Sie sind auf Seite 1von 34

Annapurna Rural Municipality

Office of The Rural Municipal Executive


Machhapokhari,Kaski

Bill of Quantities, Rate Analysis and Cost


Estimate of Sanitary Work of
Annapurna Rural Municipality Ward Office :-3 Building

Consultant:
Expert Engineering Consultant
Pokhara Metropolitan City,Kaski
Dordi Rural Municipality
Office Of The Rural Municipality Executive
Nauthar,Sera,Lamjung

Name Of Project: Ward Offices of Annapurna Rural Municipality


Location: Ward No. 3
Sanitary WORKS - BILLS OF QUANTITIES

SN Description of Works Unit Quantity Rate


A For Ground Floor
Providing and fixing in position of all work items with all
necessary fittings complete with testing and ready for
operation as per drawings, specifications, manufacturer's
recommendations and instructions. The rate shall include for
position marking, maintain line, level or grade wherever
required, sand filling/compaction, earth cutting and
backfilling, concrete grouting, benching etc. Cutting,
chasing of walls, plasters or tiles etc. and making good and
touching up to restore to original conditions wherever
instructed and applicable for any of the items below.
Applicable for Part A, B & C.
Sanitaryware: Hindware or Parryware or equivalent
CP fixtures: Hindware/ Jaquar/ Grohe or equivalent
PVC Pipes: Panchakanya/ Nepatop/ Marvel or equivalent

PVC Fittings: Panchakanya/ Nepatop/ Marvel or equivalent

CPVC Pipes and fittings: Marvel/ Mangalam/ Hilltake or


equivalent
Gate Valves: Leader or GG
CP Push Cock: Jal or Viking
Stainless Steel: Grade 304
Mirror: Modiguard or equivalent
HDPE Roof Tank: Nepatop or equivalent Extra Heavy
a SANITARY INSTALLATION
1 Orissa pan 'P' or 'S' trap , with complete set with testing and
set 2 12,176.20
ready for operation
2 White glazed earthernware Under-counter Hand Wash basin
of size 550x430mm square with 15 mm PVC connector with
both ends couplings, 15mm CP angle cock- 1 no, single set 1 10,084.35
lever pillar cock, 32mm PVC bottle trap complete with
testing and ready for operation (for Cold water)
3 CP Paper holder set 2 650.33
4 CP Soap Dish 150x150mm no. 1 593.40
5 CP Commode Spray ISI Mark set 2 5,506.55
6 5 mm thick looking mirror of approved make with CP
mirror screws and clips, size 1200x600mm no. 1 4,653.48
7 75 mm PVC cowl vent No. 1 291.98
Expert Engineering Consultant
Pokhara,kaski 3/34
Er.Bhim Prasad Dahal.
Dordi Rural Municipality
Office Of The Rural Municipality Executive
Nauthar,Sera,Lamjung

Expert Engineering Consultant


Pokhara,kaski 4/34
Er.Bhim Prasad Dahal.
Dordi Rural Municipality
Office Of The Rural Municipality Executive
Nauthar,Sera,Lamjung

b WATER SUPPLY INSTALLATION


1 CPVC pipes SDR 11 including clamps, nails and hooks, and
all necessary CPVC specials required for complete
installation, cutting, jointing, sealing of joints etc,
installation of pipes and specials including making holes on
walls or floor and repairing the same to its original finish,
excavation and backfill in any type of soil. Pipes to be
installed on trenches or walls or floor as per drawings,
specifications and instructions, cleaning of the system,
testing and ready for operation. Measurements to be taken
for running length of pipe installed. The rate shall be
inclusive of all necessary fittings but excluding gate valves
which shall be payable seperately.
- 20 mm dia. 3/4" rm 40 761.88
2 CPVC Ball Valve as shown in the drawing and as instructed
by the Engineer.
- 20 mm dia. no. 2 958.99
c SEWER, RAIN AND WASTE WATER
INSTALLATION
1 PVC pipes including cutting, jointing, sealing with rubber
washer and solvent cement and all necessary rubber ringed
moulded fittings such as Tees, Y-Tees, Bends (with or
without doors), Reducers, Couplers, connector pieces,
offsets etc. for complete installation, PVC clamps, nails and
hooks. Installation of pipes and specials including making
holes on walls or floor and repairing the same to its original
finish, excavation and backfill (compaction as per civil
works specifications) in any type of soil. Pipes to be
installed on trenches or walls or floor or hung to ceilings as
per drawings, specifications and instructions, cleaning of the
system, testing and ready for operation. The rate shall
include for all labour and materials required. The
measurement shall be done for running metre, fittings etc
not payable seperately.
- 75mm 6 kg/cm2 rm 35 720.48
- 110mm 6 kg/cm2 rm 35 699.82
Total amount in Ground Floor :

Expert Engineering Consultant


Pokhara,kaski 5/34
Er.Bhim Prasad Dahal.
Dordi Rural Municipality
Office Of The Rural Municipality Executive
Nauthar,Sera,Lamjung

B For First floor


Providing and fixing in position of all work items with all
necessary fittings complete with testing and ready for
operation as per drawings, specifications, manufacturer's
recommendations and instructions. The rate shall include for
position marking, maintain line, level or grade wherever
required, sand filling/compaction, earth cutting and
backfilling, concrete grouting, benching etc. Cutting,
chasing of walls, plasters or tiles etc. and making good and
touching up to restore to original conditions wherever
instructed and applicable for any of the items below.
Applicable for Part A, B & C.
Sanitaryware: Hindware or Parryware or equivalent
CP fixtures: Hindware/ Jaquar/ Grohe or equivalent
PVC Pipes: Panchakanya/ Nepatop/ Marvel or equivalent

PVC Fittings: Panchakanya/ Nepatop/ Marvel or equivalent

CPVC Pipes and fittings: Marvel/ Mangalam/ Hilltake or


equivalent
Gate Valves: Leader or GG
CP Push Cock: Jal or Viking
Stainless Steel: Grade 304
Mirror: Modiguard or equivalent
HDPE Roof Tank: Nepatop or equivalent Extra Heavy
a SANITARY INSTALLATION
1 Orissa pan 'P' or 'S' trap , with complete set with testing and
set 2 12,176.20
ready for operation
2 White glazed earthernware Under-counter Hand Wash basin
of size 550x430mm square with 15 mm PVC connector with
both ends couplings, 15mm CP angle cock- 1 no, single set 1 10,084.35
lever pillar cock, 32mm PVC bottle trap complete with
testing and ready for operation (for Cold water)
3 CP Paper holder set 2 2,110.00
4 CP Soap Dish 150x150mm no. 1 2,410.00
5 CP Commode Spray set 2 626.50
6 5 mm thick looking mirror of approved make with CP
mirror screws and clips, size 1200x600mm no. 1 4,653.48
7 75 mm PVC cowl vent No. 1 291.98

Expert Engineering Consultant


Pokhara,kaski 6/34
Er.Bhim Prasad Dahal.
Dordi Rural Municipality
Office Of The Rural Municipality Executive
Nauthar,Sera,Lamjung

b WATER SUPPLY INSTALLATION


1 CPVC pipes SDR 11 including clamps, nails and hooks, and
all necessary CPVC specials required for complete
installation, cutting, jointing, sealing of joints etc,
installation of pipes and specials including making holes on
walls or floor and repairing the same to its original finish,
excavation and backfill in any type of soil. Pipes to be
installed on trenches or walls or floor as per drawings,
specifications and instructions, cleaning of the system,
testing and ready for operation. Measurements to be taken
for running length of pipe installed. The rate shall be
inclusive of all necessary fittings but excluding gate valves
which shall be payable seperately.
- 20 mm dia. 3/4" rm 30 761.88
2 CPVC Ball Valve as shown in the drawing and as instructed
by the Engineer.
- 20 mm dia. no. 2 958.99
c SEWER, RAIN AND WASTE WATER
INSTALLATION
1 PVC pipes including cutting, jointing, sealing with rubber
washer and solvent cement and all necessary rubber ringed
moulded fittings such as Tees, Y-Tees, Bends (with or
without doors), Reducers, Couplers, connector pieces,
offsets etc. for complete installation, PVC clamps, nails and
hooks. Installation of pipes and specials including making
holes on walls or floor and repairing the same to its original
finish, excavation and backfill (compaction as per civil
works specifications) in any type of soil. Pipes to be
installed on trenches or walls or floor or hung to ceilings as
per drawings, specifications and instructions, cleaning of the
system, testing and ready for operation. The rate shall
include for all labour and materials required. The
measurement shall be done for running metre, fittings etc
not payable seperately.
- 75mm 6 kg/cm2 rm 35 720.48
Total amount in First Floor :
Grand Total amount :
Contengency 3% :
VAT 13% :
Total amount :

Expert Engineering Consultant


Pokhara,kaski 7/34
Er.Bhim Prasad Dahal.
Dordi Rural Municipality
Office Of The Rural Municipality Executive
Nauthar,Sera,Lamjung

Total Amount

24,352.40

10,084.35

1,300.66
593.40
11,013.10
4,653.48
291.98
Expert Engineering Consultant
Pokhara,kaski 8/34
Er.Bhim Prasad Dahal.
Dordi Rural Municipality
Office Of The Rural Municipality Executive
Nauthar,Sera,Lamjung

Expert Engineering Consultant


Pokhara,kaski 9/34
Er.Bhim Prasad Dahal.
Dordi Rural Municipality
Office Of The Rural Municipality Executive
Nauthar,Sera,Lamjung

30,475.20

1,917.98

25,216.80
24,493.70
134,393.05

Expert Engineering Consultant


Pokhara,kaski 10/34
Er.Bhim Prasad Dahal.
Dordi Rural Municipality
Office Of The Rural Municipality Executive
Nauthar,Sera,Lamjung

24,352.40

10,084.35

4,220.00
2,410.00
1,253.00
4,653.48
291.98

Expert Engineering Consultant


Pokhara,kaski 11/34
Er.Bhim Prasad Dahal.
Dordi Rural Municipality
Office Of The Rural Municipality Executive
Nauthar,Sera,Lamjung

22,856.40

1,917.98

25,216.80
97,256.39
231,649.44
6,949.48
31,017.86
269,616.78

Expert Engineering Consultant


Pokhara,kaski 12/34
Er.Bhim Prasad Dahal.
Kaski Rate Analysis for Sanitary Works 2076/077

580 mm size Orissa pan


sources Level Qty Unit Rate/unit cost Total Cost
labour skilled nos 3 1050.00 3150.00
un skilled nos 3 740.00 2220.00 5370.00
580 mm Porcelain clay white glaze Orissa Pan
(Hindustan, Parryware) nos 1 2000.00 2000.00
P or S trap. nos 1 390.00 390.00
15mm CP Angular Valve nos 1 994.00 994.00
Screw, Nipple, Cap etc 1 300.00 300.00 1294.00
15x450 mm PVC pipe connector nos 1 240.00 240.00 3924.00
Actual rate 10588.00
15% contractor overhead 1588.20
12176.20 Total (Rs.) 12176.20

White glazed earthernware under-counter Hand wash basin complete set. (European for Cold Water)
Particulars Level Unit Qty Rate Amount Total Amount
A. Labour skilled nos 2 1050.00 2100.00
un skilled nos 2 740.00 1480.00 3580.00
Porcelain clay under-counter white glazed Wash
B. Materials basin nos 1 2145.00 2145.00
32 mm PVC bottle trap including 32mm CP waste
coupling with CP chain and rubber plug etc nos 1 260.00 260.00
15 mm CP Pillar Cock nos 1 1250.00 1250.00
1.5x45Cm (½"x18") PVC pipe connector nos 1 240.00 240.00
15mm CP Angular Valve nos 1 994.00 994.00
Screw, Nipple, Cap etc 1 300.00 300.00 2784.00
Total A + B 8769.00
15% contractor overhead 1315.35
10084.35 Grand Total Rs. 10084.35

CP Toilet Paper Holder.


Particulars Level Unit Qty Rate Amount Total Amount
A. Labour skilled nos 0.11 1050.00 115.50 115.50
B. Materials Chrome plate toilet paper holder nos 1 400.00 400.00
Zink oxide screw etc Ls 50.00 450.00
Total A + B 565.50
15% contractor overhead 84.83
650.33 Grand Total Rs. 650.33

CP Soap Dish.
Particulars Level Unit Qty Rate Amount Total Amount
A. Labour skilled nos 0.22 1050.00 231.00 231.00
B. Materials CP Soap dish nos 1 275.00 275.00
Zink oxide screw etc Ls 10.00 285.00
Total A + B 516.00
15% contractor overhead 77.40
593.40 Grand Total Rs. 593.40

CP long body bib cock


Particulars Level Unit Qty Rate Amount Total Amount
A. Labour skilled nos 0.11 1050.00 115.50 115.50
B. Materials CP long body bib cock nos 1 740.00 740.00 740.00
Total A + B 855.50
15% contractor overhead 128.33
983.83 Grand Total Rs. 983.83
13/34
5mm thick Looking Mirror Size 1200x600
Particulars Level Unit Qty Rate Amount Total Amount
A. Labour skilled nos 0.33 1050.00 346.50 346.50
B. Materials Bevelled edge looking Mirror nos 1 3600.00 3600.00
Screws Ls 100.00 3700.00
Total A + B 4046.50
15% contractor overhead 606.98
4653.48 Grand Total Rs. 4653.48

CPVC 20 mm Ball Valve


Particulars Level Unit Qty Rate Amount Total Amount
A. Labour skilled nos 0.11 990.00 108.90 108.90
B. Materials CPVC 20 mm Ball Valve nos 1 725.00 725.00 725.00
Total A + B 833.90
15% contractor overhead 125.09
958.99 Grand Total Rs. 958.99

C.P. Commode Spray


Particulars Level Unit Qty Rate Amount Total Amount
A. Labour skilled nos 0.25 1050.00 262.50
un skilled nos 0.17 740.00 125.80 388.30
B. Materials CP Commode Spray ISI Mark sets 1 4400.00 4400.00 4400.00
Total A + B 4788.30
15% contractor overhead 718.25
5506.55 Grand Total Rs. 5506.55

b) 75mm. OD Pipe (ID 63mm). Unit 1 rmt.


S.No. Particulars Unit Quantity Rate Amount Total Amount
A. Labour Skilled md 0.11 1050.00 115.50
Unskilled md 0.11 740.00 81.40
B. Materials 75mm. OD pipe 6 kg/cm2 rm 1.00 358.00 358.00
PVC fittings @ 25% of pipe cost 89.50
Jointing materials, nails, hooks, clamps etc. LS 179.00 626.50
Total A + B 626.50
15% contractor overhead 93.975
720.48 Grand Total Rs. 720.48

CPVC Pipe SDR 11, 20mm (3/4")


Particulars Level Unit Qty Rate Amount Total Amount
A. Labour skilled nos 0.025 1050.00 26.25
un skilled nos 0.025 740.00 18.50 44.75
B. Materials 20 mm CPVC Pipe SDR 11 Rm 1 353.00 353.00
Cpvc fittings Ls 176.50
Jointing materials (flow guard adesive soln) Ls 88.25 617.75
Total A + B 662.50
15% contractor overhead 99.38
761.88 Grand Total Rs. 761.88

14/34
Page 15/34
Rate Analysis for Sanitary Works

White glazed earthernware European close coupled Water Closet


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 3 1050.00 3150.00
un skilled nos 3 740.00 2220.00
Porcelain clay white glazed 'P' trap camode nos 1 14300.00 14300.00
B. Materials 15mm CP Angular Cock nos 1 994.00 994.00
15 mm PVC connector nos 1 200.00 200.00
Screw, Nipple, Cap etc 1 300.00 300.00
Total A + B
15% contractor overhead
Rate per set Rs. 24338.6 Grand Total Rs.

580 mm size Orissa pan


sources Level Qty Unit Rate/unit cost
labour skilled nos 3 1050.00 3150.00
un skilled nos 3 740.00 2220.00
580 mm Porcelain clay white glaze Orissa Pan
(Hindustan, Parryware) nos 1 2000.00 2000.00
P or S trap. nos 1 390.00 390.00
15mm CP Angular Valve nos 1 994.00 994.00
Screw, Nipple, Cap etc 1 300.00 300.00
15x450 mm PVC pipe connector nos 1 240.00 240.00
Actual rate
15% contractor overhead
Rate per set Rs. 12176.20 Total (Rs.)

White glazed earthernware Wall-hung Hand wash basin complete set. (European for Hot/Cold Water)
Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 2 1050.00 2100.00
un skilled nos 2 740.00 1480.00
Porcelain clay wall-hung white glazed Wash basin
B. Materials nos 1 4219.00 4219.00
32 mm PVC bottle trap including 32mm CP waste
coupling with CP chain and rubber plug etc nos 1 260.00 260.00
15 mm CP Basin mixer nos 1 6794.00 6794.00
1.5x45Cm (½"x18") PVC pipe connector nos 2 240.00 480.00
15mm CP Angular Valve nos 2 994.00 1988.00
Screw, Nipple, Cap etc 1 300.00 300.00
Total A + B
15% contractor overhead
Rate per set Rs. 20264.15 Grand Total Rs.

White glazed earthernware under-counter Hand wash basin oval model complete set. (European for Hot/Cold Water)
Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 2 1050.00 2100.00
un skilled nos 2 740.00 1480.00
Porcelain clay under-counter white glazed Wash
B. Materials basin nos 1 4000.00 4000.00
32 mm PVC bottle trap including 32mm CP waste
coupling with CP chain and rubber plug etc nos 1 260.00 260.00
15 mm CP Basin mixer nos 1 6794.00 6794.00
1.5x45Cm (½"x18") PVC pipe connector nos 2 240.00 480.00
15mm CP Angular Valve nos 2 994.00 1988.00
Screw, Nipple, Cap etc 1 300.00 300.00
Total A + B
15% contractor overhead
Rate per set Rs. 20012.30 Grand Total Rs.
Page 16/34
White glazed earthernware Wall-hung Hand wash basin complete set. (European for Cold Water)
Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 2 1050.00 2100.00
un skilled nos 2 740.00 1480.00
Porcelain clay wall-hung white glazed Wash basin
B. Materials nos 1 2750.00 2750.00
32 mm PVC bottle trap including 32mm CP waste
coupling with CP chain and rubber plug etc nos 1 260.00 260.00
15 mm CP Pillar Cock nos 1 1250.00 1250.00
1.5x45Cm (½"x18") PVC pipe connector nos 1 240.00 240.00
15mm CP Angular Valve nos 1 994.00 994.00
Screw, Nipple, Cap etc 1 300.00 300.00
Total A + B
15% contractor overhead
Rate per set Rs. 10780.10 Grand Total Rs.

White glazed earthernware under-counter Hand wash basin complete set. (European for Cold Water)
Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 2 1050.00 2100.00
un skilled nos 2 740.00 1480.00
Porcelain clay under-counter white glazed Wash
B. Materials basin nos 1 3036.00 3036.00
32 mm PVC bottle trap including 32mm CP waste
coupling with CP chain and rubber plug etc nos 1 260.00 260.00
15 mm CP Pillar Cock nos 1 1250.00 1250.00
1.5x45Cm (½"x18") PVC pipe connector nos 1 240.00 240.00
15mm CP Angular Valve nos 1 994.00 994.00
Screw, Nipple, Cap etc 1 300.00 300.00
Total A + B
15% contractor overhead
Rate per set Rs. 11109.00 Grand Total Rs.

White glazed Large flat back Urinal with Push Cock


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 3 1050.00 3150.00
un skilled nos 2 740.00 1480.00
Large Flat back White glazed urinal with brackets
B. Materials nos 1 1300.00 1300.00
CP Push Cock, spreader nos 1 1450.00 1450.00
Screw, Nipple, Cap etc 1 200.00 200.00
Total A + B
15% contractor overhead
Rate per set Rs. 10419 Grand Total Rs.

White glazed Division Plate for Urinal.


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.5 1050.00 525.00
un skilled nos 0.5 740.00 370.00
B. Materials White glazed Division plate for urinal nos 1 2440.00 2440.00
screw etc Ls 120.00
Total A + B
15% conctractor overhead
Rate per set Rs. 3973.25 Grand Total Rs.

Kitchen Sink single bowl stainless steel


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 2 1050.00 2100.00
un skilled nos 1 740.00 740.00
B. Materials Stainless steel single bowl sink sets 1 3100.00 3100.00
Sink cock nos 1 1450.00 1450.00
Page 17/34
PVC bottle trap with 32mm Dia CP waste coupling
with CP chain and rubber. nos 1 260.00 260.00
1.5x45Cm (½"x18") PVC pipe connector nos 1 240.00 240.00
Zink Oxide screw etc nos LS 25.00 25.00
15mm CP Angular Valve nos 1 994.00 994.00
Total A + B
15% contractor overhead
Rate per set Rs. 10245.35 Grand Total Rs.

15mm CP Shower Rose


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 1 1050.00 1050.00
un skilled nos 1 740.00 740.00
B. Materials Shower rose with bath mixer, spout nos 1 8450.00 8450.00

Total A + B
15% conctractor overhead
Rate per set Rs. 11776.00 Grand Total Rs.

CP Toilet Paper Holder.


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.11 1050.00 115.50
B. Materials Chrome plate toilet paper holder nos 1 445.00 445.00
Zink oxide screw etc Ls 10.00
Total A + B
15% contractor overhead
Rate per nos Rs. 656.08 Grand Total Rs.

CP Soap Dish.
Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.11 1050.00 115.50
B. Materials CP Soap dish nos 1 350.00 350.00
Zink oxide screw etc Ls 10.00
Total A + B
15% contractor overhead
Rate per nos Rs. 546.83 Grand Total Rs.

CP long body bib cock


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.11 1050.00 115.50
B. Materials CP long body bib cock nos 1 750.00 750.00
Total A + B
15% contractor overhead
Rate per nos Rs. 995.33 Grand Total Rs.

C P towel rod 1.5x60cm (½"x 24.")


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.22 1050.00 231.00
B. Materials a. CP Towel rod nos 1 690.00 690.00
Screws etc Ls 10.00
Total A + B
15% contractor overhead
Rate per nos Rs. 1070.65 Grand Total Rs.

C P Grab Bar -Rear


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.22 1050.00 231.00
B. Materials CP Grab Bar - Rear nos 1 2100.00 2100.00
Page 18/34
Screws etc Ls 10.00
Total A + B
15% contractor overhead
Rate per nos Rs. 2692.15 Grand Total Rs.

C P Grab Bar -Side


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.22 1050.00 231.00
B. Materials CP Grab Bar - Side nos 1 2400.00 2400.00
Screws etc Ls 10.00
Total A + B
15% contractor overhead
Rate per nos Rs. 3037.15 Grand Total Rs.

5mm thick Looking Mirror Size 1200x600


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.33 1050.00 346.50
B. Materials Bevelled edge looking europen pattern nos 1 3600.00 3600.00
Screws Ls 100.00
Total A + B
15% contractor overhead
Rate per nos Rs. 4653.48 Grand Total Rs.

5mm thick Looking Mirror Size 900*600


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.33 1050.00 346.50
B. Materials Bevelled edge looking europen pattern nos 1 2850.00 2850.00
Screws Ls 100.00
Total A + B
15% contractor overhead
Rate per nos Rs. 3790.98 Grand Total Rs.

CPVC 15 mm Ball Valve


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.11 1050.00 115.50
B. Materials CPVC 15 mm Ball Valve nos 1 529.00 529.00
Total A + B
15% contractor overhead
Rate per nos Rs. 741.18 Grand Total Rs.

CPVC 20 mm Ball Valve


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.11 1050.00 115.50
B. Materials CPVC 20 mm Ball Valve nos 1 725.00 725.00
Total A + B
15% contractor overhead
Rate per nos Rs. 966.58 Grand Total Rs.

CPVC 25 mm Ball Valve


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.22 1050.00 231.00
B. Materials CPVC 25 mm Ball Valve nos 1 1150.00 1150.00
Total A + B
15% contractor overhead
Rate per nos Rs. 1588.15 Grand Total Rs.

CPVC 32 mm Ball Valve


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.22 1050.00 231.00
B. Materials CPVC 32 mm Ball Valve nos 1 1950.00 1950.00
Page 19/34
Total A + B
15% contractor overhead
Rate per nos Rs. 2508.15 Grand Total Rs.

CPVC 40 mm Ball Valve


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.33 1050.00 346.50
B. Materials CPVC 40 mm Ball Valve nos 1 3410.00 3410.00
Total A + B
15% contractor overhead
Rate per nos Rs. 4319.97 Grand Total Rs.

CPVC 50 mm Ball Valve


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.33 1050.00 346.50
B. Materials CPVC 50 mm Ball Valve nos 1 5232.75 5232.75
Total A + B
15% contractor overhead
Rate per nos Rs. 5579.25 Grand Total Rs.

PVC Multi Floor Trap


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.11 1050.00 115.50
un skilled nos 0.10 740.00 74.00
B. Materials Multi floor Trap nos 1 460.00 460.00
Total A + B
15% contractor overhead
Rate per nos Rs. 649.50 Grand Total Rs.

Rain inlet with SS jali


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.11 1050.00 115.50
un skilled nos 0.10 740.00 74.00
B. Materials Floor Trap nos 1 120.00 120.00
SS jali nos 1 600.00 600.00
Total A + B
15% contractor overhead
Rate per nos Rs. 909.50 Grand Total Rs.

110mm PVC vent cowl


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.11 1050.00 115.50
un skilled nos 0.10 740.00 74.00
B. Materials Vent Cowl nos 1 88.00 88.00
Total A + B
15% contractor overhead
Rate per nos Rs. 277.50 Grand Total Rs.

75mm PVC vent cowl


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.11 1050.00 115.50
un skilled nos 0.10 740.00 74.00
B. Materials Vent Cowl nos 1 53.00 53.00
Total A + B
15% contractor overhead
Rate per nos Rs. 242.50 Grand Total Rs.

110mm DWV Cleanout


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.11 1050.00 115.50
Page 20/34
un skilled nos 0.10 740.00 74.00
B. Materials 110 mm Cleanout nos 1 750.00 750.00
Total A + B
15% contractor overhead
Rate per nos Rs. 939.50 Grand Total Rs.

C.P. Commode Spray


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.25 1050.00 262.50
un skilled nos 0.17 740.00 125.80
Commode spray (Health faucetc) with 1.2 m. long
B. Materials
flexible pipe sets 1 1950.00 1950.00
Total A + B
15% contractor overhead
Rate per No Rs. 2689.05 Grand Total Rs.

2000 liters Plastic roof tank. Unit 1 set.


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 5 1050.00 5250.00
un skilled nos 5 740.00 3700.00
B. Materials 2000 liters Plastic roof tank nos 1 24000.00 24000.00
Inter-connections pipe and fittings @ 10% of material cost 2400.00
Total A + B
15% contractor overhead
Rate per Rm Rs. 40652.50 Grand Total Rs.

UPVC pipe including necessary specials, excavation and backfill for trenches,
making holes, repairing holes etc. on floor or wall, testing and ready for operation.
a) 50mm. OD Pipe (ID 40mm). Unit 1 rmt.
S.No. Particulars Unit Quantity Rate Amount
A. Labour Skilled md 0.06 1050.00 63.00
Unskilled md 0.10 740.00 74.00
B. Materials 50mm. OD pipe 6 kg/cm2 rm 1.00 298.00 298.00
PVC fittings @ 30% of pipe cost 89.40
Jointing materials, nails, hooks, clamps etc. LS 149.00
Total A + B
15% contractor overhead
Rate per Rm Rs. 616.86 Grand Total Rs.

b) 75mm. OD Pipe (ID 63mm). Unit 1 rmt.


S.No. Particulars Unit Quantity Rate Amount
A. Labour Skilled md 0.11 1050.00 115.50
Unskilled md 0.11 740.00 81.40
B. Materials 75mm. OD pipe 6 kg/cm2 rm 1.00 358.00 358.00
PVC fittings @ 25% of pipe cost 89.50
Jointing materials, nails, hooks, clamps etc. LS 179.00
Total A + B
15% contractor overhead
Rate per Rm Rs. 720.48 Grand Total Rs.

c) 110mm. OD Pipe (ID 100mm). Unit 1 rmt.


S.No. Particulars Unit Quantity Rate Amount
A. Labour Skilled md 0.17 1050.00 178.50
Unskilled md 0.20 740.00 148.00
B. Materials 110mm. OD pipe 6 kg/cm2 rm 1.00 746.00 746.00
PVC fittings @ 20% of pipe cost 149.20
Jointing materials, nails, hooks, clamps etc. LS 373.00
Total A + B
15% contractor overhead
Page 21/34
Rate per Rm Rs. 1458.43 Grand Total Rs.

d) 160mm. OD Pipe (ID 100mm). Unit 1 rmt.


S.No. Particulars Unit Quantity Rate Amount
A. Labour Skilled md 0.17 1050.00 178.50
Unskilled md 0.20 740.00 148.00
B. Materials 160mm. OD pipe 6 kg/cm2 rm 1.00 1,772.20 1,772.20
PVC fittings @ 25% of pipe cost 443.05
Jointing materials, nails, hooks, clamps etc. LS 886.10
Total A + B
15% contractor overhead
Rate per Rm Rs. 3566.55 Grand Total Rs.

e) 200mm. OD Pipe (ID 100mm). Unit 1 rmt.


S.No. Particulars Unit Quantity Rate Amount
A. Labour Skilled md 0.20 1050.00 210.00
Unskilled md 0.25 740.00 185.00
B. Materials 200mm. OD pipe 6 kg/cm2 rm 1.00 3,201.00 3,201.00
PVC fittings @ 25% of pipe cost 800.25
Jointing materials, nails, hooks, clamps etc. LS 1,600.50
Total A + B
15% contractor overhead
Rate per Rm Rs. 6442.01 Grand Total Rs.

160mm. ED-HDPE Pipe 6 kg/cm2. Unit 1 rmt.


S.No. Particulars Unit Quantity Rate Amount
A. Labour Skilled md 0.11 1050.00 115.50
Unskilled md 0.11 740.00 81.40
Unskilled for excavation/backfill/chipping md 0.56 680.00 380.80
B. Materials 63mm. OD pipe 6 kg/cm2 rm 1.00 1,338.75 1,338.75
HDPE fittings @ 10% of pipe cost 133.88
Jointing materials, nails, hooks, clamps etc. LS 267.75
Total A + B
15% contractor overhead
Rate per Rm Rs. 2665.79 Grand Total Rs.

CPVC Pipe SDR 11, 15mm (1/2")


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.025 1050.00 26.25
un skilled nos 0.025 740.00 18.50
B. Materials 15 mm CPVC Pipe SDR 11 Rm 1 226.00 226.00
Cpvc fittings Ls 113.00
Jointing materials (flow guard adesive soln) Ls 56.50
Total A + B
15% contractor overhead
Rate per Rm Rs. 506.29 Grand Total Rs.

CPVC Pipe SDR 11, 20mm (3/4")


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.025 1050.00 26.25
un skilled nos 0.025 740.00 18.50
B. Materials 20 mm CPVC Pipe SDR 11 Rm 1 353.00 353.00
Cpvc fittings Ls 176.50
Jointing materials (flow guard adesive soln) Ls 88.25
Total A + B
15% contractor overhead
Rate per Rm Rs. 761.88 Grand Total Rs.

CPVC Pipe SDR 11, 25mm (1")


Page 22/34
Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.03 1050.00 31.50
un skilled nos 0.03 740.00 22.20
B. Materials 25 mm CPVC Pipe SDR 11 Rm 1 517.00 517.00
Cpvc fittings Ls 258.50
Jointing materials (flow guard adesive soln) Ls 129.25
Total A + B
15% contractor overhead
Rate per Rm Rs. 1102.22 Grand Total Rs.

CPVC Pipe SDR 11, 32mm (1 1/4")


Particulars Level Unit Qty Rate Amount
A. Labour skilled nos 0.04 1050.00 42.00
un skilled nos 0.04 740.00 29.60
B. Materials 32 mm CPVC Pipe SDR 11 Rm 1 769.00 769.00
Cpvc fittings Ls 384.50
Jointing materials (flow guard adesive soln) Ls 192.25
Total A + B
15% contractor overhead
Rate per Rm Rs. 1629.95 Grand Total Rs.
Page 23/34

Total Amount

5370.00

15794.00
21164.00
3174.60
24338.60

Total Cost

5370.00

1294.00
3924.00
10588.00
1588.20
12176.20

Water)
Total Amount

3580.00

9562.00
17621.00
2643.15
20264.15

an for Hot/Cold Water)


Total Amount

3580.00

9562.00
17402.00
2610.30
20012.30
Page 24/34
ter)
Total Amount

3580.00

2784.00
9374.00
1406.10
10780.10

Water)
Total Amount

3580.00

2784.00
9660.00
1449.00
11109.00

Total Amount

4630.00

4430.00
9060.00
1359.00
10419.00

Total Amount

895.00

2560.00
3455.00
518.25
3973.25

Total Amount

2840.00
Page 25/34

6069.00
8909.00
1336.35
10245.35

Total Amount

1790.00

8450.00
10240.00
1536.00
11776.00

Total Amount
115.50

455.00
570.50
85.58
656.08

Total Amount
115.50

360.00
475.50
71.33
546.83

Total Amount
115.50
750.00
865.50
129.83
995.33

Total Amount
231.00

700.00
931.00
139.65
1070.65

Total Amount
231.00
Page 26/34
2110.00
2341.00
351.15
2692.15

Total Amount
231.00

2410.00
2641.00
396.15
3037.15

Total Amount
346.50

3700.00
4046.50
606.98
4653.48

Total Amount
346.50

2950.00
3296.50
494.48
3790.98

Total Amount
115.50
529.00
644.50
96.68
741.18

Total Amount
115.50
725.00
840.50
126.08
966.58

Total Amount
231.00
1150.00
1381.00
207.15
1588.15

Total Amount
231.00
1950.00
Page 27/34
2181.00
327.15
2508.15

Total Amount
346.50
3410.00
3756.50
563.47
4319.97

Total Amount
346.50
5232.75
5579.25
0.00
5579.25

Total Amount

189.50
460.00
649.50
0.00
649.50

Total Amount

189.50

720.00
909.50
0.00
909.50

Total Amount

189.50
88.00
277.50
0.00
277.50

Total Amount

189.50
53.00
242.50
0.00
242.50

Total Amount
Page 28/34
189.50
750.00
939.50
0.00
939.50

Total Amount

388.30

1950.00
2338.30
350.75
2689.05

Total Amount

8950.00

26400.00
35350.00
5302.50
40652.50

Total Amount

536.40
536.40
80.46
616.86

Total Amount

626.50
626.50
93.975
720.48

Total Amount

1268.20
1268.20
190.23
Page 29/34
1458.43

Total Amount

3101.35
3101.35
465.2025
3566.55

Total Amount

5601.75
5601.75
840.2625
6442.01

Total Amount

577.70

1740.38
2318.08
347.712
2665.79

Total Amount

44.75

395.50
440.25
66.04
506.29

Total Amount

44.75

617.75
662.50
99.38
761.88
Page 30/34
Total Amount

53.70

904.75
958.45
143.77
1102.22

Total Amount

71.60

1345.75
1417.35
212.60
1629.95
KASKI District Rate 2076/2077
Table of Content
Sanitary Analysis 2076/077

S.No Description Rs. Rate


1000 skilled 1050.00
1001 Un skilled 740.00
1002 Labour 740.00
580 mm Porcelain clay white glaze Orissa Pan complete set.
1003 Rs. 14231.25
1005 530mm Orissa pan with low level cistern complete set …………… Rs. 13000.75
1006 CP Commode Spray ISI Mark Rs. 4400.00
1007 Toilet Paper Holder Rs. 400.00
1008 Wash basin Rs. 1430.00
1009 CP Soap dish Rs. 275.00
1010 580mm Orissa pan complete set ………………………….………... Rs. 4887.50
1011 10.0 Ltr. Low level Porceline glazed cistern complete set … Rs. 9343.75
1012 10.0 Ltr. Low level PVC cistern complete set ………………… Rs. 7802.75
1018 55x40cm Oval Wash basin with mixer complete set ………. Rs. 11320.60
1019 55x40cm Oval Wash basin Euorpean pattern complete set ……… Rs. 11700.10
1020 55x40cm Wash basin Euorpean pattern (cotto) complete set …… Rs. 14331.30
1021 55x40cm Wash basin constallation type 1st color complete set Rs. 9758.80
1022 55x40cm Wash basin with mixer and Pedestal complete set …… Rs. 13214.90
1023 55x40cm Wash basin complete set ………………………….……….. Rs. 9508.20
1024 40x40cm Corner Wash basin complete set ……………………… Rs. 8727.35
1063 Looking mirror 55x40cm size ………………………………………….. Rs. 1272.47
1064 Looking Mirror Modi guard 450x600mm (18"x 24") Rs. 2091.85
1065 Looking mirror 50x40cm size ………………………………………...… Rs. 1157.47
1066 Looking mirror 4 MM (16"*20")………. Rs. 660.00
1074 C P 15 mm bib cock ordinary type ……………………………………… Rs. 880.32
1077 C.P. 15mm Angle valve European pattern Rs. 1563.42
1078 C P 15 mm Angle valve ordinary type ………………………………… Rs. 1563.42
1079 15mm two way angle valve Rs. 1455.32
1107 15mm dia. G I pipe ( Medium ) …………………………………………. Rs. 603.06
1108 20mm dia. G I pipe ( Medium ) …………………………………………. Rs. 662.86
1109 25mm dia. G I pipe ( Medium ) …………………………………………. Rs. 947.37
1110 32mm dia. G I pipe ( Medium ) …………………………………………. Rs. 1085.37
1111 40mm dia. G I pipe ( Medium ) …………………………………………. Rs. 1279.14
1112 50mm dia. G I pipe ( Medium ) …………………………………………. Rs. 1520.64
1113 80mm dia. G I pipe ( Medium ) ………………………………………….. Rs. 2053.09
1118 50 mm PVC Pipe 4 kg/cm2. ………………………………….………...…….. Rs. 127.00
1119 75 mm PVC pipe 4 kg\cm2. ……. ………………………………………...……... Rs. 270.00
1120 110 mm PVC Pipe 4 kg\cm . ……. …………………………………...……..…..
2
Rs. 400.00
1128 15mm CP Bath spout Euorpean pattern( American st.) Cotto Rs. 2356.73
1129 Sensor mixer for basin (Battery operating) Rs. 24858.40
1130 C P Sink mixture ………………………………………………….. Rs. 4456.82
1131 C I cover 45x45cm ( medium ) ………………………………….. Rs. 3087.17

31/34
1132 C I cover 55x55cm (medium ) ………………………………….. Rs. 3869.17
1146 CP Water Spray 1.5cm ……………………………………………… Rs. 1481.54
1148 4 Kg/cm2, High Density Polethene Pipe 50mm ………………… Rs. 488.49
1149 Rs.
4 kg\cm (110 mm) HDP pipe ………………………………………………………………..
2
190.00
1150 4 kg\cm2 (125 mm) HDP pipe ………………………………………………………………..
Rs. 1059.88
1151 Rs. 1288.28
4 kg\cm2 (140mm) HDP pipe ………………………………………………………………..
1152 4 kg\cm (150mm) HDP pipe ………………………………………………………………..
2
Rs. 1667.44
1153 4 kg\cm2 (180mm) HDP pipe ………………………………………………………………..
Rs. 2193.05
1154 4 kg\cm (200mm) HDP pipe ………………………………………………………………..
2
Rs. 2722.62
1160 15 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 Rs. 369.49
1161 20 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 Rs. 500.94
1162 25 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 Rs. 679.54
1163 32 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 Rs. 940.36
1164 40 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 Rs. 1255.00
1165 50 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 Rs. 2015.73
1166 15 mm CPVC ball valve, CTS sockets, ………………………… Rs. 762.51
1167 20 mm CPVC ball valve, CTS sockets, ………………………… Rs. 966.05
1168 25 mm CPVC ball valve, CTS sockets, …………………………. Rs. 1306.58
1169 32 mm CPVC ball valve, CTS sockets, …………………………. Rs. 2447.09
1170 40 mm CPVC ball valve, CTS sockets, …………………………. Rs. 3356.90
1171 50 mm CPVC ball valve, CTS sockets, …………………………. Rs. 4794.62
1191 UPVC Bend Specials
1195 75 mm Vent cowl………………………………………………………… Rs. 228.11
1199 75 mm Door bend………………………………………………………… Rs. 362.46
1200 75 mm Bend 45 degree……………………………………………… Rs. 284.37
1214 Cast Iron fittings Specials
1223 75 mm Vent cowl………………………………………………………… Rs. 541.96
1225 75 mmTrap p or s………………………………………………………… Rs. 654.66
1230 110 mmVent cowl………………………………………………………… Rs. 722.51

32/34
Per
Nos
Nos
Nos

Set
Set
nos
nos
nos
nos
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
nos
nos
nos
nos
nos
nos
nos
nos
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
nos
nos
nos
nos

33/34
nos
nos
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
nos
nos
nos
nos
nos
nos

nos
nos
nos

nos
nos
nos

34/34