AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
The above described work was incorporated into this project
Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 01 Dec 2019


Day : Sunday
Work Shift : Day/Night

Dry Temperature 31 o
C
01 Dec 2019
Date

01 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Inspection & Sampling of Rebar of 25 , 32 mm dia
Sampling of Anticarbonation paint .

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 02 Dec 2019


Day : Monday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
02 Dec 2019
Date

02 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Verification of Incoming material for the november month ( Coated & noncoated Reb

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 03 Dec 2019


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
ated & noncoated Rebar) Ankit (ME)
Ankit (ME)

0.0151
03 Dec 2019
Date

03 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 04 Dec 2019


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)

0.0151
04 Dec 2019
Date

04 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 05 Dec 2019


Day : Thursday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)

0.0151
05 Dec 2019
Date

05 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Witness Concrete mix design (CMD-82) for pile & pile cap with combination of flyash a

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 06 Dec 2019


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
ombination of flyash and altrafine Ankit (ME)

0.0151
06 Dec 2019
Date

06 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Inspection of coal tar epoxy application on site

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 07 Dec 2019


Day : Saturday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)

0.0151
07 Dec 2019
Date

07 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
The above described work was incorporated into this project
Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 08 Dec 2019


Day : Sunday
Work Shift : Day/Night

Dry Temperature 31 o
C
08 Dec 2019
Date

08 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Trial mix of Grade -M55 for Pier and pier cap
Sampling of Altra-fine Flyash Ashtech

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 09 Dec 2019


Day : Monday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
09 Dec 2019
Date

09 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 10 Dec 2019


Day : Tuesday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
10 Dec 2019
Date

10 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 11 Dec 2019


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
11 Dec 2019
Date

11 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
sampling of Anti carbonation paint ( M/S MC Bauchmie) India Pvt. Ltd

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 12 Dec 2019


Day : Thursday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
ndia Pvt. Ltd Ankit (ME)

0.0151
12 Dec 2019
Date

12 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 13 Dec 2019


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)

0.0151
13 Dec 2019
Date

13 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 14 Dec 2019


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
14 Dec 2019
Date

14 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Trial mix of CMD-84 Grade -M55 for Pier & Pier cap with JSW+FosrocAuramix 350

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 16 Dec 2019


Day : Monday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
W+FosrocAuramix 350 Ankit (ME)

0.0151
16 Dec 2019
Date

16 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Sampling of Anti Carbonation Paint (M/S BASF)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 17 Dec 2019


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)

0.0151
17 Dec 2019
Date

17 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Concrete mix design (CMD-85) of Grade M-55 for Segment with Flyash & Altratech

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 18 Dec 2019


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
with Flyash & Altratech cement Ankit (ME)

0.0151
18 Dec 2019
Date

18 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Concrete mix design (CMD-86) of Grade M-55 for Pier & Pier Cap with Flyash & Al

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 19 Dec 2019


Day : Thursday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Cap with Flyash & Altratech cement Ankit (ME)

0.0151
19 Dec 2019
Date

19 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 20 Dec 2019


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)

0.0151
20 Dec 2019
Date

20 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 21 Dec 2019


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)

0.0151
21 Dec 2019
Date

21 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal

Interchange

Castingyard

Mainre

Others
The above described work was incorporated into this project
Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 22 Dec 2019


Day : Sunday
Work Shift : Day/Night

Dry Temperature 31 o
C

0.0151
22 Dec 2019
Date

22 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Sampling of 32 mm dia rebar from casting yard ( 3 nos.JSW & 3 nos. Vizag) for
CMD-87 mix design of M-45 for pile and pile cap with flyash.

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 23 Dec 2019


Day : Monday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
SW & 3 nos. Vizag) for third party testing .
h.

0.0151
23 Dec 2019
Date

23 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 24 Dec 2019


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)

0.0151
24 Dec 2019
Date

24 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 25 Nov 2019


Day : Monday
Work Shift : Day/Night

Dry Temperature 31 o
C

0.0151
25 Nov 2019
Date

25 Nov 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 26 Dec 2019


Day : Thursday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)

0.0151
26 Dec 2019
Date

26 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 27 Dec 2019


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
27 Dec 2019
Date

27 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal

Interchange

Castingyard

Mainre

Others
The above described work was incorporated into this project
Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 18 Nov 2019


Day : Monday
Work Shift : Day/Night

Dry Temperature 31 o
C

0.0151
18 Nov 2019
Date

18 Nov 2019
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
The above described work was incorporated into this project
Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 18 Nov 2019


Day : Monday
Work Shift : Day/Night

Dry Temperature 31 o
C

0.0151
18 Nov 2019
Date

18 Nov 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Lab testing (Third Party) witness of 16 mm Steel plate at TCR lab (Mahape)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 30 Dec 2019


Day : Monday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

CR lab (Mahape) Ankit (ME)


Ankit (ME)
Ankit (ME)
30 Dec 2019
Date

30 Dec 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Incoming Steel qty verification for the month of December

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 31 Dec 2019


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)
31 Dec 2019
Date

31 Dec 2019
Date