Sie sind auf Seite 1von 25

ATG Content Administration Best Practices

ATG COMMERCE 9
P&T Engineering HOW TO : CA Concepts and Best Practices 9.0

CA Best Practices 9.0


Authors:
Emmanuel Parasirakis
Pepper Mint
Senior Software Developers - ATG

• CA Best Practices 9.0


• Purpose
• Chapter 1 - Understanding the Core CA Components
• ° Publishing Repository
° Version Manager
° Workflow Engine
° Deployment Server

• Chapter 2 - Projects and Workflows


• ° Content Administration Workflow
° - Production-Only CA Workflow
- - Author
- Content Review
- Deployment Approval
- Deployment
- Deployment Verification
- Revert Deployment
- Staging and Production CA Workflow
• Chapter 3 - VersionManager, VersionRepositories, and VersionFileSystems
• ° Branches
° Workspaces
° Snapshots
° VersionRepository
° VersionFileSystem

• Chapter 4 - Deployment
• ° Full Deployments
° One-Off Deployment Targets

• Part II - Implementation
• Chapter 5 - Planning a CA Implementation
• ° Where to Start
° Development Environment
° Requirements Gathering
° The Content
° Importing the Data
° - Using an Import Workflow for Automatic Imports
° Versioned Repositories and File Systems
° - Managing Automated Edits with User Edits - Catalog Structure
- VersionManager API
° Deployment
° - Asset Locks
- Asset Conflicts
- Asset Conflict Resolution
- Project Dependency Check
- Online vs Switched Deployments
- DAF Deployment
- DAF Deployment Scalability and Failover
- DAF Deployment Configuration
• Appendix
• ° Appendix A - Checklist for Starting a Content Administration Implementation

Page 1
Purpose
The purpose of this document is to familiarize those planning on an ATG Content Administration
implementation with key concepts around CA and best practices for a CA implementation. This document
is meant to assist in guiding planning, design, development, and testing of a CA implementation. It aims
to guide developers through the common tasks that all CA implementers face. It also attempts to help
developers avoid potential errors in their implementations.

Chapter 1 - Understanding the Core CA


Components
ATG Content Administration's (CA) main function is to move the latest version of data from the CA
server to a production server that has been marked for deployment. On the CA side, there are 4 main
components which work together to provide all the functionality. These components are:

• PublishingRepository: Stores information about projects and workspaces.


• VersionManager/VersionRepository/VersionFileSystem components: Manage all the versions of all
the assets. These components work in conjunction with one another.
• Workflow Engine: Manages the flow of each project through a workflow.
• DeploymentServer: Manages the asset deployment process for each project.

Publishing Repository
The PublishingRepository contains all the project and workflow instance data. When a project is created,
a new process and project object are instantiated and stored into the repository. The process item
references the project item. In most workflows, the process/project distinction is invisible and we just
refer to "the project" to describe both, but we still use separate process and project objects in the
implementation. In addition, there are several supporting repository items which may get associated
with the project. These include history items, deployment information, and workflow task information.
In addition, this repository contains all the data which is operated on via the workflow engine. The main
workflow item descriptor type is individualWorkflow. In CA, the PublishingRepository is found at /atg/
epub/PublishingRepository. However, throughout CA we use the secure version of this repository
which is found at /atg/epub/SecuredPublishingRepository.

Version Manager
The VersionManager component serves as the manager of all versioned repositories, workspaces,
and snapshots, along with the main branch. The VersionManager works in conjunction with other
components, such as VersionRepository and VersionFile Systems, to manage assets. VersionRepository
components are used by VersionManager to manage all non-file asset versions which its repository
definition files define and VersionFileSystems are used to manage versioned file assets. Typically you
will have one VersionManager and one or more VersionRepositories and/or VersionFileSystems. In CA,
the VersionManager component is found at /atg/epub/version/VersionManagerService. Within its
properties file you will find a listing of VersionRepositories and/or VersionFileSystems.

Workflow Engine
The workflow engine manages aspects of the project within the workflow, including the workflow's
state and any associated activities. When a project is created, the workflow which that project will use
is specified and a workflow instance is created. The workflow instance information contains the state
within the workflow that the current project is in. All workflows have a subject, and in CA, the subject
is always a process repository item. Remember that a process and project are created and a process
references a project. The workflow engine component is found at /atg/epub/workflow/process/
WorkflowProcessManager.

Page 2
Deployment Server
The DeploymentServer is the core component which executes all workflow functions requiring
deployment. In 2006.3 and later, this component farms out the actual deployment of the data to a non-
CA-specific deployment component called the DeploymentManager which is found in the DAF layer.
The DeploymentServer manages targets, connections to agents, and executes all the functionality
related to asset merging and branch management. The deployment server is found at /atg/epub/
DeploymentServer. The DeploymentManager is found at /atg/deployment/DeploymentManager.

All the components described above work in conjunction with one another to provide CA's functionality. In
the upcoming chapters we will discuss the relationship between all these components and how they work
with one another. After that we will describe how to design and build a CA system.

Chapter 2 - Projects and Workflows


Before proceeding with this document, it is assumed that the user understands all the basic workflow
constructs such as tasks, outcomes, actions, forks, events, conditions, etc. If not, see the Content
Administration Programming Guide, Chapter 9, Adapting Workflows to Content Management Projects.

One of the key concepts in CA is the project. The purpose of a project is to associate groups of changes
that have some relationship to one another. Sometimes the relationship is explicit, other times it is not,
other times it may be just because the user wants the changes grouped together. The project is basically
the checkin unit of the CA versioning system. A project also defines a unit of deployment. This is a set
of changes that will be deployed to the target servers at the same time. Targets are covered later in this
document, but in short a target is a system that receives data during a deployment.

When a project is created, two additional things happen: a workspace is created and a workflow is
instantiated. A workspace is a versioning construct and will be covered in the next chapter. A workflow is
the predefined steps the project must go through in order to modify and deploy assets to the production
site. When installing and configuring CA, you may provide the option for creating a number of different
type projects. Each type of project has an workflow associated with it and is therefore the workflow is
specified by selecting a link on the BCC home page which creates a new project. When a workflow is
instantiated it will be in the initial task. When a user selects an outcome for that task, the workflow will
move to the next task executing any actions along the selected branch. One way to think about it is that
the project is the subject of the workflow.

Internally, a project actually consists of two objects, a process object and a project object. The process
has a property which is a reference to a project object. This separates out the high-level workflow
(process) from the checkin and deployment unit (project). In most ATG products (including the base
Content Administration install) the process and project move in tandem and are largely indistinguishable,
but we retain the distinction for flexibility. Knowing this, it is actually the process object that is the
subject of the workflow, but we use the term "project" to refer to these two objects collectively.

Content Administration Workflow


The workflow which ships with ATG CA is the following:
/Content Administration/CA.wdl

In the BCC this workflow shows up as "Content Administration Project". It is used by both the process
and the project objects. This workflow guides a particular process/project through the authoring stage,
past review, to deployment to both the staging and production systems, and then to approval and
checkin.

You should generally not modify any part of this workflow starting with the deployment stages, as this is
complex and the source of many problems that ATG customers have. It is fairly straightforward to add
author or review stages. Also, deployment stages can be added, but should be treated as a complete
package and modeled on the staging or production deployment workflow sections. Any modification
should be done in consultation with ATG Services or Support. It is very easy to alter the workflow in a
way that subtly breaks Content Administration, for example by causing data integrity problems or failing
to release asset locks.

Page 3
The CA workflow is known as a "late" workflow, because it checks in the assets after they have been
deployed to all the targets. Prior to 9.0, it was possible to have "early" workflows, where the assets
were checked in prior to deployment. Due to simplification and performance work in 9.0, only the late
CA workflow is supported, and early staged workflows will not work in 9.0 and later. Late workflows are
powerful because they give the user full control over deployments to each target, and allow you to test
changes by deploying to a staging system prior to checkin.

There are two versions of the CA workflow. Content Administration ships with a workflow that only
deploys to a production system. This is useful in development environments, where "production" is
actually a development test server. We include an additional version of the CA workflow that deploys to
a staging server prior to deploying to production. To run with this workflow, include "-layer staging" in
the Content Administration startup. The rest of this section will primarily focus on the production-only
workflow, followed by a description of the changes in the staging and production workflow

Production-Only CA Workflow

The production-only CA workflow includes these tasks or stages: author, content review, deployment
approval, deployment, and deployment verification, and revert deployment. Following is a closer look at
each of these.

Author

The author stage is where any actual editing takes place. Once a user is finished editing (or they want
to deploy to a staging server to test their changes) they choose the review outcome. At that point,
the assets and project are set to not be editable (though they can still be edited in other projects) and
a check for asset conflicts is performed. In order to allow the user to fully discard the changes in the
project, the delete outcome is included in the workflow. Various stages later in the workflow have the
potential to return the workflow to author stage, in order to make further changes.

Content Review

During the review stage, a content reviewer (typically not the same as the author) reviews the changes
on the CA server or a preview server using the CA Preview capabilities. If they approve the changes, the
workflow moves forward to deployment. If the changes are rejected, the workflow returns to the author
stage. The project can also be deleted at this stage.

Deployment Approval

Page 4
If the approve and deploy outcome is chosen, the project will immediately be deployed to the target in
question (in this example, "MyProductionTarget"). In other words, the workflow will advance to the next
stage, locks will be created for the assets in the project, and the deployment system will be notified to
start the deployment. Note that the deployment attempted here is an incremental deployment. If the
target is in an unknown state and a full deployment is required, the CA server will throw deployment
errors if an incremental deployment is requested. If the target is in such a state, chose the approve
outcome and run a full deployment from the Admin Console.

If the approve outcome is chosen, the deployment will not be kicked off at this time, and must be started
or scheduled via the Admin Console in the BCC. However, the workflow will advance to the next stage,
and wait there for the deployment to finish.

If the deployment is rejected, any asset locks will be unlocked, and the workflow will return to the author
stage. Note that on the first run through of the workflow, there will be no assets locked when entering the
author state. Assets are locked whenever a deployment occurs. However, if we are at this stage due to an
earlier revert, there will be locked assets which must be unlocked before editing.

Deployment

This stage of the workflow is not a task, where outcomes are chosen by a user. Instead, the workflow
waits for the deployment to complete. Once the deployment complete event has been received, if the
deployment was successful the workflow moves forward to verification. If the deployment had errors, the
workflow returns to the deployment approval stage for another attempt, or so it can be returned to the
author stage for editing.

Deployment Verification

At this point in the workflow, it is expected that the user will check their deployment target to ensure
that the data is showing up as expected and there are no errors. Once they have taken a look, the user
can choose to either accept the successful deployment as permanent or revert the changes, possibly to
reauthor them.

Page 5
If the deployment is accepted, the workflow double-checks that the project has been deployed, and then
checks in the data edited in the project. The data is saved to the main line and will be visible throughout
CA and in any new projects started after this point. Also, checkin releases any asset locks for assets in
this project.

If the deployment is rejected, a revert deployment is immediately kicked off and the workflow moves to
the revert deployment stage. The revert deployment will incrementally undo the changes from the earlier
forward deployment.

Revert Deployment

Much like the deployment stage above, this workflow stage starts by waiting for the revert deployment to
complete. If the revert deployment completes successfully, the workflow returns to the author stage, so
that further changes can be made, hopefully fixing the problems that showed up after deployment.

If the revert deployment fails, the workflow is returned to the verify stage, where the project can be
checked in or the revert can be attempted once more.

Staging and Production CA Workflow

If you run Content Administration with the "-layer staging" argument, you see a workflow that includes
a staging deployment prior to the production deployment. The staging and production deployments are
sequential: staging must be successfully deployed before we deploy to production. In the other direction,
a production deployment must be reverted before a staging deployment can be reverted, and both must
be reverted before editing (author stage) can occur again. Checkin only occurs after both staging and
production have been successfully deployed.

The additional steps in the staging layer CA workflow are largely identical to the above deployment
approval, deployment, deployment verification, and revert deployment stages. Here they are:

Page 6
Note that the project is not checked in and the process is not closed once the staging deployment has
been verified. These steps do not happen until a matching production deployment has been verified, and
so remain at the end of the overall workflow.

Also, note that now reverting or rejecting a staging deployment returns to the author stage, much like
reverting from production in the production-only workflow. However, now reverting from production does
not return the workflow to authoring, but rather returns to the verify staging phase, so that staging can
be reverted or production can be re-deployed.

There is a pattern in this workflow. In general, you only return to an earlier stage by undoing the
actions at the current stage. Starting in 9.0, Content Administration generally requires that a particular
deployment action (say, deploying to production) must be undone before the previous action (say, deploy
to staging) can be re-done or undone. Deployments are run sequentially, and are unrolled in this manner
to preserve data integrity. For example, if we are deploying to production, then we know that the staging
server has the correct data. More importantly, if we are checking in, then we know that staging and
production have the deployed data. This is necessary to maintain data integrity on the target systems.

Finally, it is important to understand that CA will lock all assets in the project prior to deployment to the
staging server. The locks will be held until the workflow is either moved back to the author state, or the
assets are checked in after deployment to the production target. During the time that the assets are
locked, any other projects that contain an asset that is in this project will be unable to lock those same
assets or deploy them.

Chapter 3 - VersionManager,
VersionRepositories, and VersionFileSystems
The VersionManager is the component responsible for managing all the containers which manage
versioned assets. This includes VersionRepositories and VersionFileSystems. The VersionManager also
provides the API for accessing versioning information about assets. Finally, the VersionManager provides
the constructs which make asset management and deployment possible. These constructs are branches,
workspaces, and snapshots.

Page 7
Branches
The basic concept of a branch is that it tracks every asset. Branches are the equivalent of lines in other
versioning systems. In VersionRepositories and VersionFileSystems there is always a branch which is
referred to as "main". The main branch contains all the assets that have been checked in. Every asset on
every branch has one and only one head. The head asset on the main branch is the last version of the
asset to be checked in.

Previous to Content Administration 9.0, branches were also used to track data on each target. However,
in 9.0 this usage was eliminated to speed up performance and enhance reliability, meaning that 9.0 and
later versioned repositories have a single "main" branch.

Workspaces
A workspace is a construct which manages a set of assets being created or modified. Only the assets that
are being modified are added to the workspace. When a asset is added to a workspace (checked out), a
separate copy is created in the workspace, based on the current head copy in the main branch. When the
workspace is checked in (another way of saying all the assets in the project being checked in), the assets
are put onto the main branch, and these new assets become the head versions.

There is a one to one mapping between workspaces and projects, and each project object has a reference
to the workspace it uses. When a project is created, both a workflow instance and a new workspace
are constructed and mapped to the project. It is the workspace that actually contains the modifications
to the assets. When the project is deployed to a target, the deployment mechanism pulls data from
the workspace to determine what to deploy. After deployment, the workspace is checked in once the
deployment has been approved.

Workspaces can be queried and accessed just like the main branch. Queries against the workspace pull
items from the workspace if they are being modified there, otherwise assets are pulled from the main
branch. So, working in a workspace (working in a project) gives the user the current view of the main
branch plus any changes that have been made in the workspace.

Snapshots
A snapshot is, like the name implies, a snapshot view of the data state on the main branch at a particular
point in time. Snapshots are created when each project/workspace is checked in, to mark the state
when that project was finished. This state is used for full deployments and deployments that revert later
projects.

Snapshots are not normally seen during the use of CA, but they are described here to provide developers
and administrators a better understanding of internal CA operation.

VersionRepository
A VersionRepository is a GSARepository that can manage multiple versions of the same repository asset.
When operations are executed by a VersionManager, such as checking in a workspace, that operation
is ultimately translated into calls in the VersionRepositories that are configured in the VersionManager.
The VersionRepository exposes the same APIs as a SQL Repository, but it requires a project context
be specified in order to execute operations which modify assets. A project context is not needed to view
versioned data.

The VersionRepository implementation stores a separate row in the database for each version of a
particular repository item (asset). Asset versions are numbered starting at 1. In addition, metadata
is stored with each particular version, like the checkin date, previous version, and so on. To present a
view of the data that appears the same as a versionless SQL repository, the VersionRepository modifies
requests to only expose head versions or workspace versions as appropriate. A VersionRepository
automatically creates a wrapped GSARepository which stores the underlying specific versions for each
repository item asset. Usually this Repository has a name ending in "_ver" and can be viewed in the
Nucleus Component Browser. From there, you can run queries to see the underlying version objects that
make up an item. Application code should never access this wrapped repository directly.

Page 8
VersionFileSystem
In addition to repository items, CA can also manage file assets. File assets can be static files which may
be deployed to a web server doc root. Another example of file assets are scenarios, targeters, segments,
slots, etc. These are commonly referred to as the personalization assets. Content Administration has out-
of-the-box components that manage these sorts of files. In addition, it is possible to add components to
manage other sorts of files, for example JSP files.

On the CA server, we manage versioned files by storing them in a VersionRepository, just like
repository item assets. All file assets are stored in /atg/epub/file/PublishingFileRepository.
File assets are exposed via VersionedFileSystems. A VersionFileSystem defines a logical file system
whose assets can be versioned. Personalization assets are managed through the /atg/epub/file/
ConfigFileSystem versioned file system, and web server file assets are managed through /atg/epub/
file/WWWFileSystem. These and any customer-defined versioned file systems all store their data in
the PublishingFileRepository, but provide different views on this data, so that different sorts of files can
be deployed to different destinations. For example, web assets are typically deployed to the web server,
while personalization assets are deployed to the filesystem of the running ATG production servers.

To improve performance and save database space, the actual file data is not stored within the
PublishingFileRepository, but rather on the local filesystem. A specialized property descriptor manages
the storage of this data, making it appear as if the file data resides in the database, despite being stored
on the CA server's filesystem. These files are typically stored in Publishing/versionFileStore in the home
directory. This directory should not be modified directly. Metadata about the file is stored in the database
row associated with the file version.

The VersionManager is aware of all the versioned file systems in CA, in much the same way that it is
aware of the versioned repositories.

Chapter 4 - Deployment
The deployment system in CA is responsible for moving the assets from the CA server to each of the
defined targets. In 2006.3 and later, the /atg/epub/DeploymentServer component is responsible for
assembling the assets that are to be deployed. Once they are assembled, the assets are handed to a
component known as the DeploymentManager which was new in 2006.3. The DeploymentManager is a
component which moves data efficiently between two servers. It replaces the old deployment system
which created manifest files to move data between servers. The DeploymentManager component is part
of the DAF layer.

The DeploymentManager communicates with a software agent on the target system to transfer the assets
to that system.

When a deployment is initiated, the DeploymentServer is responsible for determining which assets need
to be deployed. The DeploymentServer determines which assets need to be moved, using information
from the particular project being deployed: the project data itself and the current snapshot. To determine
what to deploy, a diff is run between the current state of the CA server and what has been previously
deployed to the target. For revert deployments, the diff is simply in the other direction, between the
current state of the target and a previous CA snapshot. Once the DeploymentServer has determined what
assets need to be added, updated, or deleted, the list is handed off to the DeploymentManager, which
actually moves the data.

Full Deployments

A full deployment wipes all the data on the target and reinitializes it. A full deployment will deploy the
target's current snapshot on the main branch, plus data from any still-open projects that had been
previously deployed to the target. Content Administration tracks which targets have received which
snapshots and open project deployments. After a successful full deployment, any irregularities or data
inconsistencies on the target should be gone and the target should be in a stable and known state.

A full deployment is typically used when the state of the target is unknown, due to errors, changes
in configuration, or because the target is new. Some installations run regular (for example nightly
or weekly) full deployments as a backup stability measure, but this is generally not required. Full

Page 9
deployments are usually much slower than incremental deployments, because the entire current data set
must be copied to the target and its agents.

A full deployment can be run instead of a regular incremental deployment during a project workflow.
To do this, choose "approve" instead of "approve and deploy", and then run the full deployment from
the admin console, choosing the project in question from the "To Do" tab and specifying full instead of
incremental deployment. When run this way, the full deployment will incorporate data from the project in
question, and move its workflow forward.

A full deployment can also be run from the target overview page, by clicking the "full deployment"
button. This re-deploys the target data based on the Content Administration server's record of what
snapshot and which projects should be on that target.

One-Off Deployment Targets

So far we have discussed deployments to staging or production targets that happen in the context of
workflows. However, 9.0 introduced another kind of target, the "one-off target". These targets can
receive a special kind of deployment, known as one-off deployments. They cannot be deployed to in the
context of workflows. When creating a target, the user may specify whether the target is a workflow
target or a one-off target.

The primary difference between one-off targets and workflow targets is that CA does not ensure data
integrity on one-off targets. This means that one-off deployments can be performed at any point in the
workflow, and also that one-off deployments do not lock assets. One-off incremental deployments can
be triggered directly from the header of the project overview page. One-off full deployments can be
triggered from the target overview page.

The intended uses of one-off targets are two fold, as test systems and for long term projects. With a one-
off target, a user can quickly get information onto a test server, without making their project non-editable
or worrying about asset locking or other projects. For long term projects, a one-off target may be used
to stage edited assets without locking the assets, allowing other short term projects to continue and be
published to the production site.

At the same time, because one-off targets are not consistent in terms of data, it is not guaranteed that
these targets will behave the same way as production one the project is deployed. For example, if one
user deploys their project to a one-off target, and then a different user immediately deploys an earlier
project with some overlapping assets, some (but perhaps not all) of the first user's changes will not be
present when they are reviewing the one-off target. One-off targets are good for quick tests, but they are
not the final word. For that, it is best to use a staging system or check a preview server.

For this reason, it is important to frequently restore data integrity on one-off targets via full deployments.
Also, it may make sense to divide one-off targets so that only a couple users are working with each one,
to prevent conflicts. Alternatively, separating out user domains (so each user is only working on one
distinct portion of data) may prevent content editors from stepping on each others' toes.

Part II - Implementation

Chapter 5 - Planning a CA Implementation


This next part of the document is meant to serve as a guide for designing and developing a CA server.
It attempts to describe what order things should happen and things to be aware of. It also tries to cover
possible areas of configuration and customization.

The first step in planning a CA implementation is scheduling the appropriate amount of time based on the
complexity of the system. As a point of reference, ATG typically will plan for 1-3 development resources
to work on CA full time for approximately three quarters of the overall production system development
project. Also, work on a CA implementation should begin roughly at the same time as the production
system if possible. If not, the CA rollout should begin as a separate project after the original site has
gone live. A common mistake made during implementation is the assumption that CA is simply an add-on
and will just work. CA is an internally facing application that has users and administrators (sometimes the

Page 10
same person has both roles). Therefore, it also has its set of requirements and should be planned with
a full development cycle, beginning with requirements, then design, implementation, and then tested
similarly to an externally facing site.

The number of resources required also depends on the complexity of the system. Before we can address
that, some initial work needs to be done to gather requirements from the users and assemble use cases.
Other factors may already be known at this point, such as the source of the initial set of data. This is
often another system within the organization.
Given the above, below we list the common types of modifications and customizations which CA users do.
This can be used as a guideline for helping determine time and resources. If any of the items below do
not apply to your implementation, then it will reduce the overall implementation time and resources.

• Configuring custom version repositories and/or file systems


• Building custom workflows to map to your organization's business processes
• Configuring targets other than staging and production in your environment
• Importing initial data into the system
• Building a custom automated import process to import data from an external system for ongoing
updates
• Customizing the user interface for the CA users

Note that information on Customizing the user interface for CA is covered in the Content Administration
Programming Guide and not addressed in this document.

One of the most important things that must be done besides gathering requirements is testing all the use
cases that were gathered at the beginning of the project. This must be done before the CA site goes live.

Where to Start
Initially, there are several things that can occur. These are requirements gathering from the users,
workflow definition, and repository and file system configuration. Workflow definition is only required if
you plan to not use any of the workflows shipped with the product.

The purpose of the requirements gathering is to implement a system that meets the user's needs. The
requirements should consist of use cases that detail the steps exactly as the user would do them.

In the case that the workflows shipped with the product do not meet your business process requirements,
they can be customized, though ATG strongly recommends that any customizations be relatively minimal.
If customization is to occur, it is recommended that the new workflow is created by copying an existing
one and editing it, keeping the overall structure in place. This ensures that the starting point for the
workflow includes ATG's recommendations. Also, ATG strongly recommends that you consult with our
Services or Support departments to validate any workflow changes.

Development Environment
When setting up CA, it is recommended that there be two environments, a development environment and
a production environment. Each environment should contain the CA server(s) and deployment target
servers. The development environment is for the development of the CA application, and deploys to the
target severs in the development environment. Usually, each developer will have their own development
environment. The production CA environment is the system that, during development, is updated to
include new code changes as development work proceeds. This system will ultimately be the one that the
CA users do their work on and that deploys content to the production web site.

Requirements Gathering
The purposes of requirements gathering are to first, assist in building a system which provides
functionality that the users desire. Secondly, it provides a basis for testing the CA application prior
availability.

The actors in this process are the users of the CA application and the system integrator/developers.

The requirements should include use cases. The use cases include all the detail of what the user is trying
to accomplish and what steps they will need to execute in order to complete the task. The requirements

Page 11
and use cases can then be used to determine which portions of CA need to be enhanced and with which
portions integration is required.

Another portion of requirements gathering is to determine the process that the users go through to
publish content. Most organizations use some process to get content onto their sites, however in many
cases that process may not be documented. Once it is documented, the people building out the CA
implementation will have a better understanding of how they will need to adapt CA to the business
processes of the organization.

The Content
Once the initial phase of requirements gathering is complete, the next area to focus on is the content.
This area includes designing and developing the repositories that the content will be found.

Note: One of the most common places that errors begin is in the repository definition file. Many issues
can be prevented by taking care that this file is configured correctly for all repositories. If anything is
misconfigured in the definition file, it often results in an error somewhere down the line. This could be
while a user is modifying an asset or even as late as deployment.

Below is a list of the most common items to check for when validating a repository definition file.

• Data-type correctness, be sure that the data-type and the column match up correctly between the
definition file and the database ddl
• Constraints, be sure that any constraints match up, a common example is that a database column is
marked as NOT NULL, but the associated property is marked as required="false".
• Be sure that for every property that references another item type that the references attribute is
configured for that property:

<property name="myProperty">
<attribute name="references" value="true" data-type="boolean"/>
</property>

• Be sure that the versionable attribute is only set to false on item descriptors which you intend to
not have deployed. Not ensuring this will result in data which you expect to be on the target to be
missing. Also, using this attribute requires that any data which is in a non-versioned item descriptor
to also exist on the target prior to any deployments. This is especially true of versioned items
reference the non-versioned data.

The other type of content aside from repositories are files.

Files sometimes take the form of static content that is deployed to a webserver's doc root. One of the file
systems on the CA server known as the WWWFileSystem represents the files that are to be deployed to
the web server doc root. As this file system is already configured, there is no additional work required to
use the file asset functionality for deploying to a web server's doc root.

Similarly, configuration (for example, properties) files can be managed on the CA server using the
ConfigFileSystem, and then deployed to each of the application server installations on the target. Again,
this is pre-configured with the CA product.

The CA product is not limited to only these uses. In fact, the product can deploy any file content to
any location or to multiple locations on the destination cluster. To do this, it is necessary to create new
types in the PublishingFileRepository and new file system components on the CA server, following the
instructions in the documentation.

The primary consideration for new file systems is where the data will end up once deployed. While all
the file systems store their data in the PublishingFileRepository, the implementation requires a different
file system component for a different directory location on the agent (or across multiple agents).
For example, if you are using CA to manage JSP files in three different web applications, then you
will probably want to create three different file system components on CA to track these files, with
corresponding types in the PublishingFileRepository.

Page 12
Importing the Data
Importing the data into CA can often require additional planning, mainly when faced with a requirement
that data needs be imported on some time interval on a recurring basis. First we begin with the simple
case which is importing the initial data. This is a one time process that occurs when the site is first setup.
The key thing to be aware of here is whether or not any targets have been configured yet. Note: The
preferred way of importing the initial set of data is to do it before any targets have been configured in CA.
By importing data before any targets are created, the system allows for imports directly into workspaces
without needing to create a project. This is not a requirement, but sometimes makes the initial importing
step easier. If you choose to create the targets first, then you can still import data. The one thing that
you will need to be aware of is that you will need to do it within the context of a project. The reason for
this is that once a target is created, it can only recognize changes within a project for deployment.

In order to import within the context of a project, you must be sure that either a project is created as the
import begins or that the assets are imported into an existing project. When using startSQLRepository,
there is a parameter, process, that allow you to specify the name of a new project that will be created for
the assets to be imported into. If you have an existing project that you want to import into, you will need
to find the project's workspace name and use the -workspace parameter. By default, the workspace name
for a project is the string "epub" followed by the project id of the project. For example "epub-prj12345".

If you are using the repositoryLoader, the same concepts apply. In order to specify to the
repositoryLoader that a project should be created at the start of an import, then the createProcesses
property on the /atg/epub/file/VersionedLoaderEventListener should be true (the default is false). Other
properties can also be set here which control various aspects of the import. They are:

* processNamePrefix=Content Administration Import


* appendTimeToProcessName=true
* processDescription=Imported by the RepositoryLoader
* timeFormat=MMMMM dd, yyyy hh:mm:ss aaa
* workflowName=/Content Administration/editAssets.wdl
* userAuthority=/atg/dynamo/security/UserAuthority
* personaPrefix=Admin$user$
* userName=admin
* password=admin
* checkinOnCompletion=true

The above property values are the defaults. For more information on these properties, see the "Importing
Versioned Repository Data" section of the "Repository Loader" chapter of the ATG Repository Guide.

Using an Import Workflow for Automatic Imports

It is possible to use the CA workflow for imports. The way this works is that the import runs against a
project that is in its author stage. Then, users move the workflow through the deployment stages as they
would in a normal project.

However, often customers want to have an automated way to import and deploy data to the targets. To
do this they create an import-specific workflow that skips a number of user approval steps. The source
of the data is often an external system which is responsible for managing said data. Very often, say on
a nightly basis, there is a need for any updates on the external system to propagate to the externally
facing website. In order to get the data to the external site, the requirement is to import the data into CA
and push it to the target. It is fairly common that this data not go through an approval process.

The key to this workflow is building it to have only a single task and outcome when the process runs
without error. Custom code is often written to do the work of importing the data and then firing an
outcome which will cause the assets to be checked in and deployed. The workflow is quite simple when it
runs through the positive (non-error) case and a bit more involved in the case when an error occurs.

Below are sections of a workflow which is specific to automatic imports.

Page 13
The beginning of the import workflow cotains a stage where the import will occur. While their are
outcomes at this stage, they will only be accessed by users if the import workflow fails at some point. The
initial run through will use code to automate the workflow advance.

Because the import needs to be triggered from code, we cannot depend on the usual CA UI for starting
the workflow. Instead, the import code will need to automatically create the process and start the
workflow. Here is example code that does this. We describe each section following the code.

TransactionDemarcation td = new TransactionDemarcation();


boolean rollback = true;
try
{
td.begin(getTransactionManager());
assumeUserIdentity("publishing");
String projectName = getProjectName() + " " + getDateString();
ProcessHome processHome = ProjectConstants.getPersistentHomes().getProcessHome();
Process process = processHome.createProcessForImport(projectName, "/Content
Administration/import.wdl", false);
String wkspName = process.getProject().getWorkspace();
Workspace wksp = getVersionManager().getWorkspaceByName(wkspName);
WorkingContext.pushDevelopmentLine(wksp);
// import specific code goes here
advanceWorkflow();
rollback = false;
}
catch(VersionException e) {
throw e;
}
catch(PublishingException e){
throw e;
}
catch (TransactionDemarcationException e) {
throw e;
}
catch (CreateException e) {
hrow e;
}
catch (WorkflowException e) \
throw e;
}
catch (ActionException e) {
throw e;
}
finally {

Page 14
WorkingContext.popDevelopmentLine();
releaseUserIdentity();
try {
td.end(rollback);
}
catch (TransactionDemarcationException tde) {
throw tde;
}
}

The first thing that happens is that a transaction is created. You will want to do this because if something
fails during the import, rolling back the transaction will revert all the changes and not commit the project
creation.

Next, calling assumeUserIdentity() will allow the thread to assume the security characteristics of a user
defined in the profile repository. Doing this allows for accessing secure resources during the import, such
as the PublishingRepository. This method looks like this:

private boolean assumeUserIdentity(String pUserName) {


if (getUserAuthority() == null)
return false;
User newUser = new User();
Persona persona = (Persona) getUserAuthority().getPersona("Profile$login$" + pUserName);
if (persona == null)
return false;
// create a temporary User object for the identity
newUser.addPersona(persona);
// replace the current User object
ThreadSecurityManager.setThreadUser(newUser);
return true;
}

Now the project is created by getting the object which exposes the API method and calling
createProcessForImport(). It is passed a process name, the workflow that the project is to use. When the
process is created, it creates the underlying workspace, and starts the workflow. The workflow begins
executing immediately and because the first element in it is an action, it is executed. The create project
action will create the process' project object. The workflow will then advance to the next element which is
a task. A task is a wait state which means the workflow will stop and wait here. Once the workflow stops
executing, control is returned back to the createProcessForImport() method and then to the code above.

One last thing must be done before we can start importing repository items and/or files into the CA
system. That is to set the project context. The project context is set on the current thread and tells
the system into what project to make the changes. In order to do this, we need to get the project's
workspace and then call WorkingContext.pushDevelopmentLine(wksp). Note that workspace property on
a project is a workspace name and it must be first resolved against the VersionManager.

At this point any custom code to read data from other systems or files to create, update, or delete assets
is done here. Note that if the import can be very large, that transactions should be batched.

After all the import work is done, we are going to want to advance the workflow. To do this, the
advanceWorkflow() method is called which looks like this:

public static final String TASK_ELEMENT_ID = "4.1.1";

private void advanceWorkflow() {


RepositoryItem processWorkflow = project.getWorkflow();
String processName = processWorkflow.getPropertyValue(PROCESS_NAME).toString();
String subjectId = process.getId();
try {
// an alternative would be to use the global workflow view

Page 15
WorkflowView wv = getWorkflowMANAGER().getWorkflowView (ThreadSecurityManager.currentUser());

wv.fireTaskOutcome(processName, WorkflowConstants.DEFAULT_WORKFLOW_SEGMENT, subjectId,


TASK_ELEMENT_ID, ActionsConstants.ERROR_RESPONSE_DEFAULT);
} catch (MissingWorkflowDescriptionException e) {
throw e;
} catch (ActorAccessException e) {
throw e;
} catch (ActionException e) {
throw e;
} catch (UnsupportedOperationException e) {
throw e;
}
}

In the above code we are programmatically advancing the workflow to the next stage. We do this by
getting a component call the WorkflowView. This component exposes the workflow APIs. It is a session
scoped component. Once we have this object, the fireTaskOutcome() method should be called. The
first three parameters are values that come from the process level workflow, mainly the process name,
segment name, and subject id (the process id). The fourth parameter is the id of the outcome to fire.
In the /Content Administration/import.wdl workflow that id is 4.1.1. You can see the outcome ids by
looking at the workflow manager component at /atg/epub/workflow/process/WorkflowProcessManager
and selecting the workflow you are interested in. The last parameter tells the workflow engine how to
handle errors, and should always be set to ActionConstants.ERROR_RESPONSE_DEFAULT.

When the workflow is advanced, any elements after the outcome will be executed. In this workflow, these
actions would set the editable property to false in the project, check that all the assets are up to date
and no conflicts exist, and then approve and deploy the project to the staging and then production sites.
The approve and deploy action causes the project to be queued for deployment. The deployment actually
occurs in a separate thread in the background.

After starting the deployment to staging, the import workflow waits for the deployment to finish, and then
either proceeds to production in the case of success or returns control to the user in the case of failure.

In the event of failure, the user is given various options to retry the deployment or return to the import
task.

If the deployment is retried, then before advancing the workflow, the user must go to the admin
console (BCC) and stop and cancel the failed deployment. If this is not done, then the next deployment
will get queued but will not start until the current one is stopped. Once either of the retry outcomes

Page 16
are selected, then the project is approved for deployment and the workflow goes back to the
waitForStagingDeploymentToComplete task.

You will notice that there is a returnToImportTask outcome as part of each of these tasks. This is in the
workflow as a way to exit the wait state if a user determines it necessary. For example, if deployment
fails but does not advance the workflow, a user can select it in the BCC and return the workflow to the
Import task and manually retry to advance the workflow. Note that by selecting this outcome, it does not
terminate any previously started deployment that may be running. This option is not designed for normal
use, but only to recover from unexpected events, and should not affect the project beyond changing
state. Note that returning to the import task does not release any asset locks. Once the import has
deployed, it holds locks on the deployed assets until any issues are resolved, even if we return to an
editable state for hand fixes.

The production deployment follows a similar pattern. Once the production deployment completes
successfully, the workflow will continue and the assets will be checked in and the project and process
completed. Note that beyond the initial Import task, assuming everything executes successfully, the
workflow does not require any other manual intervention. In the case of an error occurring, the workflow
is designed to allow a user to interact with it in the BCC to resolve the issue.

Finally, once the import is complete and no errors have occurred, the project context should be unset by
calling WorkingContext.popDevelopmentLine(), the user identity for the thread released. Here is the code
for releaseUserIdentity():

private void releaseUserIdentity()


{
ThreadSecurityManager.setThreadUser(null);
}

Versioned Repositories and File Systems


Repositories and file systems go hand in hand with the VersionManager. Together they all make up the
part of CA which manages all the assets. We often find that the source of issues with CA is because of a
misconfiguration of one of these components. Very often that source is the versioned repository definition
file. This is understandable, given the immense amount of configuration information in it. Because of this,
it will benefit all those designing and testing this product to be very disciplined when modifying this file.

When possible, the structure of the item descriptors should determine the table layout in the database.
By this I mean that if a custom repository is being built, start with defining the repository definition file
and then the table structure will derive itself from that. The reason for this that using specialized schemas
requires additional configuration in the repository definition file. The less specialized configuration
that needs to be defined in the definition file, the less chance of an issue occurring because of
misconfiguration.

In some cases, starting from a repository definition file is not an option. If that is the case, then the
definition file needs to be created from an existing schema. Doing this forces the developer to define item
descriptors which may have specific requirements.

Managing Automated Edits with User Edits - Catalog Structure

In many implementations, there exists the problem of managing automated changes to data and user
changes to data. It is common that the automated changes happen on a set of properties on an item and
the user changes happen on a different set of properties. Because asset conflicts are detected on the item
level and not the property level, the scenario above often causes asset conflicts to occur. The solution to
the asset conflict is to resolve it which can be done easily by users, but not so easily by code.

In order to reduce the chances of a conflict occurring in the scenario above, the solution is to have
the properties that are edited by the automated system in a separate item descriptor type than those
edited by users. By doing this, those edits are done in two separate items and therefore will not cause
a conflict. For example, say a product catalog's product item descriptor is managed both by a user and
an automated import. The automated import manages the display name, description, and price, and the
users manage all the other properties manually. It would be beneficial to create another item descriptor

Page 17
that contains the display name, description, and price properties. We will call this autoProduct. The
product item descriptor would then be modified to contain a reference to the autoProduct item and the
display name, description, and price properties in the product item descriptor would get converted to a
derived property which would pull its values from the autoProduct item.

In the above scenario, when the autoProduct is changed, it will never cause a conflict with the product
item because the changes are made independently of one another and will not cause a conflict. This
design is very common and should be used if there is any concern that an automated import and
deployment will not be able to deploy because of asset conflicts.

VersionManager API

The VersionManager API exposes the method to access versioning related information. This includes
information on versioned assets and information about workspaces. The starting point for the API is the
VersionManager which can be found at /atg/epub/version/VersionManagerService. This component is of
type atg.versionmanager.VersionManager.

The operation that is most often used in the API is getting assets from the VersionManager. Getting an
asset in terms of the VersionManager returns objects such as AssetVersion and WorkingVersion. These
objects contain within them references to the actual version of the repository item or file. From an
AssetVersion, all the versions of a particular asset can be found.

In addition to asset information, the VersionManager API can be used to access workspaces and
therefore be used for tasks such as automated import of data. The operations of interest in a
Workspace are checkout, checkin, reverting changes, getting the set of assets in the workspace, and
getting a specific asset in the workspace. In general, these types of operations are done through the
atg.epub.project.Project object, but it is these lower level objects which contain the actual logic.

Deployment
There are several aspects to CA deployment. There is deploying a project from its workflow, using
the "Admin Console" to deploy and rollback, using the project page to run one-off deployments, and
automatically scheduled deployments. Understanding each of these and how they interact with one
another is key to managing your deployments.

Beginning with workflows, there are two types of actions in the workflows which deploy. They are
"Approve project" and "Approve and deploy project".

The "Approve project" action will approve a project for deployment to a specific target. Approval will lock
the assets in the project. More details on asset locks will be provided later. Approval for deployment will
not actually deploy the projects, but will identify it as being ready for deployment. The project will get
deployed either the next time the RecurringDeploymentService runs, or when manually deployed via the
BCC. The RecurringDeploymentService nucleus component can be found at /atg/epub/deployment/
RecurringDeploymentService. Its purpose is to check for any projects waiting to be deployed and
deploy them. Deployments started by the RecurringDeploymentService are incremental deployments, and
if the target is in an unknown state (requiring a full deployment) these deployments will throw an error.

The other action, "Approve and deploy project" will approve and also initiate the deployment immediately.
Again, deployments kicked off from this workflow action are incremental deployments.

Once a deployment starts, it will send an event on success or failure and the workflow will continue in
either case, once it catches the deployment event. One thing to be aware of when a deployment fails
is that the state of the data on the target is unknown. Some of the data may have been deployed and
committed. If the deployment fails, then the workflow is configured so that it will return to a previous
task.

When this happens, the problems should be addressed in the BCC Admin Console. The Admin Console
has various controls for resuming, stopping, rolling back, or cancelling deployments.

The first thing that happens on deployment failure is that the deployment engine considers automatically
rolling back the deployment. Added in 9.0, the automatic rollback feature will trigger in certain
cases when a deployment fails. Cases where this will not occur are described below. The CA server
immediately attempts to roll the problem deployment back. After a successfull automatic rollback, the

Page 18
deployment remains in a failure state and can be resumed or canceled as needed. Cancelling at this point
will leave the target in a known state and a full deployment will not be required.

Automatic rollback will not happen if the deployment was a full or rollback deployment, or if the
deployment is the second phase of a switched deployment, or if the deployment had already altered more
than a certain number (50,000 by default) of assets. In the case of these large or complex deployments,
it is better if an administrator intervenes before any automatic action. It is possible to turn off automatic
deployments using the DeploymentServer's autoRollbackDeploymentOnFailure property, or modify the
threshold with the autoRollbackCommittedThresholdCount property.

If a deployment is in a failure state (either after a successful automatic rollback, or if automatic rollback
did not run or failed), the Admin Console provides buttons to resume or stop the deployment. Resuming
is the desired first step, and it may fail again or succeed. In the case of success, you can continue
advancing the workflow by selecting the tasks in the BCC to move it forward. If it fails again, then the
deployment must be stopped. After it is stopped, it can be resumed, rolled back or cancelled. Resuming
here is the same as resuming above. A rollback will attempt to revert the state of the target to what
it was before the deployment began. It does this by doing a deployment which will remove any assets
that were added, adding assets that were removed, and setting the values of assets that were updated
back to their previous values. It is possible that the rollback will also fail. If this happens then the entire
deployment must be cancelled and the state on the target must be restored by doing a full deployment to
the target.

Resuming and rolling back a failed deployment are preferable to cancelling the deployment, as the cancel
action will require a full deployment to get the system back into a known state.

If a deployment has failed and the target has ended up in an unknown state, you will need to do a full
deployment to stabilize the target. Go to the "Admin Console" and select the target that failed. Once you
have stopped and cancelled the deployment, click on the "Full Deployment" button on the target status
page to start a full deployment.

Asset Locks

In order to maintain a consistent set of deployed assets on all the targets, CA uses the concept of locking
assets. Assets are locked when a project is approved for deployment to a target. For example, if project
1 contains assets A, B, and C and project 2 contains assets C, D, and F (note the common asset of C),
when project 1 is deployed to its first target, say staging, it is locked so that the deployment of another
project cannot overwrite any changes to any of the assets in project 1. In fact, assets A, B, and C are all
locked. If a user tries to deploy project 2, they will get a message stating that they cannot deploy until
the other project which contains the common assets is unlocked.

After project 1 is deployed to staging and then to production, its assets will remain locked until one of
two things happen. First, if the deployment is verified, the assets are checked in, the locks are released
and the user can then advance the workflow for project 2. The other way asset locks are released is by
reverting the deployed assets off all the targets they were deployed to. Below is an example of a revert
action.

Note that the workflow contains an action to release the asset locks when returning to the author stage.

Starting with 9.0, additional functionality was added to track asset locks. On the project page, there
is now a asset lock tab that lists the other projects that are locking assets in the project being viewed.
Clicking on any one of these projects opens a page which details the particular shared assets. There is
no way to directly unlock the assets from these pages, but a user can navigate to the projects that are
locking the assets and either revert or complete them.

Page 19
The purpose behind asset locks is to ensure data integrity across multiple targets. Without asset locks,
it is possible that different versions of assets are on different targets after all the projects have been
deployed. For example, if project 1 were deployed to staging, then project 2 deployed to staging and
production, and finally project 1 deployed to production, different versions of asset C would be on staging
and production. That is because project 1 was deployed to production last and project 2 was deployed
to staging last. If asset C had a property in it that was changed in both projects, say displayName, then
the displayName would be different on staging and on production. Asset locks ensure that once a project
is deployed to a target, that it is deployed through to all targets before any other project containing
overlapping assets is deployed.

Asset Conflicts

Similar in a way to asset locks, asset conflicts occur when two projects contain the same asset and one
project's assets are checked in before the other project's assets are checked in. In this example, asset A
is checked out into project 1 and 2. Some changes are made in each project to asset A. Project 1 is then
deployed to staging and production and checked in. Once the checkin happens, project 2 will not be able
to be deployed unless the conflict is resolved. The asset listing in the BCC for project 2 will display a link
to allow the asset to be resolved. Clicking this link will bring the user to a page displaying both versions
of the asset from projects 1 and 2. They can then select either version or select which properties from
each version they desire to keep. Once this is done, the conflict is resolved and project 2 can be deployed
and checked in.

It is very important for users to understand asset conflicts; why they happen and how they can be
resolved. It is also important for them to understand that if they can avoid editing a large number of the
same assets in more than one project, it will allow them to avoid resolving large numbers or assets prior
to deployment.

Asset Conflict Resolution

It's important to understand the concept of a workspace (analogous to a project in BCC) before
understanding conflict resolution. A workspace is a little sandbox in which a user makes changes
to versioned assets. Changes being done in one workspace cannot be seen in another workspace.
This means that two users can make changes to an asset without knowing about each other's edits.
VersionManager detects this case and warns the user who is checking in last, of the fact that someone
else has already checked in a change. This is called conflict detection. Internally, conflict detection is
based on the changes to the head version of the asset. Head version is the version currently checked in.
Each version has a reference to its predecessor version. This can be best explained with an example:

The above diagram explains how conflict resolution is detected. V1 was the head of the branch when V2
and V3 were checked out into separate workspaces. Workspaces here are indicated by red (upper half
of drawing) and blue color (lower half). The asset that was checked out in the "blue" workspace was the
first one to be checked in. This caused the head of the branch to become V3 from V1. When an attempt
was made by the "red" workspace to check in, version manager detected that the predecessor version
of the asset V1 is no longer the head of branch, head of branch now is V3; it throws an error asking
the application to resolve this conflict before checking in the project. Conflict resolution is performed by
the application (i.e. BCC). It asks users for which changes to keep from the asset checked in the "blue"
workspace. Note that conflict resolution itself cannot be done in a reliable way by any algorithm since it
involves decision making by a human.

Page 20
Project Dependency Check

In versions prior to 9.0, deployment would be preceded by a dependency check to ensure that projects
were not being deployed out-of-order in a manner which would break data integrity. Due to changes
in 9.0 to remove versioned repository branches, and remove support for early staged workflows, the
dependency check is no longer needed and is not performed.

Online vs Switched Deployments

The two ways to configure your system for deployments are online deployments and switched
deployments (also referred to as switching data sources). An online deployment is one in which the
deployment happens directly on the live database of the target site. With switched deployments, the
deployment of data is done to an offline copy of the database. When it completes, the offline database
becomes the live database and the live database becomes the offline database. At this time, the
deployment is done a second time to the offline database to synchronize the data between the two
databases.

In general, online deployments are good for development environments where the target sites are
not live or used for critical applications. The advantage of using online deployment is that it is quick
to setup and overall deployment time is shorter because the deployment is only executed once. The
disadvantages are that as data is committed to the target site pieces of the data become available during
the deployment. This has the effect of putting the target site in an unknown state during the deployment.
In a development environment this is acceptable because the target site is most likely not being used
for any critical applications. In a production environment however, this is not the preferred approach, as
the site is being accessed by users and if they access data that is partially committed then the result is
unknown. Therefore, online deployments should never be used for a production system.

Another problem with online deployments is that if an online deployment fails, that leaves the target
site in an unknown state usually for an extended period of time while the problem is diagnosed and
a solution is determined. Again, for a development target it is not usually an issue because it is not a
critical system. However, for a production site this is unacceptable, as loss of a production site can have
significant business repercussions.

Switched deployments solve the above mentioned problems for critical systems by doing two things.
First, they make all the deployed data available atomically. This means that all the new data is made
available to the site all at the same time regardless of how much data was moved. Secondly, they provide
the safety net of never touching the live database to deploy data. This provides the insurance that if a
deployment was to fail that the production site would still be live and running in a known state.

Production systems should always use switched deployments regardless of how large or small they are
because they guarantee site availability even if a problem was to occur. Further, systems may periodically
require a full deployment of all the data , and that deployment may take some number of minutes, even
for a small site. With a system configured for online deployments, the site would need to be taken down
during such a deployment. This is because a full deployment first deletes all the data on the target site
and then rewrites it all out to the target site. Because all the data is deleted during a full deployment, the
site will be in an unknown state during that time. A system configured for switched deployments could
run while keeping the site up and available because it will delete all the data on the offline system first,
rewrite it to the target site, and then switch making all the data available at once.

DAF Deployment

In 2006.3, a portion of the deployment system was rewritten to allow it to scale and perform better
than previous versions. This upgrade to the deployment functionality replaced only a portion of CA
deployment. It mainly replaced the portion that moves the data from one server to another, also known
as "manifest deployment." The logic which determines which assets are for deployment has not changed
and remains as part of the CA product.

Rather than packaging the data in a manifest file and sending it to the targets to deploy, for repository
items DAF Deployment makes a connection to the source and destination repositories from the same
server instance and copies the data. For file assets, the source server instance makes socket connections
to the destination server instances and sends the files across.

The PublishingAgent although not used to receive the manifest file any longer, is still required to maintain
the status of the target and also to allow for caches to be invalidated during a deployment.

Page 21
DAF Deployment Scalability and Failover

Another feature to be aware of with DAF Deployment is its ability to scale and distribute the deployment
load across multiple server instances. For example, when two CA server instances are configured in the
same cluster and a deployment is initiated, each of the two instances will request a segment of data
to deploy and then deploy it. They will continue to request segments of data until all of it has been
deployed. By running the CA instances on separate hardware, the data is deployed faster. Note that
additional instances can be started to run the deployments even faster.

Also in the multi-server case, if a non-primary instance (the instance that the deployment was initiated
on) becomes unavailable, the deployment will continue and the work that was assigned to the instance
that is no longer available will be reassigned and restarted.

DAF Deployment Configuration

For the repositories which ship with the product, the majority of the configuration is already done. Two
steps that must be done are to configure the staging and production data sources and to add the staging
and production repositories to the /atg/registry/ContentRepositories.initialRepositories property.

For any custom repositories, users must be aware that there is a repository component configured in
the CA instance for the versioned repository, another for the repository which stores the data for the
staging instance, and a third for the production instance. Each of these are configured to use a separate
data source and a separate client lock manager. Looking at the configuration for a staging or production
repository which ships with the product will give you an idea for the proper configuration.

When a second repository is created to communicate with a database, that component is logically part
of the same cluster as all other repositories of the same type that communicate with the same database.
Because you now have more than one repository that may be reading and writing to/from the database
the cache mode for all the items need to have their cache mode set to be something other than simple.
Locked cache mode will work, but you need to be sure to configure the repositories on the CA server
to communicate with the ServerLockManager on the staging/production server. The correct caching
mode for a given CA deployment will vary depending on the given system. Details on cache modes, and
suggested settings are provided in the Repository Guide, Section 10 SQL Repository Caching. See the
diagram below.

Page 22
In the above diagram, you see that there is a FakeXADataSource_production and
JTDataSource_production components defined which are configured to communicate with the production
server's database. Note that these components are defined in the DAF.Deployment module. In addition, a
ClientLockManager_production is defined to communicate with the ServerLockManager on the production
server instance. This lock manager component and the data source components are configured on the CA
server instance but are logically part of the production server cluster and therefore must be configured
against that server's components.

Appendix
Appendix A - Checklist for Starting a Content Administration
Implementation
Content Administration project fundamentals

• Establish requirements that include both full and incremental deployments for system, which will
occur on an ongoing basis
• A CA project requires appropriate time to execute and must be designed into a site. The web
application cannot be CA enabled in the final week prior to going live. (Should review time
requirements to make application CA ready, functional and tested with Professional Services.)
• CA preparation for an application should begin when the schema, virtual file system and repositories
are all fixed. These three steps should begin very early in the CA project:
1. Build front end application
2. Create versioned modules and go through process of making application ready for CA

Page 23
3. Script the initial CA imports, keep handy if necessary to reinitialize a broken CA environment
4. Test deployments

Spec and review deployment topology

• Review location of file and repository assets


• Keep it simple
• Conduct review of deployment topology and avoid:
° deployment server used as target
° multiple deployment servers deploying to the same target
° changing targets in future

Spec and review any automated import process

• Plan and schedule time for appropriate specification development, development, and testing of tools
• Carefully consider how much is manual, vs. programmatic, vs. automated; consider how workflow
execution happens
• Consider recovery process due to broken imports; what is status of project after broken import?

General Workflow Considerations

• Use OOTB workflows whenever possible


• Spec and test any changes early in CA planning
• Build rollbacks into workflow process
• Need robust and not overly complex workflows
• Workflows are not easily modifiable in production

Spec and review BCC use cases and modifications to standard workflows

• Customize BCC only when business process absolutely requires a change


• Ensure that appropriate business process and checks are in place for deploying assets Avoid
automated deployment workflows, unless a business necessity. Review any automated deployment
workflows to ensure all error conditions are handled appropriately.

Consider recovery and disaster usecases

• Anticipate corruption of Content Administration DB


• Anticipate problems with any automated import process
• Anticipate interesting BCC abuse by end users
• Expect concurrent updating by multiple BCC users including reverts
• Spec and test revert / undo functions
• Try to ensure human recoverable situations that don't require SQL / DB modifications to fix CA -
ensure that workflow allows for delete project after a disaster or other failure

Size the versioned and un-versioned content and establish time estimates for deployment activity

• Determine the update rate estimates (e.g. 1/day) and the number of assets - know what
expectations are for system
• What is the size of file assets?
• What are the time estimates for full and incremental deployment?

Review schema and repositories to ensure they are deployable

• Add references attribute to the repository definition file


• Conduct delete all items test on every repository that has versioned content

Other checks

• Install all required hotfixes for given version of product


• Supported platforms
• Network check, bandwidth, firewalls, general topology
• Ensure customer understands long term technical expertise requirements, CA expertise is essential