1. Background:
established in 1991 and working in 38 countries around the world. It is headquartered in South
Korea. GNI has fundraising offices in the USA, Korea, and Japan, and an International
Cooperation Office in Geneva. GNI currently implements 195 community development projects
(CDPs), covering a variety of areas including rural development, income generation, health,
water, sanitation and hygiene, child education, protection, disaster risk reduction as well as
advocacy and network building to improve the impact of the projects, thereby benefitting
GNI has been working in Nepal since 2002 with the objective of improving lives of poor people,
especially children through education, income generating activities, health services, child
protection, disaster risk reduction, advocacy and network building. Currently, GNI Nepal has
During the time of delivering various services to the community, GNI Nepal has been engaged in
various construction works and school building, ORCs, etc are few among them. After the
massive earthquake on 25th April 015 and 12th May 015, it now seems necessary to build the civil
structures quickly in an cost effective manner that adhere the seismic design and make gender-
disable feel safe. Keeping this view on the mind GNI Nepal has decide to prepare the design of
[1]
various civil structure that would incorporate seismically sound construction (earthquake
resistant) and gender-disable friendly building construction by using the appropriate materials.
structures that replicate the identity of GNI Nepal in construction works within its working
government authorities.
ii. To prepare structural analysis and report of the approved architectural drawings.
iv. To prepare the specification of the materials and methodologies to be used in construction
works.
NOTE: All the prepared design should be cost-effective as they would be implemented mostly in
the hilly areas where the delivery of construction materials are challenging considering
geographical scenario
The design should be based on primary data principally. However, secondary data may be used
wherever needed.
4. Activities :
For preparing the designs and estimates of the building the consultant/firm is expected to use
fitting tools and techniques that ensure quality outputs. The consultant/firm shall:
i. Develop the appropriate typical drawings in consultation with organizational technical team.
iii. Submit the final approved drawings to the organization after getting final approval from
iv. Conduct meetings with GNI Nepal and other relevant stakeholders.
5. Expected Deliverables :
[2]
i. Inception Report with detailed methodology and work schedule within seven days of
contract.
ii. Draft Report with detailed methodology, findings, conclusion, and recommendation.
i. Typical architectural design and detail working drawings for the specific structures.
ii. Structural analysis, report and detail structural drawings of the designs.
Two hard copies and an electronic copy (PDF and DWG format) of the designs and report.
One hard copy and electronic copy (PDF and DWG format) of the designs and report.
One hard copy and electronic copy (PDF and XLSX format) of the detailed estimate.
6. Duration:
The project will start immediately after the agreement signed by both parties and must be
7. Budget:
The consultant shall submit budget sheet with detailed breakdown including applicable taxes at
the time of proposal submission. The budget covers consultancy fee plus travel and
accommodation costs ( in this case) and other applicable budget lines, the amount of which shall
be agreed between GNI Nepal and the consultant. The consultant shall bear all tariffs, duties,
and applicable taxes or charges levied at any stage during the execution of the work. GNI Nepal
will release 30% of the agreed amount upon signing of the contract. Upon receipt of the final
8. Acceptance of Proposal:
All rights to accept/reject proposal without giving any reason, shall be reserved with GNI Nepal.
If deemed necessary, the consultant/firm shall be asked for modifications and presentations of
[3]
10. General Qualification of the consultant/firm
Public, private, and non-governmental organizations/ individuals registered with an authorized
agency of the Government of Nepal and having proven experience in the field of ‘Designing and
Chief architecture shall have at least a Master degree Architecture (preferably PhD holders)
and possess strong working knowledge of design, estimation, structural analysis and
The incumbent shall be responsible for ensuring that the designs are correctly prepared and
reported.
S/he shall have an extensive knowledge in building design and analysis work for rural area.
The Structural Engineer shall have a Master Degree in Structural Engineering and with at
The Civil Engineer shall have a Bachelors Degree in Civil Engineering and with at least three
The Sub Engineer shall have a Diploma in Civil Engineering or Architecture and with at least 3
the delivery of outputs stated above within the agreed budget and timeline.
performance or observance of any of its obligations under this ToR. The consultant/firm shall be
[4]
14. Confidentiality:
During the performance of the assignment or any time after expiry or termination of the
agreement, the consultant/firm or association shall not disclose to any person or otherwise
make use of any confidential information which the consultant/firm or association has obtained
or may obtain in the course of the project to GNI Nepal respondents or otherwise.
15. Copyright:
Copyright of all of the developed documents will remain with GNI Nepal.
Technical Proposal- Concept note of the approach, methodology and work plan,
VAT/PAN registration
Audit report
The EOI should reach the address below via email or post by 16 July, 2017, 17 Hrs. (Nepal Local Time).
Please, enclose the proposal in an envelope, do seal and mark it with “Consultancy Service for the
Email: eoi@gninepal.org
[5]
ANNEX I
List of Designs
School Type
Toilet
Child-friendly DWS
Drinking water
Community tap stands
system
[6]