Beruflich Dokumente
Kultur Dokumente
2019
REGULAR MAINTENANCE SERVICE FOR ALL ELECTRICAL SYSTEM (WORLD BANK PROJECT @ SULE SHANGRILA)
Address: Address:
PRPOSAL SOLUTIONS REGULAR MAINTENANCE SERVICE FOR ELECTRICAL SYSTEM (WORLD BANK PROJECT)
We are hereby pleased to submit the electrical system maintenance proposal as per your request.
We express that the electrical scopes of work in details. If you have any requirements, clarifications and other
documents for that, you can feel free to contact us. And also hope our proposal is in line with your requirement.
Faithfully yours,
……………………………………..
Managing Director
Total
Sr Rate/Month
Description Unit QTY Rate/Year Remark
No: (MMK)
(MMK)
- Wiring System
Maintenance C/W One
3. Times 1 800,000 800,000 Annually
Times Routine Check per
Annual
Discount
1. Condition of Payment
- 10% Down Payment after P.O Received.
- Monthly Claimed the rest 90% of the Contract Amount.
2. Validity Period
- This offer is open for acceptance for one month.
(ii) Power
-Weekly check sockets and power which have enough or not. If no power available, firstly check the
load usage of consumer that equipment which have error or no error then check with socket tester,
phase sequence tester and again test the load.
-Monthly inspect all the consuming socket with tester.
- If in emergency, we will trace the line cable room by room with needed instruments.
(iii) Cable
-Annually re-inspected the continuity test and check visual of cable insulation condition with
checklist, functional test form and also report the photo record.
- If in emergency, we will trace the line cable room by room with needed instruments.
(vi) AVR
-If an error occurs, we will control the situation within an hour as per training. At the same time, for
the major issue we will contact with the supplier and discus with the company how should we
prepare and maintain for that.
-Biannually, recheck the AVR test report as per factory test and cooperate with the AVR
maintenance team of supplier to do the best.
-Mainly, we will follow the O&M.
(vii) Exception
-We will do the maintenance for both floors together with building maintenance teams or after we
inform to building maintenance teams when there is any issue in the system connecting with the
Sule Square Office Building.
(x) Exclusion
- If any additional work, we will charge as per issue by coordinating with the customer (World Bank)
and DAWN.