HEP/QSF/IECS/506 INSPECTION SITE REPORT ON PROJECTS

M/S QCSM, KARAMCODE, KOLLAM Time By Rajes Project QCSM, KARAMCODE


Date 15.08.2020 Chd CIBI Pr. Code
PROJECT PLANNING-BAR CHART Client QCSM Apd Saju REPORT SL.NO. 2
ORIGINAL TENDER -25536 spindles Existing Scope of Instalation - 7296 spindles
Tentaive date
% of stage Progress so far Steps to be taken to
Sl.No Commodity/Activity/ Description of 100%
completed achieved achieve the target
Qty Unit Rate Amount Qty Unit Rate Amount cmpletion
1.0 Site Surveyed & 80% Raw Materials
1) 11kV outdoor Four Pole Structure with C 1 275000 2,75,000 1 - 2,75,000 2,75,000 45%
Levelled Received
Site Cleaned and
2) .Concrete footings (1:3:6) of size 450 x 4 1 88000 88,000 1 - 88,000 88,000 75%
removed debries
ER Vale taken and
3) Earthing a) The earthling of the structure 1 11000 11,000 1 - 11,000 11,000 75%
Satisfied
3 Installation Testing and Commissioning of 2 55000 1,10,000 0 - 55,000 -
4 APFC PANEL :- Refer IS-16636-2017 .
Panel Components Ordered @
Supply and provide 400 kVAR APFC Pane 4 880000 35,20,000 1 - 8,80,000 8,80,000 55% Manufacturing L&T and waiting for
Completed receipt
b).Installation, Testing and
commissioning of 400 kVAR/250KVAR 4 16500 66,000 1 - 16,500 16,500 15% Trench Arranged to Install
APFC Panel. the Panels
5 Demolition of existing COSB01,02 and 03 . 0 - - -
1). Transferring of all the existing connectio 1 55000 55,000 1 - 55,000 -
6 Main Switch Board
Panel Components Ordered @
Fabricate and supply 2500A LT/MV panel 1 4730000 47,30,000 1 - 29,54,200 29,54,200 55% Manufacturing L&T and waiting for
Completed receipt in 10 Days
7 Fabrication and, supply of LT/MV panel bo .
Panel Components Ordered @
SMSB-1 1 297000 2,97,000 1 - 2,97,000 2,97,000 55% Manufacturing L&T and waiting for
Completed receipt in 10 Days
Panel Components Ordered @
SMSB-2 1 247500 2,47,500 1 - 2,47,500 2,47,500 55% Manufacturing L&T and waiting for
Completed receipt in 10 Days
Panel Components Ordered @
SMSB-3 1 280500 2,80,500 1 - 2,80,500 2,80,500 55% Manufacturing L&T and waiting for
Completed receipt in 10 Days
Panel Components Ordered @
SSB-5 1 396000 3,96,000 1 - 3,96,000 3,96,000 55% Manufacturing L&T and waiting for
Completed receipt in 10 Days
Panel Components Ordered @
SSB-6 1 396000 3,96,000 1 - 3,96,000 3,96,000 55% Manufacturing L&T and waiting for
Completed receipt in 10 Days
HEP/QSF/IECS/506 INSPECTION SITE REPORT ON PROJECTS
M/S QCSM, KARAMCODE, KOLLAM Time By Rajes Project QCSM, KARAMCODE
Date 15.08.2020 Chd CIBI Pr. Code
PROJECT PLANNING-BAR CHART Client QCSM Apd Saju REPORT SL.NO. 2
ORIGINAL TENDER -25536 spindles Existing Scope of Instalation - 7296 spindles
Tentaive date
% of stage Progress so far Steps to be taken to
Sl.No Commodity/Activity/ Description of 100%
completed achieved achieve the target
Qty Unit Rate Amount Qty Unit Rate Amount cmpletion

8 Trench Arranged to Install


Erection, testing and commissioning of swi 19 14850 2,82,150 6 - 14,850 89,100 15%
the Panels
9 HT CABLE: .
1 R X 3 core x 185 sq mm cable from the
Existing Cables Checked
new HT structure consumer side to HT 20 1012 25,300 20 - 1,012 -
OK and to be Used
VCB Panel incomer
Note: Use the newly laid HT cable after pro .
2 R X 3 core x 185 sq mm aluminum,
XLPE, Armored cable from HT VCB Existing Cables Checked
50 2420 1,21,000 50 - 2,420 -
Panel outgoing circuit 1 & 2 to 1600kVA OK and to be Used
Transformers 1 & 2 ( Primary Side).
Note : For the Phase-1 operation we are u .
10 MV CABLE FROM MSB TO VARIOUS SM .
3.5 core 4 X 400 sq mm LT cable 1.1KV Existing Cables Checked
405 6480 26,24,400 405 - 6,480 -
XLPE Armored OK and to be Used
1 X 3.5 core X 95 sq mm LT cable 1.1KV X 25 396 9,900 25 - 396 -
11 MV CABLE FROM SMSBs TO SSBs 1,2,3 .
3.5 core 2 x 400 sq mm LT aluminum Existing Cables Checked
270 3240 8,74,800 270 - 3,240 -
cable 1.1KV XLPE Armored OK and to be Used

3.5 core 240 sq mm LT aluminum cable Existing Cables Checked


100 935 93,500 100 - 935 -
1.1KV XLPE Armoured OK and to be Used

3.5 core 70 sq mm LT aluminum cable Existing Cables Checked


50 374 18,700 50 - 374 -
1.1KV XLPE Armoured OK and to be Used

3.5 core 3 x 400 sq mm LT cable 1.1KV Existing Cables Checked


30 4860 1,45,800 30 - 4,860 -
XLPE Armoured OK and to be Used

3.5 core 25 sq mm LT aluminum cable Existing Cables Checked


25 176 4,400 25 - 176 -
1.1KV XLPE Armoured OK and to be Used
12 LT CABLE FROM SSBs TO the correspon .
4 core 10 sq mm Copper XLPE insulated & 1 - 0 - - -
4 core 6 sq mm copper 1 - 0 - - -
HEP/QSF/IECS/506 INSPECTION SITE REPORT ON PROJECTS
M/S QCSM, KARAMCODE, KOLLAM Time By Rajes Project QCSM, KARAMCODE
Date 15.08.2020 Chd CIBI Pr. Code
PROJECT PLANNING-BAR CHART Client QCSM Apd Saju REPORT SL.NO. 2
ORIGINAL TENDER -25536 spindles Existing Scope of Instalation - 7296 spindles
Tentaive date
% of stage Progress so far Steps to be taken to
Sl.No Commodity/Activity/ Description of 100%
completed achieved achieve the target
Qty Unit Rate Amount Qty Unit Rate Amount cmpletion

4 core 25 sq mm copper 1 - 0 - - -
4 core 4 sq mm copper 1 - 0 - - -
4 core 16 sq mm copper 1 - 0 - - -
4 core 50 sq mm copper 1 - 0 - - -
2 core 4 sq mm copper 1 - 0 - - -
1 - 0 - - -
13 Approximate cost of cables 11.1 to 11.7
105 681 71,500 40 - 681 27,240
14 1) Supply of 1.5mLx1m B Cast Iron cheque 133 3960 5,26,680 13 - 3,960 51,480
2) Fitting charges of 6mm thick chequer in 133 800 1,06,400 23 - 800 18,400
15 END & CORE TERMINATION-HT CABLE . 0 - - -
185 sq mm 6 3850 23,100 0 - 3,850 -
16 STRAIGHT JOINT FOR LT CABLE 0 - - -
Supply and making straight through joint fo .
185 sq mm 2 7700 15,400 2 - 7,700 15,400
17 EARTHING . -
Arranged Materials and
Supply and providing plate earthing as per 6 16500 99,000 6 - 16,500 99,000 50% waiting for Machinery
Erection at site
Arranged Materials and
Supply and providing pipe earthling as per 3 11000 33,000 3 - 11,000 33,000 50% waiting for Machinery
Erection at site
18 Supply and providing the following sizes of . 0 - - -
450x450x10 mm cast iron gully trap with co 6 7700 46,200 6 - 7,700 46,200
300x300x10mm cast iron gully trap with co 5 5500 27,500 5 - 5,500 27,500
19 Supply and providing test joint for the earth . 0 - - -
Arranged Materials and
2x25x6mm tinned copper strip 6 3080 18,480 6 - 3,080 18,480 50% waiting for Machinery
Erection at site
Arranged Materials and
2x25x3mm tinned copper strip 4 1540 6,160 4 - 1,540 6,160 50% waiting for Machinery
Erection at site
20 Supply and providing earth lead from the te 4 1540 6,160 0 - 1,540 -
25x6mm copper strip tinned at the point of 50 1540 77,000 50 - 1,540 77,000
4.00 mm bare copper conductor (SWG) 50 253 12,650 50 - 253 12,650
21 Supply and laying strips of the following siz . 0 - - -
HEP/QSF/IECS/506 INSPECTION SITE REPORT ON PROJECTS
M/S QCSM, KARAMCODE, KOLLAM Time By Rajes Project QCSM, KARAMCODE
Date 15.08.2020 Chd CIBI Pr. Code
PROJECT PLANNING-BAR CHART Client QCSM Apd Saju REPORT SL.NO. 2
ORIGINAL TENDER -25536 spindles Existing Scope of Instalation - 7296 spindles
Tentaive date
% of stage Progress so far Steps to be taken to
Sl.No Commodity/Activity/ Description of 100%
completed achieved achieve the target
Qty Unit Rate Amount Qty Unit Rate Amount cmpletion
Arranged Materials and
25x3mm copper strip tinned at the point of 300 770 2,31,000 50 - 770 38,500 50% waiting for Machinery
Erection at site
Arranged Materials and
25x 6mm copper strip tinned at the point of 150 1650 2,47,500 150 - 1,650 2,47,500 50% waiting for Machinery
Erection at site
Arranged Materials and
3.15 mm copper conductor (10 SWG) 150 99 14,850 150 - 99 14,850 50% waiting for Machinery
Erection at site
Supply and laying the following sizes of str . 0 - - -
25x 6 mm copper strip tinned at the point o 350 1540 5,39,000 0 - 1,540 -
Arranged Materials and
4.00 mm copper conductor ( 8 SWG) 50 143 7,150 50 - 143 7,150 50% waiting for Machinery
Erection at site
22 MISCELLANEOUS . - - -
Supply and placing 2.5 mm thick and 1m w 20 1320 26,400 2 - 1,320 2,640
Supply and placing 2.5 mm thick and 1m w 100 1100 1,10,000 30 - 1,100 33,000
Supply and providing First Aid Chart duly f 15 1100 16,500 5 - 1,100 5,500
Supply route marker with 10 cm x 10 cm G 5 253 1,265 5 - 253 1,265
Supply and providing 5 Kg Dry chemical po 10 2750 27,500 4 - 2,750 11,000
Supply and providing 9 liter capacity GI fire 5 2530 12,650 3 - 2,530 7,590
23 LIGHTING .
Collected Materials and
1).Supply and wiring of three runs of 1.5 sq 88 1958 1,72,304 58 - 1,958 1,13,564 waiting for False Ceiling
Works at site
Collected Materials and
2). Supply and wiring of two runs of 2.5 squ 20 2970 59,400 10 - 2,970 29,700 waiting for False Ceiling
Works at site
24 Collected Materials and
Renovation of LT wiring in the Plant Area, 1 60000 60,000 1 - 60,000 60,000 waiting for False Ceiling
Works at site
25 PART - KSEB/KSEI CHARGES .
Proposal Waiting for Initial
Charges for preparing the electrical schem 1 60000 60,000 1 - 60,000 60,000 50%
Submitted KSEI Approval ffrom KSEI.
Total Value of the Electrical Workorder Awarded: 173,26,699 - 69,95,569
26 2500A Bus ducts of about 50m total length 2 6,50,000 13,00,000 -
HEP/QSF/IECS/506 INSPECTION SITE REPORT ON PROJECTS
M/S QCSM, KARAMCODE, KOLLAM Time By Rajes Project QCSM, KARAMCODE
Date 15.08.2020 Chd CIBI Pr. Code
PROJECT PLANNING-BAR CHART Client QCSM Apd Saju REPORT SL.NO. 2
ORIGINAL TENDER -25536 spindles Existing Scope of Instalation - 7296 spindles
Tentaive date
% of stage Progress so far Steps to be taken to
Sl.No Commodity/Activity/ Description of 100%
completed achieved achieve the target
Qty Unit Rate Amount Qty Unit Rate Amount cmpletion

27 HT VCB Panel, having rupturing capacity o 1 17,00,000 17,00,000 -


28 L & T Panels - SSB No. 1 to No. 11 Panels 13 16,00,000 16,00,000
2816.00
Project Terms &Conditions *
* May include the liquidated damages for delay in delivery/completion period or incentives for early completion.

Signature Signature
N Prepared
fM Approved N f Remarks

MD
Date Date