14 100% 91.00 30.54 2779.14 100%
04.09 PISOS Y PAVIMENTOS
04.09.01 NIVELACION Y COMPACTACION DE PISO M2 130.56 2.00 261.12 100% 130.56 2.00 261.12 100%
04.09.02 FALSO PISO DE 4" DE CONCRETO DE 1:10 M2 71.13 13.66 971.64 100% 71.13 13.66 971.64 100%
04.09.03 CONTRAPISO DE 40 MM M2 71.30 24.75 1,764.68 100% 71.30 24.75 1764.68 100%
04.09.04 PISO DE CERAMICO ANTIDESLIZANTE 20 X 20 CM. S/PIEDRA VERDE PA M2 71.13 62.98 4,479.77 100% 71.13 62.98 4479.77 100%
04.09.05 ENCOFRADO Y DESENCOFRADO M2 4.65 46.95 218.32 100% 4.65 46.95 218.32 100%
04.09.06 VEREDA DE CONCRETO DE 4" M2 5.94 53.27 316.42 100% 5.94 53.27 316.42 100%
04.09.07 JUNTAS ASFALTICAS M 21.00 10.51 220.71 100% 21.00 10.51 220.71 100%
04.10 ZOCALOS Y CONTRAZOCALOS
04.10.01 CONTRAZOCALOS DE CERAMICA DE H=10CM M 58.68 28.63 1,680.01 100% 58.68 28.63 1680.01 100%
04.10.02 CONRAZOCALO CEMENTO S/COLOREAR H= 20 CM M 7.53 6.79 51.13 100% 7.53 6.79 51.13 100%
04.11 CARPINTERIA DE MADERA
04.11.01 PUERTAS APANELADAS DE MADERA TORNILLO M2 8.47 236.25 2,001.04 100% 8.47 236.25 2001.04 100%
04.12.01 VENTANA DE FIERRO C/ PERFIL DE 1" X 1/8" + HOJA BAST. "L"3/4" M2 70.36 153.79 10,820.66 100% 70.36 153.79 10820.66 100%
04.13 CERRAJERIA
04.13.01 BISAGRA CAPUCHINA 3" X 3" PZA 18.00 11.72 210.96 100% 18.00 11.72 210.96 100%
04.13.02 CERRADURA DE TRES GOLPES PZA 8.00 103.38 827.04 100% 8.00 103.38 827.04 100%
04.13.03 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 8.00 17.63 141.04 100% 8.00 17.63 141.04 100%
04.14 VIDRIOS, CRISTALES Y SIMILARES
04.14.01 VIDRIO SEMI DOBLE. PROVISION Y COLOCACION EN VENTANAS FIERR P2 515.34 7.01 3,612.53 100% 515.34 7.01 3612.53 100%
04.15 PINTURA
04.15.01 PINTURA EN EXTERIORES INTERIORES C/LATEX SUPERMATE M2 292.65 8.81 2,578.25 100% 292.65 8.81 2578.25 100%
04.15.02 PINTADO CIELORASO C/LATEX M2 229.67 9.30 2,135.93 100% 229.67 9.30 2135.93 100%
04.15.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA M2 8.47 12.68 107.40 100% 8.47 12.68 107.40 100%
04.15.04 PINTADO DE VENTANAS METALICAS (2 MANOS ANTIC. + 2 ESMALTE) M2 51.34 4.53 232.57 100% 51.34 4.53 232.57 100%
04.16 VARIOS
04.16.01 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA A LA COMPRESION) UND 10.00 45.00 450.00 100% 10.00 45.00 450.00 100%
04.16.02 LIMPIEZA GENERAL M2 130.56 1.31 171.03 100% 130.56 1.31 171.03 100%
04.17 SISTEMA DE AGUA DE LLLUVIA
04.17.01 CANALETA DE CALAMINAS GALVANIZADAS M 56.00 50.23 2,812.88 100% 56.00 50.23 2812.88 100%
Valorizacióm N° 05 Administración 49de75
04.17.02 TUBERIA PARA AGUAS PLUVIALES PVC SAL 3" M 23.15 13.54 313.45 100% 23.15 13.54 313.45 100%
04.17.03 CODO DE 90° PVC SAP 3" UND 12.00 12.43 149.16 100% 12.00 12.43 149.16 100%
04.17.04 ABRAZADERA DE 1" DE PLANCHA METALICA CON TUERCAS Y ARANDEL UND 30.00 6.48 194.40 100% 30.00 6.48 194.40 100%
04.18 INSTALACIONES ELECTRICAS
04.18.01 SALIDA DE CENTROS DE LUZ PTO 6.00 24.64 147.84 100% 6.00 24.64 147.84 100%
04.18.02 SALIDA DE PARED PARA BRAQUETES PTO 3.00 12.46 37.38 100% 3.00 12.46 37.38 100%
04.18.03 SALIDA PARA INTERRUPTOR PTO 4.00 24.26 97.04 100% 4.00 24.26 97.04 100%
04.18.04 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC PTO 9.00 96.20 865.80 100% 9.00 96.20 865.80 100%
04.18.05 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA PTO 1.00 489.00 489.00 100% 1.00 489.00 489.00 100%
04.18.06 FLOURECENTE RECTO 2 40 WATT INCLUENDO EQUIPO Y PANTALLA EQP 6.00 45.06 270.36 100% 6.00 45.06 270.36 100%
04.18.06 BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 100W UND 3.00 48.31 144.93 100% 3.00 48.31 144.93 100%
PROGRAMADO EJECUTADO
PROGRAMADO EJECUTADO
PROGRAMADO EJECUCTADO
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
PROGRAMADA EJECUTADA
VALORIZACIÓN DE OBRA N° 05
PROGRAMADO EJECUTADO
VALORIZACIÓN DE OBRA N° 05
PROGRAMADO EJECUTADO
VALORIZACIÓN DE OBRA N° 05
PROGRAMADO EJECUTADO
CODIGO DESCRIPCION UND
METRADO P. UNITARIO (S/.) P. PARCIAL (S/.) %
P. UNITARIO P. PARCIAL
METRADO
(S/.) (S/.)
12 PUERTA DE INGRESO
12.01 TRABAJOS PRELIMINARES
12.01.01 TRAZO Y REPLANTEO M2 2.89 2.24 6.47 100% 2.89 2.24 6.47 100%
12.02 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUND M3 7.91 24.36 192.69 100% 7.91 24.36 192.69 100%
12.02.02 RELLENO CON MATERIAL PROPIO M3 3.94 16.65 65.60 100% 3.94 16.65 65.60 100%
12.02.03 ELIMINACION MATERIAL EXCEDENTE M3 4.97 6.56 32.60 100% 4.97 6.56 32.60 100%
12.03 CONCRETO SIMPLE
12.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 5.95 89.39 531.87 100% 5.95 89.39 531.87 100%
12.04 CONCRETO ARMADO
12.04.01 ZAPATAS
12.04.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 2.98 335.04 998.42 100% 2.98 335.04 998.42 100%
12.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 52.71 4.68 246.68 100% 52.71 4.68 246.68 100%
12.04.02 COLUMNAS
12.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 0.84 413.53 347.37 100% 0.84 413.53 347.37 100%
12.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 12.31 41.04 505.20 100% 12.31 41.04 505.20 100%
12.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 135.40 4.44 601.18 100% 135.40 4.44 601.18 100%
12.04.03 VIGAS
12.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 0.78 344.40 268.63 100% 0.78 344.40 268.63 100%
12.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 7.97 39.23 312.66 100% 7.97 39.23 312.66 100%
12.04.03.03 ACERO GRADO 60 EN VIGAS KG 91.81 4.32 396.62 100% 91.81 4.32 396.62 100%
12.05 REVOQUES, ENLUCIDOS Y MOLDURAS
12.05.01 TARRAJEO EN SUPERFICIE DE COLUMNAS CON CEMENTO - M2 12.31 17.97 221.21 100% 12.31 17.97 221.21 100%
12.05.02 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMEN M2 7.97 21.15 168.57 100% 7.97 21.15 168.57 100%
12.05.03 VESTIDURA DE DERRAMES EN PUERTAS , VENTANAS Y VANO M 14.75 7.68 113.28 100% 14.75 7.68 113.28 100%
12.06 CARPINTERIA METALICA
12.06.01 PUERTA DE INGRESO PERSONAL M2 11.00 220.00 2,420.00 100% 11.00 220.00 2420.00 100%
12.07 CERRAJERIA
12.07.01 CERRADURA DE TRES GOLPES PZA 2.00 103.38 206.76 100% 2.00 103.38 206.76 100%
12.07.02 CANDADO INCLUYENDO ALDABAS UND 2.00 25.00 50.00 100% 2.00 25.00 50.00 100%
12.08 PINTURA
12.08.01 PINTURA ANTICORROSIVO EN CARPINTERIA METALICA M2 11.00 6.35 69.85 100% 11.00 6.35 69.85 100%
12.09 INSTALACIONES ELECTRICAS
12.09.01 SALIDA DE CENTROS DE LUZ PTO 2.00 24.64 49.28 100% 2.00 24.64 49.28 100%
12.09.02 SALIDA DE PARED PARA INTERRUPTOR SIMPLE PTO 1.00 48.53 48.53 100% 1.00 48.53 48.53 100%
12.09.03 FLOURECENTE CIRCULAR 32 WATT (INCL EQUIPO COMPLETO UND 2.00 31.48 62.96 100% 2.00 31.48 62.96 100%
12.09.04 CAJA DE PASE UND 1.00 15.26 15.26 100% 1.00 15.26 15.26 100%
PROGRAMADO EJECUTADA
13 MOBILIARIO
13.01 MOBILIARIO ESCOLAR G LB 1.00 68,009.13 68,009.13 100% 1.00 68,009.13 68009.13 100%
14 MITIGACION AMBIENTAL
14.01 MITIGACION AMBIENTAL GLB 1.00 7,500.00 7,500.00 100% 1.00 7,500.00 7500.00 100%
15 CAPACITACION TECNICO PEDAGOGICO
15.01 CAPACITACION GLB 1.00 2,500.00 2,500.00 100% 1.00 2,500.00 2500.00 100%
16 FLETE TERRESTRE
16.01 FLETE TERRESTRE GLB 1.00 35,250.00 35,250.00 100% 1.00 35,250.00 35250.00 100%
Ing° GABRIEL
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
ALFONSO
: GUZMAN
RESIDENTE DE OBRA MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 S/. 259,941.27 (SIN IGV) FECHA : AGOSTO DE 2018.
MONTO ADELANTO MAT : S/. 613,461.40 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
1 OBRAS EXTERIORES 187,176.71 187,176.71 100% 0.00 0.00 187,176.71 100.00 0.00 0.00%
2 AULAS Y ESCALERA 594,974.69 594,974.69 100% 0.00 0.00 594,974.69 100.00 0.00 0.00%
3 AUDIDTORIO Y CENTRO COMPUTO 373,086.38 373,086.38 100% 0.00 0.00 373,086.38 100.00 0.00 0.00%
4 AMB ADMINISTRATIVOS 174,076.58 174,076.58 100% 0.00 0.00 174,076.58 100.00 0.00 0.00%
5 COCINA COMEDOR 184,909.43 184,909.43 100% 0.00 0.00 184,909.43 100.00 0.00 0.00%
6 SS.HH. N IÑOS Y NIÑAS 102,692.82 102,692.82 100% 0.00 0.00 102,692.82 100.00 0.00 0.00%
7 SS.HH. ADMINISTRCION 53,554.99 0.00 0% 0.00 0.00 0.00 0.00 53,554.99 100.00%
8 PATIO FORMACION 118,460.67 118,460.67 100% 0.00 0.00 118,460.67 100.00 0.00 0.00%
9 LOSA DEPORTIVA 251,048.94 251,048.94 100% 0.00 0.00 251,048.94 100.00 0.00 0.00%
10 CISTERNA TANQUE ALTO 51,134.12 51,134.12 100% 0.00 0.00 51,134.12 100.00 0.00 0.00%
11 CERCO PERIMENTRICO 150,796.85 150,796.85 100% 0.00 0.00 150,796.85 100.00 0.00 0.00%
12 PUERTA DE INGRESO 7,931.69 7,931.69 100% 0.00 0.00 7,931.69 100.00 0.00 0.00%
13 MOB, MA, CAPACITC Y FLET 113,259.13 113,259.13 100% 0.00 0.00 113,259.13 1.00 0.00 0.00%
COSTO DIRECTO 2,363,103.00 2,309,548.01 97.73 0.00 0.00 2,309,548.01 97.73 53,554.99 2.27
GASTOS GENERALES 5% 118,154.86 115,477.40 0.00 115,477.40 2,677.75
UTILIDAD 5% 118,154.85 115,477.40 0.00 115,477.40 2,677.75
SUB TOTAL 2,599,412.71 2,540,502.81 0.00 2,540,502.81 58,910.49
IGV 18% 467,894.29 457,290.50 0.00 457,290.50 10,603.89
PRESUPUESTO BASE 3,067,307.00 2,997,793.31 97.73 0.00 0.00 2,997,793.31 97.73% 69,514.38 2.27%
NOTA:
EJECUTADO SALDO
ITM DESCRIPCION
PARCIAL % PARCIAL %
VALORIZACIÓN DE OBRA N° 05
( Del 01/11/2017 al 30/11/2017 )
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE
SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 30 NOVIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
AVANCES
1 OBRAS EXTERIORES 187,176.71 184,215.67 98.42 2,961.04 1.58 187,176.71 100.00 0.00 0.00
2 AULAS Y ESCALERA 594,974.69 539,396.45 90.66 55,578.24 9.34 594,974.69 100.00 0.00 0.00
3 AUDIDTORIO Y CENTRO COMPUTO 373,086.38 332,412.59 89.10 40,673.80 10.90 373,086.38 100.00 0.00 0.00
4 AMB ADMINISTRATIVOS 174,076.58 148,731.00 85.44 25,345.58 14.56 174,076.58 100.00 0.00 0.00
5 COCINA COMEDOR 184,909.43 151,059.46 81.69 33,849.97 18.31 184,909.43 100.00 0.00 0.00
6 SS.HH. N IÑOS Y NIÑAS 102,692.82 78,070.90 76.02 24,621.92 23.98 102,692.82 100.00 0.00 0.00
7 SS.HH. ADMINISTRCION 53,554.99 0.00 0.00 0.00 0.00 0.00 0.00 53,554.99 100.00
8 PATIO FORMACION 118,460.67 51,263.55 43.27 67,197.12 56.73 118,460.67 100.00 0.00 0.00
9 LOSA DEPORTIVA 251,048.94 126,400.65 50.35 124,648.29 49.65 251,048.94 100.00 0.00 0.00
10 CISTERNA TANQUE ALTO 51,134.12 45,021.36 88.05 6,112.76 11.95 51,134.12 100.00 0.00 0.00
11 CERCO PERIMENTRICO 150,796.85 150,796.85 100.00 0.00 0.00 150,796.85 100.00 0.00 0.00
12 PUERTA DE INGRESO 7,931.69 5,957.99 75.12 1,973.70 24.88 7,931.69 100.00 0.00 0.00
13 MOB, MA, CAPACITC Y FLET 113,259.13 21,150.00 18.67 14,100.00 12.45 35,250.00 31.12 78,009.13 68.88
COSTO DIRECTO 2,363,103.00 1,834,476.47 77.63 397,001.22 16.80 2,231,477.68 94.43 131,625.32 5.57
GASTOS GENERALES 5% 118,154.86 91,723.82 19,850.06 111,573.88 6,580.98
UTILIDAD 5% 118,154.85 91,723.82 19,850.06 111,573.88 6,580.97
SUB TOTAL 2,599,412.71 2,017,924.11 436,701.34 2,454,625.44 144,787.27
IGV 18% 467,894.29 363,226.33 78,606.24 441,832.57 26,061.72
PRESUPUESTO BASE 3,067,307.00 2,381,150.44 77.63 515,307.58 16.80 2,896,458.01 94.43 170,848.99 5.57
Ing° GABRIEL
CONTRATISTA : CONSORCIO NUEVA ESPERANZ: CONSORCIO BRYA FECHA DE INICO DE OBRA
ALFONSO
: GUZMAN
RESIDENTE DE OBRA MANRIQUE : Ingº.SAMUEL AYALA TINEO PLAZO
PRESUPUESTO BASE : ### ### (SIN IGV) FECHA TERMINO DE OBRA
MONTO DEL CONTRATO : ### ### (SIN IGV)
MONT ADELANT DIRECTO : ### S/. 259,941.27 (SIN IGV) FECHA
MONTO ADELANTO MAT : ### (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION
EJECUTADO
NOTA:
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO
CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ingº. GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONTO ADELANTO DIR : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 13 JUNIO 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
AVANCES
P. ACUMULADO
CODIGO DESCRIPCION UND METRADO UNITARIO P. PARCIAL (S/.)
(S/.) MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
13/07 AL 31/07 01/08 AL 31/08 01/09 AL 30/09 01/10 AL 31/10 01/11 AL 30/11 01/12 AL 31/12 METRADO
|
1 OBRAS EXTERIORES 0.00
2 06 AULAS 0.00
3 AUD Y CC 0.00
4 AMB ADMINISTRATIVOS 0.00
5 COCINA COMEDOR 0.00
6 SS.HH. N IÑOS Y NIÑAS 0.00
7 SS.HH. ADMINISTRCION 0.00
8 PATIO FORMACION 0.00
9 LOSA DEPORTIVA 0.00
10 CISTERNA TANQUE ALTO 0.00
11 CERCO PERIMENTRICO 0.00
12 PUERTA DE INGRESO 0.00
13 MOB, MA, CAPACITC Y FLET 0.00
COSTO DIRECTO 0.46
GASTOS GENERALES 5% 5% -0.30
UTILIDAD 5% 5% -0.30
SUB TOTAL -0.14
IGV 18% 18% -0.02
PRESUPUESTO BASE -0.16